Military Engineer Services Tender

View complete overview of Goa MES Tender

Military Engineer Services - MES Tender

Works
Electrical Generators And Transformers
Electrical and Electronics
Eprocure
Opening Date11 Dec 2024
Closing Soon15 Jan 2025
Tender Amount₹ 99,99,000 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Alternator Make :- BHEL Frame G62592 of Capacity 3125 KVA

-

-

-

... More
b) DG Set of capacity 62.5 KVA 415 Volts with exhaust silencer assembly batteries with charger AMF panel & complete accessories - 01 No

-

-

-

... More
Engine Make :- Greaves Type 3YDC MK - III

-

-

-

... More
Alternator Make :- STMPFORD Type UC 22 G of Capacity 62.5 KVA

-

-

-

... More
c) Lube Oil priming pump Make :- Crompton Greaves 5.5 KW / 7.5 HP 3 Phase 1440 RPM -03 No

-

-

-

... More
d) Lube Oil priming pump Make :- Prime 5.5 KW / 7.5 HP 3 Phase 1440 RPM - 01 No

-

-

-

... More
e) HT water pump (Pre heating module) Make :- Kirloskar Brothers Ltd 2.2 KW / 3 HP 3 Phase 2840 RPM - 04 Nos

-

-

-

... More
f) LT Water pump Make :- Kirloskar Brother Ltd 7.5 KW / 10 HP 3 phase 2900 RPM - 04 Nos

-

-

-

... More
g) Cooling tower fan motor Make :- Laxmi hydraulics Pvt. Ltd. 5.5 KW / 7.5 HP 3 Phase 720 RPM with cooling tower - 04 Nos

-

-

-

... More
h) Air compressor with electric motor Make :- Bharat bijalee Ltd. 9.3 KW / 12.5 HP 3 Phase 1450 RPM - 01 No

-

-

-

... More
j) Drip tank with transfer pump Make : Bharat Bijlee Ltd. 1.1 KW / 1.5 HP 3 Phase 1415 RPM with tank - 01 No

-

-

-

... More
k) Chemical mixing pump Make :- Kirloskar brothers Ltd. 2.2 KW / 3 HP 3 Phase 2840 RPM with tank - 01 No

-

-

-

... More
L) Fuel Oil centrifuge pump Make :- Crompton Greaves Ltd 3 KW / 4 HP 3 Phase 2865 RPM - 02 Nos

-

-

-

... More
m) Seperator feed pump Make :- Crompton greaves Ltd 0.37 KW / 0.5 HP 3 Phase 2820 RPM -01 No.

-

-

-

... More
n) Fuel unloading pump Make :- Bharat bijaiee Ltd. 3.7 KW / 5 HP 3 Phase 1430 RPM with strainer -02 Nos

-

-

-

... More
o) Fuel transfer pump Make :- Bharat bijalee Ltd, 1.1 KW / 1.5 HP 3 Phase 1415 RPM with tank -02 Nos

-

-

-

... More
p) Raw Water pump Make :- Kirloskar brothers Ltd. 3.7 KW / 5 HP 3 Phase 2870 RPM with water softening plant & storage tanks - 02 Nos

-

-

-

... More
q) Axial flow fan motor Make :- Crompton Graves Ltd. 7.5 KW / 10 HP 3 Phase 1430 RPM - 06 Nos

-

-

-

... More
r) Generator control panel with measuring instruments control relays & switch gears - 04 Nos

-

-

-

... More
s) AVR Exciting panel for D.G sets - 04 Nos

-

-

-

... More
t) D.G Set synchronising panel with auto / manual synchronising with metering & protection devices -01 No

-

-

-

... More
u) Storage tanks : Vertical Fuel storage tank - 60 KL capacity each - 02 Nos, day tank 600 ltrs capacity each - 04 Nos, HSD clean oil tank 4.5 KL -01 No

-

-

-

... More
v) Air conditioning system comprising of 2 Nos air conditioning units with one set fine filters ducting with supply air diffusers including electrical starters cabling etc

-

-

-

... More
Note for item No.1 above :-

-

-

-

... More
a) Contractor has to employ minimum following staff for Manning and operation of the plant :-

-

-

-

... More
i) One No MCM / Supervisor having minimum qualification Diploma in Mechanical / Electrical Engineering from recognized institute with adequate experience in one shift of 8 hrs (Total - 01 Nos per day)

-

-

-

... More
ii) One No. FGM Highly skilled / operator having minimum qualification ITI in Fitter / Electrician from recognized institute with adequate experience in each shift of 8 hrs (Total 03 Nos Per day)

-

-

-

... More
iii) One No. FGM skilled / assistant operator having minimum ITI qualification in Electrician / Mechanic trade from Govt. recognized institute with adequate experience in each shift of 8 hrs (Total 03 Nos Per day)

-

-

-

... More
iv) One No Electrician highly skilled / operator having minimum qualification Diploma in Electrical Engineering from recognized institute with adequate experience in one shift of 8 hrs(Total 01 Nos Per day)

-

-

-

... More
v) One No Mate / helper minimum 10 th pass with adequate experience in two shift of 8 hrs (Total - 02 Nos per day)

-

-

-

... More
b) Unit rates quoted above shall be deemed to be included the cost of stationery & communication and safety gears / clothing for operating staff.

-

-

-

... More
c) The contractor has to maintain various records as mentioned in particular specifications and as directed by EIC in binded book / registers

-

-

-

... More
d) Fuel (Diesel) and water for CPP will be issued by the department under schedule B items in free of cost However proper record of fuel consumption will be maintained in binded book by the contractor and put up to the Engineer - in - Charge weekly.

-

-

-

... More
e) The Contractor shall pay the wages to the opreators/helpers (as applicable) through e payment i.e. Aadhar linked bank accounts (credit to their bank account). GE shall ensure that e-payment made to the opreator / helper and their wages shall not be less than minimum wages fixedd by state Govt or Central Govt whichever is more. Monthly e banking statement shall be furnished by contractor to the GE and the same shall be kept in record duly verified.

-

-

-

... More
f) It is responsibility of contractor to deposit the employees provident fund (EPF) to the connected authority as per the prevealing scales as laid down by Ministry of labour for all opreator/helper (as applicable) and necessary proof to this regard shall be submitted to the Engineer-in- incharge for verification and record. The quoted rate shall be deemed to be included of above provisions. In case contractor fails to produce the proof of EPF, shall be liable for action as deemed fit. Decision of GE in this regard shall be final and binding.

-

-

-

... More
g) The contractors shall maintain all the registers under various labour law rules 2017 and shall be produced to GE and as well as officers detailed by labour department.

-

-

-

... More
h) The rate quoted shall deemed to be inclusive of safety gear and required tools for minor maintenaince. In case of failure to provide tools kit and safety kits (gum boots-02pairs, hand glooves) penalty of RS.3000/- per person per month will be recovered and levied.

-

-

-

... More
i) The contractor shall provide 02 uniforms to each opreator and design of uniform shall be got approved. In case of failure, a penalty of RS.1200/- per month per uniform and will be levied and recovered from the dues

-

-

-

... More
j) In case of failure due to absence of opreative staff, the contractor shall be liable to pay compensation at twice the cost of a day's manning and opreation derived from pro rata rate of Schedule 'A' quoted rates.

-

-

-

... More
k) The contractor shall be responsible for maintaining the complete area (i.e. inside boundary) such as building , lawn, garden, out side bus bay yard , hard standing , footpath etc in neat and clean position . All necessary T&P for cutting /cleaning of grass and vegetation will be arranged by contractor without any extra cost.

-

-

-

... More
M& L for servicing of Turbocharger comprising of following works & Dynamic balancing of the Rotor Shaft to be carried out by qualified team of engineers from Manufacturers Authorised Repair Workshop:-

2

-

-

... More
i) Dismantling the turbocharger from the installed position & removing , loading, transporting the turbocharger cartridge to OEM authorised & approved workshop for dynamic balancing.

-

-

-

... More
ii) Mechanical cleaning , assesmment & working condition evaluation of the turbocharger

-

-

-

... More
iii) Complete overhaul & servicing of the turbocharger

-

-

-

... More
iv) Dismantling of the Cartridge , Mechanical cleaning of the rotor and Assessment of the rotor shaft & condition evaluation

-

-

-

... More
v) Replacement of Standard Overhaul Spareparts as required at site and directed by GE.

-

-

-

... More
vi) Dynamic balancing of the rotor shaft & balancing of the rotor complete

-

-

-

... More
vii) Re Assembling the complete cartridge & transporting back to the site

-

-

-

... More
viii) Re Assembling the complete turbocharger with the cartridge, re- installing & commisioning of turbocharger assembly with the DG sets complete as per OEM Standards

-

-

-

... More
ix) Documentation & submission of the service & test reports as per prescribed format.

-

-

-

... More
M&L for Complete overhauling/servicing of FRP cooling tower, removal of complete scales, dirt etc. by using chemicals, cleaning the sump louvers, PVC fins, fan assembly, replacing of spray nozzels with connected pipe, renewal of nuts and bolts, leak arresting of the FRP tank, replacing of PVC fins. Repairing to the leakage portion by lining with FRP material including replacement of rusted nut and bolts and replacing of bird screens at air intake portion and testing of the cooling tower of CPP as specified as directed. by Engr-In-Charge. Note : Items under schedule item No 3 herein below shall be measured & paid as supply only item.

4

-

-

... More
Supply Only following routine Spares for Cooling Tower as per the requirement at site.

-

-

-

... More
FRP fins for cooling tower as per existing size at site.

320

-

-

... More
Nozzles as per existing size at site.

32

-

-

... More
M&L for taking down the damaged fan assembly of FRP cooling tower and connected fitting from the position and supply & fix by new fan assembly 1300mm minimum with 04 blades fan hub assembly made out of DIE Cast aluminium, with necessary clamp supports, nut & bolts by SS metal, including testing the cooling tower.

1

-

-

... More
M&L for carry out the repair to cooling tower fan motor 7.5HP flange mounted extended shaft type, including taking down from position, transporting to local work shop, dismantling the motor, replacing damaged unserviceable shaft, bearings, rusted nuts & bolts including servicing of motor, varnishings to winding etc. reassemble and installation to position and testing comissioning.

1

-

-

... More
M&L for replacing the cooling tower motor base frame, base plate, Nut & bolts with new all as per the existing size and shape.

1

-

-

... More
M&L for taking down the defective unserviceable fan blades set of 1300 mm sweep from the cooling tower fan motor and supply and fix the new fan blade of 1300 mm sweep with suitable clamps nut & bolts etc. Including connecting the power supply and testing all as specified as directed by Engr-in-charge

1

-

-

... More
M & L for Maint/ Servicing of 62.5 KVA DG set , removing tapped cover after removing inlet / outlet pipe removing engine head replacing unserviceable valve seat & valve guide inlet & outlet as required replacing engine main gasket sheet cleaning the oil sump, cleaning/ replacement of fuel oil filter, cleaning of air filter, repair to the self starter assembly,Replacement of the fuel injection nozzles, repair and caliberation of the FIP, cleaning & checking of all diesel hose pipes, replacement of engine oil, repalcemet of battery terminals & battery leads, servicing of self starter dynamo by replacing carbon brushes beairngs & bushes and reassembling the engine head & tappered cover in original possition including all as specified in 'C' check of engine manufacturer. Note :- Rate quoted includes cost of new items for replacement The engine oil for filling/topup will be meausued and paid seperately.

1

-

-

... More
M & L for Maint/ Servicing of diesel engine of air compressor type DA 16, BHP 16.2 cylinder , removing tappet cover after removing inlet / outlet pipe removing engine head replacing unserviceable valve seat & valve guide inlet & outlet as required replacing engine main gasket sheet cleaning the oil sump, cleaning/ replacement of fuel oil filter. Note :- Rate quoted includes cost of new items for replacement The engine oil for filling/topup will be meausued and paid seperately.

1

-

-

... More
M & L for Servicing of Lube Oil Coolers by dismantling,condition evaluation, transporting to workshop, thorough mechanical /ultrasonic mechanical cleaning the copper tube by steel brush, replacement of worn out parts like Synthetic rubber rings, Gaskets, O rings , nuts and bolts etc., assessment of leakages through pressure testing, reinstalling in original position & tetsing as per OEM standards. Note :- Rate quoted includes cost of new items for replacement.

2

-

-

... More
M & L for Servicing of Starting Air Compressor 12.5 HP by disconnecting electric motor & outlet piping, transporting the air compressor to work shop, dismantling air compressor, replacing worn our parts such as piston Ring, Oil Ring, Gas Ket Set, Bearings, Greasing Oiling & Reinstalling air compressor in original position including replacement of unserviceable soloniod coil, pressure switch etc , testing & comissioning all as specified and directed. Make ELGI, Model HP 12300 max working pressure 30 Bar, RPM 1100 of Air compressor. Note :- Rate quoted includes cost of new items for replacement

1

-

-

... More
M&L for servicing of the safety valve of air receiver capacity 0.50m3 , working pressure 30 kg/cm2, Design pressure 33 kg/cm2 & test pressure 50 kg/cm2 all as specifed & directed.

2

-

-

... More
S & F in replacement of air drain valve max. Working pressure 35 kg/cm2, end can size 0.5 BSP, Max. Working temp. 75degee C. For air receiver all as specifed & directed.

2

-

-

... More
M/L for servicing of DG control panel installed in CPP control room involving Calibration of the DE/NDE Sensors (01 set ie 02 nos, Ground protection Relay (01 no). ABB REM 543. 110v AC.Aux,V:24vdc. 7CT,2PT Input (01 no.), Gen. ROTOR Earth fault relay ( 01 nos.), Gen. STATOR Earth fault relay (1 nos.), Triping Relay & Dead Bus Relay (2 nos) all as specifed & directed.

2

-

-

... More
M & L for Servicing Automatic Voltage regulator AVR PANELS and replacement of defective parts all as specifed & directed. Note:- The above quoted rate includes replacing of defective AVR with new as existing capacity,replacing of control wiring, the calibration of Exciter panel and making sure the Voltage, RPM and frequency are as per the prescribed limits of OEM.

2

-

-

... More
M & L for Servicing of Local sensor Stand (LSS) PANEL .incl Calibration of the Pressure switch & 02 no. Temperature Switch ( HT < water ) 06 nos of Pr. Gauge. (HT & LT inlet and outlet Lube oil temp inlet and outlet pr and replacement of defective parts all as specifed & directed.

2

-

-

... More
M & L Servicing of Lighening Arrestor Protection Transformer (LAPT) PANEL incl Calibration of Droop CT (01 no), Droop PT(01no), & Distribution Lightning arrestor CT(01no.) surge arrestor CT(01 no) core balance CT(01no) , & DROOP Transformers. (01no) and replacement of defective parts all as specifed & directed.

2

-

-

... More
M & L for Servicing of Neutral Grounding Resistance (NGR) PANNEL incl Calibration of Protection CT (01 no).CBCT (1 nos) , Differential CT (03 nos) and replacement of defective parts all as specifed & directed.

2

-

-

... More
M&L for dismantalling the pump set from foundation and motor unit opening complete pump set , cleaning, replacing unserviseable parts such as gun metal bushes, rubber packing, ms nuts,bolts,rubber coupling , (spider) bearings, ai valve etc. With approved makes. Reassembling, reinstalling,testing for satisfactory running complete all as directed by EIC for the following pumps including transporting pumpsets to workshop for machininig work/ obtaining proper/suitable spares complete for:-

-

-

-

... More
Lub. Oil priming pump set 7.5 HP.

1

-

-

... More
HT water pump set 3 HP.

1

-

-

... More
LT water pump set 10 HP.

1

-

-

... More
M & L for rewinding of electric motors 3 phase 50Hz 415 volt comprising of following activities for motor of following capacity complete all as directed & specified & as per manufactures instructions Notes:- i) Disconnecting & removing the electric motor from installed position & loading, unloading, including transporting. ii) Dismantling existing burnt winding from the motor, prepare for & including rewinding complete with super enamelled copper winding wire of existing guage including all material such as insulated paper, sleeves, tape, varnish etc. complete for class F insulation, keeping in hot air oven for drying, packing & reassembling complete. iii) Reinstalling in position & in alignment including electric connection, commissioning & testing in actual working condition to check designed RPM performance complete. iv)Replacement of Ball bearings & bushes of existing size with exisisting make.

-

-

-

... More
Elect motor 0.5 to 1 HP

1

-

-

... More
Elect motor 3 HP

1

-

-

... More
Elect motor 4 HP

1

-

-

... More
Elect motor 5 HP

1

-

-

... More
Elect motor 7.5 HP

1

-

-

... More
Elect motor 10 HP

1

-

-

... More
M & L for Servicing of Plate Heat Exchanger by dismantling, assessment & condition evaluation, transporting to workshop, thorough mechanical cleaning repairing , conducting DP test, replacement of worn out parts like Field Gaskets, Ring Gaskets, Pressure Guages, Spools gasketting, Pressure testing for leakages & reinstalling the PHEs in original position & testing & commissioning as per OEM standards.

2

-

-

... More
Labour only for carrying out servicing of DG sets( through authorised service rep/OEM) of capacity 2500 KW, 11 KV and Engine Make KOEL, Type 9PA 61-280 with rated BHP 3600 & all other connected equipments forming part of CPP including routine maintenance, replacement of engine oil, Engine oil leakage arresting,water pipe leakage arresting,fuel pipe leakkage arresting, leakkage arresting & binding with new asbestos rope on silencer/Exhaust pipes and replacement of defective / unserviceable spare parts as per site requirement including testing of DG sets after servicing so as to provide uninterrupted power supply as directed by EIC. Note :- The engine oil for filling/topup and other materials / spare parts will be measured and paid seperately under respective item here - in - below as mentioned.

4

-

-

... More
A) CYLINDER HEAD :

-

-

-

... More
a)  Visual inspection of the rocking gear.

-

-

-

... More
b)  Adjustment valve backlash on cold engine.

-

-

-

... More
c)  Inspection of the starting air valve flaps & rings.

-

-

-

... More
d) Strip opening of the cylinder Head

-

-

-

... More
e) Visual inspection of the Inlet and exhaust Valves

-

-

-

... More
f) Inspection of the Valve rocker assy

-

-

-

... More
g) Inspection of the rocking gear assy

-

-

-

... More
h) Inspection of the cylinder head assy

-

-

-

... More
j) caliberation of the tappet settings

-

-

-

... More
k) Timing gear caliberation/setting

-

-

-

... More
B) FUEL INJECTION :

-

-

-

... More
a) Check calibration Atomization & the tightness of the injector.

-

-

-

... More
b)  Replacement of injector nozzles if required

-

-

-

... More
c) Checking of the sliding of the injection pump racks.

-

-

-

... More
d) Replacement of the Anti splash screws.

-

-

-

... More
e) Inspection of Fuel injection pump

-

-

-

... More
C) CRANK CASE - BEARINGS - CRANK SHAFT :

-

-

-

... More
a) Carry out the crankcase inspection.

-

-

-

... More
b) Measurement of the crankshaft deflection

-

-

-

... More
c) Inspection of the bearing shells of two main bearings

-

-

-

... More
D) COUPLING - VIBRATION DAMPER :

-

-

-

... More
a) Check the resilient segment of the coupling and inspection of relilient material.

-

-

-

... More
E) FLUID SYSTEM:

-

-

-

... More
a)  Checking of the pneumatic starter

-

-

-

... More
b)  Inspection of the Air distributor disk.

-

-

-

... More
c)  Inspection of the Main starting valve.

-

-

-

... More
d)  Inspection & cleaning of the self cleaning fuel filter.

-

-

-

... More
e)  Inspection of the oil pump safety valve.

-

-

-

... More
f)  Inspection of the oil pressure control valve.

-

-

-

... More
g)  Inspection & cleaning of the self cleaning oil filter.

-

-

-

... More
h)  Inspection of centrifugal oil purifier

-

-

-

... More
j) Replacement of the filtering elements of self cleaning SOFRON

-

-

-

... More
k) Inspection of fuel feed pump

-

-

-

... More
l) Cleaning of lube oil MOTI filter

-

-

-

... More
F) GOVERNING - OVER SPEED - SAFETY – WIRING SYSTEM :

-

-

-

... More
a) Replacement of hydraulic governor or actuator oil.

-

-

-

... More
b)  Run the electronic overspeed test.

-

-

-

... More
c) Inspection & calibration of the electric actauator of electronic governor and calibration of same

-

-

-

... More
d) preperation of the governor connected with DG set of cap 2.5MW speed and frequency as required by the existing synchronising panels all as specified.

-

-

-

... More
Supply only following spare parts for overhauling of KOEL DG sets as mentioned in item Ser No 20.00 here-in-before.

-

-

-

... More
ROCKING GEARS

-

-

-

... More
Screw with expanded tappet cat part No. 79.033.28.0.00

2

-

-

... More
Special nut cat Part No. 79.033.35.0.00

2

-

-

... More
Fuel INJECTORS

-

-

-

... More
Helicoflex Sealing Joint Cat Part No. 27.067.16.0.00

4

-

-

... More
Copper Washer ( 20 x 27) Cat Part No. 50.508.20.000

4

-

-

... More
O RING D-8, 21A7, L120C7 Cat Part No 74.466.02.000

4

-

-

... More
Cap nut cat Part No. 79.041.03.0.00

2

-

-

... More
Ring D164 3.5D NSE6.531 60C7, Cat Part No.79.041.15.000

4

-

-

... More
Injector gasket Cat Part No. 79.041.18.0.00

6

-

-

... More
Bush Viton Cat Part No. 79.041. 19 .000

4

-

-

... More
O RING D135 3D NSE6. 531 60C7 Cat Part No 74.041.21.000

4

-

-

... More
Injector Nozzle Assembly 9x0.50x140 cat part. 27.067.05.000

3

-

-

... More
Gasket cat part. 79.034.77.000

4

-

-

... More
FUEL FILTER

-

-

-

... More
Fuel Filters Element Cat Part No.79.352.06.0.00

4

-

-

... More
O Ring Filter cover (2.5 x 160, 21502) cat part No. 30.300.18.000

8

-

-

... More
O Ring Filter cover (3.5 x 112, 21502)cat part No. 30.300.28.000

8

-

-

... More
O Ring- Relief valve (2.5 x 13, 21502)cat part No. 30.300.34.000

8

-

-

... More
COUPLING

-

-

-

... More
O Ring DIA 17 x DIA 4x4 (20401) Cat Part No 70.657.33.0.00

4

-

-

... More
O Ring (20301) 4x460 Material -Nitri Cat Part No 80.356.13.0.00

6

-

-

... More
STARTING AIR VALVE

-

-

-

... More
Copper Washer (30 x 38) Cat Part No 50.508.35.000.

4

-

-

... More
Conical Spring Washer (M 14) Cat Part No 50.527.10.000.

4

-

-

... More
Spring Cat Part No 79.040.03.0.00

4

-

-

... More
Washer Cat Part No 79.040.04.0.00

4

-

-

... More
Ring Cat Part No 79.040.06.0.00

4

-

-

... More
Snep Nut,(BINX NUT) HM10, Cat Part No 79.040.08.0.00

4

-

-

... More
O - Ring, MS29-513/126, 21A7, NSE 6.531, Cat Part No 79.040.10.0.00

4

-

-

... More
GOVERNOR DRIVE

-

-

-

... More
Key Cat Part No 50.402.08.025.

4

-

-

... More
Circlip External-30 MM Cat Part No 50.501.30.000.

4

-

-

... More
Circlip internal - 62 MM Cat Part No 50.502.62.000.

4

-

-

... More
Circlip internal- 80 MM Cat Part No 50.502.80.000.

4

-

-

... More
O Ring No AN58NSE 6.5, 21 A7 Cat Part No. 79.049.24.0.00

4

-

-

... More
Lub oil cooler and chrger cooler

-

-

-

... More
Set of Gasket and O Ring for Lub Oil Cooler Cat Part No 79.425.59.0.00

4

-

-

... More
EXHAUST MANIFOLD

-

-

-

... More
Gasket cat part No. 72.328.13.000

4

-

-

... More
Flexible joint cat part No. 79.078.07.000

4

-

-

... More
Exhaust gas temp sensor cat part No. 81.068.02.000

4

-

-

... More
Flexible joint cat part No. 27.052.21.000

4

-

-

... More
THERMOMETER / SWITCHES

-

-

-

... More
Thermometer 0- 100 to Suit M18X1.5 Cat Part No79.277.02.0.00

4

-

-

... More
Thermometer 0- 200 to Suit M18X1.5 Cat Part No79.277.03.0.00

4

-

-

... More
Supply Only lubricants.

-

-

-

... More
Lubrication oil system 68 for alternator bearings.

120

-

-

... More
ELGI Air lube oil for air compressors .

5

-

-

... More
lube oil SERVO Marine-10-40Grade.

4800

-

-

... More
Material and Labour required for complete dismantling of existing burnt out 11 KV lightning arrestors and replacing the same with lightning arrestors suitable for 11 KV diesel generator.

6

-

-

... More
Supply & Fix in repairs heating element as existing on site of capacity 6 KW complete all as specified and directed by Engr-in-charge.

2

-

-

... More
M&L for caliberation of governor assembly of the DG set of cap 2.5 MW, 11 KV for desired output inorder to maintain the voltage and frequency of the DG set witin the limit of +/-1% of Voltage-11KV and frequency of 50HZ during all the time and dismantling of the governor assembly from the engine head and transporting the same to the OEM/authorized workshop and strip opening the governor assembly nad carrying out the requisite repair required to rectify the defects and assembling the governor assembly and refiiting the same with the DG set and testing the output of the DG set in the presence of the Engr-In-Chrage and rectifying the defects if any noticed complete all as specified and directed.

2

-

-

... More
Material & Labour required for servicing of air pressure control system mounted on 2.5 MW DG set by replacing old air reciever bottle of Cap 30 Kg/CM, drain valves , pressure control system complete including replacement of nuts and bolts assembly,cleaning of pipe line connected from DG set head to system be cleaned and made choke free complete as all as specifed and directed by Engineer-in-charge.

2

-

-

... More
M&L for preparation of old painted steel surfaces of 2.5 MW DG sets including alternator, support channels complete with the all connected equipments complete and painting with two coats of approved colour synthetic enamel paint complete all as directed. Note:-1. Painting should be done with existing colour codes and painting should apply with the help of spary gun using air compressor. 2. Quotated rate shall deemed to be included for preparation of old painted surface and applying zinc chrome primer over rusted portion all as directed.

4

-

-

... More
M&L for preparation of old painted steel surfaces of 62.5 KVA DG sets including alternator, support channels complete with the all connected equipments complete and painting with two coats of approved colour synthetic enamel paint complete all as directed. Note:-1. Painting should be done with existing colour codes and painting should apply with the help of spary gun using air compressor. 2. Quotated rate shall deemed to be included for preparation of old painted surface and applying zinc chrome primer over rusted portion all as directed.

1

-

-

... More
M&L for preparation of old painted surfaces of cooling tower inlet and outlet pipes any of size, support channels complete with the all connected accessories complete and painting with two coats of approved colour synthetic enamel paint complete all as directed. Note:-1. Painting should be done with existing colour codes and painting should apply with the help of spary gun using air compressor. 2. Quotated rate shall deemed to be included for preparation of old painted surface and applying zinc chrome primer over rusted portion all as directed.

4

-

-

... More
M&L for cleaning of diesel tank (Day Tank) of capacity 600 ltrs carefully by drining out fuel in the tank and disconnection from fuel system, descaling the diesel tank with water pressure and removing the complete sludge deposited, drying the tank, repair to any leakage, cleaning and testing of fuel line upto Fuel Pump inlet and preparation of old painted surfaces of diesel tank (Day Tank) of capacity 600 ltrs including all inlet and outlet pipes any of size, support channels complete with the all connected accessories complete and painting with two coats of approved colour synthetic enamel paint complete all as directed. Note:-1. Painting should be done with existing colour codes and painting should apply with the help of spary gun using air compressor. 2. Quotated rate shall deemed to be included for preparation of old painted surface.

4

-

-

... More
M&L for cleaning of diesel tank (Drip Tank) of capacity 500 ltrs carefully by drining out fuel in the tank and disconnection from fuel system, descaling the diesel tank with water pressure and removing the complete sludge deposited, drying the tank, repair to any leakage, cleaning and testing of fuel line upto Fuel Pump inlet and preparation of old painted surfaces of diesel tank (Drip Tank) of capacity 500 ltrs including all inlet and outlet pipes any of size, support channels complete with the all connected accessories complete and painting with two coats of approved colour synthetic enamel paint complete all as directed. Note:-1. Painting should be done with existing colour codes and painting should apply with the help of spary gun using air compressor. 2. Quotated rate shall deemed to be included for preparation of old painted surface.

1

-

-

... More
M&L for cleaning of Chemical mixing tank of capacity 600 ltrs - 01 No, Pre heating tank module 100 ltrs with heaters - 04 Nos and balance water tank 150 ltrs -04 Nos carefully by drining out chemical mixed water in the tank and disconnection from high temperature water circulation system system, descaling the all tank with water pressure and removing the complete sludge deposited, drying the tank, repair to any leakage, cleaning and testing of water line upto engine and preparation of old painted surfaces of Chemical mixing tank of capacity 600 ltrs - 01 No, Pre heating tank module 100 ltrs with heaters - 04 Nos and balance water tank 150 ltrs -04 Nos including all inlet and outlet pipes any of size, support channels complete with the all connected accessories complete and painting with two coats of approved colour synthetic enamel paint complete all as directed. Note:-1. Painting should be done with existing colour codes and painting should apply with the help of spary gun using air compressor. 2. Quotated rate shall deemed to be included for preparation of old painted surface.

1

-

-

... More
M&L for preparation of old painted surfaces of air circulation System of 2.5 MW DG Set comprising of Diesel engine driven compressor-01 No, Electric driven compressor-01 No and air reciever bottle of Cap 30 kg/CM -04 Nos including all inlet and outlet pipes any of size, support channels complete with the all connected accessories complete and painting with two coats of approved colour synthetic enamel paint complete all as directed. Note:-1. Painting should be done with existing colour codes and painting should apply with the help of spary gun using air compressor. 2. Quotated rate shall deemed to be included for preparation of old painted surface and applying zinc chrome primer over rusted portion all as directed.

1

-

-

... More
M&L for adding Chemical KEM Water treatment 107 M for water softening purpose into the Chemical mixing tank all as directed.

200

-

-



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements

Past Bidders
This list is curated from the bidders of the similar tenders in the past

Unlock the Tender details for free
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.