Military Engineer Services Tender

View complete overview of Goa MES Tender

Military Engineer Services - MES Tender

Works
Electrical and Electronics
Electrical Works
Eprocure
Opening Date5 Oct 2024
Closing Date26 Nov 2024
Tender Amount₹ 1,47,90,000 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
(b) 10 HP

2

-

-

... More
(c) 7.5 HP

2

-

-

... More
(d) 5 HP

2

-

-

... More
(e) 1 to 3 HP

2

-

-

... More
M & L for Servicing of water pump split casing type set by removing & dismantling pump and connected pipes & electric connections etc and replacing of unserviceable parts with new gland packing set Gun metal bushes, bearing, water seal packing complete cleaning of impeller greasing etc reassembling and refixing in original position complete with packing and necessary nut & belt etc including testing for smooth functioning etcof following capacity all as specified and directed.

-

-

-

... More
(a) 15 hp

4

-

-

... More
(b) 7.5 hp

4

-

-

... More
(c ) 5 hp

4

-

-

... More
(a) Supply & Fix in repairs scroll compressor 13 TR from the unit after disconnecting electrical wiring & piping connection nuts & bolts etc supply & install of new scroll compressor 13 TR capacity and connecting pipe line for existing piping brazing & electric connection etc complete all as specified & directed.IGLOO,DBM,PMS

2

-

-

... More
M & L for disconnecting condenser for descaling & Plugging them & providing of 15 mm tee out let for local circulation of mild acid solution in the condenser (separate container and small pump set to circulate diluted acid solution to be used) PH value of solution to be circulated & to be kept 4 and checking frequently i.e. every one hour during the operation Scalgun WS solution to be used for descaling purpose after 2 to 3 hours of cleaning if ph value remains less than 7 flush with fresh water mixed with sodium carbonate tubes and cleaning with nylon brush after closing the end covers, circulating diluted acid solution as specified above & PH value to be maintained as above & flushing the same with fresh water including recharging of stored refrigerant up to required pressure complete all as specified & directed by EIC of for the following :

-

-

-

... More
(a) 3x26 TR at IGLOO

6

-

-

... More
(b) 3x30 TR at PMS

6

-

-

... More
(c) 2x30 TR at WHJBC

4

-

-

... More
(d) 3x39 TR at DBM

9

-

-

... More
Pumping down the plant to preserve the existing refrigerant gas & leak testing of 26/30/39TR chiller package unit by charging of Nitrogen gas in to entire plant & monitoring for 24 Hrs to find the leakages, rectification of leak by brazing and replacement of necessary gasket packing as wherever required including copper tubes of suitable size vacumizing of the plant by vaccum pump and keeping 24 hrs for testing including rectification of leakages if any finally recharging of existing refrigerant gas to the plant & topping up of refrigerant if required to maintain the standard pressure complete testing of the plant for smooth functioning complete all as specified & as directed by EIC at IGLOO , DBM ,PMS , WHJBC

5

-

-

... More
All as per item No. 5.00 here in before, but for 11 TR chiller unit of Package AC plant at HTL

2

-

-

... More
Supply & charge refrigerant (R - 22) gas as per requirement

530

-

-

... More
Topping up / Replacement of compressor oil with new compressor oil of Make :- Frizol 68 or equivalent all as specified and directed by EIC

60

-

-

... More
Supply & Fix in repair & complete all as directed.

-

-

-

... More
(a) Water Flow Switch complete all as directed .

10

-

-

... More
(b) Moisture liquid indicators complete all as directed. Make: B/M or equivalent.

8

-

-

... More
(c) Single phase preventor for compressor /Motor for SM 101 GIC or eqv in L&T/Minilec/ABB

6

-

-

... More
(d) Strip type 3 KW Heaters

6

-

-

... More
(e) Strip type 2.0 KW Heaters

6

-

-

... More
(f) Pressure gauge 0-300 PSI .

6

-

-

... More
(g) Pressure gauge 0-150 PSI

6

-

-

... More
(h) Crank case heater 250 W suitable for 39/30/26 TR CHW plant

4

-

-

... More
(j) Filter drier core for 39/30/26 TR Central AC Plant

8

-

-

... More
(k) LP/HP cut out switch for 39/30/26 TR Central AC Plant

6

-

-

... More
(l ) V belt for Cooling tower . Make : Fenner/Dunlop

24

-

-

... More
(m) Float Valve for 25 mm

4

-

-

... More
(n) Cooling tower fins of size 4'x6'

300

-

-

... More
(o) AHU belt Make : Fenner/Dunlop

15

-

-

... More
M&L for applying one coat of synthetic enamel paint as per colour code with spray machine on surfaces of 3X120/3x30/3x26/3x39 TR central AC plant comprising compressor motor, Pump, water pipe lines etc by filling cavities if any with filler including preparation of surfaces & indication markings all as specified and directed. PMS/WHJBC/IGLOO/DBM

4

-

-

... More
Taking down motor, blower fan assembly from cooling Tower, removing unserviceable fins , & providing new PVC fins of size 4"x6" ,after cleaning of Louvers, drift eleminators fill surface by moderate pressure water nozzle to remove all surface impurities incl removal of rust/scale, scrapping down the hard water deposited from bottom tray with chemical and preparing the surfaces and painting with one coat of anticorrosive paint to match with existing colour, servicing of fan and motor assembly including removal of dust, oil, scale of motor body and replacing of unserviceable nozzle,bearings , painting with anti corrosive paint, draining and filling of bearing housing with new SAE 20 grade mineral oil, greasing of bearing with IOCL mobilux etc , & reassembling complete of following cooling towers

-

-

-

... More
(a) 101 USGPM at IGLOO

3

-

-

... More
(b) 141 USGPM at DBM

3

-

-

... More
(c) 75 USGPM at PMS/WHJBC

5

-

-

... More
Note: (a)Defective parts of plants will be replaced and measured under respective item of this schedule. (b) Fins, bearing , float valve reqd for replacement will be measured under under respective item of this schedule.

-

-

-

... More
Removing old unserviceable insulation of chilled water pipe line and cleaning the surface & applying one coat of TPRA coat & M & L for wrapping on MS Chilled water pipe line with 50/40 mm thick fiber glass wool moulded to shape the thermal insulation in selection of 50 mm crown wrapped with chicken mesh wire netting 20 SWG and 20mm mesh & aluminium cladding with 24 SWG aluminum sheet on 150/100 mm dia MS chilled water pipe line complete all as specified & directed

60

-

-

... More
Supply & fixing in repair Nitrile insulation layers of size 25 mm thickness sticking on the chiller surface by using approved adhesive and ceiling joint by weather proof tape after removing unserviceable nitrile insulation from the chiller & cleaning complete all as directed by Engineer-in-charge.

60

-

-

... More
Supply and fixing in repair fine filters 5 Microns as per exisiting make complete all as specified and directed.

40

-

-

... More
Supply and fixing in repair pre filters 10 Micron as per exisiting make complete all as specified and directed.

40

-

-

... More
(a) Supply & Fix in repairs MS pipe heavy grade 80 mm dia including removing of unserviceable MS pipe medium grade of 80 mm dia all as specified & directed

35

-

-

... More
(b) Supply & Fix in repairs MS pipe heavy grade 100 mm dia including removing of unserviceable MS pipe medium grade of 100 mm dia all as specified & directed

20

-

-

... More
(c) Supply & Fix in repairs MS pipe heavy grade 40 mm dia including removing of unserviceable MS pipe medium grade of 40 mm dia all as specified & directed

15

-

-

... More
(d) Supply & Fix in repairs MS pipe heavy grade 50 mm dia including removing of unserviceable MS pipe medium grade of 50 mm dia all as specified & directed

15

-

-

... More
(e) Supply & Fix in repairs butter fly valve 50 mm dia including removing of unserviceable butter fly valve of size 40/50 mm dia all as specified & directed.

3

-

-

... More
(f) Supply & Fix in repairs butter fly valve 100 mm dia including removing of unserviceable butter fly valve of size 100 mm dia all as specified & directed.

3

-

-

... More
M & L Expansion valve of AC plant capacity 26/30/39 TR including taking down unserviceable valve complete all as specified and directed by EIC

3

-

-

... More
All as per item No. 22.00 here in before, but for 7.5 TR

2

-

-

... More
PART-II :ROUTINE MAINT DUCT/ TOWER AC

-

-

-

... More
M&L for rectification of defects and making functional duct / floor mounted AC of any capacity incl rectification of minor defects such as tripping of MCBs, replacement of MCBs wherever necessary, rectifying loose electrical connections, making fresh connections in electric panel / connector / contactor/capacitor/relay etc, making functional of defective plug / cap etc, arresting condensate water leakage, checking function of compressor of any capacity etc complete all as specified and directed. Note :- (i) Unit rate quoted shall include for maintaining proper record and obtain the signature of concerned user unit. (ii) Unit rate quoted shall include for sundry items / materials as required. (iii) MCB TPN 32/40 Amps will be measured and paid separately. (iv) Spare parts required will be measured and paid separately.

30

-

-

... More
M&L for periodical maintainance of duct AC of 5 Ton capacity including cleaning of overhead ceiling supported indoor unit complete, duct system, blower, outdoor unit, wiring system, cool air vent, checking function of fire damper, cleaing including, oiling / greasing of movable parts of indoor unit such as motor bearing etc, fresh electrical connections, checking insulation of wiring etc complete, all as specified and directed.

11

-

-

... More
All as per item No 25 above but 7.5 Ton duct AC.

11

-

-

... More
All as per item No 25 above but for 3 Ton Tower AC

25

-

-

... More
Labour only for leak testing including all allied works such as vaccumising the complete system, soap leak test, nitrogen gas pressure test, replacement of copper filters, capillary, copper tubing of suitable size and required length, flux, flare nut, dead plug, dead cap, brazing etc including necessary welding work, testing and commissioning upto satisfactory performance for the following :-

-

-

-

... More
(a) Refrigeration circuit of floor mounted Tower AC of capacity 3 Ton .

25

-

-

... More
(b) Refrigeration circuit of Duct AC of capacity 5 Ton .

11

-

-

... More
(c) 3 Nos of Refrigeration circuit of 2.5 Ton each for Duct AC of capacity 7.5 Ton. Note :- Qty of gas will be measured and paid separately.

11

-

-

... More
S&F in repairs reciprocationg compressor 3 phase 415 V, 2.5 Ton capacity Model No CR 36 K 6TF 6101- 01 No of make Blue Star suitable for duct AC factory tested including taking out old compressor, pumping down refrigerant, bracing and flaring, topping up of refrigerant (labour only) connecting, testing and commissioning the compressor all as specified and directed.

7

-

-

... More
All as per item No 29 but for 3 Ton capacity for floor mounted AC and Tower AC.

3

-

-

... More
All as per item No 29 but 5 Ton capacity for duct AC AG5560.

1

-

-

... More
S&F in repairs propeller type fan / blower motor, single end shaft, single phase, 240 volts, 1/4 HP metallic body/PVC body for outdoor unit of duct / floor mounted AC suitable for Blue Star make all as specified and directed.

10

-

-

... More
All as per item No 32 but 1/2 HP for 5 TR duct AC.

3

-

-

... More
S&F in repairs fan / blower centifugal type motor, double end shaft, single phase, 240 volts, 3/4 HP metalic body for indoor unit of duct AC suitable for Blue Star make all as specified and directed.

6

-

-

... More
S&F in repairs fan blade assembly for outdoor unit suitable for Blue Star make following capacities.

-

-

-

... More
(a) 3.0 TR Capacity of floor mounted AC /tower AC

4

-

-

... More
(b) 5 TR capacity of duct AC

4

-

-

... More
(c) 7.5 TR capacity of duct AC

4

-

-

... More
M&L for taking down unserviceable fan blower motor of 1/4 HP capacity from outdoor unit of duct / floor mounted AC and rewinding motor, varnishing, drying etc, replacement of bush, assembly etc suitable for Blue Star make and fixing it back complete all as specified and directed.

6

-

-

... More
M&L for taking down unserviceable fan blower motor of 1/2 HP capacity from outdoor unit of duct / floor mounted AC and rewinding motor, varnishing, drying etc, replacement of bush, assembly etc suitable for Blue Star make and fixing it back complet all as specified and directed.

7

-

-

... More
M&L for taking down unserviceable fan blower motor of 3/4 HP capacity from outdoor unit of duct / tower AC by removing ceiling boards, disconnecting electrical connection, rewinding motor varnishing, drying etc, replacement of bush, assembly etc suitable for Blue Star make and fixing it back complet all as specified and directed.

6

-

-

... More
S&F in repairs 12 way wiring connector terminal for duct AC / tower AC complete all as specified.

10

-

-

... More
S&F in repairs PVC air filter for floor mounted AC 3 Ton capacity complete all as specified.

10

-

-

... More
S&F in repairs pendent control assembly with cord and PC circuit Model 050D suitable for Blue Star make duct AC of 5/ 7.5 Ton capacity complete all as specified & directed.

8

-

-

... More
S&F in repairs overload relay for 5 Ton compressor of Duct AC complete all as specified & directed.

10

-

-

... More
S&F in repair overload relay for 2.5/3 Ton compressor of Duct AC complete all as specified & directed.

10

-

-

... More
S&F in repairs flexible cord, 3 core, copper conductor 2.5 Sqmm complete all as specified & directed.

80

-

-

... More
S&F in repairs single phase preventer cum controller for operation of floor mounted AC of 3 Ton capacity.

12

-

-

... More
S&F in repairs including brazing of copper tube size 5/8 suitable for duct / floor mounted Acs complete all as specified & directed.

70

-

-

... More
S&F in repair including brazing of copper tube size 3/8 suitable for duct / floor mounted Acs complete all as specified & directed.

70

-

-

... More
S&F in repair copper tube insulation with heatlon or Superlon insulation material.

60

-

-

... More
Supply in repair 3 phase contactor 3 TF 3101-08, 400 V suitable for duct AC / floor mounted AC complete all as specified & directed.

4

-

-

... More
Supply & fix in repairs capacitor of 10-36 mfd, plastic body complete assembly as specified and directed.

30

-

-

... More
Taking out carefullly old Old unserviceable cooling coil condensor of 7.5 TR duct AC ( outdoor unit) and supply and fixing new cooling coil condensor of outdoor unit of 7.5 TR duct AC and make functional including testing complete all as specified and directed.

2

-

-

... More
Supply and fixing in repair MCB TPN 32 to 40 Amps complete all as specified and directed.

6

-

-

... More
Supply and fixing in repair remote control unit for 5 TR , 7.5 TR duct AC and 3TR floor mounted AC.

6

-

-

... More
PART-III :ROUTINE MAINT OF FIRE ALARM SYSTEM

-

-

-

... More
Supply & Fix in repair Manual Call Point (MCP) complete all as specified & directed. Make Notifier Cat No. F/MCP/Glass

60

-

-

... More
Supply & Fix in repair Addresable thermal detector with flash scan complete all as specified & directed. Make Notifier Cat No. FST/851R+B/501UL

40

-

-

... More
Supply & Fix in repair Addresable Relay module with flash scan provides two form-C dry contacts that switch together complete all as specified & directed. Make Notifier Cat No. Notifier, FRM/1

8

-

-

... More
Supply & Fix in repair Addresable control module with flash scan configured for one class A or Class B NAC complete all as specified & directed. Make Notifier, Cat No. FCM/1

10

-

-

... More
Supply & Fix in repair Addresable mini monitor module with flash scan supervises either a class A or class B circuit of N.D. dry-contact input devices complete all as specified & directed. Make Notifier Cat No. FMM/1

16

-

-

... More
Supply & Fix in repair Hooter cum strobe system sensor complete all as specified & directed. Make System sensor Cat No. SYS-HS

6

-

-

... More
Supply & Fix in repair UV detector complete all as specified & directed. Make Honeywell (Beam Detector)

2

-

-

... More
Supply & Fix in repairs Adressable duct detector complete all as specified & directed.Make Notifier , Cat No .DNR+FSP/851 +DNR 1.5

6

-

-

... More
Supply & Fixing in repair of Network Announciator Panel complete with accessories all as specified & directed.Make Notifier , Cat No .NCA-2+ABS-2D+CHS-2D

3

-

-

... More
Supply & Fixing in repair of OFC Network card complete with accessories all as specified & directed.Make Notifier , Cat No .HS-NCM-SF

3

-

-

... More
Labour only for Non Comprehensive Routine maintenance checkup of Fire alarm system's error and alarms, necessary inspection of the Fire alarm system and take necessary corrected actions,resolve any issues regarding the system and take corrective actions for the problems , check connectivity and communication at all terminations,check all power sources and outlets used in the system complete for 12 Nos panels of Fire alarm system by authorised service engineer of OEM and furnish the report to Engineer-in-charge.

11

-

-

... More
Supply & Fix in repairs lead acid type battery of 12 Volts 7 AH capacity complete all as specified and directed .

18

-

-

... More
M&L for taking down unserviceable UV Detector from Site E and necessary repair and fixing it back complete all as specified and directed.

10

-

-

... More
PART-IV :MANNING & OPERATIONS

-

-

-

... More
Manning and operation of package type AC plant at HTL of capacity of 11 ton-02 Nos. ( 1 W ,1 S) Make : Blue Star, Model DPA-1052 S running daily 24 hrs. in 3 shifts for smooth functioning of entire system and to maintain specific temperature as directed complete. AC plants consists of the following accessories:-

11

-

-

... More
a) Package type Air conditioning Plant sealed compressor condenser Model DPA 1052-02 Nos. (1 W,1S)

-

-

-

... More
b) Electric control panel cubical type main switches,, starter voltmeter, ammeter contractors -01Set.

-

-

-

... More
c) Control devices such as expansive valve thermostat solenoid valve HP/ LP/CP cut outs with panel board installed gauges-01 Set.

-

-

-

... More
d) Sealed AHU with cooling coil and blower motor-02Set.

-

-

-

... More
e) Ducting for supply air with grills diffusers dampers per and re heater etc.-01Set.

-

-

-

... More
Manning & operation of central AC plant with package chiller condensing unit complete of 3 Nos. 26 Ton (Make :-BLUE STAR , Model No. LCWS2-026 at IGLOO complete with cooling tower, AHU & other accessories each for 24 hrs 3 shifts around the clock run daily

11

-

-

... More
a) Water cooled package chiller unit model LCWS2-026 -03Nos.

-

-

-

... More
b) Chiller water pump motor Model ND-112 M capacity 5 hp, Make - Crompton Greaves -03Nos

-

-

-

... More
c) Chiller water pump set Model 2U1 capacity 83 USGPM at 25 Mtr head , Make Becon Weir Ltd -03Nos

-

-

-

... More
d) Condeser water pump set Model 2U1 capacity 83 USGPM at 25 Mtr head , Make Becon Weir Ltd -03Nos

-

-

-

... More
e) Condeser water pump motor Model ND-112M capacity 5 hp, Make - Crompton Greaves -03Nos

-

-

-

... More
f) Air handling unit model ESHW06-220 of capacity 22277 cmh with blower motor, cooling coil, heater bank, humidity and temperature controller, electric panel complete -02 No. Make - Blue Star

-

-

-

... More
g) FRP Cooling tower capacity 101 USGPM , Model No SM2/6C/1.5 with CT fan-03No. Make Mihir Engr Ltd

-

-

-

... More
h) Electrical control panel cubical type floor mounted with maint switch MCB's voltmeter , Ammeter, Starter Condenser etc. complete-01Set.

-

-

-

... More
j) Control devices such as expansive valve thermostat solenoid valve HP/ LP/CP cut outs with panel board installed gauges-01 Set.

-

-

-

... More
k) Digit type thermometer-01 Set

-

-

-

... More
l) Air supply duct with grill diffusers dampers and heater etc.complete-01 Set.

-

-

-

... More
m) Condenser piping MS 100/80/50mm dia with valves pressure gauge temperature gauge complete -1Set.

-

-

-

... More
Manning & operation of central AC plant with package chiller condensing unit complete of 3 Nos. 39 Ton (Make :-BLUE STAR , Model No. LCWS3-039 at DBM complete with cooling tower, AHU & other accessories each for 24 hrs 3 shifts around the clock run daily

11

-

-

... More
a) Water cooled package chiller unit model LCWS3-039 -03Nos.

-

-

-

... More
b) Chiller water pump motor Model ND-112 M capacity 5 HP, Make - Crompton Greaves -03Nos

-

-

-

... More
c) Chiller water pump set Model 2U1 capacity 141 USGPM at 25 Mtr head , Make Becon Weir Ltd -03Nos

-

-

-

... More
d) Condeser water pump set Model BWC 50/80 capacity 141 USGPM at 25 Mtr head , Make Becon Weir Ltd -03Nos

-

-

-

... More
e) Condeser water pump motor Model ND-132S capacity 7.5 HP , Make - Crompton Greaves -03Nos

-

-

-

... More
f) Air handling unit model ESHW06-270 of capacity 29549 cmh with blower motor, cooling coil, heater bank, humidity and temperature controller, electric panel complete -02 No. Make - Blue Star

-

-

-

... More
g) FRP Cooling tower capacity 141 USGPM ,Model No SM2/7.5C/2 with CT fan-03No. Make Mihir Engr Ltd-03 Nos

-

-

-

... More
h) Electrical control panel cubical type floor mounted with maint switch MCB's voltmeter , Ammeter, Starter Condenser etc. complete-01Set.

-

-

-

... More
j) Control devices such as expansive valve thermostat solenoid valve HP/ LP/CP cut outs with panel board installed gauges-01 Set.

-

-

-

... More
k) Digit type thermometer-01 Set

-

-

-

... More
l) Air supply duct with grill diffusers dampers and heater etc.complete-01 Set.

-

-

-

... More
m) Condenser piping MS 100/80/50mm dia with valves pressure gauge temperature gauge complete -1Set.

-

-

-

... More
Manning & operation of central AC plant DX type condensing unit complete of 3 Nos. 30Ton (Make :-BLUE STAR , Model No. WCUS2-030 at PMS building, MTP complete with cooling tower AHU & other accessories each for 24 hrs 3 shifts around the clock run daily

11

-

-

... More
a) Water cooled DX unit model WCUS2-030 -03Nos.

-

-

-

... More
b) Condeser water pump set Model 2U1 capacity 75 USGPM at 25 Mtr head , Make -Becon Weir Ltd -03Nos

-

-

-

... More
c) Condeser water pump motor Model ND-112 M capacity 5 HP, Make - Crompton Greaves -03Nos

-

-

-

... More
d) Air handling unit with blower motor, heater bank, cooling coil, electric control panel complete installed in AHU room -01 No. Make - Blue Star Model ESHX6-160 of 19440 cmh

-

-

-

... More
e) FRP Cooling tower capacity 75 USGPM ,Model No SM1/9B/1.5 with CT fan-03No. Make Mihir Engr Ltd-03 Nos

-

-

-

... More
f) Electrical control panel cubical type floor mounted with maint switch MCB's voltmeter , Ammeter, Starter Condenser etc. complete-01Set.

-

-

-

... More
g) Control devices such as expansive valve thermostat solenoid valve HP/ LP/CP cut outs with panel board installed gauges-01 Set.

-

-

-

... More
h) Digit type thermometer-01 Set

-

-

-

... More
j) Air supply duct with grill diffusers dampers and heater etc.complete-01 Set.

-

-

-

... More
k) Condenser piping MS 100/80/50mm dia with valves pressure gauge temperature gauge complete -1Set.

-

-

-

... More
Manning & operation of central AC plant DX type condensing unit complete of 2 Nos. 30Ton (Make :-BLUE STAR , Model No. WCUS2-030 at WHJBC building, complete with cooling tower AHU & other accessories each for 24 hrs 3 shifts around the clock run daily

11

-

-

... More
a) Water cooled DX unit model WCUS2-030 -02 Nos.

-

-

-

... More
b) Condeser water pump set Model 2U1 capacity 75 USGPM at 25 Mtr head , Make -Becon Weir Ltd -02 Nos

-

-

-

... More
c) Condeser water pump motor Model ND-112 M capacity 5 HP, Make - Crompton Greaves -02 Nos

-

-

-

... More
d) Air handling unit with blower motor, heater bank, cooling coil, electric control panel complete installed in AHU room -01 No. Make - Blue Star Model ESHX4-120 of 14076 cmh

-

-

-

... More
e) FRP Cooling tower capacity 75 USGPM ,Model No SM1/9B/1.5 with CT fan-03No. Make Mihir Engr Ltd-03 Nos

-

-

-

... More
f) Electrical control panel cubical type floor mounted with maint switch MCB's voltmeter , Ammeter, Starter Condenser etc. complete-01Set.

-

-

-

... More
g) Control devices such as expansive valve thermostat solenoid valve HP/ LP/CP cut outs with panel board installed gauges-01 Set.

-

-

-

... More
h) Digit type thermometer-01 Set

-

-

-

... More
j) Air supply duct with grill diffusers dampers and heater etc.complete-01 Set.

-

-

-

... More
k) Condenser piping MS 100/80/50mm dia with valves pressure gauge temperature gauge complete -1Set.

-

-

-

... More
Manning & Opeartion of Central AC Plant with package chiller condensing unit complete of 02 Nos working & 01 No Stand by, Each 120 Ton Capacity (Make :-BLUE STAR, Model No. LCWR 1-120 at MTP storages AC Plant complete with cooling tower, AHU & other accessories in 3 shifts as per timings decided by Engineer in charge for efficient and continuous running / operation of central AC Plant and its electrical panel board with other installation / equipments as mentioned below:-

11

-

-

... More
(a) Water cooled package chiller unit model LCWR 1-120 - 03 Nos

-

-

-

... More
(b) Chiller water pump motor model ND-160 M capacity 15 HP,Make- Crompton Greaves - 03 Nos

-

-

-

... More
(c) Chiller water pump set Model BWC 80/100 capacity 360 USGPM at 30 Mtr head,Make-Beacon Weir -03 Nos

-

-

-

... More
(d) Condenser water pump set Model BWC 80/100 capacity 450 USGPM at 25 Mtr head,Make-Beacon Weir-03 Nos

-

-

-

... More
(e) Condenser water pump motor Model ND-160 L capacity 15 HP,Make- Crompton Greaves - 03 Nos

-

-

-

... More
(f) Air handling unit model ESHW4-350 of capacity 36396 cmh with blower motor, cooling coil, heater bank, humidity and temperature controller, electric panel complete-04 Nos. Make- Blue Star

-

-

-

... More
(g) FRP Cooling tower capacity 450 USGPM, Model AQ 3870 with CT fan-03 Nos Make- Paharpur

-

-

-

... More
(h) Electrical control panel cubical type floor mounted with maint switch MCBs volmeter, Ammeter, Starter Condenser etc. complete-01 set

-

-

-

... More
(j) Control devices such as expansive valve thermostat solenoid valve HP/LP/CP cut outs with panel board installed gauges-01 set.

-

-

-

... More
(k) Digit type thermometer - 01 set

-

-

-

... More
(l)Air supply duct with grill diffusers, dampers and heater etc complete - 04 sets

-

-

-

... More
(m) Condenser piping MS 100/80/50 mm dia with valves pressure gauge, temperature gauge complete -01 set.

-

-

-

... More
Note for item No.1-6 above (a) Contractor has to employ following staff for manning & operation of the AC plants at each shifts of 8 hours

-

-

-

... More
(i) One No operator having minimum ITI qualification in Ref Mech/Electrician trade from Govt recognised institute with minimum 2 years experience in maintenance & operation of AC plants in each shift of 8 hrs (Total 3 shifts )( for item No. 1 to 6)

-

-

-

... More
(b) Contractor will maintain proper records of all kinds of daily, weekly , monthly, quarterly, half yearly, yearly or whatsoever maintenance is carried out during contract period in a binded book/register and will obtain the signature of Engineer-in-Charge

-

-

-

... More
(c) The operator/helper will ensure general cleanliness and upkeep of the installation on daily basis.

-

-

-

... More
(d) The routine maintenance/checks shall be strictly carried out by the operator all as per the list of routine maintenance activities with periodicity as per appendix 'A' to PS hereinafter attached.

-

-

-

... More
(e) The unit rate quoted shall deemed include for maintenance for earthpits, cutting & removing of vegitation and upkeep of the surrounding area, all around the bldg upto 6m from the plinth protection all as directed by Engr-in-Charge. In case of failure, a penalty of Rs 2000/- per month will be levied and recovered from dues. (f) The contractor shall provide 02 uniforms to each operator & helper and design of uniform shall be got approved. In case of failure, a penalty of Rs 2000/- per uniform will be levied and recovered from dues. (g) In case of failure due to absence of operative staff, the contractor shall be liable to pay compensation at twice the cost of a day’s Manning & Operation derived from pro rata rate of Sch ‘A’ quoted rates.

-

-

-

... More
(h) The Contractor shall pay the wages to the operators/helpers (as applicable) through e-payment i.e Adhaar linked bank accounts (credit to their bank account). Engineer-in-charge shall ensure that e-payment made to operator/helpers and their wages shall not be less than minimum wages fixed by state Govt or Central Govt whichever is more. Monthly e-banking statement shall be furnished by the contractor to the Engineer-in-charge and the same shall be kept in record duly verified. (j) It is the responsibility of contractor to deposit the employees provident fund (EPF) to the concerned authority as per the prevaling scales as laid down by Ministry of labour for all operator/helper (as appliable) and necessary proof to this regard shall be submitted to the Engineer-in-charge for verification & record. The quoted rates shall be deemend to be included of above provisions. In case contractor fails to produce the proof of EPF, the same shall be recovered from his dues as per the prevailing scale plus 15 percent profit. (k) The contractor shall maintain all the registers under various labour law rules, 2017 and shall be produced to the Engineer-in-Charge as well as officers detailed by central labour department.

-

-

-

... More
(l) Defective parts of plants will be replaced and measured under respective item of this schedule.

-

-

-



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.