Waterproofing Tenders
Waterproofing Tenders
Municipality Of La Trinidad, Benguet Tender
Philippines
Closing Date14 Aug 2024
Tender AmountPHP 297.2 K (USD 5.1 K)
Details: Description Invitation To Bid For The Procurement Of Additional Rescue Equipment 1. The Municipal Government Of La Trinidad, Through The General Fund 2024 Intends To Apply The Sum Of Two Hundred Ninety-seven Thousand Two Hundred Sixty-one Pesos (php 297,261.00) Being The Approved Budget For The Contract (abc) To Payments Under The Contract For Procurement Of Additional Rescue Equipment. Bids Received In Excess Of The Abc Shall Be Automatically Rejected At Bid Opening. 2. The Municipal Government Of La Trinidad, Benguet Now Invites Bids For The Project: Project Reference No.: 2024-07-3475-mdrrmo Name Of Project: Procurement Of Additional Rescue Equipment Project Location: La Trinidad, Benguet Contract Duration: Within 10calendar Days From Receipt Of The Notice To Proceed Brief Description: Qty. Unit Description 2 Pieces Descender Brake Bar - Rack Descender - Weight: 470g - Rope Suitable Diameter: 13mm - Can Be Installed In Any Piece Of Rope, As Long As The User’s Weight Drop Device For A Hanging, A Decrease Of The System Will Automatically Stop. 4 Pieces Hand Ascender (left And Right) - For Ascending And Pulling - Ergonomic Design On Molded Rubber Handle, Suitable To Use On Either Hot And Cold Weather - Upper Hole For Carabiner And Ropes - Lower Hole For Lanyard And Foot Strap - Self-cleaning Steel Cam - Light Weight - Optimized Structure Allows Easier Rope Ascending - Bearing Load: 4-6.5kn - Rope Suitable Diameter: 8-13mm - Weight: 211g 10 Pieces Fixed Pulley - Single Pulley, Mini Roll, Aluminum Alloy - Weight: 87g - Strength: 12x2 = 24kn - Suitable Rope: Nylon Rope, 13mm - Length*width: 80x44mm - Single Pulley Fixed Side Plates Made Of Aluminum Alloy Can Be Used In The Rope Pulley, Small Pulley Fixed Side As One More Light, Can Be Applied To An Emergency Transport, Construction, Rescue Pulley, Can Be Used For Static Pulley Can Also Be Used For Movable Pulley, Pulley System Can Be Used As A Branch Of The Rescue Package The Other Pulley Wheels To Establish Or Upgrade Pulley Sets. 7 Pieces Swing-sided Pulley - Material: Aluminum - Size:175*94mm - Rope Suitable Diameter: 8-13mm - Use For Rope And Wire Rope 10 Pieces Carabiners Oval Auto - Steel, Twist-lock, Automatic Locking - Weight: 170g - Gate Opening: 21mm - Length*width: 109x60mm - Diameter: 10mm - Closed Gate Strength: 23kn - Gate Open Strength: 10kn - Minor Axis Strength: 7kn - Automatic Locking System, Which Can Open And Close With One Hand, Often Use The Occasion Switch Safety Button, The User Forgot To Turn Off The Lock Can Prevent The Situation. - Uses Two-step Unlocking Method, To A Certain Extent Reduce The Accident Probability Of Opening To Lock The Door Closed. 9 Pieces Carabiners D Type - Color: Various - Screw-lock Mechanism - Gate Opening: 29.7mm - Diameter: 13.7mm - Length*width: 131x75mm - Weight: 323g - Strength: 60kn - Strong Stainless Steel Safety Buckle: For The Severe Environment, Wide Open Aperture 27mm Point For Connection To The Determination Of Heavy, Higher Security Lock On A Wider More Tools Can Be Connected. 6 Pieces Delta 10mm Screw Links - Triangular Quick Link - When Closed With A Wrench, This Steel Quick Link Becomes Semi-permanent Anchor Ring - Material: Steel - Certification(s): Ce En 362 Type Q - Diameter: 8mm - Color: Gray - Weight: 85g - Major Axis Strength: 25kn - Minor Axis Strength: 10kn - Gate Opening: 10mm 5 Pieces Fall Arrest Lanyard - Material: Good Quality Nylon Dynamic Rope, Steel Hook And Energy Absorber - Weight: 1540g - Diameter Or Rope: 10.5mm - Length Of Lanyard: 60” - Feature: Assistant Anchor Point For The High Air Exercise, Protection - Usage: Steel Frame Climbing, Firefighting Rescue And Military 9 Pieces Lifting Sling Webbing - Open Loop Sling For Setting Up Belay Or An Anchor Point - Strength: 22kn - Material(s): Polyester - Certification(s): Ce, Uiaa - Color(s): Green - Weight: 100 G - Length: 120 Cm 6 Pieces Chest Ascender - Length*width:121*76mm - Designed For Moving Along Fixed Ropes - Increased Chest Product Features: Above And Below Were Finally Saw Finally Saw The Hole In The Tool Wear Will Increase When The Devices Work Best In A Fixed Position - Application: Hand-type Risers With Common Use In The Ropes, Can Effectively Increase The Time To Save Energy, And Increase Speed And Efficiency Increase. - Used: 9-13 Mm Diameter Single Rope. 6 Pieces Chest Harness - Specification: All-purpose - Weight: 258g - Material: Nylon - Breaking Strength: 15kn 4 Pieces Drawstring Portable Rope Bag-dry Bag - Material: Nylon - Waterproof - Oxford Cloth Rope Bag - Circle Drawstring Bag - Standard Size 1 Piece Triangle Evacuation Harness - Size: 1mx1mx1m - Weight: 810g - In The Three Corners Of The Triangle To Save The Configuration With Three Hanging Points, Each Hanging Point Has Its Corresponding Mount Point (a, B, C Three Hanging Points And Other Connections At Both Ends Of The Corresponding Mount Point). - Used For A Variety Of Size Of The Crowd, Wear Should Be Selected In The Corresponding Points To Make It More Smooth Hanging Pocket Securely Users. - Can Be Done Quickly To Wear, Easy To Use. 1 Piece 7mm Kernmantle Rope - Color: Yellow/red - Mbs: 10.7kn (2405 Ibf) - Weight: 29g/m - Diameter: 7mm - Length: 100mm (328ft) - Made In Usa 1 Piece 2” Tubular Webbing - Built To Commercial Versions Of Military Specifications. - Use For All Rigging Uses: Slings, Anchorages, Even Hasty Seats - Spools May Contain Splices - Mbs: 36 Kn (8000 Lbf) - Weight: 75 G/yd - Length: 45.72 M (150 Ft) - Width: 2.00" (5.1 Cm) - Material: Nylon 1 Piece Dyneema Throwline - 48 Braid Construction - Yellow + Gray Reflective - 48 Braids - 50/m - Breaking Strength: 12kn - En1891: 1998 Compliant 1 Piece Knot Passing Pulley/high Line Carriage - Knot-passing Pulley That Allows Passage Of Joining Knots. The Large Diameter Sheave Mounted On Sealed Ball Bearings Ensures Excellent Efficiency. - Rope Compatibility: 8 To 19 Mm - Sheave Diameter: 76 Mm - Ball Bearings: Yes - Maximum Working Load: 5 Kn X 2 = 10 Kn - Weight: 1390 G - Height: 26 Cm - Certification(s): Ce En 12278 1 Piece Adjustable Litter Bride Set - Made With An Eye On A Very Wide Range Of Special Emergency Situations, Such As In The Mountains, Air And Sea. - Sturdy And Flexible To Use, Its Quick Reliable Fittings Enable First-aid Person To Operate It Rapidly And Safely. - Ideal For Lifted And Transported By Helicopter. - With Safety Belts And A Mattress. - Made Of Stainless Tube And Net, It Will Not Rust And Potentially Cause Additional Harm To The Patient. - Stronger Than Common Basket Stretcher. - Can Be Used Together With The Spine Boards. - Size (l*w*h): 212 X 67 X 25 Cm - Packing Size (1pc): 215 X 70 X 28 Cm - Load Bearing: ≤ 350 Kg - Net Weight: 13 Kg - Gross Weight: 18 Kg 2 Pieces Anchor Plate - Type: Rigging - Materials: Aluminum Alloy - Strength: 36kn - Size: 153*121mm - Weight: 210g - Big Hole Diameter: 52mm - Small Hole Diameter: 22mm 1 Piece Anchor Strap/textile Anchor - Offers Several Configurations For Setting Up An Anchorage Directly On An Anchor Or Around A Suitable Structure - Durable And Adjustable Anchor Strap Equipped With Two Forged Steel Attachment Points. - Abrasion-resistant Webbing - Strap Length Is Immediately Identified By Label On Strap End Featuring The Large Loop - Breaking Strength: 25 Kn - Certifications: Ce En 795 B, Nfpa 1983 General Use - Length: 200-400cm - Width: 44mm 1 Piece High Speed Air Pump - Voltage:12v - Current:10a - Max Pressure:140psi/10bar - Max Air Flow:35l/min - Integrated Led Light - With 3m Cord - With Cigarette Lighter Plug And Battery Clamp - With Nozzle Holder - Not Easy To Lose - Small And Easy To Carry - Quick Release Adapter - Explosion Proof Air Hose Bidders Should Have Completed, Within Five (5) Years From The Date Of Submission And Receipt Of Bids, A Contract Similar To The Project. The Description Of An Eligible Bidder Is Contained In The Bidding Documents, Particularly, In Section Ii (instructions To Bidders). 3. Bidding Will Be Conducted Through Open Competitive Bidding Procedures Using Non-discretionary “pass/fail” Criterion As Specified In The 2016 Revised Implementing Rules And Regulations (irr) Of Republic Act (ra) No. 9184. A. Bidding Is Open To All Interested Bidders, Whether Local Or Foreign, Subject To The Conditions For Eligibility Provided In The 2016 Revised Irr Of Ra No. 9184. 4. Prospective Bidders May Obtain Further Information From The Bids And Awards Committee Of The Municipal Government Of La Trinidad, Benguet And Inspect The Bidding Documents At The Municipal General Services Office-extension, 1st Floor Brgy. Pico Barangay Hall, Km. 5 Pico, La Trinidad, Benguet From 8:00am To 5:00pm, Mondays To Fridays. 5. A Complete Set Of Bidding Documents May Be Acquired By Interested Bidders On August 2 – August 14, 2024 At Municipal General Services Office-extension, 1st Floor Brgy. Pico Barangay Hall, Km. 5 Pico, La Trinidad, Benguet And Upon Payment Of A Non-refundable Fee For The Bidding Documents In The Amount Of Five Hundred Pesos (php500.00). 6. The Municipal Government Of La Trinidad, Benguet Will Hold A Pre-bid Conference On (n/a) Which Shall Be Open To Prospective Bidders. 7. Bids Must Be Duly Received By The Bac Secretariat Through Manual Submission At The Municipal General Services Office-extension, 1st Floor Brgy. Pico Barangay Hall, Km. 5 Pico, La Trinidad, Benguet On Or Before August 14, 2024 At 9:00am. Late Bids Shall Not Be Accepted. 8. All Bids Must Be Accompanied By A Bid Security In Any Of The Acceptable Forms And In The Amount Stated In Itb Clause 15. 9. Bid Opening Shall Be On August 14, 2024 At 10:00am At The 2nd Floor Municipal Disaster Risk Reduction Office, Km. 5 Pico, La Trinidad, Benguet. Bids Will Be Opened In The Presence Of The Bidders’ Representatives Who Choose To Attend The Activity. 10. The Municipal Government Of La Trinidad, Benguet Reserves The Right To Reject Any And All Bids, Annul The Bidding Process, Declare A Failure Of Bidding, Or Not Award The Contract At Any Time Prior To Contract Award In Accordance With Sections 35.6 And 41 Of The 2016 Revised Implementing Rules And Regulations (irr) Of Ra No. 9184, Without Thereby Incurring Any Liability To The Affected Bidder Or Bidders. 11. For Further Information, Please Refer To: Corazon A. Uyaan Head Bac Secretariat Bids And Awards Committee Office Municipal General Services Office-extension 1st Floor Brgy. Pico Barangay Hall, Km. 5 Pico, La Trinidad, Benguet Contact No.: 0969 – 334 – 9233 E-mail Address: Bac01latrinidad@yahoo.com Approved: (sgd) Yoshio P. Labi Bac Chairperson Noted: (sgd) Romeo K. Salda Head Of The Procuring Entity
National Fisheries Research & Development Institute Tender
Laboratory Equipment and Services
Philippines
Closing Date9 Jul 2024
Tender AmountPHP 475.8 K (USD 8.1 K)
Details: Description Supply And Delivery Of Laboratory Supplies And Consumables For Various Projects Of Bfrdc 475,800.00 Filter Bag 3 Piece 9,000.00 Specifications: Mesh Size: 5 Microns Dimension: 45 X 60 Cm Color: White Water Quality Test Kit 3 Piece 15,000.00 Specifications: Saltwater Test Kit Test High Range, Ph, Ammonia, Nitrite And Nitrate Contain 550 Test And Includes 6 Test Solutions, Easy-to-ready Instructions, With 4 Test Tubes And Color Chart Dissecting Tray 10 Piece 4,000.00 Specifications: Material: Stainless Steel Dimension: 30 X 20 Cm Subtotal 28,000.00 Charged To: 2024-bfrdc-01 (broodstock Development And Performance Evaluation Of Red Tilapia In Brackishwater Ponds) Digital Vernier Caliper 2 Piece 6,000.00 Specifications: Plastic Electronic Digital Caliper, Measuring Range From 0-150mm, 1.5v Cell Battery Zero Setting In Any Position, Easy To Read Subtotal 6,000.00 Charged To: Bfrdc-02 (evaluation Of Induced Molting Techniques In The Soft-shell Production Of Mangrove Crab, Scylla Spp. In Northern Mindanao, Philippines) Absolute Ethanol 1 Bottle 5,000.00 Specifications: Ar, 4l/bottle Laboratory Sealing Film 1 Piece 4,000.00 Specifications: 4" X 125 Ft/m/piece Entomology Forceps 4 Piece 2,000.00 Specifications: Fine Tip, 4.5" Length Material: Stainless Steel Saltwater Test Kit 2 Kit 4,000.00 Specifications: 550 Tests, Include 6 Test Solutions With 4 Test Tubes And Color Chart Parameters: Ph, Ammonia, Nitrate, Nitrite Ms - 222 1 Bottle 17,500.00 Specifications: Tricaine Methanesulfonate, 10 Grams Distillled Water 10 Bottle 1,000.00 Specifications: 7 Liters/bottle Subtotal 33,500.00 Charged To: 2024-bfrdc-04 (improved Production Of Milkfish Fingerlings In Lighted Net Cages In Brackishwater Ponds) Microchip Scanner 2 Unit 8,000.00 Specifications: Handheld Reading Standard: Fdx-b Protocol: Iso11784/785 Frequency: 134.2 Khz Battery: 3.7v Lithium Battery Read Range: 10 Cm Read Time: <100 Ms Special Features: Waterproof/weatherproof Color: White Qc Passed Pit Tag 2 Set 12,000.00 Specifications: Dimension: 1.4 X 8 Mm Standard: Fdx-b Protocol: Iso11784/785 Frequency: 134.2 Khz Read Range: 0-2 Cm Packaging: 100 Pcs/set Subtotal 20,000.00 Charged To: 2024-bfrdc-05 (development Of Quality Milkfish Broodstock From Wild For Genetic Improvement) Micropipette Tips (0.1-10µl) 5 Pack 10,000.00 Specifications: Colorless, Sterile, Self- Sealing Dnase/rnase Free 1000 Pcs/pack Micropipette Tips (2.0-200µl) 4 Pack 6,000.00 Specifications: Colorless, Sterile, Self- Sealing Dnase/rnase Free 1000 Pcs/pack Microcentrifuge Rack 3 Pack 3,000.00 Specifications: 3 Rows Of 12 Wells Each Holds 36 X 1.5 - 2 Ml, Polypropylene 2 Pieces/pack, Autoclavable Color: White Laboratory Sealing Film 1 Box 7,000.00 Specifications: 2" X 250 Ft/box Scalpel Blade 5 Box 2,500.00 Specifications: Surgical Grade Stainless Steel 20 Mm Thick, Length=13 Cm Cling Wrap 4 Box 11,300.00 Specifications: Clear, 20 Mm X 1kg X 500mm Aluminum Foil 2 Box 2,000.00 Specifications: 12"x5m/8m, 48pieces/box Dishwashing Liquid 3 Pack 3,300.00 Specifications: 780ml/bottle 3 Bottles/pack Commercial Salt 5 Sack 2,500.00 Specifications: 25 Kg/sack Powder Detergent 4 Pack 2,000.00 Specifications: 2.94 Kg/pack Hypochlorite Bleach 10 Gallon 5,000.00 Specifications: Multi-purpose Bleach Disinfectant Packaging: 4 L/gallon Surgical Blades 10 Box 4,200.00 Specifications: Sterile, Stainless Steel, 100 Pcs/box Pcr And Gel Purification Kit 1 Kit 20,000.00 Specifications: Sample Type: Dna From Pcr And Other Enzymatic Reactions Binding Capacity: Up To 5 Μg Dna Size Range: 100 Bp To 10 Kb; 50 Preps Typical Recovery: Dna (50 Bp To 10 Kb): 70–90% / Dna (11–23 Kb): 50–70% / Ssdna ≥ 18 Nt And Dsdna ≥ 15 Bp: 70–85% Elution Volume: ≥ 6 Μl 2x Pcr Master Mix 1 Kit 30,000.00 Specifications: Application: Pcr And Genotyping Content: 2x Pcr Mastermix With Buffer And Loading Dye, Salts, Dntps, Mgcl2, And Nuclease-free Water Packaging: 20ul X 250 Reactions/kit 100bp Dna Ladder 1 Vial 17,000.00 Specifications: Ideal For Separation On 1-2% Agarose Gels After Ethidium Bromide Or Sybr Safe Staining Size: 100 Bp To 2,000 Bp Packaging: 100 Ul Dna Ladder 1 Ml 10x Sample Loading Buffer, 100 Applications 1kb Dna Ladder 1 Vial 15,000.00 Specifications: Small Size Suitable For 200 Gel Lanes; Large Size Suitable For 1,000 Gel Lanes Size: 500bp To 10 Kb Packaging: 0.2 Ml/vial; Supplied With 1 Ml/vial Of Gel Loading Dye, Purple (6x) 6x Loading Dye 1 Vial 7,500.00 Specifications: Color: Blue Form: Liquid Suitability: Suitable For Use In Nucleic Acid Electrophoresis Impurities: Rnase None Detected Packaging: 5 Ml/vial Tris-acetate Edta 1 Box 10,000.00 Specifications: Color: White Form: Powder Turbidity: Clear Solubility Form: Solution Ph: 8.1-8.5 Suitability: Suitable For Gel Electrophoresis Impurities: Rnase None Detected 1 Liter Per Bottle Nuclease Free Water 1 Bottle 20,000.00 Specifications: Color: Colorless Form: Liquid Ph: 6.0 - 8.0 ; Relative Density: 1,000 G/cu.m Solubility: Completely Miscible Packaging: 500 Ml/bottle Subtotal 178,300.00 Charged To: 2024-bfrdc-06 (broodstock Development And Hatchery Production Of Giant Freshwater Prawn Macrobrachium Rosenbergii) 2-phenoxyethanol 1 Bottle 3,000.00 Volume: 500 Ml/bottle 90%; Usp Grade Lugol's Solution 1 Bottle 3,000.00 Specifications: Volume: 1 L/bottle Synthetic Hormone 6 Vial 18,000.00 Specifications: Powdered Form 100mg Dom + 0.2mg S-gnrh Volume: 10 Ml/vial Normal Salt Solution 5 Bottle 4,000.00 Specifications: 0.0085 Volume: 500 Ml/bottle Formalin 1 Bottle 2,000.00 Specifications: 10% Buffered Formalin Volume: 4 L/bottle Distilled Water 5 Gallon 1,000.00 Capacity: 4 L/gallon Subtotal 31,000.00 Charged To: 2024-bfrdc-07 (domestication Of Pigek Mesopristes Cancellatus And Spanner Crab Ranina Ranina) Sodium Chloride 2 Bottle 4,000.00 Specifications: Molar Mass: 58.44 G/mol Grade Value: Acs, Iso, Reag. Ph 500 Grams Per Bottle Bouin's Solution 1 Bottle 5,000.00 Specifications: Aqueous Solution Of Picric Acid, Formaldehyde, And Acetic Acid Volume: 200 Ml/bottle Isofreeze, 1.5-2 Ml 2 Unit 8,000.00 Specifications: Color Change Temperature Indicator Keep Samples At 4°c Dimension: 70 X 105 X 146 Mm Capacity: 24 Tubes Isofreeze, 0.2 Ml 2 Unit 10,000.00 Specifications: Color Change: Purple (cold) To Pink (warm) Sustain A Sample Temperature Below 4°c For Up To 3 Hours Capacity: Accomodates 96 X 0.1 And 0.2 Ml Tubes And Strip Tubes; Plates With Up To 96 Wells Dimension: 141 X 99 X 44 Mm Material: Sturdy Polypropylene And Inner Gel Interfolded Paper Towel 5 Pack 1,500.00 Specifications: 1-ply; 120 Pulls/ Piece Packaging: 6 Pcs/pack Isopropyl Alcohol 2 Bottle 800.00 Specifications: Volume: 4 L/bottle 99.9% Isopropyl Alcohol, Usp Grade Spatula 10 Piece 1,000.00 Specifications: Dimension: 16 Cm Double Head Material: Stainless Steel Pipette Tip Rack 10 Piece 6,500.00 Specifications: Capacity: 1000µl Heat Resistant, Detachable Box Color: Transparent Wear-resistant And Corrosion-resistant 2-phenoxyethanol 1 Bottle 3,000.00 Specifications: Volume: 500 Ml/bottle 90%; Usp Grade Synthetic Hormone 5 Vial 15,000.00 Specifications: Powdered Form 100mg Dom + 0.2mg S-gnrh Volume: 10 Ml/vial Microchip Scanner 1 Unit 10,000.00 Specifications: Frequency: 134.2khz/125khz Reading/writing Distance: 2 X 12mm Glass Tag>15 Cm, 30 Mm Animal Tag>25 Cm Reading Access Time: <100ms Power: 3.7-4.2v (li Battery) Signal Indicator: 128 X 64 High Brightness Oled, Buzzer Storage Capacity: 20000 Information (tag Coding + Time) Power Consumption: Working: 0.9w, Standby: 0.04w Pit Tag 2 Set 12,000.00 Specifications: Dimension: 1.4 X 8 Mm Standard: Fdx-b Protocol: Iso11784/785 Frequency: 134.2khz Read Range: 0-2cm Packaging: 100 Pcs/set Syringe 2 Box 500.00 Specifications: Capacity: 1 Cc/ml Disposable Range With Needle Packaging: 100 Pcs/box Syringe 2 Box 700.00 Specifications: Capacity: 3 Cc/ml Disposable Range With Needle Packaging: 100 Pcs/box Battery 50 Pack 6,000.00 Size: D; Lr20 Battery Carbon Zinc Type 1.5 Volts; 2 Pcs/pack Dna Extraction Kit 1 Box 35,000.00 Specifications: For Conventional Pcr, Genotyping, And Dna Sequencing Sample: Animal Tissue/blood Packaging: 200 Preps/box Nucleic Acid Gel 2 Vial 15,000.00 Specifications: Ready-to-use; Sufficient To 200 Applications Fluorescent Packaging: 1 Ml/vial 10x Tae Buffer 1 Bottle 15,000.00 Specifications: Grade: Molecular Biology Form: Powder Blend Color: Colorless Turbidity: Clear Impurities: Dnase And Rnase, None Detected Ph: 8.1 - 8.5 Suitability: For Electrophoresis 1 Liter Per Bottle Agarose Gel 1 Bottle 30,000.00 Specifications: Grade: Molecular Biology Appearance: White Powder Moisture Content: (≤ 10) Sulfate Content: (≤ 0.15) Gel Strength: 1.0% (≥ 1200) Impurities: Dnase And Rnase, None Detected Packaging: 500 G/bottle Subtotal 179,000.00 Charged To: 2024-bfrdc-08 (breeding And Seed Production Of Native Catfish (clarias Macrocephalus) *** Nothing Follows *** Note: Expiration Date Of Laboratory Consumables Should Be Atleast 2 Years From The Date Of Delivery Place Of Delivery: Bfrdc, Pacita, Lala, Lanao Del Norte Delivery Period: 30 Days After The Receipt Of Purchase Order
Department Of Agriculture Tender
Agriculture or Forestry Works
Philippines
Closing Date22 Apr 2024
Tender AmountPHP 534.9 K (USD 9.3 K)
Details: Description The Department Of Agriculture Regional Field Office Ix, Through Its Bids And Awards Committee (goods And Services), Hereby Invites All Interested Providers To Quote Their Lowest Price, Subject To The Terms And Conditions Stated Herein. Abc: ₱534,988.00 Delivery Period: 25 Calendar Days Delivery Site: Da-research Division, Sanito, Ipil, Zamboanga Sibugay Accomplished Rfq's Must Be Received By The Bac Secretariat Of The Procuring Entity At Department Of Agriculture-rso Ix, Zamboanga City Or Through E-mail (bacda9zambo@gmail.com). Late Quotations Shall Not Be Accepted. Submit Certified True Copy Of The Following Valid: · Current Business Permit Or Mayor's Permit (2024); · Philgeps Registration Number; · Latest Income Tax Return (itr); · Omnibus Sworn Statement (notarized); · notarized Secretary’s Certificate In Case Of A Corporation, Partnership, Or Cooperative; Or Special Power Of Attorney For Authorized Representative 1 11 Unit "4-level Steel Storage Rack For Office Supplies -shelf Storage Rack Shelving -metal " 1,490.00 2 10 Can Air Freshener Spray, 500grams 650.00 3 56 Btl Alcohol (70% Ethyl Alcohol) 500ml 112.00 4 35 Box "ballpen Friction Pen -0.5 Tip -12pcs/box -black " 150.00 5 30 Box "ballpen Friction Pen -0.5 Tip -12pcs/box -blue " 150.00 6 9 Pack "battery, Alkaline Battery, Double A (aa) -4pcs/pack " 280.00 7 25 Pack "battery, Rechargeable Battery -double A (aa) -size (aa) - 6hours -hr-3utgb 1.2v Min. -1,900mah Without Charger -4-cells/pack " 700.00 8 5 Pack "battery, Rechargeable Battery -double A (aa) -size (aa) - 6hours -hr-3utgb 1.2v Min. -1,900mah With Charger -4-cells/pack " 1,500.00 9 41 Ream Bookpaper, 8.5" X 11" (short), S.20 240.00 10 25 Ream Bookpaper, 8.5" X 13" (long), S.20 260.00 11 25 Ream Bookpaper, White A4 Size, Sub-20 250.00 12 16 Pc Broom Tamboo Soft 200.00 13 300 Pc "certificate Holder, Double-sided Certificate Holder -size: Short -8.5"" X 11"" -color: White" 150.00 14 10 Pc Clipboard - Long Size Writing Pad Hard Board Clipboard 100.00 15 10 Pc Clipboard - A4 Size Writing Pad Hard Board Clipboard 100.00 16 10 Pc "computer Mouse -wireless " 350.00 17 2 Pc "cork Board * Bulletin Cork Message Board -hangable Holes In Plastic Corners, -aluminum Frame -cork Sheet + Fiberboard (size): 1200 X 900mm " 2,500.00 18 3 Pc "cork Board * Bulletin Cork Message Board -hangable Holes In Plastic Corners, -aluminum Frame -cork Sheet + Fiberboard (size): 900 X 600mm " 2,000.00 19 25 Pc Correction Tape, 8m, High Quality 70.00 20 24 Pack Cotton, 150g, Packing 65.00 21 12 Pack Detergent Powder, 1.1kg Per Pouch 150.00 22 20 Btl Dishwashing Liquid, Anti-bacterial, 500ml/bottle, Lemon 200.00 23 32 Canister Disinfectant Spray, Aerosol 500g 500.00 24 6 Gal Disinfectant Bleach 280.00 25 15 Pc "document Box Geometric Design -horizontal Geometric Design -made Of Hardboard Paper -legal Size -h- 9½"" X L- 15½"" X W- 4"" " 320.00 26 8 Pc "document Box W/ Handle -document Box Geometric Design -made 9of Hardboard Paper -h- 5⅝"" X L- 15⅝"" X W- 11"" " 600.00 27 11 Roll Double Adhesive Tape, #1, Foam Type, 5meters 150.00 28 30 Roll Double-sided Tape, 1-inch (24mm) 20.00 29 8 Pc Dustpan With Foldable Broom 220.00 30 4 Ream Envelope, Brown, A4 Size 2,250.00 31 3 Ream Envelope, Brown, Long Size 2,500.00 32 3 Ream Envelope, Brown, Short Size 2,000.00 33 5 Box Envelope, Mailing, White, 70gsm With Window, Legal Size 980.00 34 200 Pc "expandable Envelope -expandable Brown Envelope With Elastic String -size: (short)" 28.00 35 250 Pc "expandable Envelope -expandable Brown Envelope With Elastic String -size: (long)" 28.00 36 200 Pc "expandable Envelope -expandable Brown Envelope With Elastic String -size: (a4)" 28.00 37 5 Pc "file Storage Box, Paper Organizer Type (box) -size: (wxdxh) 305 X 394 X 267mm" 120.00 38 7 Pc "floor Mop, Mop With Squeezer Bucket -heavy Duty" 1,500.00 39 100 Pc "folder - Slider, Transparent - Clear Sliding Folder -size: Long, Acetate Film In Front, Morocco Board At The Back (blue, Green And Black Color)" 35.00 40 100 Pc "folder - Slider, Transparent - Clear Sliding Folder -size: Short, Acetate Film In Front, Morocco Board At The Back (blue, Green And Black Color)" 30.00 41 5 Btl Glue, All Purpose, 130gram 150.00 42 8 Pc "gun Tacker -weight (kg): 0.468 -capacity (ton): 50/100 -color Multi -material Steel - Color - Multi Material Steel" 500.00 43 25 Pc Highlighter Pen, Assrtd Color, Fine Tip 48.00 44 10 Box Highlighter Pen, Assrtd Color, 10pcs/box 450.00 45 6 Box "id Sling, Id Card Case Holder With String, Horizontal Clear Transparent -size: 4 Inches X 3 Inches, 50pcs/box" 400.00 46 10 Box "laminating Film -long -100sheets/pack) -250 Microns" 1,800.00 47 54 Pc "marker Pen -white Board Marker/pen Felt Tip -bullet Type -black" 70.00 48 24 Pc "marker Pen -pentil Pen -broad Permanent -blue" 65.00 49 30 Pc "marker Pen -whiteboard Felt Tip -bullet Type -color: Blue" 70.00 50 30 Pc "marker Pen -whiteboard Felt Tip -bullet Type -color: Red" 70.00 51 24 Pc "marker Pen -broad Permanent -black" 65.00 52 24 Pc "marker Pen -pentil Pen -broad Permanent -red" 65.00 53 50 Pc "marker Pen -permanent -1.5mm Tip -black" 65.00 54 60 Pc "marker Pen -permanent -1.5mm Tip -blue" 65.00 55 60 Pc "marker Pen -permanent -1.5mm Tip -red" 65.00 56 28 Roll "masking Tape -paper Masking Tape -1inch" 22.00 57 10 Pc "mouse Pad -large Office Mouse Pad/rubber Keyboard Pad Mat -size: 90cm Width X 90cm Length X .2cm Thickness -material: Natural Rubber+fabric -color: White, Black And Gray" 580.00 58 4 Gal "muriatic Acid -1 Gal (29% Max)" 300.00 59 200 Pc Notebook, Stenographer, Spiral, 40 Leaves 60.00 60 40 Box "paper Clip -100pcs/box -vynil/plastic Coated (30mm)" 55.00 61 3 Pc "paper Cutter -heavy Duty -sliding Cutter -a4-a3 Size For Leather -cardboard -laminated Photo, Pvc Cover, Photopaper, Kraft Paper With Paper Adjuster And Stopper -material: Metal" 650.00 62 6 Pc "paper Puncher -heavy Duty" 170.00 63 10 Box "pen - Business Style Sign Pen -0.7mm Bullet Tip -12pcs/box -blue" 480.00 64 20 Pc "pen - Gel Pen -0.5mm Tip -quick Drying -black" 40.00 65 12 Pc "pen - Sign Pen0.5mm Tip -12pcs/box -black" 180.00 66 5 Box "pencil Lead With Eraser -12pcs/box" 180.00 67 5 Pc Pencil, Rotary Sharpener Hand Crank Manual Mechanical Pencil 300.00 68 300 Pc "plastic Envelope With Handle -long -assorted Colors -zipper Lock" 100.00 69 24 Box "push Pin -flat Head Type -assorted Colors -100s/case" 45.00 70 15 Book "record Book -300pages -color Blue" 220.00 71 32 Pc "ribbon -color Ribbon For 100print -ymcko Color Ribbon -part No: Cbgr0100c" 2,800.00 72 30 Kilo "rubber Band, -assorted Colors -medium -1kg Per Pack" 200.00 73 30 Pc "scissors -heavy Duty -steel Scissor -multifunctional" 200.00 74 50 Box "staple U-shaped Nail For Gun Tacker -7mm X 8mm | 7mm X 10mm -1000pcs" 55.00 75 45 Box "staple Wire -#23.13, 23/6, 23/8, 23/10, 23/13, 23/15, 23/17, 23/20, 23/24 -compatible -1,000pcs/box -5boxes/size" 200.00 76 6 Box "staple Wire #35 -5000pcs/box" 130.00 77 50 Pc "stickers, Colorful Label Sticker Bookmarks (index Tab) -20sheets" 45.00 78 10 Roll "stickers, Wallpaper -self Adhesive 10m X 45cm -waterproof Sticker -light Brown Wood Design" 150.00 79 20 Pack Sticky Notes 80.00 80 50 Pc "sticky Notes -""sign Here"" -sticky Notepad" 40.00 81 5 Pc "storage Box, Collapsible With Lid, Durable And Carries A Good Weight, Foldable When Not In Use -weight Capacity: 20lbs -dimesion When Assembled Is 9.5x10x15 Inches" 200.00 82 5 Pc "storage Box Arlin -with Lid For Filing And Organizing Documents And Made With Thick Chip Board And Arlin Book Binding Cover For A Matte Finish Product -dimensions: 40x29x28.50cm" 600.00 83 25 Box "surgical Mask -100pcs/box" 40.00 84 25 Pc "table Top Stapler #35 -heavy Duty -strandard Type With Remover -pink/gray/black, #35" 300.00 85 1 Cartridge Taskalfa 1800 - Toner 8,000.00 86 10 Btl "toilet Bowl, Urinal Cleaner -1000ml" 220.00 87 10 Pack "toilet Paper -12rolls/pack" 280.00 88 4 Pc "whiteboard -size: 45x60cm" 800.00 89 3 Pc "whiteboard -size: 60x90cm" 1,200.00 Purpose: For Official Use In The Daily Office Works At Izsres, Lpres, Zsres-bes And Other Related Activities Of The Stations Under The Research Division. Deadline For Submission: April 22, 2024 / 09:00am Opening Of Quotations: April 22, 2024 / 9:30am
Las Pi as General Hospital And Satellite Trauma Center Tender
Healthcare and Medicine...+1Machinery and Tools
Philippines
Closing Date6 May 2024
Tender AmountPHP 178.9 Million (USD 3.1 Million)
Details: Description Supply, Delivery, Installation, Testing And Commissioning Of One (1) Set Brand-new 1.5 Tesla Magnetic Resonance Imaging (mri) Machine (early Procurement Activity) (re-bid) A. Magnet • Field Strength: 1.5 Tesla • Magnet Shielding: Active Self-shielding • Type Of Shimming: Passive + Active (dynamic) • Bore Diameter: 60 Cm Or Better • Magnet Cooling Should Be Cryogen-based Or Liquid He Based On Manufacturer’s Standard. In Case Of The Latter Option, It Should Have No Cryogen Refill And No Vent/pipe Requirement. Otherwise, It Should Have Zero Helium Boil-off Technology. • Maximum Fov: At Least 50 Cm In X, Y, And Z-axis. • Magnet Homogeneity Shall Be Less Than Or Equivalent To 0.55 Ppm Guaranteed At 40 Cm Diameter Spherical Volume B. Gradient Strength • Actively Shielded Gradient System • Maximum Amplitude For Each Axis: At Least 33 Mt/m • Maximum Slew Rate For Each Axis: At Least 120 – 125 T/m/s • Rf Transmitter And Receiver Must Both Be Digital • Solid-state Type Rf Amplifier C. Radiofrequency System • The Rf System (transmitter And Receiver) Should Be Computer Controlled, And Fully Digital Type • Rf Transmitter Power Should Be Within The Range Of 10 – 20 Kw • Number Of Independent Digital Rf Channels At Least 16-channels With Corresponding 16 Adcs (analog To Digital Converter) • Proper Rf Shielding Must Be Provided D. Radiofrequency (rf) Coils • The Main Rf Body Coil Shall Be Integrated To The Magnet • Coils To Be Included, But Not Limited To, And Apart From Integrated Rf/body Coil. Channels Should Be In Congruent With The Magnet Offered. I. Head & Neck Coil Ii. Spine Array Coil Iii. Torso / Cardiac Coil Iv. Shoulder Coil V. Knee Coil Vi. Wrist Coil Vii. Foot And Ankle Coil Viii. Breast Coil With Biopsy Compatibility Ix. One (1) Large Flex Coil X. One (1) Small / Pediatric Flex Coil E. Acquisition Software/applications With License • The Following Software/ Applications Are, But Not Limited To The Following And Subject To Radiologists’ Need, Especially For Basic And Comprehensive Whole-body Imaging: I. Se, Fse, Gre, Spoiled Ge (2d And 3d), Fsss, Flair, Multi-shot And Single-shot Epi, Fat-and-water Saturation And Excitation, 2d/3d Tof And Phase Contrast, Ce-mra, Pat Or Equivalent. Ii. Must Have Motion Correction Sequences And Algorithms Iii. Flow Compensations Iv. Thick And Thin Mip V. Stitching / Composing Softwares Vi. Mr Spectroscopy (single And Multiple Voxel) Vii. Mrcp Viii. Mri Cardiac Package Ix. Dti X. Functional Mri Xi. Susceptibility Artifacts Reduction Diffusion Weighted Imaging Xii. Bolus Chasing With Automatic Moving Table Should Be Offered And Should Be Available With Fluoro Triggered Mr Angiography Xiii. Perfusion Imaging With Whole Brain Coverage And In Line Calculation Of The Resulting Hemodynamic Data Xiv. Edwi Or Reveal Diffusion Weighted Imaging For Whole Body Dwi Or Equivalent Feature Must Be Available Xv. Advance Metal Artifact Reduction For Soft Tissue Imaging Near Metal Implants Or Its Manufacturer’s Equivalent Xvi. Advanced Mr Angiography Techniques Xvii. Liver Fat Quantification Techniques Or Its Manufacturers’ Equivalent • The Software/applications Should Be Latest And Capable Of Being Constantly Upgraded To Meet Future Development In Mr Imaging For At Least The Next Ten (10) Years, Without Any Additional Cost. F. Patient Table • Should Be Fully Motorized, Computer-controlled Movements In Vertical And Horizontal Directions • Position Accuracy Of +/- 1.0 Mm Or Better • Must Be Able To Support Patient Load At Least 200 Kg. • Table Height At Its Lowest Position Should Be 60 Cm Or Lower • Should Have Patient Alarm System • Should Have Facility For Manual Traction In Case Of Emergency. • Should Deliver The Protocols For Automatic Bolus Chasing In Peripheral Angiography With The Automatic Table Movement, If Applicable. G. Cooler / Chiller System (maximum Of Tw0 (2) Units) • Modular Colling System • Gradient Coil Chiller • Air-cooled Cryogen Compressor, If Applicable H. Main Console, One (1) Unit • Cpu: At Least 6 Core • Ram: At Least 64 Gb • Hard Drive Capacity: At Least 1 Tb • Cd/dvd Writer, At Least Two (2) Usb Ports • Keyboard And Optical Mouse • Reconstruction Performance Of At Least 30,000 Fft/s At 256 X 256 Matrix For Full Fov • Monitor: Color, Fhd, At Least 23 Inches I. Diagnostic Workstation, One (1) Unit • Pu: At Least 6 Core • Ram: At Least 64 Gb • Hard Drive Capacity: At Least 1 Tb • Cd/dvd Writer, At Least Two (2) Usb Ports • Keyboard And Optical Mouse • Double Monitor: Color, Fhd, At Least 19 Inches J. Air Conditioning System • Two (2) Units Appropriate Air Conditioning System For The Magnet Room/scanning Room. • One (1) Unit Appropriate Air Conditioning System For The Equipment Room. K. Warranty Period • Three (3) Years Comprehensive Warranty On Parts And Service For The Mri System Including Helium And Chiller System. L. Trainings • At Least Two (2) Weeks Training Abroad For At Four (4) Radiologists With Certification. • Unlimited On-site Training For Radiologist Technologists With Certification • At Least Two (2) Weeks Training With Certificate For Two (2) Biomed Engineer And One 91) Health Physicist For Basic Troubleshooting, Preventive Maintenance And Calibration M. Certification That The Brand Being Offered Is In The Local And International Markets For The Past Ten (10) Years; N. Certification That The Same Brand And Model Being Offered Has At Least Two (2) Installations In Government Tertiary Hospitals In The Philippines Within The Past Five (5) Years; O. Certificate That The Principal Manufacturer Have Their Office In The Local Market For More Than Ten (10) Years (bir Or Sec Registration Certificate To Be Submitted) P. One (1) Modular Ups Each Of 90 Kva, To Supply The Gantry, Chiller And Workstation; Q. One (1) Pannel Board; R. One (1) Step-down And Step-up Transformer At 100 Kva Supply, Delivery, Installation, Testing And Commissioning Of One (1) Set Brand-new 128-slice Computed Tomography (ct) Machine A. Gantry • Aperture: At Least 70 Cm • Tilt Range (degrees): ± 30 (digital Or Actual Tilting) • Rotation Speed: 0.35 Seconds Or Faster • Slip Ring: Should Be Provided • Spatial Resolution Of 0.28 Mm Or Lower • Effective Temporal Resolution 30 Ms Or Its Manufacturer’s Equivalent • Distance Focus To Detectors Not More Than 95 Cm Or Manufacturer’s Equivalent • Distance Focus To Scan Plane 55 Cm Or Better B. X-ray Tube • Anode Heat Storage (mhu): 7 Mhu Or Higher • Must Be Dual Focal Spot C. Generator • Generator Type: High Frequency With Computer Control • Power (kw): 70 Kw Or Higher • Minimum Tube Voltage: Minimum 80 Kv Or Lower • Maximum Tube Voltage: At Least 140 Kv Or Higher • Ma Selection Available: 10 To 600ma • Ma Increment: At Least 5 Ma Or Lower D. Detector • Number Of Slices 128 Or Higher • Detector: Solid State Ct Detector Or Equivalent Detector Technology • Data Sampling Rate: Up To 2,320 • Slice Thickness (helical Mode): 0.65mm – 10mm • Slice Thickness (axial Mode) 0.625 Mm – 10 Mm • Scan Field Of View: 500 Mm • Detector Configuration / Effective Length Of [mm]: Detector Elements In Z-axis (at Isocentre) [mm]: Capable Of 54 X 0.625mm Or Higher E. Dose Management • Must Adhere To Alara Principle • Dose Reporting: Must Be Available • Dose Modulation Technique: Must Be Available • Ecg Dose Modulation: Must Be Available • Pediatric-specific Dose Control: Must Be Available • Filters: Must Be Available F. Image Reconstruction • Must Have Workflow And Operational Efficiency Enhancements Through Automatic Patient Positioning With The Use Of Camera And Ai Or Its Equivalent • Scan Field Of View: 50cm Or Higher • Minimum Dfov: 5.0 Cm • Slice Thickness: 0.625mm Or Thinner • Reconstruction Matrix: Must Have 512x512 And 1024x1024 • Display Matrix: At Least 1024 X 1024 • Must Have Iterative Reconstruction Or Equivalent Technology G. Patient Table / Couch • Horizontal Range: 1740 Mm Or Higher • Horizontal Scannable Range (helical): 1580 Mm Or Higher • Horizontal Speed: 175 Mm/sec Or Faster • Helical Pitch: At Least 1.5 Or Higher • Vertical Movement Range (out Of Gantry): ≤430 To ≥990 Mm Or Manufacturer’s Equivalent • Couch Load Capacity: ≥ 215 Kg • Cradle Travel Accuracy/ Reproducibility (mm): At Least +/- 0.25 H. Main Console And Computer • Console I. Console Type: All-in-one Console Capable Of Scan, Acquisition And Post Processing Ii. Display Monitor: Dual With At Least 19 Inches At 1280 X 1024 Resolution Iii. Console Cabinet For Dust Protection Iv. Console Table And Chair • Console Computer I. Hz / Word Size: At Least 6core, 2ghz Or Manufacturer's Latest Technology Ii. Compatible Operating System Iii. Ram: At Least 64gb Or Manufacturer's Latest Technology Iv. Graphics Card: Nvidia Quadro P620 Or Manufacturer’s Latest Configuration V. Keyboard And Mouse • Data Management I. Total Internal Disk Storage Of At Least 2tb (2,000gb) Storage For System/application, Image And Raw/scan Disk Data Or Manufacturer's Latest Storage Capability Ii. Additional Storage: Cd/dvd Iii. His / Ris Interface Worklist / Dicom Mpps: Must Be Available And Should Integrate In The Current His-ris-pacs Of The Hospital Iv. Dicom Viewer: Support For External Dicom Usb Media And Preference Management Tool To Exchange Preferences Across Users I. Independent Post Processing Workstation (radiologist) • Hardware Type/processor: At Least 6 Core, Minimum 3.0 Ghz Or Manufacturer's Latest Specification • Ram: 32gb Or Higher • Graphics Card: At Least 1 Gb • Os And Applications: At Least One (1) 256 Gb Ssd • Image Storage: At Least Two (2) 512gb Ssd In Raid Configuration For Image Protection And Redundancy • Archival Storage: Internal Dvd Writer Drive For Read/write Of Dicom Cd/dvd Media, Read/write Of Data Export Cd/dvd Data And Service Use (dvd Install) • Display Monitor: Dual Configuration, Minimum 19" Lcd • Keyboard And Mouse J. Clinical Facilities And Applications • The Following Software/ Applications Are, But Not Limited To The Following And Subject To Radiologists’ Need, Especially For Basic And Comprehensive Whole-body Imaging: I. Vessel Analysis Software Ii. Bone Removal/subtraction Software Iii. Ct Cerebrovascular Auto Segmentation, Ct Subtraction Iv. Ct Pv. Dental Software Vi. Thoracic Analysis Software, Lung Disease Assessment Vii. Lung Nodule Analysis Software Viii. Ct Pulmonary Analysis Ix. Calcium Scoring X. Cardiac Plaque Assessment Xi. Advance Coronary Ct/cardiac Capabilities Xii. Tavi / Tavr Planning Software Xiii. Myocardial Defect Assessment Xiv. Comprehensive Cardiac Function Analysis Xv. Advance Oncology Software / Ct Lesion Analysis Xvi. Hepatic Liver Analysis Software / Ct Liver Analysis Xvii. Ct Colon Analysis / Virtual Colonoscopy Xviii. Virtual Bronchoscopy Xix. Image Fusion Software With Other Modalities Xx. Dental Scan Software Xxi. Stroke Management / Application Software For Hemorrhagic And Ischemic Infarct Or Its Equivalent Xxii. Must Reduce Metal Artifacts And Improve Image Quality While Preserving Body Structural And Anatomic Details. • The Software/applications Should Be Latest And Capable Of Being Constantly Upgraded To Meet Future Development In Ct Imaging For At Least The Next Ten (10) Years, Without Any Additional Cost. K. Others • Set Of Patient Restraints • Patient Positioning Tools • Water Phantom For Calibration And Testing • Lead Glass For The Control Room • Lead Lining For The Examination Room • System Operator Manual • Software Operator Manual • Must Have Local Installation Of The Same Model In At Least 2 Public/government Hospitals In The Philippines Erfusion Analysis, Ct Volume Perfusion • Must Have Principal Local Presence For After Sales And Support L. Air Conditioning System • Two (2) Units Appropriate Air Conditioning System For The Ct Room/scanning Room. • One (1) Unit Appropriate Air Conditioning System For The Equipment Room. M. Warranty Period • Three (3) Years Comprehensive Warranty On Parts And Service For The Ct Machine N. Trainings • At Least Two (2) Weeks Training Abroad With Certification For At Least Four (4) Radiologists • Unlimited On-site Training For Radiologist Technologists, With Certification • At Least Two (2) Weeks Training With Certificate For Two (2) Biomed Engineers And One (1) Health Physicist For Basic Troubleshooting, Preventive Maintenance And Calibration O. Certification That The Brand Being Offered Is In The Local And International Markets For The Part Ten (10) Years; P. Certification That The Same Brand And Model Being Offered Has At Least Two (2) Local Installations In Government Tertiary Hospitals In The Philippines, Within The Past Five (5) Years; Q. Certificate That The Principal Manufacturer Have Their Office In The Local Market For More Than Ten (10) Years (bir Or Sec Registration Certificate To Be Submitted); R. One (1) Modular Ups Each Of 90 Kva To Supply The Gantry, Chiller And Workstation; S. One (1) A1 Pannel Board Supply, Delivery, Installation, Testing And Commissioning Of Brand-new Mri-compatible And Ct-compatible Accessories / Machine (abc: Php10,000,000.00) A. One (1) Unit Mr Compatible Anesthesia Machine With Ventilator A. Must Be Approved To Use With 1.5 Scanners, At Least 1000 Gauss B. Must Have Gauss Meter Monitoring C. Designed Specifically For Use In An Mri Environment D. Electronic Touchscreen Ventilator E. Standard Six Ventilation Modes, And Support For Spontaneous Breathing Patients F. Total System Compatibility G. Compact Footprint, Optimum Maneuverability H. Two Station Selectatec Compatible Backbar I. With 1 Sevoflurane Vaporizer Selectatec Compatible Stability K. Enclosed Construction – No Hidden Storage Areas L. Illuminated Workspace B. One (1) Unit Mr Compatible Patient Monitor A. Performs Patient Monitoring In An Mri Environment Including All Necessary Vital Parameters During Anesthesia B. The System Is Designed For All Patients: Adults, Children And Neonates C. Compatible With Mri Systems From Any Manufacturers That Have A Field Strength At Least 1.5 Tesla D. Wireless Ecg And Spo2 Sensors E. Color Touchscreen C. One (1) Unit Mr Compatible Power Injector D. One (1) Ct Dual/double Barrel Power Injector E. One (1) Unit Mr Compatible Bp Apparatus For Pediatrics And Adults F . One (1) Unit Mr Compatible Stethoscope For Pedia And Adult G. Two (2) Mr Compatible Wheelchairs H. Two (2) Mr Compatible Iv Stand I. One (1) Mr Compatible Stretcher/gurney J. One (1) Set Mr Compatible Cctv System For Patient Observation K. One (1) Mr Compatible Fire Extinguisher L. One (1) Ct Room Fire Extinguisher M. One (1) Mr Compatible Flexible Patient Transfer Board N. Two (2) Hand-held Metal Detector O. Two (2) Units Multifunctional Printer P. One (1) Mr Compatible O2 Outlet And Sunctipon System Q. One (1) Unit Mr Compatible Music / Audio System With Ear Plugs And Headset Covers And With Intercom System R. One (1) Unit Mr Compatible Oxygen Monitor S. One (1) Mr Coil Cabinet T. Two (2) Units Thermohygrometer With Data Logger U. Two (2) Pcs. Lead Aprons V. Two (2) Pcs. Gonadal Shield W. Two (2) Pcs. Thyroid Shield X. Four (4) Pcs. Hand Gloves Y. Two (2) Pcs. Eye Goggles Z. Ten (10) Microsoft Licenses Aa. One (1) Unit Of M3-chip Laptop, Or Latest Ios With At Least 128gb Unified Memory Bb. Ten (10) Stainless Hospital Waiting Area Chairs Cc. Two (2) Units Hot And Cold-water Dispenser Dd. Two (2) Pcs Wooden Bulletin Boards Ee. Two (2) Units Cd/dvd Dicom Reader And Burner Civil Works For Medical Imaging Department Proposed Medical Imaging Department Equipment Rooms Terms Of Reference For The Proposed Medical Imaging Department Equipment Rooms Objective The Las Piñas General Hospital And Satellite Trauma Center Aims To Renovate Its Medical Imaging Department To Enhance Patients’ Outcomes, Improve Diagnostic Services And Provide A Safer And More Efficient Environment For Both Patients And Healthcare Professionals. The Main Purpose Of This Tor Is To Assist The Contractor In Submitting A Bid Offer To Lpgh&stc That Will Satisfy The Hospital’s Requirements At The Most Feasible, Possible Time And Within The Specified Budget. This Document Aims: 1. To Provide A Background Information Regarding The Preparation And Submission Of The Proposed Project To Contractor. 2. To Provide A Background Information Regarding The Proposed Project Which Should Be Handled In The Shortest Possible Time, At An Acceptable Quality And Performance To The Contractor 3. To Outline The Work Of The Contractor That Has To Be Performed Under The Terms Of Its Contract. I. Project Description A) Project Name Procurement Of Infrastructure Project For The Proposed Medical Imaging Department Equipment Rooms End User: Medical Imaging Department Of Lpgh&stc Floor Area : ±300 Square Meters B) Implementing Agency: Las Pinas General Hospital And Satellite Trauma Center Located At Diego Cera Avenue, Bernabe Compound, Pulang Lupa I, Las Pinas City. Ii. Approved Budget And Duration Of Contract The Contract For The Proposed Project Shall Be Within A Period Of One Hundred Fifty (150) Calendar Days Upon Receipt Of Notice To Proceed And With An Approved Project For The Contract Of Eighteen Million Nine Hundred Twenty-five Thousand Five Hundred Fifty-seven Pesos And 80/100 (php 18,925,557.81). Iii. General Conditions 3.1 The Contractor Shall Supply Labor, Materials, Equipment And Other Necessary Items For The Project With The Following Conditions: 3.1.1 A Building Permit (if Necessary) Must Be Secured From The Building Official Of Las Pinas City And Submitted To Las Pinas General Hospital And Satellite Trauma Center Located At Diego Cera Avenue, Bernabe Compound, Pulang Lupa I, Las Pinas City Prior To Construction. 3.1.2 Conduct Ocular Inspection/site Inspection Prior To The Submission Of Bid. 3.1.3 3.1.4 The Plans, Detailed Drawings, Specifications, Detailed Bill Of Quantities, Terms Of Reference, Contract Agreement And Other Bid Documents Shall Be Considered As Complementing Each Other, So That What Is Mentioned Or Shown In One, Although Not Mentioned In The Other, Shall Be Considered As Appearing On Both. In Case Of Conflict Between The Two, The Same Should Be Referred To The Technical Working Group (twg) For Resolution With The Approval Of The Head Of The Procuring Entity (hope) Of Las Pinas General Hospital And Satellite Trauma Center. 3.1.4 The Construction Shall Be Finished With First Class Workmanship To The Satisfaction Of The Lpgh And Stc. 3.1.5 The Construction Works Shall Conform To The Requirements Of The National Building Code, National Structural Code Of The Philippines, Philippine Mechanical Code Of The Philippines, Philippine Electrical Code, Philippine Electronics Code, Code Of Professional Practice And Other Related Pertinent Practices, Codes In The Philippines As Well As The Local Rules, Regulations And Ordinances Of The City Government And Must Be Acceptable To The Las Pinas General Hospital And Satellite Trauma Center. 3.1.6 Itemized Of Bill Quantities 3.1.6.1 The Items, Description And Quantities Given On The First Three Columns Of The Bill Of Quantities Under Section Viii, Guides Only To The Bidder Interpreting The Plans And Technical Specifications. The Las Pinas General Hospital And Satellite Trauma Center, Bac And Twg Is Not Responsible For Any Mistakes, Inaccuracies, Duplications Or Omissions In This List Of The Bill Of Quantities Which Shall Never Be A Basis For Additions Nor Deletions To The Scope Of Work. Only The Entries Of The Bidder On The Last Three Columns Consisting Of His Own Take Off Quantities From The Plans And Technical Specifications And His Unit Cost And Corresponding Sums Shall Be Considered. 3.1.6.2 The Bill Of Quantities Prepared By The Bidder Cannot Be Used As Basis For Claims For Any Extra Work, But May Only Be Used Solely By The Las Pinas General Hospital And Satellite Trauma Center, Bac And Twg As Aid In Judging If Bid Is A Responsive Bid. 3.1.6.3 The Unit And Total Bid Prices Must Include All Direct And Indirect Cost/ Expenses Such As Overhead, Contingencies And Miscellaneous (ocm); Profit, Plus The Corresponding Value Added Tax And Other Obligations Of Any Kind Under Which The Contract Must Be Borne By The Contractor Since They Are Necessary To Install, Construct And Complete The Whole Of The Contract In Accordance With The Bid Documents. 3.1.7 All Permits And Corresponding Fees As May Be Assessed By The Local Government Unit/regulating Agencies Shall Be On The Account Of The Contractor. 3.1.8 The “green And Safe Health Facilities Manual 1st Edition” Shall Also Form Part Of This Tor Which Comprises Efforts Of The Health Sector That Contribute To The Attainment Of The Country’s Goals Towards Sustainable Development. 3.1.9 The Administrative Order No. 2024- “guidelines For The Implementation Of Projects Funded Under The Health Facility Enhancement Program (hfep) Fiscal Year 2024” Shall Be Part Of This Tor That Serves As A Guide For The Proper And Systematic Implementation And Monitoring Of All Projects Funded Under The Hfep Gaa Fy2024. 3.1.10 The Separate “scope And Specifications” Shall Form Part Of This Tor That Will Serve As Basis To Define The Requirements For Project Execution Regarding Installation, Materials, Products, Procedures, And Quality Aspects. The Scope And Specifications Shall Govern The Coverage And Methods Of Construction And The Kind Of Materials To Be Used For The Proposed Project Shown In The Plans And Detailed Drawings. Iv. Scope Of Works 4.1 Work/operation Plan 4.1.1 The Contractor Shall Submit The Project Work Plan (pertcpm, Gantt Chart, S-curve, Detailed Construction Methods, Project Execution Plan, Construction Safety Health Program, Procurement Plan And Manpower And Equipment Schedule) Consisting Of The Specific Work Activities And Dates Within Ten (10) Calendar Days Upon Receipt Of Notice To Proceed. 4.2 Contractual Scope Of Works 4.2.1 The Contractor Shall Provide Professional Services And Other Support Services Necessary For The Implementation Of The Complete Construction Of The Proposed Project. 4.2.2 The Contractor Shall Be Responsible For Providing Complete Professional Services For All Aspects Of The Proposed Project Including, But Not Limited To The Following: 4.2.2.1 Perform Data Collection And Field Investigation To Determine Actual Site Conditions 4.2.2.2 Submit Construction Methodology Prior To The Start Of The Renovation And After Ocular Inspection And Coordination With Lpgh&stc. 4.3 Construction Phase 4.3.1 The Contractor Shall Prepare, Secure, Submit, Process All Necessary Documents (permits, Clearance, Plans, Etc.) And Payment Of All Assessed Fees And Other Incidental Expenses Related Thereto As May Be Required By The Local Government Unit, Utility Firms (electric Cooperative, Local Water Utilities Administration, Pldt, Etc.) And Other Regulating Agencies. 4.3.2 The Contractor Shall Undertake The Proposed Medical Imaging Department Equipment Rooms And Its Required Infrastructures And Appurtenances In Accordance With The Approved Plans And Designs As Follows: 4.3.2.1 Architectural Plans 4.3.2.2 Other Engineering Plans 4.3.2.3 Project Specifications 4.3.3 The Contractor Shall Designate One (1) Project Manager, One (1) Professional Mechanical Engineer And One (1) Professional Electrical Engineer Who Shall Work During The Construction Period/duration Of The Contract And Shall Only Report On Site When Needed During Project Implementation Or Weekly Infrastructure Meeting. 4.3.4 The Contractor Shall Designate One (1) Project Engineer (civil Engineer), One (1) Project Architect, One (1) Electrical Engineer, One (1) Mechanical Engineer (mepfs), One (1) Safety Officer 2 (so2), One (1) Qa/qc Engineer And One (1) Document Controller/admin Who Shall Work Full Time During The Construction Period/duration Of The Contract And Shall Be In Charge Of The Construction Work And Perform The Following But Not Limited To: 4.3.4.1 Coordinate With The Las Pinas General Hospital And Satellite Trauma Center And Engineering And Facilities Management (efm) Regarding The Implementation Of The Construction Project. 4.3.4.2 Schedule, Oversee And Monitoring The Day-to-day Construction Works. 4.3.4.3 Coordinate, Address And Resolve All Concern/s Of Nearby Buildings And Structures Relative To The Construction And Related Services As Required By Lgu And Other Regulating Agencies. 4.3.4.4 Prepare Daily Activity Reports, Weekly And Monthly Accomplishment Reports Supported With Progress Photographs (geotagged) And S-curves To Monitor Actual Progress Status Report And To Be Used As Basis For Progress Billing. 4.3.4.5 Conduct A Weekly Construction Coordination Meeting With The Las Pinas General Hospital And Satellite Trauma Center, Twg And Infrastructure Committee During Which A Weekly Progress Report On All Activities For The Previous Week Will Be Submitted. 4.3.5 The Contractor Shall Be Responsible In Conducting The Necessary Tests Required. For The Structural Elements, Standard Testing For Concrete And Reinforcing Bars Are Required. The Testing Laboratory Must Be Accredited By Dpwh And Must Be Witnessed By Any Authorized Representatives Of The Lpgh&stc And The Consultant. 4.3.6 The Contractor Shall Be Responsible For Restoring Walls And Structures Of Adjacent Properties At The Vicinity Of The Project Site As May Be Affected During The Construction Works, If Any. 4.3.7 The Contractor Shall Provide All The Necessary Safety Equipment Such As Board- Up And Closure Signages, Mechanical Blowers To Collect Dust During Surface Preparation And Other Required Equipment To Make Sure That The Operations Of The Hospital Will Not Be Affected. 4.3.8 The Contractor Shall Be Responsible In The Hauling And Disposal Of Debris And Other Construction Wastes. 4.3.9 The Contractor Shall Provide All Other Works And/or Materials Not Included In This Terms Of Reference/scope And Specifications/bill Of Quantities But Are Essential For The Satisfactory Completion Of The Project At No Additional Cost To The Las Piñas General Hospital And Satellite Trauma Center. 4.3.10 Other Works Due To The Contractor Are: 4.3.10.1 Supply And Installation Of Accessories 4.3.10.2 Waterproofing Works At Cssd/autoclave Room 4.3.10.3 Restoration, Repair And Rectification Of Cistern Area And Vacuum Room 4.4 Electric And Water Consumption For The Duration Of The Contract Shall Be For The Account Of The Contractor. Contractor To Provide Water And Electric Meter. V. Post Construction Documentation 5.1 The Contractor Shall Submit The Following Project Documentations Within Thirty (30) Calendar Days From The Completion Of The Project. 5.1.1 As-built Plans Duly Signed And Dry-sealed By The Concerned Design Architect And Engineers With His/her Valid Registration/professional License Number, Date Of Registration And Current Ptr Number Affixed/stamped On Every Page/sheet Of The Document Of The Following: • Architectural Plans • Mechanical And Fire Protection Plans • Plumbing And Sanitary Plans • Auxiliary Plans • Other Relative Plan 5.1.2 All Plans And Documents Shall Be Delivered In Sets As Follows: 5.1.2.1 One (1) Set Original Copies, Scaled 1:100 Meter Prepared In Cadd Format, Printed/plotted In Tracing Paper. 5.1.2.2 Five (5) Sets Blue Prints Copies For Each Plan 5.1.2.3 One (1) Set Soft Copy (cadd And Pdf) In Flash Drive. 5.1.2.4 Certificate Of Occupancy (if Necessary) 5.1.2.5 Certificate Of Warranty For One (1) Year To Cover The “one – Year Defects Liability Period” Of The Contractor. Form Of Warranty Shall Be In Accordance With The Provisions Of The “revised Irr Of Republic Act. No. 9184, Otherwise Known As The Government Procurement Act”. 5.1.2.6 Warranty Certificate For All The Equipment Supplied Based On The Warranty Duration Stated In The Specifications Document. 5.1.2.7 Other Documents Processed And Issued In Favor Of The Las Pinas General Hospital And Satellite Trauma Center During The Construction Periods (i.e., Inspection Reports, Building Permits, Official Receipts, And Related Documents Other Than Stated In Section 4.3.1). Vi. Post Construction Warranties 6.1 The Contractor Shall Also Provide Within The One (1) Year Warranty Period At No Additional Cost To The Las Pinas General Hospital And Satellite Trauma Center All Replacement Units/parts With The Same Quality, Standard And Specification For All Other Deliverables. 6.2 The Contractor Shall Provide Warranties On Equipment And Other Deliverables As What Stated In The Scope And Specification. Vii. Safety Enclosures 7.1 Provide Safety Nets (enclosures, Shielding, Coverings, Warning Device, Keep-off Limits Signs, Etc.) Upon The Start Of The Project To Ensure Protection Of The General Public And Preservation Of Damage To Properties. Viii. Provision Of Storage & Material Handling 8.1 The Contractor Shall Store Their Materials, Equipment And Tools Only, In One Place Of The Hospital Premises. The Area Shall Be Coordinated With The Chief Administrative Officer Of Las Pinas General Hospital And Satellite Trauma Center And Efm. It Shall Be Kept Neat And Clean All The Times. Any Damage Thereto Or To The Surrounding Area Arising From Any Accident, Etc. Shall Be Repaired And/or Restored To Its Original Condition. Likewise, Extra Care Shall Be Taken In Storage Of Hazardous Chemicals In Order To Avoid Accident, Explosion And/or Fires. The Job Site Shall Be Cleaned At The End Of Every Working Day. 8.2 Provisions For Securing And Safekeeping The Stored Materials, Tools And Equipment During The Construction Project Shall Be For The Account Of The Contractor. Ix. Clearing Of Site The Contractor Shall Clean The Whole Area By Removing Debris, Discards, Excesses And Spillage And Shall Leave The Entire Premises Free From Rubbish Caused By Their Work To The Satisfaction Of The Las Pinas General Hospital And Satellite Trauma Center At No Extra Cost. X. Service Level Agreement Las Pinas General Hospital And Satellite Trauma Center Shall Maintain A Service Level Agreement (sla) With The Contractor, With Provisions For Liquidated Damages For Their Non-compliance. Xi. Warranties Of The Contractor 11.1 The Contractor Warrants That It Shall Conform Strictly To The Terms And Conditions Of This Terms Of Reference. 11.2 The Contractor Warrants, Represents And Undertakes Reliability Of The Service And That Their Manpower Complements Are Hardworking, Qualified, Reliable And Dedicated To Do The Service Required To The Satisfaction Of The Las Pinas General Hospital And Satellite Trauma Center. It Shall Employ Well-behaved And Honest Employees. They Shall Wear Id And Proper Company Uniform When Working Within The Construction Site. It Shall Not Employ Las Pinas General Hospital And Satellite Trauma Center Employees And Their Relatives Within The Fourth Civil Degree Of Consanguinity Or Affinity To Work In Any Category Whatsoever. 11.3 The Contractor Shall Comply With The Laws Governing Employee’s Compensation, Philhealth, Social Security And/or Labor Standard And Other Laws, Rules And Regulations Applicable To Its Personnel Employed By The Contractor On Account Of Contracted Services. The Contractor Shall Pay Its Personnel Not Less Than Minimum Wage And Other Benefits Mandated By Law. 11.4 The Contractor In Performance Of Its Services Shall Secure, Maintain At Its Own Expense All Registration, Licenses Or Permits Required By National Or Local Laws And Shall Comply With The Rules, Regulations And Directives Of Regulatory Authorities And Commissions. The Contractor Undertakes To Pay All Fees Or Charge Payable To Any Instrumentality Of Government Or To Any Other Duly Constituted Authority Relating To The Construction Project At No Cost To Las Pinas General Hospital And Satellite Trauma Center. 11.5 The Contractor’s Personnel Shall Take All Necessary Precautions For The Safety Of All Persons And Properties At Or Near Their Area Of Work And Shall Comply With All The Standard And Established Safety Regulations, Rules And Practices. A Construction Safety And Health Program Approved By The Dole Must Be Submitted By The Contractor Including The Deployment Of A Full-time Safety Officer On Site. 11.6 The Contractor Shall Coordinate With Any Authorized And/or Designated Las Pinas General Hospital And Satellite Trauma Center Personnel And E&fm In The Performance Of Their Jobs. 11.7 The Contractor Shall Be Liable For Loss, Damages, Or Injury As May Be Due Directly Through The Fault Or Negligence Of Its Personnel. It Shall Assume Responsibility Thereof And The Las Pinas General Hospital And Satellite Trauma Center Shall Be Specifically Released From Any Responsibility Arising Therefrom. 11.8 The Contractor Shall Neither Assign, Transfer, Pledge, Nor Subcontract Any Part Or Interest Therein. 11.9 The Contractor Shall Be Solely Liable To Its Suppliers And The Las Pinas General Hospital And Satellite Trauma Center Shall Be Free From Any Liabilities That May Arise From Contractor-supplier Agreement. Xiii. Contractor’s Qualification 13.1 The Minimum Requirements For The Contractor Are As Follows: 13.1.1 Must Be At Least Five (5) Years In The Construction Business. 13.1.2 Must Have Completed At Least Three (3) Solely Infrastructure Projects In A Hospital. 13.1.3 Must Have At Least Two (2) Certificate Of Very Satisfactory Rating From Client Hospital Signed By The Medical Center Chief Or Its Equivalent For The Above-mentioned Infrastructure Projects. 13.1.4 Must Have An Appropriate Pcab License Of At Least Small B Category
Apartment S.R.O. Tender
Civil And Construction...+1Civil Works Others
Czech Republic
Closing Date21 Jun 2024
Tender AmountRefer Documents
Details: The subject of the contract is the insulation of the North and South sides. The house is a terraced house, built in 1927. On the roof of the courtyard wing, a geotextile will be placed on the roof of the courtyard wing to spread the load from the scaffolding and protect the existing roof covering in the affected section, as a protective layer of the covering, on the geotextile, OSB plates and a distribution grid made of beams will be placed. The existing railing of the loggia will be removed, the Torso Vzt pipes on the south facade will be dismantled and the metal boxes originally used for hanging street lighting will be demolished. Plumbing elements will be made in plastic sheet. The New Railings Will Be Divided In The Same Way As The Existing Areas, Material Design Metal Hot-Dipped Galvanized Construction. Alternatively, the subdivision can be made from Stodeco boards. The sheathing will be provided with a silicate trowel plaster with a grain size of 2 mm. The upper side will be covered with a plastic sheet. The Existing Loggia Paving Will Be Removed, The Substrate Will Be Prepared After Part Of The Railing Is Demolished. A new waterproofing layer was made and a new frost-resistant tile was laid, including perimeter plinths. The niches after the removal of the street lighting curtains will be filled with aerated concrete forms and the plaster will be added. A contact insulation system with mineral wool thickness will be installed on the facades. 160mm, Window lining Tl. 40mm. In the loggias, the insulation will be made from Pir boards, thickness. 100mm. Will Use Hydrophilic Silicate System, Grain Size 2mm. Dismantling, overhauling and reinstallation of the battalion consoles on the Rizalite will be carried out.
City Of Veseli Nad Luznici Tender
Civil And Construction...+1Civil Works Others
Czech Republic
Closing Date28 Mar 2024
Tender AmountCZK 12.8 Million (USD 549.2 K)
Details: The subject of the performance of the public order is construction work (construction) consisting of new construction and reconstruction of sidewalks and lighting of transitions, i.e. A new sidewalk and entrances will be made from the castle paving and greenery in the remaining part of the street space. The color of the castle paving will be adapted to the existing ones already implemented in the village. Construction Includes: Main Building: So 05 – Class Czech. Armády (section From Zš Ii. To Křižovatku With Road Ii/603), Which Will Be Reconstructed In A Section Length 1326 M. Secondary Buildings: So 302 – Renewal of Water Supply Connections This is the renewal of water supply connections, the route of the water supply line does not change, the construction does not require According to §103 Par. 1 Point B) No. 7 of Act No. 183/2006 Coll., On Spatial Planning and Building Regulations (Building Act), As Amended by Later Regulations, Building Permits and Construction Notifications. So 401 - Public Lighting And Ssz Other Building Objects, Not Subject To Building Location, Building Permit Or Construction Notification, Which Are Listed In This Accompanying Report For The Reason Of Future Financing And Construction Realization: So 09 - Repair Of The Sidewalk Surface On The Lands Listed In The Project Documentation. The client points out that during the implementation of the construction in question, the laying of cables will take place at the same time, and the waterproofing of the foot of the bridge will be carried out by another contractor. For this reason, the deadline for the completion of the construction in question is also taken into account in the tender documentation.
City Of Paskov Tender
Czech Republic
Closing Date16 Jan 2024
Tender AmountRefer Documents
Details: General Definition of the Subject of the Public Contract It is about construction modifications carried out on an apartment building on Nádražní Street 7 in Pasków, namely the replacement of existing plastic windows and doors, the windows on the shields will be expanded, the implementation of a contact insulation system, the insulation of the floor and the floor and the replacement of the roof covering , Execution of Vertical Waterproofing And Drainage. The interior will have new floors, ceilings and insulation with measures against radon. Due to the necessity of static strengthening of the ceiling, instead of new partitions, ceiling beams will be added above the parts of the floor plan between 1np and 2np. New Partitions Will Be Made In Kitchens, Bathrooms And Hallways. New Furniture Items And Kitchen Lines Will Be Installed. Furthermore, a new electrical installation will be carried out, including a new lightning rod, wall, bathroom ventilation and kitchen hoods. The Heat Source Will Be Replaced - Local Solid Fuel Heaters Will Be Abandoned and Replaced by a Common Heat Pump. A new heating system with radiators will be installed. More in the Details of the Tender Documentation. This Project is co-financed by the European Union through the State Environmental Fund of the Czech Republic, within the framework of the New Green Savings Program, the National Renewal Plan, Call No. 2/2021, Support Sector - Residential Buildings. This Project Is Also Co-financed From the State Investment Support Fund, Call No. 1/nb/2023, Pursuant to Government Regulation No. 107/2023 Coll., Reg. Project No. 27800024.
VETERANS AFFAIRS, DEPARTMENT OF USA Tender
Healthcare and Medicine
United States
Closing Date1 Nov 2024
Tender AmountRefer Documents
Description: Attachment 1: Combined Synopsis-solicitation For Commercial Products And Commercial Services description this Is A Combined Synopsis/solicitation For Commercial Products And Commercial Services Prepared In Accordance With The Format In Federal Acquisition Regulation (far) Subpart 12.6, Streamlined Procedures For Evaluation And Solicitation For Commercial Products And Commercial Services, As Supplemented With Additional Information Included In This Notice. This Announcement Constitutes The Only Solicitation; Quotes Are Being Requested, And A Written Solicitation Document Will Not Be Issued. this Solicitation Is Issued As An Rfq. The Solicitation Document And Incorporated Provisions And Clauses Are Those In Effect Through Federal Acquisition Circular 2024-05. this Solicitation Is Set-aside For Authorized Resellers Of The Required Medical Devices And Services. Competition Is Restricted As A Result Of The Brand Name Requirement. the Associated North American Industrial Classification System (naics) Code For This Procurement Is 621511, Medical Laboratories, With A Small Business Size Standard Of $41.5 Million. The Fsc/psc Is Q502, Medical - Cardiology. the Southern Arizona Va Healthcare System (savahcs) Located At 3601 S 6th St., Tucson, Az, 85723, Is Seeking To Purchase An Arc Flash Analysis. all Interested Companies Shall Provide Quotations For The Following: supplies/services line Item
period Of Performance
description
quantity
unit Of Measure
unit Price
total Price
0001
base Year
48 Hour Holter Monitoring Service
100
ea
â
â
0002
base Year
24-48 Holter Monitoring Services
100
ea
â
â
0003
base Year
extended (greater Than 48 Hour) Holter Monitoring Service
100
ea
â
â
0004
base Year
event (lwa Kit)
140
ea
â
â
0005
base Year
event (lwa Combo Kit)
140
ea
â
â
0006
base Year
mcot (lwa Kit)
900
ea
â
â
0007
base Year
mcot (lwa Combo Kit)
900
ea
â
â
1001
option 1 48 Hour Holter Monitoring Service
100
ea
â
â
1002
option 1
24-48 Holter Monitoring Services
100
ea
â
â
1003
option 1
extended (greater Than 48 Hour) Holter Monitoring Service
100
ea
â
â
1004
option 1
event (lwa Kit)
140
ea
â
â
1005
option 1
event (lwa Combo Kit)
140
ea
â
â
1006
option 1
mcot (lwa Kit)
900
ea
â
â
line Item Cont.
period Of Performance
description
quantity
unit Of Measure
unit Price
total Price
1007
option 1
mcot (lwa Combo Kit)
900
ea
â
â
2001
option 2
48 Hour Holter Monitoring Service
100
ea
â
â
2002
option 2
24-48 Holter Monitoring Services
100
ea
â
â
2003
option 2
extended (greater Than 48 Hour) Holter Monitoring Service
100
ea
â
â
2004
option 2
event (lwa Kit)
140
ea
â
â
2005
option 2
event (lwa Combo Kit)
140
ea
â
â
2006
option 2
mcot (lwa Kit)
900
ea
â
â
2007
option 2
mcot (lwa Combo Kit)
900
ea
â
â
3001
option 3
48 Hour Holter Monitoring Service
100
ea
â
â
3002
option 3
24-48 Holter Monitoring Services
100
ea
â
â
3003
option 3
extended (greater Than 48 Hour) Holter Monitoring Service
100
ea
â
â
3004
option 3
event (lwa Kit)
140
ea
â
â
3005
option 3
event (lwa Combo Kit)
140
ea
â
â
3006
option 3
mcot (lwa Kit)
900
ea
â
â
3007
option 3
mcot (lwa Kit)
900
ea
â
â
4001
option 4
48 Hour Holter Monitoring Service
100
ea
â
â
4002
option 4
24-48 Holter Monitoring Services
100
ea
â
â
4003
option 4
extended (greater Than 48 Hour) Holter Monitoring Service
100
ea
â
â
4004
option 4
event (lwa Kit)
140
ea
â
â
4005
option 4
event (lwa Combo Kit)
140
ea
â
â
4006
option 4
mcot (lwa Kit)
900
ea
â
â
4007
option 4
mcot (lwa Kit)
900
ea
â
â statement Of Work (sow) contract Title ambulatory Cardiac Monitoring Service background the Southern Arizona Va Healthcare System (savahcs) Requires Ambulatory Cardiac Monitoring Services To Serve The Veteran Patients. Ambulatory Cardiac Monitoring Services Are A Necessary Component Of A Full-service Cardiology Program And Necessary To The Provision Of Quality Care To Veterans. This Service Allows The Ability To Make Timely Diagnosis Of Disorders Related To Cardiac Rhythms. While Patients Are Performing Routine Daily Activities, The Chances Of Documenting Arrhythmias Causing Transient Problems Are Greatly Enhanced With Monitoring. At The Onset Of A Symptom (flutters, Dizziness, Presyncopal Episodes, Etc.), Monitoring Allows For The Detection Of Symptomatic And Asymptomatic Cardiac Rhythm Disturbances. objective the Contractor Shall Provide All Personnel, Equipment, Supplies, Facilities, Transportation, Tools, Materials, Supervision, And Other Items And Non-personal Services Necessary To Perform Ambulatory Cardiac Monitoring Services As Defined In This Statement Of Work Except For Those Items Specified As Government Furnished Property And Services. scope the Contractor Shall Provide Ambulatory Ekg Monitoring And Data Processing For Veterans Assigned To The Savahcs. Monitoring And Analysis Shall Occur Either Near-real Time Via Event & Telemetry Service Or After The Holter Recorder Data Has Been Transmitted To The Contractor. the Contractor Shall Furnish The Following Equipment To The Government And/or Veteran Patients: personal Ekg Monitoring Recorder With Or Without Event/telemetry As Specified By The Care Provider.
current Operator S Manual(s) To Be Available Electronically And In Hard Copy. hands-on Training By A Local Representative As Requested By The Contracting Officer S Representative (cor)
the Contractor Shall Repeat The Monitoring Study At No Additional Costs To The Government For The Following Reasons: device(s) Provide Unsatisfactory Results; device(s) Fail To Transmit Or Download Information; information Is Not Retrievable Through The Web-based System; the Selected Contractor Shall Provide Equipment And Off-site Monitoring. No Travel Fees Will Apply. All Deliveries, Disposable Items, And Equipment Are Included In The Pricing. devices Shall Be Provided To Patients Directly By The Va Xyz Or Mailed To The Patient By The Contractor. After Wearing The Recorder For The Period Prescribed By The Requesting Care Provider, Device(s) Shall Be Mailed By The Veteran Directly Back To Contractor. the Contractor Shall Provide A Return Mailer As Part Of The Equipment Package. Any Devices Given To A Patient That Are Lost Or Damaged Shall Be Replaced By The Contractor Within Five Business Days At No Cost To The Government. procedure the Device(s) Are Given To Patients To Use From 1 To 30 Days Depending On Prescription Of The Requesting Care Provider.
the Contractor Shall Stock An Adequate Number Of Devices At The Va Xyz Or Patient Hookup At That Location.
after Screening By Va Technicians, Contractor May Receive A Request To Mail A Device Directly To The Patient. Upon Receipt Of Order, Contractor Shall Contact The Patient Within 24 Hours By Phone, And Electrocardiography (ecg) Technicians Will Instruct Patients On The Functions Of The Device(s) To Include But Not Limited To, How To Use It, How To Hook It Up, And How To Place Leads.
during Mailed Orders, Contractor Will Contact The Patient To Aide Activation Of Patient Monitoring Device.
after The Evaluation Period, The Patient Returns The Device(s) To The Contractor With Provided Return Mailer Or To The Va Xyz Who Will In Turn Mail The Recorder To The Contractor. general Requirements
telemetry - External Mobile Cardiovascular Telemetry With Electrocardiographic Recording, Concurrent Computerized Real Time Data Analysis And Greater Than 24 Hours Of Accessible Ecg Data Storage (retrievable With Query) With Ecg Triggered And Patient Selected Events Transmitted To A Remote Attended Surveillance Center For Up To 30 Days; Technical Support For Connection And Patient Instructions For Use, Attended Surveillance, Analysis And Transmission Of Daily And Emergent Data Reports As Prescribed By A Physician Or Other Qualified Health Care Professional. Atrial Fibrillation Detection With 100% Sensitivity And 100% And 100% Positive Predictability For Episodes Lasting 30 Seconds Or Longer.
device Philips Ecg Solutions Mobile Cardiac Outpatient Telemetry (telemetry Mode). Equipment Shall:
be Ordered For The Patients Specific Needs monitor The Patient For 24 Hours A Day (365 Days A Year)
have The Capability Of Event Transmissions Being Sent Via Wireless/cell Phone Technology have Ability To Store 100% Of The Ecg Data In The Device(s) When Patient Is In An Area Of No Cellular Service; No Event Can Be Lost Due To Memory Limitations ecg Real Time Transmissions And Analysis Must Have A Minimum Of 2 Leads, Up To 6 Leads (views) With No More Than 3 Electrodes
have Ability For 100% Of Ecg Data To Be Transmitted In Real-time To Receiving Center For Entire Monitoring Period have Ability To Post Daily Analysis Reports For Physician Review On All Ecg Data Over The Monitoring Period
have Ability To Immediately Transmit, Alert And Report Patient Activated Events Immediately Upon Patient Pressing Event Button
have Ability To Immediately Transmit, Alert And Report Asymptomatic Events Meeting The Physician S Notification Criteria
include Technical Reading Of The Device(s) Along With A Comprehensive Report That Is Available Online And Will Be Interpreted By The Medical Staff
allow Both Patients And Va Staff To Have Unlimited 24/7 Telephone Access To Contractor S Support Staff That Are Knowledgeable And Shall Supply Help In Resolving Any Monitoring Problems
have Ability To Post An End Of Study Remote Telemetry Report Compiling All Event Descriptions And Ecg Data Into One Conclusion Report.
extended Holter External Electrocardiographic Recording From 3-14 Days By Continuous Rhythm Recording And Storage; Includes Recording, Scanning Analysis With Report.
device Philips Ecg Solutions Epatch Extended Holter (3-14 Day Mail Back Or Office-upload). traditional Holter External Electrocardiographic Recording Up To 48 Hours By Continuous Rhythm Recording And Storage; Includes Recording, Scanning Analysis With Report.
device - Philips Ecg Solutions Epatch Extended Holter (24-48hr Office-upload)
notification Procedures Contractor Maintains Customizable Notification Criteria That Will Be Completed By Va Greater Los Angeles Healthcare System (vaglahs) And Will Dictate All Notifications To Location With Abnormal Holter Alerts, Urgent Mct Notifications, And Emergent Mct Notifications. data Management
philips Will Maintain The Following Qualifications:
federal Information Processing Standard 140-2 Compliance fips Certificate #3328 Now Reflects The Information That You Provided For The Philips Ecg Solutions Cryptographic Module. The Certificate Is Posted At The Link Below: https://csrc.nist.gov/projects/cryptographic-module-validation-program/certificate/3328
memorandum Of Understanding Interconnection Security Agreement Via Lifepoint Informatics (mou-isa)
portal
while Patient Is Wearing The Device, Transmission Patient Activated Report, Urgent Asymptomatic Event Report, Daily Holter Report And End Of Study Report Options Shall Be Made Available Online Via The Philips Cardiac Ambulatory Workspace Portal. The Va Greater Los Angeles Healthcare System (vaglahs) Shall Have Access To Patient Reporting 24 Hours A Day At The Physician S Or Authorized Representative S Convenience Through Password Protection. Registration Information Will Be Entered By Va Technician On The Contractor S Web Site, Or By Transmission Of An Xml Or Hl7 Encoded Data Transfer File From Va To Contractor To Provide An Automated Registration Process.
full View Of All Available Inventory And A Running Log Of Active And Historical Patients Will Be Available On The Web Portal.
emr Integration
after A 6 Months Initial Period, Contractor Should Provide An Hl7 Or Xml Encoded Data File In Addition To The Pdf Report File. This Data File To Include Identification Of The Study (patient, Recording Period, Studyid), Type Of Study, And Results (heart Rate Range, Characterization Of All Arrhythmias/events And Summary Statistics) Registration Of The Patient And Study Shall Initially Occur Manually. Â va Technician Will Provide Information On The Contractor S Website. Data To Include Name, Dob, Contact Information, Type Of Study Requested, Duration Of Study, And Any Special Requests. Â the Contractor Has Ability To Provide An Electronic Ordering Capability To Use Hl7 Encoding For This Data To Eliminate The Need For Manual Input.
contractor Shall Provide Study Reports Via Their Web-portal.â Contractor Can Also Provide Report Data Through Hl7, Sftp, And Api Integration To Align With Order Interface, As Mentioned Above.
all Emr Integration Work And Timelines Are Subject To Approval From Visn It Leadership. work Flow the Device(s) Are Given To Patients To Use From 1 To 30 Days Depending On The Indication For Continuous Monitoring. initially, Ecg Technicians Will Instruct And Explain To The Patients What The Device(s) Is, How The Patient Will Use It, How To Hook It Up, And How To Place Leads.
they Will Then Hook Up The Device(s) And Let The Patient Go Home With Specific Instructions To Continue To Have The Device On For The Duration Of Evaluation. alternatively, The Monitor(s) Will Be Sent Directly To The Patient, And The Patient Will Be Hooked Up At Home With Instructions From The Vendor. in Either Of These Cases A Baseline Is Always Submitted To The Monitoring Center Where Trained Personnel Record And Interpret The Strip. physician Notification Criteria Will Be Established Prior To Enrollment. When Asymptomatic And/or Symptomatic Ecg Events Are Alerted That Meet The Site-specific Notification Criteria, A Call Is Made To The Site To Verbally Communicate The Critical Event. Also, A Dated Urgent Report Will Be Prepared And Posted On The Web Portal For Physician Evaluation And Faxed Upon Request. daily And Weekly Mct/event Reports Will Be Made Available Within The Online Portal And Faxed Upon Request. an Mct End Of Service Summary Report Shall Be Available 1-2 Days After The Service Is Completed. a Final Holter Report Will Be Available Within 2-3 Days Of Holter Device Being Received To Accommodate Upload And Scan Of Patient Data. (access To The Data From The Website Is Limited To The Physicians And/or Any Other Authorized Representatives Responsible For Evaluating The Data). equipment
all Equipment Offered Shall Be U.s. Food And Drug Administration (fda) Approved.
all Cardiac Mcot And Holter Monitors Shall Be Provided By The Contractor For Va Use And Shall Be State-of-the-art Equipment, Lightweight, And Simple For Patients To Use. Patients Will Use The Monitors From One (1) To Thirty (30) Days, Or As Specified By The Va Provider. Samples Shall Be Provided To Each Site During The Training Or Orientation Process.
the Contractor And Facility Cor Will Determine An Equipment Inventory Level At The Time Of Contract Award That Shall Always Remain At Each Facility Location. This Equipment Inventory Must Be Adequately Always Restocked To Ensure That The Facility Can Always Meet The Daily Patient Demand.
all Equipment Remains The Sole Property Of The Contractor Including The Initial Delivery Of The Units. The Contractor Is Responsible For All Service Maintenance And Repairs Of The Equipment And Hardware. the Contractor Shall Supply A Postage-paid Return Container For All Monitors. instrument Capabilities
lightweight (no More Than 1 Pound) And Easy To Use Design That Can Be Held In One Hand. available Instruments Should Include A Wireless Waterproof Patch Recorder. capability Of Event Transmissions Being Sent Via Wireless/cell Phone Or Advanced Technology. bidirectional Communication Between Our Emr(cprs) And The Contractor Is Highly Desirable telemetry Real Time Monitoring Capability Transmitting And Recording 100% Of Ecg Data. customizable Monitors. wireless 24/48 Hour Holter / 3-14 Day Holter / Outpatient Telemetry Devices Providing All Three Monitoring Functions Over The 1 -30 Days Monitoring Period. pacemaker Pulse Detection.
instrument/monitor Has A Date And Time Stamp For Clinical Reports.
instrument/monitor Can Correlate Between Time And Symptom And Identify/present All Rhythm Strips Associated With All Reported Symptoms. all Monitoring Devices Must Provide A Of 1 To 6 Diagnostic Leads Of Continuous Ecg Data Over Entire Monitoring Period, 3 Lead Pacemaker Annotations, And The Ability To Correlate Symptoms And Activity With Ecg Changes. all Consumable Items (batteries, Patches) Are Provided To Patient By Contractor Who Returns The Item After Monitoring Period. contractor Equipment Shall Be Capable Of Storing Up To Thirty-day (30) Of All Ecg Data, Using Standard Size Batteries Readily Available, And Easily Changed By The Patient.
training: The Contractor Shall Provide Comprehensive Training To The Cor And Selected Va Staff. The Training Shall Consist Of Proper Use Of The Monitoring Devices, Instructions On How To Upload Patient Information Into Contractor Provided Software And/or Websites, And How To Maintain Or Provide Basic Quality Assurance Tests. Philips Ecg Solutions Shall Also Provide Copies Of Manuals, Equipment Checklists, Surveys, And Specific Contact Information In The Event That A Medical Center Staff Person Needs To Contact The Contractor 24/7.
technical Support: Technical Support Is Required Via Telephone For Troubleshooting Of Method And/or Problems. The Response Time For Telephone Technical Assistance Shall Be Within One (1) Hour From The Time Of The Initial Call For Technical Support. Philips Ecg Solutions Shall Also Show Availability 24/7 For Patient Support. Philips Ecg Solutions Shall Have Appropriately Trained Personnel Available By Phone Throughout The Duration Of All Tests For Patient Support. quality Assurance maintenance: all Monitors Shall Be Kept At Original Equipment Manufacturer (oem) Specifications. all Portable Ecg Monitoring Equipment Shall Be Cleaned, Disinfected, And Decontaminated Per Joint Commission Standards, Each Time Before It Is Sent Back To Facility After Download By Contractor. Unclean Equipment Should Be Stored In An Area Separate From Cleaned Equipment To Prevent Cross Contamination. contractor Shall Demonstrate Set Procedures For Proper Inspection And Maintenance Of The Portable Monitoring Equipment And Shall Provide Each Location A Copy Of The Inspection Checklist. the Contractor Shall Have A Formal Procedure To Validate The Functional Integrity Of Any Device Before It Is Provided To A Patient, And Shall, At A Minimum, Complete And Document Such Validation Procedure Whenever A Device Is Returned With Non-diagnostic Or Unsatisfactory Results, Or When Visual Inspection Suggests The Possibility Of Device Damage. contractor Shall Report On The Failure Rate Of Their Equipment And Supply Maintenance Records. contractor Shall Provide Upgrades To Equipment And Software That May Become Available At No Additional Cost To The Government. the Contractor Shall Coordinate Installation Of Upgrades With The Cor. the Contractor Shall Provide Customer Notifications And Latest Operator S Manual Within 10 Days After Their Release/publication. quality Program
the Contractor Shall Maintain A Quality System That Ensures Conformance To Contractual Requirements And Meets The Requirements Of Iso 9001 And/or Cms Requirements For Equivalent Ecg Technical Monitoring, Or An Equivalent Quality System During Performance Of This Contract. contractor Shall Have A Clearly Defined Process By Which It Collects The Required Data, Performs Fbonotice Cause Analysis, And Can Supply Easily Understandable Reports. contractor Shall Demonstrate That Their Information Systems Are Hipaa Compliant, And That The Raw Data Can Be Transferred Securely And With Accuracy To The Va.
contractor Shall Track The Following Events: Receipt Of The Recorders, Identification Of Any Events Or Arrhythmias Satisfying Criteria For Md Notification, Efforts To Notify Va Staff Of Such Events. Data Recorder Will Include Date/time And Identify The Person(s) Involved. period Of Performance work Hours
normal Hours Of Operation For Savahcs Are Monday Through Friday From 8:00 Am To 4:30 Pm. federal Holidays new Year S Day
january 01
martin Luther King S Birthday
third Monday In January
president S Day
third Monday In February
memorial Day
last Monday In May
juneteenth
june 19
independence Day
july 04
labor Day
first Monday In September
columbus Day
second Monday In October
veterans Day
november 11
thanksgiving Day
fourth Thursday In November
christmas Day
december 25 if The Holiday Falls On A Sunday, The Following Monday Will Be Observed As A National Holiday. When A Holiday Falls On A Saturday, The Preceding Friday Is Observed As A National Holiday By U.s. Government Agencies, And Any Day Specifically Declared By The President Of The United States Of America. period Of Performance the Contract Period Of Performance Is One Base And Four Option Years, With An Fob Of Destination. contract Period
pop Begin
pop End
base
12/1/2024
11/30/2025
option 1
12/1/2025
11/30/2026
option 2
12/1/2026
11/30/2027
option 3
12/1/2027
11/30/2028
option 4
12/1/2028
11/30/2029 invoices payment Of Services Rendered Under This Contract Shall Be Made In Arrears Upon Satisfactory Completion Of Each Service And Receipt Of A Properly Prepared Invoice And Submitted By The Contractor To The Payment Address Specified By Contracting. Invoices Shall Reference The Contract Number And Purchase Order Number, Manifest Number(s), Provide A Complete And Accurate Description Of Services/ Supplies Delivered/ Rendered, Including Dates Of Performance, Amounts, Unit Prices, Extended Totals And Any Other Data Relevant For Payment Purposes. the Government Shall Not Authorize Payment Until Such Time That The Savahcs Cor All Properly Executed And Signed Documentation. no Advance Payments Shall Be Authorized. Payment Shall Be Made On A Monthly Arrears For Services Provided During The Billing Month In Arrears In Accordance With Far 52.212-4, Para. (i). Upon Submission Of A Properly Prepared Invoice For Prices Stipulated In This Contract For Services Delivered And Accepted In Accordance With The Terms And Conditions Of The Contract, Less Any Deductions Stipulated In This Contract. payment Of Invoices May Be Delayed If The Appropriate Invoices As Specified In The Contract Are Not Completed And Submitted As Required. place Of Performance/place Of Delivery
address:
department Of Veterans Affairs
southern Arizona Va Medical Center (savahcs)
3601 S 6th Ave
tucson, Az
postal Code:
85723
country:
united States the Full Text Of Far Provisions Or Clauses May Be Accessed Electronically At Http://acquisition.gov/comp/far/index.html. the Following Solicitation Provisions Apply To This Acquisition:
far 52.212-1, Instructions To Offerors Commercial Products And Commercial Services (sep 2023)
addendum To Far 52.212-1, Instructions To Offerors Commercial Products And Commercial Services far 52.252-1, Solicitation Provisions Incorporated By Reference (feb 1998)
far 52.204-7, System For Award Management (oct 2018)
far 52.204-16, Commercial And Government Entity Code Reporting (aug 2020)
far 52.217-5, Evaluation Of Options (jul 1990)
far 52.229-11, Tax On Certain Foreign Procurements-notice And Representation (jun 2020)
vaar 852.233-70, Protest Content/alternative Dispute Resolution (oct 2018)
vaar 852.239-75, Information And Communication Technology Accessibility Notice (feb 2023)
far 52.204-24, Representation Regarding Certain Telecommunications And Video Surveillance Or Equipment (nov 2021)
far 52.204-29, Federal Acquisition Supply Chain Security Act Orders Representation And Disclosures (dec 2023)
far 52.209-7, Information Regarding Responsibility Matters (oct 2018)
far 52.233-2, Service Of Protest (sep 2006)
vaar 852.233-71, Alternate Protest Procedure (oct 2018)
far 52.212-2, Evaluation Commercial Products And Commercial Services (nov 2021)
far 52.212-3, Offerors Representations And Certifications Commercial Products And Commercial Services (may 2024) offerors Must Complete Annual Representations And Certifications Electronically Via The System For Award Management (sam) Website Located At Https://www.sam.gov/portal In Accordance With Far 52.212-3, Offerors Representations And Certifications Commercial Products And Commercial Services. If Paragraph (j) Of The Provision Is Applicable, A Written Submission Is Required. the Following Contract Clauses Apply To This Acquisition: far 52.212-4, Contract Terms And Conditions Commercial Products And Commercial Services (nov 2023)
addendum To Far 52.212-4, Contract Terms And Conditions Commercial Products And Commercial Services Applies To And Is Included With This Acquisition.
far 52.252-2, Clauses Incorporated By Reference (feb 1998)
far 52.203-17, Contractor Employee Whistleblower Rights (nov 2023)
far 52.204-13, System For Award Management Maintenance (oct 2018)
far 52.204-18, Commercial And Government Entity Code Maintenance (aug 2020)
far 52.242-17, Government Delay Of Work (apr 1984)
vaar 852.201-70, Contracting Officer S Representative (dec 2022)
vaar 852.203-70, Commercial Advertising (may 2018)
far 52.217-8, Option To Extend Services (nov 1999)
far 52.217-9, Option To Extend The Term Of The Contract (mar 2000)
vaar 852.232-72, Electronic Submission Of Payment Requests (nov 2018)
vaar 852.242-71, Administrative Contracting Officer (oct 2020)
far 52.212-5, Contract Terms And Conditions Required To Implement Statutes Or Executive Orders Commercial Products And Commercial Services (may 2024) the Following Subparagraphs Of Far 52.212-5 Are Applicable: Subparagraph (b)(5), (9), (11), (12), (25), (26), (31), (33), (34), (36), (39), (46), (51), (55), (59), (c)(1), (7), And (8). all Invoices From The Contractor Shall Be Submitted Electronically In Accordance With Vaar Clause 852.232-72, Electronic Submission Of Payment Requests. This Is Accomplished Through The Tungsten Network, Located At: Http://www.fsc.va.gov/einvoice.asp. This Is Mandatory And The Sole Method For Submitting Invoices. all Quoters Shall Submit The Following: All Information Required By Far 52.212-1(b) Submission Of Offers. all Quotes Shall Be Sent To The Network Contracting Office (nco), At Stephanie.naron@va.gov. award Will Be Based Upon A Comparative Evaluation Of Quotes In Accordance With The Simplified Acquisition Procedures Of Far 13. Comparative Evaluation Is The Side By Side Pairwise Comparison Of Quotes Based On Factors Resulting In A Contracting Officer Decision For The Quote Most Favorable To The Government. options Will Be Evaluated At Time Of Award. the Following Are The Decision Factors: Price, And Past Performance, With Price More Important. past Performance Will Be Based On Cpars And Fapiis Ratings. No Rating In Cpars Is Equal To A Neutral Rating. the Award Will Be Made To The Response Most Advantageous To The Government.
responses Should Contain Your Best Terms, Conditions. to Facilitate The Award Process, All Quotes Must Include A Statement Regarding The Terms And Conditions Herein As Follows: "the Terms And Conditions In The Solicitation Are Acceptable To Be Included In The Award Document Without Modification, Deletion, Or Addition." or "the Terms And Conditions In The Solicitation Are Acceptable To Be Included In The Award Document With The Exception, Deletion, Or Addition Of The Following:" Quoters Shall List Exception(s) And Rationale For The Exception(s), If Any. submission Of Questions Shall Be Received No Later Than Friday, 10/25/2024, 14:00 Pdt At Stephanie.naron@va.gov Only. Subject Line Shall Include Questions To Rfq 36c26225q0059. submissions Shall Include Your Quote, Using The Attached Schedule, As Well As A Capabilities Statement With Qualifications Proving All Certifications And Education Required For The Work Being Conducted In The Sow. Submissions Not Meeting All Requirements Of The Sow Will Be Considered Ineligible For Award . submission Of Your Response Shall Be Received Not Later Than Friday, 11/01/2024, 10:00 Pdt At Stephanie.naron@va.gov Only. Subject Line Shall Include Response To Rfq 36c26225q0059. late Submissions Shall Be Treated In Accordance With The Solicitation Provision At Far 52.212-1(f). any Questions Or Concerns Regarding This Solicitation Should Be Forwarded In Writing Via E-mail To The Point Of Contact Listed Below. point Of Contact
stephanie Naron
contract Specialist
stephanie.naron@va.gov
Bureau Of Corrections Muntinlupa City Metro Manila Tender
Civil And Construction...+1Building Construction
Philippines
Closing Date5 Jun 2024
Tender AmountPHP 272.1 Million (USD 4.6 Million)
Details: Description Republic Of The Philippines Department Of Justice Bureau Of Corrections Muntinlupa City Philippine Bidding Documents Design And Build Of Correctional Institution For Women (ciw) Facility At Iwahig Prison And Penal Farm (ippf) (procurement/ Id .019) Sixth Edition July 2020 Bids And Awards Committee 2024 Table Of Contents Section I. Invitation To Bid 3 Section Ii. Instructions To Bidders 6 Section Iii. Bid Data Sheet 13 Section Iv. General Conditions Of Contract 19 Section V. Special Conditions Of Contract 24 Section Vi. Specifications 26 Section Vii. Drawings 57 Section Viii. Bill Of Quantities 58 Section Ix. Checklist Of Technical And Financial Documents 59 Section I. Invitation To Bid Republic Of The Philippines Department Of Justice Bureau Of Corrections Muntinlupa City Invitation To Bid Design And Build Of Correctional Institution For Women (ciw) Facility At Iwahig Prison And Penal Farm (ippf) 1. The Bureau Of Corrections, Through The General Appropriations Act (gaa) Of 2024 Capital Outlay, Intends To Apply The Sum Of Two Hundred Seventy-two Million One Hundred Sixty-six Thousand Pesos Only (₱272,166,000.00) Being The Approved Budget For The Contract (abc) To Payments Under The Contract For The Design And Build Of Correctional Institution For Women (ciw) Facility At Iwahig Prison And Penal Farm (ippf) With Identification Number __19. Bids Received In Excess Of The Abc Shall Be Automatically Rejected At Bid Opening. 2. The Bureau Of Corrections Now Invites Bids For Provision Of A Detailed Preliminary Architectural And Engineering Design, Detailed Engineering Requirements And Actual Construction Of The Bureau Of Corrections Regional Prison Facilities, Based On The Final Detailed Architectural And Engineering Design, To Be Approved By The Head Of Procuring Entity Or Its Duly Authorized Representative Conformably With The Minimum Standards Set Forth In The (1) Presidential Decree (pd) No. 1096, National Building Code Of The Philippines (2) Batas Pambansa (bp)blg. 344, An Act To Enhance The Mobility Of Disabled Persons By Requiring Certain Public Buildings, Institutions, Establishments And Public Utilities To Install Facilities And Other Devices (3) National Structural Code Of The Philippines (nscp), Volume I, 2010 (4) Philippine Electrical Code (pec), 2009 (5) Revised Plumbing Code Of The Philippines (6) Revised Irr Of Ra 10575 (7) Republic Act (ra) No. 9514, Revised Fire Code Of The Philippines And (8) Applicable Local Regulations And Ordinances. Completion Of The Works Is Required Within Three Hundred Sixty-five (365) Calendar Days. Bidders Should Have Completed A Contract Similar To The Project Amounting To At Least Fifty Percent (50%) Of The Abc Within The Last Six (6) Years. The Description Of An Eligible Bidder Is Contained In The Bidding Documents, Particularly, In Section Ii. Instructions To Bidders. 3. Bidding Will Be Conducted Through Open Competitive Bidding Procedures Using Non-discretionary “pass/fail” Criterion As Specified In The 2016 Revised Implementing Rules And Regulations (irr) Of Republic Act 9184 (ra 9184), Otherwise Known As The “government Procurement Reform Act.”bidding Is Restricted To Filipino Citizens/sole Proprietorships, Cooperatives, And Partnerships Or Organizations With At Least Seventy-five Percent (75%) Interest Or Outstanding Capital Stock Belonging To Citizens Of The Philippines. 4. Interested Bidders May Obtain Further Information From Bureau Of Corrections And Inspect The Bidding Documents At The Address Given Below From Monday To Friday From 8:00am To 5:00pm. 5. A Complete Set Of Bidding Documents May Be Acquired By Interested Bidders On _may 2, 2024 (08:00am To 05:00pm) To May 23, 2024 (08:00am To 01:29pm) From The Given Address And Website(s) Below. It May Also Be Downloaded Free Of Charge From The Website Of The Philippine Government Electronic Procurement System (philgeps) And The Website Of The Procuring Entity Bucor.gov.ph, Provided That Bidders Shall Pay The Applicable Fee Of Fifty Thousand (₱50,000.00) Pesos Only For The Bidding Documents Not Later Than The Submission Of Their Bids. The Procuring Entity Shall Allow The Bidder To Present Its Proof Of Payment For The Fees In Person Or By Facsimile. 6. The Bureau Of Corrections Will Hold A Pre-bid Conference On _may 10, 2024 (01:30 Pm)___ At Bac Conference Room Nbp Reservation Muntinlupa City, Which Shall Be Open To Prospective Bidders. 7. Bids Must Be Duly Received By The Bac Secretariat Through Manual Submission At The Office Address As Indicated Below, On Or Before _may 23, 2024 (01:30pm)___. Late Bids Shall Not Be Accepted. 8. All Bids Must Be Accompanied By A Bid Security In Any Of The Acceptable Forms And In The Amount Stated In Itb Clause 15. 9. Bid Opening Shall Be On _may 23, 2024 (01:30pm)_ At The Bac Conference Room Nbp Reservation Muntinlupa City. Bids Will Be Opened In The Presence Of The Bidders’ Representatives Who Choose To Attend The Activity. 10. The Bureau Of Corrections Reserves The Right To Reject Any And All Bids, Declare A Failure Of Bidding, Or Not Award The Contract At Any Time Prior To Contract Award In Accordance With Sections 35.6 And 41 Of The 2016 Revised Implementing Rules And Regulations (irr) Of Ra No. 9184, Without Thereby Incurring Any Liability To The Affected Bidder Or Bidders. 11. For Further Information, Please Refer To: Ma. Adoracion I. Viñas Office Of The Bac Secretariat Supply Office, Bureau Of Corrections, Muntinlupa City Tel # 02-8809-8587/02-8478-0907 Bacsec2022@gmail.com 12. You May Visit The Following Websites: For Downloading Of Bidding Documents: Bucor.gov.ph Date Of Issue: _______________ Ccsupt Celso S Bravo Chairperson, Bids And Awards Committee Section Ii. Instructions To Bidders 1. Scope Of Bid The Procuring Entity, Bureau Of Corrections Invites Bids For The Design And Build Of Correctional Institution For Women (ciw) Facility At Iwahig Prison And Penal Farm (ippf), With Project Identification Number [indicate Number]. [note: The Project Identification Number Is Assigned By The Procuring Entity Based On Its Own Coding Scheme And Is Not The Same As The Philgeps Reference Number, Which Is Generated After The Posting Of The Bid Opportunity On The Philgeps Website.] The Procurement Project (referred To Herein As “project”) Is For The Construction Of Works, As Described In Section Vi (specifications). 2. Funding Information 2.1. The Gop Through The Source Of Funding Through The General Appropriations Act (gaa) Of 2024 Capital Outlay In The Amount Of Two Hundred Seventy-two Million One Hundred Sixty-six Thousand Pesos Only (₱272,166,000.00) 2.2. The Source Of Funding Is: A. Nga, The General Appropriations Act Or Special Appropriations. 3. Bidding Requirements The Bidding For The Project Shall Be Governed By All The Provisions Of Ra No. 9184 And Its 2016 Revised Irr, Including Its Generic Procurement Manual And Associated Policies, Rules And Regulations As The Primary Source Thereof, While The Herein Clauses Shall Serve As The Secondary Source Thereof. Any Amendments Made To The Irr And Other Gppb Issuances Shall Be Applicable Only To The Ongoing Posting, Advertisement, Or Invitation To Bid By The Bac Through The Issuance Of A Supplemental Or Bid Bulletin. The Bidder, By The Act Of Submitting Its Bid, Shall Be Deemed To Have Inspected The Site, Determined The General Characteristics Of The Contracted Works And The Conditions For This Project, Such As The Location And The Nature Of The Work; (b) Climatic Conditions; (c) Transportation Facilities; (c) Nature And Condition Of The Terrain, Geological Conditions At The Site Communication Facilities, Requirements, Location And Availability Of Construction Aggregates And Other Materials, Labor, Water, Electric Power And Access Roads; And (d) Other Factors That May Affect The Cost, Duration And Execution Or Implementation Of The Contract, Project, Or Work And Examine All Instructions, Forms, Terms, And Project Requirements In The Bidding Documents. 4. Corrupt, Fraudulent, Collusive, Coercive, And Obstructive Practices The Procuring Entity, As Well As The Bidders And Contractors, Shall Observe The Highest Standard Of Ethics During The Procurement And Execution Of The Contract. They Or Through An Agent Shall Not Engage In Corrupt, Fraudulent, Collusive, Coercive, And Obstructive Practices Defined Under Annex “i” Of The 2016 Revised Irr Of Ra No. 9184 Or Other Integrity Violations In Competing For The Project. 5. Eligible Bidders 5.1. Only Bids Of Bidders Found To Be Legally, Technically, And Financially Capable Will Be Evaluated. 5.2. The Bidder Must Have An Experience Of Having Completed A Single Largest Completed Contract (slcc) That Is Similar To This Project, Equivalent To At Least Fifty Percent (50%) Of The Abc Adjusted, If Necessary, By The Bidder To Current Prices Using The Psa’s Cpi, Except Under Conditions Provided For In Section 23.4.2.4 Of The 2016 Revised Irr Of Ra No. 9184. A Contract Is Considered To Be “similar” To The Contract To Be Bid If It Has The Major Categories Of Work Stated In The Bds. 5.3. For Foreign-funded Procurement, The Procuring Entity And The Foreign Government/foreign Or International Financing Institution May Agree On Another Track Record Requirement, As Specified In The Bidding Document Prepared For This Purpose. 5.4. The Bidders Shall Comply With The Eligibility Criteria Under Section 23.4.2 Of The 2016 Irr Of Ra No. 9184. 6. Origin Of Associated Goods There Is No Restriction On The Origin Of Goods Other Than Those Prohibited By A Decision Of The Un Security Council Taken Under Chapter Vii Of The Charter Of The Un. 7. Subcontracts 7.1. The Bidder May Subcontract Portions Of The Project To The Extent Allowed By The Procuring Entity As Stated Herein, But In No Case More Than Fifty Percent (50%) Of The Project. The Procuring Entity Has Prescribed That: A. Subcontracting Is Not Allowed. 7.1. [if Procuring Entity Has Determined That Subcontracting Is Allowed During The Bidding, State:] The Bidder Must Submit Together With Its Bid The Documentary Requirements Of The Subcontractor(s) Complying With The Eligibility Criteria Stated In Itb Clause 5 In Accordance With Section 23.4 Of The 2016 Revised Irr Of Ra No. 9184 Pursuant To Section 23.1 Thereof. 7.2. [if Subcontracting Is Allowed During The Contract Implementation Stage, State:] The Supplier May Identify Its Subcontractor During The Contract Implementation Stage. Subcontractors Identified During The Bidding May Be Changed During The Implementation Of This Contract. Subcontractors Must Submit The Documentary Requirements Under Section 23.1 Of The 2016 Revised Irr Of Ra No. 9184 And Comply With The Eligibility Criteria Specified In Itb Clause 5 To The Implementing Or End-user Unit. 7.3. Subcontracting Of Any Portion Of The Project Does Not Relieve The Contractor Of Any Liability Or Obligation Under The Contract. The Supplier Will Be Responsible For The Acts, Defaults, And Negligence Of Any Subcontractor, Its Agents, Servants, Or Workmen As Fully As If These Were The Contractor’s Own Acts, Defaults, Or Negligence, Or Those Of Its Agents, Servants, Or Workmen. 8. Pre-bid Conference The Procuring Entity Will Hold A Pre-bid Conference For This Project On The Specified Date And Time And Either At Its Physical Address At Bac Conference Room Nbp Reservation Muntinlupa City And/or Through Videoconferencing/webcasting} As Indicated In Paragraph 6 Of The Ib. 9. Clarification And Amendment Of Bidding Documents Prospective Bidders May Request For Clarification On And/or Interpretation Of Any Part Of The Bidding Documents. Such Requests Must Be In Writing And Received By The Procuring Entity, Either At Its Given Address Or Through Electronic Mail Indicated In The Ib, At Least Ten (10) Calendar Days Before The Deadline Set For The Submission And Receipt Of Bids. 10. Documents Comprising The Bid: Eligibility And Technical Components 10.1. The First Envelope Shall Contain The Eligibility And Technical Documents Of The Bid As Specified In Section Ix. Checklist Of Technical And Financial Documents. 10.2. If The Eligibility Requirements Or Statements, The Bids, And All Other Documents For Submission To The Bac Are In Foreign Language Other Than English, It Must Be Accompanied By A Translation In English, Which Shall Be Authenticated By The Appropriate Philippine Foreign Service Establishment, Post, Or The Equivalent Office Having Jurisdiction Over The Foreign Bidder’s Affairs In The Philippines. For Contracting Parties To The Apostille Convention, Only The Translated Documents Shall Be Authenticated Through An Apostille Pursuant To Gppb Resolution No. 13-2019 Dated 23 May 2019. The English Translation Shall Govern, For Purposes Of Interpretation Of The Bid. 10.3. A Valid Pcab License Is Required, And In Case Of Joint Ventures, A Valid Special Pcab License, And Registration For The Type And Cost Of The Contract For This Project. Any Additional Type Of Contractor License Or Permit Shall Be Indicated In The Bds. 10.4. A List Of Contractor’s Key Personnel (e.g., Project Manager, Project Engineers, Materials Engineers, And Foremen) Assigned To The Contract To Be Bid, With Their Complete Qualification And Experience Data Shall Be Provided. These Key Personnel Must Meet The Required Minimum Years Of Experience Set In The Bds. 10.5. A List Of Contractor’s Major Equipment Units, Which Are Owned, Leased, And/or Under Purchase Agreements, Supported By Proof Of Ownership, Certification Of Availability Of Equipment From The Equipment Lessor/vendor For The Duration Of The Project, As The Case May Be, Must Meet The Minimum Requirements For The Contract Set In The Bds. 11. Documents Comprising The Bid: Financial Component 11.1. The Second Bid Envelope Shall Contain The Financial Documents For The Bid As Specified In Section Ix. Checklist Of Technical And Financial Documents. 11.2. Any Bid Exceeding The Abc Indicated In Paragraph 1 Of The Ib Shall Not Be Accepted. 11.3. For Foreign-funded Procurement, A Ceiling May Be Applied To Bid Prices Provided The Conditions Are Met Under Section 31.2 Of The 2016 Revised Irr Of Ra No. 9184. 12. Alternative Bids Bidders Shall Submit Offers That Comply With The Requirements Of The Bidding Documents, Including The Basic Technical Design As Indicated In The Drawings And Specifications. Unless There Is A Value Engineering Clause In The Bds, Alternative Bids Shall Not Be Accepted. 13. Bid Prices All Bid Prices For The Given Scope Of Work In The Project As Awarded Shall Be Considered As Fixed Prices, And Therefore Not Subject To Price Escalation During Contract Implementation, Except Under Extraordinary Circumstances As Determined By The Neda And Approved By The Gppb Pursuant To The Revised Guidelines For Contract Price Escalation Guidelines. 14. Bid And Payment Currencies 14.1. Bid Prices May Be Quoted In The Local Currency Or Tradable Currency Accepted By The Bsp At The Discretion Of The Bidder. However, For Purposes Of Bid Evaluation, Bids Denominated In Foreign Currencies Shall Be Converted To Philippine Currency Based On The Exchange Rate As Published In The Bsp Reference Rate Bulletin On The Day Of The Bid Opening. 14.2. Payment Of The Contract Price Shall Be Made In: A. Philippine Pesos. 15. Bid Security 15.1. The Bidder Shall Submit A Bid Securing Declaration Or Any Form Of Bid Security In The Amount Indicated In The Bds, Which Shall Be Not Less Than The Percentage Of The Abc In Accordance With The Schedule In The Bds. 15.2. The Bid And Bid Security Shall Be Valid Until One Hundred Twenty (120) Calendar Days. Any Bid Not Accompanied By An Acceptable Bid Security Shall Be Rejected By The Procuring Entity As Non-responsive. 16. Sealing And Marking Of Bids Each Bidder Shall Submit One Copy Of The First And Second Components Of Its Bid. The Procuring Entity May Request Additional Hard Copies And/or Electronic Copies Of The Bid. However, Failure Of The Bidders To Comply With The Said Request Shall Not Be A Ground For Disqualification. If The Procuring Entity Allows The Submission Of Bids Through Online Submission To The Given Website Or Any Other Electronic Means, The Bidder Shall Submit An Electronic Copy Of Its Bid, Which Must Be Digitally Signed. An Electronic Copy That Cannot Be Opened Or Is Corrupted Shall Be Considered Non-responsive And, Thus, Automatically Disqualified. 17. Deadline For Submission Of Bids The Bidders Shall Submit On The Specified Date And Time And Either At Its Physical Address Or Through Online Submission As Indicated In Paragraph 7 Of The Ib. 18. Opening And Preliminary Examination Of Bids 18.1. The Bac Shall Open The Bids In Public At The Time, On The Date, And At The Place Specified In Paragraph 9 Of The Ib. The Bidders’ Representatives Who Are Present Shall Sign A Register Evidencing Their Attendance. In Case Videoconferencing, Webcasting Or Other Similar Technologies Will Be Used, Attendance Of Participants Shall Likewise Be Recorded By The Bac Secretariat. In Case The Bids Cannot Be Opened As Scheduled Due To Justifiable Reasons, The Rescheduling Requirements Under Section 29 Of The 2016 Revised Irr Of Ra No. 9184 Shall Prevail. 18.2. The Preliminary Examination Of Bids Shall Be Governed By Section 30 Of The 2016 Revised Irr Of Ra No. 9184. 19. Detailed Evaluation And Comparison Of Bids 19.1. The Procuring Entity’s Bac Shall Immediately Conduct A Detailed Evaluation Of All Bids Rated “passed” Using Non-discretionary Pass/fail Criteria. The Bac Shall Consider The Conditions In The Evaluation Of Bids Under Section 32.2 Of 2016 Revised Irr Of Ra No. 9184. 19.2. If The Project Allows Partial Bids, All Bids And Combinations Of Bids As Indicated In The Bds Shall Be Received By The Same Deadline And Opened And Evaluated Simultaneously So As To Determine The Bid Or Combination Of Bids Offering The Lowest Calculated Cost To The Procuring Entity. Bid Security As Required By Itb Clause 16 Shall Be Submitted For Each Contract (lot) Separately. 19.3. In All Cases, The Nfcc Computation Pursuant To Section 23.4.2.6 Of The 2016 Revised Irr Of Ra No. 9184 Must Be Sufficient For The Total Of The Abcs For All The Lots Participated In By The Prospective Bidder. 20. Post Qualification Within A Non-extendible Period Of Five (5) Calendar Days From Receipt By The Bidder Of The Notice From The Bac That It Submitted The Lowest Calculated Bid, The Bidder Shall Submit Its Latest Income And Business Tax Returns Filed And Paid Through The Bir Electronic Filing And Payment System (efps), And Other Appropriate Licenses And Permits Required By Law And Stated In The Bds. 21. Signing Of The Contract The Documents Required In Section 37.2 Of The 2016 Revised Irr Of Ra No. 9184 Shall Form Part Of The Contract. Additional Contract Documents Are Indicated In The Bds. Section Iii. Bid Data Sheet Bid Data Sheet Itb Clause 5.2 For This Purpose, Contracts Similar To The Project Refer To Contracts Which Have The Same Major Categories Of Work, Which Shall Be: Architectural, Engineering Design, Detailed Engineering Requirements And Construction Of Building With Concreting Works. 7.1 Subcontracting Is Not Allowed 10.3 A Valid Pcab License Is Required, And In Case Of Joint Ventures, A Valid Special Pcab License, And Registration For The Type And Cost Of The Contract For This Project. 10.4 The Key Personnel Must Meet The Required Minimum Years Of Experience Set Below: For Design Personnel: Key Personnel General Experience Relevant Experience Principal Architect The Principal Architect Must Be Duly-licensed With At Least Ten (10) Years’ Experience Experience In The Design Of Residential, Government Offices Or Institutional Facilities, And Shall Preferably Be Knowledgeable In The Application Of Rapid Construction Technologies. Structural Engineer The Structural Engineer Must Be A Duly-licensed Civil Engineer With At Least Ten (10) Years’ Experience. Experience In Structural Design And Shall Preferably Be Knowledgeable In The Application Of Rapid Construction Technologies. Professional Electrical Engineer The Electrical Engineer Must Be A Registered Professional Electrical Engineer With At Least Five (5) Years’ Experience. Experience In The Design Of Lighting, Power Distribution, Communication Systems (specifically Structured And Local Area Network Cabling, Pabx), Building Management Systems And Preferably Knowledgeable In Developments In Emergent Efficient Lighting Technologies And Energy Management. Professional Mechanical Engineer The Mechanical Engineer Must Be A Professional Mechanical Engineer With At Least Five (5) Years’ Experience. Experience In Hvac And Fire Protection Systems And Preferably Knowledgeable In Emergent, Alternative Energy- Efficient Hvac Technologies. Electronics And Communications Engineer The Electronics And Communications Engineer Must Be Duly-licensed With At Least Five (5) Years’ Experience. Experience In The Design Of Communications Systems, And Preferably Knowledgeable In The Application Of Building Automation And Surveillance Systems. Sanitary Engineer The Sanitary Engineer Must Be Duly-licensed With At Least Five (5) Years’ Experience. Experience In The Design Of Building Water Supply And Distribution, Plumbing, And Preferably Knowledgeable In Waste Water Management/treatment, And Emergent, Alternative Effluent Collection And Treatment System. The Design & Build Contractor May, As Needed And At Its Own Expense, Add Additional Professionals And/or Support Personnel For The Optimal Performance Of All Architectural And Engineering Design Services, As Stipulated In These Terms Of Reference, For The Project. Prospective Bidders Shall Attach Each Individual’s Resume And Prc License Of The (professional) Staff. Design Personnel May Also Be Utilized For The Construction Phase Provided That The Same Meet The Minimum Number Of Years Of Experience In The Construction Of Similar Projects. For Construction Personnel: Key Personnel General Experience Relevant Experience Project Manager The Project Manager Shall Be A Licensed Architect Or Engineer With At Least Eight (8) Years Relevant Experience. Relevant Experience On Similar And Comparable Projects In Different Locations. The Project Manager Should Have A Proven Record Or Managerial Capability Through The Directing/managing Of Major Civil Engineering Works, Including Projects Of A Similar Magnitude. Project Architect/engineer The Project Architect/engineer Shall Be A Licensed Architect Or Engineer With At Least Five (5) Years’ Experience. Experience In Similar And Comparable Projects And Shall Preferably Be Knowledgeable In The Application Of Rapid Construction Technologies. Materials Engineer (m.e. I) The Materials Engineer Must Be Duly Accredited With The Dpwh And With At Least Five (5) Years’ Experience. Experience In Similar And Comparable Projects And Shall Preferably Be Knowledgeable In The Application Of Rapid Construction Technologies. Electrical Engineer The Electrical Engineer Must Be Duly-licensed With At Least Five (5) Years’ Experience. Experience In Similar And Comparable Projects In The Installation Of Lighting, Power Distribution, Communication Systems (specifically Structured And Local Area Network Cabling, Pabx), Building Management Systems. Mechanical Engineer The Mechanical Engineer Must Be Duly-licensed With At Least Five (5) Years’ Experience. Experience In Similar And Comparable Projects In The Installation Of Hvac And Fire Protection. Sanitary Engineer The Sanitary Engineer Must Be Duly-licensed With At Least Five (5) Years’ Experience. Experience In Similar And Comparable Projects In The Installation Of Building Water Supply And Distribution, Plumbing. Foreman The Foreman Must Have At Least Five (5) Years’ Experience. Experience In Similar And Comparable Projects And Shall Preferably Be Knowledgeable In The Application Of Rapid Construction Technologies. Safety Officer The Sanitary Officer Must Have At Least Two (2) Years’ Experience. Must Be An Accredited Safety Practitioner By The Department Of Labor And Employment (dole) And Must Have Undergone The Prescribed Forty (40) Hour Construction Safety And Health Training (cosh) 10.5 The Minimum Major Equipment Requirements Are The Following: Equipment Capacity Number Of Units Backhoe At Least 38hp With 0.055 To 0.160 M3 Bucket Capacity 1 Pay Loader At Least 2.5 To 9.5 M3 Bucket Capacity 1 Dump Truck At Least 10 Cu.m. 2 Generator 50kva 1 Concrete Mixers 1 Bagger 4 Welding Machines 300amp Heavy Duty 4 Submersible Dredging Pump At Least 1hp And 2” Output 1 Prospective Bidders Shall Attach The List Of Contractor’s Major Equipment Units, Which Are Owned, Leased, And/or Under Purchase Agreements, Supported By Proof Of Ownership, Certification Of Availability Of Equipment From The Equipment Lessor/vendor For The Duration Of The Project, As The Case May Be. 12 No Further Instructions. 15.1 The Bid Security Shall Be In The Form Of A Bid Securing Declaration Or Any Of The Following Forms And Amounts: A. The Amount Of Not Less Than 2% Of The Abc, If Bid Security Is In Cash, Cashier’s/manager’s Check, Bank Draft/guarantee Or Irrevocable Letter Of Credit; B. The Amount Of Not Less Than 5% Of The Abc, If Bid Security Is In Surety Bond. 19.2 No Further Instructions. 20 Within A Non-extendible Period Of Five (5) Calendar Days From Receipt By The Bidder Of The Notice From The Bac That It Submitted The Lowest Calculated Bid, The Bidder Shall Submit Its; 1. Latest Income And Business Tax Returns Filed And Paid Through The Bir Electronic Filing And Payment System (efps) 2. Supporting Documents For The Slcc (notice Of Award And/or Notice To Proceed And Project Owner’s Certificate Of Final Acceptance Issued By The Owner Other Than The Contractor Or The Constructors Performance Evaluation System (cpes) Final Rating, Which Must Be At Least Satisfactory. In Case Of Contracts With The Private Sector, An Equivalent Document Shall Be Submitted) 3. Certified True Copy Coming From The Issuing Agency Of Valid And Current Registration Certificate (sec Certificate Of Registration For Corporation Or Dti Certificate Of Registration For Sole Proprietorship Or Cda Certificate Of Registration For Cooperative) 4. Valid And Current Mayor’s Or Business Permit 5. Valid And Current Tax Clearance 6. Valid And Current Pcab License And Registration 7. Audited Financial Statement 8. Three (3) Sets Photocopy Of Eligibility And Financial Envelope Duly Marked As “copy No.1”, “copy No.2” And “copy No.3” 21 No Further Instructions. Section Iv. General Conditions Of Contract 1. Scope Of Contract This Contract Shall Include All Such Items, Although Not Specifically Mentioned, That Can Be Reasonably Inferred As Being Required For Its Completion As If Such Items Were Expressly Mentioned Herein. All The Provisions Of Ra No. 9184 And Its 2016 Revised Irr, Including The Generic Procurement Manual, And Associated Issuances, Constitute The Primary Source For The Terms And Conditions Of The Contract, And Thus, Applicable In Contract Implementation. Herein Clauses Shall Serve As The Secondary Source For The Terms And Conditions Of The Contract. This Is Without Prejudice To Sections 74.1 And 74.2 Of The 2016 Revised Irr Of Ra No. 9184 Allowing The Gppb To Amend The Irr, Which Shall Be Applied To All Procurement Activities, The Advertisement, Posting, Or Invitation Of Which Were Issued After The Effectivity Of The Said Amendment. 2. Sectional Completion Of Works If Sectional Completion Is Specified In The Special Conditions Of Contract (scc), References In The Conditions Of Contract To The Works, The Completion Date, And The Intended Completion Date Shall Apply To Any Section Of The Works (other Than References To The Completion Date And Intended Completion Date For The Whole Of The Works). 3. Possession Of Site 3.1 The Procuring Entity Shall Give Possession Of All Or Parts Of The Site To The Contractor Based On The Schedule Of Delivery Indicated In The Scc, Which Corresponds To The Execution Of The Works. If The Contractor Suffers Delay Or Incurs Cost From Failure On The Part Of The Procuring Entity To Give Possession In Accordance With The Terms Of This Clause, The Procuring Entity’s Representative Shall Give The Contractor A Contract Time Extension And Certify Such Sum As Fair To Cover The Cost Incurred, Which Sum Shall Be Paid By Procuring Entity. 3.2 If Possession Of A Portion Is Not Given By The Above Date, The Procuring Entity Will Be Deemed To Have Delayed The Start Of The Relevant Activities. The Resulting Adjustments In Contract Time To Address Such Delay May Be Addressed Through Contract Extension Provided Under Annex “e” Of The 2016 Revised Irr Of Ra No. 9184. 4. The Contractor’s Obligations The Contractor Shall Employ The Key Personnel Named In The Schedule Of Key Personnel Indicating Their Designation, In Accordance With Itb Clause 10.3 And Specified In The Bds, To Carry Out The Supervision Of The Works. The Procuring Entity Will Approve Any Proposed Replacement Of Key Personnel Only If Their Relevant Qualifications And Abilities Are Equal To Or Better Than Those Of The Personnel Listed In The Schedule. 5. Performance Security 5.1. Within Ten (10) Calendar Days From Receipt Of The Notice Of Award From The Procuring Entity But In No Case Later Than The Signing Of The Contract By Both Parties, The Successful Bidder Shall Furnish The Performance Security In Any Of The Forms Prescribed In Section 39 Of The 2016 Revised Irr. 5.2. The Contractor, By Entering Into The Contract With The Procuring Entity, Acknowledges The Right Of The Procuring Entity To Institute Action Pursuant To Ra No. 3688 Against Any Subcontractor Be They An Individual, Firm, Partnership, Corporation, Or Association Supplying The Contractor With Labor, Materials And/or Equipment For The Performance Of This Contract. 6. Site Investigation Reports The Contractor, In Preparing The Bid, Shall Rely On Any Site Investigation Reports Referred To In The Scc Supplemented By Any Information Obtained By The Contractor. 7. Warranty 7.1. In Case The Contractor Fails To Undertake The Repair Works Under Section 62.2.2 Of The 2016 Revised Irr, The Procuring Entity Shall Forfeit Its Performance Security, Subject Its Property (ies) To Attachment Or Garnishment Proceedings, And Perpetually Disqualify It From Participating In Any Public Bidding. All Payables Of The Gop In His Favor Shall Be Offset To Recover The Costs. 7.2. The Warranty Against Structural Defects/failures, Except That Occasioned-on Force Majeure, Shall Cover The Period From The Date Of Issuance Of The Certificate Of Final Acceptance By The Procuring Entity. Specific Duration Of The Warranty Is Found In The Scc. 8. Liability Of The Contractor Subject To Additional Provisions, If Any, Set Forth In The Scc, The Contractor’s Liability Under This Contract Shall Be As Provided By The Laws Of The Republic Of The Philippines. If The Contractor Is A Joint Venture, All Partners To The Joint Venture Shall Be Jointly And Severally Liable To The Procuring Entity. 9. Termination For Other Causes Contract Termination Shall Be Initiated In Case It Is Determined Prima Facie By The Procuring Entity That The Contractor Has Engaged, Before, Or During The Implementation Of The Contract, In Unlawful Deeds And Behaviors Relative To Contract Acquisition And Implementation, Such As, But Not Limited To Corrupt, Fraudulent, Collusive, Coercive, And Obstructive Practices As Stated In Itb Clause 4. 10. Dayworks Subject To The Guidelines On Variation Order In Annex “e” Of The 2016 Revised Irr Of Ra No. 9184, And If Applicable As Indicated In The Scc, The Dayworks Rates In The Contractor’s Bid Shall Be Used For Small Additional Amounts Of Work Only When The Procuring Entity’s Representative Has Given Written Instructions In Advance For Additional Work To Be Paid For In That Way. 11. Program Of Work 11.1. The Contractor Shall Submit To The Procuring Entity’s Representative For Approval The Said Program Of Work Showing The General Methods, Arrangements, Order, And Timing For All The Activities In The Works. The Submissions Of The Program Of Work Are Indicated In The Scc. 11.2. The Contractor Shall Submit To The Procuring Entity’s Representative For Approval An Updated Program Of Work At Intervals No Longer Than The Period Stated In The Scc. If The Contractor Does Not Submit An Updated Program Of Work Within This Period, The Procuring Entity’s Representative May Withhold The Amount Stated In The Scc From The Next Payment Certificate And Continue To Withhold This Amount Until The Next Payment After The Date On Which The Overdue Program Of Work Has Been Submitted. 12. Instructions, Inspections And Audits The Contractor Shall Permit The Gop Or The Procuring Entity To Inspect The Contractor’s Accounts And Records Relating To The Performance Of The Contractor And To Have Them Audited By Auditors Of The Gop Or The Procuring Entity, As May Be Required. 13. Advance Payment The Procuring Entity Shall, Upon A Written Request Of The Contractor Which Shall Be Submitted As A Contract Document, Make An Advance Payment To The Contractor In An Amount Not Exceeding Fifteen Percent (15%) Of The Total Contract Price, To Be Made In Lump Sum, Or At The Most Two Installments According To A Schedule Specified In The Scc, Subject To The Requirements In Annex “e” Of The 2016 Revised Irr Of Ra No. 9184. 14. Progress Payments The Contractor May Submit A Request For Payment For Work Accomplished. Such Requests For Payment Shall Be Verified And Certified By The Procuring Entity’s Representative/project Engineer. Except As Otherwise Stipulated In The Scc, Materials And Equipment Delivered On The Site But Not Completely Put In Place Shall Not Be Included For Payment. 15. Operating And Maintenance Manuals 15.1. If Required, The Contractor Will Provide “as Built” Drawings And/or Operating And Maintenance Manuals As Specified In The Scc. 15.2. If The Contractor Does Not Provide The Drawings And/or Manuals By The Dates Stated Above, Or They Do Not Receive The Procuring Entity’s Representative’s Approval, The Procuring Entity’s Representative May Withhold The Amount Stated In The Scc From Payments Due To The Contractor. Section V. Special Conditions Of Contract Special Conditions Of Contract Gcc Clause 2 Sectional Completion Is Not Applicable The Intended Completion Date Is Three Hundred Sixty-five (365) Calendar Days From The Date Of Receipt Of The Ntp. 4.1 The Procuring Entity Shall Give Possession Of All Parts Of The Site To The Contractor From The Date Of The Receipt Of Notice To Proceed (ntp). 6 No Further Instructions. 7.2 Fifteen (15) Years. 10 No Dayworks Are Applicable To The Contract. 11.1 The Contractor Shall Submit The Program Of Work To The Procuring Entity’s Representative Within Fourteen (14) Calendar Days After The Issuance Of The Notice To Proceed (ntp) 11.2 The Amount To Be Withheld For Late Submission Of An Updated Program Of Work Is [insert Amount]. 13 The Amount Of The Advance Payment Is Five Percent (5%) Of The Contract Price To Be Split In Two Installments (2.5% Upon Issuance Of Nortice To Proceed And 2.5% Upon Issuance Of Notice To Construct) Upon Submission To And Acceptance By The Bureau Of Corrections Of An Irrevocable Standby Letter Of Credit Of Equivalent Value From A Commercial Bank, A Bank Guarantee Or A Surety Bond Callable Upon Demand Issued By A Surety Or Insurance Company Duly Licensed By The Insurance Commission And Confirmed By The Bureau Of Corrections. 14 The Contractor May Submit A Request For Payment For Work Accomplished. Such Requests For Payment Shall Be Verified And Certified By The Procuring Entity’s Representative/project Engineer. Payment For Work Accomplishment Shall Be Made In Two Billings Only First Billing Is At Fifty Percent (50%) And The Last And Final Billing Of One Hundred Percent (100%) Work Accomplishment. Materials And Equipment Delivered On The Site But Not Completely Put In Place Shall Not Be Included For Payment. 15.1 The Date By Which “as Built” Drawings Are Required Is Upon Actual Completion Of The Project. 15.2 The Amount To Be Withheld For Failing To Produce “as Built” Drawings And/or Operating And Maintenance Manuals By The Date Required Is Equivalent To Five Percent (5%) Of The Contract Price. Section Vi. Specifications Scope Of Work Design And Build Of Correctional Institution For Women (ciw) Facility At Iwahig Prison And Penal Farm (ippf) Sta. Lucia Sub – Prison Colony, Puerto Princesa, Philippines 1. Project Information 1.1 Project Description The Correctional Institution For Women (ciw) Security Compound Project At The Iwahig Prison And Penal Farm (ippf) Is A Pivotal Initiative Aimed At Modernizing And Securing Facilities Tailored To The Needs Of Confined Women. Situated Within The Expansive Grounds Of The Ippf, This Project Addresses Critical Deficiencies In The Current Infrastructure While Emphasizing Safety, Rehabilitation, And Community Reintegration. By Integrating Security Technologies, And Comprehensive Rehabilitation Programs, The Ciw Security Compound Will Not Only Enhance The Physical Security Of Female Psdl But Also Provide Them With Opportunities For Personal Growth, Skill Development, And Successful Reintegration Into Society. This Project Exemplifies A Commitment To Promoting Justice, Dignity, And Social Rehabilitation Within The Correctional System, Setting A New Standard For Women's Penal Facilities In The Region. The Ciw Facility At Ippf Represents A Significant Step Towards Reforming The Criminal Justice System And Promoting The Rehabilitation And Reintegration Of Female Offenders. By Prioritizing Safety, Rehabilitation, And Innovation, This Project Strives To Uphold The Principles Of Justice, Dignity, And Social Responsibility For All Individuals Within The Correctional System. This Project Aims To Be Completed Within A Year, Aligning With Our Decongestion Program. This Expedited Timeline Underscores Our Commitment To Addressing Urgent Needs Within The Correctional System And Providing Timely Solutions To Improve Conditions For Incarcerated Women. The Contract Will Involve The Design And Build Scheme Leading To The Construction Of The Ciw Facility At Sta. Lucia Sub Prison Colony, Iwahig Prison And Penal Farm, Puerto Princesa, Philippines. The Plans And Designs Shall Be In Accordance With The Plan Of The Said Structures As Conceptualized By The Planning And Design Unit (pdu) Under Civil Engineering Section (ces) Of General Services Division (gsd) Or As Conceptualized By The Winning Bidder If The Latter Is Found To Be Superior (as Defined In Section 3.1.1 Of This Tor). Contractors Shall Be Required To Conduct A Bucor Led Site Inspection And Evaluation To Enable The Contractors To Develop Their Proposals Accordingly. The Bucor Shall Not Assume Any Responsibility Regarding Erroneous Interpretations Out Of Any Data Presented By The Contractor. The Ciw Facility Shall Be Constructed As Per Approved Drawings, Specifications, Bill Of Materials, Scope Of Works And The General Contract Conditions Following The Guidelines As Per Annex G Of Irr Of Ra 9184. The Project Shall Have The Following Basic Components: A. Complete Detailed Architectural And Engineering Design Plans, Technical Specifications, And Design Calculations For The Construction Of The Project. Such Plans, Designs, And Technical Specifications Shall Be Subject For Review And Approval By The Bucor Pdu. The Design Development And The Contract Documents Phases Of The Design Shall Continue After The Bid Is Awarded. It Shall Likewise Be Subject For Review And Approval By The Bucor - Nhq General Services Division (gsd). B. The Bid Shall Be Based On The Conceptual/schematic Design Drawings Prepared By The Bucor Pdu Or That Submitted By The Winning Bidder As Defined In Section 3.1.1 Of This Tor. C. The Contractor Shall Complete The Construction Of The Following Facility Component: (sta. Lucia Sub Prison Colony – Ciw Palawan) I. One (1) Unit Two (2) Storey + Roof Deck “type B” Dormitory Designed For 500 Psdl; Ii. With Fire Protection, Fire Detection Alarm System, And Fire Suppression Equipment Included In Dormitory, Iii. 48sqm Security Office For Main Gate Iv. Main Perimeter Walls With Catwalk And Guard Towers (with Comfort Room) In Compliance With Ra 10575. Security Gate And Pedestrian Gate Included V. Secondary Perimeter Fence In Compliance With Ra 10575. Security Gate And Pedestrian Gate Included. Vi. Visiting Area, 200sqm. Vii. 250sqm Fully Furnished Admin Building Viii. Power Line Connection From Main Road/main Line To The Facility (more Or Less 320m) Ix. Electrical System, Backup Power Supply System With Capacity Not Less Than The Total Computed Kva Load, Without Demand Factor. X. Water Supply System (required System Level To Supply The Facility. With Sufficient Pressure Level And To Provide Potable Water: Cistern, Pumps, Elevated Water Tank, And Chlorinator If Necessary) Xi. Site Development (grading And Earthworks, Pathways, And Site Drainage System). Xii. Cctv Systems (centralized) Xiii. Sewage Treatment Plant (sequencing Batch Reactor) Xiv. Bunkbeds For 500 Psdl Capacity (design And Specification Of Bunk Beds For Review Of Planning And Design Unit – Gsd). 1.2 Contractual Framework The Contractual Arrangement To Be Used For The Project Is The Design-and-build (db) Scheme. Under This Scheme The Procuring Entity Awards A Single Contract For The Architectural/engineering Design And Construction To A Single Firm, Partnership, Corporation, Joint Venture Or Consortium. The Winning Contractor Shall Consult And Collaborate With The Bucor Pdu For The Preparation Of The Detailed Architectural Design Of The Project. The Detailed Architectural And Engineering Design Shall Be Subject For The Review And Approval By The Bucor Pdu. Contractors Shall Be Required To Conduct A Bucor Led Site Inspection And Evaluation To Enable The Contractors To Develop Their Proposals Accordingly. The Bucor Shall Not Assume Any Responsibility Regarding Erroneous Interpretations Out Of Any Data Presented By The Contractor. The Obligations And Liabilities Of The Contractor And Its Architect Shall Be Joint And Solidary For Purposes Of The Detailed Architectural Design Of The Project In Accordance With Article 1723 Of The Civil Code Of The Philippines And Other Pertinent Laws. The Db Scheme Of Procurement Was Recommended, Endorsed, And Adopted Pursuant To The Annex G Of Irr Of Ra 9184. 2. Scope Of Contract 2.1 Obligations Of The Winning Bidder/contractor A.render Architectural And Allied Engineering Design Services Including Final Schematic Design Necessary For The Implementation Of The Project. The Allied Engineering Design Services Shall Include, But Shall Not Be Limited To, Design For Architectural, Civil, Structural, Electrical, Mechanical, Plumbing, And Electromechanical (for Stp). All Drawings Shall Be Generated Using Modern Modeling/drafting Software And Printed On High Quality 20” X 30” Blue Print Paper. B. Undertake Detailed Architectural And Engineering Designs (daeds) Using The Given Data Such As Topographic, Hydrographic And Cross–section Surveys, Geotechnical And Geological Investigation, And Hydrologic Investigation And Initial Schematic Design Or Design Concept Provided By The Bucor Pdu Which Conforms With The Minimum Performance Specifications And Standards (mpss); C. If Applicable, Secure Environmental Clearance Or An “environmental Compliance Certificate (ecc)”. If The Proposed Project Is Considered Outside The Purview Of The Philippine Environmental Impact Statement (eis) System, A Certificate Of Non- Coverage Or Certificate Of Exemption Shall Be Secured. D. The Project Shall Be Constructed According To The Daeds Prepared By The Winning Bidder And Approved By The Bucor And In Compliance With The Mpss As Well As Provided In Rule Vii, Section 7 Of The Irr Of Ra 10575. Likewise, Construction Includes Conformance To The Provisions Pertaining To Buildings Under The Latest Edition Of The Dpwh Standard Specifications For Public Works Structures, Volumes Ii And Iii (blue Book). The Blue Book Prescribes, Among Other Things, The Material Requirements And Construction Requirements For Different Items Of Work, Including The Tests To Be Conducted During Construction By The Dpwh-accredited Testing Laboratory. The Blue Book Incorporates Pertinent Provisions Of The American Society For Testing And Materials (astm) And American Concrete Institute (aci), Among Other Standards, Pertaining To Construction. Attention Shall Be Given To The Relevant Items Of Work In The Following Parts Of The Blue Book: Volume Ii ➢ Part A – Facilities For The Engineer ➢ Part B – Other General Requirements Volume Iii ➢ Part A – Earthwork ➢ Part B – Plain And Reinforced Concrete Works ➢ Part C – Finishing ➢ Part D – Electrical ➢ Part E – Mechanical ➢ Part I – Water Supply ➢ Part J – Flood Control And Drainage ➢ Part I-c – Drainage Works For Materials And Technologies Not Covered By The Blue Book, Or If The Proponent Intends To Use Any New Material/technology Which Is Not Accredited By The Dpwh Bureau Of Research And Standards (brs), The Proponent Shall Submit A Certification From A Recognized Foreign Or International Institution To The Effect That The New Materials Or Technology Meets The Mpss For This Project And Has Been Successfully Used In Existing Structures With Proven Integrity. The Winning Bidder Or Contractor Shall Be Held Liable For Design And Structural Defects And/or Failure Of The Completed Project Within The Warranty Period Specified In Section 62.2 Of The Irr Of Ra 9184; And, F. The Winning Bidder Or Contractor Shall Be Solely Responsible For The Design And Shall Be Held Responsible For Any Default Resulted From Improper Design. Further, Extended Liability Of The Contractor Since It Stipulated That The Works, When Completed, Shall Be Fit For The Purpose For Which It Was Intended As Defined In The Contract. 2.2 Obligations Of The Bucor A. Provide Full Information On All Requirements For The Project; B. Approve The Winning Bidder Or Contractor’s Design Without Diminishing Their Full And Sole Responsibility For The Quality And Integrity Thereof; C. Give Prompt Written Notice Thereof To Winning Bidder Or Contractor, If It Observes Or Becomes Aware Of Any Defect In The Project; D. Designate When Necessary, Representatives Authorized To Act On Its Behalf. It Shall Examine Documents Submitted By The Winning Bidder Or Contractor And Render Decisions Pertaining Thereto Promptly, To Avoid Unreasonable Delay In The Progress Of Their Work. It Shall Observe The Procedure Of Issuing Orders To The Winning Bidder Or Contractor; E. Supervise And Monitor The Implementation Of The Project; I. Construction Monitoring And Testing Forms: • The Use Of Construction Monitoring And Testing Forms That Will Be Provide By The Bucor - Nhq Pdu Is Mandatory Throughout The Duration Of Construction. • Oversight Of These Forms Will Be Conducted By The General Services Section (gss) Of The Ippf On Behalf Of The Bucor Gsd • Ippf-gss To Impose To Contractor Testing Of All Items After Installation And/or Application. Gss To Send Pdu Copy Of The Test Report/s. • Ippf-gss To Monitor Material Delivery Of Contractor To Ensure All Materials Installed And/or Applied Are In Accordance With The Specifications Stated On Plans And Contract Of This Project. • In Case There Would Be Substitute Or Alternative To The Original Specification Of Material/s, Ippf-gss To Inform Pdu Of Such Variation. Ii. Bucor Engineer Visits: • Nhq Engineers And Architects (personnel Of Pdu) Will Conduct Site Visits On A Quarterly Basis Or Whenever Deemed Necessary To Ensure Compliance With Standards And Regulations. • Pdu Personnel To Witness The Final Testing And Commissioning Of The Systems, Equipment And Utilities Prior To Acceptance Of The Project Or Part Of The Project Thereof. Iii. Progress Billing Payment: • Ippf Gss Engineers Will Provide Monthly Updates, Or As Deemed Necessary, On The Statement Of Work Accomplishment Based On The Actual Progress Of The Project, Including Reports Update. F. Pay The Accomplishment Accepted In The Conformance With The Mpss Included Under The Design And Build Contract. I. This Reports And Swa Updates Of The Ippf Gss Will Be Reviewed And Approved By Gsd - Nhq Prior To Any Progress Billing Payments Being Made. 2.3 Bidding Documents The Bidding Documents For The Project Shall Govern The Conduct Of The Procurement Of The Project. 3. Scope Of Works 3.1 Planning And Design Phase 3.1.1 Preliminary Architectural Plan (pap) By Bidder The Approved Concept Design Shall Adopt The Provisions Indicated In Rule Vii, Section 7 Of The Irr Of Ra 10575. Bidders Shall Submit Also An Alternative Design Concept With Respect To The Actual Site Condition. This Alternative Design By The Winning Bidder Shall Be Adopted Should The Same Be Found To Be Superior Than The One Conceptualized By The Bucor Pdu. 3.1.2 Detailed Architectural And Engineering Design (daed) By The Winning Bidder During The Implementation Of The Project, The Winning Bidder Shall Prepare The Daed Of The Project And Submit The Same To The Bucor For Approval Prior To The Execution Of The Construction Works. The Winning Bidder Shall Prepare The Daed Based On Its Pap As Reviewed And Accepted By The Bucor Pdu And In Accordance With The Minimum Performance Standards And Specifications (mpss). The Daed Shall Be Undertaken With A Degree Of Accuracy That Will Allow Estimates To Be Made Within Approximately Plus Or Minus Five Percent (+/-5%) Of The Final Quantities. Once Approved By The Bucor, The Winning Bidder’s Daed Shall Form Part Of The Mpss. The Bucor-approved Daed, Together With The Mpss Provisions On Construction Under Section 2.0 Hereof, Shall Govern The Actual Construction Undertaken By The Winning Bidder. The Winning Bidder Shall Undertake The Necessary Field Surveys And Investigation In Accordance With The Dpwh Design Guidelines. In Carrying Out These Works, The Winning Bidder Shall Ensure That The Engineering, Environmental, Particularly During Field Investigations And The Development Of The Preliminary And Final Detailed Engineering Designs. The Winning Bidder Shall Ensure That All Designs Submitted For Approval Have Fully Taken Into Account Key Findings From The Engineering, Environmental, And That Negative Environmental Impacts Have Been Minimized Or Eliminated To The Fullest Extent Possible. 3.1.3 Architectural And Engineering Design Submittals I. Architectural Design A. The Building Should Be Designed With Structural, Electrical, Natural Or Combine Ventilation And Natural Lighting Following Building Design Standards. B. The Prospective Bidder Shall Prepare The Preliminary Architectural Plans In Accordance With The Requirements Of The National Building Code Of The Philippines, Accessibility Law (bp 344) Including All Other Applicable Laws And Local Ordinances. Submittals: (at Suitable Scale On High Quality 20” X 30” Blue Print Paper Minimum Size) 1. Site Development Plan 2. Vicinity Map 3. Perspective 4. Floor Plans 5. Elevations A. Front Elevation B. Rear Elevation C. Right Elevation D. Left Elevation 6. Sections A. Longitudinal Section B. Cross Section 7. Doors & Window Schedule 8. Plans And Details Of Stairs And Ramps 9. Schedule Of Finishes For Floors, Walls And Ceiling 10. Miscellaneous Details Ii. Structural Design A. The Proponent Shall Prepare The Necessary Structural Analysis/calculation And Design Of The Structural Members Of The Building Component In Accordance With The National Building Code Of The Philippines With Its Referral Codes Such As The Latest National Structural Code Of The Philippines. The Design For The Structure Shall Take Into Account, Among Other Things, The Seismic Requirements Of The Area To Determine The Optimum Safety Of The Whole Structure And To Minimize Possible Earthquake Damage. B. On The Basis Of The Data Obtained From The Detailed Site Investigations, Topographical/soil And Survey, Geotechnical Engineering, Foundation Investigation, Material Testing, Survey Of Existing Site Conditions, The Seismic Requirements Of The Area, The Load Requirements Of The Building And Other Investigation Required To Obtain The Data Necessary To Ensure The Safety Of The Structure, The Proposal Shall Prepare The Preliminary Structural Design Plans Of The Structure. Submittals: (at Suitable Scale On High Quality 20” X 30” Blue Print Paper Minimum Size) 1. Structural Design Criteria And Design Notes 2. Foundation Plan 3. Floor Framing Plans 4. Schedule Of Slab, Beams And Girders 5. Schedule Of Columns 6. Schedule Of Footings 7. Structural Details Of Stairs/ramp, If Applicable 8. Roof Framing Plan, If Applicable 9. Schedule And Details Of Trusses, If Applicable 10. Road Design And Details (if Applicable) 11. Miscellaneous Details Iii. Sanitary/plumbing Design A. General • The Detailed Design Shall Conform To The General Standards Adopted By The Sanitary & Plumbing Code Of The Philippines And Other Pertinent Laws And Ordinances. • All Design Considerations/assumptions Shall Be Based On The Results Of The Technical Studies, Detailed Analyses, And Design Computations. • The Technical Drawings And Specifications Shall Clearly Indicate All The Details Required To Ascertain The Care And Thoroughness Devoted In The Preparation Of The Drawings. B. Drainage And Sewerage • The Drainage Layout Shall Show All The Required Information Such As Direction Of Flow, Manhole-to-manhole Distances, And Sizes Of Lines, Manholes/canals, Location Of Outfalls, Etc. • The Prospective Bidder Shall Prepare A Design For The Sewage Treatment Plant In Accordance To The Clean Water Act Of 2004 (republic Act No. 9275) And Other Relevant Laws And Ordinances. Submittals: (at Suitable Scale On High Quality 20” X 30” Blue Print Paper Minimum Size) 1. General Notes 2. Legend & Symbols 3. Sewer, Vent And Storm Drainage Layout 4. Enlarged Toilet Plan For Common And Pwd Toilets 5. Isometric Diagram 6. Miscellaneous Details 7. Drainage And Sewerage System 8. Three Chamber Septic Tank Plans And Details C. Water Supply And Distribution System • The Proponent Shall Carry Out A Preliminary Detailed Design For The Water Supply Of The Project. The Design Should Be On The Basis Of The Source And Volume Of Water Supply, Water Consumption, Piping Network, And Conveyance In Accordance With The Applicable Laws, Rules And Regulations Governing Health, Safety And Sanitation. • The Contractor Shall Install Elevated Water Storage/s Per Unit Located At The Roof Deck Of The Prison Dormitories. (sufficient Capacity To Supply The Pdl) Submittals: (at Suitable Scale On High Quality 20” X 30” Blue Print Paper Minimum Size) 1. General Notes 2. Legend & Symbols 3. Water Line Layout 4. Water Line Isometric Diagram 5. Water Reservoir Plans And Details 6. Miscellaneous Details Iv. Electromechanical Design A. Sewage Treatment Plant • The Prospective Bidder Shall Prepare A Design For The Sewage Treatment Plant In Accordance To The Clean Water Act Of 2004 (republic Act No. 9275) And Other Relevant Laws And Ordinances. Submittals: (at Suitable Scale On High Quality 20” X 30” Blue Print Paper Minimum Size) 1. General Notes 2. Legend & Symbols 3. Electrical System Layout 4. Mechanical System Layout 5. Instrumentation And Control System Diagrams 6. Piping And Instrumentation Diagrams (p&ids) 7. Equipment Details And Specifications 8. Electrical Power Distribution 9. Emergency Power Systems 10. Grounding And Lightning Protection 11. Control And Monitoring Systems, If Applicable 12. Safety Systems 13. Miscellaneous Details B. Fire Protection System • The Prospective Bidder Shall Prepare A Design For The Fire Protection System In Accordance To The Fire Code Of The Philippines, (irr) Of Ra 9514, And Other Relevant Laws And Ordinances. Submittals: (at Suitable Scale On High Quality 20” X 30” Blue Print Paper Minimum Size) 1. Sprinkler System 2. Sprinkler System Isometric Diagram 3. Fire Fighting Piping System Diagram 4. Fire Alarm System Layout 5. Fire Suppression System Layout 6. Smoke Management System Layout 7. Fire Pump And Water Supply 8. Miscellaneous Details V. Electrical Design A. The Prospective Bidder Shall Prepare A Preliminary Design Plan For The Electrical And Power Supply System Of The Building In Accordance With The Electrical Code Of The Philippines, Fire Code Of The Philippines, National Building Code Of The Philippines And Other Relevant Laws And Ordinances. B. The Prospective Bidder Shall Prepare A Design For The Electrical And Power Supply System Considering Ease Of Maintenance And Prevention Of Illegal Connections Including Electrical Supply For Ceiling Fans. C. The Prospective Bidder Shall Prepare A Design For Backup Power Generator With Capacity Not Less Than Total Computed Kva Load Without Demand Factor. D. 3-phase Electrical Supply Shall Be Sourced From The Local Electrical Utility. E. Power Line Connection From Main Source To The Facility Submittals: (at Suitable Scale On High Quality 20” X 30” Blue Print Paper Minimum Size) 1. Power Riser Diagram 2. Power Layout System 3. Lighting Layout System 4. Local Area Network System, If Applicable 5. Grounding System 6. Load Schedules 7. Others As Applicable Vi. Other Requirements Technical Specifications Boring Test Structural Design And Analysis And Computation Final Design And Construction Plans Upon Award Of Contract, The Contractor Shall Comply The Following: O Prepare Final Draft Of Architectural And Engineering Design Plans Incorporating All Design Refinements And Revisions Based On Project Requirement Or As May Be Required By The Bucor Pdu Within The Scope Of Design. O Submit To The Bucor Design And Build Committee (bucor-dbc) The Final Architectural And Engineering Design Plans And Specifications Duly Signed And Sealed By The Concerned Professional Architect, Engineers, Incorporating All The Necessary Revisions And Refinements For Approval By The Head Of Procuring Entity. 3.2 Construction Phase The Following Works Shall Comprise This Phase: I. Permits And Clearances, The Contractor Shall Upon Authorization Of The Head Of The Procuring Entity (hope), Make Representations With The Government Agencies Concerned To Expedite The Processing Of The Necessary Permits And Certificates Such As The Following: A. Zoning Certification And Locational Clearance B. Building /electrical/sanitary Permits C. Certificate Of Occupancy D. Environmental Clearance Certificate E. All Other Permits/clearances As May Be Required For The Construction. Ii. Mobilization, The Contractor Shall Mobilize All The Required Project Team Personnel, Equipment, Tools, And Manpower With The Required Skills And In Sufficient Number As May Be Necessary For His Efficient Undertaking Of The Project. Iii. Clearing, Grubbing And Hauling/disposal Of Debris Iv. Construction Stage As A Rule, Contract Implementation Guidelines For Procurement Of Infrastructure Projects Shall Comply With Annex “e” Of The Revised Irr Of Ra 9184. The Following Provisions Shall Supplement These Procedures: I. No Works Shall Commence Unless The Contractor Has Submitted The Prescribed Documentary Requirements And Implementing Unit Has Given Written Approval. Work Execution Shall Be In Accordance With Reviewed And Approved Documents. Ii. The Contractor Shall Be Responsible For Obtaining All Necessary Information As To Risks, Contingencies And Other Circumstances Which May Affect The Works And Shall Prepare And Submit All Necessary Documents Specified By The Implementing Unit To Meet All Regulatory Approvals As Specified In The Contract Documents. Iii. The Contractor Shall Submit A Detailed Program Of Works Within Fourteen (14) Calendar Days After The Issuance Of The Notice To Proceed (ntp) For Approval By The Head Of The Procuring Entity (hope) That Shall Include, Among Others: A. The Order In Which It Tends To Carry Out The Work Including Anticipated Timing For Each Stage Or Design/detailed Engineering And Construction; B. Periods For Review Of Specific Outputs And Any Other Submissions And Approvals; C. Sequence Of Timing For Inspection And Tests; D. General Description Of The Design And Construction Methods To Be Adopted; E. Number Of Personnel To Be Assigned For Each Stage Of The Work; F. List Of Equipment Required On Site For Each Stage Of The Work; And G. Description Of The Quality Control System To Be Utilized For The Project. Iv. Any Errors, Omissions, Inconsistencies, Inadequate Or Failure Submitted By The Contractor That Do Not Comply With The Requirements Shall Be Rectified, Resubmitted And Reviewed At The Contractor’s Cost. If The Contractor Wishes To Modify Any Design Or Document Which Has Been Previously Submitted, Reviewed And Approved, The Contractor Shall Notify The Implementing Unit Within A Reasonable Period Of Time And Shall Shoulder The Cost Of Such Changes. V. As A Rule, Changes In Design And Construction Requirements Shall Be Limited Only To Those That Have Not Been Anticipated In The Contract Signing And Approval. The Following Guidelines Shall Govern Approval For Change Or Variation Order: A. Change Orders Resulting From Design Errors, Omissions Or Non-conformance With The Performance Specifications And Parameters And The Contract Documents By The Contractor Shall Be Implemented By The Contractor At No Additional Cost To The Bucor. B. Provided That The Contractor Suffers Delay And/or Incurs Costs Due To Changes Or Errors In The Preparation Of Performance Specification And Parameters, The Contractor Shall Be Entitled To Either One Of The Following: An Extension Of Time For Any Such Delays Under Section 10 Of Annex “e” Of Irr-a (ra9184; Or Payments For Such Cost As Specified In The Contract Documents, Provided That The Cumulative Amount Of The Variation Order Does Not Exceed Ten Percent (10%) Of The Original Project Cost. C. The Contract Documents Shall Include The Manner And Schedule Of Payment Specifying The Estimated Contract Amount And Installments In Which The Contract Will Be Paid. D. The Contractor Shall Be Entitled To Advance Payment Subject To The Provisions Of Section 4 Of Annex “e” Of The Revised Irr Of Ra 9184. E. The Implementing Unit Shall Monitor The Quality Control Procedures For The Design And Construction In Accordance With The Government Guidelines And Shall Issue The Proper Certificates Of Acceptance For Sections Of The Works Or Whole Of The Works As Provided For In The Contract Documents. F. The Contractor Shall Provide All Necessary Equipment, Personnel, Instruments, Documents And Others To Carry Out Specified Tests. G. This Design And Build Project Shall Have Minimum Defects Liability Period Of One (1) Year Contract Completion Or As Provided In The Contract Documents. This Is Without Prejudice To The Liabilities Imposed Upon The Engineer/architect Who Drew Up The Plans And Specification For A Building Sanctioned Under Section 1723 Of The New Civil Code Of The Philippines. H. The Contractor Shall Be Held Liable For Design And Structural Defects And/or Failure Of The Completed Project Within The Warranty Period Of 15 Years For Permanent Structures/buildings And 5 Years For Roads As Specified In Section 62.2.2 Of The Revised Irr Of Ra 9184 V. As-built Plans. The Contractor Shall Cause The Preparation And Submission Of As-built Plans Duly Signed And Sealed By All Concerned Parties Involved In The Construction In The Same Sheet Size And Scale As The Original Drawings In One (1) Blue Print Copy And One (1) Reproducible Copy. Vi. General Requirements: 1. Temporary Facilities Such As Field Offices For The Bucor Inspectorate Team, Project Engineers And Quarters For Laborers; Temporary Warehouse For The Construction Material. 2. Office Furniture And Equipment, Survey Equipment And Consumables 3. Photographs: This Item Consists Of The Supply Of Equipment And Materials, I.e., Album, Necessary To Undertake Photographic Progress Activities Of The Project And Of All Cost Incidental To The Preparation And Submission Of Photographs (at Least 12 Photographs Per Day). The Quantities For Photographs Shall Be One (1) Set Of Photographs Per Month. 4. Health And Safety Program Including Personal Protective Equipment (ppe) A. All Standard Safety Measures And Precautions Shall Be Exercised By The Contractor In The Course Of The Project For The Protection Of The Public And Its Workers And In Conformity With Dole Department Order No. 13, Series Of 1998. B. All Workers Shall Be Equipped With Proper Working Uniform And Identification At All Times. They Must Be Registered With The Governing Bucor Security Office And Must Comply With The Bucor’s Rules And Regulations. C. The Contractor Shall Secure His/her Own Equipment And Materials On Site. The Bucor Shall Not Be Liable To Any Losses Incurred During The Progress Of The Work. 5. Environmental Compliance 6. Communication Equipment: This Item Consists Of The Provision Of Communication Equipment. 7. Billboard 8. Traffic Management (if Applicable). Vii. Building Construction 1 Unit One (1) Storey Type ‘b’ Pdl Dormitory Building With 500 Pdl Capacity. 4.7sqm Per Pdl (shower, Water Closet And Wash Basin Included). Maximum Of 10psdl Per Cell. Including: Fire Protection And Fire Detection Alarm Systems, And Fire Suppression Equipment For Dormitory In Accordance To Governing Laws And Regulations Requirements. With Stainless Steel Elevated Water Tank On Roof Deck; To Supply Sufficient Pressure In Every Plumbing Fixtures. Minimum Number Of Fixtures Per Cell: 2 Unit’s Flush Valve Water Closet, 2 Unit Flush Valve Urinal, 1 Unit Lavatory, 3 Units Wall Faucet, And 3 Units Shower Head. Provide Enhanced Natural Ventilation As Necessary. 1 Unit One (1) Storey Admin Building 250sqm. (open Space Staff Working Area, Reception Area, Conference Room, Chief Office, Pantry, Storage, Cctv Room). Fully Furnished 1 Unit One (1) Storey Visitation Area 200sqm, (office, Control/frisking Area, Toilets). 700 Ln.m., More Main Perimeter Concrete Fence With Concrete Catwalk, Stairs, Post Towers With Individual Cr (maximum Distance Of 100m). Provision Of Main Sliding Steel Control Gate And Pedestrian Steel Gate (refer To Rule Vii, Section 7 Of The Revised Irr Of Ra 10575) 700 Ln.m., More Secondary Perimeter Fence With, Provision Of Solar Light (outside Secondary Perimeter) With Maximum Distance Of 20m Apart. Secondary Steel Gate And Pedestrian Steel Gate (refer To Rule Vii, Section 7 Of The Revised Irr Of Ra 10575) 1 Lot Site Development. Includes Not Limited To The Following: Stormwater Management: Implementing Systems To Manage Stormwater Runoff, Which Include Underground Drainage Systems. (planning, Designing, And Installing Pipes, Channels, Culverts, Ditches, And Other Structures That Collect, Convey, And Discharge Storm Water Runoff). Drainage Outfall To Connect To Existing Nearest Drainage Line. Shall Conform To Existing Rules And Regulations Of The Lgu. Grading And Earthwork: Leveling The Ground And Shaping It To The Required Specifications For The Construction Project. This May Involve Excavation, Filling, And Compacting Soil. 1 Lot Control Gate And 48sqm Control Gate Security Office 250 Units Double Deck Bunk Beds (design And Specification Of Bunk Beds For Review Of Planning And Design Unit – Gsd). 1 Lot Electrical System Designed To Accommodate Future Facility Electrical Loads. Backup Power Generator Sets, Capacity Not Less Than Total Computed Kva Load, Without Demand Factor) 1 Lot 3-phase Power Line Connecting From Main Power Source Posts, Cables And Necessary Electrical Components. Street Lights Included 1 Lot Water Supply System. Includes The Ff: Water Source, Water Treatment System (as Necessary To Provide Potable Water), Storages, Distribution And Plumbing System. Required Water System Level To Supply The Facility. Sufficient Water Pressure To Supply Outpost Plumbing Fixtures 1 Lot Sewerage Treatment Plant (sequencing Batch Reactor). With Quality Deemed Suitable For Discharge Into Nearby Water Bodies, In Accordance With The Standards Set By The Local Municipality Or Government. 1 Lot Cctv System For Perimeter And Dormitory (centralized). Inside And Outside Of Both Dorm And Perimeter Can Be Monitored. Recording Of Video Data Will Be Continuous 24/7/365 For All Cameras Deployed On The Security Video System. Provision Of Housing For Protection Of Outside Cctvs. With Ir Leds For True Day And Night Surveillance. With At Least 2mp Sensor. With Wide Field Of Vision. With Movement Sensor. A. Material Specifications: A. Floor Finishes • Polished Cement Finish Prison Cell, Hallways, Staircases, And Rooms • Plain Cement Finish - Pathways. • Ramps - Anti Slip Pavers Or Tiles • Crs – Unglazed Ceramic Tiles B. Wall Finishes A. Glazed Wall Tiles - 1.8m Height. B. Plain Cement Plaster Finish - For All Buildings And Facilities C. Ceiling Finishes C. Concrete Steel Decking, If Applicable. – Coated In White Enamel D. Painting D. Semi-gloss Solvent Paint Top Coat (high-end Quality) For Interior And Exterior Walls In Two To Three Coats Application. Apply Concrete Neutralizer For Newly Finished Concrete Surfaces. Use Solvent Primer. E. Varnish Paint Finish With Weather Proof Coating – For Doors And Jambs Branded, High-end Quality (offices, Etc.), All Wooden Doors Must Have Secondary Steel Doors. F. Use Epoxy Paint Primer. Epoxy Paint Finish – For Structural Steel And All Metal Works E. Doors And Windows G. No Doors For Prison Facility Comfort Rooms With 1.20 Meter Finish Wall Height (see Rule Vii, Section 7 R-irr Of Ra 10575). H. Steel Doors And Grills – For Dormitories, Gates And Other Security Areas. Sliding Doors For All Cells (see Rule Vii, Section 7 R-irr Of Ra 10575) F. Waterproofing I. Uv Resistant Polyurethane Waterproofing – For All Roof Deck With Topping Works Provided With Welded Wire Mesh. J. Cistern - Polyurethane Waterproofing G. Plumbing Works K. Upvc Pipe Series 1000 – For All Soil, Sewer, Waste, Dry And Wet Vent Piping High-end Quality L. Pprc Fusion Type – For All Water Lines High-end Quality M. Sprinkler System To All Prison Dormitories In Accordance With The Provisions Of Revised Plumbing Code Of The Philippines. 4. Approved Budget For The Contract (abc) The Approved Budget For The Contract (abc) Is Php 272,166,000.00. This Is The Ceiling For Acceptable Bids. Bids Higher Than Abc Shall Be Automatically Rejected. 5. Proposed Implementation Schedule (example): No. Of Months 1 2 4 5 6 7 8 9 10 11 12 Design Phase Construction Phase 6. Eligibility Criteria For Bidders 6.1 General The Eligibility Requirements For This Design And Build Project Shall Adopt The Provisions Of Annex “g” Of The Implementing Rules And Regulations Of Ra 9184 (e.g. Eligibility Requirement). However, If A Bidder Who Has No Experience In Db Project On Its Own May Opt To Enter A Subcontracting Agreement, Partnership, Or Joint Venture With A Design Or Engineering Firm For The Design Portion Of The Project. 6.2 Legal Requirements A. Valid Contractor’s License Issued By The Philippine Contractor’s Accreditation Board B. Valid License Of The Contractor’s Designer Issued By The Professional Regulation Commission. 6.3 Technical Requirements A. The Contractor’s Designer Must Have Designed One Structure Similar To The Project At Hand With A Construction Cost Of At Least 50 % Of The Abc. 6.4 Financial Requirements The Contractor Must Have A Net Financial Contracting Capacity (nfcc) At Least Equal To The Abc To Be Bid Or Equivalent To Php272,166,000.00. 7. Contents Of The Bid 7.1 In The First Envelope Class “a” Documents Legal Documents I. Philgeps Certificate Of Registration And Membership In Accordance With Section 8.5.2 Of This Irr. For Procurement To Be Performed Overseas, It Shall Be Subject To The Guidelines To Be Issued By The Gppb. (a) Ii. Pcab License And Registration, In Case Of Jv; 57 Iii. Statement Of All Ongoing Government And Private Contracts; Iv. Statement Of Slcc; V. Nfcc Computation; Vi. Jva, If Applicable; Vii. Bid Security In The Prescribed Form, Amount And Validity Period; Viii. Project Requirements, Which Shall Include The Following: 1. Organizational Chart For The Contract To Be Bid; 2. List Of Contractor’s Personnel (design And Construction), To Be Assigned To The Contract To Be Bid, With Their Complete Qualification And Experience Data; 3. List Of Contractor’s Equipment Units Which Are Owned, Leased And/or Under Purchase Agreements, Supported By Certification Of Availability Of Equipment From Lessor/vendor For The Duration Of The Project. Ix. Omnibus Sworn Statement By The Prospective Bidder Or Its Authorized Representative In The Prescribed Format; X. Submission Of Preliminary Conceptual Design Plans: Class “b” Documents I. For Infrastructure Projects, Jv Bidders Shall Submit A Jva In Accordance With R.a. 4566 And It’s Irr. Ii. Each Partner Of The Joint Venture Shall Submit Their Philgeps Certificates Of Registration In Accordance With Section 8.5.2 Of This Irr. The Submission Of Technical And Financial Eligibility Documents By Any Of The Joint Venture Partners Constitutes Compliance: Provided, That The Partner Responsible To Submit The Nfcc Shall Likewise Submit The Statement Of All Of Its Ongoing Contracts And Audited Financial Statements. 1. Preliminary Conceptual Architectural Design Plans In Accordance With The Degree Of Details Specified By The Procuring Entity: (at Suitable Scale On High Quality A3 Blue Print Paper /digital Print Minimum Size) A. Location Plan/vicinity Map B. Perspective C. Floor Plans D. Front View Elevation E. Rear View Elevation F. Left Side View Elevation G. Right Side View Elevation H. Longitudinal Section I. Transverse Section 2. Design And Construction Method 3. List Of Contractor’s Personnel To Be Assigned To The Contract To Be Bid With Their Complete Qualification And Experience Data And Photocopy Of Their Valid Licenses Issued By The Professional Regulatory Commission (prc), Curriculum Vitae Of Key Staff, Partners Or Principal Officers With A Minimum Work Experience Requirements Set In The Bds; For Design The Key Professionals And The Respective Qualifications Of The Design Personnel Shall Be As Follows: • Principal Architect The Principal Architect Must Be Duly-licensed With At Least Ten (10) Years’ Experience In The Design Of Residential, Government Offices Or Institutional Facilities, And Shall Preferably Be Knowledgeable In The Application Of Rapid Construction Technologies. • Structural Engineer The Structural Engineer Must Be A Duly-licensed Civil Engineer With At Least Ten (10) Years’ Experience In Structural Design And Shall Preferably Be Knowledgeable In The Application Of Rapid Construction Technologies. • Professional Electrical Engineer The Electrical Engineer Must Be A Registered Professional Electrical Engineer With At Least Five (5) Years’ Experience In The Design Of Lighting, Power Distribution, Communication Systems (specifically Structured And Local Area Network Cabling, Pabx), Building Management Systems And Preferably Knowledgeable In Developments In Emergent Efficient Lighting Technologies And Energy Management. • Professional Mechanical Engineer The Mechanical Engineer Must Be A Professional Mechanical Engineer With At Least Five (5) Years In Hvac And Fire Protection Systems And Preferably Knowledgeable In Emergent, Alternative Energy- Efficient Hvac Technologies. • Electronics And Communications Engineer The Electronics And Communications Engineer Must Be Duly-licensed With At Least Ten (5) Years’ Experience In The Design Of Communications Systems, And Preferably Knowledgeable In The Application Of Building Automation And Surveillance Systems. • Sanitary Engineer The Sanitary Engineer Must Be Duly-licensed With At Least Five (5) Years’ Experience In The Design Of Building Water Supply And Distribution, Plumbing, And Preferably Knowledgeable In Waste Water Management/treatment, And Emergent, Alternative Effluent Collection And Treatment System. The Design & Build Contractor May, As Needed And At Its Own Expense, Add Additional Professionals And/or Support Personnel For The Optimal Performance Of All Architectural And Engineering Design Services, As Stipulated In These Terms Of Reference, For The Project. Prospective Bidders Shall Attach Each Individual’s Resume And Prc License Of The (professional) Staff. Design Personnel May Also Be Utilized For The Construction Phase Provided That The Same Meet The Minimum Number Of Years Of Experience In The Construction Of Similar Projects. For Construction Personnel The Key Professionals And The Respective Qualifications Of The Construction Personnel Shall Be As Follows: • Project Manager The Project Manager Shall Be A Licensed Architect Or Engineer With At Least Eight (8) Years Relevant Experience On Similar And Comparable Projects In Different Locations. The Project Manager Should Have A Proven Record Or Managerial Capability Through The Directing/managing Of Major Civil Engineering Works, Including Projects Of A Similar Magnitude. • Project Architect/engineer The Project Architect/engineer Shall Be A Licensed Architect Or Engineer With At Least Five (5) Years’ Experience In Similar And Comparable Projects And Shall Preferably Be Knowledgeable In The Application Of Rapid Construction Technologies. • Materials Engineer (m.e. I) The Materials Engineer Must Be Duly Accredited With The Dpwh And With At Least Five (5) Years’ Experience In Similar And Comparable Projects And Shall Preferably Be Knowledgeable In The Application Of Rapid Construction Technologies. • Electrical Engineer The Electrical Engineer Must Be Duly-licensed With At Least Five (5) Years’ Experience In Similar And Comparable Projects In The Installation Of Lighting, Power Distribution, Communication Systems (specifically Structured And Local Area Network Cabling, Pabx), Building Management Systems. • Mechanical Engineer The Mechanical Engineer Must Be Duly-licensed With At Least Five (5) Years’ Experience In Similar And Comparable Projects In The Installation Of Hvac And Fire Protection. • Sanitary Engineer The Sanitary Engineer Must Be Duly-licensed With At Least Five (5) Years’ Experience In Similar And Comparable Projects In The Installation Of Building Water Supply And Distribution, Plumbing. • Foreman The Foreman Must Have At Least Five (5) Years’ Experience In Similar And Comparable Projects And Shall Preferably Be Knowledgeable In The Application Of Rapid Construction Technologies. • Safety Officer The Safety Officer Must Be An Accredited Safety Practitioner By The Department Of Labor And Employment (dole) And Must Have Undergone The Prescribed Forty (40) Hour Construction Safety And Health Training (cosh) And Must Have At Least Two (2) Years’ Experience. 4. Value Engineering Analysis Of Design And Construction. The Second Envelope (financial Proposal) Shall Contain All The Required Documents For Infrastructure Projects Under Section 25.38 Of The Irr Of R.a 9184. 7.2 In The Second Envelope – Financial Proposal The Contents Of Financial Proposal – In The Second Envelope Shall Be Governed By Section 6.1 Design And Build Scheme Of The Dpwh Procurement Manual Volume Ii - Infrastructure Main Guidelines (2016). A. Lump Sum Bid Prices, Which Shall Include The Detailed Engineering Cost, In The Prescribed Bid Form Inclusive Of Vat B. Detailed Estimates Including A Summary Sheet Indicating The Unit Prices Of Construction Materials, Labor Rates And Equipment Rentals Used In Coming Up With The Bid For The Following: I Detailed Architectural And Engineering Design; Ii Demolition Works; And Iii Building Construction/civil Works. C. Bill Of Quantities D. Cash Flow And Payments Schedule. 8. Procedure And Criteria For Bids Evaluation For The Detailed Evaluation Of The Design And Build Proposals A Two-step Procedure Shall Be Adopted By The Bac, Which May Be Undertaken With The Assistance Of The Dbc. First-step Procedure: With The Assistance Of The Bucor Design And Build Committee (bucor-dbc), The Bac Shall Conduct The Opening, Preliminary Examination And Detailed Evaluation Of The Design And Build Proposals, As Follows: (1) The First Step Of The Evaluation Shall Involve The Review Of The Preliminary Conceptual Designs And Track Record Submitted By The Contract As Indicated In The Bidding Documents Using A Nondiscretionary “pass/fail” Criteria That Involve Compliance With The Following Requirements: A. Performance Specifications And Parameters And Degree Of Details; B. Adherence Of Preliminary Design Plans To The Required Concept Of Approach And Methodology For Detailed Engineering, Design And Construction With Emphasis On The Clarity, Feasibility, Innovativeness And Comprehensiveness Of The Plan Approach, And The Quality Of Interpretation Of Project Problems, Risks, And Suggested Solutions; And C. Quality Of Personnel To Be Assigned To The Project Which Covers Suitability Of Key Staff To Perform The Duties Of The Particular Assignments And General Qualifications And Competence Including Education And Training Of The Key Staff. 8.1 Merit Point Critera For The Bid Evaluation 8.1.1 Adherence To Performance Specifications (35 Points) A. Compliance And Adherence To Specifications: Excellent Compliance (100 Points): The Submission Fully Adheres To All Specified Project Requirements And Regulations, Demonstrating Meticulous Attention To Detail And Comprehensive Understanding Of The Tor. All Drawings And Documentation Are Accurate, Complete, And In Compliance With Relevant Standards. Good Compliance (80 Points): The Submission Largely Complies With Project Specifications And Regulations, With Minor Discrepancies. Drawings And Documentation Are Mostly Accurate And Complete, Meeting The Majority Of Requirements. Acceptable Compliance (70 Points): The Submission Satisfies Most Of The Specified Requirements And Regulations, Albeit With Some Notable Omissions Or Inconsistencies. Drawings And Documentation Are Generally Accurate And Complete, Meeting The Basic Expectations. Some Reservations (50 Points): The Submission Partially Meets The Specified Requirements And Regulations, With Several Notable Deficiencies Or Inconsistencies. There Are Significant Gaps Or Inaccuracies In The Drawings And Documentation, Raising Concerns About Compliance. Serious Reservations (20%) The Submission Falls Significantly Short Of Meeting The Specified Requirements And Regulations, With Major Deficiencies Or Inconsistencies. Drawings And Documentation Lack Essential Details Or Fail To Comply With Key Standards, Casting Doubt On The Bidder's Understanding Of The Project Scope. Unacceptable (0%) The Submission Fails To Comply With The Specified Requirements And Regulations, Lacking Essential Details And Demonstrating A Fundamental Misunderstanding Of The Project Scope. Drawings And Documentation Are Incomplete Or Inaccurate, Indicating A Lack Of Capability To Deliver The Project On Time. B. Functionality And Efficiency: Excellent (100%): The Design Optimally Utilizes Space, Facilitating Efficient Accommodation Of 500 Psdl. Layout And Design Enhance Operational Flow, Demonstrating Exceptional Foresight And Planning. Integration Of Facilities Promotes Smooth Prison Management. Good (80%): The Design Effectively Utilizes Space, With Minor Areas For Improvement In Operational Flow. Layout And Design Contribute To Efficient Prison Management, Meeting Most Functional Requirements. Acceptable (70%): The Design Adequately Utilizes Space, Meeting Basic Requirements For Accommodating 500 Psdl. Layout And Design Support Operational Flow, Though Some Improvements Are Needed For Optimal Functionality. Some Reservations (50%): The Design Partially Optimizes Space Utilization, With Notable Deficiencies In Operational Flow. Layout And Design Hinder Efficient Prison Management, Requiring Significant Adjustments For Improvement. Serious Reservations (20%): The Design Inadequately Utilizes Space, Hindering Accommodation Of 500 Psdl. Layout And Design Severely Impede Operational Flow, Indicating A Lack Of Understanding Of Functional Requirements. Unacceptable (0%): The Design Fails To Optimize Space Utilization, Lacking Consideration For Accommodating 500 Psdl. Layout And Design Pose Significant Obstacles To Efficient Prison Management, Indicating A Fundamental Misunderstanding Of Functional Requirements. C. Safety And Security: Excellent (100%): The Design Features Robust Perimeter Walls, Guard Towers, And Security Features Ensuring Optimal Pdl Containment And Facility Security. Fire Protection And Detection Systems Are Highly Reliable, With Comprehensive Safety Measures For Both Psdl And Staff. Good (80%): The Design Incorporates Effective Perimeter Walls, Guard Towers, And Security Features, With Minor Areas For Enhancement. Fire Protection And Detection Systems Are Reliable, With Adequate Safety Measures For Psdl And Staff. Acceptable (70%) The Design Includes Satisfactory Perimeter Walls, Guard Towers, And Security Features, Meeting Basic Requirements For Pdl Containment And Facility Security. Fire Protection And Detection Systems Are Functional, With Sufficient Safety Measures For Psdl And Staff. Some Reservations (50%): The Design Features Partially Effective Perimeter Walls, Guard Towers, And Security Features, With Notable Deficiencies In Pdl Containment And Facility Security. Fire Protection And Detection Systems Lack Reliability, With Limited Safety Measures For Psdl And Staff. Serious Reservations (20%): The Design Lacks Effective Perimeter Walls, Guard Towers, And Security Features, Compromising Pdl Containment And Facility Security. Fire Protection And Detection Systems Are Inadequate, Posing Significant Risks To Psdl And Staff Safety. Unacceptable (0%): The Design Neglects Perimeter Walls, Guard Towers, And Security Features, Failing To Ensure Pdl Containment And Facility Security. Fire Protection And Detection Systems Are Absent Or Non-functional, Posing Severe Risks To Psdl And Staff Safety. D. Sustainability And Environmental Considerations: Excellent (100%): The Design Includes Robust Safety Measures And Emergency Protocols, Ensuring The Safety And Well-being Of Psdl And Staff In Accordance With Ra 10575. Good (80%): The Design Integrates Sustainable Design Principles Effectively, With Minor Opportunities For Improvement In Energy Efficiency And Material Selection. Sewage Treatment And Water Conservation Measures Are Adequate, Supporting Environmental Sustainability. Acceptable (70%) The Design Includes Basic Sustainable Design Principles, Meeting Minimum Requirements For Energy Efficiency And Material Selection. Sewage Treatment And Water Conservation Measures Are Functional, Contributing To Environmental Sustainability. Some Reservations (50%): The Design Partially Incorporates Sustainable Design Principles, With Notable Deficiencies In Energy Efficiency And Material Selection. Sewage Treatment And Water Conservation Measures Lack Comprehensiveness, Limiting Environmental Sustainability. Serious Reservations (20%): The Design Lacks Consideration For Sustainable Design Principles, Neglecting Energy Efficiency And Eco-friendly Materials. Sewage Treatment And Water Conservation Measures Are Insufficient, Undermining Environmental Sustainability. Unacceptable (0%): The Design Disregards Sustainable Design Principles, Showing No Commitment To Energy Efficiency Or Eco-friendly Materials. Sewage Treatment And Water Conservation Measures Are Absent Or Inadequate, Disregarding Environmental Sustainability. E. Aesthetics And Architectural Design: Excellent (100%): The Design Exhibits Exceptional Aesthetic Appeal And Architectural Coherence, Showcasing Innovative And Visually Pleasing Elements. Consideration Of Local Architectural Vernacular And Contextual Integration Is Evident, Contributing To The Overall Excellence Of The Design. Good (80%): The Design Demonstrates Good Aesthetic Appeal And Architectural Coherence, With Some Areas For Enhancement In Creativity And Visual Impact. Consideration Of Local Architectural Vernacular And Contextual Integration Is Apparent, Enriching The Design. Acceptable (70%): The Design Achieves Acceptable Aesthetic Appeal And Architectural Coherence, Meeting Basic Expectations For Visual Presentation. Consideration Of Local Architectural Vernacular And Contextual Integration Is Present, Though Limited In Scope. Some Reservations (50%): The Design Lacks Significant Aesthetic Appeal And Architectural Coherence, With Notable Deficiencies In Creativity And Visual Impact. Consideration Of Local Architectural Vernacular And Contextual Integration Is Minimal, Detracting From The Overall Quality Of The Design. Serious Reservations (20%): The Design Exhibits Poor Aesthetic Appeal And Architectural Coherence, Failing To Engage Visually Or Inspire Interest. Consideration Of Local Architectural Vernacular And Contextual Integration Is Lacking, Diminishing The Design's Relevance And Appropriateness. Unacceptable (0%): The Design Lacks Any Aesthetic Appeal Or Architectural Coherence, Showing No Effort To Engage Visually Or Integrate With The Local Architectural Vernacular. Consideration Of Contextual Integration Is Absent, Rendering The Design Unsuitable For The Project. 8.1.2 Approach And Methodology For Detailed Engineering, Design, And Construction (40 Points) Excellent (100%): The Concept Of Approach And Methodology For Detailed Engineering, Design, And Construction Is Exceptionally Clear, Feasible, Innovative, And Comprehensive. The Plan Demonstrates A High Level Of Understanding Of Project Problems, Risks, And Suggested Solutions, With Well-defined Strategies For Addressing Them. Good (80%): The Concept Of Approach And Methodology For Detailed Engineering, Design, And Construction Is Clear, Feasible, And Comprehensive, With Some Innovative Elements. The Plan Adequately Addresses Project Problems, Risks, And Suggested Solutions, Though Some Areas May Require Further Development. Acceptable (70%): The Concept Of Approach And Methodology For Detailed Engineering, Design, And Construction Satisfactorily Addresses Project Requirements, With A Basic Level Of Clarity And Feasibility. The Plan Outlines Strategies For Addressing Project Problems, Risks, And Suggested Solutions, Meeting The Minimum Expectations. Some Reservations (50%): The Concept Of Approach And Methodology For Detailed Engineering, Design, And Construction Partially Addresses Project Requirements, With Notable Gaps In Clarity And Feasibility. The Plan Lacks Innovative Elements And May Inadequately Address Project Problems, Risks, And Suggested Solutions. Serious Reservations (20%): The Concept Of Approach And Methodology For Detailed Engineering, Design, And Construction Demonstrates Significant Deficiencies In Clarity, Feasibility, And Comprehensiveness. The Plan Fails To Adequately Address Project Problems, Risks, And Suggested Solutions, Indicating A Lack Of Understanding Or Inadequate Planning. Unacceptable (0%): The Concept Of Approach And Methodology For Detailed Engineering, Design, And Construction Is Unclear, Infeasible, And Lacks Comprehensiveness. The Plan Fails To Address Project Problems, Risks, And Suggested Solutions, Indicating A Fundamental Misunderstanding Or Disregard For Project Requirements. 8.1.3 Quality Of Personnel Assigned To The Project (25 Points) Excellent (100%): The Personnel Assigned To The Project, Including Key Staff, Are Highly Suitable And Competent To Perform Their Duties. Key Staff Members Possess Exceptional Qualifications, Competence, Education, And Training Relevant To Their Roles, Demonstrating A High Level Of Expertise And Experience. Good (80%): The Personnel Assigned To The Project, Including Key Staff, Are Suitable And Competent To Perform Their Duties Effectively. Key Staff Members Possess Relevant Qualifications, Competence, Education, And Training, Demonstrating Solid Expertise And Experience. Acceptable (70%): The Personnel Assigned To The Project, Including Key Staff, Meet The Basic Requirements For Suitability And Competence In Performing Their Duties. Key Staff Members Possess General Qualifications And Competence, Education, And Training Relevant To Their Roles, Meeting The Minimum Expectations. Some Reservations (50%): The Personnel Assigned To The Project, Including Key Staff, Demonstrate Some Suitability And Competence In Performing Their Duties, But Notable Deficiencies Are Present. Key Staff Members May Lack Certain Qualifications, Competence, Education, Or Training, Raising Concerns About Their Ability To Effectively Fulfill Their Roles. Serious Reservations (20%): The Personnel Assigned To The Project, Including Key Staff, Exhibit Significant Deficiencies In Suitability And Competence To Perform Their Duties. Key Staff Members Lack Essential Qualifications, Competence, Education, Or Training, Indicating A Lack Of Expertise Or Experience Relevant To Their Roles. Unacceptable (0%): The Personnel Assigned To The Project, Including Key Staff, Are Unsuitable And Incompetent To Perform Their Duties Effectively. Key Staff Members Lack The Necessary Qualifications, Competence, Education, And Training, Demonstrating A Fundamental Mismatch With The Requirements Of Their Roles. 8.2 Determination Of The Merit Point Score The Aggregate Of The Scores In Each Criterion Must Be 70% Or More To Pass Using The Following Formula In Equation. Description Weight (w) Rating (r) Criteria 1 35% (smax/sact) Criteria 2 40% Sact Criteria 3 25% Sact Smax = Η (100) Sact = R1 +r2 +r3 + . . .(rη) Where Η = Number Of Sub Criteria R = Rating Given To The Criteria/sub Criteria The Actual Score (sact) For Each Of The Criteria/sub Criteria Is Obtained By Adding All The Given Rating. (smax) Is The Summation Of Maximum Score Per Criteria 8.3 Passing Rate The Specific Passing Rate Value Depends On The Specific Context Of The Project, The Priorities Of The Design And Build Committee, And The Complexity Of The Requirements Outlined In Ra 10575. Based On The Provided Criteria And Descriptions, The Passing Rate For The Merit Point Criteria (mpc) Could Be Set At 75%. This Means That Bidders Must Score At Least 75% Or Higher In The Evaluation Process To Be Considered As Meeting The Minimum Requirements For The Project A. Pass Rate Per Criteria Will Be Determined Using The Formula: Score = W1*r1 + W2*r2 + W3*r3 B. A Bid Or Technical Bid That Failed In Any Of The Criteria’s Will Not Be Considered For Further Evaluation C. Score Above 75% Will Be Considered As Technically Responsive. Aggregate Score Of Less Than 75% Will Be Considered Failed, And May Be Rejected On That Basis. Second-step Procedure: Only Those Bids That Passed The Above Criteria Shall Be Subjected To The Second Step Of Evaluation. The Bac Shall Open The Financial Proposal Of Each “passed” Bidder And Shall Evaluate It Using Non-discretionary Criteria – Including Arithmetical Corrections For Computational Errors – As Stated In The Bidding Documents, And Thus Determine The Correct Total Calculated Prices. The Bac Shall Automatically Disqualify Any Total Calculated Bid Price Which Exceeds The Abc 9. Data To Be Provided By The Bucor These Data Are For Reference Only And Does Not Guarantee The Contractor That The Data Provided Are Correct, Free From Error, And Applicable To The Project At Hand. The Contractor Is Responsible For The Accuracy Or Applicability Of Any Data That He Will Use In His Design– Build Proposal And Services. Sample Data For Buildings: A. Conceptual Plans 10. Documents To Be Provided By The Contractor During Contract Implementation A. Detailed Architectural And Engineering Plans B. Design Analysis C. Survey Data D. Quantity Calculation E. Detailed Geotechnical Investigation Report F. Design Report. G. As-built Plans, (printed Including Cad Files And Bim Files (lod 500) H. Other Relevant Documents 11. Design And Build Period The Winning Bidder Shall Commence Actual Works Upon The Issuance By The Bucor Of The Notice To Proceed (ntp). The Winning Bidder Shall Complete The Daed And Submit Within The Sixty (60) Calendar Days (cds) Period To The Bucor For Review And Approval. The Contractor Shall Complete The Construction Of The Building Within 305 Cds For The Total Contract Duration Of 365 Cd. Conforme: Name Of Company In Print Signature Over Printed Name Of Authorized Representative/date Section Vii. Drawings The Conceptual Drawings Should Be Attached To This Section Or Annexed In A Separate Folder As Part Of The First Envelope (technical Component Envelope). Preliminary Conceptual Architectural Design Plans In Accordance With The Degree Of Details Specified By The Procuring Entity: At Suitable Scale On High Quality A3 Blue Print Paper /digital Print Minimum Size) 1. Location Plan/vicinity Map 2. Perspective 3. Floor Plans 4. Front View Elevation 5. Rear View Elevation 6. Left Side View Elevation 7. Right Side View Elevation 8. Longitudinal Section 9. Transverse Section Section Viii. Bill Of Quantities The Bill Of Quantities Should Be Attached To This Section As Part Of The Second Envelope (financial Component Envelope). Section Ix. Checklist Of Technical And Financial Documents Checklist Of Technical And Financial Documents I. Technical Component Envelope Class “a” Documents Legal Documents ⬜ (a) Valid Philgeps Registration Certificate (platinum Membership) (all Pages) In Accordance With Section 8.5.2 Of The Irr; Technical Documents ⬜ (b) Statement Of The Prospective Bidder Of All Its Ongoing Government And Private Contracts, Including Contracts Awarded But Not Yet Started, If Any, Whether Similar Or Not Similar In Nature And Complexity To The Contract To Be Bid; And ⬜ (c) Statement Of The Bidder’s Single Largest Completed Contract (slcc) Similar To The Contract To Be Bid, Except Under Conditions Provided Under The Rules; And ⬜ (d) Special Pcab License In Case Of Joint Ventures And Registration For The Type And Cost Of The Contract To Be Bid; And ⬜ (e) Original Copy Of Bid Security. If In The Form Of A Surety Bond, Submit Also A Certification Issued By The Insurance Commission Or Original Copy Of Notarized Bid Securing Declaration; And (f) Project Requirements, Which Shall Include The Following: ⬜ A. Organizational Chart For The Contract To Be Bid; ⬜ B. List Of Contractor’s Key Personnel (e.g., Project Manager, Project Engineers, Materials Engineers, And Foremen), To Be Assigned To The Contract To Be Bid With Their Complete Qualification And Experience Data And Photocopy Of Their Valid Licenses Issued By The Professional Regulatory Commission (prc) And Curriculum Vitae Of Key Staff, Partners Or Principal Officers With A Minimum Work Experience Requirements Set In The Bds; ⬜ C. List Of Contractor’s Major Equipment Units, Which Are Owned, Leased, And/or Under Purchase Agreements, Supported By Proof Of Ownership Or Certification Of Availability Of Equipment From The Equipment Lessor/vendor For The Duration Of The Project, As The Case May Be; And ⬜ (g) Original Duly Signed Omnibus Sworn Statement (oss); And If Applicable, Original Notarized Secretary’s Certificate Or Board Resolution/partnership Resolution In Case Of A Corporation, Partnership, Or Cooperative; Or Original Notarized Special Power Of Attorney In Case Of Sole Proprietorship Of All Members Of The Joint Venture Giving Full Power And Authority To Its Officer To Sign The Oss And Do Acts To Represent The Bidder. And ⬜ (h) Conformity With The Technical Specifications (scope Of Work); And ⬜ (i) Preliminary Conceptual Architectural Design Plans In Accordance With The Degree Of Details Specified By The Procuring Entity: (at Suitable Scale On High Quality A3 Blue Print Paper /digital Print Minimum Size) 10. Location Plan/vicinity Map 11. Perspective 12. Floor Plans 13. Front View Elevation 14. Rear View Elevation 15. Left Side View Elevation 16. Right Side View Elevation 17. Longitudinal Section 18. Transverse Section ⬜ (j) Design And Construction Method And ⬜ (k) Value Engineering Analysis Of The Design And Construction Method. And Financial Documents ⬜ (l) The Prospective Bidder’s Computation Of Net Financial Contracting Capacity (nfcc) At Least Equal To The Abc. And Class “b” Documents ⬜ (m) Jv Bidders Shall Submit A Jva In Accordance With R.a. 4566 And Its Irr. Each Partner Of The Joint Venture Shall Submit Their Respective Philgeps Certificates Of Registration In Accordance With Section 8.5.2 Of This Irr. The Submission Of Technical And Financial Eligibility Documents By Any Of The Joint Venture Partners Constitutes Compliance: Provided, That The Partner Responsible To Submit The Nfcc Shall Likewise Submit The Statement Of All Of Its Ongoing Contracts And Audited Financial Statements. Ii. Financial Component Envelope ⬜ (n) Original Of Duly Signed And Accomplished Financial Bid Form; And Other Documentary Requirements Under Ra No. 9184 ⬜ (o) Original Of Duly Signed Bid Prices In The Bill Of Quantities; And ⬜ (p) Duly Accomplished Detailed Estimates Form, Including A Summary Sheet Indicating The Unit Prices Of Construction Materials, Labor Rates, And Equipment Rentals Used In Coming Up With The Bid; And ⬜ (q) Cash Flow And Payment Schedule. Bidding Form Company Letterhead Statement Of Ongoing Government & Private Contracts Design And Build Of Correctional Institution For Women (ciw) Facility At Iwahig Prison And Penal Farm (ippf) Statement Of All Its Ongoing Government And Or Private Contracts Including Contracts Awarded But Not Yet Started, If Any Whether Similar Or Not Similar In Nature. Name Of Contract Date Of Contract Contract Duration Owner’s Name And Address Nature Of Work Contractor’s Role (whether Sole Contractor, Subcontractor, Or Partner In A Jv) And Percentage Of Participation Total Contract Value At Award Date Of Completion Or Estimated Completion Time Value Of Outstanding Works Certified Correct: Name And Signature Of Authorized Representative Position Date Company Letterhead Statement Of Single Largest Completed Contract Design And Build Of Correctional Institution For Women (ciw) Facility At Iwahig Prison And Penal Farm (ippf) Statement Of Single (1) Largest Completed Contract Of Similar In Nature Within The Last Six (6) Years From The Date Of Submission And Receipt Of Bids Amounting To At Least Fifty Percent (50%) Of The Approved Budget Of The Contract (abc) Name Of Contract Date Of Contract Contract Duration Owner’s Name And Address Nature Of Work Contractor’s Role (whether Sole Contractor, Subcontractor, Or Partner In A Jv) And Percentage Of Participation Total Contract Value At Award Date Of Completion Or Estimated Completion Time Certified Correct: Name And Signature Of Authorized Representative Position Date Company Letterhead Design And Build Of Correctional Institution For Women (ciw) Facility At Iwahig Prison And Penal Farm (ippf) Republic Of The Philippines) City Of _______________________) S.s. X------------------------------------------------------x Bid Securing Declaration Invitation To Bid: [insert Reference Number] To: Bureau Of Corrections I/we, The Undersigned, Declare That: 1. I/we Understand That, According To Your Conditions, Bids Must Be Supported By A Bid Security, Which May Be In The Form Of A Bid-securing Declaration. 2. I/we Accept That: (a) I/we Will Be Automatically Disqualified From Bidding For Any Contract With Any Procuring Entity For A Period Of Two (2) Years Upon Receipt Of Your Blacklisting Order; And, (b) I/we Will Pay The Applicable Fine Provided Under Section 6 Of The Guidelines On The Use Of Bid Securing Declaration, Within Fifteen (15) Days From Receipt Of The Written Demand By The Procuring Entity For The Commission Of Acts Resulting To The Enforcement Of The Bid Securing Declaration Under Sections 23.1(b), 34.2, 40.1 And 69.1, Except 69.1(f), Of The Irr Of Ra 9184; Without Prejudice To Other Legal Action The Government May Undertake. 3. I/we Understand That This Bid Securing Declaration Shall Cease To Be Valid On The Following Circumstances: (a) Upon Expiration Of The Bid Validity Period, Or Any Extension Thereof Pursuant To Your Request; (b) I Am/we Are Declared Ineligible Or Post-disqualified Upon Receipt Of Your Notice To Such Effect, And (i) I/we Failed To Timely File A Request For Reconsideration Or (ii) I/we Filed A Waiver To Avail Of Said Right; (c) I Am/we Are Declared The Bidder With The Lowest Calculated Responsive Bid, And I/we Have Furnished The Performance Security And Signed The Contract. In Witness Whereof, I/we Have Hereunto Set My/our Hand/s This ____ Day Of [month] [year] At [place Of Execution]. ______________________________________________________ [insert Name Of Bidder’s Authorized Representative] _____________________________ [insert Signatory’s Legal Capacity] Affiant Subscribed And Sworn To Before Me This ___ Day Of [month] [year] At [place Of Execution], Philippines. Affiant/s Is/are Personally Known To Me And Was/were Identified By Me Through Competent Evidence Of Identity As Defined In The 2004 Rules On Notarial Practice (a.m. No. 02-8-13-sc). Affiant/s Exhibited To Me His/her [insert Type Of Government Identification Card Used], With His/her Photograph And Signature Appearing Thereon, With No. ____________ Issued On ______________ At ___________________________________. Witness My Hand And Seal This ___ Day Of [month] [year]. Name Of Notary Public Serial No. Of Commission _______________ Notary Public For _______ Until __________ Roll Of Attorneys No. __________________ Ptr No. ______ [date Issued], [place Issued] Ibp No. ______ [date Issued], [place Issued] Doc. No. _____ Page No. _____ Book No. _____ Series Of _____ Company Letterhead Omnibus Sworn Statement Design And Build Of Correctional Institution For Women (ciw) Facility At Iwahig Prison And Penal Farm (ippf) _________________________________________________________________________ Republic Of The Philippines ) City/municipality Of ______ ) S.s. Affidavit I, [name Of Affiant], Of Legal Age, [civil Status], [nationality], And Residing At [address Of Affiant], After Having Been Duly Sworn In Accordance With Law, Do Hereby Depose And State That: 1. [select One, Delete The Other:] [if A Sole Proprietorship:] I Am The Sole Proprietor Or Authorized Representative Of [name Of Bidder] With Office Address At [address Of Bidder]; [if A Partnership, Corporation, Cooperative, Or Joint Venture:] I Am The Duly Authorized And Designated Representative Of [name Of Bidder] With Office Address At [address Of Bidder]; 2. [select One, Delete The Other:] [if A Sole Proprietorship:] As The Owner And Sole Proprietor, Or Authorized Representative Of [name Of Bidder], I Have Full Power And Authority To Do, Execute And Perform Any And All Acts Necessary To Participate, Submit The Bid, And To Sign And Execute The Ensuing Contract For Design And Build Of Correctional Institution For Women (ciw) Facility At Iwahig Prison And Penal Farm (ippf) Of The Bureau Of Corrections, As Shown In The Attached Duly Notarized Special Power Of Attorney; [if A Partnership, Corporation, Cooperative, Or Joint Venture:] I Am Granted Full Power And Authority To Do, Execute And Perform Any And All Acts Necessary To Participate, Submit The Bid, And To Sign And Execute The Ensuing Contract For Design And Build Of Correctional Institution For Women (ciw) Facility At Iwahig Prison And Penal Farm (ippf) Of The Bureau Of Corrections, As Shown In The Attached [state Title Of Attached Document Showing Proof Of Authorization (e.g., Duly Notarized Secretary’s Certificate, Board/partnership Resolution, Or Special Power Of Attorney, Whichever Is Applicable;)]; 3. [name Of Bidder] Is Not “blacklisted” Or Barred From Bidding By The Government Of The Philippines Or Any Of Its Agencies, Offices, Corporations, Or Local Government Units, Foreign Government/foreign Or International Financing Institution Whose Blacklisting Rules Have Been Recognized By The Government Procurement Policy Board, By Itself Or By Relation, Membership, Association, Affiliation, Or Controlling Interest With Another Blacklisted Person Or Entity As Defined And Provided For In The Uniform Guidelines On Blacklisting; 4. Each Of The Documents Submitted In Satisfaction Of The Bidding Requirements Is An Authentic Copy Of The Original, Complete, And All Statements And Information Provided Therein Are True And Correct; 5. [name Of Bidder] Is Authorizing The Head Of The Procuring Entity Or Its Duly Authorized Representative(s) To Verify All The Documents Submitted; 6. [select One, Delete The Rest:] [if A Sole Proprietorship:] The Owner Or Sole Proprietor Is Not Related To The Head Of The Procuring Entity, Members Of The Bids And Awards Committee (bac), The Technical Working Group, And The Bac Secretariat, The Head Of The Project Management Office Or The End-user Unit, And The Project Consultants By Consanguinity Or Affinity Up To The Third Civil Degree; [if A Partnership Or Cooperative:] None Of The Officers And Members Of [name Of Bidder] Is Related To The Head Of The Procuring Entity, Members Of The Bids And Awards Committee (bac), The Technical Working Group, And The Bac Secretariat, The Head Of The Project Management Office Or The End-user Unit, And The Project Consultants By Consanguinity Or Affinity Up To The Third Civil Degree; [if A Corporation Or Joint Venture:] None Of The Officers, Directors, And Controlling Stockholders Of [name Of Bidder] Is Related To The Head Of The Procuring Entity, Members Of The Bids And Awards Committee (bac), The Technical Working Group, And The Bac Secretariat, The Head Of The Project Management Office Or The End-user Unit, And The Project Consultants By Consanguinity Or Affinity Up To The Third Civil Degree; 7. [name Of Bidder] Complies With Existing Labor Laws And Standards; And 8. [name Of Bidder] Is Aware Of And Has Undertaken The Responsibilities As A Bidder In Compliance With The Philippine Bidding Documents, Which Includes: A. Carefully Examining All Of The Bidding Documents; B. Acknowledging All Conditions, Local Or Otherwise, Affecting The Implementation Of The Contract; C. Making An Estimate Of The Facilities Available And Needed For The Contract To Be Bid, If Any; And D. Inquiring Or Securing Supplemental/bid Bulletin(s) Issued For The Design And Build Of Correctional Institution For Women (ciw) Facility At Iwahig Prison And Penal Farm (ippf). 9. [name Of Bidder] Did Not Give Or Pay Directly Or Indirectly, Any Commission, Amount, Fee, Or Any Form Of Consideration, Pecuniary Or Otherwise, To Any Person Or Official, Personnel Or Representative Of The Government In Relation To Any Procurement Project Or Activity. 10. In Case Advance Payment Was Made Or Given, Failure To Perform Or Deliver Any Of The Obligations And Undertakings In The Contract Shall Be Sufficient Grounds To Constitute Criminal Liability For Swindling (estafa) Or The Commission Of Fraud With Unfaithfulness Or Abuse Of Confidence Through Misappropriating Or Converting Any Payment Received By A Person Or Entity Under An Obligation Involving The Duty To Deliver Certain Goods Or Services, To The Prejudice Of The Public And The Government Of The Philippines Pursuant To Article 315 Of Act No. 3815 S. 1930, As Amended, Or The Revised Penal Code. In Witness Whereof, I Have Hereunto Set My Hand This __ Day Of ___, 2024 At ____________, Philippines. _____________________________________ Bidder’s Representative/authorized Signatory Affiant Subscribed And Sworn To Before Me This ___ Day Of [month] [year] At [place Of Execution], Philippines. Affiant/s Is/are Personally Known To Me And Was/were Identified By Me Through Competent Evidence Of Identity As Defined In The 2004 Rules On Notarial Practice (a.m. No. 02-8-13-sc). Affiant/s Exhibited To Me His/her [insert Type Of Government Identification Card Used], With His/her Photograph And Signature Appearing Thereon, With No. ____________ And Issued On ____________________ At _____________________. Witness My Hand And Seal This ___ Day Of [month] [year]. Name Of Notary Public Serial No. Of Commission _______________ Notary Public For _______ Until __________ Roll Of Attorneys No. __________________ Ptr No. ______ [date Issued], [place Issued] Ibp No. ______ [date Issued], [place Issued] Doc. No. _____ Page No. _____ Book No. _____ Series Of _____ Company Letterhead Certificate Of Net Financial Contracting Capacity Design And Build Of Correctional Institution For Women (ciw) Facility At Iwahig Prison And Penal Farm (ippf) (please Show Figures At How You Arrived At The Nfcc) This Is To Certify That Our Net Financial Contracting Capacity (nfcc) Is _____________________ (p____________) Which Is At Least Equal To The Total Ceiling Price We Are Bidding. The Amount Is Computed As Follows: (please Show Computation Of Nfcc) Nfcc = (ca-cl) (15) – C Where: Ca = Current Assets Cl = Current Liabilities C = Value Of All Outstanding Or Uncompleted Portions Of The Projects Under Going Contracts, Including Awarded Contracts Yet To Be Started Coinciding With The Contract For This Project Note: The Values Of The Bidder’s Current Assets And Current Liabilities Shall Be Based On The Audited Financial Statement Submitted To The Bir. Issued This _________________day Of ________________, 2024 _______________________________________________ Name & Signature Of Authorized Representative ____________________ Position _______________ Date Company Letterhead Bid Form Date: Ib No: To Bids And Awards Committee Bureau Of Corrections Nbp Reservation Muntinlupa City We, The Undersigned, Declare That: (a) We Have Examined And Have No Reservation To The Bidding Documents, Including Addenda, For The Contract Design And Build Of Correctional Institution For Women (ciw) Facility At Iwahig Prison And Penal Farm (ippf); (b) We Offer To Execute The Works For This Contract In Accordance With The Bid And Bid Data Sheet, General And Special Conditions Of Contract Accompanying This Bid; The Total Price Of Our Bid, Excluding Any Discounts Offered Below Is: ________________________________________₱_________________; The Discounts Offered And The Methodology For Their Application Are: [insert Information]; (c) Our Bid Shall Be Valid For A Period Of 120 Calendar Days From The Date Fixed For The Bid Submission Deadline In Accordance With The Bidding Documents, And It Shall Remain Binding Upon Us And May Be Accepted At Any Time Before The Expiration Of That Period; (d) If Our Bid Is Accepted, We Commit To Obtain A Performance Security In The Amount Of 30% Percent Of The Contract Price For The Due Performance Of The Contract; (e) Our Firm, Including Any Subcontractors Or Suppliers For Any Part Of The Contract, Have Nationalities From The Following Eligible Countries; (f) We Are Not Participating, As Bidders, In More Than One Bid In This Bidding Process, Other Than Alternative Offers In Accordance With The Bidding Documents; (g) Our Firm, Its Affiliates Or Subsidiaries, Including Any Subcontractors Or Suppliers For Any Part Of The Contract, Has Not Been Declared Ineligible By The Funding Source; (h) We Understand That This Bid, Together With Your Written Acceptance Thereof Included In Your Notification Of Award, Shall Constitute A Binding Contract Between Us, Until A Formal Contract Is Prepared And Executed; And (i) We Understand That You Are Not Bound To Accept The Lowest Calculated Bid Or Any Other Bid That You May Receive. (j) We Likewise Certify/confirm That The Undersigned, Is The Duly Authorized Representative Of The Bidder, And Granted Full Power And Authority To Do, Execute And Perform Any And All Acts Necessary To Participate, Submit The Bid, And To Sign And Execute The Ensuing Contract For The Design And Build Of Correctional Institution For Women (ciw) Facility At Iwahig Prison And Penal Farm (ippf) Of The Bureau Of Corrections. (k) We Acknowledge That Failure To Sign Each And Every Page Of This Bid Form, Including The Bill Of Quantities, Shall Be A Ground For The Rejection Of Our Bid. Name: In The Capacity Of: Signed: Duly Authorized To Sign The Bid For And On Behalf Of: Date: ___________
Caraga Regional Hospital Tender
Healthcare and Medicine
Philippines
Closing Date28 Nov 2024
Tender AmountPHP 1.3 Million (USD 22 K)
Details: Description Republic Of The Philippines Department Of Health Caraga Regional Hospital Surigao City Bids And Awards Committee Ooooooo ----------------------------------------------------------------------------------------------------------------------------- @@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@ Invitation To Bid Ib No. 2024-11-28 (91) Supply And Delivery Of Various Medical Grade Equipment And Instrument Back Table For Ambulatory Use – Rebid Abc: ₱ 1,300,000.00 ===================================================================== 1. The Caraga Regional Hospital (crh), Through The General Appropriation Act (gaa), Hfep - Saa No. 2024-02-0271 Intends To Apply The Sum Of Being The Approved Budget For The Contract (abc) Of One Million Three Hundred Thousand Pesos Only (php 1,300,000.00) Under The Contract For The Supply And Delivery Of Various Medical Grade Equipment And Instrument Back Table For Ambulatory Use – Rebid. Bids Received In Excess Of The Abc Shall Be Automatically Rejected At Bid Opening And Items Below Are Subject For A Competitive Bidding, To Wit: Item No. Description Qty Unit Of Measure Unit Cost Total Cost 1 Vacuum Cleaner, Heavy Duty With Hepa Filter Bags 2 Set ₱150,000.00 ₱ 300,000.00 2 Surgical Emergency Medecine Crash Cart W/ Power Outlet Extension Wire And Cardiac Board 1 Set ₱100,000.00 ₱ 100,000.00 3 Patient Normothermia Warming Blanket Device 4 Unit ₱50,000.00 ₱ 200,000.00 4 Core Needle Biopsy Gun, Reusable With Autoclavable Needle Set 2 Unit ₱100,000.00 ₱ 200,000.00 5 Cast Cutter, Orthopedic, Electric, Medical Grade 2 Set ₱200,000.00 ₱ 400,000.00 6 Instrument Back Table With Pedal Operated Wheels And Hydraulic Height Adjustment 2 Unit 50,000.00 100,000.00 Grand Total ₱ 1,300,000.00 This Is A Partial Bid Or Line Item Bid 1 Vacuum Cleaner, Heavy Duty With Hepa Filter Bags Description A Vacuum Cleaner With A Hepa Filtration System For More Effective Indoor Cleaning And Disinfection. This Machine Can Minimize Indoor Air Pollution And Mitigate Exposure To Allergic Triggers. Purpose Of Use Ambulatory Surgery Unit Technical Specification Dust Capacity: 2.5l Hose Length: Not More Than 1.5m Washable And Filters Preferably Autoclavable Quick Dust Release One Touch Automatic Cord Rewind Extension Cord Of 5 Meters To 10 Meters Long Power Cord To Avoid Changing Power Points Every 5 Meters. Power: 1000w Suction Power: 130w Voltage: 100vac-240vac 60hz Waterproof Motor Additional Reusable Filter Bags Preferably Autoclavable Physical / Chemical Characteristics Consider A Vacuum Cleaner That Is: Light Weight Quiet Operation Easy To Use Over Floors, Walls, Ceiling And Hard Surfaces And Has A Compact Design For Easy Storage And Maneuverability Environmental Factors Capable Of Being Stored Continuously In Ambient Temperature Of 0 To 50 Deg Celsius And Relative Humidity Of 15 To 90%. Capable Of Operating Continuously In Ambient Temperature Of 10 To 40 Deg Celsius And Relative Humidity Of 15 To 90% Accessories, Consumables, Spare Parts, Other Components · Brush Tool · Hose Not More Than 1.5m · Filter (preferably Autoclavable) · Hose Connector · Compressed Brush · Extending Plastic Tube At Least 5 Pieces Extra Hepa Filters (autoclavable) Technical Services System Warranty Must Be Five (5) Years Service Call Within 24 Hours Maximum. Preventive Maintenance For Every Quarter Until Warranty Expires. Service Kits And Consumables To Be Included For One Year Use. Supplier Must Deliver And Install The Unit Without Cost To The Owner Training Of End-users And Biomed Engineer Must Be Done On-site With Minimum Of 1 Day Period. Training / Installation / Utilization Pre- Installation Supplier To Perform Installation, Safety And Operation Checks Before Handover. Requirement For Commissioning Local Clinical Staff To Affirm Completion Of Installation, Calibration Certificate And Warranty Certificate Training Of Users Training Of Users And Biomed Engineer & Staff In Operation And Basic Maintenance Shall Be Provided User Care To Demonstrate The Proper Cleaning And Disinfection With Provision Of Printed Cards Or Tags Beside The Unit. Safety And Standards En 1041: Information Supplied By The Manufacturer With Medical Devices En 60601-1: Medical Electrical Equipment Part 1: General Requirements For Safety (iec: 60601-1:1998) En 60601-1-2: Medical Electrical Equipment Part 1-2: General Requirements For Safety - Collateral Standard: Electromagnetic Compatibility - Requirements And Test (iec 60601-1-2:2001) Warranty And Maintenance 5 Years Warranty Documentation Requirements User, Technical And Maintenance Manuals To Be Supplied In English Language. Service Manual In English. List To Be Provided Of Important Spares And Accessories, With Their Part Serial Numbers And Cost. Certificate Of Calibration, Warranty And Inspection To Be Provided. Delivery Period 45 Calendar Days From Receipt Of The Notice To Proceed Mode Of Payment Upon Full Delivery, Installed, Tested And Commissioned Post-qualification Must Be Willing To Send Demo Unit To Caraga Regional Hospital. Supplier To Provide Actual Prototype/demo-unit During The Conduct Of Post Qualification- Same Brand & Model Of Offered Bid, No Alteration Of Actual Submitted Brochure Technical Specification Sheets. Failure To Comply With The Preferred Schedule Of The Procuring Entity For The Post Qualification Can Be A Ground For Disqualification. (no Extensions Allowed.) Service Center Must Have Service Center Within Caraga Region, Cebu City, Cdo Or Davao City. Other Terms And Condition Of Acceptability: Supplier Must Comply With The Following Conditions: 1. Must Be The Authorized Distributor Of The Principal Company Of The Equipment And The Necessary Consumables In The Philippines 2. Submit Certificate Of Training Of The Company Engineer /technical Personnel And Product Specialist Issued By The Principal Or Manufacturer 3. Provide Company Response Within 24-48hrs In Case Technical Problems Or Equipment Breakdown 4. Must Submit Notarized Certificate Of Availability Of Spare Parts For The Next 5years 5. Supplier Must Have An Actual Installation Of The Offered Brand And Model 6. Provision On-site Training For End-user & Maintenance Personnel On Basic Preventive Maintenance And Proper Operation Of The Unit. 2 Surgical Emergency Medicine Crash Cart W/ Power Outlet Extension Wire And Cardiac Board Description Surgical Emergency Medicine Crash Cart Is Used To Transport And Dispense Emergency Medications And Supplies. It Is Essential For Cardiopulmonary Resuscitation As It Contains Advanced Cardiac Life Support (acls) First-line Drugs, A Defibrillator, A Bag Valve Mask, A Suction Device And Emergency Supplies. Purpose Of Use Ambulatory Surgery Unit Technical Specification Portable Stainless Steel Trolley Body Stainless Columns Rust Proof Iv Poles (2 Pcs) Dust Basket Utility Container Waterproof File Bag At The Side Defibrillator And Cardiac Monitor Shelf Power Outlet, Extension Wire & Hook Sliding Side Shelf Stainless Steel Guard Rail Stainless Steel Waste Bins Centralized Lock Two (2) Small And Four (4) Big Drawers Total Of 6 Level Division Drawers Adjustable Partitions For Organization At The Inner Portion Of Each Drawer Drawers Can Be Repositioned Easily 4pcs 125mm Casters, Two With Brake And Lock System Cpr Or Cardiac Board Oxygen Tank Holder Catheter Holders Sharps Containers Physical / Chemical Characteristics Surgical Emergency Medicine Crash Cart Is Made Of High-strength Stainless Material, Making It Sturdy And Durable. The One-piece Stainless Top Board Has An Arching Handle And Raised-edge Design, Covered With Rust Proof Stainless Steel. It Comes With Four Rust Proof Stainless Steel Columns For Added Stability. Ideal For Emergency Situations During A Surgical Operation As It Is Easy To Maneuver And Can Transport A Variety Of Medical Supplies And Medications. Environmental Factors - Capable Of Being Stored Continuously In Ambient Temperature Of 0 To 50 Deg Celsius And Relative Humidity Of 15 To 100%. Accessories, Consumables, Spare Parts, Other Components Emergency Crash Cart Accessory Package: 2 Pcs Stainless Steel Iv-pole With 4 Durable Hangers, Cardiac Board, Side Shelf, Heavy Duty Railings, Oxygen Tank Brackets, 3 Inches X 4 Inches Tray W/ Dividers, 5 Inches X 2 Inches Tray W/ Dividers, Waterproof Label Holders And Utility Hooks, And Emergency Led Flashlight Technical Services System Warranty Must Be Five (5) Years Service Call Within 24 Hours Maximum. Preventive Maintenance For Every Quarter Until Warranty Expires. Service Kits And Consumables To Be Included For One Year Use. Supplier Must Deliver And Install The Unit Without Cost To The Owner Training Of End-users And Biomed Engineer Must Be Done On-site With Minimum Of 1 Day Period. Training / Installation / Utilization Pre- Installation Supplier To Perform Installation, Safety And Operation Checks Before Handover. Requirement For Commissioning Local Clinical Staff To Affirm Completion Of Installation, Calibration Certificate And Warranty Certificate Training Of Users Training Of Users And Biomed Engineer & Staff In Operation And Basic Maintenance Shall Be Provided User Care To Demonstrate The Proper Cleaning And Disinfection With Provision Of Printed Cards Or Tags Beside The Unit. Safety And Standards Iso 13485, Fda, Ce. Iso 14971:2007 Medical Devices -- Application Of Risk Management To Medical Devices Iec 60601-1:2012 Medical Electrical Equipment - Part 1: General Requirements For Basic Safety And Essential Performance Warranty And Maintenance 5 Years Warranty Documentation Requirements User, Technical And Maintenance Manuals To Be Supplied In English Language. Service Manual In English. List To Be Provided Of Important Spares And Accessories, With Their Part Numbers And Cost. Certificate Of Calibration, Warranty And Inspection To Be Provided. Delivery Period 45 Calendar Days From Receipt Of The Notice To Proceed Mode Of Payment Upon Full Delivery, Installed, Tested And Commissioned Post-qualification Must Be Willing To Send Demo Unit To Caraga Regional Hospital. Supplier To Provide Actual Prototype/demo-unit During The Conduct Of Post Qualification- Same Brand & Model Of Offered Bid, No Alteration Of Actual Submitted Brochure Technical Specification Sheets. Failure To Comply With The Preferred Schedule Of The Procuring Entity For The Post Qualification Can Be A Ground For Disqualification. (no Extensions Allowed.) Service Center Must Have Service Center Within Caraga Region, Cebu City, Cdo Or Davao City. Other Terms And Condition Of Acceptability: Supplier Must Comply With The Following Conditions: 1. Must Be The Authorized Distributor Of The Principal Company Of The Equipment And The Necessary Consumables In The Philippines 2. Submit Certificate Of Training Of The Company Engineer /technical Personnel And Product Specialist Issued By The Principal Or Manufacturer 3. Provide Company Response Within 24-48hrs In Case Technical Problems Or Equipment Breakdown 4. Must Submit Notarized Certificate Of Availability Of Spare Parts For The Next 5years 5. Supplier Must Have An Actual Installation Of The Offered Brand And Model 6. Provision On-site Training For End-user & Maintenance Personnel On Basic Preventive Maintenance And Proper Operation Of The Unit. 3 Patient Normothermia Warming Blanket Device Description A Device That Helps Control The Patient’s Temperature. Has Two Separate Heating And Cooling Reservoirs To Help Deliver Either A Heated Solution Or Cooled Solution To The Patient When Needed. The Desired Temperature Water Is Circulated Through Tubing In A Blanket. The System Is Continuously Checking The Temperature Of The Water Against The Temperature Of The Patient To Achieve The Desired Correct Temperature. A Manual Mode And An Automatic Mode With A Microprocessor That Creates A More Precise And Accurate Reading. Actively Warming Patients That Have Hypothermic Symptoms. Dual Reservoir For Warming And Cooling System. Maintaining Normothermia Throughout The Perioperative And Postoperative Periods Help Safeguard Patients From The Potential Of Dangerous Complications. The Normothermia Blanket System Provides A Comprehensive Solution That Works Seamlessly Throughout The Perioperative Process To Effectively And Efficiently Measure And Manage Patient Temperature. Clinical Research About Patient Warming Shows That Consistently Maintaining A Patient’s Core Body Temperature Before, During And After Surgery With The Temperature Management System Helps Reduce The Risk Of Surgical Site Infections By Maintaining Normothermia. Purpose Of Use Ambulatory Surgery Unit Technical Specification Temperature Control: Blanket Range: 39.2 To 107.6 °f (4 To 42°c) Patient Range: 86 To 105.8 °f (30 To 41°c) Heating Rate: 3.2 °f/ Min ( 1.8°c/min) Cooling Rate: 3.4 °f/min (1.9°c/min) Control: Microprocessor Self-compensating Temperature Measurement No Periodic Calibration Required Fluid System Distilled Water: 2.5 Gallons Separated Hot And Cold Reservoirs Magnetically Coupled Pump 16gph Flow Rate Minimum Within The Blanket Refrigerant: R-134a (freon Free) Power: Volts: 100vac-240vac 60hz 500 Watts Heater 1/3 Hp Refrigeration System Physical / Chemical Characteristics The Blanket Is X-ray Compatible. It Is Also Latex Free To Reduce Allergy Risks And Is Recyclable And Can Be Easily Wiped Down With Approved Disinfectants. Patient Warming Blankets Are An Ideal Choice For A Variety Of Normothermic Procedures, As They Are Lightweight, Convenient To Carry And Easily Transportable. The Blanket Can Still Maintain Performance After Cuts Or Spills, And Its Small-profile Cable Can Be Secured Easily With Its Integrated Linen Clip To Reduce Tripping Hazard Risk. Environmental Factors - Capable Of Being Stored Continuously In Ambient Temperature Of 0 To 50 Deg Celsius And Relative Humidity Of 15 To 100%. Accessories, Consumables, Spare Parts, Other Components 1 Safety Storage Box Flexible, Versatile Flexible Blanket Overlays, Covered On Both Sides In A Soft, Lightweight Material That’s Comfortable Against A Patient’s Skin. Tamper-proof Or Tear-proof Material. Integrated Rechargeable Battery With Two Hours Of Continuous Use To Allow Warming To Continue Uninterrupted During Transport And Power Shortage. The Soft-touch Controller Unit And Universally Pole-mountable, Features Adjustable Temperature Settings And A Large Temperature Display, And Can Independently Manage Two Blankets Simultaneously To Maximize Skin Coverage. Self-sealing Connecting Hoses Linen Clip Or Securing Clips Refrigerant: R-134a (freon Free) Technical Services System Warranty Must Be Five (5) Years Service Call Within 24 Hours Maximum. Preventive Maintenance For Every Quarter Until Warranty Expires. Service Kits And Consumables To Be Included For One Year Use. Supplier Must Deliver And Install The Unit Without Cost To The Owner Training Of End-users And Biomed Engineer Must Be Done On-site With Minimum Of 1 Day Period. Training / Installation / Utilization Pre- Installation Supplier To Perform Installation, Safety And Operation Checks Before Handover. Requirement For Commissioning Local Clinical Staff To Affirm Completion Of Installation, Calibration Certificate And Warranty Certificate Training Of Users Training Of Users And Biomed Engineer & Staff In Operation And Basic Maintenance Shall Be Provided User Care To Demonstrate The Proper Cleaning And Disinfection With Provision Of Printed Cards Or Tags Beside The Unit. Safety And Standards Iec 60601-1:2012 Medical Electrical Equipment - Part 1: General Requirements For Basic Safety And Essential Performance Iec 60601-1-1:2000 Medical Electrical Equipment - Part 1-1: General Requirements For Safety - Collateral Standard: Safety Requirements For Medical Electrical Systems En 12470-5: European Standard For Clinical Thermometer Performance, En 1041: Information Supplied By The Manufacturer With Medical Devices Warranty And Maintenance 5 Years Warranty Documentation Requirements User, Technical And Maintenance Manuals To Be Supplied In English Language. Service Manual In English. List To Be Provided Of Important Spares And Accessories, With Their Part Numbers And Cost. Certificate Of Calibration, Warranty And Inspection To Be Provided. Delivery Period 45 Calendar Days From Receipt Of The Notice To Proceed Mode Of Payment Upon Full Delivery, Installed, Tested And Commissioned Post-qualification Must Be Willing To Send Demo Unit To Caraga Regional Hospital. Supplier To Provide Actual Prototype/demo-unit During The Conduct Of Post Qualification- Same Brand & Model Of Offered Bid, No Alteration Of Actual Submitted Brochure Technical Specification Sheets. Failure To Comply With The Preferred Schedule Of The Procuring Entity For The Post Qualification Can Be A Ground For Disqualification. (no Extensions Allowed.) Service Center Must Have Service Center Within Caraga Region, Cebu City, Cdo Or Davao City. Other Terms And Condition Of Acceptability: Supplier Must Comply With The Following Conditions: 1. Must Be The Authorized Distributor Of The Principal Company Of The Equipment And The Necessary Consumables In The Philippines 2. Submit Certificate Of Training Of The Company Engineer /technical Personnel And Product Specialist Issued By The Principal Or Manufacturer 3. Provide Company Response Within 24-48hrs In Case Technical Problems Or Equipment Breakdown 4. Must Submit Notarized Certificate Of Availability Of Spare Parts For The Next 5years 5. Supplier Must Have An Actual Installation Of The Offered Brand And Model 6. Provision On-site Training For End-user & Maintenance Personnel On Basic Preventive Maintenance And Proper Operation Of The Unit. 4 Core Needle Biopsy Gun, Reusable With Autoclavable Needle Set Description A Set Of Hand-held Reusable Biopsy Device Used To Obtain Adequate Tissue Samples From Patients With Tumors, Masses Or Areas Of Concern. It Can Be Used To Do Biopsy In Various Organs And Masses In The Breast, Extremities, Liver, Kidney, Prostate, Among Others. These Tissue Samples Are Then Sent For Pathological Examination. It Is Intended For Multiple Use, And Fires Both A Central Stylet And Cutting Sheath In A Rapid Forward Motion Such That The Tissue Core Is Obtained At A Preset Distance Ahead Of The Visualized Needle Tip. Purpose Of Use Ambulatory Surgery Unit Technical Specification ● Reusable Core Needle Biopsy Gun ● Dual Spring System - For High Speed And Consistent Sampling ● Lightweight And Made Of Aluminum ● One-hand Activation For Single Person Operation And Easy Access To Tissue Sample ● Compatible With Needles In Various Lengths And Sizes. ● Dual Penetration Depths (15mm To 22mm) For Flexibility And Accuracy ● Etched Needle Tips For Better Visualization Of Needle Placement Under Ultrasound Guidance ● Color-coded Hubs For Easier Identification Of Size Of Needles Measurement Length: 12-15cm X 20-25cm Weight: <250g Physical / Chemical Characteristics Components: Instrument To Be Placed In A Sturdy Case That Is Portable And Well-cushioned To Avoid Damage During Transport. Mobility And Portability: Portable, Mobile And Easy To Carry Case Containing The Instrument. Environmental Factors Capable Of Being Stored Continuously In Ambient Temperature Of 0 To 50°celsius And Relative Humidity Of 15 To 90%. Capable Of Operating Continuously In Ambient Temperature Of 10 To 40°celsius And Relative Humidity Of 15 To 90%. Accessories, Consumables, Spare Parts, Other Components ● Case For The Device For Storage ● Biopsy Autoclavable Needles Compatible To The Instrument: ○ 10 Pcs - Gauge 18, Length 10cm ○ 10pcs - Gauge 18, Length 20cm ○ 20 Pcs - Gauge 14, Length 10cm Technical Services System Warranty Must Be Five (5) Years Service Call Within 24 Hours Maximum. Preventive Maintenance For Every Quarter Until Warranty Expires. Service Kits And Consumables To Be Included For One Year Use. Supplier Must Deliver And Install The Unit Without Cost To The Owner Training Of End-users And Biomed Engineer Must Be Done On-site With Minimum Of 1 Day Period. Training / Installation / Utilization Pre- Installation Supplier To Perform Installation, Safety And Operation Checks Before Handover. Requirement For Commissioning Local Clinical Staff To Affirm Completion Of Installation, Calibration Certificate And Warranty Certificate Training Of Users Training Of Users And Biomed Engineer & Staff In Operation And Basic Maintenance Shall Be Provided User Care To Demonstrate The Proper Cleaning And Disinfection With Provision Of Printed Cards Or Tags Beside The Unit. Safety And Standards Certified In At Least One Of The Following: Iso 13485:2003 Medical Devices -- Quality Management Systems -- Requirements For Regulatory Purposes (australia, Canada And Eu) Iso 14971:2007 Medical Devices -- Application Of Risk Management To Medical Devices Iec 60601-1:2012 Medical Electrical Equipment - Part 1: General Requirements For Basic Safety And Essential Performance Iec 60601-1-1:2000 Medical Electrical Equipment - Part 1-1: General Requirements For Safety - Collateral Standard: Safety Requirements For Medical Electrical Systems Iec 60601-1-2:2007 Medical Electrical Equipment - Part 1-2: General Requirements For Basic Safety And Essential Performance - Collateral Standard: Electromagnetic Compatibility - Requirements And Tests Iec 60601-2-37:2007 Medical Electrical Equipment - Part 2-37: Particular Requirements For The Basic Safety And Essential Performance Of Ultrasonic Medical Diagnostic And Monitoring Equipment Iec 61391-1:2006 Ultrasonics - Pulse-echo Scanners - Part 1: Techniques For Calibrating Spatial Measurement Systems And Measurement Of System Point-spread Function Response Iec 61391-2:2010 Ultrasonics - Pulse-echo Scanners - Part 2: Measurement Of Maximum Depth Of Penetration And Local Dynamic Range Iec 62359 :2010 Ultrasonics - Field Characterization - Test Methods For The Determination Of Thermal And Mechanical Indices Related To Medical Diagnostic Ultrasonic Fields Warranty And Maintenance 5 Years Warranty Documentation Requirements User, Technical And Maintenance Manuals To Be Supplied In English Language. Service Manual In English. List To Be Provided Of Important Spares And Accessories, With Their Part Numbers And Cost. Certificate Of Calibration, Warranty And Inspection To Be Provided. Delivery Period 45calendar Days From Receipt Of The Notice To Proceed Mode Of Payment Upon Full Delivery, Installed, Tested And Commissioned Post-qualification Must Be Willing To Send Demo Unit To Caraga Regional Hospital. Supplier To Provide Actual Prototype/demo-unit During The Conduct Of Post Qualification- Same Brand & Model Of Offered Bid, No Alteration Of Actual Submitted Brochure Technical Specification Sheets. Failure To Comply With The Preferred Schedule Of The Procuring Entity For The Post Qualification Can Be A Ground For Disqualification. (no Extensions Allowed.) Service Center Must Have Service Center Within Caraga Region, Cebu City, Cdo Or Davao City. Other Terms And Condition Of Acceptability: Supplier Must Comply With The Following Conditions: 1. Must Be The Authorized Distributor Of The Principal Company Of The Equipment And The Necessary Consumables In The Philippines 2. Submit Certificate Of Training Of The Company Engineer /technical Personnel And Product Specialist Issued By The Principal Or Manufacturer 3. Provide Company Response Within 24-48hrs In Case Technical Problems Or Equipment Breakdown 4. Must Submit Notarized Certificate Of Availability Of Spare Parts For The Next 5years 5. Supplier Must Have An Actual Installation Of The Offered Brand And Model 6. Provision On-site Training For End-user & Maintenance Personnel On Basic Preventive Maintenance And Proper Operation Of The Unit. 5 Cast Cutter, Orthopedic, Electric, Medical Grade Description Orthopedic Electric Cast Cutter Is A Medical Grade Cutter Designed For Light Weight, Low Noise, And Low Vibration System. It's Ergonomic Design Allows For Extended Use Offering Reduction In Heat And Hand Fatigue. It Offers Increased Maneuverability Due To Their Decreased Grip Size And Lack Of Obtrusive Cabling. The Facility Requires An Integrated Vacuum System With Reference Standard In Medical Grade Cast Removal Systems. Purpose Of Use Ambulatory Surgery Unit Technical Features · Mechanical Elements Mounted On Rubber Bushings Help Minimize Noise And Vibration · Scaled Components Reduce Handset Weight · No Tools Required Enabling Quick Blade And Accessory Changes · 100 Vac Low Voltage At The Handset · With Integrated Vacuum System And Additional Cutter Blades For Replacements Placed In A Sturdy Case Or Box Technical Vacuum Specification · Vacuum Power: Adjustable From 300-1000 Watts · Vacuum Noise Level: 60-70 Db · Suction: 5.21 In Hg; 84 Cfm · Vacuum Hose Length: Not Less Than 10 Inches · Vacuum Tank Capacity: 5 Gallons · Vacuum/acc. Weight: Not More Than 40 Lbs. · Handset Weight: Not More Than 1.70 Lbs. Technical Saw Specification Standard Speed Supply Frequency: 50-60hz, 120w Power Supply Input 220v / 230v,ac Only Physical / Chemical Characteristics Secured Against Fluid Ingress Machine Cover Should Be Openable For Repair And Maintenance Oil-free Pump Operation Preferred Environmental Factors - Capable Of Being Stored Continuously In Ambient Temperature Of 0 To 50 Deg Celsius And Relative Humidity Of 15 To 100%. - Capable Of Operating Continuously In Ambient Temperature Of 10 To 40 Deg Celsius And Relative Humidity Of 15 To 100%. Accessories, Consumables, Spare Parts, Other Components 12 Pcs 50mm Dia. Titanium Cast Saw Blade 12 Pcs 44mm Dia. Titanium Cast Saw Blade 12 Pcs 64mm Dia. Titanium Cast Saw Blade 2 Pcs Extraction Hood 12 Pcs Dust Bag Preferably Autoclavable 2 Pcs Cast Saw Wall Bracket Orthopedic Cast Cutter Blades, Compatible With Electric Orthopedic Cast Cutter, Tungsten Carbide Coated Heavy Duty Technical Services System Warranty Must Be Five (5) Years Service Call Within 24 Hours Maximum. Preventive Maintenance For Every Quarter Until Warranty Expires. Service Kits And Consumables To Be Included For One Year Use. Supplier Must Deliver And Install The Unit Without Cost To The Owner Training Of End-users And Biomed Engineer Must Be Done On-site With Minimum Of 1 Day Period. Training / Installation / Utilization Pre- Installation Supplier To Perform Installation, Safety And Operation Checks Before Handover. Requirement For Commissioning Local Clinical Staff To Affirm Completion Of Installation, Calibration Certificate And Warranty Certificate Training Of Users Training Of Users And Biomed Engineer & Staff In Operation And Basic Maintenance Shall Be Provided User Care To Demonstrate The Proper Cleaning And Disinfection With Provision Of Printed Cards Or Tags Beside The Unit. Safety And Standards Iso 13485, Fda, Ce. Iso 13485:2003 Medical Devices -- Quality Management Systems -- Requirements For Regulatory Purposes (australia, Canada And Eu) Iso 14971:2007 Medical Devices -- Application Of Risk Management To Medical Devices Iec 60601-1:2012 Medical Electrical Equipment - Part 1: General Requirements For Basic Safety And Essential Performance Iec 60601-1-1:2000 Medical Electrical Equipment - Part 1-1: General Requirements For Safety - Collateral Standard: Safety Requirements For Medical Electrical Systems Warranty And Maintenance 5 Years Warranty Documentation Requirements User, Technical And Maintenance Manuals To Be Supplied In English Language. Service Manual In English. List To Be Provided Of Important Spares And Accessories, With Their Part Numbers And Cost. Certificate Of Calibration, Warranty And Inspection To Be Provided. Delivery Period 45calendar Days From Receipt Of The Notice To Proceed Mode Of Payment Upon Full Delivery, Installed, Tested And Commissioned Post-qualification Must Be Willing To Send Demo Unit To Caraga Regional Hospital. Supplier To Provide Actual Prototype/demo-unit During The Conduct Of Post Qualification- Same Brand & Model Of Offered Bid, No Alteration Of Actual Submitted Brochure Technical Specification Sheets. Failure To Comply With The Preferred Schedule Of The Procuring Entity For The Post Qualification Can Be A Ground For Disqualification. (no Extensions Allowed.) Service Center Must Have Service Center Within Caraga Region, Cebu City, Cdo Or Davao City. Other Terms And Condition Of Acceptability: Supplier Must Comply With The Following Conditions: 1. Must Be The Authorized Distributor Of The Principal Company Of The Equipment And The Necessary Consumables In The Philippines 2. Submit Certificate Of Training Of The Company Engineer /technical Personnel And Product Specialist Issued By The Principal Or Manufacturer 3. Provide Company Response Within 24-48hrs In Case Technical Problems Or Equipment Breakdown 4. Must Submit Notarized Certificate Of Availability Of Spare Parts For The Next 5years 5. Supplier Must Have An Actual Installation Of The Offered Brand And Model 6. Provision On-site Training For End-user & Maintenance Personnel On Basic Preventive Maintenance And Proper Operation Of The Unit. 6. Instrument Back Table With Pedal Operated Wheels And Hydraulic Height Adjustment Description Instrument Back Table Are Portable Instrument Stands With A Tray On Top Used To Hold Surgical Instruments And Materials During Operating Room And In-office Procedures. Instrument Back Table Provide A Convenient Location Which Can Be Sterilized And Positioned Close To Surgical Sites Without Getting In The Way. Must Have Hydraulic System Adjustable Height Via Foot Pedal And Manual Override System For Easy Maneuvering And Adjustment While Keeping Sterility On Site. Purpose Of Use Clinical Department/ward Ambulatory Surgery Unit Technical Characteristics Recommended Uses For Product: indoor Wheel Type: nylon Caster Wheels Item Weight: Not More Than 7.4 Pounds Number Of Wheels: 4 Pcs With 2 Inch Swivel Caster Wheels With Brake System Caster Type: swivel Weight Limit: Not More Than 25 Pounds Frame Material: stainless Steel (304-grade) Or Rust Proof Metal Alloy Special Feature: Hydraulic Adjustable Height W/ Foot Pedal, With Manual Override System Changeable Design Tray: Detachable Tray Tray Size: 650-750mm X 530-550mm X 20-30mm (lwh) Training, Installation And Utilization Pre-installation Requirements Supplier To Perform Installation, Safety And Operation Checks Before Handover. Requirements For Commissioning Local Clinical Staff To Affirm Completion Of Installation Training Of User/s Training Of Users And Biomed Staff In Operation And Basic Maintenance Shall Be Provided User Care To Demonstrate The Proper Cleaning And Disinfection. Warranty And Maintenance Warranty 5 Year Warranty Documentation Documentation Requirements • User, Technical And Maintenance Manuals To Be Supplied In English Language. (hard And Soft Copy) • Provide Warranty Certificate Upon Delivery/installation. • List To Be Provided Of Important Spares And Accessories, With Their Brand Names, Part Numbers, Serial Numbers And Cost. Warranty Certificate And Inspection To Be Provided. Delivery Period 45 Calendar Days From Receipt Of The Notice To Proceed Terms Of Payment Upon Full Delivery, Installed, Tested And Commissioned Service Center Must Have Service Center Within Caraga Region, Cebu City, Cdo Or Davao City. Post Qualification Must Be Willing To Send Demo Unit To Caraga Regional Hospital And/or Site Visit To Nearest Hospital. Failure To Comply With The Preferred Schedule Of The Procuring Entity For The Post Qualification Can Be A Ground For Disqualification. (no Extensions Allowed.) Additional Terms Of Reference Supplier Must Comply With The Following Conditions: 1. Must Be The Authorized Distributor Of The Principal Company Of The Equipment And The Necessary Consumables In The Philippines 2. Submit Certificate Of Training Of The Company Engineer /technical Personnel And Product Specialist Issued By The Principal Or Manufacturer 3. Provide Company Response Within 24-48hrs In Case Technical Problems Or Equipment Breakdown 4. Must Submit Notarized Certificate Of Availability Of Spare Parts For The Next 5years 5. Supplier Must Have An Actual Installation Of The Offered Brand And Model 6. Provision On-site Training For End-user & Maintenance Personnel On Basic Preventive Maintenance And Proper Operation Of The Unit. Technical Specification And Other Terms Of Reference Are Hereby Posted In Philgeps And Form An Integral Part Of This Invitation To Bid. 2. The Crh Now Invites Bids For The Procurement Of The Above-captioned Project. Delivery Of The Goods Is Required Within The Period Specified Under Section Vi (schedule Of Requirements). Bidders Should Have Completed, Within Five (5) Years From The Date Of Submission And Receipt Of Bids, A Contract Similar To The Project. Section 23.4.1.3. (ra 9184) The Bidder Must Have Completed A Single Contract That Is Similar To This Project, Equivalent To At Least Fifty Percent (50%) Of The Abc. Slcc Must Be Within 5 Years From The Submission Of Bids. (based On The Completion Date). Slcc Shall Be The Same Or Similar In Nature. Similar In Nature Means, The Bidder Shall Have An Slcc Of Any Medical Equipment. For Procurement Where The Procuring Entity Has Determined, After The Conduct Of Market Research, That Imposition Of Either (a) Or (b) Will Likely Result To Failure Of Bidding Or Monopoly That Will Defeat The Purpose Of Public Bidding: The Bidder Should Comply With The Following Requirements: A. Completed At Least Two (2) Similar Contracts, The Aggregate Amount Of Which Should Be Equivalent To At Least Fifty Percent (50%) In The Case Of Non-expendable Supplies And Services Or Twenty-five Percent (25%) In The Case Of Expendable Supplies] Of The Abc For This Project; And B. The Largest Of These Similar Contracts Must Be Equivalent To At Least Half Of The Percentage Of The Abc As Required Above. 3. Bidding Will Be Conducted Through Open Competitive Bidding Procedures Using A Nondiscretionary “pass/fail” Criterion As Specified In The 2016 Revised Implementing Rules And Regulations (irr) Of Republic Act (ra) 9184, Otherwise Known As The “government Procurement Reform Act”. Bidding Is Restricted To Filipino Citizens/sole Proprietorships, Partnerships, Or Organizations With At Least Sixty Percent (60%) Interest Or Outstanding Capital Stock Belonging To Citizens Of The Philippines, And To Citizens Or Organizations Of A Country The Laws Or Regulations Of Which Grant Similar Rights Or Privileges To Filipino Citizens, Pursuant To Ra 5183. 4. Interested Bidders May Obtain Further Information From The Bids And Awards Committee (bac) Secretariat, At Procurement Section, Caraga Regional Hospital, Surigao City And Inspect The Bidding Documents At The Address Given Above During 8:00 Am – 5:00 Pm, Monday To Friday. 5. A Complete Set Of Bidding Documents May Be Acquired By Interested Bidders On November 06, 2024 – November 28, 2024 On Or Before 10:00 A.m. From The Address Above And Upon Payment Of The Applicable Fee For The Bidding Documents, Pursuant To The Latest Guidelines Issued By The Gppb, In The Amount Specified Below: Bidding Schedule Pre-bidding Conference November 14, 2024 At 9:00 O’clock In The Morning Via Zoom Platform Link: Join Zoom Meeting Https://us06web.zoom.us/j/82360165920?pwd=ndy4dclziqayocu32blkxtgzqgw5jv.1 Meeting Id: 823 6016 5920 Passcode: 869461 Deadline Of Submission Of Bids November 28, 2024 At 10:00 A.m... Via Online And Submit Your Bidding Documents To This Email Address: Crhbac2020@gmail.com . Opening Of Bids November 28, 2024 At 2:00 P.m. Via Zoom Platform. Link: Join Zoom Meeting Https://us06web.zoom.us/j/87622574433?pwd=agknjohbmjpuh0jn6aikabgsgwbtt1.1 Meeting Id: 876 2257 4433 Passcode: 571792 Complete Philippine Bidding Documents Please Click The Link Below For The Complete Pbd: Https://drive.google.com/drive/folders/1ezfcujc3htid9l92crbxxz4ahjch-7gc?usp=sharing Payment Of Bidding Documents Php 5,000.00 It May Also Be Downloaded Free Of Charge From The Website Of The Philippine Government Electronic Procurement System (philgeps) And The Website Of The Procuring Entity, Provided That Bidders Shall Pay The Applicable Fee For The Bidding Documents Not Later Than The Submission Of Their Bids. The Following Philippine Bidding Documents Can Be Accessed In The Philgeps, To Wit: A. Technical Specification / Terms Of Reference/ List Of Items B. Instruction To Bidders: B.1. Documents To Be Submitted (checklist- This Will Be Discussed During The Pre-bid Conference) B.2. Memorandum Of Undertaking – Provision Thereof Is Strictly Implemented C. Guidelines On The Conduct Of The Electronic Submission And Receipt Of Bids By The Procuring Entity – Caraga Regional Hospital (crh) D. Philippine Bidding Documents 6. The Crh Will Hold A Pre-bid Conference On The Above-mentioned Date, Time And Venue, Which Shall Be Opened To Prospective Bidders. The Pre-bidding Conference And Opening Of Bids Shall Be Conducted Through Videoconferencing, Webinar Or Virtual. Please Send Your Intent To Participate To Our Email Address As Provided Below. 7. Bids Must Be Duly Received By The Bac Secretariat At Via Designated Email On Or Before November 28, 2024 At 10:00 O’clock In The Morning. All Bids Must Be Accompanied By A Bid Security In Any Of The Acceptable Forms And In The Amount Stated In Itb Clause 18. Bid Opening Shall Be On November 28, 2024 At 2:00 O’clock In The Afternoon At The Bac Conference Room, Beside Procurement Office, Caraga Regional Hospital, Rizal Street, Surigao City As Virtual / Electronic Bidding. Bids Will Be Opened In The Presence Of The Bidders’ Representatives Who Choose To Attend At The Address Above. Late Bids Shall Not Be Accepted. 8. Furthermore, The Standard Philippine Bidding Document (pbd) Is Form And Part Of This Invitation In Accordance To Ra 9184 And Other Applicable Laws, Rules And Policy. 9. The Crh Reserves The Right To Reject Any And All Bids, Declare A Failure Of Bidding, Or Not Award The Contract At Any Time Prior To Contract Award In Accordance With Section 41 Of Ra 9184 And Its Irr, Without Thereby Incurring Any Liability To The Affected Bidder Or Bidders. 10. The Opening And Receipt Of Bids Is Strictly Implemented Through Electronic Submission. Given The Covid-19 Pandemic, Procurement Activity Has Been Expedient And One Of This Is The Conduct Of Electronic Submission Of Bids. The Crh Thru The Bids And Awards Committee (bac) Has Submitted Certification, Certified By The Highest Official Managing The Information Technology, Describing The Electronic System Or Procedure To Be Used By The Crh For The Electronic Submission And Receipts Of Bids And A Statement That The Same Is Compliant With The Gppb Resolution No. 12-2020 Requirements. 11. Bidding Documents Shall Be Emailed To This Email Address, With Activated Password To: Crhbac2020@gmail.com. You May Deposit On Line For The Payment Of The Bidding Documents To This Account Below: Bank Name: Land Bank Of The Philippines Account Name: Caraga Regional Hospital-trust Fund Account Number: 0982 -1288 – 70 12. Furthermore Deposit Slip Shall Be Submitted Via Email To: Crhprocurement.bac@gmail.com. 13. The Procuring Entity Will No Longer Accept Nor Entertain Any Form Of Bids Submission Except Electronic. Failure To Comply Electronic Submission Will Be Immediately Disqualified. Guideline On The Electronic Submission Is Hereby Attached. 14. Please Fill Up The Caraga Regional Hospital Supplier’s Registry To This Link: Https://bit.ly/crh_suppliersregistry 15. For Further Information, Please Inquire To: Bac Secretariat Caraga Regional Hospital. Rizal Street, Surigao City Tel. Nos. (086) 826-1575 Local 194 (086) 826-9058 Mobile Nos: Globe: 0953-9212-832 / Smart: 0985-0508-783 E-mail Address: Crhprocurement.bac@gmail.com Fb Page: Caraga Regional Hospital – Bids And Awards Committee Approved By: (sgd) Atty. Ma. Flordelin T. Ensomo, Cpa Attorney Iv Chairman, Bids And Awards Committee
9511-9520 of 9707 archived Tenders