Transportation Tenders

Transportation Tenders

Public Service Delivery Tender

Electrical Goods and Equipments...+2Machinery and Tools, Electrical and Electronics
Canada
Details: Manitoba Reference Number: Mb-mbpb-03s-00048 Issuing Department: Procurement And Supply Chain Date Issued: 11/12/2024 Issued By: Gom Psc Telephone: 204 945-6361 This Request For Quotation (solicitation) Is An Invitation By The Government Of Manitoba (manitoba), As Represented By The Minister Of Public Service Delivery, To Prospective Vendors To Submit Bid Submissions For The Supply And Delivery Of Water Chiller For The Department Of Agriculture. For The Purposes Of This Procurement Process, The Solicitation Contact Will Be: Subject Title: Rfq# 30078 - Supply & Delivery Of Water Chiller Contact Email: Bids@gov.mb.ca Contact Name: Marc Go Vendors And Their Representatives Are Not Permitted To Contact Any Employees, Officers, Agents, Elected Or Appointed Officials, Or Other Representatives Of Manitoba, Other Than The Solicitation Contact, Concerning Matters Regarding This Solicitation. Failure To Adhere To This Rule May Result In The Disqualification Of The Vendor And The Rejection Of The Vendor's Submission. Inquiry Submission Deadline: December 27, 2024 _________________________________________________________________________ Item Qty Description Delivery No. Date ======================================================== Item 10 31/03/2025 1.00 Each Gsin: N6600material: 99181030 Industrial Laboratory Equipment As Described Below: Water Chiller, Stainless Steel Specifications: ·,,10hp - Nqa1004e - 230v ·,,set Point Range: 6° To 26.6°c ·,,temperature Stability: ±0.6°c ·,,power Requirements: 230v, 3 Phase, 60hz, 37.7 A ·,,reservoir Capacity(gallons/liters): 22 Gallons / 83 Liters With Low Liquid Level Alarm ·,,overall Dimensions(l X W X H): 75" X 35" X 61"(190.5cm X 89cm X 155 Cm) ·,,pump Type: 3hp Stainless Steel Pump ·,,maximum Pump Pressure: 30 Psi ·,,refrigerant Type: R410a ·,,process Connections: 1.5" Stainless Steel Tri-clamp Fittings ·,,csa Approved ·,,includes: Operational Training For 4 People Indicate: Manufacturers Name_________________________________________ Brand Name________________________________________________ Product / Style Number _______________________________________ Vendor's Catalogue/reference Number (if Applicable) ________________ Quantity Clarification: Quantity Listed Contains 2 Or 3 Decimals. ======================================================== Mandatory Submission Requirement: The Bid Must Be Signed By A Representative Of The Vendor With The Authority To Bind The Vendor. The Name And Title Of The Representative Signing The Bid Should Also Be Printed Below Their Signature. Vendor's E-mail Address: _______________________________________ Your Quotation Reference # (if Applicable) _____________________ Evaluation And Award : A. Pricing The Submitted Pricing Of Each Qualified Bid Submission Will Be Evaluated In Accordance With The Price Evaluation Method Which Is Generally The Lowest Overall Price Or Stipulated Lump Sum. In The Event That A Vendor's Pricing Appears To Be Abnormally Low In Relation To The Deliverables, Manitoba May Require The Vendor To Provide A Detailed Explanation Of The Pricing Information To Account For The Low Level Of Price And Confirm That All Requirements In Respect Of The Deliverables Have Been Taken Into Account. If The Vendor Is Unable To Satisfactorily Account For The Abnormally Low Pricing, Manitoba May Reject The Submission. Manitoba May Also Reject Any Submission That Contains Unbalanced Pricing. Pricing May Be Considered Unbalanced Where Nominal Or Significantly Understated Prices Are Proposed For Some Elements Of The Deliverables And Inflated Prices Are Proposed For Other Elements Of The Deliverables. Unbalanced Pricing Includes, But Is Not Limited To, #front-loaded# Pricing Which Contains Inflated Pricing For Deliverables To Be Provided Or Completed At The Beginning Of The Contract, Offset By Understated Pricing For Deliverables To Be Provided Or Completed Later In The Contract. B. Selection Compliant Vendors Will Be Ranked Based On The Price Evaluation. Subject To The Process Rules Contained In The Terms And Conditions Of The Solicitation Process, The Top-ranked Vendor Will Be Invited To Enter Into The Contract In Accordance With The Terms And Condition Of This Solicitation. In The Event Of A Tie, The Selected Vendor Will Be Determined By Way Of Coin Toss. The Selected Vendor Will Be Notified In Writing And Will Be Expected To Satisfy Any Applicable Conditions Of This Solicitation, Including The Pre-conditions Of Award Listed Below, And Enter Into The Contract Within The Timeframe Specified In The Selection Notice. Failure To Do So May Result In The Disqualification Of The Vendor And The Selection Of Another Vendor Or The Cancellation Of The Solicitation. C. Pre-conditions Of Award The Following Documents Will Be Required From The Top-ranked Vendor(s) As A Condition Of Award: Signed Bid Submission. Terms And Conditions: A. Solicitation Process: Manitoba General Terms And Conditions Are Incorporated By Reference Into This Solicitation And Shall Apply To The Solicitation. The Manitoba General Terms And Conditions Are Available And Can Be Accessed At The Following Link: Https://www.gov.mb.ca/central/psc/pubs/form/mb_terms_conditions.pdf B. Contract Award Process: The Purchase Order (po) To Be Issued To The Top-ranked Vendor(s) Is Subject To The Manitoba Purchase Order Terms And Conditions To Be Accessed At The Following Link: Https://www.gov.mb.ca/central/psc/pubs/form/manitoba_po_terms_condi Tions.pdf Deliverables: A. Product Offered: The Product Offered Must Meet The Specified Requirements And Expectations For Its Intended Use. If It Is The Vendor's Intention To Offer An Item Which Does Not Meet All The Specification Or Description As Outlined, Then Vendor Must Indicate All Intended Deviations Or Changes On The Return Quote. B. Delivery: F.o.b. Destination, Freight Prepaid To: Manitoba Agriculture Value Added Branch 810 Phillips St., Portage La Prairie Mb R1n 4a4 Canada Is Vendor Able To Meet The Requested Delivery Date Of March 31, 2025 Or Earlier? Yes____ Or No ____ If No, Indicate A Realistic Delivery As Follows: Delivery In ___ Working Days Or ___weeks From Receipt Of The Purchase Order. C. Quality: Any Product Supplied Must Be New, Unused, First Quality, And As Specified On The Contract/purchase Order. Demo Units Will Not Be Accepted. Any Substitutes Shipped Without Prior Written Approval Will Be Rejected At Time Of Delivery Or Held At Shipper's Risk Pending Return Instructions. D. Inspection And Acceptance: All Goods Delivered Are Subject To Inspection Prior To Delivery Acceptance. Signing Of Any Delivery Slip Should Not Be Construed As Acceptance Of The Product Delivered. Manitoba Reserves The Right To Reject Any Product, After Final Inspection That Does Not Meet The Specification Or Product Description Requested. Manitoba Reserves The Right To Reject Any Product Supplied Which, Upon Inspection Or Use, Is Deemed By The Using Department To Be Unacceptable For Their Intended Use. Products Rejected By The Using Department Will Be Returned To The Vendor For Full Credit Or Replacement At No Cost To Manitoba Or The Contract May Be Cancelled. Final Inspection And Acceptance Or Rejection Of The Goods Will Be Made Promptly As Practicable, But Failure To Inspect And Accept Or Reject Goods Promptly Does Not Mean That The Manitoba Government Has Accepted These Goods. The Government Of Manitoba Reserves The Right To Inspect The Goods For Up To 90 Days After The Date Of Delivery. Partial Acceptance Or Rejection Of An Order Does Not Release The Vendor From Its Responsibility To Complete The Order. E. Warranty: 1. Manufacturer's Warranty: State Warranty Of Units Offered (as Applicable To Manitoba's Use - Would Usually Be Considered Commercial Application Not Consumer). Product _________ Months Or _______ Years Labour _________ Months Or _______ Years Note: During The Period Of The Warranty Offered, All Labour, Transportation, Parts, Surcharges Including Shipping And Brokerage Will Be Included. Manitoba Will Not Pay Additional Charges While The Item(s) Offered Are Under The Above-stated Warranty. If The Warranty Offered Is The Vendor's Warranty In Combination With Or In Place Of The Manufacturer's Warranty, Then, An Explanation Must Be Provided. 2. Warranty Service/location: Potential Costs Associated With The Location Of Warranty Service Might Be Used In The Evaluation Of This Quote. Is Warranty Service Provided On-site At Our Premises? Yes____ Or No ____ If No, Indicate The Location The Unit Must Be Sent To For Manufacturer's Certified And/or Approved Warranty Service, Closest To The Point Of Delivery, For This Tender<(>,<)> Company Name _______________________________________________ Location (city & Province) _________________________________ Do You Have A Toll-free Phone Number For Warranty Service? Yes____ Or No ____ If Yes, Specify:______________________________________________ 3. After Warranty Service: Is After Warranty Service Provider The Same As Above? Yes____ Or No ____ If No, Indicate The Warranty Service Provider Below. Company Name _______________________________________________ Location (city & Province) _________________________________ 4. Non-warranty For Parts And Service: Provide Details As Follows For The Item(s) Offered (for Occasional Non-warranty Service And Parts Purchases). Current Labour Rate For In-shop Service: $_________ Per Hour Parts And Accessories Charged At: ________ % Discount From ___________ Prices (indicate Msrp, Wholesale, Etc.) F. Contract Term: The Term Of The Contract Will Be In Effect Upon Receipt Of The Purchase Order Until The Completion Of The Deliverables. G. Payment Terms: Manitoba's Standard Payment Term Is Net Thirty (30) Days. If Vendor Has A Different Standard Invoice Payment Term, Specify: ____________________________________________________________ H. Manitoba's Retail Sales Tax License: Are You Licensed By Manitoba Finance To Collect And Remit Manitoba's Retail Sales Tax? Yes____ Or No ____ If No, Disregard The Following Paragraph. Manitoba's Retail Sales Tax: Is The Product(s) Offered Subject To Manitoba's Retail Sales Tax? Yes____ Or No ____ If The Quote Consists Of Both Taxable (t) And Non-taxable (nt) Items, Indicate T Or Nt Opposite Each Item Offered. I. Accounts Receivable Address: For Manitoba's Accounts Payable System Requirement, Is The Vendor's Invoice Address The Same As The Address For Both Orders/quotes And Account Receivable? Yes____ Or No ____ If No, Provide Complete Account Receivable Details, I.e. Box #, Building #, Street, City, Province, Postal Code, Etc. _______________________________________________________________ Proposed Delivery Address: Manitoba Agriculture Value Added Branch 810 Phillips St., Portage La Prairie Mb R1n 4a4 Canada Tenders To Be Returned To: Www.merx.com Submissions Must Be Submitted Electronically Through Merx. It Is The Electronic Tendering System Used By Manitoba (the E-procurement System).
Closing Date10 Jan 2025
Tender AmountRefer Documents 

National Institutes Of Health Tender

Others
United States
Details: This Notice Is A Combined Synopsis/solicitation For Commercial Items Using Simplified Acquisition Procedures. This Acquisition Will Be Made In Accordance With The Format In Federal Acquisition Regulation (far) Subpart 12.6 “streamlined Procedures For Evaluation And Solicitation For Commercial Items,” As Applicable, And As Supplemented With Additional Information Included In This Notice. This Announcement Constitutes The Only Solicitation (a Written Solicitation Will Not Be Issued) And Quotes Are Being Requested. The Solicitation Number Is Rfq-niaid-25-2243922 And The Solicitation Is Issued As A Request For Quotes (rfq). this Acquisition Will Be Awarded In Accordance With Far Part 13 Simplified Acquisition Procedures (sap). The Solicitation Documents And Incorporated Provisions And Clauses Are Those In Effect Through Federal Acquisition Circular (fac) 2024-07, 09/30/2024. the North American Industry Classification System (naics) Code For This Procurement Is 811210, Other Electronic And Precision Equipment Repair And Maintenance, With A Small Business Size Standard Of $34 Million. The Requirement Is Being Competed Full And Open Competition, Un-restricted And Without A Small Business Set-aside. the National Institute Of Allergy And Infectious Diseases (niaid) Has A Requirement For Laundry Services, Period Of Performance 2/1/2025 – 1/31/2026. the Services Requested Shall Be Quoted With Consideration To Including All Labor, Management, Supervision, Materials, Equipment, And Transportation Necessary To Provide Commercial Laundry Services As A Firm Fixed Price. Commercial Services Shall Include Bio-safety Laboratory Levels 1 And 2. The General Description Of Laundry Requested Includes, Animal Unit, And Shop Personnel Clothing And Other Items Utilized At The National Institutes Of Health (nih), National Institutes Of Allergy And Infectious Diseases (niaid) Located At The Nih, Niaid Rocky Mountain Laboratories (rml) 903 South 4th Street, Hamilton, Montana. 1. The Contractor Shall:provide Commercial Laundering Services That Utilize Controlled And Monitored Chemical Dispensing Systems. Washing Equipment Shall Be Of The Programmable Type To Allow For Commercial Formulas To Be Set According To Type Of Garment And Fabric Being Laundered. Formulas And Chemical Injection Systems Shall Be Checked And Calibrated Monthly, With Records Kept Showing Accuracy Of Each System. All Laundering Services Shall Be In Accordance With Standard Industry Practices, To Include Washing And Pressing Of Laboratory Coats, Uniform Tops And Bottoms, And Washing Of Coveralls, Sweatshirts, Dust Mops, Laundry Bags, And Hand And Bath Towels Etc. 2. All Dirty Laundry Items Are Normally Autoclaved In Laundry Bags At Building 13 And Are Stored There Prior To Pick-up. Each Laundry Bag Is Tagged With The Name And/or Building From Which They Came From. After Laundry Services Are Completed, All Laundered Items Are To Be Returned To Their Designated Area In Sealed Bundles And Tagged With The Name And/or Building For Which They Are Designated For, Except Laboratory Coats And Uniforms Which Shall Be Pressed And Returned On Hangers. Laundered Items Shall Be Delivered At The Following Three Designated Areas: Building 13, Building 25, Building 28, And Building Hd2. The Contractor Shall Be Liable For The Return Of The Number And Kind Of Articles Furnished For Laundering. note: Because Of The On-going Building Renovations At Rocky Mountain Laboratories, Building Locations For Pick-up And Delivery Of Laundered Items Are Subject To Change. The Contractor Shall Be Notified In Advance Prior To Any Changes. 3. The Contractor Shall Also Provide Various Colors And Sizes Of Nitrile Rubber Matting Rugs For All Entry Areas Of The Following Buildings On The Rocky Mountain Laboratories Campus: 1, 3, 5, 6, A, 12, 13, 13b, 22, 28, 29, 30, 31, And 32. Rugs Shall Not Be Vinyl Rubber Matting. Rugs Shall Be Changed On A Bi-weekly Basis. Colors Shall Be Approved By The Government Project Officer. 4. The Contractor Shall Be Liable For The Return Of The Number And Kind Of Articles Furnished For Laundering. Upon Completion Of Each Commercial Laundering, The Contractor Shall Provide A Listing Of All Items Laundered And The Quantities Of Each Item To Shipping/receiving, Building 29. 5. Pick-up Of Soiled Items And Delivery Of Clean Items Shall Be Provided Once Per Week (friday To Friday) During Normal Working Hours (deliveries Scheduled On A Federal Holiday Should Be Made On The Adjoining Workday). Normal Hours Of Operation For Rml Are 8:00 A.m. To 4:00 P.m., Monday Through Friday. Rml Is Secure And A Gated Government Campus. Contractor Must Dedicate One Person For Deliveries As The Delivery Driver Is Required To Give Fingerprints, Submit To And Pass A Background Check, And Obtain A Security Badge To Enter Campus To Do Deliveries. Technical Evaluation Criteria ability To Meet The Technical Requirements past Performance price Inspection And Acceptance all Work Under This Contract Is Subject To Inspection And Final Acceptance By The Project Officer Or A Designated Authorized Representative Of The Government. Inspection And Acceptance Will Be Performed At The Rocky Mountain Laboratories, National Institutes Of Health In Hamilton, Montana On All Services. in Accordance With The Attached Invoice And Payment Provisions, Payment Shall Be Made Monthly Upon Completion Of Services For That Period, Pending Satisfactory Inspection And Acceptance. rml Is A Secure Government Campus. The Individuals Delivering And Picking Up Laundry Items Will Be Required To Complete A Background Investigation And Fingerprint Records Check To Receive A Id Badge For Access. estimated Laundry Types And Quantities (one 12-month Contract Period) item Quantity (1) Sweatshirts 20 Ea. (2) Laboratory Coats 2000 Ea. (3) Coveralls 6500 Ea. (4) Laundry Bags 3000 Ea. (5) Hand Towels 275 Ea. (6) Bath Towels 15000 Ea. (7) Dust Mops 20 Ea. (8) Uniform Tops 20 Ea. (9) Uniform Bottoms 20 Ea. (10) Rugs 1800 Ea. (11) Scrub Pants 8250 Ea. (12) Scrub Shirts 8250 Ea. (13) T-shirts 100 Ea. (14) Maintenance Uniform Shirts 700 Ea. (15) Maintenance Uniform Pants 700 Ea. (16) Socks 15000 Ea. (17) Sports Bras 600 Ea. (18) Lab Coat Buttons Repaired 250 Ea. place Of Performance: Nih, 903 South 4th Street, Bldg. 22, Hamilton, Mt 59840, United States. Fob: Destination the Government Intends To Award A Firm Fixed Price Purchase Order To The Responsible Contractor As A Result Of This Rfq That Will Include The Terms And Conditions Set Forth Herein. The Award Will Be Based On The Following: Technical Capability To Meet The Requirements And Price. the Following Far Provisions Apply To This Acquisition: far 52.212-1 Instructions To Offerors Commercial Items (sep 2023) far 52.212-3 Offerors Representations And Certifications - Commercial Items (may 2024) far 52.204-7 System For Award Management (nov 2024) (offerors Must Complete Annual Representations And Certifications On-line At Http://www.sam.gov/ In Accordance With Far 52.212-3 Offerors Representations And Certifications- Commercial Items (please Ensure Far 52.209-2 -- Prohibition On Contracting With Inverted Domestic Corporations--representation. (nov 2015) Is Updated In Your Sam Record) far 52.203-18 Prohibition On Contracting With Entities That Require Certain Internal Confidentiality Agreements – Representation (jan 2017) far 52.204–26 Covered Telecommunications Equipment Or Services-representation (oct 2020) *** Must Complete Representation If Attached To This Solicitation- See Attachment 52.204-26 the Following Far Contract Clauses Apply To This Acquisition: far 52.212-4 Contract Terms And Conditions Commercial Items (nov 2023) far 52.212-5 Contract Terms And Conditions Required To Implement Statutes Or Executive Orders Commercial Items (jan 2025) *the Applicable Subparagraphs Of Far52.212-5 Are Included In The Attachment To This Posting. far 52.232-40 Providing Accelerated Payments To Small Business Subcontractors (mar 2023) far 52.204-13 System For Award Management Maintenance (oct 2018) far 52.204-25 Prohibition On Contracting For Certain Telecommunications And Video Surveillance Services Or Equipment (nov 2021) far 52.217-8 Option To Extend Services (nov 1999) far 52.217-9 Option To Extend The Term Of The Contract (mar 2000) hhsar 352.222-70, Contractor Cooperation In Equal Employment Opportunity Investigations (dec 2015) far 52.252-2 -- Clauses Incorporated By Reference. (feb 1998) this Contract Incorporates One Or More Clauses By Reference, With The Same Force And Effect As If They Were Given In Full Text. Upon Request, The Contracting Officer Will Make Their Full Text Available. Also, The Full Text Of A Clause May Be Accessed Electronically At This Address: Http://farsite.hill.af.mil/vffara.htm by Submission Of An Offer, The Offeror Acknowledges The Requirement That A Prospective Awardee Shall Be Registered In The System For Award Management (sam) Database Prior To Award, During Performance, And Through Final Payment Of Any Contract, Basic Agreement, Basic Ordering Agreement, Or Blanket Purchasing Agreement Resulting From This Solicitation (www.sam.gov). copies Of The Above-referenced Provisions And Clauses Are Available From Http://www.acquisition.gov/far/loadmainre.html & Http: //www.hhs.gov/regulation/index.html Or, Upon Request, Either By Telephone Or Fax. submission Shall Be Received Not Later Than January 21, 2025 @ 12:00 Am Est all Quotations And Required Documents Must Be Submitted Via The Niaid Electronic Simplified Acquisition Submission System (esass) Website At Https://esass.nih.gov. All Vendors Must Register In The Esass System To Submit A Quotation. Instructions On How To Register / Submit Quotes Are Included On The Website. Late Submissions Shall Be Treated In Accordance With The Solicitation Provision At Far 52.212-1(f). All Responsible Sources May Submit An Offer That Will Be Considered By This Agency.
Closing Date21 Jan 2025
Tender AmountRefer Documents 

DEPT OF THE ARMY USA Tender

Real Estate Service
United States
Details: Rlp Procurement Summary/solicitation – United States Army Corps Of Engineers the U.s. Government, By And Through United States Army Corps Of Engineers (usace), Seeks To Lease The Following Space: state: Oregon city:bend delineated Area: north: Nw Spruce Ave, Redmond, Or south:murphey Rd, Bend, Or east:ne 9th St, Redmond, Or west:nw Mount Washington Dr, Bend, Or gross Square Feet:3,880 - 4,850 net Square Feet: 3,376 - 4,220 space Type: Retail gov Parking Spaces (total): 13 full Term: 60 Months option Term: None address: U.s. Army Corps Of Engineers, Seattle District, Attn: Cenws-res, 4735 East Marginal Way South, Building 1202, Seattle, Washington 98134-2388 email Address: Cenwsre-rfp@usace.army.mil real Estate Contracting Officer:thomas J. Seymour electronic Offer Submission: offers Must Be Submitted Electronically Via Email Listed Above. Offers Are Due On Or Before: January 31, 2025 any Questions Regarding This Solicitation May Be Directed To Primary Or Secondary Points Of Contact Listed In The “contact Information” Section Of This Notice. the U.s. Government, By And Through Usace, Currently Occupies Retail And Related Space In A Building Under A Lease In The City And State Specified Above. The Government Is Considering Relocation To An Alternative Space If Economically Advantageous. In Making This Determination, The Government Will Consider, Among Other Things, The Availability Of Alternative Space That Potentially Can Satisfy The Government’s Requirements, As Well As Costs Likely To Be Incurred Through Relocating, Such As Physical Move Costs, Replication Of Tenant Improvements And Telecommunication Infrastructure, Non-productive Agency Downtime, And Costs, Including Rent, Related To Vacating The Current Location Prior To Lease Termination. the Government’s Desire Is For A Full-service Lease To Include Base Rent, Cam, Utilities, And Janitorial Services For A Retail Space For An Armed Forces Career Center For A Term Of Five (5) Years With Government Termination Rights And Location Within The Delineated Area Specified Above. Non-exclusive Parking For Government Vehicles Must Be Provided 24 Hours 7 Days. Offered Space Must Meet Government Requirements Per The Terms Of The Government Lease. Interested Respondents May Include Building Owners And Representatives With The Exclusive Right To Represent Buildings Owners. Representatives Of Building Owners Must Include The Exclusivity Granting The Exclusive Right To Represent The Building Owner With Their Response To This Advertisement. additional Requirements: space Must Be Located In A Prime Retail Area With Attractive Surroundings With A Prevalence Of Modern Design And/or Tasteful Rehabilitation In Modern Use. space Shall Be Located In A Professional Retail Setting And Preferably Not Within Close Proximity To Residential Areas, Railroad Tracks, Or Power Transmission Lines. space Should Not Be Located Within The 100-year Flood Plain Or Wetland Unless The Government Has Determined It To Be The Only Practicable Alternative. space Should Not Located Near Establishments Whose Primary Operation Is The Sale Of Alcoholic Beverages, Firearms Sold/discharged, Marijuana Dispensaries, Or Where There Are Tenants Or Invitees Related To Drug Treatment Or Detention Facilities. employee And Visitor Entrances Of The Building Must Be Connected To Public Sidewalks Or Street By Continuous, Accessible Sidewalks. regularly Scheduled Public Transportation (if Provided By Municipality) During The Workday Is Required Within 1,000 Feet. parking Must Be Available Per Local Code And Be Available Within Walkable 4 Blocks From The Building. The Parking-to-square -foot Ratio Available Onsite Shall At Least Meet Current Local Code Requirements. Restricted Or Metered Parking Of One Hour Or Less Within The Four-block Area Of The Space Does Not Meet Parking Requirements. subleases Are Not Acceptable. retail Space Should Be On The Ground Floor. space Configuration Shall Be Conducive To An Efficient Layout. Considerations For An Efficient Layout Include, But Are Not Limited To, The Following: Size And Location Of Interior Fire (support) Walls, Size And Number Of Columns, Column Placement, Bay Depts, Window Size And Placement, Convector Size And Placement, Electrical And Telephone Accessibility, And Angles, Curves, Or Offsets That Will Result In An Inefficient Use Of Space. the Following Space Configurations Will Not Be Considered: Space With Atriums And Other Areas Interrupting Contiguous Space, Extremely Long Or Narrow Runs Of Space (more Than Twice As Long As Wide), Irregularly Shaped Space Configurations Or Other Unusual Building Features Adversely Affective Usage. columns Cannot Exceed Two (2’) Square Feet And Space Between Columns And/or Walls Cannot Be Less Than Twenty (20’) Feet. the Offered Space Must Meet Or Be Capable Of Meeting Government Requirements For Security, Fire Life Safety And Handicapped Accessibility. if Space Offered Is Above Ground Level, There Must Be Elevator Access. the Government Requires A Fully Serviced Lease. All Services, Janitorial Supplies, Utilities, And Tenant Alterations Are To Be Provided As Part Of The Rental Consideration. the Government Will Have Access To The Space 24 Hours A Day, 7 Days A Week. Normal Hours Of Operation Are Monday Through Friday 0800 To 1700 (excluding Weekends And Federal Holidays). additionally, Offerors Must Review The Attached Documents Which Contain Other Government Leasing Requirements: request For Lease Proposals exhibit A – Rental Proposal Worksheet, Usace Recruiting Form 1364 exhibit B – U. S. Government Lease For Real Property exhibit C – General Clauses, Gsa Template 3517b exhibit D – Construction And Security Specifications exhibit E – Construction Specifications Bid Proposal Worksheet exhibit F – Janitorial Specifications exhibit G – Sam Representations And Certifications, Gsa Form 3518 exhibit H – Lessor’s Annual Cost Statement, Gsa Form 1217 exhibit I – Certificate Of Authorization exhibit J – Agency Agreement, Authorization For Property Manager To Act On Behalf Of Owner (where Applicable) to Be Responsive, Your Offer Should Be Based On All The Terms, Conditions, And Responsibilities Expressed Throughout The Rlp And Lease And Be Submitted Electronically. Please Review The Rlp And All Attachments Carefully Paying Particular Attention To The Solicitation Requirements. the Following Forms Must Be Completed, Initialed, And/or Signed And Returned Electronically With Your Initial Offer. (note: There May Be Other Required Forms. Refer To The Enclosed Rlp For Details.) exhibit A – Rental Proposal Worksheet, Usace Recruiting Form 1364 exhibit E – Construction Specifications Bid Proposal Worksheet for Your Proposal For New Builds, Please Ensure That You Obtain At Least Three (3) Bids From Contractors To Complete The Build-out Based On The Construction And Security Specifications. Once You Have Obtained Contractors’ Bids, Please Complete, Sign, And Submit The Attached Rental Proposal Worksheet And Construction Specifications Bid Proposal Worksheet. For Existing Spaces, Please Complete, Sign, And Submit The Attached Rental Proposal Worksheet Only; A Completed Construction Specifications Bid Proposal Worksheet Is Not Required. exhibit G – Sam Representations And Certifications, Gsa Form 3518 (if Offeror Is Not Registered In Sam At The Time Of The Offer Submission) exhibit H – Lessor’s Annual Cost Statement, Gsa Form 1217 evidence Of Ownership (warranty Deed) Or Control Of Building Or Site. please Note That You Are Not Required To Initial And Return The Following Documents At This Time: request For Lease Proposal (rlp) exhibit B – U. S. Government Lease For Real Property exhibit C – General Clauses, Gsa Template 3517b exhibit D – Construction And Security Specifications exhibit F – Janitorial Specifications exhibit I – Certificate Of Authorization exhibit J - Agency Agreement please Review All The Attached Documents Thoroughly To Obtain A Complete Understanding Of The Government’s Requirements. One Item Of Note In The General Clauses, Gsa Form 3517b, Is The Requirement To Register In The System For Award Management (sam) At Www.sam.gov (general Clause 17, Cfr 52.204-7). This Registration Is Mandatory For Any Entity Wishing To Do Business With The Government And Must Be Completed At The Time Of Lease Award. Entities Not Currently Registered In Sam Are Advised To Start The Registration Process As Soon As Possible. after Receipt Of All Proposals, Conclusions Of Any Discussions, And Receipt Of Best And Final Offers, The Government Will Select A Location Based On The Best Value Specified In The Enclosed Rlp. Past Performance, If Applicable, Will Also Be Taken Into Consideration. The Selection Is Expected To Occur Approximately Thirty (30) Days Following The Initial Proposal Response Date Stated Above. A Government Market Survey, Appraisal, Or Value Estimate Will Be Conducted To Determine Fair Market Rental Value. offered Space Must Meet Government Requirements For Fire Safety, Accessibility, Seismic, And Sustainability Standards Per The Terms Of The Lease. Offered Space Shall Not Be In The 1-percent-annual Chance Floodplain (formerly Referred To As “100-year” Floodplain). entities Are Advised To Familiarize Themselves With The Telecommunications Prohibitions Outlined Under Section 889 Of The Fy19 National Defense Authorization Act (ndaa), As Implemented By The Federal Acquisition Regulation (far).). For More Information, Visit: Https://acquisition.gov/far-case-2019-009/889_part_b. funds May Or May Not Be Presently Available For This Effort. No Award Will Be Made Under This Solicitation Until Funds Are Available. The Government Reserves The Right To Cancel This Solicitation, Either Before Or After The Closing Date For Receipt Of Proposals. In The Event The Government Cancels This Solicitation, The Government Has No Obligation To Reimburse Offeror(s) For Any Cost.
Closing Date1 Feb 2025
Tender AmountRefer Documents 

DEPT OF THE NAVY USA Tender

Others
Corrigendum : Closing Date Modified
United States
Details: Item Unique Identification And Valuation (jan 2023)|19|||||||||||||||||||| inspection Of Supplies--fixed-price (aug 1996)|2||| stop-work Order (aug 1989)|1|| wide Area Workflow Payment Instructions (jan 2023)|16|combo Invoice And Receiving||tbd|n00104|tbd|tbd|see Schedule|see Schedule|see Schedule||tbd|||||| navy Use Of Abilityone Support Contractor - Release Of Offeror Information (3-18))|1|wss| equal Opportunity (sep 2016)|2||| small Business Subcontracting Plan (dod Contracts)- Basic (dec 2019)|2||| integrity Of Unit Prices (nov 2021)|1|| small Business Subcontracting Plan (sep 2023)|4||||| safeguarding Sensitive Conventional Arms, Ammunition, And Explosives (nov 2023))|9|||||||||| equal Opportunity For Workers With Disabilities (jun 2020)|2||| transportation Of Supplies By Sea (oct 2024)|2||| critical Safety Item (aug 2011)|4|all Items In The Schedule|||| requirements For Certified Cost Or Pricing Data And Data Other Than Certified Cost Or Pricing Data-modifications (nov 2021))|7|||||||| list Of Solicitation Attachments|5|x|2|x||| alternate A, Annual Representations And Certifications (oct 2024)|13|||||||||||||| annual Representations And Certifications (may 2024)|13|334511|1350 Employees|||||||||||| instructions To Offerors -- Competitive Acquisition (nov 2021)|2||| requirements For Certified Cost Or Pricing Data And Data Other Than Certified Cost Or Pricing Data (nov 2021))|7||||x|email||| type Of Contract (apr 1984)|1|firm Fixed Price| notice Of Priority Rating For National Defense, Emergency Perpardeness, And Enrgy Progam Use (april 2008))|2||x| requirements For Certified Cost Or Pricing Data And Data Other Than Certifiedcost Or Pricing Data (may 2024))|1|| offerors Shall Submit Proposals Via Neco Or Email Only. the Government Requires A Repair Turnaround Time (rtat) Of: 70 Days \ 1. Scope 1.1 This Contract/purchase Order Contains The Requirements For Repair And The Contract Quality Requirements For The Gyroscope,rate . 2. Applicable Documents 2.1 Applicable Documents - The Document(s) Listed Below Form A Part Of This Contract/purchase Order Including Modifications Or Exclusions. 2.1.1 "document References" Listed Below Must Be Obtained By The Contractor. Ordering Information Is Included As An Attachment To This Contract/purchase Order. 3. Requirements 3.1 Cage Code/reference Number Items - The Gyroscope,rate Repaired Under This Contract/purchase Order Shall Meet The Operational And Functional Requirements As Represented By The Cage Code(s) And Reference Number(s) Listed Below. All Repair Work Shall Be performed In Accordance With The Contractors Repair/overhaul Standard Practices, Manuals And Directives Including But Not Limited To Drawings, Technical Orders, Manufacturing Operations, Tooling Instructions, Approved Repair Standards And Any Other Contractor or Government Approved Documents Developed To Provide Technical Repair Procedures. cage___ref. No. ;53711 6196547 ; 3.2 Marking - This Item Shall Be Physically Identified In Accordance with ;mil-std-130, Rev N, 16 Nov 2012; . 3.3 Changes In Design, Material Servicing, Or Part Number - Except For A Code 1 Change, Which Shall Be Processed As Provided In The Code Statement Shown Below, No Substitution Of Items Shall Be Made Until The Navicp-mech Contracting Officer Has Notified And approval Has Been Given By Issuance Of A Written Change Order. When Any Change In Design, Material, Servicing Or Part Number Is Made To Replace Or Substitute Any Item To Be Furnished On This Contract/purchase Order, The Contractor Shall Furnish, For The substituting/replacement Item, A Drawing And An Explanation Of The Reason For The Change, Explaining The Reason Therefor. If Finished Detail Drawings Are Not Available, Shop Drawings In The Form Used By The Manufacturer Will Be Acceptable For Government evaluation. When Notifying The Procurement Contracting Officer Of The Reasons For Making Substitutions, The Type Of Change Shall Be Indicated By Code Number In Accordance With One Of The Following Statements: code 1: Part Number Change Only - If The Manufacturer's Part Number Indicated Thereon Has Changed, But The Parts Are Identical In All Respects, Supply The Item And Advise Navicp-mech Immediately Of The New Part Number. code 2: Assembly (or Set Or Kit) Not Furnished - Used Following Detail Parts. code 3: Part Not Furnished Separately - Use Assembly. code 4: Part Redesigned - Old And New Parts Are Completely Interchangeable. code 5: Part Redesigned - New Part Replaces Old. Old Part Cannot Replace New. code 6: Part Redesigned - Parts Not Interchangeable. 4. Quality Assurance 4.1 Responsibility For Inspection - Unless Otherwise Specified In The Contract/purchase Order, The Contractor Is Responsible For The Performance Of All Inspection Requirements As Specified Herein. Except As Otherwise Specified In The Contract/purchase Order, the Contractor May Use His Own Or Any Other Facilities Suitable For The Performance Of The Inspection Requirements Specified Herein, Unless Disapproved By The Government. The Government Reserves The Right To Perform Any Of The Inspections Set Forth In The specification Where Such Inspections Are Deemed Necessary To Assure Supplies And Services Conform To Prescribed Requirements. 4.2 Responsibility For Compliance - All Items Must Meet All Requirements Of This Contract/purchase Order. The Inspection Set Forth In This Specification Shall Become A Part Of The Contractor's Overall Inspection System Or Quality Program. The Absence Of Any inspection Requirements Shall Not Relieve The Contractor Of The Responsibility Of Assuring That All Products Or Supplies Submitted To The Government For Acceptance Comply With All Requirements Of The Contract/purchase Order. Sampling In Quality Conformance does Not Authorize Submission Of Known Defective Material, Either Indicated Or Actual, Not Does It Commit The Government To Acceptance Of Defective Material. 4.3 Records - Records Of All Inspection Work By The Contractor Shall Be Kept Complete And Available To The Government During The Performance Of Contract/purchase Order And For A Period Of 365 Calendar Days After Final Delivery Of Supplies. 4.4 Inspection/testing Repaired Items - The Contractor Shall Perform All Inspection And Testing Requirements As Specified In The Original Manufacturer's Specifications And Drawings. 5. Packaging 5.1 Preservation, Packaging, Packing And Marking - Preservation, Packaging, Packing And Marking Shall Be In Accordance With The Contract/purchase Order Schedule And As Specified Below. mil-std 2073 Packaging Applies As Found Elsewhere In The Schedule 6. Notes 6.1 Ordering Information For Document References - The Department Of Defense Single Stock Point (dodssp), Website Http://www.dsp.dla.mil/, Provides Product Information For The Department Of Defense Index Of Specifications And Standards (dodiss) (i.e.military/federal Specifications And Standards), Data Item Descriptions (dids), And Other Dodssp Products. Most Specifications Can Obtained Directly From Http://quicksearch.dla.mil/ a. Availability Of Cancelled Documents - The Dodssp Offers Cancelled Documentsthat Are Required By Private Industry In Fulfillment Of Contractual Obligationsin Paper Format. Documents Can Be Requested By Phoning The Subscription Services Desk. b. Commercial Specifications, Standards, And Descriptions - These Specifications, Standards And Descriptions Are Not Available From Government Sources. Theymay Be Obtained From The Publishers Of The Applicable Societies. c. Ordnance Standards (os), Weapons Specifications (ws), And Navord Ostd 600 Pages - These Type Publications May Be Obtained By Submitting A Request To: commander, Indian Head Division, Naval Surface Warfare Center code 8410p, 101 Strauss Avenue indian Head, Md 20640-5035 d. On Post-award Actions, Requests For "official Use Only" And "noforn" (not Releasable To Foreign Nationals) Documents Must Identify The Government Contractnumber, And Must Be Submitted Via The Cognizant Defense Contract Management Command (dcmc) For certification Of Need For The Document. On Pre-award Actions Such Requests Must Be Submitted To The Pco For Certification Of Need For The Document. e. Noforn Military Specifications And Standards (including Amendments, Change Notices And Supplements, But Not Interim Changes) To Be Ordered From: contracting Officer navsup-wss code 87321 5450 Carlisle Pike p.o. Box 2020 mechanicsburg, Pa. 17055-0788 f. Nuclear Reactor Publications Assigned Navsea Documents And Identification Numbers (i.e. Navsea Welding Standard, Navsea 250-1500-1) Are To Be Ordered Enue: commanding Officer navsup-wss code 009 5450 Carlisle Pike p.o. Box 2020 mechanicsburg, Pa. 17055-0788 g. Technical Manuals Assigned Navsea Identification Numbers (i.e. Navsea Welding And Brazing Procedure, Navsea S9074-aq-gib-010/248) Are To Be Ordered From: commanding Officer navsup-wss code 1 Support Branch 700 Robbins Avenue philadelphia, Pa. 19111-5094 h. Interim Changes And Classified Specifications Must Be Obtained By Submitting A Request On Dd Form 1425 To Navsup-wss. 6.2 In Accordance With Opnavinst 5510.1 All Documents And Drawings Provided By The U.s. Navy To Perspective Contractors Must Include A "distribution Statement" To Inform The Contractor Of The Limits Of Distribution, And The Safeguarding Of The Information contained On Those Documents And Drawings. There Are 7 (seven) Seperate Distribution Statement Codes Used For Non-classified Documents And Drawings. The Definition For Each Is As Follows: a... Approved For Public Release; Distribution Is Unlimited. b... Distribution Authorized To Us Governments Agencies Only. c... Distribution Authorized To Us Government Agencies And Their Contractors. d... Distribution Authorized To Dod And Dod Contractors Only. e... Distribution Authorized To Dod Components Only. f... Further Distribution Only As Directed By Commander, Naval Sea Systems Command, Code 09t. x... Distribution Is Authorized To Us Government Agencies And Private Individuals Or Enterprises Eligible To Obtain Export Controlled Technical Data In Accordance With Opnavinst 5510.161. 6.3 Notice To Distributors/offerors - Consideration For Award Of Contract Shall Be Given Only To Authorized Distributors Of The Original Manufacturer's Item Represented In This Solicitation. If You Desire To Be Considered As A Potential Source For Award Of this Contract, Proof Of Being An Authorized Distributor Shall Be Provided On Company Letterhead Signed By A Responsible Company Official And Sent With Your Offer To The Procurement Contracting Officer.
Closing Date14 Feb 2025
Tender AmountRefer Documents 

DEFENSE LOGISTICS AGENCY USA Tender

Machinery and Tools
United States
Details: 2,000kg Forklift Delivered To Dla Disposition Services Bahrain this Is A Combined Synopsis/solicitation For Commercial Items/services Prepared In Accordance With Far 12 And 13. The Required Equipment Is Per The Attached Specifications, Including Its Delivery Timeframes. The Procurement Is Under Naics 333924. The Requirement Is Placed For Full And Open Competition. The Following Clauses Will Be Included Into The Award: Far 52.212-4, Contract Terms And Conditions Commercial Item; Far 52.212-5, Contract Terms And Conditions Required To Implement Statutes Or Executive Orders Commercial Items. Offeror Must Submit Representations And Certifications (far 52.212-3). If An Offeror Has Completed The Annual Representations And Certificates Electronically The Offeror Shall Complete Only Paragraph (b) Of This Provision. quotes Are To Be Received No Later Than 2:00 P.m. Eastern Standard U.s. Time On The Above Specified Date, Via Email Only To The Designated Contracting Officer. see Attachment For The Price Schedule And Specifications/additional Terms. all Contractor Performance Shall Be In A Safe Manner, And In Compliance With All Applicable Federal, State, And Local Laws And Regulations, And All Installation Policies. Any/all Required Documentation And Service-related Requirements Including Installation Access Are The Responsibility Of The Contractor, With Coordination As Necessary With The Site Poc. Deliveries Must Be Performed During Normal Installation Work Hours Which Are Available From The Above Poc, Excluding Federal Holidays. notes: all Offerors, And All Proposed Subcontractors, Must Be Registered Online At The Joint Contingency Contracting System (jccs) Website In Order To Be Eligible For The Award. all Quotes Shall Be In U.s. Dollars. each Offeror Will Clearly State The Quoted Products Place Of Manufacture (country Of Origin). far 52.212-1 (instructions To Offerors -- Commercial) (sep 2023) all Offerors Shall Submit Detailed Technical Specifications On The Equipment Being Proposed For Technical Acceptability Review. Specification Shall Include Equipment / Model / Specifications And Features (manufacturer’s Cut Sheet). The Detailed Specification Shall Be Complete To Verify That All Salient Characteristics Are Met. Each Offeror Will Clearly State The Quoted Products’ Place Of Manufacture (country Of Origin). far 52.212-2 (evaluation -- Commercial Items) (nov 2021) Applies To This Procurement (with Evaluation Consisting Of Award To The Responsible Contractor On The Basis Of The Lowest Evaluated Price Technically Acceptable). far 52.212-3 (offerors Representations And Certifications -- Commercial Items) (2023-o0002) (may 2024) far 52.212-3 Offeror Representations And Certifications—commercial Products And Commercial Services--alternate I (may 2024) far 52.212-4 (nov 2023) (contract Terms And Conditions -- Commercial Items) far 52.212-5 (may 2024) (contract Terms And Conditions Required To Implement Statutes Or Executive Orders -- Commercial Items) Applies To This Procurement. - 52.203-19 Prohibition On Requiring Certain Internal Confidentiality Agreements Or Statements (jan 2017) - 52.204-23 Prohibition On Contracting For Hardware, Software, And Services Developed Or Provided By Kaspersky Lab And Other Covered Entities (dec 2023) - 52.204-25 Prohibition On Contracting For Certain Telecommunications And Video Surveillance Services Or Equipment. (nov 2021) - 52.209-10 Prohibition On Contracting With Inverted Domestic Corporations (nov 2015) - 52.233-3 Protest After Award (aug 1996) - 52.233-4 Applicable Law For Breach Of Contract Claim (oct 2004) - 52.204-10 Reporting Executive Compensation And First-tier Subcontract Awards(jun 2020) - 52.204-27 Prohibition On A Bytedance Covered Application (jun 2023) - 52.204-28, Federal Acquisition Supply Chain Security Act Orders—federal Supply Schedules, Governmentwide Acquisition Contracts, And Multi-agency Contracts. (dec 2023) - 52.204-30, Federal Acquisition Supply Chain Security Act Orders—prohibition. (dec 2023) - 52.209-6 Protecting The Government’s Interest When Subcontracting With Contractors Debarred, Suspended, Or Proposed For Debarment (nov 2021) - 52.219-4 Notice Of Price Evaluation Preference For Hubzone Small Business Concerns (oct 2022) - 52.222-19, Child Labor-cooperation With Authorities And Remedies (feb 2024) - 52.222-50, Combating Trafficking In Persons (nov 2021) - 52.225-13, Restrictions On Certain Foreign Purchases (feb 2021) - 52.226-8, Encouraging Contractor Policies To Ban Text Messaging While Driving (may 2024) - 52.232-33, Payment By Electronic Funds Transfer-system For Award Management (oct2018) the Following Additional Far Clauses Apply To This Procurement: 52.203-19 Prohibition On Requiring Certain Internal Confidentiality Agreements Or Statements (jan 2017) 52.204-7 System For Award Management (oct 2018) 52.204-13 System For Award Management Maintenance (oct 2018) 52.204-16 Commercial And Government Entity Code Reporting (aug 2020) 52.204-17 Ownership Or Control Ofofferor(aug 2020) 52.204-18 Commercial And Government Entity Code Maintenance (aug 2020) 52.204-19 Incorporation By Reference Of Representations And Certifications (dec 2014) 52.204-20 Predecessor Of Offeror (aug 2020) 52.204-22 Alternative Line Item Proposal (jan 2017) 52.204-24, Representation Regarding Certain Telecommunications And Video Surveillance Services Or Equipment (nov 2021) 52.204-26 Covered Telecommunications Equipment Or Services-representation (oct 2020) 52.209-2 Prohibition On Contracting With Inverted Domestic Corporations—representation (nov 2015) 52.209-11 Representation By Corporations Regarding Delinquent Tax Liability Or A Felony Conviction Under Any Federal Law (feb 2016) 52.225-25 Prohibition Oncontractingwith Entities Engaging In Certain Activities Or Transactions Relating To Iran—representation And Certifications (jun 2020) 52.232-23 Assignment Of Claims (may 2014) 52.233-1 Disputes (may 2014) 52.232-39, Unenforceability Of Unauthorized Obligations (jun 2013) 52.232-40 Providing Accelerated Payments To Small Business Subcontractors (nov 2021) 52.247-34, Fob Destination (nov 1991) the Following Dfars Clauses Apply To This Procurement: 252.203-7000, Requirements Relating To Compensation Of Former Dod Officials (sep 2011) 252.203-7002, Requirement To Inform Employees Of Whistleblower Rights (dec 2022) 252.203-7005, Representation Relating To Compensation Of Former Dod Officials (sep 2022) 252.204-7003 Control Of Government Personnel Work Product (apr 1992) 252.204-7009, Limitations On The Use Or Disclosure Of Third-party Contractor Reported Cyber Incident Information (jan 2023) 252.204-7015 Notice Of Authorized Disclosure Of Information For Litigation Support (jan 2023) 252.204-7016 Covered Defense Telecommunications Equipment Or Services—representation (dec 2019) 252.204-7017 Prohibition On The Acquisition Of Covered Defense Telecommunications Equipment Or Services—representation (may 2021) 252.204-7018 Prohibition On The Acquisition Of Covered Defense Telecommunications Equipment Or Services (jan 2023) 252.204-7024 Notice On The Use Of The Supplier Performance Risk System (mar 2023) 252.211-7003 Item Unique Identification And Valuation (jan 2023) 252.223-7008 Prohibition Of Hexavalent Chromium (jan 2023) 252.225-7002, Qualifying Country Sources As Subcontractors (mar 2022) 252.225-7012 Preference For Certain Domestic Commodities (apr 2022) 252.225-7036 Buy American—free Trade Agreements--balance Of Payments Program (feb 2024) 252.225-7048 Export-controlled Items (jun 2013) 252.225-7055 Representation Regarding Business Operations With The Maduro Regime (may 2022) 252.225-7056 Prohibition Regarding Business Operations With The Maduro Regime (may 2022 252.225-7059 Prohibition On Certain Procurements From The Xinjiang Uyghur Autonomous Region–representation (jun 2023) 252.225-7060 Prohibition On Certain Procurements From The Xinjiang Uyghur Autonomous Region (jun 2023) 252.225-7995 Contractor Personnel Performing In The United States Central Command Area Of Responsibility (deviation 2017-o0004) (sep 2017) 252.229-7001 Tax Relief—basic (apr 2020) 252.232-7003, Electronic Submission Of Payment Requests And Receiving Reports (dec 2018) 252.232-7006 Wide Area Workflow Payment Instructions (jan 2023) (by Reference, Full Text Provided In Bilateral Award) 252.233-7001 Choice Of Law (overseas) (jun 1997) 252.244-7000 Subcontracts For Commercial Items (dec 2022) 252.243-7001 Pricing Of Contract Modifications (dec 1991) 252.247-7023 Transportation Of Supplies By Sea—basic (jan 2023) dlad 5452.233-9001 Disputes – Agreement To Use Alternative Dispute Resolution (jun 2020) dlad Procurement Notes: c02 Manufacturing Phase-out Or Discontinuation Of Production, Diminishing Sources, And Obsolete Materials Or Components (dec 2016) c03 Contractor Retention Of Supply Chain Traceability Documentation (sep 2016) l06 Agency Protests (dec 2016)
Closing Date19 Feb 2025
Tender AmountRefer Documents 

DEPT OF THE NAVY USA Tender

Others
United States
Details: Item Unique Identification And Valuation (jan 2023)|19|||||||||||||||||||| inspection Of Supplies--fixed-price (aug 1996)|2||| time Of Delivery (june 1997)|20||||||||||||||||||||| stop-work Order (aug 1989)|1|| wide Area Workflow Payment Instructions (jan 2023)|16|combo Invoice And Receiving |n/a|to Be Determined (tbd) |n00104|tbd|tbd|see Schedule|tbd|||tbd|||||| navy Use Of Abilityone Support Contractor - Release Of Offeror Information (3-18))|1|wss Mechanicsburg| equal Opportunity (sep 2016)|2||| small Business Subcontracting Plan (dod Contracts)- Basic (dec 2019)|2||| integrity Of Unit Prices (nov 2021)|1|| small Business Subcontracting Plan (sep 2023)|4||||| safeguarding Sensitive Conventional Arms, Ammunition, And Explosives (nov 2023))|9|||||||||| equal Opportunity For Workers With Disabilities (jun 2020)|2||| transportation Of Supplies By Sea (oct 2024)|2||| critical Safety Item (aug 2011)|4|all Items In The Schedule|||| requirements For Certified Cost Or Pricing Data And Data Other Than Certified Cost Or Pricing Data-modifications (nov 2021))|7|||||||| list Of Award Attachments|5|||||| alternate A, Annual Representations And Certifications (oct 2024)|13|||||||||||||| small Business Program Representations (feb 2024)|4||||| certification Regarding Knowledge Of Child Labor For Listed End Products(feb 2021))|4||||| annual Representations And Certifications (jan 2025)|13|334412|750|||||||||||| type Of Contract (apr 1984)|1|firm Fixed Price (ffp) | alterations In Solicitation (apr 1984)|3|||| notice Of Priority Rating For National Defense, Emergency Perpardeness, And Enrgy Progam Use (april 2008))|2||x| offerors Shall Submit Proposals Via Neco Or Email Only. 1. Scope 1.1 This Contract/purchase Order Contains The Requirements For Repair And The Contract Quality Requirements For The Motor,direct Curren . 2. Applicable Documents 2.1 Applicable Documents - The Document(s) Listed Below Form A Part Of This Contract/purchase Order Including Modifications Or Exclusions. 2.1.1 "document References" Listed Below Must Be Obtained By The Contractor. Ordering Information Is Included As An Attachment To This Contract/purchase Order. 3. Requirements 3.1 Cage Code/reference Number Items - The Motor,direct Curren Repaired Under This Contract/purchase Order Shall Meet The Operational And Functional Requirements As Represented By The Cage Code(s) And Reference Number(s) Listed Below. All Repair Work Shall be Performed In Accordance With The Contractors Repair/overhaul Standard Practices, Manuals And Directives Including But Not Limited To Drawings, Technical Orders, Manufacturing Operations, Tooling Instructions, Approved Repair Standards And Any Other contractor Or Government Approved Documents Developed To Provide Technical Repair Procedures. cage___ref. No. ;95270 E954-cl927; 3.2 Marking - This Item Shall Be Physically Identified In Accordance with ;mil-std-130, Rev N, 16 Nov 2012; . 3.3 Changes In Design, Material Servicing, Or Part Number - Except For A Code 1 Change, Which Shall Be Processed As Provided In The Code Statement Shown Below, No Substitution Of Items Shall Be Made Until The Navicp-mech Contracting Officer Has Notified And approval Has Been Given By Issuance Of A Written Change Order. When Any Change In Design, Material, Servicing Or Part Number Is Made To Replace Or Substitute Any Item To Be Furnished On This Contract/purchase Order, The Contractor Shall Furnish, For The substituting/replacement Item, A Drawing And An Explanation Of The Reason For The Change, Explaining The Reason Therefor. If Finished Detail Drawings Are Not Available, Shop Drawings In The Form Used By The Manufacturer Will Be Acceptable For Government evaluation. When Notifying The Procurement Contracting Officer Of The Reasons For Making Substitutions, The Type Of Change Shall Be Indicated By Code Number In Accordance With One Of The Following Statements: code 1: Part Number Change Only - If The Manufacturer's Part Number Indicated Thereon Has Changed, But The Parts Are Identical In All Respects, Supply The Item And Advise Navicp-mech Immediately Of The New Part Number. code 2: Assembly (or Set Or Kit) Not Furnished - Used Following Detail Parts. code 3: Part Not Furnished Separately - Use Assembly. code 4: Part Redesigned - Old And New Parts Are Completely Interchangeable. code 5: Part Redesigned - New Part Replaces Old. Old Part Cannot Replace New. code 6: Part Redesigned - Parts Not Interchangeable. 4. Quality Assurance 4.1 Responsibility For Inspection - Unless Otherwise Specified In The Contract/purchase Order, The Contractor Is Responsible For The Performance Of All Inspection Requirements As Specified Herein. Except As Otherwise Specified In The Contract/purchase Order, the Contractor May Use His Own Or Any Other Facilities Suitable For The Performance Of The Inspection Requirements Specified Herein, Unless Disapproved By The Government. The Government Reserves The Right To Perform Any Of The Inspections Set Forth In The specification Where Such Inspections Are Deemed Necessary To Assure Supplies And Services Conform To Prescribed Requirements. 4.2 Responsibility For Compliance - All Items Must Meet All Requirements Of This Contract/purchase Order. The Inspection Set Forth In This Specification Shall Become A Part Of The Contractor's Overall Inspection System Or Quality Program. The Absence Of Any inspection Requirements Shall Not Relieve The Contractor Of The Responsibility Of Assuring That All Products Or Supplies Submitted To The Government For Acceptance Comply With All Requirements Of The Contract/purchase Order. Sampling In Quality Conformance does Not Authorize Submission Of Known Defective Material, Either Indicated Or Actual, Not Does It Commit The Government To Acceptance Of Defective Material. 4.3 Records - Records Of All Inspection Work By The Contractor Shall Be Kept Complete And Available To The Government During The Performance Of Contract/purchase Order And For A Period Of 365 Calendar Days After Final Delivery Of Supplies. 4.4 Inspection/testing Repaired Items - The Contractor Shall Perform All Inspection And Testing Requirements As Specified In The Original Manufacturer's Specifications And Drawings. 5. Packaging 5.1 Preservation, Packaging, Packing And Marking - Preservation, Packaging, Packing And Marking Shall Be In Accordance With The Contract/purchase Order Schedule And As Specified Below. mil-std 2073 Packaging Applies As Found Elsewhere In The Schedule 6. Notes 6.1 Ordering Information For Document References - The Department Of Defense Single Stock Point (dodssp), Website Http://www.dsp.dla.mil/, Provides Product Information For The Department Of Defense Index Of Specifications And Standards (dodiss) (i.e.military/federal Specifications And Standards), Data Item Descriptions (dids), And Other Dodssp Products. Most Specifications Can Obtained Directly From Http://quicksearch.dla.mil/ a. Availability Of Cancelled Documents - The Dodssp Offers Cancelled Documentsthat Are Required By Private Industry In Fulfillment Of Contractual Obligationsin Paper Format. Documents Can Be Requested By Phoning The Subscription Services Desk. b. Commercial Specifications, Standards, And Descriptions - These Specifications, Standards And Descriptions Are Not Available From Government Sources. Theymay Be Obtained From The Publishers Of The Applicable Societies. c. Ordnance Standards (os), Weapons Specifications (ws), And Navord Ostd 600 Pages - These Type Publications May Be Obtained By Submitting A Request To: commander, Indian Head Division, Naval Surface Warfare Center code 8410p, 101 Strauss Avenue indian Head, Md 20640-5035 d. On Post-award Actions, Requests For "official Use Only" And "noforn" (not Releasable To Foreign Nationals) Documents Must Identify The Government Contractnumber, And Must Be Submitted Via The Cognizant Defense Contract Management Command (dcmc) For certification Of Need For The Document. On Pre-award Actions Such Requests Must Be Submitted To The Pco For Certification Of Need For The Document. e. Noforn Military Specifications And Standards (including Amendments, Change Notices And Supplements, But Not Interim Changes) To Be Ordered From: contracting Officer navsup-wss code 87321 5450 Carlisle Pike p.o. Box 2020 mechanicsburg, Pa. 17055-0788 f. Nuclear Reactor Publications Assigned Navsea Documents And Identification Numbers (i.e. Navsea Welding Standard, Navsea 250-1500-1) Are To Be Ordered Enue: commanding Officer navsup-wss code 009 5450 Carlisle Pike p.o. Box 2020 mechanicsburg, Pa. 17055-0788 g. Technical Manuals Assigned Navsea Identification Numbers (i.e. Navsea Welding And Brazing Procedure, Navsea S9074-aq-gib-010/248) Are To Be Ordered From: commanding Officer navsup-wss code 1 Support Branch 700 Robbins Avenue philadelphia, Pa. 19111-5094 h. Interim Changes And Classified Specifications Must Be Obtained By Submitting A Request On Dd Form 1425 To Navsup-wss. 6.2 In Accordance With Opnavinst 5510.1 All Documents And Drawings Provided By The U.s. Navy To Perspective Contractors Must Include A "distribution Statement" To Inform The Contractor Of The Limits Of Distribution, And The Safeguarding Of The Information contained On Those Documents And Drawings. There Are 7 (seven) Seperate Distribution Statement Codes Used For Non-classified Documents And Drawings. The Definition For Each Is As Follows: a... Approved For Public Release; Distribution Is Unlimited. b... Distribution Authorized To Us Governments Agencies Only. c... Distribution Authorized To Us Government Agencies And Their Contractors. d... Distribution Authorized To Dod And Dod Contractors Only. e... Distribution Authorized To Dod Components Only. f... Further Distribution Only As Directed By Commander, Naval Sea Systems Command, Code 09t. x... Distribution Is Authorized To Us Government Agencies And Private Individuals Or Enterprises Eligible To Obtain Export Controlled Technical Data In Accordance With Opnavinst 5510.161. 6.3 Notice To Distributors/offerors - Consideration For Award Of Contract Shall Be Given Only To Authorized Distributors Of The Original Manufacturer's Item Represented In This Solicitation. If You Desire To Be Considered As A Potential Source For Award Of this Contract, Proof Of Being An Authorized Distributor Shall Be Provided On Company Letterhead Signed By A Responsible Company Official And Sent With Your Offer To The Procurement Contracting Officer.
Closing Date21 Feb 2025
Tender AmountRefer Documents 

DEPT OF THE NAVY USA Tender

Others
Corrigendum : Closing Date Modified
United States
Description: Contact Information|4|n792.14|u90|see Email|helen.i.carmelo.civ@us.navy.mil| item Unique Identification And Valuation (jan 2023)|19|||||||||||||||||||| higher-level Contract Quality Requirement|8||||||||| time Of Delivery (june 1997)|20||||||||||||||||||||| stop-work Order (aug 1989)|1|| wide Area Workflow Payment Instructions (jan 2023)|16|combo Invoice And Receiving||tbd|n00383|tbd|tbd|see Schedule|see Schedule|see Schedule||tbd|||||| navy Use Of Abilityone Support Contractor - Release Of Offeror Information (3-18))|1|wss| value Engineering (jun 2020)|3|||| equal Opportunity (sep 2016)|2||| integrity Of Unit Prices (nov 2021)|1|| warranty Of Supplies Of A Noncomplex Nature (jun 2003)|6|1 Year After Date Of Delivery|45 Days From Discovery Of Defect||||| equal Opportuity For Workers With Disabilities (jun 2020)|2||| transportation Of Supplies By Sea (oct 2024)|2||| buy American-free Trade Agreements-balance Of Payments Program-basic (feb 2024)|11|||||||||||| limitation Of Liability--high-value Items (feb 1997)|1|| limitations On Pass-through Charges (jun 2020)|1|| alternate A, Annual Representations And Certifications (oct 2024)|13|||||||||||||| buy American-free Trade Agreements-balance Of Payments Program Certificate-basic (feb 2024))|5|||||| buy American--balance Of Payments Program (feb 2024)|1|| royalty Information (apr 1984)|1|| annual Representations And Certifications (may 2024)|12|336413|1250 Emp||||||||||| facsimile Proposals (oct 1997)|1|| notice Of Priority Rating For National Defense, Emergency Preparedness, Andenergy Program Use (apr 2008))|2||x| offerors Shall Submit Proposals Via Neco Or Email Only. 1. Scope 1.1 Articles To Be Furnished Hereunder Shall Be Repaired, Tested And Inspected In Accordance With The Terms And Conditions Specified In The Requirements Section Of This Document. 1.1.1 Any Item Contracted For Repair Shall Have A Statement Of Work To Ensure Compliance With All Repair Procedures And Requirements. repair Of: nrp,rectifier A011 ;1680-016447157; Nsn , ;514272-1; Part Number, Shall Be Performed Iaw: Nrp,rectifier A011 ;latest Applicable; Publication (s). 1.1.2 There Will Be No Repair Deviation From The Approved Written Procedures Without Review And Acceptance By The Basic Design Engineer. All Requests For Waiver/deviation Shall Be Via Form 1694 Routed Throught The Local Dcma/aco Office For Review And recommendations Via Form 1998. 2. Applicable Documents - Not Applicable 3. Requirements 3.1 1.0 General 3.1.1 This Statement Of Work (sow) Establishes The Criteria For Repair And Testing /inspection Of The Subject Item. It Includes Inspection, Component Repair And Replacement,reassembly And Testing Procedures Required To Return Units Back Into A Servicable condition. 3.2 2.0 Definitions. 3.2.1 Contractor: Is Defined As The Successful Offeror Awarded A Contract, Orderor Issued A Project Work Order. The Term "contract" Encompasses A Contract, An Order, Or A Project Work Order. 3.2.2 Overhaul: An Overhauled Part Is One Which Has Been Disassembled, Cleaned, Inspected, Repaired As Necessary (by Replacing Or Repairing All Components Which Have Been Found To Exceed Limits Established By The Repair/overhaul Manual) Reassembled And Tested in Accordance With The Approved Repair/overhaul Manual Listed In This Sow And Returned To A Ready For Issue (rfi) Condition (refer To Contract Schedule For Items To Be Overhauled). 3.2.3 Repair: A Repaired Part Is One Which Has Been Restored To A Ready For Issue(rfi) Condition (by Replacing Or Repairing Those Components Found To Be Defective, Broken, Damaged Or Inoperative During The Initial Evaluation And Troubleshooting Phase) And tested In Accordance With The Approved Repair/overhaul Manual Listed In This Sow (refer To Contract Schedule For Items To Be Repaired). 3.3 3.0 Scope 3.3.1 General. The Items To Be Furnished Hereunder Shall Be Overhauled, Upgraded,repaired, Tested, Inspected, And Accepted In Accordance With The Terms And Conditions Specified In This Contract. Unless Expressly Provided Government Furnished Property, including Equipment Such As Fixtures, Jigs, Dies, Patterns, Mylars, Special Tooling, Special Test Equipment, Or Any Other Manufacturing Aid Required For The Repair, Manufacture, And/or Testing Of The Subject Item(s) Will Not Be Provided By The Government And shall Be The Responsibility Of The Contractor. The Foregoing Applies Notwithstanding Any Reference To Such Equipment Or The Furnishing Thereof That May Be Contained In Any Drawing, Manual, Or Specification For The Contract Items. 3.3.2 Repair Upgrade Requirements:the Contractor Shall Provide The Necessary facility, Labor, Materials, Parts, And Test And Tooling Equipment Required To To Return The Following Items To A Ready For Issue (rfi) Condition: nrp,rectifier A011 ;514272-1; P/n, ;1680-016447157; Nsn, ;latest Applicable; Tech Publications 3.3.3 Rfi Is Defined As That Condition Allowing The Items To Perform Properly And Reliably In An Operational Environment In A Manner They Were Intended To Operate.the Contractor Must Perform All Repairs/upgrades At The Facility Identified Within This Sow. repairs Performed By The Contractor Or Subcontractor Shall Be Performed In Accordance With The Specified Drawings And Repair Manual(s). 3.4 Changes To Such Manuals Used For Repairs Under This Contract, Or Changes To Drawings Or Specifications Used In The Manufacture Of Parts Utilized In These Repairs, Require Procuring Contracting Officer (pco) Approval In Accordance With The Configuration management Provisions Of This Statement Of Work Or Contract. Under No Circumstances Should The Repair, Test, And Inspection Extend Beyond The Requirements Of This Paragraph Unless Authorized By The Government Qar.in Addition, Requests For Approval Of Changes to A Repair Source Or Repair Facility Shall Be Submitted In Writing To The Pco Prior To Making Any Such Change. 3.4.1 Any Repairs Performed Using Unapproved Changes To Such Manuals, Drawings, Specifications, Or Changes To Repair Source Or Facility Are Done At The Contractor's Own Risk. If The Government Disapproves The Requested Change, The Contractor Shall Replace Any delivered Items Repaired Using Such Unapproved Manuals,drawing, Specification, Repair Source Or Repair Facility Change. The Contractor Is Not Entitled To Any Equitable Adjustment To The Contract Price Or Terms Based On The Government's Disapproval Of A requested Change To Manuals, Drawings, Specifications, Or To A Repair Source Or Facility. 3.4.2 References On Drawings And Specifications:for Repair And Overhaul Purposes Only. All References To The "prime Contractor" Or The "actual Manufacturer" Appearing On The Drawings And / Or Specifications Or Technical Data Furnished By The Government Shall Be read As The "government Designated Agency" 3.4.3 Process Control Documentation: The Contractor Shall Prepare And Maintain Repair Procedures, And Test / Inspection Information / Procedures Which Shall Be Made Available To The Government For Review And Approval. The Procedures Shall Include Sequential diagrams Of Processes, As Well As The Performance Specifications To Perform The Testing / Inspection Procedures. Those Processes Shall Be Frozen After Approval Of The Inspection / Test. 3.4.4 Beyond Economical Repair (ber). An Item Is Ber If The Cost Of The Repair Exceeds 75% Of The Production Quantity Price To Replace The Item, Current At Time Of Award. This Replacement Price Is For The Purposes Of Ber Determinations Only, And May Not Be used Or Relied On By The Offeror In The Pricing Of The Repairs Required By This Contract. Items Determined Ber Are Not Included In The Contract Price. The Contractor Shall Obtain Written Concurrence From Dcma For All Units Determined By The Contractor To Be ber. All Such Determinations, Including The Basis For The Determination, The Repair Required, The Proposed Price To Repair And The Dcma Written Concurrence Shall Be Provided By The Contractor To The Pco, With A Copy To The Inventory Manager. After Receipt Of the Required Documentation, The Pco Shall Provide The Contractor Disposition Instructions Or Contractual Authority For Repair Of The Item. The Contractor Is Not Authorized To Proceed With The Repair Until Notification To Proceed Is Received From The Pco. Any disposal Ordered Shall Be Performed By The Contractor In Accordance With All Applicable Regulations And In Accordance With All Dcma Disposal Procedures And Requirements. 3.4.5 Missing On Induction (moi). A Weapons Repairable Assembly (wra) Is Subject To This Moi Provision If The Item Received By The Contractor For Repair Is Missing One Or More Shop Replaceable Assemblies (sras). Contractor Replacement Of Moi Sras Is Not included In The Contract Price. The Contractor Shall Immediately Notify Dcma When An Item Is Received With Moi Sra(s) And Shall Obtain Written Verification From Dcma For All Wras Determined To Have Moi Sra(s). The Contractor Shall Provide All Such determinations, Including Identification Of The Missing Sra(s), And The Dcma Written Verification, To The Inventory Manager With A Copy To The Pco And Aco Prior To Induction And/or Repair Of The Wra. The Contractor Shall Not Induct And/or Repair Wras With Moi sras Until Instructions On How To Proceed Are Provided To The Contractor By The Inventory Manager (where No Adjustment Price To The Contract Is Required) Or By The Pco. Items Received By The Contractor Missing Consumable Parts Are Not Moi Items. Rather, repair Of Such Items And Replacement Of The Missing Consumable Parts Are Included In The Contract Price And The Item Shall Be Inducted And Repaired By The Contractor Under This Contract. 3.4.6 Replacing Failed Or Missing Shop Replaceable Assembly (sra) When Repairinga Weapons Replaceable Assembly (wra). 3.4.7 A. When The Contractor Believes One Or More Sra(s) Within A Wra Are Either: 3.4.8 Beyond Economic Repair (ber) Or Beyond Repair (br) I. E. The Unit Is Not Capable Of Being Repaired Because Of The Extent Of Physical Damage), Or Missing On Induction (moi), The Contractor Shall Obtain Written Verification From Dcma And Advice From The inventory Manager Whether A Sra May Be Replaced By One Or More Of The Following Options: Ship In Place From An Existing Spares Or Repair Contract, If Any, Milstrip The Sra(s), Otherwise Be Provided Direction For Obtaining The Sra(s) At No Cost To The contractor.the Detailed Procedures Are Set Forth In Section 6.0 Of The Web-based Commercial Asset Visibility (cav) Statement Of Work. 3.4.9 B.when Not Otherwise Provided For (or Precluded) By Other Terms Of This Contract, The Contractor May Seek Written Authorization To Replace Failed Sra(s) With Ready For Issue Sra(s). When Authorized, The Procedures Set Forth In Paragraph 3.0 Of Section 6.2 Of The Web-based Commercial Asset Visibility (cav) Statement Of Work Shall Be Followed. 3.4.10 Over And Above Repair (oar). An Item Sent To The Contractor Shall Be Considered To Require Over And Above (oar) Repair Effort If The Repair Required Is Not The Type Of Repair That Would Be Anticipated As A Result Of Normal Navy Operation Of The Item And is Not Included In The Contract Pricing Due To The Nature Or Scope Of The Repair Needed For That Particular Item. Therefore, Repair Of Oar Items May Be Subject To Equitable Adjustment. The Contractor Shall Obtain Written Concurrence From Dcma For All Units determined By The Contractor To Require Oar Effort. All Such Oar Determinations, Including The Basis For The Determination, The Repair Required, The Proposed Price To Repair And The Dcma Written Concurrence, Shall Be Provided By The Contractor To The Pco Prior to Undertaking Repair Of The Item. after Receipt Of The Required Documentation, The Pco Shall Provide The Contractor Disposition Instructions Or Contractual Authority For Repair Of The Item. Any Ordered Disposal Shall Be Performed By The Contractor In Accordance With All Applicable Regulations and Dcma Disposal Procedures And Requirements. 3.5 4.0 Parts And Materials 3.5.1 General. The Contractor Is Responsible For Supplying All Parts And Material Necessary To Perform The Required Repairs Under This Contract Unless Parts Or Material Are Specifically Identified As Government Furnished Material (gfm). All Parts And Material used In Performance Of This Contract Shall Be In Accordance With The Latest Approved Revision Of Applicable Drawings And Specifications And Shall Be New In Accordance With Far 52.211-5, Material Requirements, Which Is Incorporated By Reference Herein. authorization To Use Other Than New Material As Defined By Far 52.211-5 Requires Written Approval From The Pco. In Addition, Cannibalization Must Be Approved By The Pco. Cannibalization Of Units That Have Not Been Inducted Is Not Typically Authorized And requires Specific Approval By The Pco. 3.5.2 The Contractor Shall Ensure It Has Access For The Duration Of This Contract To Updated Drawings And Specifications For Parts And Material Required For Repairs Performed Under This Contract. Any Change To Such Parts/material Drawings Or Specifications requires Government Approval In Accordance With The Configuration Management Provisions Of This Statement Of Work. Written Approval From The Pco Must Be Obtained Prior To Any Change To The Manufacturing Source Or Manufacturing Facility For All Parts Which require Source Approval, Unless The Contractor Is The Design Control Agent (dca) (i.e. The Entity Responsible For Maintaining The Latest Configuration Data) For The The Contract Item. If The Contractor Is The Dca, The Contractor May Approve Approve Changes To manufacturing Source Or Manufacturing Facility For All Parts, Including Those Which Require Source Approval. Any Repairs Performed Using Unapproved Changes To Such Drawings, Specifications Or Manufacturing Source Or Facility Are Done At The Contractor's Own risk. If The Government Disapproves The Requested Change, The Contractor Shall Replace Any Delivered Items Repaired Using Such Unapproved Change. The Contractor Is Not Entitled To Any Equitable Adjustment To The Contract Price Or Terms Based On The government's Disapproval Of A Requested Change To The Drawings, Specifications Or Manufacturing Source Or Facility. 3.5.3 Purchased Material Control And Parts Control. The Contractor Shall Establish And Maintain A System Of Control Over Purchased Parts And Material. Such Controls Shall, At A Minimum, Assure That The Parts And And Material Purchased Are In Compliance With The requirements Of This Contract. 3.5.4 Receiving Inspection Of Purchased Parts And Material. (1)purchased Items Shall Be Inspected Upon Receipt At The Contractor's Facility To Assure Conformance With All Requirements Of The Applicable Drawings And Specifications Or (2)the Contractor Shall provide Prior To The Contract Award Evidence For Government Review And Approval Of A Purchased Parts And Material System Which Provides For The Inspections To Assure Conformance With All Requirements Of The Applicable Drawings And Specifications. Evidence Of such Inspections Of Such Inspections Shall Be Maintained By The Contractor Or Subcontractor For Government Review.the Inspection Report Shall, At A Minimum, Include A Record Of All Dimensional Data (coordinate/positional), Material, Finish, And Process With appropriate Pass/fail Criteria Such As Certifications and Actual Dimensonal Readings. 3.5.5 ^^^note^^^part Cannibalization Is Not Authorized Unless Specifically Approved By Navsup Wss And The Bde. 3.5.6 3.6 Source And Location Of Repair Source: 3.6.1 The Contractor Shall Specify The Name Of The Source/division Performing The Work And The Actual Location Where Work Will Be Performed. nrp,rectifier A011 ; General Atomics; Company Name , ;3550 General Atomics Court San Diego, Ca 92121-1122; Address , ;4v360; Cage Code inspection Will Be Accomplished On The Contractor's Equipment 3.7 5.0 Contractor Quality Requirements: 3.7.1 Quality Program. The Contractor Shall Establish, Implement, Document And Maintain A Quality System That Ensures Conformance To All Applicable Requirements Of Iso 9001/ Sae As9100. The Contractor's Quality Management System/program Shall Be Designed To promptly Detect, Correct And Prevent Conditions That Adversely Affect Quality. 3.7.2 Calibration System Requirements. Contractor Shall Maintain A Calibration System That Meets The Requirements Of Ansi/ncsl Z540.3, Iso-10012-1 Or An Equivalent Calibration Program Acceptable To The Government. 3.8 6.0 Configuration Management (cm): 3.8.1 The Contractor Shall Maintain A Configuration Management Plan In Accordance With The Provisions Of Navsup Wss Configuration Management Clause Navicpia18. (refer To Contract). 3.9 7.0 Markings. 3.9.1 Marking Shall Be As Indicated In The Contract When Applicable. 3.10 8.0 Storage; 3.10.1 The Contractor Shall Provide A Proper Enclosed Warehouse Environment For Both Material Items Awaiting Repair And Assets Which Have Been Repaired And Are Awaiting Shipment To Ensure The Items Are Not Damaged While Being Stored. 4. Quality Assurance item Is Non-critical Alre. 5. Packaging- Mil-std 2073 Packaging Applies As Found Elsewhere In The Schedule 6. Notes - Not Applicable this Is An Alre Non-critical Item.
Closing Date5 Feb 2025
Tender AmountRefer Documents 

Public Service Delivery Tender

Aerospace and Defence
Canada
Details: Manitoba Reference Number: Mb-mbpb-10t-00030 Issuing Department: Procurement And Supply Chain Date Issued: 19/12/2024 Issued By: Gurjeet Kharay Telephone: 431-336-6413 The Government Of Manitoba (manitoba) Is Requesting Bid Submissions For The Supply & Delivery Of Ammunition On An "as And When" Requested Basis For The Period March 1, 2025, To February 28, 2026, With Two (2) Optional Of One (1) Year Extension. Note: For Information Or Item Clarification, If Required<(>,<)> Contact: Gurjeet Kharay Email: Bids@gov.mb.ca (enquiry Only) Please Contact The Individual Noted Above If Additional Information Or Clarification Is Required On The Following Items. Fob Destination Freight Prepaid To: Delivery Address: 1-1383 Whyte Ave., Winnipeg, Manitoba<(>,<)> R3e 1v7 Invoice Address: Conservation Officer Service Box 44- 14 Fultz Blvd Winnipeg, Mb R3y 0x7 Delivery In ___ Working Days Or ____weeks From Receipt Of The Order. General Terms & Conditions: This Rfq Is Subject To The Manitoba General Terms And Conditions: Https://www.gov.mb.ca/central/psc/pubs/form/mb_terms_conditions.pdf The Purchase Order To Be Issued To The Top Ranked Vendor(s) Is Subject To The Manitoba Purchase Order Terms And Conditions: Https://www.gov.mb. Ca/central/psc/pubs/form/manitoba_po_terms_conditions.pdf Submission Terms And Conditions: The Bid Must Be Signed By A Representative Of The Bidder With The Authority To Bind The Bidder. The Name And Title Of The Representative Signing The Bid Should Also Be Printed Below Their Signature. Vendor's E-mail Address: (if Available) ____________________ Quantity Clarification: Quantity Listed Contains 2 Or 3 Decimals. _________________________________________________________________________ Item Qty Description Delivery No. Date ======================================================== Item 10 01/04/2025 5,000.000 Case Gsin: N1300material: 41729 Ammunition, As Described Below Centre Fire Pistol Cartridges Training Ammunition, 9mm Parabellum Caliber Federal Brand. Bullet Weight 147 Grain Full Metal Jacket (fmj) Brass Case Factory Loads<(>,<)> Must Meet Saami Specs- No Reloads 50 Rounds/box. 1000 Rounds/case Please Indicate: Manufacturer Name, Brand Name And Product Information On The Proposed Product Offered As Follow: Manufacturer Name _________________ Brand Name ________________ Product / Style Number ________________ Bidder's Catalogue/reference Number (if Applicable) _________ Include Proposed Product Specification Sheet With Your Bid Submission. ======================================================== Item 20 01/04/2025 40.000 Case Gsin: N1300material: 41729 Ammunition, As Described Below Shotgun Ammunition 12 Gauge, 2 3/4 In Shotgun Cartridge, Slug (1 Oz) 5,000 Rounds Of 12 Gauge 2.75" Length 1 Oz Rifled Slug 1500-1650 Feet Per Second Velocity Please Indicate: Manufacturer Name, Brand Name And Product Information On The Proposed Product Offered As Follow: Manufacturer Name _________________ Brand Name ________________ Product / Style Number ________________ Bidder's Catalogue/reference Number (if Applicable) _________ Include Proposed Product Specification Sheet With Your Bid Submission. ======================================================== Item 30 01/04/2025 10.000 Case Gsin: N1300material: 41729 Ammunition, As Described Below Patrol Rifle Duty Ammunition 5,000 Rounds Of Premium Hunting Quality, Caliber In .308 Win Only<(>,<)> Bonded Bullet Construction. Ballistic Tip Or Hollow Point. Nickle Plated Casing Bullet Weight 160gr To 168gr Copper Jacketed With Bonded Lead Core Or Solid Copper Construction With Ballistic Tip. Please Indicate: Manufacturer Name, Brand Name And Product Information On The Proposed Product Offered As Follow: Manufacturer Name _________________ Brand Name ________________ Product / Style Number ________________ Bidder's Catalogue/reference Number (if Applicable) _________ Include Proposed Product Specification Sheet With Your Bid Submission. ======================================================== Item 40 01/04/2025 1.00 Each Gsin: N1300material: 99201010 Ammunition As Described Below: Assorted Ammunition-unispecified Assorted Ammunition, For The Purchase Of Unspecified Ammunition Provide Company Catalog And Discount Off Of List Catalog Pricing ________% ======================================================== Quotation Evaluation: Generally, The Lowest Overall Price Of An Acceptable Item(s) In Accordance With The Terms & Conditions Of The Rfq Will Be Awarded The Order. Quotations Will Also Be Evaluated Based On Suitability Of Unit Offered Compared To The End User#s Needs, Product Specifications, Delivery, Warranty, Price, Quality Of The Bidder's Performance In Past Awards And Any Other Terms & Conditions Indicated On This Rfq. Each Product Offered Will Be Considered Individually, However, The Intent Is To Award This Rfq To One Supplier In Total (if Possible And Economic To Manitoba) Therefore Bidders Should Quote On All Items If Possible. (economic Evaluation To Be At Manitoba#s Sole Discretion) Failure To Provide Adequate Information To Evaluate The Item Offered May Be Cause For Rejection Of Your Quote By The Manitoba Government (manitoba). Suitability Selection To Be At Manitoba's Sole Discretion. Quantity: The Quantity Shown Is Approximate And May Vary More Or Less It Should Be Noted That There Is No Guarantee Of Any Business. Any Unused Portion As Of The End Of The Contract Will Be Considered Cancelled. Quality / Acceptability All Products Supplied Are Subject To Inspection Prior To Acceptance. Manitoba Reserves The Right To Reject Any Products, After Final Inspection That Does Not Meet The Specification Requested. Product Offered: The Product Offered Must Meet The Requirements And Expectations For Its Intended Use. If It Is Your Intention To Offer An Item, Which Does Not Meet All The Specs/description As Outlined, Then You Must Indicate All Intended Deviations Or Changes On The Return Quote. Please Indicate: Manufacturers Name__________ Brand Name______________ Product / Style Number ________ Bidders Catalogue/reference Number (if Applicable) ___________ Note: If Any Of The Above Items/features Are Accessories That Are To Be Included And Installed Prior To Delivery. It Is The Supplier's Responsibility To Test All Systems To Ensure They Are Functioning Properly Prior To Delivery. Delivery Address: 1-1383 Whyte Ave., Winnipeg, Manitoba<(>,<)> R3e 1v7 Invoice Address: Conservation Officer Service Box 44- 14 Fultz Blvd Winnipeg, Mb R3y 0x7 (unit Prices Include All Necessary Charges E.g., Freight, Insurance, Handling Etc.) If Any Charges Are Not Included, Please Explain In Detail Any/all Charges That Will Be Extra To The Unit Prices Quoted And That Will Be Charged On The Invoice. Products/brands: Brand Names, Where Indicated, Are Shown For Reference Purposes Only And Are Not Intended As Endorsement Of A Particular Product. Authorized Vendor: Manitoba Reserves The Right, Prior To Any Contract Award, To Secure Evidence To Manitoba's Satisfaction That Any Bidder Is The Manufacturer, Or An Authorized Distributor, Dealer Or Retailer Of The Goods Offered And Is Authorized To Sell These Goods In Manitoba, Canada And Upon Request Will Provide Manitoba With Written Evidence Thereof. Warranty: Manufacturer's Warranty: State Warranty Of Units Offered (as Applicable To Manitoba's Use). (manitoba's Use Would Usually Be Considered Commercial Application Not Consumer) Product _________ Months Or _______ Years Labor _________ Months Or _______ Years Parts _________ Months Or _______ Years Please Note: During The Period Of The Warranty Offered, All Labor, Transportation, Parts, Surcharges Including Shipping And Brokerage Will Be Included. The Province Of Manitoba "will Not" Pay Additional Charges While The Item(s) Offered Are Under The Above Stated Warranty. Potential Costs Associated With The Location Of Warranty Service Might Be Used In The Evaluation Of This Quote. If The Warranty Offered Is The Vendor's Warranty In Combination With Or In Place Of The Manufacturer's Warranty Then A Complete Explanation Must Be Provided. Warranty Service/location: Is Warranty Service Provided On Site At Our Premises? Yes___ Or No____ If No, Indicate The Location The Unit Must Be Sent To For Manufacturer's Certified And/or Approved Warranty Service. Company Name_______________________ Location (city & Province) ______________ Do You Have A Toll Free Phone Number For Warranty Service? Yes______ Or No______ If Yes Please Provide: ________________________ After Warranty Service: Is After Warranty Service Provider The Same As Above? Yes ___ Or No_____ If No, Please Advice Company Name_______________________ Location (city & Province) ______________ Accounts Receivable Address: Due To Our Computerized Accounts Payable System Please Advise If Your Invoice Address (accounts Receivable) Is The Same As The Address For Orders / Quotes Shown Above Yes ____ Or No ______ If No Provide Complete Details I.e. Box #, Street Address, City, Province, Postal Code, Etc. _________________ Manitoba's Retail Sales Tax License: Are You Licensed By Manitoba Finance To Collect And Remit? Manitoba's Retail Sales Tax Yes_____ Or No_____ If No Disregard The Following Paragraph. Manitoba's Retail Sales Tax Is The Product(s) Offered Subject To Manitoba's Retail Sales Tax? Yes____ Or No _____ If The Quote Consists Of Both Taxable (t) And Non-taxable (nt) Items Please Indicate T Or Nt Opposite Each Item Offered. Payment Terms: Manitoba Will Consider Early Payment Terms. Manitoba's Standard Payment Term Is Net Thirty (30) Days. The Bidder Shall Specify Their Standard Invoice Term: _____________________________ Is There Any Applicable Discounts For Early Payment? Yes _____ No _____ Initial __________ If Yes, Please Specify: _____________________________________________________ Does Your Early Payment Clause Appear On Your Invoice? Yes _____ No _____ Initial __________ Your Quotation Reference # (if Applicable) _________. Proposed Delivery Address: 1-1383 Whyte Ave., Winnipeg, Manitoba<(>,<)> R3e 1v7 Tenders To Be Returned To: Merx Electronic Bid Submission Www.merx.com
Closing Date18 Jan 2025
Tender AmountRefer Documents 

Talavera General Hospital Tender

Healthcare and Medicine
Philippines
Details: Description Request For Quotation Date: February 4, 2025 Rfq No.: 2025-11 Name Of Company: ____________________________________________________________________ Office Address: _______________________________________________________________________ Business Permit No.: _____________________ Valid Until: ______________________________ Tax Id No.: __________________________________________________________________________ Philgeps Reg. No. (required): __________________________________________________________ The Talavera General Hospital, Through Its Bids And Awards Committee (bac), Intends To Apply The Sum One Hundred Twenty Thousand Pesos (php 120,000.00) Being The Approved Budget For The Contract (abc) From Regular Fund For Payments Under The Contract Iso 9001:2015 1st Surveillance Audit Consultation And Training Services Through Small Value Procurement Under Sec. 53.9 Of The Republic Act. 9184. Please Submit Your Duly Signed Quotation Addressed To The Bids And Awards Committee (bac) Chairperson And To The Given Address Below, On Or Before February 10, 2025, Monday, 5:00pm, Subject To The Compliance With The Terms And Conditions Provided On This Request For Quotation (rfq): Dhonna Sheila A. Baterina, Md, Mha, Fpogs Chairperson, Bids And Awards Committee Talavera General Hospital Maestrang Kikay District, Talavera, Nueva Ecija Tel. No. (044) 940 – 7136 Loc 170 – 171 Email Address: Procurement.tgh@gmail.com Standard Requirements: Document Remarks Mayor’s Permit Or Business Permit Please Submit Your Valid Mayor’s Permit Or Business Permit. Failure To Provide The Required Document Will Result In The Automatic Disqualification Of Your Quotation. Notarized Omnibus Sworn Statement (gppb-prescribed Form) If Unable To Have The Document Notarized, You May Submit A Signed Unnotarized Omnibus Sworn Statement (in The Prescribed Template), Subject To Compliance Therewith After Award Of Contract But Before Payment. Updated Company Profile Submit An Updated Company Profile Together With This Request For Quotation. For Any Clarification, Or Further Information You May Refer To: Liwayway Dg. Pangilinan Administrative Officer V/head Bac Secretary Talavera General Hospital Procurement Office Maestrang Kikay, Maharlika Hi-way, Talavera, Nueva Ecija Telefax: [044] 940-7136 Loc. 170 To 171 Email: Procurement.tgh@gmail.com Note: 1. If A Revised Philgeps Certificate Of Platinum Registration And Membership Is Submitted You Can Disregard The Standard Requirement No. 1 (mayor’s Permit Or Business Permit). _____________¬_______________ Dhonna Sheila A. Baterina, Md, Mha, Fpogs Chairperson, Bids And Awards Committee Philgeps: February 5, 2025 Instructions: Note: Failure To Follow These Instructions Will Disqualify Your Entire Quotation. I. Do Not Alter The Contents Of This Form In Any Way. Ii. The Use Of This Rfq Is Mandatory. In Case Of Any Changes Or Alteration, The Submitted Quotation Shall Be Automatically Rejected. If Another Form Is Used Other Than The Latest Rfq, The Quotation, The Submitted Quotation Shall Be Automatically Rejected. Iii. All Mandatory Technical Specifications Must Be Complied With. Failure To Comply With The Mandatory Requirements Shall Render The Quotation Ineligible/disqualified. Iv. Quotations May Be Submitted Through Electronic Mail At Procurement.tgh@gmail.com. V. Quotations, Including Documentary Requirements, Received After The Deadline Shall Not Be Accepted. For Quotations Submitted Via Electronic Mail, The Date And Time Of Receipt Indicated In The E-mail Shall Be Considered. Terms And Conditions: I. Bidders Shall Provide Correct And Accurate Information Required In This Form. Ii. Any Interlineations, Erasures, Or Overwriting Shall Be Valid Only If They Are Signed Or Initialed By You Or Any Of Your Duly Authorized Representative/s. Iii. Price Quotation/s Of The Winning Bidder Will Be Contracting Price/amount Which Is Considered Fixed Price. Iv. Price Quotation/s, To Be Denominated In Philippine Peso, Shall Include All Taxes, Duties, And/or Levies Payable. V. Quotations Exceeding The Approved Budget For The Contract Shall Be Rejected. Vi. In Case Of Two Or More Bidders Are Determined To Have Submitted The Lowest Calculated Quotation/lowest Calculated And Responsive Quotation, The Talavera General Hospital Shall Adopt And Employ “draw Lots/toss Coin” As The Tie-breaking Method To Finally Determine The Single Winning Provider In Accordance With Gppb Circular 06-2005. Vii. Award Of Contract Shall Be Made To The Lowest Quotation Which Complies With The Terms Of Reference, Requirements And Other Terms And Conditions Stated Herein. Viii. The Item/s Shall Be Delivered According To The Accepted Offer Of The Bidder. Ix. The Procuring Entity May Cancel Or Terminate The Contract At Any Time In Accordance With The Grounds Provided Under Ra No. 9184 And Its 2016 Revised Irr. X. The Rfq, Purchase Order (po)/job Order (jo), And Other Related Documents For The Above-stated Procurement Projects Shall Be Deemed To Form Part Of The Contract. Xi. This Project Will Be Awarded By Lot Which Will Be Evaluated Per Lot Item And The Award Will Be Given To The Lowest Calculated And Responsive Quotation. After Having Carefully Read And Accepted The Instructions And Terms And Conditions, I/we Submit Our Quotation/s For The Item/s As Follows: Technical Specifications # Description Quantity Unit Statement Of Compliance (“comply” Or “not Comply”) Note: Non-compliance With The Minimum Required Specifications Shall Be Rejected. 1 Iso 9001:2015 1st Surveillance Consultation And Training Services • Root Cause Analysis Training • Document Review O Corrective Preventive Action Records O Customer Satisfaction Survey Records O Management Review Records O Objective Target And Plan Records O Internal Quality Audit Records O Updates Of Risk Registries O Context Of The Organization / Needs & Expectation Of Interested & Relevant Parties O Forms (checklist / Pm) O Document Control Records O Legal Requirements (permits & Licenses) O Review Of Quality Manual For Necessary Updates O New Covid-19 Procedures And Records O Infection Control Hai • Preparation For The Conduct Of Certifying Body (cb) Audit • Assistance During The Final Cb Audit (1st Surveillance) 1 Package Delivery Requirements - Delivery Within The Actual Date Of The Activities (february 17-21, 2025) Terms Of Reference (tor) Vi. Tittle: Iso 9001:2015 1st Surveillance Consultation And Training Services Vii. Type Of Service: Hiring Of Third-party Consultant For Iso 9001:2015 1st Surveillance Consultation And Training Services For Talavera General Hospital The Consultant Should Have The Following Qualifications: • The Company Assisted More Than Five (5) Doh Hospital To Pass The Iso Certification; • The Company Assisted At Least 10 Organization To Pass Iso Certification; • The Company Has Been In The Service Of Iso Consulting For Seven (7) Years Or More • The Consultant Must Be A Certified Qms Lead Assessor Passer. • The Consultant Must Be A Certified Training Of Trainers (tot) • The Consultant Is A Member Of Any Professional Or Accrediting Body For Quality (e.g., Fellow-philippine Society For Quality In Healthcare (fpsqua)) Viii. Client: Talavera General Hospital Ix. Duration Of Engagement, Timeline And Activities: Iso 9001:2015 1st Surveillance Consultation And Training Services February 17-21, 2025 Activity Man Days Root Cause Analysis Training 1.0 Document Review A. Corrective Preventive Action Records B. Customer Satisfaction Survey Records C. Management Review Records D. Objective Target And Plan Records E. Internal Quality Audit Records F. Updates Of Risk Registries G. Context Of The Organization / Needs & Expectation Of Interested & Relevant Parties H. Forms (checklist / Pm) I. Document Control Records J. Legal Requirements (permits & Licenses) K. Review Of Quality Manual For Necessary Updates L. New Covid-19 Procedures And Records M. Infection Control Hai 2.0 Preparation For The Conduct Of Certifying Body (cb) Audit 1.0 Assistance During The Final Cb Audit (1st Surveillance) 1.0 X. Terms And Conditions Client Will Shoulder The Food, Accommodation And Transportation Of The Consultant Xi. Contract Price A. The Total Cost For The Complete Consultation And Training Services Shall Be One Hundred Twenty Thousand Pesos (php 120,000.00) From Regular Fund For Payments Under The Contract Iso 9001:2015 1st Surveillance Consultation And Training Services. Activity Abc Root Cause Analysis Training 20,000.00 Document Review • Corrective Preventive Action Records • Customer Satisfaction Survey Records • Management Review Records • Objective Target And Plan Records • Internal Quality Audit Records • Updates Of Risk Registries • Context Of The Organization / Needs & Expectation Of Interested & Relevant Parties • Forms (checklist / Pm) • Document Control Records • Legal Requirements (permits & Licenses) • Review Of Quality Manual For Necessary Updates • New Covid-19 Procedures And Records • Infection Control Hai 80,000.00 Preparation For The Conduct Of Certifying Body (cb) Audit 10,000.00 Assistance During The Final Cb Audit (1st Surveillance) 10,000.00 Financial Offer: Terms Of Payment: Payment Shall Be Made Within Fifteen (15) Days Upon Completion Of The Project/delivery And Submission Of Billing/invoice And User Acceptance Of The Product. Please Quote Your Best Offer For The Item/s Below. Please Do Not Leave Any Blank Items. Bid Price Form # Items Quantity Unit Abc Per Line Item Unit Cost Total Cost 1 Iso 9001:2015 1st Surveillance Consultation And Training Services 1 Package 120,000.00 Grand Total Name Of Representative Of The Bidder Address Tel. No.: Name Of Company Date
Closing Date10 Feb 2025
Tender AmountPHP 120 K (USD 2 K)

Tourism Promotions Board Tender

Other Consultancy Services...+1Consultancy Services
Philippines
Details: Description Request For Quotation The Tourism Promotions Board Invites You To Submit Quotation For The Item/s Listed Below: Rfq No. Tpb Rfq 2025-02-033 Pr No. 02.023 Requirements: Services Of A Tour Operator For Hong Kong, Sar Travel Agents Familiarization Trip To Davao Scope Of Work/services/deliverables • The Project Requires The Services Of A Tour Operator Who Help And Assist In The Implementation Of The Hong Kong, Sar Travel Agents Familiarization Trip To Davao; • The Trip Will Be Participated By A Total Of Twelve (12) Participants Consisting Of Nine (9) Travel Agents, One (1) Cebu Pacific Representative, One (1) Pdot-shanghai And One (1) Tpb Representative. • Secured Sponsorship Or Discounted Rates Should Be Deducted From Total Expenses; And • Itinerary And Dates May Be Subject To Change Based On The Availability Of Flights, Accommodation, Activities, And Travel Restrictions/quarantine Status Of The Chosen Destinations. I. International And Domestic Air Tickets - Taxes And Fuel Surcharges - Taxes And Surcharges For The International Airline Tickets Of 11 Participants, As Well As Taxes For The Domestic Ticket Of 1 Participant (including Airline Taxes, Fuel Surcharges, And Other Taxes, Where Applicable) A. Hkg – Dvo For 11 Pax B. Dvo – Hkg For 11 Pax C. Mnl – Dvo-hkg For 1 Pax (tpb Representative) • Estimated Cost: Php 63,500.00 Note: Cebu Pacific To Take Care Of The International And Domestic Air Tickets. Ii. Travel Insurance - 9 Travel Agents + 1 Cebu Pacific Representative + 1 Tpb Officer + 1 Pdot Shanghai = 12pax - Individual Comprehensive Travel Insurance With Medical And Loss Or Damaged Luggage And Medical Emergencies Coverage Worth Php 1 Million/pax Iii. Transportation (land) - Location: Davao (please Refer To The Attached Itinerary) - One (1) Unit Of Tourist Coaster Or Minibus And One (1) Luggage Van For The Whole Duration Of The Trip A. Vehicles Should Be Compliant With The Philippine Laws On Technical Safety Requirements (dot, Or/ Cr, Ltfrb Accredited) B. Daily Disinfection Of Vehicle And Ensure Cleanliness At All Times. C. Vehicle Year Model Must Be At Least 2018 Or Newer; Should The Vehicle Develop Any Mechanical Fault In Transit, The Tour Operator Must Have A Replacement Within An Hour. D. Vehicles Must Have Available First Aid-kit Onboard With Provision Of Wet Tissue, Alcohol, Mineral Water And Mints. *personal Health/first Aid Kits For 12 Pax To Include At Least Six (6) Pieces Of The Following Medicines: - Antacid For Upset Stomach - Paracetamol For Headache And Fever Antihistamine For Allergies - Loperamide For Diarrhea - Meclizine Hydrochloride For Motion Sickness - Ibuprofen For Pain Reliever • Ensure The Availability Of Umbrellas For The Guests In Case Of Rain. • Maximum Of 15 Hours Per Day Inclusive Of Overtime And Drivers’ Fee. • Must Include Driver’s Fee As Well As His Food And Other Miscellaneous Cost, Maintenance Cost, Gasoline, Lubricant, Parking Fee, Toll Fee, Other Consumable Cost, And Other Onsite Related Expenses. • Driver Should Have Strong Navigation Skills, Always In Proper Attire Or Uniform, Presentable And Experienced In Interacting With Foreign Guests. Iv. Accommodation - Total No. Of Pax: 12 Pax - Duration: 17-21 March 2025 A. 10 Single Deluxe Rooms With Breakfast B. 1 Twin Bedroom With Breakfast For 2pax C. At Least 4 Star Rated Establishment Or At Least Aa-rated Resort D. Dot-accredited Establishment E. Accessible To Shopping, Recreation, And Attraction Areas (please Refer To The Attached Itinerary). F. Can Provide A One-hour Spa/ Massage Service For Maximum Of 12 Guests V. Meals And Beverages - Provision Of Full-board Meals And Beverages For 12 Pax For The Whole Duration Of The Trip - Php 3,400.00 Per Pax Inclusive Of The Following: A. Three (3) Am And Pm Snacks – Php 500/pax B. Four (4) Lunch – Php 1,200/pax C. Four (4) Dinner – Php 1,700/pax - Menu To Be Approved By Tpb - Winning Bidder To Provide Proposed Menu Additional Notes: • One (1) Round Of Non-alcoholic Beverage And One (1) Round Of Alcoholic Beverage Per Meal • Tpb Representative To Finalize The Order/s Per Meal Based On The Itinerary. • Ensure Provision Of Dietary Requirements, If There Is Any. • Should The Tpb/dot Be Able To Secure Meal Hosting, The Supplier Will Deduct This From The Final Bill (to Be Conferred With Tpb). Vi. Tour Activities - Book, Conduct, Coordinate In Advance With Establishments, Provide Interactive/ Experiential Tours And Activities For 12 Pax. - Cover Entrance, Environmental Fees And Other Related Expenses, If Needed. Additional Notes: • Tour Activities And Dates Are Subject To Change Based On The Recommendations Of Tpb, Dot Foreign And Regional Offices Involved. • Provide Alternative Itinerary Or Activity In Case Of Bad Weather, Risk Of Typhoon, And Other Force Majeure And Other Unforeseen Or Fortuitous Event, Subject To The Approval Of Tpb. • Final Itinerary To Be Approved By The Tpb. Vii. Tour Kits - Provision Of Safety Tour Kits For 12 Pax To Include The Following: A. Kits Placed In Reusable Drawstring Bags, Cacha Bags Or In Sustainable Packaging B. 500 Ml Reusable Water Tumbler C. Two (2) Pieces Individually Wrapped Disposable Kn94 Masks D. One (1) Pack Of Facial Tissue E. One (1) Pack Wet Wipes (biodegradable Bamboo Fiber Material) F. 50 Ml. Of 70% Isopropyl Alcohol In Spray Bottle G. Hand Sanitizer H. Mints I. Mosquito Repellant In Spray J. Sunblock K. Disposable Hooded Emergency Raincoat Viii. Tour Guide - Provision Of One (1) Licensed Dot-accredited Chinese Or English-speaking Tour Guide With The Following Qualifications: A. Must Be Familiar With The Destination, Must Be Fluent And Conversant In Chinese And English, And Have A Strong Sense Of Philippine History, Culture, Tradition, Art As Well As Current Events. B. Must Have Handled At Least (3) Foreign Tour Groups In The Past 5 Years *note: Copy Of Dot-accreditation And Curriculum Vitae (cv) Must Be Submitted To Tpb Ten (10) Days Before The Actual Tour. Ix. Tour Coordinator - Provision Of Tour Coordinator To Handle On-site Requirements And Arrangements For The Duration Of The Tour. Additional Notes: • Tour Coordinator Must Have At Least Three (3) Years Relevant Experience. • Bidder Should Submit A Copy Of The Curriculum Vitae (cv) Of The Proposed Tour Coordinator In Their Technical Bid. • Shall Work Closely With The Tour Guide As Well As The Assigned Tpb Officer On All Matters Required For The Smooth Implementation Of The Tour. X. Tour Signage, Banner And Itinerary Booklet - Provision Of Vehicle Banners, Identifiers For The Delegates. - Post Tour Banner (1 M X 2 M) For Group Photos (preferably Cloth) - Provision Of A Printed And Digital Tour Booklet Showing The Detailed Itinerary, Photos Of The Destinations, Contact Persons, And Emergency Contact Details. *proposed Design Will Be Subject To Tpb’s Approval Xi. Sustainable Destination-based Giveaways - Provision Of Curated Sustainable Destination-based Giveaways For 12 Pax @ Php 500 Each. *note: Submit Photos Of Proposed Giveaways To Be Included In The Bid, For Tpb’s Approval. Xii. Miscellaneous Expenses - Communication Expenses, Food Sampling, Coordination Meetings, Supplies, Dot-shanghai Local Hire Dsa And Other On-site & Administrative Expenses Amounting To Php 16,000.00 *note: Billing Should Be Based On Actual Expense And Must Be Supported By Receipts. Xiii. Other Requirements - Must Be A Dot-accredited Tour Operator Company. Please Include A Copy Of The Dot-accredited Certification In Their Bid; - Engaged In The Business As A Travel And Tour Operator For At Least Three (3) Years At The Date And Time Of The Submission Of The Bids And - Submit List Of At Least Three (3) Similar Projects/groups Handled In The Last Five Years As Part Of Their Bid. - The Winning Tour Operator Should Cover All Travel Expenses And Insurance Of All Their Deployed Personnel And All Administrative Expenses Including Gratuity Pay. Additional Notes: Itinerary And Dates May Be Subject To Change Based On The Availability Of Flights, Accommodation, Activities, And Travel Restrictions/quarantine Status Of The Chosen Destinations, If Applicable. Legal Requirements: 1. Mayor’s/ Business Permit 2. Philgeps Registration Number/ Certificate 3. Income/business Tax Return 4. Notarized Omnibus Sworn Statement Attachments: 1. Technical Specifications/ Terms Of Reference 2. Statement Of Compliance 3. Omnibus Sworn Statement Note: 1. All Entries Must Be Typewritten In Your Company Letterhead. 2. Price Validity Shall Be For A Period Of Thirty (30) Calendar Days. Terms - Payment Shall Be Made Within 30 Working Days Upon Submission Of The Statement Of Account, After The Conclusion Of The Event, So Long As There Are No Additional Documentary Requirements Or Billing Concerns; - The Supplier Is Encouraged To Have A Landbank Account. Payment Will Be Made Through Lbp Bank Deposit. In Case The Supplier Does Not Have A Landbank Account, Bank Charges Will Be Shouldered By The Supplier; And - Terms Of Payment To The Winning Bidder Shall Be In Accordance With The Government Procedure (send Bill Arrangement Must Be Based On The Actual Number Of Participants). Tpb Shall Inform The Winning Bidder Of The Sponsorships Secured Two (2) Weeks Before The Date Of The Event Abc Php900,000.00 Inclusive Of Service Charge And All Applicable Taxes.
Closing Date21 Feb 2025
Tender AmountPHP 900 K (USD 15.5 K)
9521-9530 of 9846 archived Tenders