Military Engineer Services Tender
View complete overview of Goa MES Tender
Costs
EMD
0Document Cost
Refer DocumentsTender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2024_MES_690788_1Tender No
3126/JW/E3Tender Authority
Military Engineer Services ViewPurchaser Address
-Website
http://https://mes.gov.in/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
BOQ Items
... More
Priming the surface with Kemperol EP Primer and applying liquid applied polyester resin base, flexible, UV Resistent waterproofing System Kemperol V 210 with Kemperol Fleece 165 GSM in a two layer system for upto 25mm wide joint, having first layer of 21 CM and second layer of 26.25 cm as per the specification, providing & applying two coast of kemperol EP Primer finished with sprinkled sand as a alkali resistant coating on finished floor/wall. The item rate shall include all cost towards all materials including wastages required labour, tools & tackles along with consumable, all leads & lifts. The entire Work shall be done as per manufactures specification
12
-
-
... More
Redoing the broken brickbat coba to match existing line & level in cement mortar 1:3 with integral waterproofing mixture conproof HP, finished with IPS marked with false square curing etc., complete Including leaving a gap of 25mm upto the finished floor level.
12
-
-
... More
Providing all material and labours and finishing the expansion joint at floor level by fixing Backer Rod and filling PU sealant Mycoflex 210LM
24
-
-
... More
Removal of debris from site by truck load
1
-
-
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements