Scanning Tenders

Scanning Tenders

ARCHITECT OF THE CAPITOL USA Tender

Civil And Construction...+2Others, Pipe Line Project
United States
Details: General annual Piping Inspections Of The Capitol Power Plant (cpp) Utility Distribution System (uds) Tunnels. short Description on An Annual Basis, The Contractor Shall Perform A Comprehensive Piping Inspection Of The Capitol Power Plant (cpp) Utility Distribution System (uds). evaluate The Current Pipe Thickness Of Steam Lines, Chilled Water Lines, And Condensate Piping Systems Throughout The Uds To Determine Discrete Locations For Piping Inspections. background the Capitol Power Plant (cpp) Provides Steam And/or Chilled Water Service To Twenty-three (23) Buildings Within The Capitol Complex. Buildings Receive Steam And/or Chilled Water Service From The Network Of Piping Located Within The Cpp Utility Tunnels And From Direct-buried Piping Systems. the Walkable And Utility (non-walkable) Tunnels, Buried Pipelines, And Utility Vaults Are Aoc Permit-required Confined Spaces And May Contain Asbestos-containing Material And Lead-based Painted Materials. objectives the Contractor Shall Perform Comprehensive Piping Inspection Of The Cpp Uds Tunnels (walkable, Non-walkable/utility Vaults, And Branch Tunnels) To Evaluate If The Piping Still Meets The Requirements Of Asme B31.1 Based On The Operating And Design Pressure And Temperature Of The Steam Supply, Chilled Water Supply (cws), High/low Pressure Condensate Return, And Chille Water Return (cwr). scope the Purpose Of This Solicitation Is For The Contractor To Furnish All Labor, Materials, Supplies, Equipment, Software, Transportation, Management, And Incidentals To Perform Site Investigations And Any Evaluations (i.e. Pipe Stress Analysis, Life Cycle, Or Other Test Methods) For Preparing An Engineering Assessment Of The Steam, Chilled Water, And Condensate Distribution System. assess The Current Condition Of The Piping Systems In Terms Of Remaining Wall Thickness, Wall Loss, Corrosion Rate, And Estimated Remaining Service Life. Evaluate Existing And Past Piping Assessment Reports (provided For Reference Only) For Piping Re-inspection At Certain Locations As Determined Which Require Close Monitoring. identify Any System Weakness, And Immediate And Near-term Threats Of Leak Or Failure. Post Compiling Of All The Information, The Contractor Shall Evaluate If The Piping Still Meets The Requirements Of Asme B31.1 Based On The Operating And Design Pressure And Temperature Of The Steam Supply, Cws, High/low Pressure Condensate Return, And Cwr. the Contractor Provides An Engineering Assessment With Remedial Recommendations That Are Safe And Effective Based On Applicable Engineering Standards And Industry Best Practices. Provide Documentation Of Specific Findings And Observations Contributing To Such Abnormally Higher Corrosion Activity. evaluate Existing And Past Piping Assessment Reports (provided For Reference Only) For Piping Re-inspection At Certain Locations As Determined Which Require Close Monitoring. evaluate The Current Pipe Thickness Of Steam Lines (insulated), Chilled Water Lines (insulated), And Condensate Piping (insulated) Systems Throughout The Uds To Determine Discrete Locations For Piping Inspections. Compare The Measured Thickness With The Minimum Pipe Thickness Required By The Industry (asme B31.1). the Contractor Shall Be Responsible For Removal Of Pipe Insulation And Shall Provide Pipe Cleaning And Surface Preparation Per Required Guidelines. The Contractor Shall Be Responsible For Re-insulating The Removed Insulation Post-inspection. Removal, Storage, Surface Preparation, And Re-installation Of Pipe Insulation And Jacketing Within A Timely Manner To Ensure Efficient And Safe Operations Of Cpp Uds. this Work May Require Coordination With Aoc Cpp Steam Line Charging, Steam Line Switchover, Safety Stand-downs, Evacuations, And Evacuation Drills, Etc., During The Project Inspection Period. types Of Inspection types Of Inspections (as Applicable Per Asme B31.1 Requirements - Inclusive And Not Limited To): magnetic Particle Examination inspect The Exposed Welds And Attachment Points For Surface Defects. time Of Flight Diffraction Ultrasonic (tofd) inspect The Seam Welds For Defects. linear Phased Array (lpa) Ultrasonic Testing investigate And Provide Suspected Defects. Use Encoded Lpa To Inspect The Girth Welds. a-scan And B-scan Ultrasonic Testing establish Reference Locations And Scan The Piping To Generate Wall Thickness Data. Establish Surface Profile Morphology Of Piping System At Reference Locations Using 3d Laser Scanning. energy Dispersive X-ray Spectrometry remove Representative Corrosion Samples For Elemental Analysis. Perform Energy Dispersive X-ray Spectrometry To Detect And Measure Elemental Composition. hardness Inspection guided Wave Thickness eddy Pulse Current report generate A Report With The Following Contents: Executive Summary, Background, Summary Of All Test Results, Detailed Analysis Of Individual Test Locations, Trend Analysis Graphs, Priority Listing Of Tested Areas, Conclusions And Recommendations, And Potential Addendums, Appendix Etc. contract Type: Firm Fixed Price (ffp) place Of Performance / Hours Of Operation capitol Hill And Capitol Power Plant, Located At 25 E Street Se, Washington Dc 20003. 6:00 Am To 2:30 Pm (monday Through Friday). period Of Performance a Base Contract Will Be Award Date Up To 12 Months. Each Option Year Will Be For One Year After The Base Year With Four (4) Option Years. onsite Activities Related To Piping Inspections Of Utility Distribution Lines Between The Warmer Months Of May Through September Of Each Calendar Year Weather Dependent. funding for The Base Year And Each Option Period Will Be Subject To The Governments Need For Services And Availability Of Fiscal Year Funding. privacy Act all Plans, Specifications, And Photographs In Reference To This Project Are The Property Of The United States Government. Copying, Disseminating, Or Distributing Is Prohibited. the Contractor Shall Not Release Any Project Information, In Any Format, Without Prior Written Approval By The Aoc Contracting Officer (aoc Co) In Accordance With Aoc52.203-2 And Aoc52.203-4. personal Service this Is Not A Personal Services Contract. security in Accordance With Clause Aoc52.223-5 “special Security Requirements – Services (feb 2010) Of The Contract, Within 7 Calendar Days After Date Of Award The Contractor Shall Submit To The Cor A List Of All Employees Proposed To Support This Contract. The Contractor Shall Comply With All Aoc Security Regulations, Policies, And Procedures. furthermore, In Accordance With Clause Aoc52.204-4 “personal Identity Verification Of Contractor Personnel (december 2012),” Of The Contract, A Copy Of The E-verify Case Details Document Evidencing “employment Authorized” (final Verification Request) Shall Be Provided With Each Request For An Aoc Id Badge.” all Offeror Employees Shall Submit An E-verify Form And A United States Capitol Police Background Check Form (cp-491) Prior To Working On Any Task Order Under The Bpa. The Offeror’s Employees Shall Also Complete An Offeror Badging Request Form. All Members Of The Team Working On Site Will Be Required To Submit To Wear An Identification Badge, That Is In Visible Sight, At All Times. On Site Work May Be Interrupted Because Of Congressional Events Or U.s. Capitol Police Requirements. All Work To Be Performed Is Subject To Government Interruptions. safety the Contractor Shall Observe All Safety Precautions Throughout The Performance Of This Contract. all Aoc, Em 385 1-1, Osha, And Ocwr Safety Procedures Shall Be Always Followed. The Work To Be Performed Is In Permit-required Confined Space Tunnels, And All Entrants Must Take And Submit Certifications As Proof Of Successfully Completing All Required Training Before Entering A Tunnel, Including, But Not Limited To, Permit-required Confined Space, Asbestos Awareness And Heat Stress Prevention. the Contractor Shall Assume Full Responsibility And Liability For Compliance With Applicable Regulations Pertaining To The Health And Safety Of Personnel During The Execution Of Work And Shall Hold The Aoc Harmless For Any Action On His/her Part, Or That Of His/her Employees Or Subcontractors, Which Results In Illness, Injury, Or Death. energy Efficiency/compliance the Contractor Must Follow Applicable Aoc Policies, Dc Regulations, Environmental Protection Association Regulations, And Dc Department Of Transportation Regulations. sustainability this Section Is Not Used. key Personnel the Contractor Shall Staff This Project With Appropriate Subject Matter Expert (sme) Personnel To Perform The Required Scope As Described Above. key Personnel Shall Be Administered In Accordance With Aoc52.211-1, Key Personnel And Aoc52.211-2, Approval Of Substitute Offeror Personnel. key Personnel May Not Be Removed From The Contract Without The Approval Of The Co. quality Control this Will Be The Responsibility Of The Contractor For All Work Performed In The Field And Before The Submission Of Any Documents/records To The Aoc Must Review And Certify. records / Data all Records And Data Produced Under This Contract The Property Of The Aoc. The Aoc Will Archive All Submitted Data For The Record. Per Deliverables. Aoc52.227-2, Unlimited Government Rights (nov 2004), The Government Shall Have Unlimited Rights Other Work Developed In The Performance Of This Contract, Including The Right To Use Same On Any, For The Benefit Of The Government, In All Drawings, Designs, Specifications, Notes, And Other Government Work Without Additional Cost To The Government; And With Respect Thereto The Contractor Agrees To And Does Hereby Grant To The Government A Royalty-free License To All Such Data Which The Contractor May Cover By Copyright And To All Designs As To Which The Contractor May Assert Any Rights Or Establish Any Claim Under The Design Patent Or Copyright Laws. The Contractor Agrees To Furnish And To Provide Access To All Such Materials At The Request Of The Contracting Officer. Pdfs And Electronic Files Will Be Included In Every Submission. Electronic Files Must Be Submitted In Microsoft Excel Format. All Documents Are Included In The Aoc Non-disclosure Agreement. packaging/packing/shipping Instructions not Applicable To This Contract offsite Screening Instructions all Large Equipment / Service Trucks Required For The Assessment Must Be Screened By The Us Capitol Police At The Offsite Screening Facility In Accordance With Capitol Police Procedures. applicable Documents tbd points Of Contact contracting Officer (co): Tbd contracting Officer’s Representative (cor): Tbd definitions & Acronyms As Defined In Context And Stated Below: aoc – Architect Of The Capitol co- Contracting Officer cor – Contracting Officers Representative idiq - Indefinite Delivery Indefinite Quantity osha – Occupational Safety And Health Administration far – Federal Acquisition Regulation ffp - Firm-fixed Price ahj – Authorities Having Jurisdiction cfr – Code Of Federal Regulations cpp – Capitol Power Plant sow – Statement Of Work uds – Utility Distribution System government Furnished Property (gfp) not Applicable To This Contract contractor Furnished Items the Contractor Shall Provide All Labor, Tools, Materials, Equipment, Software’s, Hardware, Technology, Manpower, Scaffolding, Transportation, Connections, Tie-in, Testing Instrumentation, Safety Tools And Equipment And All Other Miscellaneous Items Per Their Means And Methods Required To Complete The Project Contract Work Including Required Ppe. proposal Submission: Government Request Proposals Submitted Electronically. travel Costs: All Travel Costs Shall Be Built Into A Fixed Pricing Schedule. deliverables And Reports hard Copies And Electronic Via Web Base For All Submittals. inspection And Acceptance inspection And Acceptance Shall Be Conducted In Accordance With Contract Clause Aoc52.246-5 Inspection And Acceptance - Architect-engineer Services (nov 2004). inspection, Review, And Acceptance Will Be Performed By Co With Cor Support. procedures For Payment billing And Payment Shall Be Accomplished In Accordance With Contract Clauses 52.232-10 Payments Under Fixed-price Architect-engineer Contracts (apr 2010), Aoc52.232-1 Payment Requests (march 2012), And Aoc52.232-6 Payment By Electronic Funds Transfer (march 2012). payment Will Be Accomplished Through Ipp. Submit A Draft By The 25th Of Every Month To Cor For Review And Approval; Once Agreed Upon, Submit It Into The Ipp System And Provide A Copy To Co And Cor For Tracking. instructions For Responding To This Rfi: 1) Please Provide A Response To The Following Questions From The Government: a) Will Your Company Be Interested In Submitting A Quotation For This Contract If A Solicitation Is Issued? b) Can Your Company Perform This Scope Of Work Under Its Gsa Schedule Contract? If So, What Is The Gsa Schedule Contract Number? What Sin Is This Usually Done Under? Or Is This A Mix Of Sins? c) What Questions Do You Have For The Government? (you May Either List Your Questions In The Rfi Response Or You May Email The Questions To The Contracting Officer, Donald Fuqua At Donald.fuqua@aoc.gov If It Helps You To Provide A Better Response With The Answers Known) d) What Is The Usual Duration Of A Contract For This Work? In Other Words, What Period Of Performance Is Typical For This? e) Please Provide Examples Of Past Contracts Within The Past Three Years That Are Either Completed Or Ongoing That Have The Same Or Similar Scope Of Work. Please Provide The Awarded Contract Dollar Amount As Well. f) Any Other Information You Believe Will Be Of Interest To The Government. please Email Responses To The Contracting Officer, Donald Fuqua At Donald.fuqua@aoc.gov By Noon On June 28, 2024. thank You, donald Fuqua architect Of The Capitol supplies, Services, And Material Management Division (ssmmd) www.aoc.gov
Closing Date28 Jun 2024
Tender AmountRefer Documents 

ARCHITECT OF THE CAPITOL USA Tender

Civil And Construction...+2Others, Pipe Line Project
United States
Details: General annual Piping Inspections Of The Capitol Power Plant (cpp) Utility Distribution System (uds) Tunnels. short Description on An Annual Basis, The Contractor Shall Perform A Comprehensive Piping Inspection Of The Capitol Power Plant (cpp) Utility Distribution System (uds). evaluate The Current Pipe Thickness Of Steam Lines, Chilled Water Lines, And Condensate Piping Systems Throughout The Uds To Determine Discrete Locations For Piping Inspections. background the Capitol Power Plant (cpp) Provides Steam And/or Chilled Water Service To Twenty-three (23) Buildings Within The Capitol Complex. Buildings Receive Steam And/or Chilled Water Service From The Network Of Piping Located Within The Cpp Utility Tunnels And From Direct-buried Piping Systems. the Walkable And Utility (non-walkable) Tunnels, Buried Pipelines, And Utility Vaults Are Aoc Permit-required Confined Spaces And May Contain Asbestos-containing Material And Lead-based Painted Materials. objectives the Contractor Shall Perform Comprehensive Piping Inspection Of The Cpp Uds Tunnels (walkable, Non-walkable/utility Vaults, And Branch Tunnels) To Evaluate If The Piping Still Meets The Requirements Of Asme B31.1 Based On The Operating And Design Pressure And Temperature Of The Steam Supply, Chilled Water Supply (cws), High/low Pressure Condensate Return, And Chille Water Return (cwr). scope the Purpose Of This Solicitation Is For The Contractor To Furnish All Labor, Materials, Supplies, Equipment, Software, Transportation, Management, And Incidentals To Perform Site Investigations And Any Evaluations (i.e. Pipe Stress Analysis, Life Cycle, Or Other Test Methods) For Preparing An Engineering Assessment Of The Steam, Chilled Water, And Condensate Distribution System. assess The Current Condition Of The Piping Systems In Terms Of Remaining Wall Thickness, Wall Loss, Corrosion Rate, And Estimated Remaining Service Life. Evaluate Existing And Past Piping Assessment Reports (provided For Reference Only) For Piping Re-inspection At Certain Locations As Determined Which Require Close Monitoring. identify Any System Weakness, And Immediate And Near-term Threats Of Leak Or Failure. Post Compiling Of All The Information, The Contractor Shall Evaluate If The Piping Still Meets The Requirements Of Asme B31.1 Based On The Operating And Design Pressure And Temperature Of The Steam Supply, Cws, High/low Pressure Condensate Return, And Cwr. the Contractor Provides An Engineering Assessment With Remedial Recommendations That Are Safe And Effective Based On Applicable Engineering Standards And Industry Best Practices. Provide Documentation Of Specific Findings And Observations Contributing To Such Abnormally Higher Corrosion Activity. evaluate Existing And Past Piping Assessment Reports (provided For Reference Only) For Piping Re-inspection At Certain Locations As Determined Which Require Close Monitoring. evaluate The Current Pipe Thickness Of Steam Lines (insulated), Chilled Water Lines (insulated), And Condensate Piping (insulated) Systems Throughout The Uds To Determine Discrete Locations For Piping Inspections. Compare The Measured Thickness With The Minimum Pipe Thickness Required By The Industry (asme B31.1). the Contractor Shall Be Responsible For Removal Of Pipe Insulation And Shall Provide Pipe Cleaning And Surface Preparation Per Required Guidelines. The Contractor Shall Be Responsible For Re-insulating The Removed Insulation Post-inspection. Removal, Storage, Surface Preparation, And Re-installation Of Pipe Insulation And Jacketing Within A Timely Manner To Ensure Efficient And Safe Operations Of Cpp Uds. this Work May Require Coordination With Aoc Cpp Steam Line Charging, Steam Line Switchover, Safety Stand-downs, Evacuations, And Evacuation Drills, Etc., During The Project Inspection Period. types Of Inspection types Of Inspections (as Applicable Per Asme B31.1 Requirements - Inclusive And Not Limited To): magnetic Particle Examination inspect The Exposed Welds And Attachment Points For Surface Defects. time Of Flight Diffraction Ultrasonic (tofd) inspect The Seam Welds For Defects. linear Phased Array (lpa) Ultrasonic Testing investigate And Provide Suspected Defects. Use Encoded Lpa To Inspect The Girth Welds. a-scan And B-scan Ultrasonic Testing establish Reference Locations And Scan The Piping To Generate Wall Thickness Data. Establish Surface Profile Morphology Of Piping System At Reference Locations Using 3d Laser Scanning. energy Dispersive X-ray Spectrometry remove Representative Corrosion Samples For Elemental Analysis. Perform Energy Dispersive X-ray Spectrometry To Detect And Measure Elemental Composition. hardness Inspection guided Wave Thickness eddy Pulse Current report generate A Report With The Following Contents: Executive Summary, Background, Summary Of All Test Results, Detailed Analysis Of Individual Test Locations, Trend Analysis Graphs, Priority Listing Of Tested Areas, Conclusions And Recommendations, And Potential Addendums, Appendix Etc. contract Type: Firm Fixed Price (ffp) place Of Performance / Hours Of Operation capitol Hill And Capitol Power Plant, Located At 25 E Street Se, Washington Dc 20003. 6:00 Am To 2:30 Pm (monday Through Friday). period Of Performance a Base Contract Will Be Award Date Up To 12 Months. Each Option Year Will Be For One Year After The Base Year With Four (4) Option Years. onsite Activities Related To Piping Inspections Of Utility Distribution Lines Between The Warmer Months Of May Through September Of Each Calendar Year Weather Dependent. funding for The Base Year And Each Option Period Will Be Subject To The Governments Need For Services And Availability Of Fiscal Year Funding. privacy Act all Plans, Specifications, And Photographs In Reference To This Project Are The Property Of The United States Government. Copying, Disseminating, Or Distributing Is Prohibited. the Contractor Shall Not Release Any Project Information, In Any Format, Without Prior Written Approval By The Aoc Contracting Officer (aoc Co) In Accordance With Aoc52.203-2 And Aoc52.203-4. personal Service this Is Not A Personal Services Contract. security in Accordance With Clause Aoc52.223-5 “special Security Requirements – Services (feb 2010) Of The Contract, Within 7 Calendar Days After Date Of Award The Contractor Shall Submit To The Cor A List Of All Employees Proposed To Support This Contract. The Contractor Shall Comply With All Aoc Security Regulations, Policies, And Procedures. furthermore, In Accordance With Clause Aoc52.204-4 “personal Identity Verification Of Contractor Personnel (december 2012),” Of The Contract, A Copy Of The E-verify Case Details Document Evidencing “employment Authorized” (final Verification Request) Shall Be Provided With Each Request For An Aoc Id Badge.” all Offeror Employees Shall Submit An E-verify Form And A United States Capitol Police Background Check Form (cp-491) Prior To Working On Any Task Order Under The Bpa. The Offeror’s Employees Shall Also Complete An Offeror Badging Request Form. All Members Of The Team Working On Site Will Be Required To Submit To Wear An Identification Badge, That Is In Visible Sight, At All Times. On Site Work May Be Interrupted Because Of Congressional Events Or U.s. Capitol Police Requirements. All Work To Be Performed Is Subject To Government Interruptions. safety the Contractor Shall Observe All Safety Precautions Throughout The Performance Of This Contract. all Aoc, Em 385 1-1, Osha, And Ocwr Safety Procedures Shall Be Always Followed. The Work To Be Performed Is In Permit-required Confined Space Tunnels, And All Entrants Must Take And Submit Certifications As Proof Of Successfully Completing All Required Training Before Entering A Tunnel, Including, But Not Limited To, Permit-required Confined Space, Asbestos Awareness And Heat Stress Prevention. the Contractor Shall Assume Full Responsibility And Liability For Compliance With Applicable Regulations Pertaining To The Health And Safety Of Personnel During The Execution Of Work And Shall Hold The Aoc Harmless For Any Action On His/her Part, Or That Of His/her Employees Or Subcontractors, Which Results In Illness, Injury, Or Death. energy Efficiency/compliance the Contractor Must Follow Applicable Aoc Policies, Dc Regulations, Environmental Protection Association Regulations, And Dc Department Of Transportation Regulations. sustainability this Section Is Not Used. key Personnel the Contractor Shall Staff This Project With Appropriate Subject Matter Expert (sme) Personnel To Perform The Required Scope As Described Above. key Personnel Shall Be Administered In Accordance With Aoc52.211-1, Key Personnel And Aoc52.211-2, Approval Of Substitute Offeror Personnel. key Personnel May Not Be Removed From The Contract Without The Approval Of The Co. quality Control this Will Be The Responsibility Of The Contractor For All Work Performed In The Field And Before The Submission Of Any Documents/records To The Aoc Must Review And Certify. records / Data all Records And Data Produced Under This Contract The Property Of The Aoc. The Aoc Will Archive All Submitted Data For The Record. Per Deliverables. Aoc52.227-2, Unlimited Government Rights (nov 2004), The Government Shall Have Unlimited Rights Other Work Developed In The Performance Of This Contract, Including The Right To Use Same On Any, For The Benefit Of The Government, In All Drawings, Designs, Specifications, Notes, And Other Government Work Without Additional Cost To The Government; And With Respect Thereto The Contractor Agrees To And Does Hereby Grant To The Government A Royalty-free License To All Such Data Which The Contractor May Cover By Copyright And To All Designs As To Which The Contractor May Assert Any Rights Or Establish Any Claim Under The Design Patent Or Copyright Laws. The Contractor Agrees To Furnish And To Provide Access To All Such Materials At The Request Of The Contracting Officer. Pdfs And Electronic Files Will Be Included In Every Submission. Electronic Files Must Be Submitted In Microsoft Excel Format. All Documents Are Included In The Aoc Non-disclosure Agreement. packaging/packing/shipping Instructions not Applicable To This Contract offsite Screening Instructions all Large Equipment / Service Trucks Required For The Assessment Must Be Screened By The Us Capitol Police At The Offsite Screening Facility In Accordance With Capitol Police Procedures. applicable Documents tbd points Of Contact contracting Officer (co): Tbd contracting Officer’s Representative (cor): Tbd definitions & Acronyms As Defined In Context And Stated Below: aoc – Architect Of The Capitol co- Contracting Officer cor – Contracting Officers Representative idiq - Indefinite Delivery Indefinite Quantity osha – Occupational Safety And Health Administration far – Federal Acquisition Regulation ffp - Firm-fixed Price ahj – Authorities Having Jurisdiction cfr – Code Of Federal Regulations cpp – Capitol Power Plant sow – Statement Of Work uds – Utility Distribution System government Furnished Property (gfp) not Applicable To This Contract contractor Furnished Items the Contractor Shall Provide All Labor, Tools, Materials, Equipment, Software’s, Hardware, Technology, Manpower, Scaffolding, Transportation, Connections, Tie-in, Testing Instrumentation, Safety Tools And Equipment And All Other Miscellaneous Items Per Their Means And Methods Required To Complete The Project Contract Work Including Required Ppe. proposal Submission: Government Request Proposals Submitted Electronically. travel Costs: All Travel Costs Shall Be Built Into A Fixed Pricing Schedule. deliverables And Reports hard Copies And Electronic Via Web Base For All Submittals. inspection And Acceptance inspection And Acceptance Shall Be Conducted In Accordance With Contract Clause Aoc52.246-5 Inspection And Acceptance - Architect-engineer Services (nov 2004). inspection, Review, And Acceptance Will Be Performed By Co With Cor Support. procedures For Payment billing And Payment Shall Be Accomplished In Accordance With Contract Clauses 52.232-10 Payments Under Fixed-price Architect-engineer Contracts (apr 2010), Aoc52.232-1 Payment Requests (march 2012), And Aoc52.232-6 Payment By Electronic Funds Transfer (march 2012). payment Will Be Accomplished Through Ipp. Submit A Draft By The 25th Of Every Month To Cor For Review And Approval; Once Agreed Upon, Submit It Into The Ipp System And Provide A Copy To Co And Cor For Tracking. instructions For Responding To This Rfi: 1) Please Provide A Response To The Following Questions From The Government: a) Will Your Company Be Interested In Submitting A Quotation For This Contract If A Solicitation Is Issued? b) Can Your Company Perform This Scope Of Work Under Its Gsa Schedule Contract? If So, What Is The Gsa Schedule Contract Number? What Sin Is This Usually Done Under? Or Is This A Mix Of Sins? c) What Questions Do You Have For The Government? (you May Either List Your Questions In The Rfi Response Or You May Email The Questions To The Contracting Officer, Donald Fuqua At Donald.fuqua@aoc.gov If It Helps You To Provide A Better Response With The Answers Known) d) What Is The Usual Duration Of A Contract For This Work? In Other Words, What Period Of Performance Is Typical For This? e) Please Provide Examples Of Past Contracts Within The Past Three Years That Are Either Completed Or Ongoing That Have The Same Or Similar Scope Of Work. Please Provide The Awarded Contract Dollar Amount As Well. f) Any Other Information You Believe Will Be Of Interest To The Government. please Email Responses To The Contracting Officer, Donald Fuqua At Donald.fuqua@aoc.gov By Noon On June 28, 2024. thank You, donald Fuqua architect Of The Capitol supplies, Services, And Material Management Division (ssmmd) www.aoc.gov
Closing Date28 Jun 2024
Tender AmountRefer Documents 

Corazon Locsin Montelibano Memorial Regional Hospital doh R6 Tender

Healthcare and Medicine
Philippines
Details: Description Item Description Abc Unit Qty 1 Procure And Delivery Of Gas Flow Analyzer 1,500,000.00 Pc 1.00 Technical Specification Procure And Delivery Of Vital Signs Simulator Location: Engineering Facilities Management (efm) Biomedical Unit Estimated Budget: Php 1,500,000.00 General Statement: This Project Entails The Procure And Delivery Of A Vital Signs Simulator To Engineering Facilities Management (efm) Biomedical Unit, Corazon Locsin Montelibano Memorial Regional Hospital (clmmrh), Bacolod City, Negros Occidental. General Scope Of Works: 1. The External Service Provider Shall Provide And Deliver The Vital Signs Simulator In Accordance With The Specification Attached In Annex A. 2. The External Service Provider Shall Provide Hard And Soft Copies Of The Following: A. Calibration Report/certificate/sticker B. Service Report C. Warranty Certificate D. User And Service Manual E. Training Certificate 3. The External Service Provider Shall Conduct Two (2) Days Face To Face Technical Training With Soft And Hard Copies Of Training Manuals With The Following Topics: 3.1.theory Of Operation Of Vital Signs Simulator 3.2.theory Of Operation And Functions On The Following Medical Equipment: 3.2.1 Electrocardiogram (ecg) 3.2.2 Fetal Monitor 3.2.3.patient Monitor 3.2.4 Cardiac Monitor 3.2.5 Bp Apparatus (analog & Digital) 3.2.6 Pulse Oximeter 3.2.7 Temperature Monitors 3.3. Actual Demonstration Of Calibration And Verification Of Medical Equipment Stated In Item 3.2 Using The Vital Signs Simulator. The General Conditions: 1.) The External Service Provider Service Shall Complete The Project Within Sixty (60) Working Days Upon Receipt Of The Purchase Order. 2.) The External Service Provider Shall Provide One (1) Year Warranty On Parts And Labor For The Manufacturing Defects Of The Equipment. In Case Of Test Tools Pullout For Warranty Coverage, A Loaner Of The Same Shall Be Provided By The External Service Provider. 3.) The Training Certificate Shall Have No Date Of Validity Indicated. 4.) The External Service Provider Shall Provide 24/7 Customer Service Within The Warranty Period In Case Of Equipment Breakdown. 5.) The External Service Provider Shall Provide Licensed Software, Along With A Computer And Printer, For Extracting Data From The Vital Signs Simulator. This Software Should Facilitate The Generation And Printing Of Reports Detailing The Testing, Calibration, And Verification Undergone By The Equipment. 6.) The Soft Copies Of The Report Shall Be Sent To The Official Email Of The Efm Biomedical Unit (emails: Biomedclmmrh@2gmail.com, Biomedclmmrh23@gmail.com,) Annex A Vital Sign Simulator Specifications Key Features:  Multi Parameters For Medical Equipment Simulation Including Nibp/ibp, Spo2, Cardiac Output, Cardiac Catheterization, Ecg, Fetal, Arrhythmia, Respiration, And Temperature  Easy And Secure Ecg Snap And Lead Connections  Static Pressure Linearity Testing  Nibp Dynamic Pressure Testing And Repeatability (+/- 2 Mmhg)  Spo2 Accurate Testing With R-curve And Readiness For Future Oximetry Technology  Barcode Scanning And Direct Data Capture Ready With Printing Functionality  Long Life Battery And Easy Replaceable  English Language Interface  Integratable With Pc Interface Using Licensed Software Featuring Customizable Checklists For Automated Data Capture And Storage  Wired And Wireless Communication To Pc For Equipment Testing, Data Transfer, And Automatic Regulatory Reporting Specifications: Specifications: I. Non-invasive Blood Pressure (nibp) Pressure Units Mmhg, Kpa Pressure Range 10mmhg - 400mmhg Pressure Relief Range 100mmhg - 400mmhg Accuracy Range ± 0.5 % - 2% (reading) ± 0.5 - 2 Mmhg Resolution Range 0.1mmhg - 1mmhg Leakage Test Range 20mmhg - 400mmhg Leakage Test Rate Range 0mmhg/min - 200mmhg/min Repeatability Range ± 1 - 2 Mmhg Simulation (systolic/diastolic) Adult: 60/30, 80/50, 100/65, 120/80, 150/100, 200/150, 255/195 Neonatal: 35/15, 60/30, 80//50, 100/75, 120/80, 150/100 Ii. Invasive Blood Pressure (ibp) Channels Two (2) Channels Independently Settable With Identical Parameters And Electrically Isolated From Unwanted Signals Impedance Range 290 - 310 Ω ± 10% Excitation Range 2 - 6 V Peak Excitation Frequency Range Dc To 5khz Sensitivity 5 Or 40 Μv/v/mmhg Iii. Oxygen Saturation (spo2) Emitter/detector Oxygen Saturation Range 30% - 100% Oxygen Accuracy Reading ± 1 Heart Rate Range 30bpm - 300bpm (in 1 Bpm Steps) Pulse Amplitude Range 0% - 20% Pulse Resolution 0.01% Rainbow Technology Rainbow Technology With Adapter Cable For Two (2) Wavelength Test And Rainbow Multiple Wavelength System Curve R-curve Feature Iv. Cardiac Output Catheter Type Baxter Edwards, 93a-131-7f Calibration Coefficient 0.542 ( 0°c Injectate), 0.595 ( 24°c Injectate) Blood Temperature Range 36°c ( 98.6°f) - 38°c ( 100.4°f) ± 0.2 °c In 1°c Steps Injectable Volume 10cc Injectable Temperature Range 0 °c - 24 °c Cardiac Output 2.5, 5, 10 Liters Per Minute ± 7.5% Faulty-injectable Curve Waveform For Simulation Available Left-to-right Shunt Curve Waveform For Simulation Available Calibrated Pulse 1.5* For 1 Second V. Pacemaker Amplitude Settings 0(off), ± 2,± 4,± 6, ± 8, ±10, ± 12,± 14,±16, ± 18, ± 20, 50, ± 100, ± 200, ± 500 And ± 700mv Amplitude Accuracy Range 5% - 10% Pulse Width 0.1ms , 0.2ms , 0.5ms, And 2ms ±5% Paced Arrhythmia Atrial 80 Bpm Asynchronous 75 Bpm Demand With Frequent Sinus Beat Demand With Occasional Sinus Beats Atrio-ventricula Sequential Non Capture ( One Time) Nonfunction Supraventricular Arrhythmia Atrial Fibrillation( Coarse Or Fine): Atrial Flutter; Sinus Arrhythmia, Missed Beat ( One Time); Atrial Tachycardia; Paroxysmal Atrial Tachycardia; Nodal Rhythm; And Supraventricular Tachycardia V. Electrocardiogram (ecg) Amplitude Range 0.05 Mv - 0.5 Mv (0.05mv Steps) 0.5mv To 5.0 Mv( 0.25mv Steps) Pulse Wave 30bpm, 60bpm (60ms Pulse Width) Square Wave .125 Hz, 2hz, 2.5hz R-wave Detection Triangular Phase 30 Bpm, 60bpm, 80bpm, 120bpm, 200bpm, And 250bpm ± ( 1% Of Setting + 1ms) Qrs Detection 8ms - 20ms (2ms Steps) 20ms - 200ms (10ms Steps) 30 Bpm, 60bpm, 80bpm, 120bpm, 200bpm, And 250bpm ± ( 1% Of Setting + 1ms) Tall T-wave Rejection Qt Interval 350ms T-wave 80ms T-wave Shaoe 1/2 Sinewave 0%-150% Amplitude With Respective To Reference Lead 80bpm Rate Accuracy ± 1% Of Setting Ecr Artifact 50 Hz, 60 Hz, Muscular, Baseline Wanders, Respiration 25%, 50%, 100% Of The Normal Sinus R-wave For Each Lead All, Ra,ll, La, V1, V2, V3, V4, V5, V6 ± (2 % Of Setting +0.05mv) 10 Bpm To 360 Bpm In 1 Bpm Steps Vi. Fetal/maternal Electrocardiogram (ecg) Fetal Heart Rate Range 60bpm - 240bpm In 1 Bpm Steps Intrauterine Pressure Waveforms Early Deceleration, Late Deceleration And Acceleration Wave Duration 90 Seconds, Bell-shape Pressure Curve, From 0 Mmhg To 90 Mmhg And Returning To 0 Iup Period 2 Min, 3 Min, Or 5 Minutes: And Manual Vii. Arrhythmia Baseline Nsr 80bpm Pvc Focus Left Focus, Standard Timing ( Except Where Specified) Supraventricular Arrhythmia Atrial Fibrillation( Coarse Or Fine): Atrial Flutter; Sinus Arrhythmia, Missed Beat ( One Time); Atrial Tachycardia; Paroxysmal Atrial Tachycardia; Nodal Rhythm; And Supraventricular Tachycardia Viii. Respiration Rate Range 0, 10 Brpm - 150brpm (1brpm Steps) Waves 300 Ω ± 10% Ration (inspiration:expiration) 1:1, 1:2, 1:3, 1:4, 1:5 Impedance Variation ( A Ω) Range 0.00ω - 1.00ω (0.05ω Steps) 1ω - 5ω (0.25ω Steps) Accuracy Delta ± ( 5% Of Setting + 0.1ω) Baseline 500ω, 1000ω,(default), 1500ω, 2000 Ω, Lead I, Ii, Iii Respiration Lead La Or Ll ( Default) Apnea Selection 12 Sec, 22 Sec, Or 32 Sec(one-time Events), Or Continuous (apnea On= Respiration Off) Viii. Temperature Temperature Range 30 °c - 42.0°c , In 0.5 °c Steps Accuracy ± 0.4 °c General Specifications Operating Temperature 10°c - 40 °c (50°f To 104°f) Humidity Range 10% - 90% Non-condensing Dimension Range (l X W X H) L: 10 - 20cm W: 20 - 40cm H: 5 - 15cm Weight Less Than 2kg (can Be Hand Carried) Display Lcd Color Display Communications Usb Device Upstream Port Usb Host Control Port Wireless Battery Lithium-ion (rechargeable) Battery Life At Least Nine (9) Hours At Full Charge Battery Charger Input: 220vac, 60hz Output: 15v/2.0a Safety Standards Iec/en 61010-1 3rd Edition; Pollution Degree 2 Cat None Certifications Ce, Csa, C-tick N 10140, Rohs Electromagnetic Compatibility Iec 61326-1:2006 Simulation Settings Normal, Hypertensive, Hypotensive, Tachycardic, Bradycardic, Ventricular Fibrillation, Asystole Auto Sequence Settings Monitor Testing, Medical Training, Oximeter Testing, Cardiac Failure, Arrhythmia, Exercise, Respiration, Performance, Ibp, Temperature Accessories User Manual, Getting Start Manual, Battery Pack, Usb Cable, Ibp Cable (unterminated), Carrying Case, Nibp Mandrel Set, Set Of Nibp Cuff Adapters, Ac /dc Power Supply (ac Power Cord) Computer Monitor: 22” Ips Monitor Processor: I7 10th Gen Processor Or Better Ram: 16gb Or Higher Vram: 2gb Or Higher Storage: 1tb Solid State Drive (ssd) (raid 1 Setting) Or Higher Keyboard, Mouse, Power Cord, 3000w Or Higher Uninterruptible Power Supply (ups), 3000w Or Higher Automatic Voltage Regulator (avr), Wi-fi 6 Module (for Wireless Connection) Printer All In One Ink Tank (cyan, Magenta, Yellow, Black) Function:print/scan/copy/automatic, Duplex Printing (precisioncore), Automatic Document Feeder (can Scan Long Size Paper), Friction Feed Display: Lcd Coloured Touch Screen With Physical Buttons Scanner: Flatbed (cis) Type Paper Tray: At Least 1 Front, 1 Back Connectivity: Usb, Wireless (wifi/wifi Direct) Ink: 5 Pcs (cyan, Magenta, Yellow, Black) Paper: 5 Rims 80gm Short And Long Bill Of Quantities Item No. Item Description Qty / Unit Estimated Total Direct Cost 1 Procure And Delivery Of Vital Signs Simulator 1 Pc Php
Closing Date2 Jul 2024
Tender AmountPHP 1.5 Million (USD 25.5 K)

Province Of Aklan Tender

Software and IT Solutions
Philippines
Details: Description 1. 1 Lot - Network Infrastructure For Dr. Rafael Tumbokon Memorial Hospital Project Includes 1 Set - Firewall (branded, Brand New) 3 Years Subscription Central Management Central Reporting Zero-touch Deployment Sd-wan Orchestration Lateral Movement Protection Synchronized User Id Synchronized Sd-wan Powerful Protection Exposes Hidden Risks Blocks Unknown Threats Automatically Responds To Incidents Networking And Sd Wan: Wireless, Sd-wan, Application Aware Routing, Traffic Shaping Ipsec/ssl Site-to-site And Remote Access Vpn (unlimited) Historical On-box Logging And Reporting Network Protection Next-gen Intrusion Prevention System Inspection With Pre-packaged Exceptions Streaming Deep-packet Inspection Ips: Next-gen Intrusion Prevention Advanced Threat Protection Advanced Vpn Technologies Clientless Vpn: Htmls Manage Sd-red Vpn Extensive Network And Threat Reporting Web Protection Powerful User And Group Web Policy Application Control And Qos Web Control Advanced Web Threat Protection App Control Synchronized App Control Synchronized Sd-wan Extensive Web And App Reporting High-performance Traffic Scanning Zero Day Protection: Analyze All Unknown Files Using Ai, Ml, And Sandboxing Cloud-based Intelligence And Analysis Using Multiple Deep Learning Models Dynamic Run-time Analysis Of Unknown File Extensive Threat Intelligence Analysis Reporting Orchestration Point And Click Site-to-site Vpn Orchestration Multi-firewall Reporting With Save, Schedule And Export Web Server Protection Business Application Policy Templates Protection From The Latest Hacks And Attacks Reverse Proxy Physical Interfaces Form Factor: 1u Ports/slots: 10/1 Firewall (mbps): 30,000.00 Ipsec Vpn (mbps): 12,000.00 Threat Protection (mbps): 1,250 Ssl/yls: 1,100 Technical Specifications Firewall Throughput: 30,000 Mbps Firewall Imix: 15,900 Mbps Firewall Latency (64 Byte Udp): 6 Μs Ips Throughput: 5,800 Mbps Threat Protection Throughput: 1,250 Mbps Ngfw: 5,200 Mbps Concurrent Connections: 6,500,000 New Connections/sec: 134,700 Ipsec Vpn Throughput: 12,000 Mbps Ssl Vpn Concurrent Tunnels: 2,500 Ssl/tls Inspection: 1,100 Mbps Ssl/tls Concurrent Connections: 18,432 Storage (local Quarantine/logs):integrated Min. 120 Gb Sata-iii Ssd Ethernet Interfaces (fixed): 8 X Gbe Copper; 2 X Sfp Fiber* Bypass Port Pairs: 1 Management Ports: 1 X Rj45 Mgmt; 1 X Com Rj45 1 X Micro-usb (cable Incl.) Other I/o Ports: 2 X Usb 3.0 (front); 1 X Usb 2.0 (rear) Includes: Mounting Of Firewall In Main Data Frame 2. 2 Sets - Core Switch - Loaded (branded, Brand New) Simple Deployment No Independent Power Supply System Required Two-in-one Network And Power Cable Shortened Construction Period Reduced Costs Simple Deployment Secure And Reliable Loaded, 2x1g Sfp Transceiver, Multimode 24 X 10/100/1000m Electrical Ports Supporting Auto Negotiation + 4 X 1ge Sfp Ports Loaded, 4x1gb Sfp Transceiver, Multimode At Least 256gbps Switching Capacity At Least 42mpps/96mpps Packet Forwarding Rate Rated Input Voltage: Ac Input: Rated Voltage Range 100 V To 240 V, Frequency 50/60 Hz Maximum Input Voltage: Ac Input: Rated Voltage Range 90 V To 264 V, Frequency 50/60 Hz Input Voltage: High Voltage Dc (hvdc) Input: Input Voltage Range 192 V To 290 V Poe 24 X Electrical Ports Supporting Poe And Poe+ Maximum Poe/poe+ Output Power: 370 W Fan Speed Adjustment And Fault Alarms Vlan: 4k Vlans; Interface-based Vlan Assignment; Mac Address-based Vlan Assignment; Protocol-based Vlan Assignment; Private Vlan; Voice Vlan; Ip Subnet-based Vlan; Gvrp Dhcp Server; Dhcp Client; Dhcp Snooping; Dhcp Relay; Ipv6 Dhcp Snooping; Ipv6 Dhcp Client; Ipv6 Dhcp Relay Add Ons: Patch Panel 19” Utp Cat.6 Cable Organizer 1ru 19" Standard Rack And Cabinet Mountable Mounting Of Core Switches In Main Data Frame 3. 5 Sets - Access Switch - Loaded (branded, Brand New) 10 Ports 10/100/1000base-t, 2 Ports 1000m Sfp, 8 Ports Poe/poe+ Enabled Ports Loaded, 4x1gb Sfp Transceiver Supports Ieee802.3af (poe), Supports Ieee802.3at (poe+), 125w Poe Power Budget, Maximum 12mbit Packet Buffer, Maximum 512mb Cpu Memory, Maximum 256mb Flash Internal Type Power Supply, 50/60hz Frequency, 100~240v Ac Voltage, 2a Ac Current, 240v Dc Rated Hvdc Voltage, 192~290v Dcmaximum Hvdc Voltage, 165w Maximum Power Rating, Supports Certifications Safety: En 60950-1; Emc: En 300 386; Emissions: En 55032; Immunity Generic: En 55024; Esd: En 61000-4-2; Radiated: En 61000-4-3; Eft/burst: En 61000-4-4 Surge: En 61000-4-5; Conducted: En 61000-4-6; Power Frequency Magnetic Field: En 61000-4-8 Voltage Dips And Interruptions: En 61000-4-11; Harmonics: En 61000-3-2; Flicker: En 61000-3-3 Supports Rohs, Eee, Maximum 24gbps Switching Capacity, Maximum 18mpps Forwarding Rate, Maximum 500 Arp Table Size, Maximum 16k Mac Table Size Supports Stp, Supports Rstp, Supports Mstp (64 Instances), Supports Port Grouping (lacp), Supports Vlan (ieee802.1q/macvlan/private Vlan/protocol Vlan/voice Vlan), Supports Gvrp, Supports Igmp Snooping ((v1/v2/v3)/sgvl/ivgl/igmp Filter/igmp Fast Leave), Supports Qinq, Supports G.8032/erps, Supports Ipv4 Routing Static/rip/ospfv1/v2/vrrp, Supports Ipv6 Routing Static/ripng/ospfv3/nd(neighbor Discovery)/vrrpv3/vrrp+ Supports Ping (ipv4 And Ipv6), Supports Traceroute (ipv4 And Ipv6), Supports Dhcp (server/client/relay), Supports Arp Features (arp Proxy/trusted Arp/arp-based Ip Guard/gratuitous Arp/arp-check/), Supports Reliability Gr; Reup; Rldp; Dldp , Supports Security: Cpp; Nfpp; Ssh; Ssl; Ieee802.1x; Port Security; Radius; Tacacs+; Dai; Ip-mac Binding Supports Acl (ipv4 And Ipv6, Standard Ip Acl, Extended Ip Acl, Mac-extended Acl, Time- Based Acl, Expert Acl, Acl80, Ipv6 Acl, Svi Router Acl, Acl Logging, Acl Counter, Acl Remark, Acl Redirection, Security Channel, Protected Port) Supports Ip Source Guard (ipv4 And Ipv6), Supports Dhcp Snooping (ipv4 And Ipv6), Supports Qos, Supports Web User Interface, Supports Http/https, Supports Cloud Management, Supports Rg-snc Management, Supports Command Line Interface Telnet/console, Supports Snmp, Supports Syslog; Ntp; Dns; Span; Rspan; Erspan; Public Mibs; Private Mibs; Rmon; 1/2/3/9); Sflow;, Supports Firmware Upgrade, Supports Port Mirroring Add Ons: Patch Panel 19” Utp Cat.6 Cable Organizer 1ru 19" Standard Rack And Cabinet Mountable 4. 1 Set - Main Data Frame 42 Ru, 600 Mm Width X 1000 Mm Depth, Perforated Front Door, Perforated Rear Door, Black Add Ons: Rack Power Distribution Unit 1u; 19” Us (nema5-15p) Plug, 6 Universal Outlets, With /led Master Switch Mounting Of Data Cabinet And Peripherals Location: Data Center (3rd Floor) 5. 5 Sets - Intermediate Data Frame 9u Wall Mount Switch Cabinet Add On: Rack Power Distribution Unit 1u; 19” Us (nema5-15p) Plug, 6 Universal Outlets, With/led Master Switch Mounting Of Data Cabinet And Peripherals Locations: Ehmis Office/accounting/pharmacy/philhealth Ward Female Doctor's Quarters • Civil Works • Cable Management 6. 6 Units - Uninterruptible Power Supply (branded, Brand New) 1kva 1000va/600w Automatic Voltage Regulation 7. 1 Set - Installation, Commissioning Testing And Training, Including All Accessories And Consumables Backbone Structured Cabling Location: Data Center (3rd Floor) To Hmis Office Data Center (3rd Floor) To Accounting Office Hmis To Pharmacy Office Accounting To Female Doctor's Quarters Pharmacy Office To Philhealth Ward Female Doctor's Quarters To Philhealth Ward Includes: • Civil Works • Cable Pulling • Termination, Splicing • Testing And Labeling • Commissioning Standards: Installation At The Station Must Be Within The Wall Or Within Cable Raceway With No Exposed Cable. Add Ons: Cable Pulling Civil Works Nap Box For 7 Location Nap Box Fiber Optic Splitter Box Plc Outdoor Indoor Fiber Optic Terminal Fiber Patch Cord Sc-lc Optic Fiber Patch Cable Multimode Duplex - 50/125um Om2 Upc Min.binding Radius: 5.0cm Nodal Structured Cabling 60 Nodes Location: 25 Nodes - Accounting Office 9 Nodes - Pharmacy Office 9 Nodes - Female Doctors Office 9 Nodes - Hmis Office 8 Nodes - Philhealth Ward Includes: • Civil Works • Cable Pulling • Termination, Splicing • Commissioning Standards: Installation At The Station Must Be Within The Wall Or Within Cable Raceway With No Exposed Cable. Standard Termination: Rj45 Plug And Keystone Jacks, Pvc Electrical Box Add Ons: Patch Cable 0.5m Patch Cable 3m Cat6 23awg Rj45 Connector Cat6 Keyconnect Cat6 Faceplate Cat6 Duplex Fiber Optic Cable (400meters) Fiber Optic Cable 8core Outdoor Unshielded Twisted Pair (10 Boxes) Cat6 23awg Configuration Of Active Devices Core, Distribution And Access Switches Data Center/ehmis/accounting/pharmacy Female Doctor's Quarters/philhealth Ward Grounding System For 6 Location Ground Cable (green) Ground Rod; 1" Copper, Copper, 6ft Ground Clip; 1" Mobilization And Demobilization Additional Requirements • Suppliers Must Possess Pcab Certified Class D - Communication Facility • Suppliers Must Have Ntc Certificate - Ntc Accredited Supplier Of Terminal Equipment • Suppliers Must Have Ntc Dealers Permit For Radio Transmitter/transceiver/wireless Data • Supplier Must Have Certified Network Engineer Of The Brand Offered.network Scope Of Works: • 1-year Warranty Installation, Configuration, Testing And Commissioning • Transfer Knowledge (training For Ehmis Staff) • Brochure/manual • 1-year Warranty For Hardware, Firmware And Configuration • Documentation (screenshot Of Configuration To Be Submitted After Installation) • Re-harnessing /re-termination At Patch Panels Of Mdf/idf (if Needed) • Supply And Installation Of Roughing-ins (pipes, Hangers, Supports, Etc.) Must Be Included. • Pole Posts Should Include Terminal Box, Surge Protection Grounding And Air Terminal. • Installation, Configuration, Testing And Commissioning Of The Over-all Functionality Of The Project After Project Completion - Suppliers Must Provide The Following Documentation: O Network Topology (design And Build) O Running Configurations O Site Map And Floor Plans With Tagging O Nodal Documentation With Tagging X-x-x
Closing Date11 Mar 2024
Tender AmountPHP 2 Million (USD 37.2 K)

Municipality Of Kasibu, Nueva Vizcaya Tender

Software and IT Solutions
Philippines
Details: Description Procurement Of Ict Equipments The Municipal Government Of Kasibu, Through The General Fund Intends To Apply The Sum Of One Million One Hundred Twenty Six Thousand Four Hundred Ninety Five Pesos Only (₱1,126,495.00) For The Project: Procurement Of Ict Equipments. Invitation Number 45-2024 Being The Abc To Payments Under The Contract To Wit: Item No. Unit Qty Description Abc Remarks Unit Cost Total Cost Gsd Desktop Computer With Printer 85,000.00 85,000.00 1 1 Set -core-i7(4 Cores 8 Threads Up To 4.7 Ghz -8gb Ddr4 Memory -512gb Nvme Ssd -2gb Nvidia Mx300 Windows 11 Home -ms Office Home & Student 2021-genuine-lifetime -27" Fhd 1080p Printer -print/copy/scan -wifi Ethernet -auto 2 Sided Print -front Paper Input -auto Copy/scan -durable Printhead -ecotank 2 1 Set Desktop Computer With Printer 65,000.00 65,000.00 -core-i5(6 Cores 12 Threads Up To 4.4 Ghz) -8gb Ddr4 Memory -256gb Nvme Ssd+1 Tb Hdd Republic Of The Philippines Province Of Nueva Vizcaya Municipality Of Kasibu 8 -2gb Nvidia Gt730 Windows 11 Home -ms Office Home & Student 2021-genuine-lifetime -21.5" Fhd Printer -print/copy/scan -rear Paper Input -durable Printhead -ecotank -4,500.00pages-black -7,500 Pages-colored 3 1 Unit Document Scanner 65,000.00 65,000.00 -scanner Type:sheet-fed, One￾pass Duplex Color Scanner,sensor:color Cis,optical Resolution:600 Dpi,maximum Resolution:1200 Dpicolor And Grayscale, Scan Mode (bit Depth):30-bit Internal/24-bit External, Monochrome Bit Depth:input 10-bit/ Output 8-bit, Output Resolution:50 To 1200 Dpi, Effective Pixels:5100 X 9300 Pixels,light Source:three-color Rgb Led,scanning Speed:85 Ppm/170 Ipm: 200 And 300 Dpi Black-and-white, Color, Gray; 16 Ppm/32 Ipm: 400 And 600 Dpi Black-and-white, Gray, Color1 Capacity: 100 Sheet￾documents Sizes: Minimum: 8.5” X 240” At 200 Dpi : Maximum : 8.5” X 21” At 300dpi , Paper Weight: 24 -413 G/m2 Card Thickness: Maximum : Less Than 1.4 Mm With Emboss, Realiability : Peak Daily Duty Cycle2: 9,000 Sheets: Consumables (rollerassembly Kit): 200,000 Pages -temperature:41° To 95° F (5° To 35° C),dimensions:11.6" X 8.3" X 8.5" (w X D X H),, Weight:7.9 Lb, Security:kensington® Type 9 Menro 4 1 Unit Computer Desktop (branded ) - Computer Desktop (all In One) Os : Windows 11 Or 12 Processor :core I5 , Memory :32gb Ram , Storage Drive : 1tb , Screen Size : 23" Resolution :full Hd , Connectivity :lan , Wifi Bluetooth . I/o Ports: Usb 2.0, Vga , Hmdi, Microphone/ Headphone , With Back-ups 650 80,000.00 80,000.00 5 1 Unit Laptop- Laptop￾processor : Intel Core I5 -12500h, Memory : 8gb Ddr4 ( Double 70,000.00 70,000.00 Data Rate 4th Generation) ' Storage : 512gb ( Solid State Drive ) , Size : 15.6 Inches . Municipal Health Office 6 1 Unit Procurement Of Itc Equipment 80,000.00 80,000.00 -computer Set.21.5"tfc Display Monitor W/ Full Hd 1920 X 1080 Resolution , Nvdia Geforce Gt With 6 Gb Ddr3, 12 Gb Ram , 1 Tb Ssd+ 1 Tb Hdd Storage , Inclusive Of Printer , Ups , Accessories And 2 In 1 Bluethooth And Wi-fi Transmitter . Peso 7 1 Unit Desktop (all-in-one ) Intel Core I5-8130v , 4gb 1tb, Intel Hd Windows 10,23.8 “ , Keyboard & Mouse , With Printer (all-in-one Print , Scan, Copy And Fax With Adf) 70,000.00 70,000.00 Mswdo 8 1 Unit All In One Desktop Core I5 C-24 - 1750 60,000.00 60,000.00 -core I5 ; Standard Memory , 8 Gb ; Maximum Memory ' Up To 32gb ; -screen Size , 60.5 Cm 10 (23.8") ; -display Screen Technology, Led -intel Core I5-2140 -8gb Ddr4 -256gb Ssd , 1tb Hdd -23.8 " Screen, 1920x1080 Resolution -genuine Installed Windows Municipal Assessment Office 9 1 Set Computer Desktop 166,495.00 166,495.00 Central Processing Unit (cpu) -core I9, 64 Gb Ram , 2tb Nvme Ssd+4tb Hhd -geforce Rtx 3090 24 Gb -windows 11 Home -graphic Card Series : Geforce Rtx3090 -processor Type Series: Core I9- 12000 Series -display Size : 15.5 -memory Storage Capacity : 2 Tb Ssd+ 4tb Hdd -ram Memory Installed Size: 64 Gb -color : Black -cpu Speed : 3.7 Ghz) -accessories : Mouse Ups Port , Mouse Pad -black , Keyboard Monitor -product Number : 6fno8aa -display Panel Type : Led Blacklight -viewable Image Area (diagonal): 27" -panel Active Area (w X H) : 59.67 X 33.56 Cm -resolution : Qhd (2560 X 1440 @ 60 Hz) -aspect Ratio : 16:9 -display Features : Anti- Glare ; Led Backlights: On-screen Controls; -------plug And Play ; Amd Free Sync; ---height Adjustable 11 -port: 1 Analog And Digital Audio - Out : 3usb 3.0 (1 Uptream , 2 Downstream), Display Input Type: 2 Hdmi 2.0 (with Hdcp Support) ; 1 ---display Port 1.4 (with Hdcp Support ) -tilt And Swivel Angle : Tilt : -5 To +23° -cable : Display Port Cable ; Hdmi Cable ; Usb Type -a To B Cable 10 1 Unit Computer Laptop 220,000.00 220,000.00 -windows 11 Pro 64 -bit 12th Generation Core I7-12700h , 14 Core , 20-threads Clock Speed 1.7 Ghz Max Turbo Frequenzy 4.7 Ghz, 10mm, 45 W Smart Cache 24 Mb Mobile Alder Lake Chipset, 32 Gb Ddr5 4800 Mhz / Pc5 38400 (16 Gx2) Dual Channel, 1 Tb Pcie Nvme Ssd (os) -accessories: Bag (backpack , Waterproof , With Pocket For Battery , Black ) Mouse , Mouse Pad ( 70*35cm , Gray) 11 1 Unit Computer Laptop 85,000.00 85,000.00 Microprocessor: Core I7 - 1255u (up To 4.7 Ghz With Turbo Boost Technology , 12 Mb L3 Cache , 10 Cores , 12 Threads) Memory : 16 Gb Ddr4 Sodimm-3200 Mhz Ram ( 2x8 Gb) Video Grphics: Nvidia Ge Force Mx550 ( 2 Gb Gddr6 Dedicated) Hard Drive : 1 Tb Pcle Nvme M.2 Ssd Display:15,6" Diagonal Fhd (1920x1080 ), Ips , Microedge , Anti -glare ,250 Nits 45% Ntsc Wireless Connectivity : Media Tek Wi-fi 6 Mt 7921 (2x2) And Bluethooth 5.2 Combo ( Supporting Gigabit Data Rate) External Port : 1 Superspeed Usb Type -c 10 Gbps Signaling Rate ( Usb Power Delivery , Display 12 Port 1.4 , Hp Sleep And Charge ); 2 Superspeed Usb Type -a 5gbps Signaling Rate ; 1 Hdmi 2.1;1 Ac Smart Pin; 1headphone / Microphone Combo -chaisi: Webcam -power Supply Type : 65 W Smart -ac Power Adapter Battery Type: 3-cell , 41wh- Li-on Battery Life Mixed Usage : Up To 7 Hours Operating System : Windows 11 Home Color : Black Warranty : 3 Months Accessories: Bag ( Sling Type , Waterproof , With Pocket For Battery Black) , Wireless Slim Bluethooth Mouse , Mouse ;pad ( 70 * 35cm , Gray ) Mbo Desktop Computer 80,000.00 80,000.00 12 1 Pc Desktop Computer ( All In One ) – Intel Core I5-1135g7 Intel Iris Xe Graphics ,2.4ghz With Turbo Boost Technology Up To 4.2 Ghz (mb Smart Cache ) 8 Gb Ddr4 Ram, 512 Gb Nvme M.2 Ssd, Intel Wi-fi 6, Windows Os 1,126,495.00 Total One Million One Hundred Twenty Six Thousand Four Hundred Ninety Five Pesos Only Bids Received In Excess Of The Abc Shall Be Automatically Rejected At Bid Opening. The Municipal Government Of Kasibu Now Invites Bids For The Above Procurement Project. Delivery Of The Goods Is Required By At Least 15 Days After Receipt Of Purchase Order. The Description Of An Eligible Bidder Is Contained In The Bidding Documents, Particularly, In Section Ii (instructions To Bidders). Bidding Will Be Conducted Through Open Competitive Bidding Procedures Using A Non-discretionary “pass/fail” Criterion As Specified In The 2016 Revised Implementing Rules And Regulations (irr) Of Republic Act (ra) No. 9184. Bidding Is Restricted To Filipino Citizens/sole Proprietorships, Partnerships, Or Organizations With At Least Sixty Percent (60%) Interest Or Outstanding Capital Stock Belonging To Citizens Of The Philippines, And To Citizens Or Organizations Of A Country The Laws Or Regulations Of Which Grant Similar Rights Or Privileges To Filipino Citizens, Pursuant To Ra No. 5183. 13 Prospective Bidders May Obtain Further Information From The Municipal Government Of Kasibu-bac Secretariat And Inspect The Bidding Documents At The Address Given Below During Office Hours 8:00am To 5:00pm – Monday To Friday. A Complete Set Of Bidding Documents May Be Acquired By Interested Bidders On March 5, 2024 From The Given Address And Upon Payment Of The Applicable Fee For The Bidding Documents, Pursuant To The Latest Guidelines Issued By The Gppb, In The Amount Of Five Thousand Pesos Only (p5,000.00). The Procuring Entity Shall Allow The Bidder To Present Its Proof Of Payment For The Fees Presented Personal. The Municipal Government Of Kasibu Will Hold A Pre-bid Conference1 On March 12, 2024 At 10:00am At The General Services Office, Which Shall Be Open To Prospective Bidders. Bids Must Be Duly Received By The Bac Secretariat Through (i) Manual Submission At The General Services Office On Or Before March 26,2024 At 10:00 O’clock Am. Late Bids Shall Not Be Accepted. All Bids Must Be Accompanied By A Bid Security In Any Of The Acceptable Forms And In The Amount Stated In Itb Clause 14. Bid Opening Shall Be On March 26,2024 At Exactly 10:30am At The General Services Office. Bids Will Be Opened In The Presence Of Bidder’s Representative Who Choose To Attend. The Opening Of Bids Shall Take Place At The General Services Office. The Municipal Government Of Kasibu Reserves The Right To Reject Any And All Bids, Declare A Failure Of Bidding, Or Not Award The Contract At Any Time Prior To Contract Award In Accordance With Sections 35.6 And 41 Of The 2016 Revised Irr Of Ra No. 9184, Without Thereby Incurring Any Liability To The Affected Bidder Or Bidders. For Further Information, Please Refer To: Gaudencio Q. Orpiano, Jr. Jesijen Grace N. Lunag Admin. Asst. V/store Keeper Iv/ Head Bac Secretariat Admin. Asst. Ii/ Member Bac Secretariat Cp # 09265996599 Cp #09279534801 Date Of Posting: [march 5, 2024] James B. Canayan Municipal Assessor Bac Chairperson
Closing Date26 Mar 2024
Tender AmountPHP 1.1 Million (USD 20.1 K)

Department Of Human Settlement And Urban Development Quezo Tender

Philippines
Details: Description Request For Quotation Doc Control No. : Form-as-pd-002 Revision No: 0 Effectivity Date : 1 September 2023 The Department Of Human Settlements And Urban Development (dhsud) Would Like To Invite Your Company To Submit A Quotation Or Proposal For The Following Procurement Activity: Request For Quotation No. Rfq No. 09-0562, S. 2024 Procurement Activity Procurement Of Multifunction Printers For The Dhsud Central Office (finance And Internal Audit Services) Mode Of Procurement Negotiated Procurement - Small Value Procurement (section 53.9) Approved Budget For The Contract (abc) Fifty-five Thousand Pesos And 00/100 (php 55,000.00), Inclusive Of All Existing And Appropriate Government Taxes And Charges. Deadline For The Receipt Of Quotations Or Bid Proposal On Or Before September 30, 2024 At 1:00 P.m. Delivery Schedule Delivery Of Goods/items Shall Be Seven (7) To Twenty (20) Calendar Days Upon Receipt Of The Approved Purchase Order. The Minimum Technical Specifications For The Items Are As Follows: Item No. Qty. Item, Description, & Minimum Specifications 1 1 Unit Multifunction Printer – Print, Scan And Copy Colored, Multifunctional Printer With Scanner And Photocopier Up To 7.0 Ipm Flatbead Color Image Scanner Wifi Direct Or Wifi Ready Printer Ink Tank Wireless Print Speed (laser Comparable): Up To 17ipm(mono) And 16.5ipm(colour) Print Speed (fast Mode): Up To 30ppm (mono) And 26ppm(colour) Automatic 2-sided Printing (a4/ltr) Print Resolution: Up To 1200 X 6000 Dpi Optical Scan Resolution : Up To 1200 X 2400 Dpi Wired/wireless Lan, Highspeed Usb 2.0 2 1 Unit A3 Specialized Printer (3 In 1) - Multi-function Printer Technical Specification/s: Key Functions: Print, Scan, Copy; Printer Type: Inkjet Printer (refill Ink Tank) Paper Size: A3, A4, A5, Letter, Legal, Folio; Print Resolution: Up To 1,200 X 2400 Dpi; Print Speed: Up To 22-25 Ipm (mono) / 12-20 Ipm (colour); 2 Sided Printing: Up To A3; Scan Resolution: Up To 1200 X 2400 Dpi; Scan Speed: Up To 18 Ipm (mono/colour); Scan Colour Depth :48 Bit (colour), 16 Bit (grayscale ) – Input, 24 Bit (colour), 8 Bit (grayscale) - Output; Scan Size: Up To A3; Scanning Method: Flatbed, Adf Colour /grayscale; Copy Capabilities Reduction/enlargement: 25 - 400%; Copy Speed: Up To 15 – 23 (mono) And 10-11 Ipm (colour); Copy Size: Up To A3 Terms And Conditions: 1. Payment Shall Be Made Upon Completion Of Service/delivery And Submission Of The Supporting Documents (e.g., Delivery Receipt, Sales Invoice, Billing Statement, Warranty Certificate If Applicable, And Other Documents As May Be Required In The Technical Specifications); 2. Kindly Accomplish The Attached Reply Slip Correctly And Accurately. Please Do Not Alter The Contents Of The Form In Any Way; 3. All Technical Specifications Are Mandatory. Failure To Comply With Any Of The Said Requirements Shall Be A Cause For The Disqualification Of Your Quotation; 4. The Department Shall Have The Right To Inspect The Goods To Check Its Conformity With The Required Minimum Technical Specifications; 5. Issuance Of Official Receipts (or) Or Sales Invoice (si) In The Name Of The Department Of Human Settlements And Urban Development (dhsud) Is Mandatory. The Supplier Shall Bear The Cost Of Mailing The Ors Or Sis. The Supplier Shall Be Responsible For Bearing Any Bank Charges And/or Service Charges That May Be Incurred By The Department In Case Of Payment Requests Via Check Deposit; 6. Please Submit The Latest Copy Or E-copy Of The Following Documentary Requirements: A. Philgeps Registration Number / Certificate Of Philgeps Membership; B. 2024 Mayor’s Permit/business Permit; (note: In Case The Permit Has Recently Expired, Please Submit The Old Permit And Attach The Official Receipt For The Renewal Application Thereof.) C. Signed Omnibus Sworn Statement (oss) (annex “a”); Note: A Notarized Omnibus Sworn Statement (oss) Shall Be Submitted By The Lcrb Or Scrb Prior To The Processing Of Payment. If The Authorized Representative Listed On The Reply Slip Is Not The Same Person Who Executed The Omnibus Sworn Statement (oss) Kindly Attach A Copy Of The Notarized Special Power Of Attorney (spa) Together With The Valid Government-issued Identification Card Of Both Signatories. D. Supporting Documents (as May Be Applicable): For Sole Proprietorships – Dti Business Name Registration; For Partnerships Or Corporations - A Notarized Special Power Of Attorney, Or A Notarized Secretary’s Certificate, Whichever Is Applicable (bidders With Previously Submitted Eligibility Requirements, Provided They Are Current And Updated, Are No Longer Required To Submit The Said Documents.) Your Quotation Or Bid Proposal Must Be Submitted Together With The Attached Reply Slip And The Above Mentioned Documentary Requirements Through Personal Delivery, And In A Sealed Envelope, To The Procurement Division Located At The 8th Floor, Dhsud Building, Kalayaan Avenue Corner Mayaman Street, Diliman, Quezon City, Or Through Electronic Mail At Procurement@dhsud.gov.ph. The Dhsud Bids And Awards Committee (bac), Through The Concerned End-user Unit And The Bac Secretariat, Shall Recommend The Award Of The Contract To The Head Of The End-user Unit Or Implementing Office, Of The Service Provider With The Single/lowest Calculated And Responsive Quotation (scrq/lcrq) Pursuant To Section 53.10 Of The 2016 Revised Irr Of Ra 9184. With The End View Of Obtaining The Contract Most Advantageous To The Government Pursuant To Sec. 41 Of The 2016 Revised Irr Of Ra 9184, Dhsud Reserves The Right To Reject Any And All Quotations/bids, To Annul The Procurement Process, To Declare A Failure Of Bidding, To Reject All Quotations/bids At Any Time Prior To Contract Award, Or Not To Award The Contract, Without Thereby Incurring Any Liability To The Affected Bidder/s. For Questions And/or Clarifications, Please Contact The Procurement Division At Telephone Number 8424-4080 (local 1833). (original Signed) Dr. Abrian Joy B. Orencia Oic, Procurement Division   Reply Slip Procurement: Procurement Of Multifunction Printers For The Dhsud Central Office (finance And Internal Audit Services). Request For Quotation No.: 09-0562, S. 2024 ____________ Date Dr. Abrian Joy B. Orencia Oic-procurement Division Department Of Human Settlements And Urban Development 8th Floor, Administrative Services Dhsud Bldg. Kalayaan Avenue, Cor. Mayaman St. Quezon City Dear Dr. Orencia: This Is To Submit The Following Bid Quotation/proposal For The Subject Procurement With A Total Bid Price Of ______________________________, Inclusive Of All Existing And Appropriate Government Taxes And Charges: Quantity Unit Description (kindly Attach A Sample Photo For Each Item) I Hereby Certify That The Above Bid Quotation/proposal Is True And Correct, And I Accept The Rights Of The Department Of Human Settlements And Urban Development, As The Procuring Entity, Under Section 41 Of The 2016 Revised Implementing Rules And Regulations (irr) Of Republic Act (ra) No. 9184. Thank You. Truly Yours, Name Of Company : ______________________________________ Name Of Authorized Representative: ______________________________________ Designation/position : ______________________________________ Address : ______________________________________ Telephone No./mobile No. : ______________________________________ Email Address : ______________________________________ Philgeps Registration No. : ______________________________________ Tax Identification No : ______________________________________ : ______________________________________ Type Of Registration : Vat󠄀 ( ) Non-vat ( ) Payment Details: Bank Name/ Branch : ______________________________________ Bank Account Number : ______________________________________ (note: For Bank Account Maintained Other Than Land Bank Of The Philippines (lbp), The Corresponding Bank Charges Shall Be Borne/paid By The Supplier As Deduction From The Amount Of Payment Transferred To Their Account.) Signature : ______________________________________ Omnibus Sworn Statement (revised) [shall Be Submitted With The Bid] [kindly Fill Out This Template Accordingly By Completing The Needed Information And Deleting The Non-applicable Provisions That May Be Deleted.] _________________________________________________________________________ Republic Of The Philippines ) City/municipality Of ______ ) S.s. Affidavit I, [name Of Affiant], Of Legal Age, [civil Status], [nationality], And Residing At [address Of Affiant], After Having Been Duly Sworn In Accordance With Law, Do Hereby Depose And State That: 1. [select One, Delete The Other:] [if A Sole Proprietorship:] I Am The Sole Proprietor Or Authorized Representative Of [name Of Bidder] With Office Address At [address Of Bidder]; [if A Partnership, Corporation, Cooperative, Or Joint Venture:] I Am The Duly Authorized And Designated Representative Of [name Of Bidder] With Office Address At [address Of Bidder]; 2. [select One, Delete The Other:] [if A Sole Proprietorship:] As The Owner And Sole Proprietor, Or Authorized Representative Of [name Of Bidder], I Have Full Power And Authority To Do, Execute And Perform Any And All Acts Necessary To Participate, Submit The Bid, And To Sign And Execute The Ensuing Contract For [name Of The Project] Of The [name Of The Procuring Entity], As Shown In The Attached Duly Notarized Special Power Of Attorney; [if A Partnership, Corporation, Cooperative, Or Joint Venture:] I Am Granted Full Power And Authority To Do, Execute And Perform Any And All Acts Necessary To Participate, Submit The Bid, And To Sign And Execute The Ensuing Contract For [name Of The Project] Of The [name Of The Procuring Entity], As Shown In The Attached [state Title Of Attached Document Showing Proof Of Authorization (e.g., Duly Notarized Secretary’s Certificate, Board/partnership Resolution, Or Special Power Of Attorney, Whichever Is Applicable;)]; 3. [name Of Bidder] Is Not “blacklisted” Or Barred From Bidding By The Government Of The Philippines Or Any Of Its Agencies, Offices, Corporations, Or Local Government Units, Foreign Government/foreign Or International Financing Institution Whose Blacklisting Rules Have Been Recognized By The Government Procurement Policy Board, By Itself Or By Relation, Membership, Association, Affiliation, Or Controlling Interest With Another Blacklisted Person Or Entity As Defined And Provided For In The Uniform Guidelines On Blacklisting; 4. Each Of The Documents Submitted In Satisfaction Of The Bidding Requirements Is An Authentic Copy Of The Original, Complete, And All Statements And Information Provided Therein Are True And Correct; 5. [name Of Bidder] Is Authorizing The Head Of The Procuring Entity Or Its Duly Authorized Representative(s) To Verify All The Documents Submitted; 6. [select One, Delete The Rest:] [if A Sole Proprietorship:] The Owner Or Sole Proprietor Is Not Related To The Head Of The Procuring Entity, Members Of The Bids And Awards Committee (bac), The Technical Working Group, And The Bac Secretariat, The Head Of The Project Management Office Or The End-user Unit, And The Project Consultants By Consanguinity Or Affinity Up To The Third Civil Degree; [if A Partnership Or Cooperative:] None Of The Officers And Members Of [name Of Bidder] Is Related To The Head Of The Procuring Entity, Members Of The Bids And Awards Committee (bac), The Technical Working Group, And The Bac Secretariat, The Head Of The Project Management Office Or The End-user Unit, And The Project Consultants By Consanguinity Or Affinity Up To The Third Civil Degree; [if A Corporation Or Joint Venture:] None Of The Officers, Directors, And Controlling Stockholders Of [name Of Bidder] Is Related To The Head Of The Procuring Entity, Members Of The Bids And Awards Committee (bac), The Technical Working Group, And The Bac Secretariat, The Head Of The Project Management Office Or The End-user Unit, And The Project Consultants By Consanguinity Or Affinity Up To The Third Civil Degree; 7. [name Of Bidder] Complies With Existing Labor Laws And Standards; And 8. [name Of Bidder] Is Aware Of And Has Undertaken The Responsibilities As A Bidder In Compliance With The Philippine Bidding Documents, Which Includes: A. Carefully Examining All Of The Bidding Documents; B. Acknowledging All Conditions, Local Or Otherwise, Affecting The Implementation Of The Contract; C. Making An Estimate Of The Facilities Available And Needed For The Contract To Be Bid, If Any; And D. Inquiring Or Securing Supplemental/bid Bulletin(s) Issued For The [name Of The Project]. 9. [name Of Bidder] Did Not Give Or Pay Directly Or Indirectly, Any Commission, Amount, Fee, Or Any Form Of Consideration, Pecuniary Or Otherwise, To Any Person Or Official, Personnel Or Representative Of The Government In Relation To Any Procurement Project Or Activity. 10. In Case Advance Payment Was Made Or Given, Failure To Perform Or Deliver Any Of The Obligations And Undertakings In The Contract Shall Be Sufficient Grounds To Constitute Criminal Liability For Swindling (estafa) Or The Commission Of Fraud With Unfaithfulness Or Abuse Of Confidence Through Misappropriating Or Converting Any Payment Received By A Person Or Entity Under An Obligation Involving The Duty To Deliver Certain Goods Or Services, To The Prejudice Of The Public And The Government Of The Philippines Pursuant To Article 315 Of Act No. 3815 S. 1930, As Amended, Or The Revised Penal Code. In Witness Whereof, I Have Hereunto Set My Hand This __ Day Of ___, 20__ At ____________, Philippines. [insert Name Of Bidder Or Its Authorized Representative] [insert Signatory’s Legal Capacity] Affiant [jurat] [format Shall Be Based On The Latest Rules On Notarial Practice]
Closing Date30 Sep 2024
Tender AmountPHP 55 K (USD 983)

Province Of Aklan Tender

Philippines
Details: Description 1. 1 Lot - Network Infrastructure For Dr. Rafael Tumbokon Memorial Hospital Project Includes 1 Set - Firewall (branded, Brand New) 3 Years Subscription Central Management Central Reporting Zero-touch Deployment Sd-wan Orchestration Lateral Movement Protection Synchronized User Id Synchronized Sd-wan Powerful Protection Exposes Hidden Risks Blocks Unknown Threats Automatically Responds To Incidents Networking And Sd Wan: Wireless, Sd-wan, Application Aware Routing, Traffic Shaping Ipsec/ssl Site-to-site And Remote Access Vpn (unlimited) Historical On-box Logging And Reporting Network Protection Next-gen Intrusion Prevention System Inspection With Pre-packaged Exceptions Streaming Deep-packet Inspection Ips: Next-gen Intrusion Prevention Advanced Threat Protection Advanced Vpn Technologies Clientless Vpn: Htmls Manage Sd-red Vpn Extensive Network And Threat Reporting Web Protection Powerful User And Group Web Policy Application Control And Qos Web Control Advanced Web Threat Protection App Control Synchronized App Control Synchronized Sd-wan Extensive Web And App Reporting High-performance Traffic Scanning Zero Day Protection: Analyze All Unknown Files Using Ai, Ml, And Sandboxing Cloud-based Intelligence And Analysis Using Multiple Deep Learning Models Dynamic Run-time Analysis Of Unknown File Extensive Threat Intelligence Analysis Reporting Orchestration Point And Click Site-to-site Vpn Orchestration Multi-firewall Reporting With Save, Schedule And Export Web Server Protection Business Application Policy Templates Protection From The Latest Hacks And Attacks Reverse Proxy Physical Interfaces Form Factor: 1u Ports/slots: 10/1 Firewall (mbps): 30,000.00 Ipsec Vpn (mbps): 12,000.00 Threat Protection (mbps): 1,250 Ssl/yls: 1,100 Technical Specifications Firewall Throughput: 30,000 Mbps Firewall Imix: 15,900 Mbps Firewall Latency (64 Byte Udp): 6 Μs Ips Throughput: 5,800 Mbps Threat Protection Throughput: 1,250 Mbps Ngfw: 5,200 Mbps Concurrent Connections: 6,500,000 New Connections/sec: 134,700 Ipsec Vpn Throughput: 12,000 Mbps Ssl Vpn Concurrent Tunnels: 2,500 Ssl/tls Inspection: 1,100 Mbps Ssl/tls Concurrent Connections: 18,432 Storage (local Quarantine/logs):integrated Min. 120 Gb Sata-iii Ssd Ethernet Interfaces (fixed): 8 X Gbe Copper; 2 X Sfp Fiber* Bypass Port Pairs: 1 Management Ports: 1 X Rj45 Mgmt; 1 X Com Rj45 1 X Micro-usb (cable Incl.) Other I/o Ports: 2 X Usb 3.0 (front); 1 X Usb 2.0 (rear) Includes: Mounting Of Firewall In Main Data Frame 2. 2 Sets - Core Switch - Loaded (branded, Brand New) Simple Deployment No Independent Power Supply System Required Two-in-one Network And Power Cable Shortened Construction Period Reduced Costs Simple Deployment Secure And Reliable Loaded, 2x1g Sfp Transceiver, Multimode 24 X 10/100/1000m Electrical Ports Supporting Auto Negotiation + 4 X 1ge Sfp Ports Loaded, 4x1gb Sfp Transceiver, Multimode At Least 256gbps Switching Capacity At Least 42mpps/96mpps Packet Forwarding Rate Rated Input Voltage: Ac Input: Rated Voltage Range 100 V To 240 V, Frequency 50/60 Hz Maximum Input Voltage: Ac Input: Rated Voltage Range 90 V To 264 V, Frequency 50/60 Hz Input Voltage: High Voltage Dc (hvdc) Input: Input Voltage Range 192 V To 290 V Poe 24 X Electrical Ports Supporting Poe And Poe+ Maximum Poe/poe+ Output Power: 370 W Fan Speed Adjustment And Fault Alarms Vlan: 4k Vlans; Interface-based Vlan Assignment; Mac Address-based Vlan Assignment; Protocol-based Vlan Assignment; Private Vlan; Voice Vlan; Ip Subnet-based Vlan; Gvrp Dhcp Server; Dhcp Client; Dhcp Snooping; Dhcp Relay; Ipv6 Dhcp Snooping; Ipv6 Dhcp Client; Ipv6 Dhcp Relay Add Ons: Patch Panel 19” Utp Cat.6 Cable Organizer 1ru 19" Standard Rack And Cabinet Mountable Mounting Of Core Switches In Main Data Frame 3. 5 Sets - Access Switch - Loaded (branded, Brand New) 10 Ports 10/100/1000base-t, 2 Ports 1000m Sfp, 8 Ports Poe/poe+ Enabled Ports Loaded, 4x1gb Sfp Transceiver Supports Ieee802.3af (poe), Supports Ieee802.3at (poe+), 125w Poe Power Budget, Maximum 12mbit Packet Buffer, Maximum 512mb Cpu Memory, Maximum 256mb Flash Internal Type Power Supply, 50/60hz Frequency, 100~240v Ac Voltage, 2a Ac Current, 240v Dc Rated Hvdc Voltage, 192~290v Dcmaximum Hvdc Voltage, 165w Maximum Power Rating, Supports Certifications Safety: En 60950-1; Emc: En 300 386; Emissions: En 55032; Immunity Generic: En 55024; Esd: En 61000-4-2; Radiated: En 61000-4-3; Eft/burst: En 61000-4-4 Surge: En 61000-4-5; Conducted: En 61000-4-6; Power Frequency Magnetic Field: En 61000-4-8 Voltage Dips And Interruptions: En 61000-4-11; Harmonics: En 61000-3-2; Flicker: En 61000-3-3 Supports Rohs, Eee, Maximum 24gbps Switching Capacity, Maximum 18mpps Forwarding Rate, Maximum 500 Arp Table Size, Maximum 16k Mac Table Size Supports Stp, Supports Rstp, Supports Mstp (64 Instances), Supports Port Grouping (lacp), Supports Vlan (ieee802.1q/macvlan/private Vlan/protocol Vlan/voice Vlan), Supports Gvrp, Supports Igmp Snooping ((v1/v2/v3)/sgvl/ivgl/igmp Filter/igmp Fast Leave), Supports Qinq, Supports G.8032/erps, Supports Ipv4 Routing Static/rip/ospfv1/v2/vrrp, Supports Ipv6 Routing Static/ripng/ospfv3/nd(neighbor Discovery)/vrrpv3/vrrp+ Supports Ping (ipv4 And Ipv6), Supports Traceroute (ipv4 And Ipv6), Supports Dhcp (server/client/relay), Supports Arp Features (arp Proxy/trusted Arp/arp-based Ip Guard/gratuitous Arp/arp-check/), Supports Reliability Gr; Reup; Rldp; Dldp , Supports Security: Cpp; Nfpp; Ssh; Ssl; Ieee802.1x; Port Security; Radius; Tacacs+; Dai; Ip-mac Binding Supports Acl (ipv4 And Ipv6, Standard Ip Acl, Extended Ip Acl, Mac-extended Acl, Time- Based Acl, Expert Acl, Acl80, Ipv6 Acl, Svi Router Acl, Acl Logging, Acl Counter, Acl Remark, Acl Redirection, Security Channel, Protected Port) Supports Ip Source Guard (ipv4 And Ipv6), Supports Dhcp Snooping (ipv4 And Ipv6), Supports Qos, Supports Web User Interface, Supports Http/https, Supports Cloud Management, Supports Rg-snc Management, Supports Command Line Interface Telnet/console, Supports Snmp, Supports Syslog; Ntp; Dns; Span; Rspan; Erspan; Public Mibs; Private Mibs; Rmon; 1/2/3/9); Sflow;, Supports Firmware Upgrade, Supports Port Mirroring Add Ons: Patch Panel 19” Utp Cat.6 Cable Organizer 1ru 19" Standard Rack And Cabinet Mountable 4. 1 Set - Main Data Frame 42 Ru, 600 Mm Width X 1000 Mm Depth, Perforated Front Door, Perforated Rear Door, Black Add Ons: Rack Power Distribution Unit 1u; 19” Us (nema5-15p) Plug, 6 Universal Outlets, With /led Master Switch Mounting Of Data Cabinet And Peripherals Location: Data Center (3rd Floor) 5. 5 Sets - Intermediate Data Frame 9u Wall Mount Switch Cabinet Add On: Rack Power Distribution Unit 1u; 19” Us (nema5-15p) Plug, 6 Universal Outlets, With/led Master Switch Mounting Of Data Cabinet And Peripherals Locations: Ehmis Office/accounting/pharmacy/philhealth Ward Female Doctor's Quarters • Civil Works • Cable Management 6. 6 Units - Uninterruptible Power Supply (branded, Brand New) 1kva 1000va/600w Automatic Voltage Regulation 7. 1 Set - Installation, Commissioning Testing And Training, Including All Accessories And Consumables Backbone Structured Cabling Location: Data Center (3rd Floor) To Hmis Office Data Center (3rd Floor) To Accounting Office Hmis To Pharmacy Office Accounting To Female Doctor's Quarters Pharmacy Office To Philhealth Ward Female Doctor's Quarters To Philhealth Ward Includes: • Civil Works • Cable Pulling • Termination, Splicing • Testing And Labeling • Commissioning Standards: Installation At The Station Must Be Within The Wall Or Within Cable Raceway With No Exposed Cable. Add Ons: Cable Pulling Civil Works Nap Box For 7 Location Nap Box Fiber Optic Splitter Box Plc Outdoor Indoor Fiber Optic Terminal Fiber Patch Cord Sc-lc Optic Fiber Patch Cable Multimode Duplex - 50/125um Om2 Upc Min. Binding Radius: 5.0cm Nodal Structured Cabling 60 Nodes Location: 25 Nodes - Accounting Office 9 Nodes - Pharmacy Office 9 Nodes - Female Doctors Office 9 Nodes - Hmis Office 8 Nodes - Philhealth Ward Includes: • Civil Works • Cable Pulling • Termination, Splicing • Commissioning Standards: Installation At The Station Must Be Within The Wall Or Within Cable Raceway With No Exposed Cable. Standard Termination: Rj45 Plug And Keystone Jacks, Pvc Electrical Box Add Ons: Patch Cable 0.5m Patch Cable 3m Cat6 23awg Rj45 Connector Cat6 Keyconnect Cat6 Faceplate Cat6 Duplex Fiber Optic Cable (400meters) Fiber Optic Cable 8core Outdoor Unshielded Twisted Pair (10 Boxes) Cat6 23awg Configuration Of Active Devices Core, Distribution And Access Switches Data Center/ehmis/accounting/pharmacy Female Doctor's Quarters/philhealth Ward Grounding System For 6 Location Ground Cable (green) Ground Rod; 1" Copper, Copper, 6ft Ground Clip; 1" Mobilization And Demobilization Additional Requirements · Suppliers Must Possess Pcab Certified Class D - Communication Facility · Suppliers Must Have Ntc Certificate - Ntc Accredited Supplier Of Terminal Equipment · Suppliers Must Have Ntc Dealers Permit For Radio Transmitter/transceiver/wireless Data Network Scope Of Works: • 1-year Warranty Installation, Configuration, Testing And Commissioning • Transfer Knowledge (training For Ehmis Staff) • Brochure/manual • 1-year Warranty For Hardware, Firmware And Configuration • Documentation (screenshot Of Configuration To Be Submitted After Installation) • Re-harnessing /re-termination At Patch Panels Of Mdf/idf (if Needed) • Supply And Installation Of Roughing-ins (pipes, Hangers, Supports, Etc.) Must Be Included. • Pole Posts Should Include Terminal Box, Surge Protection Grounding And Air Terminal. • Installation, Configuration, Testing And Commissioning Of The Over-all Functionality Of The Project After Project Completion - Suppliers Must Provide The Following Documentation: O Network Topology (design And Build) O Running Configurations O Site Map And Floor Plans With Tagging O Nodal Documentation With Tagging X-x-x
Closing Date24 Jan 2024
Tender AmountPHP 2 Million (USD 37.1 K)

VETERANS AFFAIRS, DEPARTMENT OF USA Tender

Healthcare and Medicine
United States
Details: Sources Sought Notice this Is A Sources Sought Notice Only. This Is Not A Request For Proposal Or Quote; The Va Is Not Seeking Pricing Or Offers. the Department Of Veterans Affairs, Visn 20, In Support Of The Puget Sound Va Healthcare System, Is Performing Market Research To Compile Data Regarding: (1) The Availability And Capability Of Qualified Small Business Concerns; (2) Identify If There Are Sufficient Number Of Qualified Service-disabled Veteran-owned Small Business, Veteran Owned Small Business, Hub Zone 8(a), Women-owned Small Business, Or Small Disadvantaged Business, Small Business Concerns Relative To The Subject North American Industry Classification System (naics) Code. Responses To The Information Requested Will Assist The Government In Determining The Appropriate Procurement Method, Including Any Set-aside Decision. Respondents Should Clearly Describe Their Capabilities To Include Management Experience, Equipment And Personnel Or The Ability To Obtain Them. Furthermore, Interested Sources Must Also Meet All Requirements Of Federal, State, And Local Municipal Codes Regarding Operations Of This Type Of Service. the Naics Code Assigned Is: 336212 Truck Trailer Manufacturing the Small Business Size Standard Is 1,000 Employees. not Responding To This Sources Sought Does Not Preclude Participation In Any Future Or Potential Solicitation, Or Request For Quotation. It Is The Intent Of The Portland Va Healthcare System To Use The Information Gathered For Market Research Purposes Only. If A Formal Solicitation Is Released, It Will Be Posted Via The Contract Opportunies On Sam.gov. Description Of The Requirement: the Department Of Veterans Affairs (everett Cboc 220 Olympic Blvd, Everett, Wa 98203) Is Seeking To Purchase, On A Brand-name Or Equal Basis, A 12x60 Mri Trailer To Allow For The Easy Transportability Of The Unit. This Is Just For The Purchase Of The Trailer; The Mri Unit Is Currently Being Held By Ge. essential/significant Physical, Functional, Or Performance Characteristics. 12x60 Transportable Mri Trailer Brand/manufacture Name Amst A Kentucky Trailer Company. since This Is A Trailer Being Built To House The Ge Voyager Mri And Therefore Must Comply With The Mri Manufacturer S Requirements For A Mobile Housing For The For The Mri. Any Small Business Must Show They Have Experience Manufacturing These Types Of Trailers. mri Trailer Overall Length: 60 Overall Height: 13 -6 Overall Width: 12 Custom Chassis: o Custom Built Dual Twin I-beam Flat Floor Aluminum Chassis o Four (4) Fixed Jack Stands For Rear Of Trailer o Two (2) Manual Landing Legs With Pins Located In The Front Of The Trailer o All Aluminum Wheels And Radial Tires o Air Ride Suspension o Spread Axle With Air Ride Rear Suspension o Anti-lock Brakes Custom Body: o Wall Construction To Include Aluminum Tube o Magnetic Steel Shielding Per Oem Requirements For Va Puget Sound Specific 1.5t Mri System To Be Integrated Into Unit. Gauss Line Will Be Maintained Below 5 Gauss At Any Point Beyond 6 From Any Side Wall o Exterior Sheet 0.50 Raw Aluminum o Entire Unit Painted White o Polyurethane Spray Foam Insulation Between Tubes To Provide Barrier To Heat, Cold And Noise o Vapor Barrier Installed On Floor Of Trailer To Resist Moisture o Drip Rails Over Main Entry Door And All Along The Top Of The Unit o Mirror Image Orientation With Entry Doors Located On The Driver S Side Of The Unit Exterior Features o All Aluminum Lower Belly Box Compartment Area. To Include Lockable Storage With Aluminum Insulated Doors And Gas Cylinders o Staff Entry Door And Stairs For Direct Access To Unit With Handrails On All Sides o Bubble Levels Mounted On The Unit o Swinging Door (into Mri Trailer) To Allow For Unit To Connect To Zone 2 Mri Trailer o Vinyl Skirting Around Perimeter Of Unit To Protect Exposed Areas To The Elements o Steel Combination Lockbox Mounted On The Front Of The Trailer For Key Storage General Layout o Unit Will Meet All Specifications That The Mri Oem Has Developed Regarding The Siting And Installation Of Their Mri System Into A Transportable Unit o Mirror Image Orientation o Mri Scan Room At The Rear Of The Unit o Technologist Control Room In The Middle Of The Unit o Linen Storage Area With Shelves For Clean And Soiled Linen o Swing Door To Allow For Direct Connection Between Zone 2 Mri Trailer And Mri Trailer o Front Equipment Room For Oem Computer Equipment And Transportable Support Systems Including Electrical And Hvac Systems Flooring o Plates To Mount System And Equipment In Scan Room And Equipment Room. o Single Piece Vinyl Flooring Throughout Entire Trailer To Include Plywood Sub Flooring Walls, Cabinets And Counter Tops o Solid Surface Countertops In Scan Room And Control Room o Cabinetry Located In The Scan Room And Control Room o Coil And Phantom Storage In Scan Room o Walls To Be Built With Hospital Grade Wall Covering For Ease Of Cleaning And Longevity Ceiling And Lighting o Fully Dimmable Led Lights To Be Provided Throughout The Trailer o Sound Reducing Drop Ceiling With Acoustical Ceiling Tiles o Ceiling To Include A/c Louvers For Proper Dispersion Of Air Flow o Separate Lighting Controls Located In Each Room Magnetic Shielding o Shielding Per Manufacturers Specifications In The Scan Room On Each Wall And The Back Of The Unit Where The Rear Door Is Located o Gauss Field Will Be Maintained Below 5 At All Points 6 Away From Outside Walls o 44 Wide Pneumatic Scan Room Door Rfi Shielding o Aluminum Rfi Shielding Lightweight And Non-oxidizing. Installed To The Specifications Of The System Manufacturer. Third Party Rfi Testing Company To Confirm Compliance Rf Windows o Window Between The Control Room And Scan Room Is Designed For Ease Of Viewing But Also Rfi Compliance o Auto Fogging Capability For Privacy Communications o Three (3) Phone, Fax, And Seven (7) Data Connection Conveniently Located In Control Room And Lower Compartment. (2) 15.24m Hubbell Data Cords And (1) Phone Cord Supplied With Unit. Electrical o Main 480 Volt Ac Disconnect For System Located In Lower Compartment o Electrical Distribution Panel Located In Equipment Room To Allow For Ease Of Serviceability And Maintenance o 480 Volt, 3 Phase Power o Shore Power Cable Provided In The Underbelly Storage Compartment o 12-volt Dc Charger/inverter Provided o Interior Emergency Lighting Installed To Provide Illumination When The Unit Has Lost Power o Dc Power Supply In Belly Box Area Along With Another Power Supply For The Battery Charger o 45kw On Board Generator To Provide Emergency Back-up Power In The Event Of Power Loss. Generator Provides Sufficient Power To Run Cold Head To Prevent Helium Loss, Hvac System, And Transportable Lights o Automatic Transfer Switch That Starts Generator If Shore Power Supply Is Interrupted o The Generator Does Not Provide Sufficient Power To Support Scanning Operations Air Conditioning/heating o Northern Air Combination Hvac/chiller System Mounted At The Front Top Of The Transportable Unit. This System Provides Both Environmental Heating And Cooling As Well As All Chilled Water Requirements For The Mri System this System Eliminates The Need For An Oem Supplied External Chiller o Separate Air Supplies To Go To The Different Rooms o Louvers In The Ceiling Are Designed For Minimum Downdrafts But Still Maintain Proper Air Flow Throughout The Unit o Thermostats Are Set At Out Facility Before Shipping To Maintain Proper Temperature Miscellaneous o Am/fm Stereo Receiver With Cd And Ipod Interface Installed In Control Room. Speakers To Be Installed In Unit o Site Planning Guide To Be Provided At Time Of Deposit Received o Manuals For All Components To Be Provided On Board Unit At Time Of Delivery o Fire Extinguishers, Handheld Abc All Purpose, Located In Each Room o Fire Suppression System (dry System) o Code Blue Alert System o Nurse Call Alert System o Prep For Customer Supplied Patient Injector o Install Customer Supplied Patient Injector o Sky Factory Sky Light 6 X4 Over Mri Table In Scan Room o Wall Mural In Scan Room o Medical Gas Outlets 02/air/suction provide Outlets In The Scan Room And Outlets In The Underbelly Compartment o Wave Guide Pass Through Scan Room Wall o Custom Candy Cane Quench Vent o Rigging Support To Oem Installation Team During Mechanical Installation Process At Trailer Company Production Facility o Transportation To Everett Cboc 220 Olympic Blvd everett, Wa 98203 Warranty o 1-year Warranty Coordination o Coordinate Transport Of Trailer With The Facility Poc o The Facility Cor Will Coordinate Oem Personnel With Trailer Manufacturer For The Installation Of The Ge Mri Unit o Kickoff Meeting With Trailer Vendor, Poc, And Ge Healthcare o Design Review Prior To Trailer And Mri Going Into Production o Immediately After Production Of Trailer And When The Mri Is Shipped From Ge To Trailer Vendor o During Delivery/installation Of Mri Into The Trailer o Prior To Trailer And Coming Being Delivered To Everett Location o During Installation At Everett Location the Information Above Is Intended To Be Descriptive, Not Restrictive, To Indicate The Quality Of Equipment That Will Be Satisfactory. It Is The Responsibility Of The Interested Source To Demonstrate To The Government That The Interested Source Can Provide Equipment That Fulfills The Required Specifications. potential Sources Shall Provide The Following Information In Their Response: mark If Your Firm Is Eligible For Participation In One Of The Following Small Business Programs. If So, Please Indicate The Program: [ ] Yes [ ] No - Small Business (sb) [ ] Yes [ ] No - Hubzone [ ] Yes [ ] No - Small Business 8(a) [ ] Yes [ ] No - Small Disadvantaged Business (sdb) [ ] Yes [ ] No - Women-owned (wo) Small Business [ ] Yes [ ] No - Service Disabled Veteran Owned Small Business (sdvosb) [ ] Yes [ ] No - Veteran Owned Small Business (vosb) [ ] Yes [ ] No - Large Business [ ] Yes [ ] No - Other (please Specify) [ ] Yes [ ] No Are You The Original Equipment Manufacturer (oem)? [ ] Yes [ ] No If Not The Oem, Are You An Authorized Distributor, And Can Produce A Letter From The Oem? [ ] Yes [ ] No Is This Product Available On Your Gsa/fss Or Other Gwac Contract? if So, What Is Your Contract Number?_____________________ [ ] Yes [ ] No Does Your Equipment Conform To The Buy American Act And Far 52.225-1? 52.225-1 Buy American-supplies | Acquisition.gov what Is The Estimated Delivery Date After Receipt Of Order (aro)? _____________ please Include The Following Information: company Name: poc: uei: address: email: in Addition To Providing The Information Requested Above, Responding Companies Are Encouraged To Include Any Relevant Information (specifications, Cut Sheets, Brochures, Capability Statement, Experience Etc.) To Confirm The Company S Ability To Meet The Requirements Outlined In This Request. disclaimer: This Notice Does Not Obligate The Government To Award A Contract Or Otherwise Pay For The Information Provided In Response. The Government Reserves The Right To Use Information Provided By Respondents For Any Purpose Deemed Necessary And Legally Appropriate. After Review Of The Responses Received, A Pre-solicitation Synopsis And Solicitation May Be Published In Federal Business Opportunities (http://www.fbo.gov). submit Capability Statements To: Department Of Veterans Affairs, Visn 20 Attn: Krystal Weeks, No Later Than 3:00 Pm (pst), April 8, 2024. Responses Must Be Submitted Via E-mail To: Krystal.weeks@va.gov. Note: Do Not Include Proprietary, Classified, Confidential, Or Sensitive Information In Responses.
Closing Date19 Apr 2024
Tender AmountRefer Documents 

Adela Serra Ty Memorial Medical Center Tender

Philippines
Details: Description Procurement Of Color Doppler Ultrasound System With 3d/4d With Workstation Ib No. 2024-08-13 (45) 1. The Adela Serra Ty Memorial Medical Center, Through The Astmmc Fund Intends To Apply The Sum Of Ten Million Pesos Only [php 10,000,000.00] Being The Abc To Payments Under The Contract For An Item. Bids Received In Excess Of The Abc For Each Lot Shall Be Automatically Rejected At Bid Opening. 2. The Adela Serra Ty Memorial Medical Center Now Invites Bids For The Above Procurement Project. Delivery Of The Goods Is Required By 60 Calendar Days. Bidders Should Have Completed, Within 5 Years From The Date Of Submission And Receipt Of Bids, A Contract Similar To The Project. The Description Of An Eligible Bidder Is Contained In The Bidding Documents, Particularly, In Section Ii (instructions To Bidders). 3. Bidding Will Be Conducted Through Open Competitive Bidding Procedures Using A Non-discretionary “pass/fail” Criterion As Specified In The 2016 Revised Implementing Rules And Regulations (irr) Of Republic Act (ra) No. 9184. Bidding Is Restricted To Filipino Citizens/sole Proprietorships, Partnerships, Or Organizations With At Least Sixty Percent (60%) Interest Or Outstanding Capital Stock Belonging To Citizens Of The Philippines, And To Citizens Or Organizations Of A Country The Laws Or Regulations Of Which Grant Similar Rights Or Privileges To Filipino Citizens, Pursuant To Ra No. 5183. 4. Prospective Bidders May Obtain Further Information From Adela Serra Ty Memorial Medical Center And Inspect The Bidding Documents At The Address Given Below During 8:00am To 5:00pm, Monday Thru Friday. 5. A Complete Set Of Bidding Documents May Be Acquired By Interested Bidders On July 24, 2024 To August 13, 2024 From The Given Address Below And Upon Payment Of The Applicable Fee For The Bidding Documents In The Amount Of Ten Thousand Pesos Only [php 10,000.00]. The Procuring Entity Shall Allow The Bidder To Present Its Proof Of Payment In Person. 6. The Adela Serra Ty Memorial Medical Center Will Hold A Pre-bid Conference On August 01, 2024; 10:30 Am At Bac Conference Room, Opd Bldg, Astmmc, Tandag City And Or Through Video Conferencing Or Webcasting Via Meet.google.com/rbu-snjw-vga Which Shall Be Open To Prospective Bidders. 7. Bids Must Be Duly Received By The Bac Secretariat Through Manual Submission At The Office Address Indicated Below, On Or Before 10:30 Am; August, 2024. Late Bids Shall Not Be Accepted. 8. All Bids Must Be Accompanied By A Bid Security In Any Of The Acceptable Forms And In The Amount Stated In Itb Clause 14. 9. Bid Opening Shall Be On 10:31 Am; August 13, 2024 At Bac Conference Room, Opd Bldg, Astmmc, Tandag City And Or Through Video Conferencing Or Webcasting Via Meet.google.com/rbu-snjw-vga Bids Will Be Opened In The Presence Of The Bidders’ Representatives Who Choose To Attend The Activity. 10. The Adela Serra Ty Memorial Medical Center Reserves The Right To Reject Any And All Bids, Declare A Failure Of Bidding, Or Not Award The Contract At Any Time Prior To Contract Award In Accordance With Sections 35.6 And 41 Of The 2016 Revised Irr Of Ra No. 9184, Without Thereby Incurring Any Liability To The Affected Bidder Or Bidders. 11. For Further Information, Please Refer To: Dominador B. Toral, Md Bac Office, 2nd Floor Opd Bldg. Astmmc, Tandag City, Sds, 8300 Tel No. 086-211-4306 Astmmcprocurement@gmail.com 12. For Downloading Of Bidding Documents, You May Visit: Philgeps.gov.ph Dominador B. Toral, Md Hbac Chairman Item No. Description Unit Qty Total Delivered, Weeks/months 1 Color Doppler Ultrasound System With 2d/4d With Workstation Unit 1 10,000,000.00 60 Calendar Days Overview Of Functional Requirements The Type Of The Ultrasound Machine For The Radiology Department Should Influence Quality Of Patient Care And Diagnostic Precision. Considerations For Clinical Applications, Image Quality, Ease Of Use, And Possibility Of Future Upgrades For Specific Needs Should Be Done. The Machine Should Be Able To Do Basic Sonographic Functions And Acts As A General-purpose Imaging System That Supports A Wide Variety Of Transducers And Related Application Software Packages Allowing For The Collection, Display And Analysis Of Ultrasound Information. The Machine Should Also Be Able To Do Further Specific Functions Such As Cardiac Assessments, Vascular Imaging, Including Doppler And Color Doppler Studies, Ob/gyn Procedures, Musculoskeletal Examinations, Etc. Technical Specifications * Color Monitor, Tft Or Lcd From "22-inch High Resolution Led Monitor * 360° Articulating Monitor Arm * 10.1-13.3 Inch, Ultra-slim, Angle Adjustable, Touch Gestures Supporter * Dynamic Range At Least 272 Db. * Frequency Range Of At Least 1-15 Mhz * Modes: B/2d, M; Color Doppler; Pulsed/continuous/power Doppler With Simultaneous Capability; Color Perfusion; Tdi, Harmonic Images * Digital And Caliper Measurement Functions Required For Both Distance, Area And Volume. * Trackball And/or Touchpad In User Panel. * Frame By Frame Image Memory Or Cine-loop. * Doppler Display To Indicate Blood Flow Both Numerically And In Colour. * Connection Port For Image Printing To Be Included (printer Specified Separately). * Hd/cd/dvd/usb Storage Unit * Internal Hard Disk Of At Least 500gb -1 Tb * Monitor Arm * Raw Data * Patient Information Management * 4 Probes Ports * Storage Space * Gel Warmer * Cable Management * Back Tray/tray Connectivity - Wireless Adapter & Lan : 802.11n, Dual Band 2.4ghz & 5ghz - Built-in Battery Up To~60 Min Scanning Application Physical Specification Abdomen Audio Speakers Obstetrics Stereo Audio Speakers Gynecology/ivf Monitor Floating Arm Small Parts Rotate Angle:360 Degrees Reverse With Monitor Arm Urology Along With The Support Arm Msk Vascular Up: 150mm Pediatrics Front/back: 300mm Emergency Medicine Wheels Front Castor (2 Ea): Total Lock And Break For Swivel Lock Shearwave Elastography Panoramic View Application 3d/4d Others Electrical Power Voltage: 220-240v~ Frequency: 50/60 Hz Transducer Port And Holder: 5(one For Power Consumption: Max. 750-800va Transducer Ports With Dust Prevention Circuit Breaker: 100v~, 10a Operating Environment Ambient Temperature: 0-40 °c Relative Humidity: 30%-75% Atmospheric Pressure: Adjustable Panel Height 700hpa-1060hpa Touch Screen Display User Interface 21.5 -inch High Sensitivity Floating Control Panel Anti-glare Color Touch Screen Resolution: Up To 1280*800 Brightness Adjustable For The Digital Brightness And Contrast Adjustment Through Preset Backlight Of The Whole Control Panel Angel Adjustable Range: 360degrees Full-sized, Backlit Qwerty Keyboard Viewing Angle: ≥178 Degrees 8 Programmable Keys Support Touch Screen 8-segment Tgc Control Support Either Hand Writing Or With Gloves On Rotate Angle Range: Atleast 180 Degrees Touch Screen Down/up: 200±20 Mm Or Better Touch Screen Menu Layout Editable 8" Or 224mm Monitor Upward System Boot-up Boot-up From Shut-down: < 90sec 22-inch High Resolution Color Up Special Functions. Led Monitor Touch Screen Menu Layout Editable Resolution: 1920x1080 Atleast True Color System Boot-up Boot-up From Shut-down: < 90sec Viewing Angle: ≥178 Degrees Digital Brightness And Contrast Adjustment Through Preset Tile/rotate Independent Adjustment: Tilt Angle Range:55 Upward , 10 Downward Rotate Angle Range: 160-180 Degrees Recorder Printer Included Probes: A) 2 Curvilinear Probes (basic And Advanced (3d/4d) For With At Least Triple Frequency, Bandwidth Of 2-5 Mhz Frequency Range B) Linear With At Least Triple Frequency, Bandwidth Of 5-15 Mhz Frequency; C) Phased Array With At Least Triple Frequency, Bandwidth Of At Least 1 Mhz -5 Mhz Including 3 Mhz Frequency; D) Endocavity Probe With At Least Triple Frequency, At 8-13 Mhz, And Field Of View Of At Least 185° For One Equipment. Trolley To Include Shelf Space For Image Printer And Documentation Application: - Shared Service (includes Obstetrics, Pediatrics, Gynecology, Abdomen, Urology, Small Parts, Vascular, Nerve, Emergency And Cardiology Packages). - Dicom Basic - Dicom/hl7 Worklist - 3d/4d Includes: - Viewing Workstation - 1 Unit 55" Smart Tv For Viewing Of Patient Computer Specifications * 1 Unit Branded Computer System At Least 16cores Up Processor 3.5ghz Up With 32gb Of Ram And Dedicated Video Card At Least 8gb Gddr5 24 Inches Monitor With Wireless Adapter, Ups, Mouse, Keyboard, Speaker, And Other Accessories Needed * Provide Wireless & Wired Access Point For Pacsplus & Dicom (router & Switchub) * 2 Units Branded Laptop At Least 19" With Viewing System For Ultrasound Synchronizing To Ultrasound '-16 Core, 1 Tb With Bag & Wireless Mouse * 2 Units Rotating Chair Adjustable Up & Down * 1 Unit Modern Table Hard Structure Steel And Chrome Plated Or Stainless * 2kva Ups With Avr Computer Grade For Workstation - 3kva Ups Medical Grade With Trolly For Ultrasound Consumables - 1000 Pcs Ultrasound Printer Thermal Paper * 500 Btls Probe Antiseptic Cleanser - 100 Gallons Ultrasound Gel * 1000 Condom Probe Cover Requirements For Commissioning *** Supplier To Perform Installation, Safety, And Operation Checks Before Handover *** Staff/end-user And Biomed Technician In Coordination With The Engineering Department To Affirm Completion Of The Installation Training End Users & Biomedical/engineer Training Of Users And Biomedical *** Training Of Users In Operation And Basic Maintenance And Calibration Shall Be Provided *** Supplier To Issue Certificate Of Training *** Comprehensive Training Of Users In Operation, Basic And Advanced Maintenance Shall Be Provided *** Off-site Comprehensive Training 4-6 Biomed Technician Participants Can Attend For One Week Technical Training & Orientation Of Biomedical Technician/engineer Including Fares, Accommodation And Meals User Care*** Unit Layout To Enable Easy Cleaning And Sterilization Of All Surfaces. Warranty And Maintenance Warranty 3 Years Warranty Should Be Provided By The Supplier Parts = At Least 5 Years Maintenance And Service = At Least 2 Years Maintenance Tasks *semi-annual Preventive Maintenance/calibration To Be Conducted By The Company Engineer In-charge *advanced Maintenance Tasks Required Shall Be Documented *radiology As The Need Arise Type Of Service Contract Service Contract Is Recommended In Case No In-house Service Experience Is Available To Ensure That Preventive Maintenance Will Be Performed At Regular Intervals. Pricing For Service Contracts Should Be Negotiated Before The System Is Purchased. Spare Parts Availability Post-warranty 10 Years Software / Hardware Upgrade Availability Routine Software Updates Should Be Provided Documentation: Documentation Requirements - User, Technical And Maintenance Manuals To Be Supplied In English Language - At Least 3 Copies - Certificate Of Calibration And Inspection To Be Provided - List Of Equipment And Procedures Required For Local Calibration And Routine Maintenance To Be Provided By The Supplier - List Of Important Spare Parts And Accessories, With Their Part Numbers And Cost To Be Provided By The Supplier - Trade-in With Manufacturer If Available Decommissioning Estimated Life Span: 10 Years Safety And Standards Risk Classification Regulatory Approval / Certification Should Be A Ce Or Ul Approved Product. "manufacturer / Supplier Should Have Iso Certificate For Quality Standard. Electrical Safety Conforms To Standards
Closing Date13 Aug 2024
Tender AmountPHP 10 Million (USD 174.3 K)

ARCHITECT OF THE CAPITOL USA Tender

Civil And Construction...+2Others, Pipe Line Project
United States
Details: General annual Piping Inspections Of The Capitol Power Plant (cpp) Utility Distribution System (uds) Tunnels. short Description on An Annual Basis, The Contractor Shall Perform A Comprehensive Piping Inspection Of The Capitol Power Plant (cpp) Utility Distribution System (uds). evaluate The Current Pipe Thickness Of Steam Lines, Chilled Water Lines, And Condensate Piping Systems Throughout The Uds To Determine Discrete Locations For Piping Inspections. background the Capitol Power Plant (cpp) Provides Steam And/or Chilled Water Service To Twenty-three (23) Buildings Within The Capitol Complex. Buildings Receive Steam And/or Chilled Water Service From The Network Of Piping Located Within The Cpp Utility Tunnels And From Direct-buried Piping Systems. the Walkable And Utility (non-walkable) Tunnels, Buried Pipelines, And Utility Vaults Are Aoc Permit-required Confined Spaces And May Contain Asbestos-containing Material And Lead-based Painted Materials. objectives the Contractor Shall Perform Comprehensive Piping Inspection Of The Cpp Uds Tunnels (walkable, Non-walkable/utility Vaults, And Branch Tunnels) To Evaluate If The Piping Still Meets The Requirements Of Asme B31.1 Based On The Operating And Design Pressure And Temperature Of The Steam Supply, Chilled Water Supply (cws), High/low Pressure Condensate Return, And Chille Water Return (cwr). scope the Purpose Of This Solicitation Is For The Contractor To Furnish All Labor, Materials, Supplies, Equipment, Software, Transportation, Management, And Incidentals To Perform Site Investigations And Any Evaluations (i.e. Pipe Stress Analysis, Life Cycle, Or Other Test Methods) For Preparing An Engineering Assessment Of The Steam, Chilled Water, And Condensate Distribution System. assess The Current Condition Of The Piping Systems In Terms Of Remaining Wall Thickness, Wall Loss, Corrosion Rate, And Estimated Remaining Service Life. Evaluate Existing And Past Piping Assessment Reports (provided For Reference Only) For Piping Re-inspection At Certain Locations As Determined Which Require Close Monitoring. identify Any System Weakness, And Immediate And Near-term Threats Of Leak Or Failure. Post Compiling Of All The Information, The Contractor Shall Evaluate If The Piping Still Meets The Requirements Of Asme B31.1 Based On The Operating And Design Pressure And Temperature Of The Steam Supply, Cws, High/low Pressure Condensate Return, And Cwr. the Contractor Provides An Engineering Assessment With Remedial Recommendations That Are Safe And Effective Based On Applicable Engineering Standards And Industry Best Practices. Provide Documentation Of Specific Findings And Observations Contributing To Such Abnormally Higher Corrosion Activity. evaluate Existing And Past Piping Assessment Reports (provided For Reference Only) For Piping Re-inspection At Certain Locations As Determined Which Require Close Monitoring. evaluate The Current Pipe Thickness Of Steam Lines (insulated), Chilled Water Lines (insulated), And Condensate Piping (insulated) Systems Throughout The Uds To Determine Discrete Locations For Piping Inspections. Compare The Measured Thickness With The Minimum Pipe Thickness Required By The Industry (asme B31.1). the Contractor Shall Be Responsible For Removal Of Pipe Insulation And Shall Provide Pipe Cleaning And Surface Preparation Per Required Guidelines. The Contractor Shall Be Responsible For Re-insulating The Removed Insulation Post-inspection. Removal, Storage, Surface Preparation, And Re-installation Of Pipe Insulation And Jacketing Within A Timely Manner To Ensure Efficient And Safe Operations Of Cpp Uds. this Work May Require Coordination With Aoc Cpp Steam Line Charging, Steam Line Switchover, Safety Stand-downs, Evacuations, And Evacuation Drills, Etc., During The Project Inspection Period. types Of Inspection types Of Inspections (as Applicable Per Asme B31.1 Requirements - Inclusive And Not Limited To): magnetic Particle Examination inspect The Exposed Welds And Attachment Points For Surface Defects. time Of Flight Diffraction Ultrasonic (tofd) inspect The Seam Welds For Defects. linear Phased Array (lpa) Ultrasonic Testing investigate And Provide Suspected Defects. Use Encoded Lpa To Inspect The Girth Welds. a-scan And B-scan Ultrasonic Testing establish Reference Locations And Scan The Piping To Generate Wall Thickness Data. Establish Surface Profile Morphology Of Piping System At Reference Locations Using 3d Laser Scanning. energy Dispersive X-ray Spectrometry remove Representative Corrosion Samples For Elemental Analysis. Perform Energy Dispersive X-ray Spectrometry To Detect And Measure Elemental Composition. hardness Inspection guided Wave Thickness eddy Pulse Current report generate A Report With The Following Contents: Executive Summary, Background, Summary Of All Test Results, Detailed Analysis Of Individual Test Locations, Trend Analysis Graphs, Priority Listing Of Tested Areas, Conclusions And Recommendations, And Potential Addendums, Appendix Etc. contract Type: Firm Fixed Price (ffp) place Of Performance / Hours Of Operation capitol Hill And Capitol Power Plant, Located At 25 E Street Se, Washington Dc 20003. 6:00 Am To 2:30 Pm (monday Through Friday). period Of Performance a Base Contract Will Be Award Date Up To 12 Months. Each Option Year Will Be For One Year After The Base Year With Four (4) Option Years. onsite Activities Related To Piping Inspections Of Utility Distribution Lines Between The Warmer Months Of May Through September Of Each Calendar Year Weather Dependent. funding for The Base Year And Each Option Period Will Be Subject To The Governments Need For Services And Availability Of Fiscal Year Funding. privacy Act all Plans, Specifications, And Photographs In Reference To This Project Are The Property Of The United States Government. Copying, Disseminating, Or Distributing Is Prohibited. the Contractor Shall Not Release Any Project Information, In Any Format, Without Prior Written Approval By The Aoc Contracting Officer (aoc Co) In Accordance With Aoc52.203-2 And Aoc52.203-4. personal Service this Is Not A Personal Services Contract. security in Accordance With Clause Aoc52.223-5 “special Security Requirements – Services (feb 2010) Of The Contract, Within 7 Calendar Days After Date Of Award The Contractor Shall Submit To The Cor A List Of All Employees Proposed To Support This Contract. The Contractor Shall Comply With All Aoc Security Regulations, Policies, And Procedures. furthermore, In Accordance With Clause Aoc52.204-4 “personal Identity Verification Of Contractor Personnel (december 2012),” Of The Contract, A Copy Of The E-verify Case Details Document Evidencing “employment Authorized” (final Verification Request) Shall Be Provided With Each Request For An Aoc Id Badge.” all Offeror Employees Shall Submit An E-verify Form And A United States Capitol Police Background Check Form (cp-491) Prior To Working On Any Task Order Under The Bpa. The Offeror’s Employees Shall Also Complete An Offeror Badging Request Form. All Members Of The Team Working On Site Will Be Required To Submit To Wear An Identification Badge, That Is In Visible Sight, At All Times. On Site Work May Be Interrupted Because Of Congressional Events Or U.s. Capitol Police Requirements. All Work To Be Performed Is Subject To Government Interruptions. safety the Contractor Shall Observe All Safety Precautions Throughout The Performance Of This Contract. all Aoc, Em 385 1-1, Osha, And Ocwr Safety Procedures Shall Be Always Followed. The Work To Be Performed Is In Permit-required Confined Space Tunnels, And All Entrants Must Take And Submit Certifications As Proof Of Successfully Completing All Required Training Before Entering A Tunnel, Including, But Not Limited To, Permit-required Confined Space, Asbestos Awareness And Heat Stress Prevention. the Contractor Shall Assume Full Responsibility And Liability For Compliance With Applicable Regulations Pertaining To The Health And Safety Of Personnel During The Execution Of Work And Shall Hold The Aoc Harmless For Any Action On His/her Part, Or That Of His/her Employees Or Subcontractors, Which Results In Illness, Injury, Or Death. energy Efficiency/compliance the Contractor Must Follow Applicable Aoc Policies, Dc Regulations, Environmental Protection Association Regulations, And Dc Department Of Transportation Regulations. sustainability this Section Is Not Used. key Personnel the Contractor Shall Staff This Project With Appropriate Subject Matter Expert (sme) Personnel To Perform The Required Scope As Described Above. key Personnel Shall Be Administered In Accordance With Aoc52.211-1, Key Personnel And Aoc52.211-2, Approval Of Substitute Offeror Personnel. key Personnel May Not Be Removed From The Contract Without The Approval Of The Co. quality Control this Will Be The Responsibility Of The Contractor For All Work Performed In The Field And Before The Submission Of Any Documents/records To The Aoc Must Review And Certify. records / Data all Records And Data Produced Under This Contract The Property Of The Aoc. The Aoc Will Archive All Submitted Data For The Record. Per Deliverables. Aoc52.227-2, Unlimited Government Rights (nov 2004), The Government Shall Have Unlimited Rights Other Work Developed In The Performance Of This Contract, Including The Right To Use Same On Any, For The Benefit Of The Government, In All Drawings, Designs, Specifications, Notes, And Other Government Work Without Additional Cost To The Government; And With Respect Thereto The Contractor Agrees To And Does Hereby Grant To The Government A Royalty-free License To All Such Data Which The Contractor May Cover By Copyright And To All Designs As To Which The Contractor May Assert Any Rights Or Establish Any Claim Under The Design Patent Or Copyright Laws. The Contractor Agrees To Furnish And To Provide Access To All Such Materials At The Request Of The Contracting Officer. Pdfs And Electronic Files Will Be Included In Every Submission. Electronic Files Must Be Submitted In Microsoft Excel Format. All Documents Are Included In The Aoc Non-disclosure Agreement. packaging/packing/shipping Instructions not Applicable To This Contract offsite Screening Instructions all Large Equipment / Service Trucks Required For The Assessment Must Be Screened By The Us Capitol Police At The Offsite Screening Facility In Accordance With Capitol Police Procedures. applicable Documents tbd points Of Contact contracting Officer (co): Tbd contracting Officer’s Representative (cor): Tbd definitions & Acronyms As Defined In Context And Stated Below: aoc – Architect Of The Capitol co- Contracting Officer cor – Contracting Officers Representative idiq - Indefinite Delivery Indefinite Quantity osha – Occupational Safety And Health Administration far – Federal Acquisition Regulation ffp - Firm-fixed Price ahj – Authorities Having Jurisdiction cfr – Code Of Federal Regulations cpp – Capitol Power Plant sow – Statement Of Work uds – Utility Distribution System government Furnished Property (gfp) not Applicable To This Contract contractor Furnished Items the Contractor Shall Provide All Labor, Tools, Materials, Equipment, Software’s, Hardware, Technology, Manpower, Scaffolding, Transportation, Connections, Tie-in, Testing Instrumentation, Safety Tools And Equipment And All Other Miscellaneous Items Per Their Means And Methods Required To Complete The Project Contract Work Including Required Ppe. proposal Submission: Government Request Proposals Submitted Electronically. travel Costs: All Travel Costs Shall Be Built Into A Fixed Pricing Schedule. deliverables And Reports hard Copies And Electronic Via Web Base For All Submittals. inspection And Acceptance inspection And Acceptance Shall Be Conducted In Accordance With Contract Clause Aoc52.246-5 Inspection And Acceptance - Architect-engineer Services (nov 2004). inspection, Review, And Acceptance Will Be Performed By Co With Cor Support. procedures For Payment billing And Payment Shall Be Accomplished In Accordance With Contract Clauses 52.232-10 Payments Under Fixed-price Architect-engineer Contracts (apr 2010), Aoc52.232-1 Payment Requests (march 2012), And Aoc52.232-6 Payment By Electronic Funds Transfer (march 2012). payment Will Be Accomplished Through Ipp. Submit A Draft By The 25th Of Every Month To Cor For Review And Approval; Once Agreed Upon, Submit It Into The Ipp System And Provide A Copy To Co And Cor For Tracking. instructions For Responding To This Rfi: 1) Please Provide A Response To The Following Questions From The Government: a) Will Your Company Be Interested In Submitting A Quotation For This Contract If A Solicitation Is Issued? b) Can Your Company Perform This Scope Of Work Under Its Gsa Schedule Contract? If So, What Is The Gsa Schedule Contract Number? What Sin Is This Usually Done Under? Or Is This A Mix Of Sins? c) What Questions Do You Have For The Government? (you May Either List Your Questions In The Rfi Response Or You May Email The Questions To The Contracting Officer, Donald Fuqua At Donald.fuqua@aoc.gov If It Helps You To Provide A Better Response With The Answers Known) d) What Is The Usual Duration Of A Contract For This Work? In Other Words, What Period Of Performance Is Typical For This? e) Please Provide Examples Of Past Contracts Within The Past Three Years That Are Either Completed Or Ongoing That Have The Same Or Similar Scope Of Work. Please Provide The Awarded Contract Dollar Amount As Well. f) Any Other Information You Believe Will Be Of Interest To The Government. please Email Responses To The Contracting Officer, Donald Fuqua At Donald.fuqua@aoc.gov By Noon On June 28, 2024. thank You, donald Fuqua architect Of The Capitol supplies, Services, And Material Management Division (ssmmd) www.aoc.gov
Closing Date28 Jun 2024
Tender AmountRefer Documents 
6211-6220 of 6383 archived Tenders