Military Engineer Services Tender
View complete overview of Goa MES Tender
Costs
EMD
₹ 90,000Document Cost
₹ 500Tender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2025_MES_693012_1Tender No
85914/E8Tender Authority
Military Engineer Services ViewPurchaser Address
-Website
http://http://mes.gov.in/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
BOQ Items
... More
Comprehensive Maint. of Lifts including Checking daily its smooth functioning and greasing to all movable parts and wire ropes once in a fortnight replacing the worn out Electrical and mechanical parts complete all as directed by Engineer – in –Charge suitable to electric passenger cum goods lift of single speed capacity 2000 Kgs catering to two floors ground and Ist floor installed in Air Store Building at NAY (G).
11
-
-
... More
Notes: (a). Tenderer shall visit the site and study the condition for each lifts before quoting.
-
-
-
... More
(b). The rates quoted shall be deemed to include for periodical checking / Maint as mentioned in P.S.
-
-
-
... More
(c). For the purpose of RAR payment rate will be worked out proportionally for the number of days actually worked but Sunday and holidays shall not be deducted for payment purpose.
-
-
-
... More
(d). Contractor shall hand over all the lifts/cranes to AGE E/M-I in serviceable condition after completion contract period.
-
-
-
... More
(e). Electricity required for testing of lifts shall be provided free of cost.
-
-
-
... More
(f) Replacement of spare will be paid under schedule A vide supply only rates.
-
-
-
... More
Supply & Fix Micro processor for lift controller complete all as specified and as directed.
2
-
-
... More
Supply & Fix PCB position indicator signal PCB complete all as specified and as directed.
2
-
-
... More
Supply only brake liner suitable for 2-5 Ton capacity lift/crane to match the existing one complete all as specified and as directed.
4
-
-
... More
Supply and fix in replacement Limit switches, protective device to stop lift at terminal floors during over travel complete all as specified and as directed.
8
-
-
... More
M&L for gate lock interlock swithc for every landing gate and car gate including voice card speaker etc complete all as specified and as directed.
6
-
-
... More
Supply only indicator for lamp assembly LED pilot lighting complete suitable for ECE lifts upto 2 ton capacity complete all as specified and as directed.
4
-
-
... More
Supply and fix in replacement 10 mm steel wire rope for overspeed governer complete all as specified and as directed.
200
-
-
... More
Supply and fix in replacement and commissioning of Automatic Rescue Device (ARD) capacity 15kw/20HP complete all as specified and as directed.
4
-
-
... More
Supply and fix in replacement of battery 7AH, 12 V batteries for ARD complete all as specified and as directed.
36
-
-
... More
Supply and fix in replacement of car operating panel board with metal concealed body and stainless steel plate front side 12 V seven segment display card with "NO" push button for G+1, fan, light, alarm, and stop set complete all as specified and as directed.
3
-
-
... More
Supply and fix in replacement of car landing operating panel for each floor (12V seven segment display card, "NO" push buttons outside lift) complete all as specified and as directed.
3
-
-
... More
Comprehensive maint of EOT cranes including checking daily its smooth functioning and greasing to all movable parts and wire ropes once in a fortnight replacing the worn out electrical and mechnical parts complete all as directed by Engineer in charge suitable for 5 Ton capacity electrically operated travelling crane installecd at ERS NAY(G) complete all as specified and as directed.
11
-
-
... More
All as per item No -16 above but for 5 Ton capacity EOT crane installed at P8I .
11
-
-
... More
All as per item No -16 above but for 2.5 Ton capacity EOT crane installed at Air Store NAY (G) .
11
-
-
... More
All as per item No -16 above but for 2 Ton capacity EOT crane installed at BSF.
11
-
-
... More
All as per item No -16 above but for 5 Ton capacity EOT crane installed at 316 SQN.
11
-
-
... More
All as per item No -16 above but for 5 Ton capacity EOT crane installed in EHU NAY(G).
11
-
-
... More
All as per item No -16 above but for 5 TON capacity EOT cran installed in TU 142 (KAMOV) Hanger No -02 in NAY(G).
11
-
-
... More
All as per item No -16 above but for 5 TON capacity EOT crane installed in MIG simulator building .
11
-
-
... More
All as per item No -16 above but for 5 TON capacity EOT crane installed in 303 Hanger.
11
-
-
... More
All as per item No -16 above but for 5 Ton capacity EOT crane installed in H2 Hanger.
11
-
-
... More
All as per item No -16 above but for 3 Ton capacity EOT Gantry type crane installed in BSF Hanger.
11
-
-
... More
All as per item No -16 above but for 3.5 Ton capacity EOT crane installed in ERS INS Hansa.
11
-
-
... More
Carry out the periodical maint of following HOT cranes , including replacement and greasing to all parts such as , bolts, nuts,coupling bolts and bushes during contract period and attending the brake down as and when required complete all directed for efficient operation of HOT cranes 5 Ton capacity crane installed at Avionics power house.
11
-
-
... More
All as per item No -28 but for above HOT crane of capacity 0.5 TON installed at Racee Pad Bay
11
-
-
... More
All as per item No -28 but for above HOT crane of capacity 0.5 TON installed at Racee Pad Bay
11
-
-
... More
All as per item No -28 but for above HOT crane of capacity 0.5 TON installed at MT Section
11
-
-
... More
All as per item No -28 but for above HOT crane of capacity 1.5/2 TON installed at EHU/ERS NAY (G).
11
-
-
... More
All as per item No -28 but for above HOT crane of capacity 2 TON installed at NAY(G) MT section.
11
-
-
... More
All as per item No -28 but for above HOT crane of capacity 1 TON installed at TU hanger No -01.
11
-
-
... More
All as per item No -28 but for above HOT crane of capacity 1.5 TON installed at Magazine Bldg.
11
-
-
... More
All as per item No -28 but for above HOT crane of capacity 1.5 TON installed at Magazine Bldg .
11
-
-
... More
All as per item No -28 but for above HOT crane of capacity 1.5 TON installed at Magazine Bldg complete all as specified and as directed.
11
-
-
... More
Note :-. (i) Tenderer shall visit the site and study the condition for each crane before testing. (ii) The rates quoted shall be deemed to include for peridical ckecking/maint. (iii) Contractor shall hand over all the cranes to AGE E/M-1 in serviceable condition after completion contract period. (iv) Electricity required for testing shll be supplied free of cost. (v) Replacement of spares will be paid under releveant items of Sch A .
-
-
-
... More
Carry out load and deflection test for each EOT crane from 1 to 5 ton capacity at 100 % full load with necessary instruments on hoisting, LT/CT for checking the performance of the cranes as directed by the Engineer In Charge /and upto the users satisfaction. Note : (i) Load/delection test is to be carried out by the contractor's expert rep in the relevant field in presence of the department rep and recording the test and issue necessary certifuicate . (ii) The load required for the testing and necessary transportation , will be arranged by the contractor at the location of testing for 5 TON capacity EOT crane ERS NAY(G) complete all as specified and as directed.
1
-
-
... More
All as per item No -38 above but for 5 Ton capacity EOT crane installed in EHU NAY(G) complete all as specified and as directed.
1
-
-
... More
All as per item No -38 above but for 5 TON capacity EOT cran installed in TU 142 (KAMOV) Hanger No -02 in NAY(G) complete all as specified and as directed.
1
-
-
... More
All as per item No -38 above but for 5 TON capacity EOT crane installed in MIG simulator building complete all as specified and as directed.
1
-
-
... More
All as per item No -38 above but for 5 TON capacity EOT crane installed in 303 Hanger.
1
-
-
... More
All as per item No -38 above but for 5 Ton capacity EOT crane installed in H2 Hanger.
1
-
-
... More
All as per item No -38 above but for 3 Ton capacity EOT Gantry type crane installed in BSF Hanger.
1
-
-
... More
All as per item No -38 above but for 3.5 Ton capacity EOT crane installed in ERS INS Hansa.
1
-
-
... More
Carry out load and deflection test for each HOT crane from 0.5 to 5 TON capacity at 100 % full load with necessary instruments on hoisting, LT/CT for checking the performance of the cranes as directed by the Engineer In Charge /and upto the users satisfaction. Note : (i) Load/delection test is to be carried out by the contractor's expert rep in the relevant field in presence of the department rep and recording the test and issue necessary certifuicate . (ii) The load required for the testing and necessary transportation , will be arranged by the contractor at the location of testing for 5 Ton capacity crane installed at Avoinic power house
1
-
-
... More
All as per item No -46 but for above HOT crane of capacity 0.5 TON installed at Racee Pad Bay
1
-
-
... More
All as per item No -46 but for above HOT crane of capacity 0.5 TON installed at Racee Pad Bay
1
-
-
... More
All as per item No -46 but for above HOT crane of capacity 0.5 TON installed at MT Section
1
-
-
... More
All as per item No -46 but for above HOT crane of capacity 1.5/2 TON installed at EHU/ERS NAY (G).
1
-
-
... More
All as per item No -46 but for above HOT crane of capacity 2 TON installed at NAY(G) MT section complete all as specified and as directed.
1
-
-
... More
All as per item No -46 but for above HOT crane of capacity 1 TON installed at TU hanger No -01.
1
-
-
... More
All as per item No -46 but for above HOT crane of capacity 1.5 TON installed at Magazine Bldg.
1
-
-
... More
All as per item No -46 but for above HOT crane of capacity 1.5 TON installed at Magazine Bldg .
1
-
-
... More
All as per item No -46 but for above HOT crane of capacity 1.5 TON installed at Magazine Bldg.
1
-
-
... More
Material and labour for dismantling and over hauling of CT and LT wheels of EOT and HOT cranes , repair to shaft and replacement of lock plate etc , fixing and testing , replacement of worn out and demaged bearing including makiing necessary arrangenent like staging, plate form for carry out the above repair .
8
-
-
... More
Material and labour , rewinding of electromagnatic brake with existing gauge and size of copper wire of superier quality , proper insulation and testing on completion complete all as direcetd by Engineer In Charge
4
-
-
... More
Supply only mixture of grease and oil in the gear box of EOT cranes make: Servo 320.
200
-
-
... More
Supply and fixing over load relay model MU 32 Make L&T or equivalent in Schneider,BCH
5
-
-
... More
Supply and fix in replacement push buttons complete suitable to match the existing one for upto 5 Ton capacity crane/Lift
20
-
-
... More
M & L for rewinding of electric motor of lifts/cranes service heavy duty includes dismantling, lowering down, transporting to work shop and back, erection, testing & commissioning etc. complete all as specified and directed by Engg-in-Charge.
72
-
-
... More
Supply only crane control cable 24 core PVC insulated tinned copper braided PVC sheathed flexible cable 1100 volts 0.75 sqmm size.
250
-
-
... More
Supply and fixing in repair MCB TPN 32 amps 415 volts 50 HZ AC . Make : C&S or equivalent
18
-
-
... More
Supply and fixing in repair MCB SP 6-32 amps 415 volts 50 HZ AC . Make : C&S or equivalent
35
-
-
... More
Supply and fix power contactor assembly complete 3 phase 3 pole 415V AC suitable for the existing EOT crane control panel and of current rating up to 32 with 2 NO&2 NC
4
-
-
... More
Supply and fix Brake Coil 250 mm dia 110V/148 ohms coil for operating brake unit Make: IES Elevators or equivalent
2
-
-
... More
Supply and fix Limit switches, protective device to stop lift at terminal floors during over travel complete all as specified and as directed.
6
-
-
... More
Supply and fix Indicator for lamp Assembly LED pilot lighting complete suitable for ECE lifts 500Kg capacity complete all as specified and as directed.
4
-
-
... More
Supply and fix 3 pole power contractor type MNX- 22 as per cat No : CS94980 complete all as specified and as directed.
20
-
-
... More
Supply and fix Bakelite fuse unit 16A 230 V with HRC fuses of 32 amps complete all as specified and as directed.
6
-
-
... More
M & L for preparing / scrapping the surface of EOT crane of 5 Ton capacity 13 mtr span double girder end carriages, CT & LT drive mechaanism applying two coats of synthetic enamel paint over a one coat of red oxide primer of approved colour and all as directed by Engineer-in-Charge, installed in ERS NAY-G
1
-
-
... More
All as per item no 71 above but for 5 ton capacity 60 Meter span EOT crane installed at P8I Hangar
1
-
-
... More
All as per item no 71 above but for 5 ton capacity Meter span EOT crane installed at Air Store NAY (G)
1
-
-
... More
All as per item no 71 above but for 5 ton capacity 44 Meter span EOT crane installed at BSF.
1
-
-
... More
All as per item no 71 above but for 5 ton capacity 13 Meter span EOT crane installed at 316 SQN.
1
-
-
... More
All as per item no 71 above but for 5 ton capacity 13 Meter span EOT crane installed at EHU NAY-G
1
-
-
... More
All as per item no 71 above but for 5 ton capacity 48 Meter span and height 9 mtr EOT crane installed at H 2 Hangar.
1
-
-
... More
All as per item no 71 above but for 5 TON capacity 48 Meter span and height 15 mtr EOT crane installed at 303 Hanger.
1
-
-
... More
All as per item no 71 above but for 5 ton capacity 60 Meter span and height 15 mtr EOT crane installed at TU Hanger No. 2.
1
-
-
... More
All as per item no 71 above but for 5 ton capacity 17 Meter span and height 12 mtr EOT crane installed at Mig Simulator.
1
-
-
... More
All as per item no 71 above but for 3.5 ton capacity 12 Meter span and height 08 mtr installed at ERS INS Hansa .
1
-
-
... More
All as per item no 71 above but for Gantry type Crane 3 Ton capacity 44 Meter span and height 12 mtr EOT crane
1
-
-
... More
M & L for preparing / scrapping the surface of HOT crane of 5 Ton capacity girder end carriages, CT & LT drive mechaanism applying two coats of synthetic enamel paint with spray painting using compressor over one coat of red oxide primer of approved colour at Avoinic power house and all as directed by Engineer-in-Charge
1
-
-
... More
All as per item No -83 but for above HOT crane of capacity 0.5 TON installed at Racee Pad Bay
1
-
-
... More
All as per item No -83 but for above HOT crane of capacity 0.5 TON installed at Racee Pad Bay
1
-
-
... More
All as per item No -83 but for above HOT crane of capacity 0.5 TON installed at MT Section
1
-
-
... More
All as per item No -83 but for above HOT crane of capacity 1.5/2 TON installed at EHU/ERS NAY (G).
1
-
-
... More
All as per item No -83 but for above HOT crane of capacity 2 TON installed at NAY(G) MT section.
1
-
-
... More
All as per item No -83 but for above HOT crane of capacity 1 TON installed at TU hanger No -01.
1
-
-
... More
All as per item No -83 but for above HOT crane of capacity 1.5 TON installed at Magazine Bldg.
1
-
-
... More
All as per item No -83 but for above HOT crane of capacity 1.5 TON installed at Magazine Bldg .
1
-
-
... More
All as per item No -83 but for above HOT crane of capacity 1.5 TON installed at Magazine Bldg.
1
-
-
... More
All as per item No 83 above but for HOT crane of capacity 0.5 Ton at Simulator building
1
-
-
... More
All as per item No 83 above but for HOT crane of capacity 2 Ton at 315 Hanger
1
-
-
... More
All as per item No 83 above but for HOT crane of capacity 2 Ton at EHU/ERS
1
-
-
... More
All as per item No 83 above but for HOT crane of capacity 2 Ton at NAY(G) MT Section
1
-
-
... More
All as per item No 83 above but for HOT crane of capacity 1 Ton at TU 1 Hanger
1
-
-
... More
Preparation of old painted surface of the lift car shutters grills machine, iron shutters, motor gear assembly panel board complete and painting with two coats of synthetic enamel paint of approved colour 2/ 0.5 ton capacity lifts all as specified and directed by Engineer - in - Charge
2
-
-
... More
Material and labour for dismantling lowering and over hauling of CT and LT control gear box , opening the gear box replacement of demaged bearing and oil seals , gaskets , filling with new oil , er fixing in position , tresting complete all as directed by Engineer In charge .
2
-
-
... More
Material and labour for dismantling lowering down, replacement of unserviceable cross travel trolley arrangement for 0.5 Ton HOT crane.
1
-
-
... More
Material and labour for dismantling lowering down, replacement of unserviceable cross travel trolley arrangement for 1 Ton HOT crane.
1
-
-
... More
Material and labour for dismantling lowering down, replacement of unserviceable cross travel trolley arrangement for 2 Ton HOT crane.
1
-
-
... More
Supply and fixing in repair of chain pulley block for 0.5 Ton capacity 5 Mtr height HOT crane.
1
-
-
... More
Supply and fixing in repair of chain pulley block for 1 Ton capacity 5 Mtr height HOT crane.
1
-
-
... More
Material and labour for dismantling & lowering down of 4 Nos LT wheels and drive shafts and overhauling including replacement of unserviceable parts like LT wheel bearings, drive shaft, plumber blocks with bearings, couplings, bolts, nuts etc for long travel arrangement complete all as specified and as directed.
5
-
-
... More
Material and labour for Gas cutting, Dismantling, Lowering down of existing un serviceable E/M Brake with foundation and Modification of Foundation, Supply. Fixing of new Electro Hydraulic Thruster Brake dia 100 to 250mm, alignment properly, filled with new transformer oil and testing commissioning etc.
4
-
-
... More
Supply , Fixing & electrical wirings, testing and commissioning in repair of VVVF Drive with required slip resistance, power and control cables, cable legs, for fixing of Drive suitable for CT & LT operation for 1 to5Tones capacity EOT cranes as per sample complete all as specified and as directed.
2
-
-
... More
Supply , Fixing & electrical wirings, testing and commissioning in repair of VVVF Drive with required slip resistance, power and control cables, cable legs, for fixing of Drive suitable to work on main Hoist operation for 1 to5Tones capacity EOT cranes as per sample complete all as specified and as directed.
4
-
-
... More
M & L for dismantling, removing , taking down the gear box assembly of main hoist for cranes capacity up to 5 ton and then overhauling the gear box including replacement of worn gear wheel unit complete with new one matching to the existing size, replacement of defective bearings, oil seal, gear couplings etc and then assembling , fixing back to the system alignment, testing & commissioning of EOT Crane capacity up to 5 ton all as specified and directed by Engineer-in-charge
4
-
-
... More
Material and labour for disconnecting and taking down electromagnetic thruster/Hydraulic Brake unit from the crane, shifting to work shop, dismantling all parts, replacement of unserviceable parts like bearings, Brake coil, thruster oil, assembling, shifting to existing location and fixing in a same position, complete testing the system all as directed by Eng-in-Charge.
6
-
-
... More
Material and labour for arrange necessary staging (scaffolding) for removing of all electrical cable connections from EOT crane main control panel to monorail hoist assembly and dismantling, removing, taking down of monorail hoist block assembly 5Ton capacity which is below 60m span underbridge box girder at a height of 12m.
2
-
-
... More
Material and labour for loading, unloading necessary transportation of monorail hoist block assembly to and fro from site to workshop.
2
-
-
... More
Material and labour dismantling complete gearbox assembly , wire rope drum of monorail hoist block at workshop, repairing and replacement of old worn out spares, reassembling the same after repair complete all as directed by Engr-in-charge
2
-
-
... More
Material and labour for Hoisting(12m), reinstating and testing & commissioning of monorail hoist block assembly at site complete all as directed by Engr-in-charge
2
-
-
... More
Supply and fixing in repair of 5Ton capacity bottom block assembly (hook assembly)
2
-
-
... More
M & L for replacement of 12 mm steel wire rope for 5Ton capacity EOT crane (Make- Usha Martin)
180
-
-
... More
Supply and fixing in repair of Rotary gear type limit switch suitable for 5 Ton EOT crane complete all as directed by Engr-in-Charge.
2
-
-
... More
Material and labour charges for carry out load and serviceability test of lift upto 02 TON capacity installed at various places in INS Hansa through authorised Lift Inspector.
Note : (i) Load/serviceability test is to be carried out by the Reginol Lift inspector in presence of the department rep and recording the test and issue necessary certificate . (ii) The load required for the testing and necessary transportation , will be arranged by the contractor at the location of testing .
5
-
-
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements
Past BiddersThis list is curated from the bidders of the similar tenders in the past
- Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
- Awarded Ratexx%
- Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
- Awarded Ratexx%
- Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
- Awarded Ratexx%