Pumps Tenders

Pumps Tenders

Bureau Of Corrections Muntinlupa City Metro Manila Tender

Civil And Construction...+1Building Construction
Philippines
Details: Description Republic Of The Philippines Department Of Justice Bureau Of Corrections Muntinlupa City Philippine Bidding Documents Design And Build Of Bureau Of Corrections Supermaximum Prison Facility (2nd Phase) At Sablayan Prison And Penal Farm (sppf) (procurement/contract No. 009) Sixth Edition July 2020 Bids And Awards Committee 202 Table Of Contents Section I. Invitation To Bid 3 Section Ii. Instructions To Bidders 6 Section Iii. Bid Data Sheet 13 Section Iv. General Conditions Of Contract 19 Section V. Special Conditions Of Contract 24 Section Vi. Specifications 26 Section Vii. Drawings 59 Section Viii. Bill Of Quantities 60 Section Ix. Checklist Of Technical And Financial Documents 61 Section I. Invitation To Bid Republic Of The Philippines Department Of Justice Bureau Of Corrections Muntinlupa City Invitation To Bid Design And Build Of Bureau Of Corrections Supermaximum Prison Facility (2nd Phase) At Sablayan Prison And Penal Farm (sppf) 1. The Bureau Of Corrections, Through The National Expenditure Program (nep) Of 2025 Capital Outlay, Intends To Apply The Sum Of Three Hundred Million Pesos Only (₱300,000,000.00) Being The Approved Budget For The Contract (abc) To Payments Under The Contract For The Design And Build Of Bureau Of Corrections Supermaximum Prison Facility (2nd Phase) At Sablayan Prison And Penal Farm (sppf) With Identification Number _epa-009__. Bids Received In Excess Of The Abc Shall Be Automatically Rejected At Bid Opening. 2. The Bureau Of Corrections Now Invites Bids For Provision Of A Detailed Preliminary Architectural And Engineering Design, Detailed Engineering Requirements And Actual Construction Of The Bureau Of Corrections Super Maximum Security Facility, Based On The Final Detailed Architectural And Engineering Design, To Be Approved By The Head Of Procuring Entity Or Its Duly Authorized Representative Conformably With The Minimum Standards Set Forth In The (1) Presidential Decree (pd) No. 1096, National Building Code Of The Philippines (2) Batas Pambansa (bp)blg. 344, An Act To Enhance The Mobility Of Disabled Persons By Requiring Certain Public Buildings, Institutions, Establishments And Public Utilities To Install Facilities And Other Devices (3) National Structural Code Of The Philippines (nscp), Volume I, 2010 (4) Philippine Electrical Code (pec), 2009 (5) Revised Plumbing Code Of The Philippines (6) Revised Irr Of Ra 10575 (7) Republic Act (ra) No. 9514, Revised Fire Code Of The Philippines And (8) Applicable Local Regulations And Ordinances. Completion Of The Works Is Required Within Three Hundred Sixty-five (365) Calendar Days. Bidders Should Have Completed A Contract Similar To The Project Amounting To At Least Fifty Percent (50%) Of The Abc Within The Last Six (6) Years. The Description Of An Eligible Bidder Is Contained In The Bidding Documents, Particularly, In Section Ii. Instructions To Bidders. 3. Bidding Will Be Conducted Through Open Competitive Bidding Procedures Using Non-discretionary “pass/fail” Criterion As Specified In The 2016 Revised Implementing Rules And Regulations (irr) Of Republic Act 9184 (ra 9184), Otherwise Known As The “government Procurement Reform Act.” Bidding Is Restricted To Filipino Citizens/sole Proprietorships, Cooperatives, And Partnerships Or Organizations With At Least Seventy-five Percent (75%) Interest Or Outstanding Capital Stock Belonging To Citizens Of The Philippines. 4. Interested Bidders May Obtain Further Information From Bureau Of Corrections And Inspect The Bidding Documents At The Address Given Below From Monday To Friday From 8:00am To 5:00pm. 5. A Complete Set Of Bidding Documents May Be Acquired By Interested Bidders On _december 28, 2024 (08:00am To 05:00pm) To January 20, 2025 (01:29 Pm)_____ From The Given Address And Website(s) Below. It May Also Be Downloaded Free Of Charge From The Website Of The Philippine Government Electronic Procurement System (philgeps) And The Website Of The Procuring Entity Bucor.gov.ph, Provided That Bidders Shall Pay The Applicable Fee Of Fifty Thousand (₱50,000.00) Pesos Only For The Bidding Documents Not Later Than The Submission Of Their Bids. The Procuring Entity Shall Allow The Bidder To Present Its Proof Of Payment For The Fees In Person Or By Facsimile. 6. The Bureau Of Corrections Will Hold A Pre-bid Conference On _january 06, 2025 (01:30pm)__ At Bac Conference Room Nbp Reservation Muntinlupa City, Which Shall Be Open To Prospective Bidders. 7. Bids Must Be Duly Received By The Bac Secretariat Through Manual Submission At The Office Address As Indicated Below, On Or Before __january 20, 2025 (01:30pm)_____. Late Bids Shall Not Be Accepted. 8. All Bids Must Be Accompanied By A Bid Security In Any Of The Acceptable Forms And In The Amount Stated In Itb Clause 15. 9. Bid Opening Shall Be On __january 20, 2025 (01:30pm)____ At The Bac Conference Room Nbp Reservation Muntinlupa City. Bids Will Be Opened In The Presence Of The Bidders’ Representatives Who Choose To Attend The Activity. 10. The Bureau Of Corrections Reserves The Right To Reject Any And All Bids, Declare A Failure Of Bidding, Or Not Award The Contract At Any Time Prior To Contract Award In Accordance With Sections 35.6 And 41 Of The 2016 Revised Implementing Rules And Regulations (irr) Of Ra No. 9184, Without Thereby Incurring Any Liability To The Affected Bidder Or Bidders. 11. For Further Information, Please Refer To: Ma. Adoracion I. Viñas Office Of The Bac Secretariat Supply Office, Bureau Of Corrections, Muntinlupa City Tel # 02-8809-8587/02-8478-0907 Bacsec2022@gmail.com 12. You May Visit The Following Websites: For Downloading Of Bidding Documents: Bucor.gov.ph Date Of Issue: _______________ Ccsupt Celso S Bravo Chairperson, Bids And Awards Committee Section Ii. Instructions To Bidders 1. Scope Of Bid The Procuring Entity, Bureau Of Corrections Invites Bids For The Design And Build Of Bureau Of Corrections Supermaximum Prison Facility (2nd Phase) At Sablayan Prison And Penal Farm (sppf), With Project Identification Number__________________. [note: The Project Identification Number Is Assigned By The Procuring Entity Based On Its Own Coding Scheme And Is Not The Same As The Philgeps Reference Number, Which Is Generated After The Posting Of The Bid Opportunity On The Philgeps Website.] The Procurement Project Design And Build Of Bureau Of Corrections Supermaximum Prison Facility (2nd Phase) At Sablayan Prison And Penal Farm (sppf) Is For The Construction Of Works, As Described In Section Vi (specifications). 2. Funding Information 2.1. The Gop Through The Source Of Funding As Indicated Below For 2025 In The Amount Of Three Hundred Million Pesos Only (₱300,000,000.00). 2.2. The Source Of Funding Is: Nga, The National Expenditure Program 3. Bidding Requirements The Bidding For The Project Shall Be Governed By All The Provisions Of Ra No. 9184 And Its 2016 Revised Irr, Including Its Generic Procurement Manual And Associated Policies, Rules And Regulations As The Primary Source Thereof, While The Herein Clauses Shall Serve As The Secondary Source Thereof. Any Amendments Made To The Irr And Other Gppb Issuances Shall Be Applicable Only To The Ongoing Posting, Advertisement, Or Invitation To Bid By The Bac Through The Issuance Of A Supplemental Or Bid Bulletin. The Bidder, By The Act Of Submitting Its Bid, Shall Be Deemed To Have Inspected The Site, Determined The General Characteristics Of The Contracted Works And The Conditions For This Project, Such As The Location And The Nature Of The Work; (b) Climatic Conditions; (c) Transportation Facilities; (c) Nature And Condition Of The Terrain, Geological Conditions At The Site Communication Facilities, Requirements, Location And Availability Of Construction Aggregates And Other Materials, Labor, Water, Electric Power And Access Roads; And (d) Other Factors That May Affect The Cost, Duration And Execution Or Implementation Of The Contract, Project, Or Work And Examine All Instructions, Forms, Terms, And Project Requirements In The Bidding Documents. 4. Corrupt, Fraudulent, Collusive, Coercive, And Obstructive Practices The Procuring Entity, As Well As The Bidders And Contractors, Shall Observe The Highest Standard Of Ethics During The Procurement And Execution Of The Contract. They Or Through An Agent Shall Not Engage In Corrupt, Fraudulent, Collusive, Coercive, And Obstructive Practices Defined Under Annex “i” Of The 2016 Revised Irr Of Ra No. 9184 Or Other Integrity Violations In Competing For The Project. 5. Eligible Bidders 5.1. Only Bids Of Bidders Found To Be Legally, Technically, And Financially Capable Will Be Evaluated. 5.2. The Bidder Must Have An Experience Of Having Completed A Single Largest Completed Contract (slcc) That Is Similar To This Project, Equivalent To At Least Fifty Percent (50%) Of The Abc Adjusted, If Necessary, By The Bidder To Current Prices Using The Psa’s Cpi, Except Under Conditions Provided For In Section 23.4.2.4 Of The 2016 Revised Irr Of Ra No. 9184. A Contract Is Considered To Be “similar” To The Contract To Be Bid If It Has The Major Categories Of Work Stated In The Bds. 5.3. For Foreign-funded Procurement, The Procuring Entity And The Foreign Government/foreign Or International Financing Institution May Agree On Another Track Record Requirement, As Specified In The Bidding Document Prepared For This Purpose. 5.4. The Bidders Shall Comply With The Eligibility Criteria Under Section 23.4.2 Of The 2016 Irr Of Ra No. 9184. 6. Origin Of Associated Goods There Is No Restriction On The Origin Of Goods Other Than Those Prohibited By A Decision Of The Un Security Council Taken Under Chapter Vii Of The Charter Of The Un. 7. Subcontracts 7.1. The Bidder May Subcontract Portions Of The Project To The Extent Allowed By The Procuring Entity As Stated Herein, But In No Case More Than Fifty Percent (50%) Of The Project. The Procuring Entity Has Prescribed That: A. Subcontracting Is Not Allowed. 7.1. [if Procuring Entity Has Determined That Subcontracting Is Allowed During The Bidding, State:] The Bidder Must Submit Together With Its Bid The Documentary Requirements Of The Subcontractor(s) Complying With The Eligibility Criteria Stated In Itb Clause 5 In Accordance With Section 23.4 Of The 2016 Revised Irr Of Ra No. 9184 Pursuant To Section 23.1 Thereof. 7.2. [if Subcontracting Is Allowed During The Contract Implementation Stage, State:] The Supplier May Identify Its Subcontractor During The Contract Implementation Stage. Subcontractors Identified During The Bidding May Be Changed During The Implementation Of This Contract. Subcontractors Must Submit The Documentary Requirements Under Section 23.1 Of The 2016 Revised Irr Of Ra No. 9184 And Comply With The Eligibility Criteria Specified In Itb Clause 5 To The Implementing Or End-user Unit. 7.3. Subcontracting Of Any Portion Of The Project Does Not Relieve The Contractor Of Any Liability Or Obligation Under The Contract. The Supplier Will Be Responsible For The Acts, Defaults, And Negligence Of Any Subcontractor, Its Agents, Servants, Or Workmen As Fully As If These Were The Contractor’s Own Acts, Defaults, Or Negligence, Or Those Of Its Agents, Servants, Or Workmen. 8. Pre-bid Conference The Procuring Entity Will Hold A Pre-bid Conference For This Project On The Specified Date And Time And Either At Its Physical Address At Bac Conference Room Nbp Reservation Muntinlupa City And/or Through Videoconferencing/webcasting} As Indicated In Paragraph 6 Of The Ib. 9. Clarification And Amendment Of Bidding Documents Prospective Bidders May Request For Clarification On And/or Interpretation Of Any Part Of The Bidding Documents. Such Requests Must Be In Writing And Received By The Procuring Entity, Either At Its Given Address Or Through Electronic Mail Indicated In The Ib, At Least Ten (10) Calendar Days Before The Deadline Set For The Submission And Receipt Of Bids. 10. Documents Comprising The Bid: Eligibility And Technical Components 10.1. The First Envelope Shall Contain The Eligibility And Technical Documents Of The Bid As Specified In Section Ix. Checklist Of Technical And Financial Documents. 10.2. If The Eligibility Requirements Or Statements, The Bids, And All Other Documents For Submission To The Bac Are In Foreign Language Other Than English, It Must Be Accompanied By A Translation In English, Which Shall Be Authenticated By The Appropriate Philippine Foreign Service Establishment, Post, Or The Equivalent Office Having Jurisdiction Over The Foreign Bidder’s Affairs In The Philippines. For Contracting Parties To The Apostille Convention, Only The Translated Documents Shall Be Authenticated Through An Apostille Pursuant To Gppb Resolution No. 13-2019 Dated 23 May 2019. The English Translation Shall Govern, For Purposes Of Interpretation Of The Bid. 10.3. A Valid Pcab License Is Required, And In Case Of Joint Ventures, A Valid Special Pcab License, And Registration For The Type And Cost Of The Contract For This Project. Any Additional Type Of Contractor License Or Permit Shall Be Indicated In The Bds. 10.4. A List Of Contractor’s Key Personnel (e.g., Project Manager, Project Engineers, Materials Engineers, And Foremen) Assigned To The Contract To Be Bid, With Their Complete Qualification And Experience Data Shall Be Provided. These Key Personnel Must Meet The Required Minimum Years Of Experience Set In The Bds. 10.5. A List Of Contractor’s Major Equipment Units, Which Are Owned, Leased, And/or Under Purchase Agreements, Supported By Proof Of Ownership, Certification Of Availability Of Equipment From The Equipment Lessor/vendor For The Duration Of The Project, As The Case May Be, Must Meet The Minimum Requirements For The Contract Set In The Bds. 11. Documents Comprising The Bid: Financial Component 11.1. The Second Bid Envelope Shall Contain The Financial Documents For The Bid As Specified In Section Ix. Checklist Of Technical And Financial Documents. 11.2. Any Bid Exceeding The Abc Indicated In Paragraph 1 Of The Ib Shall Not Be Accepted. 11.3. For Foreign-funded Procurement, A Ceiling May Be Applied To Bid Prices Provided The Conditions Are Met Under Section 31.2 Of The 2016 Revised Irr Of Ra No. 9184. 12. Alternative Bids Bidders Shall Submit Offers That Comply With The Requirements Of The Bidding Documents, Including The Basic Technical Design As Indicated In The Drawings And Specifications. Unless There Is A Value Engineering Clause In The Bds, Alternative Bids Shall Not Be Accepted. 13. Bid Prices All Bid Prices For The Given Scope Of Work In The Project As Awarded Shall Be Considered As Fixed Prices, And Therefore Not Subject To Price Escalation During Contract Implementation, Except Under Extraordinary Circumstances As Determined By The Neda And Approved By The Gppb Pursuant To The Revised Guidelines For Contract Price Escalation Guidelines. 14. Bid And Payment Currencies 14.1. Bid Prices May Be Quoted In The Local Currency Or Tradable Currency Accepted By The Bsp At The Discretion Of The Bidder. However, For Purposes Of Bid Evaluation, Bids Denominated In Foreign Currencies Shall Be Converted To Philippine Currency Based On The Exchange Rate As Published In The Bsp Reference Rate Bulletin On The Day Of The Bid Opening. 14.2. Payment Of The Contract Price Shall Be Made In: A. Philippine Pesos. 15. Bid Security 15.1. The Bidder Shall Submit A Bid Securing Declaration Or Any Form Of Bid Security In The Amount Indicated In The Bds, Which Shall Be Not Less Than The Percentage Of The Abc In Accordance With The Schedule In The Bds. 15.2. The Bid And Bid Security Shall Be Valid Until One Hundred Twenty (120) Calendar Days. Any Bid Not Accompanied By An Acceptable Bid Security Shall Be Rejected By The Procuring Entity As Non-responsive. 16. Sealing And Marking Of Bids Each Bidder Shall Submit One Copy Of The First And Second Components Of Its Bid. The Procuring Entity May Request Additional Hard Copies And/or Electronic Copies Of The Bid. However, Failure Of The Bidders To Comply With The Said Request Shall Not Be A Ground For Disqualification. If The Procuring Entity Allows The Submission Of Bids Through Online Submission To The Given Website Or Any Other Electronic Means, The Bidder Shall Submit An Electronic Copy Of Its Bid, Which Must Be Digitally Signed. An Electronic Copy That Cannot Be Opened Or Is Corrupted Shall Be Considered Non-responsive And, Thus, Automatically Disqualified. 17. Deadline For Submission Of Bids The Bidders Shall Submit On The Specified Date And Time And Either At Its Physical Address Or Through Online Submission As Indicated In Paragraph 7 Of The Ib. 18. Opening And Preliminary Examination Of Bids 18.1. The Bac Shall Open The Bids In Public At The Time, On The Date, And At The Place Specified In Paragraph 9 Of The Ib. The Bidders’ Representatives Who Are Present Shall Sign A Register Evidencing Their Attendance. In Case Videoconferencing, Webcasting Or Other Similar Technologies Will Be Used, Attendance Of Participants Shall Likewise Be Recorded By The Bac Secretariat. In Case The Bids Cannot Be Opened As Scheduled Due To Justifiable Reasons, The Rescheduling Requirements Under Section 29 Of The 2016 Revised Irr Of Ra No. 9184 Shall Prevail. 18.2. The Preliminary Examination Of Bids Shall Be Governed By Section 30 Of The 2016 Revised Irr Of Ra No. 9184. 19. Detailed Evaluation And Comparison Of Bids 19.1. The Procuring Entity’s Bac Shall Immediately Conduct A Detailed Evaluation Of All Bids Rated “passed” Using Non-discretionary Pass/fail Criteria. The Bac Shall Consider The Conditions In The Evaluation Of Bids Under Section 32.2 Of 2016 Revised Irr Of Ra No. 9184. 19.2. If The Project Allows Partial Bids, All Bids And Combinations Of Bids As Indicated In The Bds Shall Be Received By The Same Deadline And Opened And Evaluated Simultaneously So As To Determine The Bid Or Combination Of Bids Offering The Lowest Calculated Cost To The Procuring Entity. Bid Security As Required By Itb Clause 16 Shall Be Submitted For Each Contract (lot) Separately. 19.3. In All Cases, The Nfcc Computation Pursuant To Section 23.4.2.6 Of The 2016 Revised Irr Of Ra No. 9184 Must Be Sufficient For The Total Of The Abcs For All The Lots Participated In By The Prospective Bidder. 20. Post Qualification Within A Non-extendible Period Of Five (5) Calendar Days From Receipt By The Bidder Of The Notice From The Bac That It Submitted The Lowest Calculated Bid, The Bidder Shall Submit Its Latest Income And Business Tax Returns Filed And Paid Through The Bir Electronic Filing And Payment System (efps), And Other Appropriate Licenses And Permits Required By Law And Stated In The Bds. 21. Signing Of The Contract The Documents Required In Section 37.2 Of The 2016 Revised Irr Of Ra No. 9184 Shall Form Part Of The Contract. Additional Contract Documents Are Indicated In The Bds. Section Iii. Bid Data Sheet Bid Data Sheet Itb Clause 5.2 For This Purpose, Contracts Similar To The Project Refer To Contracts Which Have The Same Major Categories Of Work, Which Shall Be: Architectural, Engineering Design, Detailed Engineering Requirements And Construction Of Building With Concreting Works. 7.1 Subcontracting Is Not Allowed 10.3 A Valid Pcab License Is Required, And In Case Of Joint Ventures, A Valid Special Pcab License, And Registration For The Type And Cost Of The Contract For This Project. 10.4 The Key Personnel Must Meet The Required Minimum Years Of Experience Set Below: For Design Personnel: Key Personnel General Experience Relevant Experience Principal Architect The Principal Architect Must Be Duly-licensed With At Least Ten (10) Years’ Experience Experience In The Design Of Residential, Government Offices Or Institutional Facilities, And Shall Preferably Be Knowledgeable In The Application Of Rapid Construction Technologies. Structural Engineer The Structural Engineer Must Be A Duly-licensed Civil Engineer With At Least Ten (10) Years’ Experience. Experience In Structural Design And Shall Preferably Be Knowledgeable In The Application Of Rapid Construction Technologies. Professional Electrical Engineer The Electrical Engineer Must Be A Registered Professional Electrical Engineer With At Least Five (5) Years’ Experience. Experience In The Design Of Lighting, Power Distribution, Communication Systems (specifically Structured And Local Area Network Cabling, Pabx), Building Management Systems And Preferably Knowledgeable In Developments In Emergent Efficient Lighting Technologies And Energy Management. Professional Mechanical Engineer The Mechanical Engineer Must Be A Professional Mechanical Engineer With At Least Five (5) Years’ Experience. Experience In Hvac And Fire Protection Systems And Preferably Knowledgeable In Emergent, Alternative Energy- Efficient Hvac Technologies. Electronics And Communications Engineer The Electronics And Communications Engineer Must Be Duly-licensed With At Least Five (5) Years’ Experience. Experience In The Design Of Communications Systems, And Preferably Knowledgeable In The Application Of Building Automation And Surveillance Systems. Sanitary Engineer The Sanitary Engineer Must Be Duly-licensed With At Least Five (5) Years’ Experience. Experience In The Design Of Building Water Supply And Distribution, Plumbing, And Preferably Knowledgeable In Waste Water Management/treatment, And Emergent, Alternative Effluent Collection And Treatment System. The Design & Build Contractor May, As Needed And At Its Own Expense, Add Additional Professionals And/or Support Personnel For The Optimal Performance Of All Architectural And Engineering Design Services, As Stipulated In These Terms Of Reference, For The Project. Prospective Bidders Shall Attach Each Individual’s Resume And Prc License Of The (professional) Staff. Design Personnel May Also Be Utilized For The Construction Phase Provided That The Same Meet The Minimum Number Of Years Of Experience In The Construction Of Similar Projects. For Construction Personnel: Key Personnel General Experience Relevant Experience Project Manager The Project Manager Shall Be A Licensed Architect Or Engineer With At Least Eight (8) Years Relevant Experience. Relevant Experience On Similar And Comparable Projects In Different Locations. The Project Manager Should Have A Proven Record Or Managerial Capability Through The Directing/managing Of Major Civil Engineering Works, Including Projects Of A Similar Magnitude. Project Architect/engineer The Project Architect/engineer Shall Be A Licensed Architect Or Engineer With At Least Five (5) Years’ Experience. Experience In Similar And Comparable Projects And Shall Preferably Be Knowledgeable In The Application Of Rapid Construction Technologies. Materials Engineer (m.e. I) The Materials Engineer Must Be Duly Accredited With The Dpwh And With At Least Five (5) Years’ Experience. Experience In Similar And Comparable Projects And Shall Preferably Be Knowledgeable In The Application Of Rapid Construction Technologies. Electrical Engineer The Electrical Engineer Must Be Duly-licensed With At Least Five (5) Years’ Experience. Experience In Similar And Comparable Projects In The Installation Of Lighting, Power Distribution, Communication Systems (specifically Structured And Local Area Network Cabling, Pabx), Building Management Systems. Mechanical Engineer The Mechanical Engineer Must Be Duly-licensed With At Least Five (5) Years’ Experience. Experience In Similar And Comparable Projects In The Installation Of Hvac And Fire Protection. Sanitary Engineer The Sanitary Engineer Must Be Duly-licensed With At Least Five (5) Years’ Experience. Experience In Similar And Comparable Projects In The Installation Of Building Water Supply And Distribution, Plumbing. Foreman The Foreman Must Have At Least Five (5) Years’ Experience. Experience In Similar And Comparable Projects And Shall Preferably Be Knowledgeable In The Application Of Rapid Construction Technologies. Safety Officer The Sanitary Officer Must Have At Least Two (2) Years’ Experience. Must Be An Accredited Safety Practitioner By The Department Of Labor And Employment (dole) And Must Have Undergone The Prescribed Forty (40) Hour Construction Safety And Health Training (cosh) 10.5 The Minimum Major Equipment Requirements Are The Following: Equipment Capacity Number Of Units Backhoe At Least 38hp With 0.055 To 0.160 M3 Bucket Capacity 1 Pay Loader At Least 2.5 To 9.5 M3 Bucket Capacity 1 Dump Truck At Least 10 Cu.m. 2 Generator 50kva 1 Concrete Mixers 1 Bagger 4 Welding Machines 300amp Heavy Duty 4 Submersible Dredging Pump At Least 1hp And 2” Output 1 Prospective Bidders Shall Attach The List Of Contractor’s Major Equipment Units, Which Are Owned, Leased, And/or Under Purchase Agreements, Supported By Proof Of Ownership, Certification Of Availability Of Equipment From The Equipment Lessor/vendor For The Duration Of The Project, As The Case May Be. 12 No Further Instructions. 15.1 The Bid Security Shall Be In The Form Of A Bid Securing Declaration Or Any Of The Following Forms And Amounts: A. The Amount Of Not Less Than 2% Of The Abc, If Bid Security Is In Cash, Cashier’s/manager’s Check, Bank Draft/guarantee Or Irrevocable Letter Of Credit; B. The Amount Of Not Less Than 5% Of The Abc, If Bid Security Is In Surety Bond. 19.2 No Further Instructions. 20 Within A Non-extendible Period Of Five (5) Calendar Days From Receipt By The Bidder Of The Notice From The Bac That It Submitted The Lowest Calculated Bid, The Bidder Shall Submit Its; 1. Latest Income And Business Tax Returns Filed And Paid Through The Bir Electronic Filing And Payment System (efps) 2. Supporting Documents For The Slcc (notice Of Award And/or Notice To Proceed And Project Owner’s Certificate Of Final Acceptance Issued By The Owner Other Than The Contractor Or The Constructors Performance Evaluation System (cpes) Final Rating, Which Must Be At Least Satisfactory. In Case Of Contracts With The Private Sector, An Equivalent Document Shall Be Submitted) 3. Certified True Copy Coming From The Issuing Agency Of Valid And Current Registration Certificate (sec Certificate Of Registration For Corporation Or Dti Certificate Of Registration For Sole Proprietorship Or Cda Certificate Of Registration For Cooperative) 4. Valid And Current Mayor’s Or Business Permit 5. Valid And Current Tax Clearance 6. Valid And Current Pcab License And Registration 7. Audited Financial Statement 8. Three (3) Sets Photocopy Of Eligibility And Financial Envelope Duly Marked As “copy No.1”, “copy No.2” And “copy No.3” 21 No Further Instructions. Section Iv. General Conditions Of Contract 1. Scope Of Contract This Contract Shall Include All Such Items, Although Not Specifically Mentioned, That Can Be Reasonably Inferred As Being Required For Its Completion As If Such Items Were Expressly Mentioned Herein. All The Provisions Of Ra No. 9184 And Its 2016 Revised Irr, Including The Generic Procurement Manual, And Associated Issuances, Constitute The Primary Source For The Terms And Conditions Of The Contract, And Thus, Applicable In Contract Implementation. Herein Clauses Shall Serve As The Secondary Source For The Terms And Conditions Of The Contract. This Is Without Prejudice To Sections 74.1 And 74.2 Of The 2016 Revised Irr Of Ra No. 9184 Allowing The Gppb To Amend The Irr, Which Shall Be Applied To All Procurement Activities, The Advertisement, Posting, Or Invitation Of Which Were Issued After The Effectivity Of The Said Amendment. 2. Sectional Completion Of Works If Sectional Completion Is Specified In The Special Conditions Of Contract (scc), References In The Conditions Of Contract To The Works, The Completion Date, And The Intended Completion Date Shall Apply To Any Section Of The Works (other Than References To The Completion Date And Intended Completion Date For The Whole Of The Works). 3. Possession Of Site 3.1 The Procuring Entity Shall Give Possession Of All Or Parts Of The Site To The Contractor Based On The Schedule Of Delivery Indicated In The Scc, Which Corresponds To The Execution Of The Works. If The Contractor Suffers Delay Or Incurs Cost From Failure On The Part Of The Procuring Entity To Give Possession In Accordance With The Terms Of This Clause, The Procuring Entity’s Representative Shall Give The Contractor A Contract Time Extension And Certify Such Sum As Fair To Cover The Cost Incurred, Which Sum Shall Be Paid By Procuring Entity. 3.2 If Possession Of A Portion Is Not Given By The Above Date, The Procuring Entity Will Be Deemed To Have Delayed The Start Of The Relevant Activities. The Resulting Adjustments In Contract Time To Address Such Delay May Be Addressed Through Contract Extension Provided Under Annex “e” Of The 2016 Revised Irr Of Ra No. 9184. 4. The Contractor’s Obligations The Contractor Shall Employ The Key Personnel Named In The Schedule Of Key Personnel Indicating Their Designation, In Accordance With Itb Clause 10.3 And Specified In The Bds, To Carry Out The Supervision Of The Works. The Procuring Entity Will Approve Any Proposed Replacement Of Key Personnel Only If Their Relevant Qualifications And Abilities Are Equal To Or Better Than Those Of The Personnel Listed In The Schedule. 5. Performance Security 5.1. Within Ten (10) Calendar Days From Receipt Of The Notice Of Award From The Procuring Entity But In No Case Later Than The Signing Of The Contract By Both Parties, The Successful Bidder Shall Furnish The Performance Security In Any Of The Forms Prescribed In Section 39 Of The 2016 Revised Irr. 5.2. The Contractor, By Entering Into The Contract With The Procuring Entity, Acknowledges The Right Of The Procuring Entity To Institute Action Pursuant To Ra No. 3688 Against Any Subcontractor Be They An Individual, Firm, Partnership, Corporation, Or Association Supplying The Contractor With Labor, Materials And/or Equipment For The Performance Of This Contract. 6. Site Investigation Reports The Contractor, In Preparing The Bid, Shall Rely On Any Site Investigation Reports Referred To In The Scc Supplemented By Any Information Obtained By The Contractor. 7. Warranty 7.1. In Case The Contractor Fails To Undertake The Repair Works Under Section 62.2.2 Of The 2016 Revised Irr, The Procuring Entity Shall Forfeit Its Performance Security, Subject Its Property (ies) To Attachment Or Garnishment Proceedings, And Perpetually Disqualify It From Participating In Any Public Bidding. All Payables Of The Gop In His Favor Shall Be Offset To Recover The Costs. 7.2. The Warranty Against Structural Defects/failures, Except That Occasioned-on Force Majeure, Shall Cover The Period From The Date Of Issuance Of The Certificate Of Final Acceptance By The Procuring Entity. Specific Duration Of The Warranty Is Found In The Scc. 8. Liability Of The Contractor Subject To Additional Provisions, If Any, Set Forth In The Scc, The Contractor’s Liability Under This Contract Shall Be As Provided By The Laws Of The Republic Of The Philippines. If The Contractor Is A Joint Venture, All Partners To The Joint Venture Shall Be Jointly And Severally Liable To The Procuring Entity. 9. Termination For Other Causes Contract Termination Shall Be Initiated In Case It Is Determined Prima Facie By The Procuring Entity That The Contractor Has Engaged, Before, Or During The Implementation Of The Contract, In Unlawful Deeds And Behaviors Relative To Contract Acquisition And Implementation, Such As, But Not Limited To Corrupt, Fraudulent, Collusive, Coercive, And Obstructive Practices As Stated In Itb Clause 4. 10. Dayworks Subject To The Guidelines On Variation Order In Annex “e” Of The 2016 Revised Irr Of Ra No. 9184, And If Applicable As Indicated In The Scc, The Dayworks Rates In The Contractor’s Bid Shall Be Used For Small Additional Amounts Of Work Only When The Procuring Entity’s Representative Has Given Written Instructions In Advance For Additional Work To Be Paid For In That Way. 11. Program Of Work 11.1. The Contractor Shall Submit To The Procuring Entity’s Representative For Approval The Said Program Of Work Showing The General Methods, Arrangements, Order, And Timing For All The Activities In The Works. The Submissions Of The Program Of Work Are Indicated In The Scc. 11.2. The Contractor Shall Submit To The Procuring Entity’s Representative For Approval An Updated Program Of Work At Intervals No Longer Than The Period Stated In The Scc. If The Contractor Does Not Submit An Updated Program Of Work Within This Period, The Procuring Entity’s Representative May Withhold The Amount Stated In The Scc From The Next Payment Certificate And Continue To Withhold This Amount Until The Next Payment After The Date On Which The Overdue Program Of Work Has Been Submitted. 12. Instructions, Inspections And Audits The Contractor Shall Permit The Gop Or The Procuring Entity To Inspect The Contractor’s Accounts And Records Relating To The Performance Of The Contractor And To Have Them Audited By Auditors Of The Gop Or The Procuring Entity, As May Be Required. 13. Advance Payment The Procuring Entity Shall, Upon A Written Request Of The Contractor Which Shall Be Submitted As A Contract Document, Make An Advance Payment To The Contractor In An Amount Not Exceeding Fifteen Percent (15%) Of The Total Contract Price, To Be Made In Lump Sum, Or At The Most Two Installments According To A Schedule Specified In The Scc, Subject To The Requirements In Annex “e” Of The 2016 Revised Irr Of Ra No. 9184. 14. Progress Payments The Contractor May Submit A Request For Payment For Work Accomplished. Such Requests For Payment Shall Be Verified And Certified By The Procuring Entity’s Representative/project Engineer. Except As Otherwise Stipulated In The Scc, Materials And Equipment Delivered On The Site But Not Completely Put In Place Shall Not Be Included For Payment. 15. Operating And Maintenance Manuals 15.1. If Required, The Contractor Will Provide “as Built” Drawings And/or Operating And Maintenance Manuals As Specified In The Scc. 15.2. If The Contractor Does Not Provide The Drawings And/or Manuals By The Dates Stated Above, Or They Do Not Receive The Procuring Entity’s Representative’s Approval, The Procuring Entity’s Representative May Withhold The Amount Stated In The Scc From Payments Due To The Contractor. Section V. Special Conditions Of Contract Special Conditions Of Contract Gcc Clause 2 Sectional Completion Is Not Applicable The Intended Completion Date Is Three Hundred Sixty-five (365) Calendar Days From The Date Of Receipt Of The Ntp. 4.1 The Procuring Entity Shall Give Possession Of All Parts Of The Site To The Contractor From The Date Of The Receipt Of Notice To Proceed (ntp). 6 No Further Instructions. 7.2 Fifteen (15) Years. 10 No Dayworks Are Applicable To The Contract. 11.1 The Contractor Shall Submit The Program Of Work To The Procuring Entity’s Representative Within Fourteen (14) Calendar Days After The Issuance Of The Notice To Proceed (ntp) 11.2 The Amount To Be Withheld For Late Submission Of An Updated Program Of Work Is One Tenth Of One Percent Of The Total Contract Price. 13 The Amount Of The Advance Payment Is Fifteen Percent (15%) Of The Contract Price Upon Submission To And Acceptance By The Bureau Of Corrections Of An Irrevocable Standby Letter Of Credit Of Equivalent Value From A Commercial Bank, A Bank Guarantee Or A Surety Bond Callable Upon Demand Issued By A Surety Or Insurance Company Duly Licensed By The Insurance Commission And Confirmed By The Bureau Of Corrections. 14 The Contractor May Submit A Request For Payment For Work Accomplished. Such Requests For Payment Shall Be Verified And Certified By The Procuring Entity’s Representative/project Engineer. Materials And Equipment Delivered On The Site But Not Completely Put In Place Shall Not Be Included For Payment. 15.1 The Date By Which “as Built” Drawings Are Required Is Upon Actual Completion Of The Project. 15.2 The Amount To Be Withheld For Failing To Produce “as Built” Drawings And/or Operating And Maintenance Manuals By The Date Required Is Equivalent To Five Percent (5%) Of The Contract Price. Section Vi. Specifications Terms Of Reference Design And Build Of Bureau Of Corrections Supermaximum Prison Facility (2nd Phase) Sablayan Prison And Penal Farm, Occidental Mindoro 1. Project Information 1.1 Project Description The Mission Of The Bucor Is To Protect Society By Confining Offenders In The Controlled Environments Of Prisons And Community-based Facilities That Are Safe, Humane, Cost-efficient, And Appropriately Secure, And That Provide Self-improvement Opportunities To Assist Offenders In Becoming Law-abiding Citizens. The Design And Build Of Bureau Of Corrections Supermaximum Prison Facility (2nd Phase) Shall Be Conducive To The Reformation And Rehabilitation Of Inmates That Will Bring Them Back Into The Mainstream Of Society As Useful Citizens Of The Country. The Contract Will Involve The Design And Build Scheme Leading To The Construction Of The Bureau Of Corrections Super Maximum Prison Facility (2nd Phase) At Sablayan Prison And Penal Farm, Sablayan, Occidental Mindoro. The Plans And Designs Shall Be In Accordance With The Plan Of The Said Structures As Conceptualized By The Bucor Planning And Design Division Or As Conceptualized By The Winning Bidder If The Latter Is Found To Be Superior (as Defined In Section 3.1.1 Of This Tor). Contractors Shall Be Required To Conduct A Bucor Led Site Inspection And Evaluation To Enable The Contractors To Develop Their Proposals Accordingly. The Bureau Of Corrections Shall Not Assume Any Responsibility Regarding Erroneous Interpretations Out Of Any Data Presented By The Contractor. The Bucor Super Maximum Prison Facility (phase 2) Shall Be Constructed As Per Approved Drawings, Specifications, Bill Of Materials, Scope Of Works And The General Contract Conditions Following The Guidelines As Per Annex G Of Irr Of Ra 9184. This Project Aims To Be Completed Within A Year, Aligning With Our Decongestion Program. This Expedited Timeline Underscores Our Commitment To Addressing Urgent Needs Within The Correctional System And Providing Timely Solutions For The High Risk Committed Pdl. The Plans And Designs Shall Be In Accordance With The Plan Of The Said Structures As Conceptualized By The Planning And Design Division (pdd) Under. Contractors Shall Be Required To Conduct A Bucor Led Site Inspection And Evaluation To Enable The Contractors To Develop Their Proposals Accordingly. The Bucor Shall Not Assume Any Responsibility Regarding Erroneous Interpretations Out Of Any Data Presented By The Contractor. The Construction Of Super Maximum-security Facility Shall Be Constructed As Per Approved Drawings, Specifications, Bill Of Materials, Scope Of Works And The General Contract Conditions Following The Guidelines As Per Annex G Of Irr Of Ra 9184. The Project Shall Have The Following Basic Components: A. Complete Detailed Architectural And Engineering Design Plans, Technical Specifications, And Design Calculations For The Construction Of The Project. Such Plans, Designs, And Technical Specifications Shall Be Subject For Review And Approval By The Bucor Pdd. The Design Development And The Contract Documents Phases Of The Design Shall Continue After The Bid Is Awarded. It Shall Likewise Be Subject For Review And Approval By The Director Of Directorate For Engineering Services (des). B. The Bid Shall Be Based On The Conceptual/schematic Design Drawings Prepared By The Bucor Pdd Or That Submitted By The Winning Bidder As Defined In Section 3.1.1 Of This Tor. C. The Contractor Shall Complete The Construction Of The Following Facility Component: I. One (1) Unit 2-storey“type B” Pdl Dormitory At Least 3190 Sq.m (gross Area) Polished Flooring And Sandwich Panel Roofing With The Capacity Of Atleast 340 Pdl, 2 Pdl Per Cell With Double Deck Bunk Bed (160 Cells), 1 Pdl Per Cell With Single Bed (20 Cells). The Dormitory To Include Complete Utilities, Power Supply, Cctv, Water Supply, Fire Protection; • Electrical System: Three-phase Power Line Supply, Connected From The Local Electric Utility (from Main Road/ Source To The Compound. The Power Line Shall Be Used For The Future Development Of The 50 Ha Facility. • Electrical System: Backup Power (three-phase Genset) Supply System With Capacity Not Less Than Total Computed Mva Load, Without Demand Factor (designed To Supply The Dormitory), And To Include Capacitor Bank, If Necessary; • Sewerage And Drainage Systems(pipelines To Cover From Project Site To Nearest Tapping Point); • Water Supply System With Sufficient Pressure To Provide The Water Requirement Of The Psdl. The System Is Oncomposed Of A Cistern Tank, Pumps, And An Overhead Water Storage Tank. Deep Well Source Water System (intake Box, Transmission Pipelines, Pressure Break Tanks, Chlorinator With Tanks And Accessories, Etc.) Whichever Is Deemed Most Suitable For The Facility And Is Authorized By The Lgu. • Fire Protection System (fire & Jockey Pump, Pump House), Fire Detection Alarm System And Fire Suppression Equipment Included In Dormitory. • Cctv Systems: To Install Cctv At Perimeter Fence To Monitor The Inside Compound And Dormitory To Monitor The Hallways And Blind Spots. Ii. 3 Meters Height Concrete Perimeter Security Fence With Concertina Above, To Cover 50 Hectares Area (plastered And Painted Finish); Iii. Primary And Secondary Fence For 1.8 Hectares Compound Including Gates, Catwalk And Post Towers (with Cr And Water Supply) (r.a. 10575 Rule 7). • 4 Meters Height Concrete Primary Perimeter Fence (with Catwalks, Concertina Wirings, Post Tower (with Cr And Water Supply) And Solar Lightings, (ra10575). • Secondary Perimeter Fence (3 Layer Concertina, Steel Mesh) With 300w Integrated Solar Light Every 3 Bays And (to Include Post Towers And Gates); Iv. Road Networks And Culverts • All Entry And Exit Point Of Any Bodies Of Water E.g. Creeks, Canals Shall Be Fenced Culvert By Metal Grills (non-corrosive); • The Project Has An Allocated Budget Sufficient To Cover At Least 1440 Sqm Of Road Construction Within The Prison Facility. While This Budget Allows For Road Development, Prioritization Shall Be Given To The Construction Of Culverts, Both Fenced And Road Culverts, To Ensure Adequate Drainage And Prevent Flooding. These Culverts Are Critical For The Road Leading From The Main Road To The Site, As Well As Along The Perimeter Of The Facility. To Accurately Assess The Project Scope And Design, Bidders Are Required To Conduct A Thorough Site Inspection To Identify And Evaluate All Necessary Culverts." 1.2 Contractual Framework The Contractual Arrangement To Be Used For The Project Is The Design-and-build (db) Scheme. Under This Scheme The Procuring Entity Awards A Single Contract For The Architectural/engineering Design And Construction To A Single Firm, Partnership, Corporation, Joint Venture Or Consortium. The Winning Contractor Shall Consult And Collaborate With The Bucor Pdd For The Preparation Of The Detailed Architectural Design Of The Project. The Detailed Architectural And Engineering Design Shall Be Subject For The Review And Approval By The Bucor Pdd. Contractors Shall Be Required To Conduct A Bucor Led Site Inspection And Evaluation To Enable The Contractors To Develop Their Proposals Accordingly. The Bucor Shall Not Assume Any Responsibility Regarding Erroneous Interpretations Out Of Any Data Presented By The Contractor. The Obligations And Liabilities Of The Contractor And Its Architect Shall Be Joint And Solidary For Purposes Of The Detailed Architectural Design Of The Project In Accordance With Article 1723 Of The Civil Code Of The Philippines And Other Pertinent Laws. The Db Scheme Of Procurement Was Recommended, Endorsed, And Adopted Pursuant To The Annex G Of Irr Of Ra 9184. 2. Scope Of Contract 2.1 Obligations Of The Winning Bidder/contractor A. Render Architectural And Allied Engineering Design Services Including Final Schematic Design Necessary For The Implementation Of The Project. The Allied Engineering Design Services Shall Include, But Shall Not Be Limited To, Design For Architectural, Civil, Structural, Electrical, Mechanical, Plumbing, And Electromechanical. All Drawings Shall Be Generated Using Modern Modeling/drafting Software And Printed On High Quality 20” X 30” Blue Print Paper. B. Undertake Detailed Architectural And Engineering Designs (daeds) Using The Given Data Such As Topographic, Hydrographic And Cross–section Surveys, Geotechnical And Geological Investigation, And Hydrologic Investigation And Initial Schematic Design Or Design Concept Provided By The Bucor Pdd Which Conforms With The Minimum Performance Specifications And Standards (mpss); C. If Applicable, Secure Environmental Clearance Or An “environmental Compliance Certificate (ecc)”. If The Proposed Project Is Considered Outside The Purview Of The Philippine Environmental Impact Statement (eis) System, A Certificate Of Non- Coverage Or Certificate Of Exemption Shall Be Secured. D. The Project Shall Be Constructed According To The Daeds Prepared By The Winning Bidder And Approved By The Bucor And In Compliance With The Mpss As Well As Provided In Rule Vii, Section 7 Of The Irr Of Ra 10575. Likewise, Construction Includes Conformance To The Provisions Pertaining To Buildings Under The Latest Edition Of The Dpwh Standard Specifications For Public Works Structures, Volumes Ii And Iii (blue Book). The Blue Book Prescribes, Among Other Things, The Material Requirements And Construction Requirements For Different Items Of Work, Including The Tests To Be Conducted During Construction By The Dpwh-accredited Testing Laboratory. The Blue Book Incorporates Pertinent Provisions Of The American Society For Testing And Materials (astm) And American Concrete Institute (aci), Among Other Standards, Pertaining To Construction. Attention Shall Be Given To The Relevant Items Of Work In The Following Parts Of The Blue Book: Volume Ii ➢ Part A – Facilities For The Engineer ➢ Part B – Other General Requirements Volume Iii ➢ Part A – Earthwork ➢ Part B – Plain And Reinforced Concrete Works ➢ Part C – Finishing ➢ Part D – Electrical ➢ Part E – Mechanical ➢ Part I – Water Supply ➢ Part J – Flood Control And Drainage ➢ Part I-c – Drainage Works For Materials And Technologies Not Covered By The Blue Book, Or If The Proponent Intends To Use Any New Material/technology Which Is Not Accredited By The Dpwh Bureau Of Research And Standards (brs), The Proponent Shall Submit A Certification From A Recognized Foreign Or International Institution To The Effect That The New Materials Or Technology Meets The Mpss For This Project And Has Been Successfully Used In Existing Structures With Proven Integrity. The Winning Bidder Or Contractor Shall Be Held Liable For Design And Structural Defects And/or Failure Of The Completed Project Within The Warranty Period Specified In Section 62.2 Of The Irr Of Ra 9184; And, F. The Winning Bidder Or Contractor Shall Be Solely Responsible For The Design And Shall Be Held Responsible For Any Default Resulted From Improper Design. Further, Extended Liability Of The Contractor Since It Stipulated That The Works, When Completed, Shall Be Fit For The Purpose For Which It Was Intended As Defined In The Contract. 2.2 Obligations Of The Bucor A. Provide Full Information On All Requirements For The Project; B. Approve The Winning Bidder Or Contractor’s Design Without Diminishing Their Full And Sole Responsibility For The Quality And Integrity Thereof; C. Give Prompt Written Notice Thereof To Winning Bidder Or Contractor, If It Observes Or Becomes Aware Of Any Defect In The Project; D. Designate, When Necessary, Representatives Authorized To Act On Its Behalf. It Shall Examine Documents Submitted By The Winning Bidder Or Contractor And Render Decisions Pertaining Thereto Promptly, To Avoid Unreasonable Delay In The Progress Of Their Work. It Shall Observe The Procedure Of Issuing Orders To The Winning Bidder Or Contractor; E. Supervise And Monitor The Implementation Of The Project; I. Construction Monitoring And Testing Forms: • The Use Of Construction Monitoring And Testing Forms That Will Be Provide By The Bucor - Nhq Pdd Is Mandatory Throughout The Duration Of Construction. • Oversight Of These Forms Will Be Conducted By The Engineering Services (es) Of The Sppf On Behalf Of The Bucor Pdd • Sppf-es To Impose To Contractor Testing Of All Items After Installation And/or Application. Es To Send Pdd Copy Of The Test Report/s. • Sppf-es To Monitor Material Delivery Of Contractor To Ensure All Materials Installed And/or Applied Are In Accordance With The Specifications Stated On Plans And Contract Of This Project. • In Case There Would Be Substitute Or Alternative To The Original Specification Of Material/s, Sppf- Es To Inform Pdd Of Such Variation. Ii. Bucor Engineer Visits: • Nhq Engineers And Architects (personnel Of Pdd) Will Conduct Site Visits On A Quarterly Basis Or Whenever Deemed Necessary To Ensure Compliance With Standards And Regulations. • Pdd Personnel To Witness The Final Testing And Commissioning Of The Systems, Equipment And Utilities Prior To Acceptance Of The Project Or Part Of The Project Thereof. Iii. Progress Billing Payment: • Sppf Es Engineers Will Provide Monthly Updates, Or As Deemed Necessary, On The Statement Of Work Accomplishment Based On The Actual Progress Of The Project, Including Reports Update. F. Pay The Accomplishment Accepted In The Conformance With The Mpss Included Under The Design And Build Contract. I. This Reports And Swa Updates Of The Ippf Es Will Be Reviewed And Approved By Pdd - Nhq Prior To Any Progress Billing Payments Being Made. 2.3 Bidding Documents The Bidding Documents For The Project Shall Govern The Conduct Of The Procurement Of The Project. 3. Scope Of Works 3.1 Planning And Design Phase 3.1.1 Preliminary Architectural Plan (pap) By Bidder The Approved Concept Design Shall Adopt The Provisions Indicated In Rule Vii, Section 7 Of The Irr Of Ra 10575. Bidders Shall Submit Also An Alternative Design Concept With Respect To The Actual Site Condition. This Alternative Design By The Winning Bidder Shall Be Adopted Should The Same Be Found To Be Superior Than The One Conceptualized By The Bucor Pdd. 3.1.2 Detailed Architectural And Engineering Design (daed) By The Winning Bidder During The Implementation Of The Project, The Winning Bidder Shall Prepare The Daed Of The Project And Submit The Same To The Bucor For Approval Prior To The Execution Of The Construction Works. The Winning Bidder Shall Prepare The Daed Based On Its Pap As Reviewed And Accepted By The Bucor Pdd And In Accordance With The Minimum Performance Standards And Specifications (mpss). The Daed Shall Be Undertaken With A Degree Of Accuracy That Will Allow Estimates To Be Made Within Approximately Plus Or Minus Five Percent (+/-5%) Of The Final Quantities. Once Approved By The Bucor, The Winning Bidder’s Daed Shall Form Part Of The Mpss. The Bucor-approved Daed, Together With The Mpss Provisions On Construction Under Section 2.0 Hereof, Shall Govern The Actual Construction Undertaken By The Winning Bidder. The Winning Bidder Shall Undertake The Necessary Field Surveys And Investigation In Accordance With The Dpwh Design Guidelines. In Carrying Out These Works, The Winning Bidder Shall Ensure That The Engineering, Environmental, Particularly During Field Investigations And The Development Of The Preliminary And Final Detailed Engineering Designs. The Winning Bidder Shall Ensure That All Designs Submitted For Approval Have Fully Taken Into Account Key Findings From The Engineering, Environmental, And That Negative Environmental Impacts Have Been Minimized Or Eliminated To The Fullest Extent Possible. 3.1.3 Architectural And Engineering Design Submittals I. Architectural Design A. The Building Should Be Designed With Structural, Electrical, Natural Or Combine Ventilation And Natural Lighting Following Building Design Standards. B. The Prospective Bidder Shall Prepare The Preliminary Architectural Plans In Accordance With The Requirements Of The National Building Code Of The Philippines, Accessibility Law (bp 344) Including All Other Applicable Laws And Local Ordinances. Submittals: (at Suitable Scale On High Quality 20” X 30” Blue Print Paper Minimum Size) 1. Site Development Plan 2. Vicinity Map 3. Perspective 4. Floor Plans 5. Elevations A. Front Elevation B. Rear Elevation C. Right Elevation D. Left Elevation 6. Sections A. Longitudinal Section B. Cross Section 7. Doors & Window Schedule 8. Plans And Details Of Stairs And Ramps 9. Schedule Of Finishes For Floors, Walls And Ceiling 10. Miscellaneous Details Ii. Structural Design A. The Proponent Shall Prepare The Necessary Structural Analysis/calculation And Design Of The Structural Members Of The Building Component In Accordance With The National Building Code Of The Philippines With Its Referral Codes Such As The Latest National Structural Code Of The Philippines. The Design For The Structure Shall Take Into Account, Among Other Things, The Seismic Requirements Of The Area To Determine The Optimum Safety Of The Whole Structure And To Minimize Possible Earthquake Damage. B. On The Basis Of The Data Obtained From The Detailed Site Investigations, Topographical/soil And Survey, Geotechnical Engineering, Foundation Investigation, Material Testing, Survey Of Existing Site Conditions, The Seismic Requirements Of The Area, The Load Requirements Of The Building And Other Investigation Required To Obtain The Data Necessary To Ensure The Safety Of The Structure, The Proposal Shall Prepare The Preliminary Structural Design Plans Of The Structure. Submittals: (at Suitable Scale On High Quality 20” X 30” Blue Print Paper Minimum Size) 1. Structural Design Criteria And Design Notes 2. Foundation Plan 3. Floor Framing Plans 4. Schedule Of Slab, Beams And Girders 5. Schedule Of Columns 6. Schedule Of Footings 7. Structural Details Of Stairs/ramp, If Applicable 8. Roof Framing Plan, If Applicable 9. Schedule And Details Of Trusses, If Applicable 10. Road Design And Details (if Applicable) 11. Miscellaneous Details Iii. Sanitary/plumbing Design A. General • The Detailed Design Shall Conform To The General Standards Adopted By The Sanitary & Plumbing Code Of The Philippines And Other Pertinent Laws And Ordinances. • All Design Considerations/assumptions Shall Be Based On The Results Of The Technical Studies, Detailed Analyses, And Design Computations. • The Technical Drawings And Specifications Shall Clearly Indicate All The Details Required To Ascertain The Care And Thoroughness Devoted In The Preparation Of The Drawings. B. Drainage And Sewerage • The Drainage Layout Shall Show All The Required Information Such As Direction Of Flow, Manhole-to-manhole Distances, And Sizes Of Lines, Manholes/canals, Location Of Outfalls, Etc. • The Prospective Bidder Shall Prepare A Design For The Sewage Treatment Plant In Accordance To The Clean Water Act Of 2004 (republic Act No. 9275) And Other Relevant Laws And Ordinances. Submittals: (at Suitable Scale On High Quality 20” X 30” Blue Print Paper Minimum Size) 1. General Notes 2. Legend & Symbols 3. Sewer, Vent And Storm Drainage Layout 4. Enlarged Toilet Plan For Common And Pwd Toilets 5. Isometric Diagram 6. Miscellaneous Details 7. Drainage And Sewerage System 8. Three Chamber Septic Tank Plans And Details C. Water Supply And Distribution System • The Proponent Shall Carry Out A Preliminary Detailed Design For The Water Supply Of The Project. The Design Should Be On The Basis Of The Source And Volume Of Water Supply, Water Consumption, Piping Network, And Conveyance In Accordance With The Applicable Laws, Rules And Regulations Governing Health, Safety And Sanitation. • The Contractor Shall Install Elevated Water Storage/s Per Unit Located At The Roof Deck Of The Prison Dormitories. (sufficient Capacity To Supply The Pdl) Submittals: (at Suitable Scale On High Quality 20” X 30” Blue Print Paper Minimum Size) 1. General Notes 2. Legend & Symbols 3. Water Line Layout 4. Water Line Isometric Diagram 5. Water Reservoir Plans And Details 6. Miscellaneous Details Iv. Electromechanical Design A. Sewage Treatment Plant • The Prospective Bidder Shall Prepare A Design For The Sewage Treatment Plant In Accordance To The Clean Water Act Of 2004 (republic Act No. 9275) And Other Relevant Laws And Ordinances. Submittals: (at Suitable Scale On High Quality 20” X 30” Blue Print Paper Minimum Size) 1. General Notes 2. Legend & Symbols 3. Electrical System Layout 4. Mechanical System Layout 5. Instrumentation And Control System Diagrams 6. Piping And Instrumentation Diagrams (p&ids) 7. Equipment Details And Specifications 8. Electrical Power Distribution 9. Emergency Power Systems 10. Grounding And Lightning Protection 11. Control And Monitoring Systems, If Applicable 12. Safety Systems 13. Miscellaneous Details B. Fire Protection System • The Prospective Bidder Shall Prepare A Design For The Fire Protection System In Accordance To The Fire Code Of The Philippines, (irr) Of Ra 9514, And Other Relevant Laws And Ordinances. Submittals: (at Suitable Scale On High Quality 20” X 30” Blue Print Paper Minimum Size) 1. Sprinkler System 2. Sprinkler System Isometric Diagram 3. Fire Fighting Piping System Diagram 4. Fire Alarm System Layout 5. Fire Suppression System Layout 6. Smoke Management System Layout 7. Fire Pump And Water Supply 8. Miscellaneous Details V. Electrical Design A. The Prospective Bidder Shall Prepare A Preliminary Design Plan For The Electrical And Power Supply System Of The Building In Accordance With The Electrical Code Of The Philippines, Fire Code Of The Philippines, National Building Code Of The Philippines And Other Relevant Laws And Ordinances. B. The Prospective Bidder Shall Prepare A Design For The Electrical And Power Supply System Considering Ease Of Maintenance And Prevention Of Illegal Connections Including Electrical Supply For Ceiling Fans. C. The Prospective Bidder Shall Prepare A Design For Backup Power Generator With Capacity Not Less Than Total Computed Kva Load Without Demand Factor. D. 3-phase Electrical Supply Shall Be Sourced From The Local Electrical Utility. E. Power Line Connection From Main Source To The Facility Submittals: (at Suitable Scale On High Quality 20” X 30” Blue Print Paper Minimum Size) 1. Power Riser Diagram 2. Power Layout System 3. Lighting Layout System 4. Local Area Network System, If Applicable 5. Grounding System 6. Load Schedules 7. Others As Applicable Vi. Other Requirements  Technical Specifications  Boring Test  Structural Design And Analysis And Computation  Final Design And Construction Plans  Upon Award Of Contract, The Contractor Shall Comply The Following: O Prepare Final Draft Of Architectural And Engineering Design Plans Incorporating All Design Refinements And Revisions Based On Project Requirement Or As May Be Required By The Bucor Pdd Within The Scope Of Design. O Submit To The Bucor Design And Build Committee (bucor-dbc) The Final Architectural And Engineering Design Plans And Specifications Duly Signed And Sealed By The Concerned Professional Architect, Engineers, Incorporating All The Necessary Revisions And Refinements For Approval By The Head Of Procuring Entity. 3.2 Construction Phase The Following Works Shall Comprise This Phase: I. Permits And Clearances, The Contractor Shall Upon Authorization Of The Head Of The Procuring Entity (hope), Make Representations With The Government Agencies Concerned To Expedite The Processing Of The Necessary Permits And Certificates Such As The Following: A. Zoning Certification And Locational Clearance B. Building /electrical/sanitary Permits C. Certificate Of Occupancy D. Environmental Clearance Certificate E. All Other Permits/clearances As May Be Required For The Construction. Ii. Mobilization, The Contractor Shall Mobilize All The Required Project Team Personnel, Equipment, Tools, And Manpower With The Required Skills And In Sufficient Number As May Be Necessary For His Efficient Undertaking Of The Project. Iii. Clearing, Grubbing And Hauling/disposal Of Debris Iv. Construction Stage As A Rule, Contract Implementation Guidelines For Procurement Of Infrastructure Projects Shall Comply With Annex “e” Of The Revised Irr Of Ra 9184. The Following Provisions Shall Supplement These Procedures: I. No Works Shall Commence Unless The Contractor Has Submitted The Prescribed Documentary Requirements And Implementing Unit Has Given Written Approval. Work Execution Shall Be In Accordance With Reviewed And Approved Documents. Ii. The Contractor Shall Be Responsible For Obtaining All Necessary Information As To Risks, Contingencies And Other Circumstances Which May Affect The Works And Shall Prepare And Submit All Necessary Documents Specified By The Implementing Unit To Meet All Regulatory Approvals As Specified In The Contract Documents. Iii. The Contractor Shall Submit A Detailed Program Of Works Within Fourteen (14) Calendar Days After The Issuance Of The Notice To Proceed (ntp) For Approval By The Head Of The Procuring Entity (hope) That Shall Include, Among Others: A. The Order In Which It Tends To Carry Out The Work Including Anticipated Timing For Each Stage Or Design/detailed Engineering And Construction; B. Periods For Review Of Specific Outputs And Any Other Submissions And Approvals; C. Sequence Of Timing For Inspection And Tests; D. General Description Of The Design And Construction Methods To Be Adopted; E. Number Of Personnel To Be Assigned For Each Stage Of The Work; F. List Of Equipment Required On Site For Each Stage Of The Work; And G. Description Of The Quality Control System To Be Utilized For The Project. Iv. Any Errors, Omissions, Inconsistencies, Inadequate Or Failure Submitted By The Contractor That Do Not Comply With The Requirements Shall Be Rectified, Resubmitted And Reviewed At The Contractor’s Cost. If The Contractor Wishes To Modify Any Design Or Document Which Has Been Previously Submitted, Reviewed And Approved, The Contractor Shall Notify The Implementing Unit Within A Reasonable Period Of Time And Shall Shoulder The Cost Of Such Changes. V. As A Rule, Changes In Design And Construction Requirements Shall Be Limited Only To Those That Have Not Been Anticipated In The Contract Signing And Approval. The Following Guidelines Shall Govern Approval For Change Or Variation Order: A. Change Orders Resulting From Design Errors, Omissions Or Non-conformance With The Performance Specifications And Parameters And The Contract Documents By The Contractor Shall Be Implemented By The Contractor At No Additional Cost To The Bureau Of Corrections. B. Provided That The Contractor Suffers Delay And/or Incurs Costs Due To Changes Or Errors In The Preparation Of Performance Specification And Parameters, The Contractor Shall Be Entitled To Either One Of The Following:  An Extension Of Time For Any Such Delays Under Section 10 Of Annex “e” Of Irr-a (ra9184; Or  Payments For Such Cost As Specified In The Contract Documents, Provided That The Cumulative Amount Of The Variation Order Does Not Exceed Ten Percent (10%) Of The Original Project Cost. C. The Contract Documents Shall Include The Manner And Schedule Of Payment Specifying The Estimated Contract Amount And Installments In Which The Contract Will Be Paid. D. The Contractor Shall Be Entitled To Advance Payment Subject To The Provisions Of Section 4 Of Annex “e” Of The Revised Irr Of Ra 9184. E. The Implementing Unit Shall Monitor The Quality Control Procedures For The Design And Construction In Accordance With The Government Guidelines And Shall Issue The Proper Certificates Of Acceptance For Sections Of The Works Or Whole Of The Works As Provided For In The Contract Documents. F. The Contractor Shall Provide All Necessary Equipment, Personnel, Instruments, Documents And Others To Carry Out Specified Tests. G. This Design And Build Project Shall Have Minimum Defects Liability Period Of One (1) Year Contract Completion Or As Provided In The Contract Documents. This Is Without Prejudice To The Liabilities Imposed Upon The Engineer/architect Who Drew Up The Plans And Specification For A Building Sanctioned Under Section 1723 Of The New Civil Code Of The Philippines. H. The Contractor Shall Be Held Liable For Design And Structural Defects And/or Failure Of The Completed Project Within The Warranty Period Of 15 Years For Permanent Structures/buildings And 5 Years For Roads As Specified In Section 62.2.2 Of The Revised Irr Of Ra 9184 V. As-built Plans. The Contractor Shall Cause The Preparation And Submission Of As-built Plans Duly Signed And Sealed By All Concerned Parties Involved In The Construction In The Same Sheet Size And Scale As The Original Drawings In One (1) Blue Print Copy And One (1) Reproducible Copy. Vi. General Requirements: 1. Temporary Facilities Such As Field Offices For The Bucor Inspectorate Team, Project Engineers And Quarters For Laborers; Temporary Warehouse For The Construction Material. 2. Office Furniture And Equipment, Survey Equipment And Consumables 3. Photographs: This Item Consists Of The Supply Of Equipment And Materials, I.e., Album, Necessary To Undertake Photographic Progress Activities Of The Project And Of All Cost Incidental To The Preparation And Submission Of Photographs (at Least 12 Photographs Per Day). The Quantities For Photographs Shall Be One (1) Set Of Photographs Per Month. 4. Health And Safety Program Including Personal Protective Equipment (ppe) A. All Standard Safety Measures And Precautions Shall Be Exercised By The Contractor In The Course Of The Project For The Protection Of The Public And Its Workers And In Conformity With Dole Department Order No. 13, Series Of 1998. B. All Workers Shall Be Equipped With Proper Working Uniform And Identification At All Times. They Must Be Registered With The Governing Bucor Security Office And Must Comply With The Bucor’s Rules And Regulations. C. The Contractor Shall Secure His/her Own Equipment And Materials On Site. The Bucor Shall Not Be Liable To Any Losses Incurred During The Progress Of The Work. 5. Minimum Heavy Equipment Requirement (as Needed) For Site Development Such As: No. Item Specification 1. Backhoe 0.8 Cu. M. 2. Backhoe Wheel Mounted With Breaker 0.90 Cu. M. 3. Cargo/service Truck 2-5 Mt., 160 Hp 4. Dump Truck 12 Cu. Yd. 5. Motorized Road Grader G710a, 140hp 6. Payloader 1.5 Cu. M. 7. Vibrator Roller 10 Mt 8. Bulldozer 170 Hp 9. Scraper 515 Hp 10. Truck Mounted Crane, Hydraulic Telescopic Bommer Capacity: 41 – 45 Mt. 11. Crawler Crane 41-45 Mt 12. Generator Set 300 Kw/375 Kva 13. Water Pump 100mm Suction Dia. 14. One Bagger Mixer 4-6 Ft3/min 15. Concrete Vibrator Ey20, 5hp, 32-70mm 16. Vibro Hammer 45000 Kg-m 17. Excavator 17.5 Kw Or Any Specify Types Of Heavy Equipment Needed For A Site Development Will Be Determined By The Winning Bidder. 6. Environmental Compliance 7. Communication Equipment: This Item Consists Of The Provision Of Communication Equipment. 8. Billboard 9. Traffic Management (if Applicable). Vii. Building Construction 1 Lot One (1) Unit 2-storey“type B” Pdl Dormitory At Least 3190 Sq.m (gross Area) Polished Flooring And Sandwich Panel Roofing With The Capacity Of Atleast 340 Pdl, 2 Pdl Per Cell With Double Deck Bunk Bed (160 Cells), 1 Pdl Per Cell With Single Bed (20 Cells). The Dormitory To Include Complete Utilities, Power Supply, Cctv, Water Supply, Fire Protection; • Electrical System: Three-phase Power Line Supply, Connected From The Local Electric Utility (from Main Road/ Source To The Compound. The Power Line Shall Be Used For The Future Development Of The 50 Ha Facility. • Electrical System: Backup Power (three-phase Genset) Supply System With Capacity Not Less Than Total Computed Mva Load, Without Demand Factor (designed To Supply The Dormitory), And To Include Capacitor Bank, If Necessary; • Sewerage And Drainage Systems(pipelines To Cover From Project Site To Nearest Tapping Point); • Water Supply System With Sufficient Pressure To Provide The Water Requirement Of The Psdl. The System Is Composed Of A Cistern Tank, Pumps, And An Overhead Water Storage Tank. Deep Well Source Water System (intake Box, Transmission Pipelines, Pressure Break Tanks, Chlorinator With Tanks And Accessories, Etc.) Whichever Is Deemed Most Suitable For The Facility And Is Authorized By The Lgu. • Fire Protection System (fire & Jockey Pump, Pump House), Fire Detection Alarm System And Fire Suppression Equipment Included In Dormitory. • Cctv Systems: To Install Cctv At Perimeter Fence To Monitor The Inside Compound And Dormitory To Monitor The Hallways And Blind Spots. 1 Lot 3 Meters Height Concrete Perimeter Security Fence With Concertina Above, To Cover 50 Hectares Area (plastered And Painted Finish); 1 Lot Primary And Secondary Fence For 1.8 Hectares Compound Including Gates, Catwalk And Post Towers (with Cr And Water Supply) (r.a. 10575 Rule 7). • 4 Meters Height Concrete Primary Perimeter Fence (with Catwalks, Concertina Wirings, Post Tower (with Cr And Water Supply) And Solar Lightings, (ra10575). • Secondary Perimeter Fence (3 Layer Concertina, Steel Mesh) With 300w Integrated Solar Light Every 3 Bays And (to Include Post Towers And Gates); 1 Lot Road Networks And Culverts • The Project Has An Allocated Budget Sufficient To Cover At Least 1440 Sqm Of Road Construction Within The Prison Facility. While This Budget Allows For Road Development, Prioritization Shall Be Given To The Construction Of Culverts, Both Fenced And Road Culverts, To Ensure Adequate Drainage And Prevent Flooding. These Culverts Are Critical For The Road Leading From The Main Road To The Site, As Well As Along The Perimeter Of The Facility. • All Entry And Exit Point Of Any Bodies Of Water E.g. Creeks, Canals Shall Be Fenced Culvert By Metal Grills (non-corrosive); • To Accurately Assess The Project Scope And Design, Bidders Are Required To Conduct A Thorough Site Inspection To Identify And Evaluate All Necessary Culverts. A. Material Specifications: A. Floor Finishes • Polished Cement Finish Prison Cell, Hallways, Staircases, And Rooms • Plain Cement Finished - Pathways. • Ramps - Anti Slip Pavers Or Tiles • Crs – Unglazed Ceramic Tiles B. Wall Finishes A. Glazed Wall Tiles - 1.8m Height. B. Plain Cement Plaster Finish - For All Buildings And Facilities C. Ceiling Finishes C. Concrete Steel Decking, If Applicable. – Coated In White Enamel D. Painting D. Semi-gloss Solvent Paint Top Coat (high-end Quality) For Interior And Exterior Walls In Two To Three Coats Application. Apply Concrete Neutralizer For Newly Finished Concrete Surfaces. Use Solvent Primer. E. Varnish Paint Finish With Weather Proof Coating – For Doors And Jambs Branded, High-end Quality (offices, Etc.), All Wooden Doors Must Have Secondary Steel Doors. F. Use Epoxy Paint Primer. Epoxy Paint Finish – For Structural Steel And All Metal Works E. Doors And Windows G. No Doors For Prison Facility Comfort Rooms With 1.20 Meter Finish Wall Height (see Rule Vii, Section 7 R-irr Of Ra 10575). H. Steel Doors And Grills – For Dormitories, Gates And Other Security Areas. Sliding Doors For All Cells (see Rule Vii, Section 7 R-irr Of Ra 10575) F. Waterproofing I. Uv Resistant Polyurethane Waterproofing – For All Roof Deck With Topping Works Provided With Welded Wire Mesh. (at Elevated Water Tank Area) J. Cistern - Polyurethane Waterproofing G. Plumbing Works K. Upvc Pipe Series 1000 – For All Soil, Sewer, Waste, Dry And Wet Vent Piping High-end Quality L. Pprc Fusion Type – For All Water Lines High-end Quality M. Contractor Encouraged To Adapt: Lpf Flush Valve For Water Closet Or Stainless Toilet-lavatory Combination. Waterless Urinals N. Sprinkler System To All Prison Dormitories In Accordance With The Provisions Of Revised Plumbing Code Of The Philippines. O. Contractor To Provide A Water System To Supply The Facility 4. Approved Budget For The Contract (abc) The Approved Budget For The Contract (abc) Is Php 300,000,000. This Is The Ceiling For Acceptable Bids. Bids Higher Than Abc Shall Be Automatically Rejected. 5. Proposed Implementation Schedule (example): No. Of Months 1 2 4 5 6 7 8 9 10 11 12 Design Phase Construction Phase 6. Eligibility Criteria For Bidders 6.1 General The Eligibility Requirements For This Design And Build Project Shall Adopt The Provisions Of Annex “g” Of The Implementing Rules And Regulations Of Ra 9184 (e.g. Eligibility Requirement). However, If A Bidder Who Has No Experience In Db Project On Its Own May Opt To Enter A Subcontracting Agreement, Partnership, Or Joint Venture With A Design Or Engineering Firm For The Design Portion Of The Project. 6.2 Legal Requirements A. Valid Contractor’s License Issued By The Philippine Contractor’s Accreditation Board B. Valid License Of The Contractor’s Designer Issued By The Professional Regulation Commission. 6.3 Technical Requirements A. The Contractor’s Designer Must Have Designed One Structure Similar To The Project At Hand With A Construction Cost Of At Least 50 % Of The Abc. 6.4 Financial Requirements The Contractor Must Have A Net Financial Contracting Capacity (nfcc) At Least Equal To The Abc To Be Bid Or Equivalent To Php300,000,000.00. 7. Contents Of The Bid 7.1 In The First Envelope Class “a” Documents Legal Documents I. Philgeps Certificate Of Registration And Membership In Accordance With Section 8.5.2 Of This Irr. For Procurement To Be Performed Overseas, It Shall Be Subject To The Guidelines To Be Issued By The Gppb. (a) Ii. Pcab License And Registration, In Case Of Jv; 57 Iii. Statement Of All Ongoing Government And Private Contracts; Iv. Statement Of Slcc; V. Nfcc Computation; Vi. Jva, If Applicable; Vii. Bid Security In The Prescribed Form, Amount And Validity Period; Viii. Project Requirements, Which Shall Include The Following: 1. Organizational Chart For The Contract To Be Bid; 2. List Of Contractor’s Personnel (design And Construction), To Be Assigned To The Contract To Be Bid, With Their Complete Qualification And Experience Data; 3. List Of Contractor’s Equipment Units Which Are Owned, Leased And/or Under Purchase Agreements, Supported By Certification Of Availability Of Equipment From Lessor/vendor For The Duration Of The Project. Ix. Omnibus Sworn Statement By The Prospective Bidder Or Its Authorized Representative In The Prescribed Format; X. Submission Of Preliminary Conceptual Design Plans: Class “b” Documents I. For Infrastructure Projects, Jv Bidders Shall Submit A Jva In Accordance With R.a. 4566 And It’s Irr. Ii. Each Partner Of The Joint Venture Shall Submit Their Philgeps Certificates Of Registration In Accordance With Section 8.5.2 Of This Irr. The Submission Of Technical And Financial Eligibility Documents By Any Of The Joint Venture Partners Constitutes Compliance: Provided, That The Partner Responsible To Submit The Nfcc Shall Likewise Submit The Statement Of All Of Its Ongoing Contracts And Audited Financial Statements. 1. Preliminary Conceptual Architectural Design Plans In Accordance With The Degree Of Details Specified By The Procuring Entity: (at Suitable Scale On High Quality A3 Blue Print Paper /digital Print Minimum Size) A. Location Plan/vicinity Map B. Perspective C. Floor Plans D. Front View Elevation E. Rear View Elevation F. Left Side View Elevation G. Right Side View Elevation H. Longitudinal Section I. Transverse Section 2. Design And Construction Method 3. List Of Contractor’s Personnel To Be Assigned To The Contract To Be Bid With Their Complete Qualification And Experience Data And Photocopy Of Their Valid Licenses Issued By The Professional Regulatory Commission (prc), Curriculum Vitae Of Key Staff, Partners Or Principal Officers With A Minimum Work Experience Requirements Set In The Bds; For Design The Key Professionals And The Respective Qualifications Of The Design Personnel Shall Be As Follows: • Principal Architect The Principal Architect Must Be Duly-licensed With At Least Ten (10) Years’ Experience In The Design Of Residential, Government Offices Or Institutional Facilities, And Shall Preferably Be Knowledgeable In The Application Of Rapid Construction Technologies. • Structural Engineer The Structural Engineer Must Be A Duly-licensed Civil Engineer With At Least Ten (10) Years’ Experience In Structural Design And Shall Preferably Be Knowledgeable In The Application Of Rapid Construction Technologies. • Professional Electrical Engineer The Electrical Engineer Must Be A Registered Professional Electrical Engineer With At Least Five (5) Years’ Experience In The Design Of Lighting, Power Distribution, Communication Systems (specifically Structured And Local Area Network Cabling, Pabx), Building Management Systems And Preferably Knowledgeable In Developments In Emergent Efficient Lighting Technologies And Energy Management. • Professional Mechanical Engineer The Mechanical Engineer Must Be A Professional Mechanical Engineer With At Least Five (5) Years In Hvac And Fire Protection Systems And Preferably Knowledgeable In Emergent, Alternative Energy- Efficient Hvac Technologies. • Electronics And Communications Engineer The Electronics And Communications Engineer Must Be Duly-licensed With At Least Ten (5) Years’ Experience In The Design Of Communications Systems, And Preferably Knowledgeable In The Application Of Building Automation And Surveillance Systems. • Sanitary Engineer The Sanitary Engineer Must Be Duly-licensed With At Least Five (5) Years’ Experience In The Design Of Building Water Supply And Distribution, Plumbing, And Preferably Knowledgeable In Waste Water Management/treatment, And Emergent, Alternative Effluent Collection And Treatment System. The Design & Build Contractor May, As Needed And At Its Own Expense, Add Additional Professionals And/or Support Personnel For The Optimal Performance Of All Architectural And Engineering Design Services, As Stipulated In These Terms Of Reference, For The Project. Prospective Bidders Shall Attach Each Individual’s Resume And Prc License Of The (professional) Staff. Design Personnel May Also Be Utilized For The Construction Phase Provided That The Same Meet The Minimum Number Of Years Of Experience In The Construction Of Similar Projects. For Construction Personnel The Key Professionals And The Respective Qualifications Of The Construction Personnel Shall Be As Follows: • Project Manager The Project Manager Shall Be A Licensed Architect Or Engineer With At Least Eight (8) Years Relevant Experience On Similar And Comparable Projects In Different Locations. The Project Manager Should Have A Proven Record Or Managerial Capability Through The Directing/managing Of Major Civil Engineering Works, Including Projects Of A Similar Magnitude. • Project Architect/engineer The Project Architect/engineer Shall Be A Licensed Architect Or Engineer With At Least Five (5) Years’ Experience In Similar And Comparable Projects And Shall Preferably Be Knowledgeable In The Application Of Rapid Construction Technologies. • Materials Engineer (m.e. I) The Materials Engineer Must Be Duly Accredited With The Dpwh And With At Least Five (5) Years’ Experience In Similar And Comparable Projects And Shall Preferably Be Knowledgeable In The Application Of Rapid Construction Technologies. • Electrical Engineer The Electrical Engineer Must Be Duly-licensed With At Least Five (5) Years’ Experience In Similar And Comparable Projects In The Installation Of Lighting, Power Distribution, Communication Systems (specifically Structured And Local Area Network Cabling, Pabx), Building Management Systems. • Mechanical Engineer The Mechanical Engineer Must Be Duly-licensed With At Least Five (5) Years’ Experience In Similar And Comparable Projects In The Installation Of Hvac And Fire Protection. • Sanitary Engineer The Sanitary Engineer Must Be Duly-licensed With At Least Five (5) Years’ Experience In Similar And Comparable Projects In The Installation Of Building Water Supply And Distribution, Plumbing. • Foreman The Foreman Must Have At Least Five (5) Years’ Experience In Similar And Comparable Projects And Shall Preferably Be Knowledgeable In The Application Of Rapid Construction Technologies. • Safety Officer The Safety Officer Must Be An Accredited Safety Practitioner By The Department Of Labor And Employment (dole) And Must Have Undergone The Prescribed Forty (40) Hour Construction Safety And Health Training (cosh) And Must Have At Least Two (2) Years’ Experience. 4. Value Engineering Analysis Of Design And Construction. The Second Envelope (financial Proposal) Shall Contain All The Required Documents For Infrastructure Projects Under Section 25.38 Of The Irr Of R.a 9184. 7.2 In The Second Envelope – Financial Proposal The Contents Of Financial Proposal – In The Second Envelope Shall Be Governed By Section 6.1 Design And Build Scheme Of The Dpwh Procurement Manual Volume Ii - Infrastructure Main Guidelines (2016). A. Lump Sum Bid Prices, Which Shall Include The Detailed Engineering Cost, In The Prescribed Bid Form Inclusive Of Vat B. Detailed Estimates Including A Summary Sheet Indicating The Unit Prices Of Construction Materials, Labor Rates And Equipment Rentals Used In Coming Up With The Bid For The Following: I Detailed Architectural And Engineering Design; Ii Demolition Works; And Iii Building Construction/civil Works. C. Bill Of Quantities D. Cash Flow And Payments Schedule. 8. Procedure And Criteria For Bids Evaluation For The Detailed Evaluation Of The Design And Build Proposals A Two-step Procedure Shall Be Adopted By The Bac, Which May Be Undertaken With The Assistance Of The Dbc. First-step Procedure: With The Assistance Of The Bucor Design And Build Committee (bucor-dbc), The Bac Shall Conduct The Opening, Preliminary Examination And Detailed Evaluation Of The Design And Build Proposals, As Follows: (1) The First Step Of The Evaluation Shall Involve The Review Of The Preliminary Conceptual Designs And Track Record Submitted By The Contract As Indicated In The Bidding Documents Using A Nondiscretionary “pass/fail” Criteria That Involve Compliance With The Following Requirements: A. Performance Specifications And Parameters And Degree Of Details; B. Adherence Of Preliminary Design Plans To The Required Concept Of Approach And Methodology For Detailed Engineering, Design And Construction With Emphasis On The Clarity, Feasibility, Innovativeness And Comprehensiveness Of The Plan Approach, And The Quality Of Interpretation Of Project Problems, Risks, And Suggested Solutions; And C. Quality Of Personnel To Be Assigned To The Project Which Covers Suitability Of Key Staff To Perform The Duties Of The Particular Assignments And General Qualifications And Competence Including Education And Training Of The Key Staff. 8.1 Merit Point Critera For The Bid Evaluation 8.1.1 Adherence To Performance Specifications (35 Points) A. Compliance And Adherence To Specifications: Excellent Compliance (100 Points): The Submission Fully Adheres To All Specified Project Requirements And Regulations, Demonstrating Meticulous Attention To Detail And Comprehensive Understanding Of The Tor. All Drawings And Documentation Are Accurate, Complete, And In Compliance With Relevant Standards. Good Compliance (80 Points): The Submission Largely Complies With Project Specifications And Regulations, With Minor Discrepancies. Drawings And Documentation Are Mostly Accurate And Complete, Meeting The Majority Of Requirements. Acceptable Compliance (70 Points): The Submission Satisfies Most Of The Specified Requirements And Regulations, Albeit With Some Notable Omissions Or Inconsistencies. Drawings And Documentation Are Generally Accurate And Complete, Meeting The Basic Expectations. Some Reservations (50 Points): The Submission Partially Meets The Specified Requirements And Regulations, With Several Notable Deficiencies Or Inconsistencies. There Are Significant Gaps Or Inaccuracies In The Drawings And Documentation, Raising Concerns About Compliance. Serious Reservations (20%) The Submission Falls Significantly Short Of Meeting The Specified Requirements And Regulations, With Major Deficiencies Or Inconsistencies. Drawings And Documentation Lack Essential Details Or Fail To Comply With Key Standards, Casting Doubt On The Bidder's Understanding Of The Project Scope. Unacceptable (0%) The Submission Fails To Comply With The Specified Requirements And Regulations, Lacking Essential Details And Demonstrating A Fundamental Misunderstanding Of The Project Scope. Drawings And Documentation Are Incomplete Or Inaccurate, Indicating A Lack Of Capability To Deliver The Project On Time. B. Functionality And Efficiency: Excellent (100%): The Design Optimally Utilizes Space, Facilitating Efficient Accommodation Of 500 Psdl. Layout And Design Enhance Operational Flow, Demonstrating Exceptional Foresight And Planning. Integration Of Facilities Promotes Smooth Prison Management. Good (80%): The Design Effectively Utilizes Space, With Minor Areas For Improvement In Operational Flow. Layout And Design Contribute To Efficient Prison Management, Meeting Most Functional Requirements. Acceptable (70%): The Design Adequately Utilizes Space, Meeting Basic Requirements For Accommodating 500 Psdl. Layout And Design Support Operational Flow, Though Some Improvements Are Needed For Optimal Functionality. Some Reservations (50%): The Design Partially Optimizes Space Utilization, With Notable Deficiencies In Operational Flow. Layout And Design Hinder Efficient Prison Management, Requiring Significant Adjustments For Improvement. Serious Reservations (20%): The Design Inadequately Utilizes Space, Hindering Accommodation Of 500 Psdl. Layout And Design Severely Impede Operational Flow, Indicating A Lack Of Understanding Of Functional Requirements. Unacceptable (0%): The Design Fails To Optimize Space Utilization, Lacking Consideration For Accommodating 500 Psdl. Layout And Design Pose Significant Obstacles To Efficient Prison Management, Indicating A Fundamental Misunderstanding Of Functional Requirements. C. Safety And Security: Excellent (100%): The Design Features Robust Perimeter Walls, Guard Towers, And Security Features Ensuring Optimal Pdl Containment And Facility Security. Fire Protection And Detection Systems Are Highly Reliable, With Comprehensive Safety Measures For Both Psdl And Staff. Good (80%): The Design Incorporates Effective Perimeter Walls, Guard Towers, And Security Features, With Minor Areas For Enhancement. Fire Protection And Detection Systems Are Reliable, With Adequate Safety Measures For Psdl And Staff. Acceptable (70%) The Design Includes Satisfactory Perimeter Walls, Guard Towers, And Security Features, Meeting Basic Requirements For Pdl Containment And Facility Security. Fire Protection And Detection Systems Are Functional, With Sufficient Safety Measures For Psdl And Staff. Some Reservations (50%): The Design Features Partially Effective Perimeter Walls, Guard Towers, And Security Features, With Notable Deficiencies In Pdl Containment And Facility Security. Fire Protection And Detection Systems Lack Reliability, With Limited Safety Measures For Psdl And Staff. Serious Reservations (20%): The Design Lacks Effective Perimeter Walls, Guard Towers, And Security Features, Compromising Pdl Containment And Facility Security. Fire Protection And Detection Systems Are Inadequate, Posing Significant Risks To Psdl And Staff Safety. Unacceptable (0%): The Design Neglects Perimeter Walls, Guard Towers, And Security Features, Failing To Ensure Pdl Containment And Facility Security. Fire Protection And Detection Systems Are Absent Or Non-functional, Posing Severe Risks To Psdl And Staff Safety. D. Sustainability And Environmental Considerations: Excellent (100%): The Design Includes Robust Safety Measures And Emergency Protocols, Ensuring The Safety And Well-being Of Psdl And Staff In Accordance With Ra 10575. Good (80%): The Design Integrates Sustainable Design Principles Effectively, With Minor Opportunities For Improvement In Energy Efficiency And Material Selection. Sewage Treatment And Water Conservation Measures Are Adequate, Supporting Environmental Sustainability. Acceptable (70%) The Design Includes Basic Sustainable Design Principles, Meeting Minimum Requirements For Energy Efficiency And Material Selection. Sewage Treatment And Water Conservation Measures Are Functional, Contributing To Environmental Sustainability. Some Reservations (50%): The Design Partially Incorporates Sustainable Design Principles, With Notable Deficiencies In Energy Efficiency And Material Selection. Sewage Treatment And Water Conservation Measures Lack Comprehensiveness, Limiting Environmental Sustainability. Serious Reservations (20%): The Design Lacks Consideration For Sustainable Design Principles, Neglecting Energy Efficiency And Eco-friendly Materials. Sewage Treatment And Water Conservation Measures Are Insufficient, Undermining Environmental Sustainability. Unacceptable (0%): The Design Disregards Sustainable Design Principles, Showing No Commitment To Energy Efficiency Or Eco-friendly Materials. Sewage Treatment And Water Conservation Measures Are Absent Or Inadequate, Disregarding Environmental Sustainability. E. Aesthetics And Architectural Design: Excellent (100%): The Design Exhibits Exceptional Aesthetic Appeal And Architectural Coherence, Showcasing Innovative And Visually Pleasing Elements. Consideration Of Local Architectural Vernacular And Contextual Integration Is Evident, Contributing To The Overall Excellence Of The Design. Good (80%): The Design Demonstrates Good Aesthetic Appeal And Architectural Coherence, With Some Areas For Enhancement In Creativity And Visual Impact. Consideration Of Local Architectural Vernacular And Contextual Integration Is Apparent, Enriching The Design. Acceptable (70%): The Design Achieves Acceptable Aesthetic Appeal And Architectural Coherence, Meeting Basic Expectations For Visual Presentation. Consideration Of Local Architectural Vernacular And Contextual Integration Is Present, Though Limited In Scope. Some Reservations (50%): The Design Lacks Significant Aesthetic Appeal And Architectural Coherence, With Notable Deficiencies In Creativity And Visual Impact. Consideration Of Local Architectural Vernacular And Contextual Integration Is Minimal, Detracting From The Overall Quality Of The Design. Serious Reservations (20%): The Design Exhibits Poor Aesthetic Appeal And Architectural Coherence, Failing To Engage Visually Or Inspire Interest. Consideration Of Local Architectural Vernacular And Contextual Integration Is Lacking, Diminishing The Design's Relevance And Appropriateness. Unacceptable (0%): The Design Lacks Any Aesthetic Appeal Or Architectural Coherence, Showing No Effort To Engage Visually Or Integrate With The Local Architectural Vernacular. Consideration Of Contextual Integration Is Absent, Rendering The Design Unsuitable For The Project. 8.1.2 Approach And Methodology For Detailed Engineering, Design, And Construction (40 Points) Excellent (100%): The Concept Of Approach And Methodology For Detailed Engineering, Design, And Construction Is Exceptionally Clear, Feasible, Innovative, And Comprehensive. The Plan Demonstrates A High Level Of Understanding Of Project Problems, Risks, And Suggested Solutions, With Well-defined Strategies For Addressing Them. Good (80%): The Concept Of Approach And Methodology For Detailed Engineering, Design, And Construction Is Clear, Feasible, And Comprehensive, With Some Innovative Elements. The Plan Adequately Addresses Project Problems, Risks, And Suggested Solutions, Though Some Areas May Require Further Development. Acceptable (70%): The Concept Of Approach And Methodology For Detailed Engineering, Design, And Construction Satisfactorily Addresses Project Requirements, With A Basic Level Of Clarity And Feasibility. The Plan Outlines Strategies For Addressing Project Problems, Risks, And Suggested Solutions, Meeting The Minimum Expectations. Some Reservations (50%): The Concept Of Approach And Methodology For Detailed Engineering, Design, And Construction Partially Addresses Project Requirements, With Notable Gaps In Clarity And Feasibility. The Plan Lacks Innovative Elements And May Inadequately Address Project Problems, Risks, And Suggested Solutions. Serious Reservations (20%): The Concept Of Approach And Methodology For Detailed Engineering, Design, And Construction Demonstrates Significant Deficiencies In Clarity, Feasibility, And Comprehensiveness. The Plan Fails To Adequately Address Project Problems, Risks, And Suggested Solutions, Indicating A Lack Of Understanding Or Inadequate Planning. Unacceptable (0%): The Concept Of Approach And Methodology For Detailed Engineering, Design, And Construction Is Unclear, Infeasible, And Lacks Comprehensiveness. The Plan Fails To Address Project Problems, Risks, And Suggested Solutions, Indicating A Fundamental Misunderstanding Or Disregard For Project Requirements. 8.1.3 Quality Of Personnel Assigned To The Project (25 Points) Excellent (100%): The Personnel Assigned To The Project, Including Key Staff, Are Highly Suitable And Competent To Perform Their Duties. Key Staff Members Possess Exceptional Qualifications, Competence, Education, And Training Relevant To Their Roles, Demonstrating A High Level Of Expertise And Experience. Good (80%): The Personnel Assigned To The Project, Including Key Staff, Are Suitable And Competent To Perform Their Duties Effectively. Key Staff Members Possess Relevant Qualifications, Competence, Education, And Training, Demonstrating Solid Expertise And Experience. Acceptable (70%): The Personnel Assigned To The Project, Including Key Staff, Meet The Basic Requirements For Suitability And Competence In Performing Their Duties. Key Staff Members Possess General Qualifications And Competence, Education, And Training Relevant To Their Roles, Meeting The Minimum Expectations. Some Reservations (50%): The Personnel Assigned To The Project, Including Key Staff, Demonstrate Some Suitability And Competence In Performing Their Duties, But Notable Deficiencies Are Present. Key Staff Members May Lack Certain Qualifications, Competence, Education, Or Training, Raising Concerns About Their Ability To Effectively Fulfill Their Roles. Serious Reservations (20%): The Personnel Assigned To The Project, Including Key Staff, Exhibit Significant Deficiencies In Suitability And Competence To Perform Their Duties. Key Staff Members Lack Essential Qualifications, Competence, Education, Or Training, Indicating A Lack Of Expertise Or Experience Relevant To Their Roles. Unacceptable (0%): The Personnel Assigned To The Project, Including Key Staff, Are Unsuitable And Incompetent To Perform Their Duties Effectively. Key Staff Members Lack The Necessary Qualifications, Competence, Education, And Training, Demonstrating A Fundamental Mismatch With The Requirements Of Their Roles. 8.2 Determination Of The Merit Point Score The Aggregate Of The Scores In Each Criterion Must Be 70% Or More To Pass Using The Following Formula In Equation. Description Weight (w) Rating (r) Criteria 1 35% (smax/sact) Criteria 2 40% Sact Criteria 3 25% Sact Smax = Η (100) Sact = R1 +r2 +r3 + . . .(rη) Where Η = Number Of Sub Criteria R = Rating Given To The Criteria/sub Criteria The Actual Score (sact) For Each Of The Criteria/sub Criteria Is Obtained By Adding All The Given Rating. (smax) Is The Summation Of Maximum Score Per Criteria 8.3 Passing Rate The Specific Passing Rate Value Depends On The Specific Context Of The Project, The Priorities Of The Design And Build Committee, And The Complexity Of The Requirements Outlined In Ra 10575. Based On The Provided Criteria And Descriptions, The Passing Rate For The Merit Point Criteria (mpc) Could Be Set At 75%. This Means That Bidders Must Score At Least 75% Or Higher In The Evaluation Process To Be Considered As Meeting The Minimum Requirements For The Project A. Pass Rate Per Criteria Will Be Determined Using The Formula: Score = W1*r1 + W2*r2 + W3*r3 B. A Bid Or Technical Bid That Failed In Any Of The Criteria’s Will Not Be Considered For Further Evaluation C. Score Above 75% Will Be Considered As Technically Responsive. Aggregate Score Of Less Than 75% Will Be Considered Failed, And May Be Rejected On That Basis. Second-step Procedure: Only Those Bids That Passed The Above Criteria Shall Be Subjected To The Second Step Of Evaluation. The Bac Shall Open The Financial Proposal Of Each “passed” Bidder And Shall Evaluate It Using Non-discretionary Criteria – Including Arithmetical Corrections For Computational Errors – As Stated In The Bidding Documents, And Thus Determine The Correct Total Calculated Prices. The Bac Shall Automatically Disqualify Any Total Calculated Bid Price Which Exceeds The Abc 9. Data To Be Provided By The Bucor These Data Are For Reference Only And Does Not Guarantee The Contractor That The Data Provided Are Correct, Free From Error, And Applicable To The Project At Hand. The Contractor Is Responsible For The Accuracy Or Applicability Of Any Data That He Will Use In His Design– Build Proposal And Services. Sample Data For Buildings: A. Conceptual Plans 10. Documents To Be Provided By The Contractor During Contract Implementation A. Detailed Architectural And Engineering Plans B. Design Analysis C. Survey Data D. Quantity Calculation E. Detailed Geotechnical Investigation Report F. Design Report. G. As-built Plans, (printed Including Cad Files And Bim Files (lod 500) H. Other Relevant Documents 11. Design And Build Period The Winning Bidder Shall Commence Actual Works Upon The Issuance By The Bucor Of The Notice To Proceed (ntp). The Winning Bidder Shall Complete The Daed And Submit Within The Ninety (60) Calendar Days (cds) Period To The Bucor For Review And Approval. The Contractor Shall Complete The Construction Of The Building Within 305 Cds For The Total Contract Duration Of 365 Cd. Conforme: Name Of Company In Print Signature Over Printed Name Of Authorized Representative/date Section Vii. Drawings The Conceptual Drawings Should Be Attached To This Section Or Annexed In A Separate Folder As Part Of The First Envelope (technical Component Envelope). Preliminary Conceptual Architectural Design Plans In Accordance With The Degree Of Details Specified By The Procuring Entity: At Suitable Scale On High Quality A3 Blue Print Paper /digital Print Minimum Size) 1. Location Plan/vicinity Map 2. Perspective 3. Floor Plans 4. Front View Elevation 5. Rear View Elevation 6. Left Side View Elevation 7. Right Side View Elevation 8. Longitudinal Section 9. Transverse Section Section Viii. Bill Of Quantities The Bill Of Quantities Should Be Attached To This Section As Part Of The Second Envelope (financial Component Envelope). Section Ix. Checklist Of Technical And Financial Documents Checklist Of Technical And Financial Documents I. Technical Component Envelope Class “a” Documents Legal Documents ⬜ (a) Valid Philgeps Registration Certificate (platinum Membership) (all Pages) In Accordance With Section 8.5.2 Of The Irr; Technical Documents ⬜ (b) Statement Of The Prospective Bidder Of All Its Ongoing Government And Private Contracts, Including Contracts Awarded But Not Yet Started, If Any, Whether Similar Or Not Similar In Nature And Complexity To The Contract To Be Bid; And ⬜ (c) Statement Of The Bidder’s Single Largest Completed Contract (slcc) Similar To The Contract To Be Bid, Except Under Conditions Provided Under The Rules; And ⬜ (d) Special Pcab License In Case Of Joint Ventures And Registration For The Type And Cost Of The Contract To Be Bid; And ⬜ (e) Original Copy Of Bid Security. If In The Form Of A Surety Bond, Submit Also A Certification Issued By The Insurance Commission Or Original Copy Of Notarized Bid Securing Declaration; And (f) Project Requirements, Which Shall Include The Following: ⬜ A. Organizational Chart For The Contract To Be Bid; ⬜ B. List Of Contractor’s Key Personnel (e.g., Project Manager, Project Engineers, Materials Engineers, And Foremen), To Be Assigned To The Contract To Be Bid With Their Complete Qualification And Experience Data And Photocopy Of Their Valid Licenses Issued By The Professional Regulatory Commission (prc) And Curriculum Vitae Of Key Staff, Partners Or Principal Officers With A Minimum Work Experience Requirements Set In The Bds; ⬜ C. List Of Contractor’s Major Equipment Units, Which Are Owned, Leased, And/or Under Purchase Agreements, Supported By Proof Of Ownership Or Certification Of Availability Of Equipment From The Equipment Lessor/vendor For The Duration Of The Project, As The Case May Be; And ⬜ (g) Original Duly Signed Omnibus Sworn Statement (oss); And If Applicable, Original Notarized Secretary’s Certificate Or Board Resolution/partnership Resolution In Case Of A Corporation, Partnership, Or Cooperative; Or Original Notarized Special Power Of Attorney In Case Of Sole Proprietorship Of All Members Of The Joint Venture Giving Full Power And Authority To Its Officer To Sign The Oss And Do Acts To Represent The Bidder. And ⬜ (h) Conformity With The Technical Specifications (scope Of Work); And ⬜ (i) Preliminary Conceptual Architectural Design Plans In Accordance With The Degree Of Details Specified By The Procuring Entity: (at Suitable Scale On High Quality A3 Blue Print Paper /digital Print Minimum Size) 1. Location Plan/vicinity Map 2. Perspective 3. Floor Plans 4. Front View Elevation 5. Rear View Elevation 6. Left Side View Elevation 7. Right Side View Elevation 8. Longitudinal Section 9. Transverse Section ⬜ (j) Design And Construction Method And ⬜ (k) Value Engineering Analysis Of The Design And Construction Method. And Financial Documents ⬜ (l) The Prospective Bidder’s Computation Of Net Financial Contracting Capacity (nfcc) At Least Equal To The Abc. And Class “b” Documents ⬜ (m) Jv Bidders Shall Submit A Jva In Accordance With R.a. 4566 And Its Irr. Each Partner Of The Joint Venture Shall Submit Their Respective Philgeps Certificates Of Registration In Accordance With Section 8.5.2 Of This Irr. The Submission Of Technical And Financial Eligibility Documents By Any Of The Joint Venture Partners Constitutes Compliance: Provided, That The Partner Responsible To Submit The Nfcc Shall Likewise Submit The Statement Of All Of Its Ongoing Contracts And Audited Financial Statements. Ii. Financial Component Envelope ⬜ (n) Original Of Duly Signed And Accomplished Financial Bid Form; And Other Documentary Requirements Under Ra No. 9184 ⬜ (o) Original Of Duly Signed Bid Prices In The Bill Of Quantities; And ⬜ (p) Duly Accomplished Detailed Estimates Form, Including A Summary Sheet Indicating The Unit Prices Of Construction Materials, Labor Rates, And Equipment Rentals Used In Coming Up With The Bid; And ⬜ (q) Cash Flow And Payment Schedule. Bidding Form Company Letterhead Statement Of Ongoing Government & Private Contracts Design And Build Of Bureau Of Corrections Supermaximum Prison Facility (2nd Phase) At Sablayan Prison And Penal Farm (sppf) Statement Of All Its Ongoing Government And Or Private Contracts Including Contracts Awarded But Not Yet Started, If Any Whether Similar Or Not Similar In Nature. Name Of Contract Date Of Contract Contract Duration Owner’s Name And Address Nature Of Work Contractor’s Role (whether Sole Contractor, Subcontractor, Or Partner In A Jv) And Percentage Of Participation Total Contract Value At Award Date Of Completion Or Estimated Completion Time Value Of Outstanding Works Certified Correct: Name And Signature Of Authorized Representative Position Date Company Letterhead Statement Of Single Largest Completed Contract Design And Build Of Bureau Of Corrections Supermaximum Prison Facility (2nd Phase) At Sablayan Prison And Penal Farm (sppf) Statement Of Single (1) Largest Completed Contract Of Similar In Nature Within The Last Six (6) Years From The Date Of Submission And Receipt Of Bids Amounting To At Least Fifty Percent (50%) Of The Approved Budget Of The Contract (abc) Name Of Contract Date Of Contract Contract Duration Owner’s Name And Address Nature Of Work Contractor’s Role (whether Sole Contractor, Subcontractor, Or Partner In A Jv) And Percentage Of Participation Total Contract Value At Award Amount Of Completed Contracts, Adjusted By The Bidder To Current Prices Using Psa’s Consumer Price Index, If Necessary Date Of Completion Or Estimated Completion Time Certified Correct: Name And Signature Of Authorized Representative Position Date Company Letterhead Design And Build Of Bureau Of Corrections Supermaximum Prison Facility (2nd Phase) At Sablayan Prison And Penal Farm (sppf) Republic Of The Philippines) City Of _______________________) S.s. X------------------------------------------------------x Bid Securing Declaration Invitation To Bid: [insert Reference Number] To: Bureau Of Corrections I/we, The Undersigned, Declare That: 1. I/we Understand That, According To Your Conditions, Bids Must Be Supported By A Bid Security, Which May Be In The Form Of A Bid-securing Declaration. 2. I/we Accept That: (a) I/we Will Be Automatically Disqualified From Bidding For Any Contract With Any Procuring Entity For A Period Of Two (2) Years Upon Receipt Of Your Blacklisting Order; And, (b) I/we Will Pay The Applicable Fine Provided Under Section 6 Of The Guidelines On The Use Of Bid Securing Declaration, Within Fifteen (15) Days From Receipt Of The Written Demand By The Procuring Entity For The Commission Of Acts Resulting To The Enforcement Of The Bid Securing Declaration Under Sections 23.1(b), 34.2, 40.1 And 69.1, Except 69.1(f), Of The Irr Of Ra 9184; Without Prejudice To Other Legal Action The Government May Undertake. 3. I/we Understand That This Bid Securing Declaration Shall Cease To Be Valid On The Following Circumstances: (a) Upon Expiration Of The Bid Validity Period, Or Any Extension Thereof Pursuant To Your Request; (b) I Am/we Are Declared Ineligible Or Post-disqualified Upon Receipt Of Your Notice To Such Effect, And (i) I/we Failed To Timely File A Request For Reconsideration Or (ii) I/we Filed A Waiver To Avail Of Said Right; (c) I Am/we Are Declared The Bidder With The Lowest Calculated Responsive Bid, And I/we Have Furnished The Performance Security And Signed The Contract. In Witness Whereof, I/we Have Hereunto Set My/our Hand/s This ____ Day Of [month] [year] At [place Of Execution]. ______________________________________________________ [insert Name Of Bidder’s Authorized Representative] _____________________________ [insert Signatory’s Legal Capacity] Affiant Subscribed And Sworn To Before Me This ___ Day Of [month] [year] At [place Of Execution], Philippines. Affiant/s Is/are Personally Known To Me And Was/were Identified By Me Through Competent Evidence Of Identity As Defined In The 2004 Rules On Notarial Practice (a.m. No. 02-8-13-sc). Affiant/s Exhibited To Me His/her [insert Type Of Government Identification Card Used], With His/her Photograph And Signature Appearing Thereon, With No. ____________ Issued On ______________ At ___________________________________. Witness My Hand And Seal This ___ Day Of [month] [year]. Name Of Notary Public Serial No. Of Commission _______________ Notary Public For _______ Until __________ Roll Of Attorneys No. __________________ Ptr No. ______ [date Issued], [place Issued] Ibp No. ______ [date Issued], [place Issued Doc. No. _____ Page No. _____ Book No. _____ Series Of ____ Company Letterhead Omnibus Sworn Statement Design And Build Of Bureau Of Corrections Supermaximum Prison Facility (2nd Phase) At Sablayan Prison And Penal Farm (sppf) _________________________________________________________________________ Republic Of The Philippines ) City/municipality Of ______ ) S.s. Affidavit I, [name Of Affiant], Of Legal Age, [civil Status], [nationality], And Residing At [address Of Affiant], After Having Been Duly Sworn In Accordance With Law, Do Hereby Depose And State That: 1. [select One, Delete The Other:] [if A Sole Proprietorship:] I Am The Sole Proprietor Or Authorized Representative Of [name Of Bidder] With Office Address At [address Of Bidder]; [if A Partnership, Corporation, Cooperative, Or Joint Venture:] I Am The Duly Authorized And Designated Representative Of [name Of Bidder] With Office Address At [address Of Bidder]; 2. [select One, Delete The Other:] [if A Sole Proprietorship:] As The Owner And Sole Proprietor, Or Authorized Representative Of [name Of Bidder], I Have Full Power And Authority To Do, Execute And Perform Any And All Acts Necessary To Participate, Submit The Bid, And To Sign And Execute The Ensuing Contract For Design And Build Of Bureau Of Corrections Supermaximum Prison Facility (2nd Phase) Of The Bureau Of Corrections, As Shown In The Attached Duly Notarized Special Power Of Attorney; [if A Partnership, Corporation, Cooperative, Or Joint Venture:] I Am Granted Full Power And Authority To Do, Execute And Perform Any And All Acts Necessary To Participate, Submit The Bid, And To Sign And Execute The Ensuing Contract For Design And Build Of Bureau Of Corrections Supermaximum Prison Facility (2nd Phase) Of The Bureau Of Corrections, As Shown In The Attached [state Title Of Attached Document Showing Proof Of Authorization (e.g., Duly Notarized Secretary’s Certificate, Board/partnership Resolution, Or Special Power Of Attorney, Whichever Is Applicable;)]; 3. [name Of Bidder] Is Not “blacklisted” Or Barred From Bidding By The Government Of The Philippines Or Any Of Its Agencies, Offices, Corporations, Or Local Government Units, Foreign Government/foreign Or International Financing Institution Whose Blacklisting Rules Have Been Recognized By The Government Procurement Policy Board, By Itself Or By Relation, Membership, Association, Affiliation, Or Controlling Interest With Another Blacklisted Person Or Entity As Defined And Provided For In The Uniform Guidelines On Blacklisting; 4. Each Of The Documents Submitted In Satisfaction Of The Bidding Requirements Is An Authentic Copy Of The Original, Complete, And All Statements And Information Provided Therein Are True And Correct; 5. [name Of Bidder] Is Authorizing The Head Of The Procuring Entity Or Its Duly Authorized Representative(s) To Verify All The Documents Submitted; 6. [select One, Delete The Rest:] [if A Sole Proprietorship:] The Owner Or Sole Proprietor Is Not Related To The Head Of The Procuring Entity, Members Of The Bids And Awards Committee (bac), The Technical Working Group, And The Bac Secretariat, The Head Of The Project Management Office Or The End-user Unit, And The Project Consultants By Consanguinity Or Affinity Up To The Third Civil Degree; [if A Partnership Or Cooperative:] None Of The Officers And Members Of [name Of Bidder] Is Related To The Head Of The Procuring Entity, Members Of The Bids And Awards Committee (bac), The Technical Working Group, And The Bac Secretariat, The Head Of The Project Management Office Or The End-user Unit, And The Project Consultants By Consanguinity Or Affinity Up To The Third Civil Degree; [if A Corporation Or Joint Venture:] None Of The Officers, Directors, And Controlling Stockholders Of [name Of Bidder] Is Related To The Head Of The Procuring Entity, Members Of The Bids And Awards Committee (bac), The Technical Working Group, And The Bac Secretariat, The Head Of The Project Management Office Or The End-user Unit, And The Project Consultants By Consanguinity Or Affinity Up To The Third Civil Degree; 7. [name Of Bidder] Complies With Existing Labor Laws And Standards; And 8. [name Of Bidder] Is Aware Of And Has Undertaken The Responsibilities As A Bidder In Compliance With The Philippine Bidding Documents, Which Includes: A. Carefully Examining All Of The Bidding Documents; B. Acknowledging All Conditions, Local Or Otherwise, Affecting The Implementation Of The Contract; C. Making An Estimate Of The Facilities Available And Needed For The Contract To Be Bid, If Any; And D. Inquiring Or Securing Supplemental/bid Bulletin(s) Issued For The Design And Build Of Bureau Of Corrections Supermaximum Prison Facility (2nd Phase). 9. [name Of Bidder] Did Not Give Or Pay Directly Or Indirectly, Any Commission, Amount, Fee, Or Any Form Of Consideration, Pecuniary Or Otherwise, To Any Person Or Official, Personnel Or Representative Of The Government In Relation To Any Procurement Project Or Activity. 10. In Case Advance Payment Was Made Or Given, Failure To Perform Or Deliver Any Of The Obligations And Undertakings In The Contract Shall Be Sufficient Grounds To Constitute Criminal Liability For Swindling (estafa) Or The Commission Of Fraud With Unfaithfulness Or Abuse Of Confidence Through Misappropriating Or Converting Any Payment Received By A Person Or Entity Under An Obligation Involving The Duty To Deliver Certain Goods Or Services, To The Prejudice Of The Public And The Government Of The Philippines Pursuant To Article 315 Of Act No. 3815 S. 1930, As Amended, Or The Revised Penal Code. In Witness Whereof, I Have Hereunto Set My Hand This __ Day Of ___, 2024 At ____________, Philippines. _____________________________________ Bidder’s Representative/authorized Signatory Affiant Subscribed And Sworn To Before Me This ___ Day Of [month] [year] At [place Of Execution], Philippines. Affiant/s Is/are Personally Known To Me And Was/were Identified By Me Through Competent Evidence Of Identity As Defined In The 2004 Rules On Notarial Practice (a.m. No. 02-8-13-sc). Affiant/s Exhibited To Me His/her [insert Type Of Government Identification Card Used], With His/her Photograph And Signature Appearing Thereon, With No. ____________ And Issued On ____________________ At _____________________. Witness My Hand And Seal This ___ Day Of [month] [year]. Name Of Notary Public Serial No. Of Commission _______________ Notary Public For _______ Until __________ Roll Of Attorneys No. __________________ Ptr No. ______ [date Issued], [place Issued] Ibp No. ______ [date Issued], [place Issued] Doc. No. _____ Page No. _____ Book No. _____ Series Of _____ Company Letterhead Certificate Of Net Financial Contracting Capacity Design And Build Of Bureau Of Corrections Supermaximum Prison Facility (2nd Phase) At Sablayan Prison And Penal Farm (sppf) (please Show Figures At How You Arrived At The Nfcc) This Is To Certify That Our Net Financial Contracting Capacity (nfcc) Is _____________________ (p____________) Which Is At Least Equal To The Total Ceiling Price We Are Bidding. The Amount Is Computed As Follows: (please Show Computation Of Nfcc) Nfcc = (ca-cl) (15) – C Where: Ca = Current Assets Cl = Current Liabilities C = Value Of All Outstanding Or Uncompleted Portions Of The Projects Under Going Contracts, Including Awarded Contracts Yet To Be Started Coinciding With The Contract For This Project Note: The Values Of The Bidder’s Current Assets And Current Liabilities Shall Be Based On The Audited Financial Statement Submitted To The Bir. Issued This _________________day Of ________________, 2024 _______________________________________________ Name & Signature Of Authorized Representative ____________________ Position _______________ Date Company Letterhead Bid Form Date: Ib No: To Bids And Awards Committee Bureau Of Corrections Nbp Reservation Muntinlupa City We, The Undersigned, Declare That: (a) We Have Examined And Have No Reservation To The Bidding Documents, Including Addenda, For The Contract Design And Build Of Bureau Of Corrections Supermaximum Prison Facility (2nd Phase) At Sablayan Prison And Penal Farm (sppf) (b) We Offer To Execute The Works For This Contract In Accordance With The Bid And Bid Data Sheet, General And Special Conditions Of Contract Accompanying This Bid; The Total Price Of Our Bid, Excluding Any Discounts Offered Below Is: ________________________________________₱_________________; The Discounts Offered And The Methodology For Their Application Are: [insert Information]; (c) Our Bid Shall Be Valid For A Period Of 120 Calendar Days From The Date Fixed For The Bid Submission Deadline In Accordance With The Bidding Documents, And It Shall Remain Binding Upon Us And May Be Accepted At Any Time Before The Expiration Of That Period; (d) If Our Bid Is Accepted, We Commit To Obtain A Performance Security In The Amount Of 30% Percent Of The Contract Price For The Due Performance Of The Contract; (e) Our Firm, Including Any Subcontractors Or Suppliers For Any Part Of The Contract, Have Nationalities From The Following Eligible Countries; (f) We Are Not Participating, As Bidders, In More Than One Bid In This Bidding Process, Other Than Alternative Offers In Accordance With The Bidding Documents; (g) Our Firm, Its Affiliates Or Subsidiaries, Including Any Subcontractors Or Suppliers For Any Part Of The Contract, Has Not Been Declared Ineligible By The Funding Source; (h) We Understand That This Bid, Together With Your Written Acceptance Thereof Included In Your Notification Of Award, Shall Constitute A Binding Contract Between Us, Until A Formal Contract Is Prepared And Executed; And (i) We Understand That You Are Not Bound To Accept The Lowest Calculated Bid Or Any Other Bid That You May Receive. (j) We Likewise Certify/confirm That The Undersigned, Is The Duly Authorized Representative Of The Bidder, And Granted Full Power And Authority To Do, Execute And Perform Any And All Acts Necessary To Participate, Submit The Bid, And To Sign And Execute The Ensuing Contract For The Design And Build Of Bureau Of Corrections Supermaximum Prison Facility (2nd Phase) Of The Bureau Of Corrections. (k) We Acknowledge That Failure To Sign Each And Every Page Of This Bid Form, Including The Bill Of Quantities, Shall Be A Ground For The Rejection Of Our Bid. Name: In The Capacity Of: Signed: Duly Authorized To Sign The Bid For And On Behalf Of: Date: ___________
Closing Date20 Jan 2025
Tender AmountPHP 300 Million (USD 5.1 Million)

City Government Of Navotas Tender

Automobiles and Auto Parts
Philippines
Details: Description Request For Quotations: Please Quote Your Best Offer For The Item/s Described Below, Subject To The Terms And Conditions Provided At The Dorsal Portion Of This Request For Quotation. Submit Your Quotation Duly Signed By You Or Your Duly Representative And Copies Of Eligibility Requirements (business Permit, Local/national Tax Clearance And Philgeps Certificate Of Registration) Not Later Than The Deadline For Submission. Items: Procurement For The Repair & Maintenance Of Transportation Equipment: Motor Vehicle Under The Repair & Maintenance Fund Of The City General Services Office Lot 1-repair & Maintenance Of Transportation Equipment: Motor Vehicle Unit Qty "item Description " Unit Cost " Lot 1 Repair And Maintenance Of Transportation Equipment : Motor Vehicle 1,000,000.00 Ordering Agreement - Supply Of Vehicle Parts For Minor Repairs And Maintenance At The Navotas Motorpool For 4 - Wheel Vehicles Pc/s 50 Battery Lug 150.00 Mtr/s 50 Wire-#10,16,18 290.00 Pc/s 50 Switches- 2gang,3gang,6gang 950.00 Pc/s 50 Handle Switch 1,200.00 Pc/s 100 Oil Seal 950.00 Pc/s 100 Battery Terminal Ci Brass 260.00 Pc/s 50 Brake Master 4,700.00 Pc/s 100 Repair Kit 1,200.00 Set/s 100 Brake Pads 2,500.00 Set/s 100 Brake Shoe 3,500.00 Pc/s 100 Drum Brake 6,900.00 Pc/s 100 Brake Hose 950.00 Pc/s 100 Bleeder Valve 1,250.00 Pc/s 100 Return Spring 950.00 Pc/s 150 Lug Nuts 95.00 Pc/s 150 Bolt/nut 65.00 Pc/s 300 Clips 75.00 Pc/s 150 Wheel Cap 95.00 Pc/s 150 Wheel Boot 95.00 Pc/s 50 Rotor Disk Brake 1,900.00 Pc/s 100 Headlight Bulb 850.00 Pc/s 100 Bulb Socket 150.00 Pc/s 100 Brake Light 250.00 Pc/s 100 Signal Light Bulb 150.00 Pc/s 100 Clutch Cable 3,900.00 Pc/s 100 Gas Cable 2,500.00 Mtr/s 50 Copper Tube 250.00 Pc/s 100 Hand Brake Cable 2,500.00 Pc/s 50 Lever 650.00 Pc/s 150 Air Filter 1,200.00 Pc/s 50 Hose-radiator Inlet 3,600.00 Pc/s 50 Hose-radiator Outlet "b" 3,100.00 Pc/s 50 Hose-radiator Outlet "c" 3,800.00 Pc/s 50 Hose-radiator Outlet 1,900.00 Pc/s 50 Hose-fill Line 1,350.00 Pc/s 50 Hose-heater 1,315.00 Pc/s 100 Hose Clamp 95.00 Pc/s 50 Belt "v" 3,700.00 Pc/s 50 Ribbed Belt-v 3,400.00 Pc/s 100 Radiator Hose 1,700.00 Pc/s 100 Radiator Cap 1,200.00 Pc/s 100 Fan Belt 1,600.00 Pc/s 150 Spark Plug 650.00 Pc/s 150 Spark Plug Terminal 380.00 Ltr/s 150 Radiator Coolant 550.00 Pc/s 100 Wheel Hub 1,600.00 Pc/s 100 Wheel Bearing 1,450.00 Pc/s 50 Wheel Cylinder 1,650.00 Pc/s 150 Seal 350.00 Box/s 30 Automotive Fuse 5a,10a,15a,20a,25a,30a 350.00 Assy/s 50 Horn 2,400.00 Pc/s 100 Relay 950.00 Ltr/s 150 Gear Oil 375.00 Pc/s 150 Tire Valve 150.00 Pc/s 150 Tire Selant 325.00 Pc/s 100 Throttle Controller 2,450.00 Pc/s 100 Tube 750.00 Pc/s 100 Truck Tubes 1,200.00 Pc/s 100 Flap 550.00 Ltr/s 150 High Performance Gear Oil 700.00 Assy/s 50 Clutch Master 3,100.00 Assy/s 50 Secondary Master 2,500.00 Set/s 50 Fender Liner 2,500.00 Pc/s 50 Floor Guard Rubber 3,000.00 Pc/s 50 Steering Wheel Cover 2,200.00 Pc/s 50 Side Mirror 1,200.00 Pc/s 50 Side Mirror Glass Only 350.00 Pc/s 50 Oil Filter 850.00 Pc/s 50 Coil 1,500.00 Unit 20 Radiator Assy. 5,200.00 Bottle/s 50 Coolant 3l 750.00 Bottle/s 100 Engine Oil 800ml 650.00 Assy. 30 Starter Motor Assy 10,990.00 Assy. 30 Alternator Assy 11,500.00 Pc/s 20 Alternator Pulley 950.00 Assy. 30 Fan Motor Assy. 3,800.00 Bottle/s 100 Brake Fluid 3l 340.00 Assy. 20 Fuel Pump Assy. 1,750.00 Pc/s 20 Clutch Disc 4,700.00 Pc/s 20 Clutch Cover 4,450.00 Pc/s 20 Pressure Plate 4,650.00 Pc/s 20 Release Bearing 2,150.00 Pc/s 30 Timing Belt 3,500.00 Pc/s 30 Tensioner Bearing 2,250.00 Pc/s 30 Tensioner Adjuster 950.00 Pc/s 30 Camshaft Oil Seal 1,350.00 Pc/s 50 Fuel Filter 980.00 Pc/s 20 Hydrovac Brake Booster 9,500.00 Pc/s 20 Ignition Switch 3,800.00 Pc/s 20 Intake Manifold Gasket 1,200.00 Pc/s 20 Intake/exhaust Valve 850.00 Pc/s 20 Knucle Bearing 1,200.00 Set/s 20 Leaf Spring Set 4,350.00 Pc/s 20 Main Bearing 3,500.00 Pc/s 20 Connecting Rod 3,800.00 Pc/s 20 Thrust Washer 1,450.00 Pc/s 20 Regulator 2,500.00 Pc/s 50 Car Charger Cigar Port 490.00 Pc/s 20 Steering Bearing 2,500.00 Pc/s 50 Ignition Coil 1,950.00 Pc/s 50 U-bolt 350.00 Pc/s 20 Power Steering Fluid Reservoir 1,350.00 Pc/s 20 Rotor Disc 4,950.00 Pc/s 20 Ball Joint 1,950.00 Set/s 20 Stabilizer Link 2,450.00 Pc/s 20 Bearing 1,350.00 Assy. 20 Shock Absorber 4,500.00 Set/s 30 Coil Spring 3,500.00 Pc/s 50 Battery Lug 150.00 Mtr/s 50 Wire-#10,16,18 290.00 Pc/s 50 Switches- 2gang,3gang,6gang 650.00 Pc/s 100 Oil Seal 350.00 Pc/s 100 Oil Filter 180.00 Pc/s 100 Engine Oil 550.00 Pc/s 100 Battery Terminal Ci Brass 100.00 Pc/s 50 Brake Master 950.00 Pc/s 100 Repair Kit 1,200.00 Set/s 100 Brake Pads 850.00 Set/s 100 Brake Shoe 950.00 Pc/s 100 Drum Brake 950.00 Pc/s 100 Brake Hose 650.00 Pc/s 150 Lug Nuts 95.00 Pc/s 150 Bolt/nut 65.00 Pc/s 150 Wheel Cap 95.00 Pc/s 150 Wheel Boot 95.00 Pc/s 50 Rotor Disk Brake 1,750.00 Pc/s 100 Headlight Bulb 250.00 Pc/s 100 Bulb Socket 150.00 Pc/s 100 Clutch Cable 550.00 Pc/s 100 Gas Cable 750.00 Pc/s 100 Hand Brake Cable 890.00 Pc/s 50 Lever 650.00 Pc/s 150 Air Filter 550.00 Pc/s 100 Hose Clamp 95.00 Pc/s 50 Belt "v" 1,200.00 Pc/s 150 Flyball 140.00 Pc/s 150 Slider 140.00 Pc/s 100 Pulley 950.00 Pc/s 100 Radiator Hose 650.00 Pc/s 100 Radiator Cap 490.00 Pc/s 150 Spark Plug 650.00 Pc/s 150 Spark Plug Terminal 650.00 Pc/s 5 E-cab 1000 Battery Charger 10,500.00 Pc/s 10 Wiper Motor 2,200.00 Pc/s 10 Meter Assy. 1,500.00 Pc/s 10 E-cab Braker 350.00 Ltr/s 150 Radiator Coolant 550.00 Pc/s 100 Wheel Hub 1,600.00 Pc/s 100 Wheel Bearing 750.00 Pc/s 50 Wheel Cylinder 850.00 Pc/s 150 Automotive Fuse 65.00 Assy/s 50 Horn 950.00 Pc/s 100 Relay 320.00 Ltr/s 150 Gear Oil 375.00 Pc/s 20 Breaker 450.00 Pc/s 150 Tire Valve 150.00 Pc/s 150 Tire Selant 325.00 Pc/s 100 Throttle Controller 350.00 Pc/s 50 Fun350 395.00 Set/s 50 Sprocket & Chain Set 6,800.00 Pc/s 50 Ecargo 375.00 Pc/s 100 Tube 280.00 Ltr/s 150 High Performance Gear Oil 700.00 Assy/s 50 Clutch Master 2,500.00 Pc/s 30 Side Stand 650.00 Pc/s 30 Center Stand 1,500.00 Pc/s 50 Wiper Arm 1,500.00 Assy/s 30 Exhaust Pipe 2,500.00 Pc/s 50 Stand Spring 150.00 Pc/s 50 Side Mirror 450.00 Pc/s 50 Chain 3,000.00 Pc/s 50 Front Sprocket 1,450.00 Pc/s 50 Rear Sprocket 2,800.00 Pc/s 50 Fender 980.00 Assy/s 50 Shock Absorber 2,500.00 Set/s 50 Sprocket & Chain Set 6,800.00 -tires Pc/s 10 10.00r20 18,500.00 Pc/s 10 11r22.5 25,500.00 Pc/s 10 165/80r13 5,400.00 Pc/s 30 185/60r15 5,700.00 Pc/s 50 185/70r14 6,000.00 Pc/s 30 185/70r15 8,600.00 Pc/s 30 185/80r14 7,100.00 Pc/s 40 185r-14c 6,700.00 Pc/s 10 195/70r15c 7,250.00 Pc/s 20 195r14c 8ply 7,600.00 Pc/s 50 195r15 7,680.00 Pc/s 30 205/65r16 8,600.00 Pc/s 20 205/85r16 13,100.00 Pc/s 50 205/65r15 8,400.00 Pc/s 30 215/70r - 16c 9,570.00 Pc/s 20 235/75r17.5 15,100.00 Pc/s 10 235/70r15 9,900.00 Pc/s 10 295/70r17 39,500.00 Pc/s 30 750/16 14,600.00 Pc/s 30 700/16 11,100.00 Pc/s 20 7.00/15 13,500.00 Pc/s 30 R(3.25-17) 3,100.00 Pc/s 30 F(2.75 - 17) 3,000.00 Pc/s 30 70-90-14 4,100.00 Pc/s 30 F(80-90-14) 4,100.00 Pc/s 30 (2.75-18) 2,850.00 Pc/s 30 (2.75-17) 2,500.00 Pc/s 30 (3.75-17) 2,800.00 Pc/s 30 (3.75 - 12) 2,900.00 Pc/s 30 (3.50 - 12) 2,750.00 Pc/s 30 (4.10-18) 3,600.00 Pc/s 30 (2.75-21) 4,300.00 Pc/s 30 (80/80-14) 3,800.00 Pc/s 30 (90/80-14) 4,100.00 Pc/s 30 2.75 – 17 2,650.00 Pc/s 30 3.00 – 17 2,850.00 -batteries Pc/s 30 Mg7l 4,000.00 Pc/s 30 Yb7bl 2,200.00 Pc/s 30 Ytx4l 2,200.00 Pc/s 30 12n9-4b-1 2,200.00 Pc/s 30 2sm 8,600.00 Pc/s 50 3sm 9,900.00 Pc/s 30 6sm 11,800.00 Pc/s 30 B24l 8,300.00 Pc/s 30 Ln3 11,000.00 Pc/s 20 2d 14,500.00 Pc/s 20 4d 16,200.00 Pc/s 20 8d 21,800.00 Pc/s 30 Ns60 8,300.00 Pc/s 15 E-cab Battery 11,200.00 -wiper Blades Pc/s 50 12" 500.00 Pc/s 50 14" 550.00 Pc/s 50 16" 600.00 Pc/s 50 17" 650.00 Pc/s 50 18" 700.00 Pc/s 50 19" 700.00 Pc/s 50 20" 750.00 Pc/s 50 21" 800.00 Pc/s 50 24" 850.00 Pc/s 50 26" 900.00 -lot 1 Navotas Motorpool Vehicle Repair And Maintenance Tools & Other Supplies Navotas Motorpool Vehicle Repair And Maintenance Tools & Other Supplies 200,000.00 Gal. 100 Car Wash And Wax Shampoo 330.00 Bottle/s 100 Car Wax, Wax And Dry, 769ml 880.00 Oz. 100 Carnauba Cleaner Paste Wax 14 Fl 850.00 Bottle/s 100 High Gloss Tire Black, 250ml 330.00 Pc/s 150 Chamois Towel 380.00 Pack/s 150 Microfiber Absorbent Square Towel 40*40cm 250.00 Set/s 10 6-32mm Combination Wrench Set 4,500.00 Set/s 10 Professional Car Tools Socket Wrench Complete Set 7,800.00 Set/s 10 Diagonal Combination Long Nose Pump Plier Pliers Set 2,000.00 Set/s 10 Tools Original Rapid Cross Wrench 17,19,21,23mm 2,140.00 Set/s 10 Vise Grip Set 5wr And 10wr (set) 2,500.00 Pc/s 10 Adjustable Wrenches Set (6", 8", 10") 1,500.00 Pc/s 10 High Pressure Washer Water Spray Gun 726.00 Pc/s 10 High Pressure Hose 20meters 2,915.00 Set/s 10 Power Sprayer Repair Kit - V-packing And Valve Seal 600.00 Pc/s 10 Lengthened Squeegee Cleaner Brush Shower Car Wiper Sponge 450.00 Pc/s 10 Industrial Multi-function Grease Gun (500g - 8500psi) 1,500.00 Unit 10 Electric Car Polisher Machine Auto Polishing Buffing 2,200.00 Pc/s 10 Soft Wool Clean Polishing Buffing Bonnet Pad For Car Auto 180mm/7" 420.00 Unit/s 1 Hydraulic Press 10 Ton 39,200.00 Unit/s 3 Bottle Jack 20tons 6,000.00 Unit/s 10 3 Tons Industrial Jack Stand 2pcs / Pair Iht 3,100.00 Unit/s 10 70mai Car Jump Starte Portable 70mai Car Jump Starte Portable 4,100.00 Pc/s 10 High Pressure Washer Brass Quick Coupler Connectors 600.00 Pack/s 50 Tubeless Tire Seal Strip Repair Plug 250.00 Pack/s 50 Tire Patches 50mm 1,000.00 Set/s 20 Auto Tire Repair Kit Tool 650.00 Can 50 Vulcanizing Solution 400.00 Pc/s 10 Car Tire Repair Kit Roller Auto Patch Roller 850.00 Gallon/s 20 Bac-to-zero Solution 4,000.00 Gallon/s 20 Disinfectant Solution 1,100.00 Set/s 10 Booster Cable 800amp Heavy Duty 5.0m 12/24v With Plastic Case 4,500.00 Pc/s 10 Heavy Duty Plastic Tool Box 980.00 Unit 2 Original Industrial (empty) Roller Cabinet With 7pcs Drawers 29,000.00 Set/s 10 Spark Plug Wrench Set 16" And 21" 1,700.00 Set/s 10 8pcs Screwdriver Set - Heavy Duty 1,545.00 Unit 10 6t/8t/12t Hydraulic Crimper Tool Kit Tube Terminals Lugs Battery Wire Crimping Force 3,800.00 Set/s 10 18pcs Hex Key And Torx Key Set(allen) 914.00 Pc/s 10 Philip Screw 200mm 310.00 Pc/s 10 Screw Driver 200mm 310.00 Set/s 1 Mini Obd2 Scanner Car Diagnostic Tools 25,000.00 Can 100 Brake Cleaner 650.00 Can 100 Electronic Contact Cleaner 650.00 Can 100 Anti Rust Lubricant 277ml 550.00 Pc/s 100 Epoxy Steel 210.00 Pc/s 100 Electrical Tape, Big 90.00 Pc/s 50 Tapelon 30.00 Unit 1 3 Jawed Puller 1,500.00 Set/s 1 Inner Bearing Puller 1,500.00 Set/s 1 Car Steering Wheel Puller Removal Tool 1,200.00 Set/s 1 Caliper Piston Compressor Press Tool Kit 1,200.00 Set/s 1 Snapring Plier Set 1,500.00 30 Can Grease 350.00 30 Can Chain Lube 950.00 50 Pc/s Electrical Tape, Small 60.00 20 Pc/s Boat Battery 3sm 9,900.00 50 Pc/s Floor Matting 1,600.00 50 Pc/s Seat Cover 2,800.00 60 Pc/s Dashboard Matting 650.00 150 Pc/s Car Headlight Cleaner 350.00 150 Pc/s Car Glass Cleaner 350.00 2 Set/s High Pressure Washer 1700w, 220v 6,000.00 20 Assy./s Car Key Duplicate 800.00 50 Unit/s Bottle Jack 4tons 3,000.00 100 Pc/s Car Air Freshener 210.00 1 Unit/s 2hp Air Compressor, Cylinder: 2, Phase: 1, Pressure: 115, Psi Capacity: 88liters 32,500.00 100 Btls Acid Rain Remover (250ml) 450.00 1 Unit Water Dispenser 8,000.00 1 Unit Dc Inverter Mma-300 Welding Machine 20,000.00 1 Unit " Oxy-acetylene Cutting Outfit W/complete Accessories Oxygen Cylinder, Acetylene Cylinder W/content 28,000.00 2 Unit Heavy Duty Soldering Iron 300a/200a 6,300.00 10 Kilos " Stainless Steel Electrode 308-1/16 1,500.00 20 Kilos Bronze Rod 1/8" 150.00 20 Can Soldering Paste Soldering Paste 300.00 20 Roll Lead Soldering Wire (250g) 500.00 20 Pound Borax 1 350.00 1 Unit Cordless Impact Wrench 18v 12,500.00 1 Unit Hydraulic Floor Jack (double Pump, Low Profile), Model:asj-5l Max Lifting Cap: 5tons, Lifting Height: 75-500mm, Net Weight: 45kgs 20,000.00 2 Unit 40" Car Creeper 2,100.00 1 Unit Automatic Wire Stripper Cutting Crimper 8 1/4" Detection Cutter 4in1 1,800.00 5 Set/s T- Handle Socket Wrench #8,10,12,14,17,19 1,500.00 10 Set/s Wrench 8-32mm 2,000.00 3 Unit Air Blow Gun / Air Duster 16mm 350.00 5 Unit Vice Grip 1,000.00 5 Unit Hammer 650.00 5 Unit Voltage Tester Car Truck Circuit Tester Pen Automotive 450.00 5 Unit Battery Load Tester 100amp Load 1,100.00 5 Unit Spout Funnel For Oil 1,600.00 5 Unit Car Repair Inspection Lamp Work Light 450.00 5 Set/s Torque Wrech 1/2drive Click Type 2,000.00 Unit 5 Jack Stand 6 Tons, Min Height: 382mm, Max Height: 600mm 5,600.00 Set/s 5 Steel Toe Rubber Boots 1,200.00 Set/s 10 Mechanical Heavy Duty Working Gloves 200.00 Set/s 5 Safety Shoes High Cut Sewed And Vulcanized Leather Safety Shoes Boots 650.00 Pc/s 5 Leather Long-sleeved Apron Waterproof Oil-proof 900.00 Set/s 10 Arm Band Heat Protector 450.00 Pc/s 5 Cover All Safety Suits 1,100.00 Pc/s 5 Hard Hat Safety Helmet 500.00 Gallon/s 20 Water Soluble Oil Degreaser 400.00 Pc/s 300 Rags 3.00 Pc/s 300 Sand Paper- #600,#1000,#1,200 10.00 Set/s 10 Wire Brushes Set Nylon,steel,stainless 100.00 Pc/s 10 Top Box Alloy, 45l 10,800.00 Set/s 10 Top Box Bracket 2,200.00 Abc:php1,000,000.00 Delivery Schedule: By Ordering Agreement (terms Of Reference Attached To The Pr) -spare Parts Must Be Deliver Within 3 Calendar Days -tools & Supplies Within 15 Calendar Days Upon Receipt Of The Delivery Ordering Contract Note: For Other Information, Queries And Specifications Pertaining To The Said Request Please Coordinate With Our Canvasser (please Secure Complete List And/or Rfq Form From Ms. Maricar E. Pablo, At 09676781263 Pauline Anne S. Sioco At 09338100230, And Roxette May P. Poblete At 0936-493-5632 Or Email Address: Procurement@navotas.gov.ph) Terms And Conditions: 1. Bidders Shall Provide Correct And Accurate Information Required. 2. Bidders May Quote For All The Items. 3. Price Quotation/s Must Be Valid For A Period Of Thirty (30) Days Calendar Days From The Date Of Submission. 4. Price Quotation/s, To Be Denominated In Philippine Peso Shall Include All Taxes, Duties And/or Levies Payable. 5. Quotations Exceeding The Approved Budget For The Contract Shall Be Rejected. 6. Delivery Period Expressed Merely In Days Or Working Days Shall Be Rejected. 7. Award Of Contract Shall Be Made To The Lowest Quotation (for Goods And Infrastructure) Or, The Highest Rated Offer (for Consulting Services) Which Complies With The Minimum Technical Specifications And Other Terms And Conditions Stated Herein. 8. Any Interlineations, Erasures Or Overwriting Shall Be Valid Only If They Are Signed Or Initiated By You Or Any Of Your Duly Authorized Representative/s. 9. The Item/s Shall Be Delivered As Indicated In The Approved Bac Resolution/purchase Order. 10. The Procuring Entity Concerned Shall Have The Right To Inspect And/or To Test The Goods To Confirm Their Conformity To The Technical Specifications. 11. Liquidated Damages Equivalent To One Tenth Of One Percent (0.001%) Of The Value Of The Goods Not Delivered Within The Prescribed Delivery Period Shall Be Imposed Per Day Of Delay. The City Government Of Navotas Shall Rescind The Contract Once The Cumulative Amount Of Liquidated Damages Reaches Ten Percent (10%) Of The Amount Of The Contract, Without Prejudice To Other Courses Of Action And Remedies Open To It. For The Committee Original Signed Atty. Joel Joselito D. Parong Bac Chairperson
Closing Soon13 Jan 2025
Tender AmountPHP 1 Million (USD 17.2 K)

DEPT OF THE NAVY USA Tender

Others
United States
Description: Contact Information|4|n744.10|cfb|please Use Email|sherry.l.kaylor.civ@us.navy.mil | item Unique Identification And Valuation (jan 2023)|19|||||||||||||||||||| higher-level Contract Quality Requirement (navicp Review Feb 1991)(feb 1999)|1|iso9001| inspection Of Supplies--fixed-price (aug 1996)|2||| wide Area Workflow Payment Instructions (jan 2023)|16|invoice And Receiving Report (combo)||tbd|n00104|tbd|tbd|see Schedule|tbd|see Schedule||tdb|||||| navy Use Of Abilityone Support Contractor - Release Of Offeror Information (3-18))|1|wss Mechanicsburg | equal Opportunity (sep 2016)|2||| buy American-free Trade Agreements-balance Of Payments Program-basic (feb 2024)|11|||||||||||| notice Of Total Small Business Set-aside (oct 2020)(deviation 2020-o0008)|1|| alternate A, Annual Representations And Certifications (oct 2024)|13|||||||||||||| buy American-free Trade Agreements-balance Of Payments Program Certificate-basic (feb 2024))|5|||||| buy American-balance Of Payments Program Certificate-basic (feb 2024)|1|| annual Representations And Certifications (may 2024)|13|335311|800 Emp|x|x|||||||||| notice Of Priority Rating For National Defense, Emergency Perpardeness, And Enrgy Progam Use (april 2008))|2||x| this Solicitation Is Issued Pursuant To Emergency Acquisition Flexibilities (eaf). a. Electronic Submission Of Any Quotes, Representations, And Any Necessary Certifications Shall Be Accomplished Via An Email Directed To Sherry.l.kaylor.civ@us.navy.mil b. General Requirements: Mil-std Packaging, Government Source Inspection Required. c. All Freight Is Fob Origin. d. This Rfq Is For A Buy/procurement. The Resultant Award Of This Solicitation Will Be Issued Bilaterally, Requiring The Contractor?s Written Acceptance Prior To Execution. Verify Nomenclature, Part Number, And Nsn Prior To Responding. e. Only A Firm-fixed Price (ffp) Will Be Accepted. f. Must Adhere To Iuid Requirements Of Dfars 252.211-7003 g. The Ultimate Awardee Of The Proposed Contract Action Must Be An Authorized Source. Award Of The Proposed Contract Action Will Not Be Delayed While An Unauthorized Source Seeks To Obtain Authorization. h. Your Quote Should Include The Following Information For Justification Purposes: - New Procurement Unit Price____________________ - Total Price _____________________ - Procurement Delivery Lead Time (ptat) _________________ Days - Award To Cage _______________ - Inspection & Acceptance Cage, If Not At Award To Cage _____________ - Cost Breakdown Requested, Including Profit Rate (if Feasible). - Quote Expiration Date _______________ (90 Days Minimum Is Requested). - Delivery Vehicle (if Delivery Order Requested)(e.g. If Your Cage Has A Current Boa/idiq) i. Important Traceability Notice: if You Are Not The Manufacturer Of The Material You Are Offering, You Must Provide An Official Letter And/or Email From The Oem Confirming That Your Company Is An Authorized Distributor Of Their Items. \ 1. Scope 1.1 This Contract/purchase Order Contains The Requirements For Manufacture And The Contract Quality Requirements For The Cable Assembly,spec . 2. Applicable Documents 2.1 Applicable Documents - The Document(s) Listed Below Form A Part Of This Contract/purchase Order Including Modifications Or Exclusions. 2.1.1 Documents, Drawings, And Publications Supplied Are Listed Under "drawing Number". These Items Should Be Retained Until An Award Is Made. 2.1.2 "document References" Listed Below Must Be Obtained By The Contractor. Ordering Information Is Included As An Attachment To This Contract/purchase Order. 2.2 Order Of Precedence - In The Event Of A Conflict Between The Text Of This Contract/purchase Order And The References And/or Drawings Cited Herein, The Text Of This Contract/purchase Order Shall Take Precedence. Nothing In This Contract/purchase Order, however, Shall Supersede Applicable Laws And Regulations Unless A Specific Exemption Has Been Obtained. drawing Data=ws6536 |30003| E| |d|0000 | E|49998|0010771 drawing Data=ws6536 |30003| E| |d|0001 | E|49998|0016415 drawing Data=ws6536 |30003| E| |d|0002 | E|49998|0017688 drawing Data=ws6536 |30003| E| |d|0003 | E|49998|0016334 drawing Data=ws6536 |30003| E| |d|0004 | E|49998|0027866 drawing Data=ws6536 |30003| E| |d|0005 | E|49998|0037260 drawing Data=ws6536 |30003| E| |d|0006 | E|49998|0037319 drawing Data=ws6536 |30003| E| |d|0007 | E|49998|0030189 drawing Data=ws6536 |30003| E| |d|0008 | E|49998|0033697 drawing Data=ws6536 |30003| E| |d|0009 | E|49998|0026793 drawing Data=ws6536 |30003| E| |d|0010 | E|49998|0022456 drawing Data=ws6536 |30003| E| |d|0011 | E|49998|0037153 drawing Data=ws6536 |30003| E| |d|0012 | E|49998|0024691 drawing Data=ws6536 |30003| E| |d|0013 | E|49998|0029589 drawing Data=ws6536 |30003| E| |d|0014 | E|49998|0015408 drawing Data=ws6536 |30003| E| |d|0015 | E|49998|0030197 drawing Data=ws6536 |30003| E| |d|0016 | E|49998|0032233 drawing Data=ws6536 |30003| E| |d|0017 | E|49998|0020760 drawing Data=ws6536 |30003| E| |d|0018 | E|49998|0013096 drawing Data=ws6536 |30003| E| |d|0019 | E|49998|0022933 drawing Data=ws6536 |30003| E| |d|0020 | E|49998|0032844 drawing Data=ws6536 |30003| E| |d|0021 | E|49998|0033000 drawing Data=ws6536 |30003| E| |d|0022 | E|49998|0015290 drawing Data=ws6536 |30003| E| |d|0023 | E|49998|0026111 drawing Data=ws6536 |30003| E| |d|0024 | E|49998|0018045 drawing Data=ws6536 |30003| E| |d|0025 | E|49998|0021755 drawing Data=ws6536 |30003| E| |d|0026 | E|49998|0011244 drawing Data=ws6536 |30003| E| |d|0027 | E|49998|0013588 drawing Data=ws6536 |30003| E| |d|0028 | E|49998|0019738 drawing Data=ws6536 |30003| E| |d|0029 | E|49998|0027640 drawing Data=ws6536 |30003| E| |d|0030 | E|49998|0010265 drawing Data=ws6536 |30003| E| |d|0031 | E|49998|0012222 drawing Data=ws6536 |30003| E| |d|0032 | E|49998|0021773 drawing Data=ws6536 |30003| E| |d|0033 | E|49998|0030134 drawing Data=ws6536 |30003| E| |d|0034 | E|49998|0027158 drawing Data=ws6536 |30003| E| |d|0035 | E|49998|0020239 drawing Data=ws6536 |30003| E| |d|0036 | E|49998|0026199 drawing Data=ws6536 |30003| E| |d|0037 | E|49998|0032083 drawing Data=ws6536 |30003| E| |d|0038 | E|49998|0013756 drawing Data=ws6536 |30003| E| |d|0039 | E|49998|0013406 drawing Data=ws6536 |30003| E| |d|0040 | E|49998|0014670 drawing Data=ws6536 |30003| E| |d|0041 | E|49998|0033474 drawing Data=ws6536 |30003| E| |d|0042 | E|49998|0016731 drawing Data=ws6536 |30003| E| |d|0043 | E|49998|0024937 drawing Data=ws6536 |30003| E| |d|0044 | E|49998|0016252 drawing Data=ws6536 |30003| E| |d|0045 | E|49998|0013265 drawing Data=ws6536 |30003| E| |d|0046 | E|49998|0022394 drawing Data=ws6536 |30003| E| |d|0047 | E|49998|0034868 drawing Data=ws6536 |30003| E| |d|0048 | E|49998|0034481 drawing Data=ws6536 |30003| E| |d|0049 | E|49998|0035941 drawing Data=ws6536 |30003| E| |d|005a | E|49998|0008378 drawing Data=ws6536 |30003| E| |d|0050 | E|49998|0010992 drawing Data=ws6536 |30003| E| |d|0051 | E|49998|0022778 drawing Data=ws6536 |30003| E| |d|0052 | E|49998|0018825 drawing Data=ws6536 |30003| E| |d|0053 | E|49998|0028727 drawing Data=ws6536 |30003| E| |d|0054 | E|49998|0035301 drawing Data=ws6536 |30003| E| |d|0055 | E|49998|0027590 drawing Data=ws6536 |30003| E| |d|0056 | E|49998|0025291 drawing Data=ws6536 |30003| E| |d|0057 | E|49998|0031367 drawing Data=ws6536 |30003| E| |d|0058 | E|49998|0037530 drawing Data=ws6536 |30003| E| |d|0059 | E|49998|0030892 drawing Data=ws6536 |30003| E| |d|0060 | E|49998|0040516 drawing Data=ws6536 |30003| E| |d|0061 | E|49998|0022115 drawing Data=ws6536 |30003| E| |d|0062 | E|49998|0028870 drawing Data=ws6536 |30003| E| |d|0063 | E|49998|0033641 drawing Data=ws6536 |30003| E| |d|0064 | E|49998|0035819 drawing Data=ws6536 |30003| E| |d|0065 | E|49998|0032881 drawing Data=ws6536 |30003| E| |d|0066 | E|49998|0031633 drawing Data=ws6536 |30003| E| |d|0067 | E|49998|0032841 drawing Data=ws6536 |30003| E| |d|0068 | E|49998|0036091 drawing Data=ws6536 |30003| E| |d|0069 | E|49998|0027637 drawing Data=ws6536 |30003| E| |d|007a | E|49998|0018311 drawing Data=ws6536 |30003| E| |d|0070 | E|49998|0030743 drawing Data=ws6536 |30003| E| |d|0071 | E|49998|0026680 drawing Data=ws6536 |30003| E| |d|0072 | E|49998|0036976 drawing Data=ws6536 |30003| E| |d|0073 | E|49998|0030400 drawing Data=ws6536 |30003| E| |d|0074 | E|49998|0027829 drawing Data=ws6536 |30003| E| |d|0075 | E|49998|0025967 drawing Data=ws6536 |30003| E| |d|0076 | E|49998|0021372 drawing Data=ws6536 |30003| E| |d|0077 | E|49998|0024032 drawing Data=ws6536 |30003| E| |d|0078 | E|49998|0025722 drawing Data=ws6536 |30003| E| |d|0079 | E|49998|0021230 drawing Data=ws6536 |30003| E| |d|0080 | E|49998|0021969 drawing Data=ws6536 |30003| E| |d|0081 | E|49998|0021491 drawing Data=ws6536 |30003| E| |d|0082 | E|49998|0031375 drawing Data=ws6536 |30003| E| |d|0083 | E|49998|0027202 drawing Data=ws6536 |30003| E| |d|0084 | E|49998|0008512 drawing Data=ws6536 |30003| E| |d|0085 | E|49998|0004926 drawing Data=ws6536 |30003| E| |d|0086 | E|49998|0074745 drawing Data=ws6536 |30003| E| |d|0087 | E|49998|0030595 drawing Data=ws6536 |30003| E| |d|0088 | E|49998|0030881 drawing Data=ws6536 |30003| E| |d|0089 | E|49998|0058392 drawing Data=ws6536 |30003| E| |d|0090 | E|49998|0065801 drawing Data=ws6536 |30003| E| |d|0091 | E|49998|0052362 drawing Data=ws6536 |30003| E| |d|0092 | E|49998|0065627 drawing Data=ws6536 |30003| E| |d|0093 | E|49998|0103313 drawing Data=ws6536 |30003| E| |d|0094 | E|49998|0100745 drawing Data=ws6536 |30003| E| |d|0095 | E|49998|0054231 drawing Data=ws6536 |30003| E| |d|0096 | E|49998|0063738 drawing Data=ws6536 |30003| E| |d|0097 | E|49998|0110005 drawing Data=ws6536 |30003| E| |d|0098 | E|49998|0105315 drawing Data=ws6536 |30003| E| |d|0099 | E|49998|0062527 drawing Data=ws6536 |30003| E| |d|0100 | E|49998|0041252 drawing Data=ws6536 |30003| E| |d|0101 | E|49998|0011024 drawing Data=ws6536 |30003| E| |d|0102 | E|49998|0022481 drawing Data=ws6536 |30003| E| |d|0103 | E|49998|0012965 drawing Data=ws6536 |30003| E| |d|0104 | E|49998|0015719 drawing Data=ws6536 |30003| E| |d|0105 | E|49998|0020372 drawing Data=ws6536 |30003| E| |d|0106 | E|49998|0010848 drawing Data=ws6536 |30003| E| |d|0107 | E|49998|0024405 drawing Data=ws6536 |30003| E| |d|0108 | E|49998|0030975 drawing Data=ws6536 |30003| E| |d|0109 | E|49998|0027138 drawing Data=ws6536 |30003| E| |d|011a | E|49998|0027764 drawing Data=ws6536 |30003| E| |d|0110 | E|49998|0029391 drawing Data=ws6536 |30003| E| |d|0111 | E|49998|0027850 drawing Data=ws6536 |30003| E| |d|0112 | E|49998|0027355 drawing Data=ws6536 |30003| E| |d|0113 | E|49998|0024498 drawing Data=ws6536 |30003| E| |d|0114 | E|49998|0015049 drawing Data=ws6536 |30003| E| |d|0115 | E|49998|0026461 drawing Data=ws6536 |30003| E| |d|0116 | E|49998|0028845 drawing Data=ws6536 |30003| E| |d|0117 | E|49998|0026155 drawing Data=ws6536 |30003| E| |d|0118 | E|49998|0025885 drawing Data=ws6536 |30003| E| |d|0119 | E|49998|0027184 drawing Data=ws6536 |30003| E| |d|012a | E|49998|0009929 drawing Data=ws6536 |30003| E| |d|0120 | E|49998|0028317 drawing Data=ws6536 |30003| E| |d|0121 | E|49998|0019263 drawing Data=ws6536 |30003| E| |d|0122 | E|49998|0029208 drawing Data=ws6536 |30003| E| |d|015a | E|49998|0014954 drawing Data=ws6536 |30003| E| |d|048a | E|49998|0015985 drawing Data=ws6536 |30003| E| |d|051a | E|49998|0010734 drawing Data=ws6536 |30003| E| |d|054a | E|49998|0006844 drawing Data=ws6536 |30003| E| |d|068a | E|49998|0007854 drawing Data=5528078 |53711| -| |d|0001 | -|49998|0065063 drawing Data=5528078 |53711| -| |d|0002 | -|49998|0073431 drawing Data=5528078 |53711| -| |d|0003 | -|49998|0078148 drawing Data=5528078 |53711| -| |d|0004 | -|49998|0080725 drawing Data=5528078 |53711| -| |d|0005 | -|49998|0068108 drawing Data=5528078 |53711| -| |d|0006 | -|49998|0071819 drawing Data=5727573 |53711| C| |d|0001 | C|49998|0081448 drawing Data=5727573 |53711| C| |d|0002 | C|49998|0072228 drawing Data=5727573 |53711| C| |d|0003 | C|49998|0056328 drawing Data=5727573 |53711| C| |d|0004 | C|49998|0082674 drawing Data=5727573 |53711| C| |d|0005 | C|49998|0068071 drawing Data=5727573 |53711| C| |d|0006 | C|49998|0067326 drawing Data=5727573 |53711| C| |d|0007 | C|49998|0039199 drawing Data=5727573 |53711| C| |d|0008 | C|49998|0032135 drawing Data=5727573 |53711| C| |d|0009 | C|49998|0047193 drawing Data=5727573 |53711| C| |d|0010 | C|49998|0109287 drawing Data=5727573 |53711| C| |d|0011 | C|49998|0031263 drawing Data=5727573 |53711| C| |d|0012 | C|49998|0037875 drawing Data=5727573 |53711| C| |d|0013 | C|49998|0035904 drawing Data=5727573 |53711| C| |d|0014 | C|49998|0029194 drawing Data=5727573 |53711| C| |d|0015 | C|49998|0033416 drawing Data=5727573 |53711| C| |d|0016 | C|49998|0036036 drawing Data=5727573 |53711| C| |d|0017 | C|49998|0041405 drawing Data=5727573 |53711| C| |d|0018 | C|49998|0030864 drawing Data=5727573 |53711| C| |d|0019 | C|49998|0046536 drawing Data=5727573 |53711| C| |d|0020 | C|49998|0034148 drawing Data=5727573 |53711| C| |d|0021 | C|49998|0068847 drawing Data=5727573 |53711| C| |d|0022 | C|49998|0053652 drawing Data=5727573 |53711| C| |d|0023 | C|49998|0044018 drawing Data=5727573 |53711| C| |d|0024 | C|49998|0062166 drawing Data=5727573 |53711| C| |d|0025 | C|49998|0064146 drawing Data=5727573 |53711| C| |d|0026 | C|49998|0044757 drawing Data=5727573 |53711| C| |d|0027 | C|49998|0051027 drawing Data=5727573 |53711| C| |d|0028 | C|49998|0080805 drawing Data=5727573 |53711| C| |d|0029 | C|49998|0068028 drawing Data=5727573 |53711| C| |d|0030 | C|49998|0068980 drawing Data=5727573 |53711| C| |d|0031 | C|49998|0097232 drawing Data=5727596 |53711| B|fn |d|0001 | B|49998|0307060 drawing Data=5727670 |53711| A| |d|0001 | A|49998|0052596 drawing Data=5727670 |53711| A| |d|0002 | A|49998|0041867 drawing Data=5727670 |53711| A| |d|0003 | A|49998|0031465 drawing Data=5729277 |53711| M|fn |d|0001 | M|49998|0079488 drawing Data=5729277 |53711| M|pl |d|0001 | M|49998|0025368 drawing Data=5729277 |53711| M|pl |d|0002 | M|49998|0037670 drawing Data=5729277 |53711| M|pl |d|0003 | M|49998|0010565 drawing Data=5729368 |53711| A|fn |d|0001 | A|49998|1062944 drawing Data=5729374 |53711| -| |d|0001 | -|49998|0052363 drawing Data=5729374 |53711| -| |d|0002 | -|49998|0059005 drawing Data=5729374 |53711| -| |d|0003 | -|49998|0047272 drawing Data=5729374 |53711| -| |d|0004 | -|49998|0050506 drawing Data=5729374 |53711| -| |d|0005 | -|49998|0052728 drawing Data=5729382 |53711| A|fn |d|0001 | A|49998|0382277 drawing Data=5729428 |53711| A| |d|0001 | A|49998|0058563 drawing Data=5729428 |53711| A| |d|0002 | A|49998|0084786 drawing Data=5729428 |53711| A| |d|0003 | A|49998|0084041 drawing Data=5729428 |53711| A| |d|0004 | A|49998|0078077 drawing Data=5729428 |53711| A|pl |d|0001 | A|49998|0015384 drawing Data=5729428 |53711| A|pl |d|0002 | A|49998|0037266 drawing Data=5729445 |53711| E|fn |d|0001 | E|49998|9999999 drawing Data=5729941 |53711| A| |d|0001 | A|49998|0141085 drawing Data=5729941-7 |53711| A|pl |d|0001 | A|49998|0027691 drawing Data=6239880 |53711| C|fn |d|0001 | C|49998|0181784 drawing Data=6558346 |53711| A| |d|0000.c0v | A|49998|0020797 drawing Data=6558346 |53711| A| |d|0000.i | A|49998|0017283 drawing Data=6558346 |53711| A| |d|0000.ii | A|49998|0016020 drawing Data=6558346 |53711| A| |d|0000.iii | A|49998|0040970 drawing Data=6558346 |53711| A| |d|0000.iv | A|49998|0037760 drawing Data=6558346 |53711| A| |d|0000.v | A|49998|0018755 drawing Data=6558346 |53711| A| |d|0001 | A|49998|0044386 drawing Data=6558346 |53711| A| |d|0002 | A|49998|0035575 drawing Data=6558346 |53711| A| |d|0003 | A|49998|0052310 drawing Data=6558346 |53711| A| |d|0004 | A|49998|0063782 drawing Data=6558346 |53711| A| |d|0005 | A|49998|0066192 drawing Data=6558346 |53711| A| |d|0006 | A|49998|0058663 drawing Data=6558346 |53711| A| |d|0007 | A|49998|0073076 drawing Data=6558346 |53711| A| |d|0008 | A|49998|0018726 drawing Data=6558346 |53711| A| |d|0009 | A|49998|0015898 drawing Data=6558346 |53711| A| |d|0010 | A|49998|0020259 drawing Data=6558346 |53711| A| |d|0011 | A|49998|0055953 drawing Data=6558346 |53711| A| |d|0012 | A|49998|0019773 drawing Data=6558346 |53711| A| |d|0013 | A|49998|0042533 drawing Data=6558346 |53711| A| |d|0014 | A|49998|0069692 drawing Data=6558346 |53711| A| |d|0015 | A|49998|0067183 drawing Data=6558346 |53711| A| |d|0016 | A|49998|0040306 drawing Data=6558346 |53711| A| |d|0017 | A|49998|0043966 drawing Data=6558346 |53711| A|1n |d|0001 | A|49998|0055725 drawing Data=6558346 |53711| A|1n |d|0002 | A|49998|0020551 drawing Data=6558346 |53711| A|1n |d|0003 | A|49998|0027304 drawing Data=6558346 |53711| A|1n |d|0004 | A|49998|0023509 drawing Data=6558346 |53711| A|1n |d|0005 | A|49998|0019763 drawing Data=6558346 |53711| A|1n |d|0006 | A|49998|0025462 drawing Data=6558346 |53711| A|1n |d|0007 | A|49998|0022227 document Ref Data=mil-std-129 | | |p |041029|a| |03| document Ref Data=iso9001 | | | |010417|a| | | document Ref Data=mil-std-973 | | | |950113|a| |03| 3. Requirements 3.1 Design, Manufacture, And Performance - Except As Modified Herein, the Cable Assembly,spec Furnished Under This Contract/purchase Order Shall Meet The design, Manufacture, And Performance Requirements Specified On Drawing ;53711 5729277; cage ; . 3.2 Marking - This Item Shall Be Physically Identified In Accordance with ;mil-std-129; . 3.3 Configuration Control - Mil-std-973 Entitled "configuration Management", Paragraph 5.4.8, Configuration Control (short Form Procedure), Is Hereby Incorporated. The Contractor Shall Submit All Engineering Change Proposals In Accordance With Mil-std-973, paragraph 5.4.8.2 And Appendix D. Requests For Deviations Shall Be Processed In Accordance With Mil-std-973, Paragraph 5.4.8.3 And Appendix E. Requests For Waivers Shall Be Processed In Accordance With Mil-std-973, Paragraph 5.4.8.4 And Appendix E. (original and Two Copies Shall Be Submitted To Contracting Officer, Navicp-mech, P. O. Box 2020, Mechanicsburg Pa. 17055-0788.) 3.3.1 Configuration Control - When The Contractor Has Received Authorization On A Prior Contract For The Same Nsn For The Use Of A Drawing Of A Later Revision Status, That Authorization Is Hereby Extended To All Succeeding Contracts/purchase Orders Until another Drawing Revision Is Approved. The Contractor Will Notify The Pco Of This Occurrence In Each Instance, In The Response To The Solicitation. Such Notification Shall Be In Writing Setting Forth The Contract Under Which The Prior Authorization Was Granted, the Date Of The Granting Of The Authorization, And The Name Of The Granting Authority. Contractors Shall Also Refer Technical Inquiries (other Than Those Covered By Mil-std-973) On Company Letterhead Signed By A Responsible Company Official, With Copies Distributed As Stated Below. The Original And Two Copies Of All Contractor Generated Correspondence Regarding Configuration Shall Be Submitted To Contracting Officer, Navicp-mech, P.o. Box 2020, Mechanicsburg, Pa 17055-0788. Contractors Are Cautioned That Implementing Engineering Changes, Waivers, Deviations Or Technical Inquiries Into The Contract/purchase Order Without Approval Of The Contracting Officer Will Be At The Sole Risk Of The Contractor. 3.4 Mercury Free - The Material Supplied Under This Contract/purchase Order Is Intended For Use On Submarines/surface Ships And Therefore Shall Contain No Metallic Mercury And Shall Be Free From Mercury Contamination. Mercury Contamination Of The Material will Be Cause For Rejection. If The Inclusion Of Metallic Mercury Is Required As A Functional Part Of The Material Furnished Under This Contract, The Contractor Shall Obtain Written Approval From The Procurement Contracting Officer Before Proceeding With Manufacture. The contractor's Request Shall Explain In Detail The Requirements For Mercury, Identify Specifically The Parts To Contain Mercury, And Explain The Method Of Protection Against Mercury Escape. Such A Request Will Be Forwarded Directly To The Procurement Contracting officer With A Copy To The Applicable Government Inspector. Upon Approval By The Contracting Officer, The Vendor Will Provide A "warning Plate" Stating That Metallic Mercury Is A Functional Part Of The Item And Will Include Name And Location Of That Part. The Use Of Mercury, Mercury Compounds, Or Mercury-bearing Instruments And/or Equipment In A Manner Which Might Cause Contamination In The Manufacture, Assembly, Or Test Of Material On This Contract Is Prohibited. The Most Probable Causes Of contamination Are Direct-connected Manometers, Mercury Vacuum Pumps, Mercury Seals, Or The Handling Of Mercury In The Immediate Vicinity. Mercury Switches, Mercury In Glass Thermometers, Standard Cells And Other Items Containing Mercury May Be Used If They Are located So As Not To Constitute A Contamination Hazard. If External Contamination By Metallic Mercury Occurs Or Is Suspected, The Following Test May Be Used To Determine Whether Contamination By Metallic Mercury Exists Or Whether Corrective Cleaning Measures Have Been Effective. Enclose The Equipment In A polyethylene Bag Or Close-fitting Airtight Container For Eight Hours At Room Temperature (70 Degrees F Minimum).sample The Trapped Air And If Mercury Vapor Concentration Is 0.01 Mg/cu Meter Or More, The Material Is Mercury Contaminated Insofar As The requirements Of This Contract Are Concerned. These Requirements Shall Be Included In Any Subcontract Or Purchase Order Hereunder And The Contractor Shall Insure Subcontractor Compliance With These Requirements. Technical Questions Pertaining To These Requirements Shall Be Referred To The Procurement Contracting Officer Via The Cognizant Administrative Contracting Officer. For Background, The Following Information Is Provided: Mercury Is Corrosive To Gold, Silver, Nickel, Stainless Steels, Aluminum And Copper Alloys. Stainless Steels, Nickel, And Copper Alloys Are Widely Used In Reactor Plants And Other Submarine/surface Ship Systems. Accidental Trapping Of Mercury In A component Could Cause Serious Damage To Vital Parts. Mercury Is Also Toxic If Inhaled, Ingested, Or Absorbed Through The Skin. It Is Evident That Grave Consequences Could Result From Small Amounts Of Mercury Vapor Present In An Unreplenished Submarine/surface ship Atmosphere. 4. Quality Assurance 4.1 Responsibility For Inspection - Unless Otherwise Specified In The Contract/purchase Order, The Contractor Is Responsible For The Performance Of All Inspection Requirements As Specified Herein. Except As Otherwise Specified In The Contract/purchase Order, the Contractor May Use His Own Or Any Other Facilities Suitable For The Performance Of The Inspection Requirements Specified Herein, Unless Disapproved By The Government. The Government Reserves The Right To Perform Any Of The Inspections Set Forth In The specification Where Such Inspections Are Deemed Necessary To Assure Supplies And Services Conform To Prescribed Requirements. 4.2 Quality System Requirements - The Supplier Shall Provide And Maintain A Quality System Acceptable To The Government. The Quality System Requirements Shall Be In Accordance With Iso 9001. 4.2.1 ;suppliers Currently Using And Maintaining Inspection System Requirements To mil-i-45208 Are Granted Permission To Utilize This If Desired.; 4.3 Responsibility For Compliance - All Items Must Meet All Requirements Of This Contract/purchase Order. The Inspection Set Forth In This Specification Shall Become A Part Of The Contractor's Overall Inspection System Or Quality Program. The Absence Of Any inspection Requirements Shall Not Relieve The Contractor Of The Responsibility Of Assuring That All Products Or Supplies Submitted To The Government For Acceptance Comply With All Requirements Of The Contract/purchase Order. Sampling In Quality Conformance does Not Authorize Submission Of Known Defective Material, Either Indicated Or Actual, Not Does It Commit The Government To Acceptance Of Defective Material. 4.4 Records Of Inspection - (this Requirement Is Not Applicable To Government Purchase Orders) Records Of All Inspection Work Performed By The Contractor, As Referenced Elsewhere In This Contract, Shall Be Kept Complete And Available To The Government During the Performance Of The Contract And For A Period Of Four Years After Final Delivery Of Supplies. 5. Packaging 5.1 Preservation, Packaging, Packing And Marking - Preservation, Packaging, Packing And Marking Shall Be In Accordance With The Contract/purchase Order Schedule And As Specified Below. mil-std 2073 Packaging Applies As Found Elsewhere In The Schedule 6. Notes 6.1 Ordering Information For Document References - The Department Of Defense Single Stock Point (dodssp), Website Http://www.dsp.dla.mil/, Provides Product Information For The Department Of Defense Index Of Specifications And Standards (dodiss) (i.e.military/federal Specifications And Standards), Data Item Descriptions (dids), And Other Dodssp Products. a. Availability Of Cancelled Documents - The Dodssp Offers Cancelled Documents That Are Required By Private Industry In Fulfillment Of Contractual Obligations In Paper Format. Documents Can Be Requested By Phoning The Subscription Services Desk. b. Commercial Specifications, Standards, And Descriptions - These Specifications, Standards And Descriptions Are Not Available From Government Sources. They May Be Obtained From The Publishers Of The Applicable Societies. C. Ordnance Standards (os), Weapons Specifications (ws), And Navord Ostd 600 Pages - These Type Publications May Be Obtained By Submitting A Request To: Commander, Indian Head Division, Naval Surface Warfare Center Code 8410p, 101 Strauss Avenue Indian Head, Md 20640-5035 d. On Post-award Actions, Requests For "official Use Only" And "noforn" (not Releasable To Foreign Nationals) Documents Must Identify The Government Contract Number, And Must Be Submitted Via The Cognizant Defense Contract Management Command (dcmc) For certification Of Need For The Document. On Pre-award Actions Such Requests Must Be Submitted To The Pco For Certification Of Need For The Document. e. Noforn Military Specifications And Standards (including Amendments, Change Notices And Supplements, But Not Interim Changes) To Be Ordered From: Contracting Officer Navicp-mech Code 87321 5450 Carlisle Pike P.o. Box 2020 Mechanicsburg, Pa. 17055-0788 f. Nuclear Reactor Publications Assigned Navsea Documents And Identification Numbers (i.e. Navsea Welding Standard, Navsea 250-1500-1) Are To Be Ordered From: Commanding Officer Navicp-mech Code 009 5450 Carlisle Pike P.o. Box 2020 Mechanicsburg, Pa. 17055-0788 g. Technical Manuals Assigned Navsea Identification Numbers (i.e. Navsea Welding And Brazing Procedure, Navsea S9074-aq-gib-010/248) Are To Be Ordered From: Naval Inventory Control Point Code 1 Support Branch 700 Robbins Avenue Phildelphia, Pa. 19111-5094 h. Interim Changes And Classified Specifications Shall Be Obtained By Submitting A Request On Dd Form 1425 To Navicp-mech.
Closing Date21 Jan 2025
Tender AmountRefer Documents 

LWG Lausitzer Wasser GmbH & Co KG Tender

Laboratory Equipment and Services
Germany
Details: - 1 new construction of pumping station made from concrete shaft, diameter approx. 1.50 m, left depth approx. 5.68 m with separate cover plate with stainless steel shaft cover 1.00x1.00 m, class A, ventilation chimney including earthworks and shoring, 2 KSB pumps, foot installation, 1 knife gate valve DN 400 - 1 valve shaft made from concrete shaft, diameter approx. 1.50 m, left depth approx. 2.40 m with valves and shaped pieces including earthworks and shoring - 20 m jacking pipe PP, DN/OD 280 x 18.0; length 0.47 m with start and finish pit - 1 start shaft made from reinforced concrete or steel, diameter 2.00 m including proportional earthworks - 20 m pressure line made from PE-HD DN/OD 90x8.2, drilling through including connection to existing. DL Dn/od 160x14.6 with start and finish pit - Conversion of existing pump shaft to sewer shaft including pulling in a PKS casing pipe Dn1000 with annular space filling and new shaft cover class A - 16 m protective pipe Pe-hd Da= 76mm for electrical connection with start and finish pit - 4 bollards red/white, fixed and retractable - Over-pumping operation - Road excavation and restoration, - Groundwater management - Traffic safety
Closing Date5 Feb 2025
Tender AmountRefer Documents 

VETERANS AFFAIRS, DEPARTMENT OF USA Tender

Civil And Construction...+1Others
United States
Details: Presolicitation Notice presolicitation Notice presolicitation Notice *=required Field presolicitation Notice this Pre-solicitation Notice Is Not A Request For Proposal. All Information Needed To Submit Sf330 Documents Are Contained Herein. No Additional Solicitation Package Or Technical Information Will Be Issued. project: 534-23-106 Ae Upgrade Mechanical Systems Phase 2 work Location: Ralph H. Johnson Health Care System, Charleston, Sc estimated/target Completion Period: 360 Calendar Days After Award. construction Magnitude: Between $5,000,000 And $10,000,000 naics: 541310 Architectural Services small Business Standard: $12.5 Million set-aside: 100% Service-disabled Veteran-owned Small Business (sdvosb) site Visits Will Not Be Arranged During This Phase. the Anticipated Award Date Of The Proposed A-e Contract Is On Or Before September 01, 2025. sf 330 Date Of Receipt/due Date: Interested Firms Having The Capabilities To Perform This Work Must Submit One (1) Electronic Sf330 And Attachments If Any, No Later Than (nlt) 10:00 Am (est) February 5, 2025. project Overview: provide Professional Architect/engineer (a/e) Services Necessary For A Complete Design To Replace The Main Laboratories Air Handling Unit, Correct Hvac And Mechanical Systems Deficiencies, And Provide Compliant Temperature Control And Air Change Requirements By Areas As Defined In The Limits Of Work. Additional Scope Includes Assessment And Replacement Of Isolation Exhaust Systems And Steam-to-hot Water Heat Exchangers And Associated Pumps Located In Penthouse, Specialty Clinics, And Eye Specialty Clinic. The Project Will Include Temporary Hvac Considerations And Phasing To Enable Continued Operations. sdvosb Set-aside: this Requirement Is A 100% Set-aside For Service-disabled Veteran-owned Small Businesses Under The Authority Of 38 U.s.c. 8127(d). To Be Eligible For Award The Sdvosb You Must Be Considered Small Under The Relevant Naics Code. Sdvosb Contractors Must Be Verified And Viewable In Small Business Administration Veteran Small Business Certification (vetcert) Database Https://veterans.certify.sba.gov Prior To Submission And Prior To Award Of Contract With Vaar 804.1103-70. Status As A Qualified Sdvosb Concern Is Under The Authority Of 38 Cfr Part 74 In Accordance With The Va Acquisition Regulation (vaar) Part 819. Any Person, Persons, Or Business Entity Suspected Of Misrepresenting Itself For The Purpose Of Securing A Government Contract May Be Criminally Investigated And Prosecuted For Fraud Against The United States Of America. Parties Found Misrepresenting Their Status Also Risk Debarment From Further Government Contracts. Eligible Sdvosb Concerns Must Also Be Registered At The Following Websites: system For Award Management (sam): Https://www.sam.gov/ vets100/100a Report Must Be Complete: Http://www.dol.gov/vets/vets4212.htm important Notice: Prior To Submitting A Package Under This Sdvosb Set- Aside Solicitation; Offerors Must Apply For And Receive Verification From The Small Business Administration In Accordance With 38 Cfr Part 74 And Vaar 819.70 By Submission Of Documentation Of Veteran Status, Ownership, And Control Sufficient To Establish Appropriate Status. All Offerors Are Urged To Contact The Sba And Submit The Required Documents To Obtain Verification Of Their Sdvosb Status If They Have Not Already Done So. for A Service-disabled Veteran Owned Small Business (sdvosb) To Be Considered As A Prospective Contractor, The Firm, Including Joint Ventures, Must Be Verified And Registered In The Small Business Administration Veteran Small Business Certification (vetcert) Database (https://veterans.certify.sba.gov) And Registered In The System For Award Management (sam) Database (www.sam.gov) At Time Of Submission Of Their Qualifications. Failure Of A Prospective Sdvosb To Be Verified By The Center For Veterans Enterprise (cve) At The Time The Sf 330 Is Submitted Shall Result In Elimination From Consideration. All Joint Ventures Must Be Cve Verified At Time Of Submission And Submit Agreements That Comply With 13cfr 125.15 Prior To Contract Award. sf 330 Selection Criteria: Evaluation Of Submission Requirements And Selection Criteria Are Provided Below And Listed In Relative Order Of Importance. note: Failure To Meet An Acceptable Submission Requirements For Each Criteria Will Result In The Entire Submission Being Denied For Further Evaluation. phase 1 Submission Requirements objective Scoring: Acceptable Submissions Meets All Submission Requirements Unacceptable Submission Fails To Meet At Least One Submission Requirement specialized Experience And Technical Competence In The Type Of Work Required. submission Requirements: sf 330 Information Shall Be Provided Per The Latest Format From The Gsa Library Located At Https://www.gsa.gov/forms-library/architect-engineer-qualifications. complete Using Blocks F. And H. Of The Sf330 Form. Complete Block F. For Each Relevant Project. Complete Block H. Summary Sheet For The Offeror And Each Key Consultant; Each Summary Sheet Shall Be Not More Than One (1) Page In Length. submit No More Than Five (5) Projects Similar To Required Work In The Solicitation From The Date The Solicitation Closes To Five (5) Years Prior; at Minimum, Three (3) Projects Must Be Construction Complete Or Construction Substantially (50%+) Complete; projects/data Submitted Shall Be Projects With Total Construction Costs Of $6,000,000 And Greater; projects May Include Federal, State, Or Local Government, As Well As Private Industry Projects. Offerors Are Responsible For Providing Project Description And Applicable Information In Sufficient Detail To Permit Evaluation Of Project Relevancy Versus These Minimum Requirements. past Performance On Contracts With Government Agencies And Private Industry In Terms Of Cost Control, Quality Work, And Compliance With Performance Schedules. submission Requirements: complete A Summary Sheet Using Block H. Of The Sf 330 Describing The Offeror S Past Performance. The Summary Sheet Shall Be Not More Than Two (2) Pages In Length. provide The Contractor Performance Assessment And Reporting System (cpars), Interim And Final Reports, For Each Submitted Federal Entity Project Under Specialized Experience Criteria, Above. If A Cpars Is Not Available, Provide A Ppq. if A Relevant Project Submitted Under Specialized Experience Criteria Does Not Have A Cpars Because It Is A Non-federal Entity Project, Provide A Past Performance Questionnaire (ppq). cpar And Ppq Reports Will Not Count Towards Page Limitations. professional Qualifications Necessary For Satisfactory Performance Of Required Services. submission Requirements: complete Using Block E. Of The Sf 330. Submit Personal Resumes And Relevant Information For Key And Responsible Personnel. Block E. Shall Be Not More Than One (1) Page In Length Per Individual. the Offeror Shall Have A Professional Engineer, Currently Registered In Any Us State Or Territory Of The United States, Knowledgeable In Their Registered Design Discipline, To Be The Lead Designer Responsible For Reviewing And Approving Design Submissions. the Offeror Shall Have A Professional Engineer, Qualified And Knowledgeable Of South Carolina State And Local Regulations, Be The Lead Designer Responsible For Reviewing And Approving Design Submissions And Facilitating Permit Documentation (depending On The Nature Of The Design I.e. Environmental, Hazardous Material Abatement, Stormwater, Etc.). key Personnel To Provide Qualifications To Meet This Criterion Include Principal(s), Project Manager(s), Key Consultants, Individuals Responsible For Implementation Of The Design Qa/qc Plan, Licensed Asbestos Inspector, Physical Security Specialist, Life Safety Specialist, And Other Individuals That Are Responsible Or Accountable For Design Submissions And Regulatory Compliance. physical Security Subject Matter Experts Shall Meet The Requirements Of Section 10.1.5 Of The Physical Security & Resiliency Design Manual. experience In Construction Period Services. submission Requirements: complete Using Block H. Of The Sf 330. Provide A Narrative That Describes The Offeror S Performance Completing Construction Period Services (cps) For Construction For Each Submitted Project Under Specialized Experience Criteria, Above. Narrative Shall Be Not More Than Two (2) Pages In Length. capacity To Accomplish The Work In The Required Time. submission Requirements: complete Using Block H. Of The Sf 330. Provide A Narrative That Describes The Offeror S Work Capacity. Narrative Shall Be Not More Than One (1) Page In Length. location In The General Geographical Area Of Charleston, Sc, And Knowledge Of The Locality Of The Ralph H. Johnson Va Facility: submission Requirements: complete Using Block H. Of The Sf 330. Provide A Narrative That Describes The Offeror S Experience In The Charleston, Sc Geographical Area. Narrative Shall Be Not More Than One (1) Page In Length. the Extent To Which Potential Contractors Identify And Commit To The Use Of Service-disabled Veteran-owned Small Businesses, Veteran-owned Small Businesses, And Other Types Of Small Businesses As Subcontractors: submission Requirements: complete Using Block H. Of The Sf 330. Provide A Narrative That Discusses The Offeror S Approach. Narrative Shall Be Not More Than One (1) Page In Length. offerors Shall Complete And Submit The Following Statement In Block H. : I [signatory Authority], Of [offeror Company Or Joint Venture] Certify That The Team Proposed To Perform Under This Requirement Demonstrates The Capability Of 50% Sdvosb Performance In Compliance Of 48 Cfr 852.219-10 . phase 2 Evaluation Of Selection Criteria specialized Experience And Technical Competence In The Type Of Work Required. basis Of Evaluation: specialized Experience Pertains To The Types, Size, Volume, Budget, And Complexity Of Work Previously Or Currently Being Performed By The Offeror That Is Comparable To The Work Covered By This Solicitation. Specialized Experience May Also Include Unique Conditions, Considerations, Or Circumstances Encountered That Are Relevant To This Solicitation. specialized Experience Does Not Include Overseas Offices For Projects Outside The United States, Its Territories, Or Possessions; Nor Does It Include Subsidiaries That Are Not Normally Subject To Management Decisions, Accounting, And Policies, Or A Holding Or Parent Company Or An Incorporated Subsidiary That Operates Under A Firm Name Different From The Parent Company. technical Competence Includes Construction And Design Projects Similar In Project Scope, Size, Construction Features, Dollar Value, And Complexity Of That Listed In The Solicitation. Technical Competence Also Includes Experience In Energy Conservation, Pollution Prevention, Waste Reduction, And The Use Of Recovered Materials. similar Complexity Is Considered Projects Of An Operational, Construction, Or Design Likeness To The Work Covered In The Solicitation. specific Emphasis Of Experience And Technical Competence Shall Be Geared Towards Fire Protection, Seismic Design/retrofit, Physical Security Resilience And Design, Healthcare Design/planning, Building Automatic System Design, And Mechanical/electrical System Design. past Performance On Contracts With Government Agencies And Private Industry In Terms Of Cost Control, Quality Work, And Compliance With Performance Schedules. basis Of Evaluation: past Performance Is A Measure Of The Degree To Which An Offeror Satisfied Its Customers Needs And Requirements And Compliance With Applicable Codes, Standards, Laws, And Regulations. The Evaluation Of Past Performance Will Include But Is Not Limited To: the Customer S Assessment Of The Offeror's Commitment To Customer Satisfaction; timely Delivery Of Quality Work; the Offeror's Record Of Conforming To Contract Requirements And Applicable Codes, Standards, Laws, And Regulations; successful Implementation Of A Quality Control Plan And Quality Control Procedures; addressing Design Errors/omissions Timely; adherence To Approved Schedules; And, history Of Timely And Professional Communication And Cooperative Behavior. include Information On Problems (errors/omissions) Found, How The Problems Were Corrected, And The Impacts To The Successful Completion Of The Project (time Delays, Cost Impacts, Design Modifications, Etc.). provide Information Supporting Favorable Cost Control, Quality Of Design Submissions, And Schedule Compliance. include A Discussion On The Offeror S Record Of Significant Claims For Improper Or Incomplete Design Services. higher Ratings May Be Given For Work Performed On Va Medical Center Campuses. adjectival Rating: offeror Risks Receiving A Lower Rating If Fewer Than Three (3) Ppqs Are Provided Or If The Ppqs Were Not Completed By Project Point Of Contact. failure To Demonstrate Proven Competence To Perform Projects With Similar Requirements To The Requirements Of The Solicitation May Be Considered Ineligible For Award. if No Cpars Or Ppqs Are Submitted Or Responses To Requests Were Not Provided, The Rating Shall Not Be Higher Than Satisfactory . professional Qualifications Necessary For Satisfactory Performance Of Required Services. basis Of Evaluation: evaluation Of Professional Qualifications Will Include But Is Not Limited To The Subjective Assessment Of The Offeror's Individual Resumes. the Offeror Shall Describe And/or Depict Which Projects And How Well Key Personnel Of The Design Team Have Worked Together. higher Ratings For This Criterion May Be Given When The Offeror's Specific Personnel Demonstrate Relevant Credentials, Such As Involvement And Degree Of Involvement In Professional Organizations, Research/publications, Code/standard Body Involvement, Etc. adjectival Scoring: offerors Unable To Demonstrate Professional Qualifications Necessary To Perform Designs May Be Considered Ineligible For Award. experience In Construction Period Services. basis Of Evaluation: experience In Construction Period Services To Include Professional Field Inspections During The Construction Period, Review Of Construction Submittals, Support In Answering Requests For Information During The Construction Period, And Support Of Construction Contract Changes To Include Drafting Statements Of Work, And Cost Estimates Shall Be Included As An Evaluation Criterion When Construction Period Services Is Included In The Statement Of Work For A-e Services. evaluation Of The Offeror S Knowledge, Skills, And Abilities To Complete Necessary Cps To Support Successful Project Completion. provide A Narrative Describing The Below Services, But Not Limited To: professional Field Inspections, Both Scheduled And Emergent; maintaining A Comprehensive Submittal Log Inclusive Of Material Data, Shop Drawings, Certifications, Etc.; review Of Construction Submittals For Design Conformance, Variance, And Applicable Code/standard Compliance; providing Timely And Complete Responses To Requests For Information; providing Supporting Documentation (statements Of Work, Cost Estimates, Technical Reports, Etc.) For Construction Modifications; providing Record Drawing Documentation; process For Correcting Design Errors/omissions Identified During Construction; And, other Requirements Defined Under Cps In The Statement Of Work. capacity To Accomplish The Work In The Required Time. basis Of Evaluation: identify The Offeror S Past, Present And Projected Future Workload, Including Va Contracts Over The Previous 12 Months. describe The Offeror S Capacity To Incorporate This Solicitation S Work While Meeting Prescribed Dates For Current Workload. Each Key Team Member To Include % Of Available Capacity To Take On New Projects. evaluation Of This Factor Will Be An Assessment Of The Offeror S Ability To Complete Design Documents Within The Period Of Performance And Meet Solicitation Requirements. data Is Acceptable In Tables Or Charts. capacity < 25% Shall Be Rated Not Greater Than Satisfactory. higher Ratings May Be Given For This Criterion When Information Provided Exceeds The Minimum Requirements. location In The General Geographical Area Of Charleston, Sc, And Knowledge Of The Locality Of The Ralph H. Johnson Va Facility: basis Of Evaluation: offerors Will Be Subjectively Evaluated Based On Their Knowledge (and The Knowledge Of Subcontractors) Of Unique Conditions Or Variables, Such As Familiarity Of Applicable Codes, Regulations, Construction Market & Labor Conditions, Geotechnical, Seismic, Weather, Environmental, Or Other Unique Considerations Found In Charleston, Sc And The Low Country Geographical Area. if Prior Experience In Charleston, Sc Is Minimal, Describe How The Design Team Plans To Obtain Specific Knowledge Of Local Conditions Or Project Features Required For A Compliant Design. data From Other Projects And Locations Are Acceptable To Highlight Knowledge Of The Charleston, Sc Geographical Area Or Areas Of Similar Nature. adjectival Scoring: offerors That Submit Relevant Projects Outside Of The Charleston, Sc Geographical Area May Be Given A Lower Rating Than Projects Within The Charleston, Sc Geographical Area. offerors That Demonstrate No Experience In The Geographical Area Shall Be Rated Not Higher Than Satisfactory . the Extent To Which Potential Contractors Identify And Commit To The Use Of Service-disabled Veteran-owned Small Businesses, Veteran-owned Small Businesses, And Other Types Of Small Businesses As Subcontractors: basis Of Evaluation: offerors Shall Be Evaluated Based On Their Utilization Plans For Service-disabled Veteran-owned Small Businesses (sdvosbs), Veteran-owned Small Businesses (vosbs), Or Other Types Of Small Businesses. offerors Shall Be Evaluated On The Expected Amount Of Work Versus Key Personnel To Verify The Above Signatory Statement. If Less Than 50% Of Work Is Estimated To Be Performed By The Prime Sdvosb, The Offeror May Be Given A Lower Rating. offerors Shall Submit Qualifications For Proposed Consultants Per Other Criteria In This Solicitation. selection Process: federal Acquisition Regulation (far) Part 36.6 (brooks Act) Selection Procedures Apply. The A-e Services Listed Herein Is Being Procured In Accordance With The Brooks Act (public Law 92-582) As Implemented In Federal Acquisition Regulation (far) 36.6 And Vaar 836.6. Pursuant To Far, The Firm Responding To This Requirement Must Be Permitted, By Law, To Practice The Professions Of Architecture Or Engineering And Meet All Required Qualifications For The State Of South Carolina. Firms Responding To This Announcement By Submitting A Qualifying Sf 330, Before The Closing Date And Time, Will Be Considered For Initial Selection Evaluation. Following Initial Evaluation Of The Sf330s Received Three Or More Firms That Are Considered The Most Highly Qualified To Provide The Type Of Services Required Will Be Selected For Interviews. Selected Firms Will Be Notified By Email Of Selection And Provided Further Instructions. selection And Evaluation Of Firms Shall Be Made Based On Sf 330 Submissions And Direct Responses To The Selection Criteria Identified Herein. Failure To Address All Selection Criteria Will Result In A Decreased Rating. evaluating Past Performance And Experience May Include Information Provided By The Firm, Customer Inquiries, Government Databases, And Contracting Officer Knowledge Of Current Project Performance. Failure To Provide Requested Data, Accessible Points Of Contact Or Valid Phone Numbers Could Result In A Firm Being Removed From Consideration. firms That Design Or Prepare Specifications In Conjunction With This Contract Are Prohibited From Participating On Any Future Construction Contracts Based On Those Documents. All Projects Identified On The Sf330 Must Be Completed By The Office/branch/individual Team Member Performing The Work Under This Contract. submission Criteria/requirements: The Sf 330 Form May Be Downloaded From Http://www.gsa.gov/portal/forms/type/sf. Completed Sf 330 S Shall Include The Primary Firms, Subcontractor Firms And Any Consultants Expected To Be Used On The Project. Do Not Submit Information Incorporating By Reference. Prospective Firms Shall Address All Selection Criteria Factors Within Their Submitted Sf330 Packages. email Capacity Is Limited To Five (5) To Seven (7) Megabytes (megs). the Following Format Shall Be Used: cover Page With Solicitation Number, Project Title table Of Contents sf 330 S copy Of Current A/e License copy Of Current Vetbiz.gov Sdvosb Certification uei Number cage Code tax Id Number the E Mail Address And Phone Number Of The Primary Point Of Contact. all Sf330 Submittals And Questions Must Be Sent Electronically To The Attention Of Jennifer Smith, Contract Specialist At Jennifer.smith19c497@va.gov. Please Provide Pre-solicitation Number, Project Number, Project Title, And Firm Name In Subject Line Of Email. When Submitting Sf330s, If More Than One Email Is Sent, Please Number Emails In Subjects As 1 Of N . Submittals Received After The Date And Time Identified On Page One (1) Will Not Be Considered. Firms Not Providing The Required Information May Be Negatively Evaluated. Facsimile Submittals Will Not Be Accepted. All Information Must Be Included In The Sf330. the Sf-330 Including Title Page, Table Of Contents, And Any Other Relevant Information Shall Be In A Common Font Size 12 Font, Single Spaced. The Package Shall Be Submitted As A Single Application-generated (not Scanned), Searchable Pdf Document. A Page Is Defined As Each Face Of An 8.5 X 11-inch Sheet Of Paper Containing Information. it Is The Offeror S Responsibility To Check The Sam.gov Contracting Business Opportunities Website At: Www.sam.gov For Any Revisions To This Announcement Prior To Submission Of Sf330s. attachments: see Attached Document: Ae Past Performance Questionnaire And Cover Letter.
Closing Date5 Feb 2025
Tender AmountRefer Documents 

City Government Iligan Tender

Civil And Construction...+2Building Construction, Construction Material
Philippines
Details: Description Invitation To Re-bid The Iligan City Government Bids And Awards Committee (bac), Through Gen Fund-20% / Sb No. 2 Cy 2024, Intend To Apply The Sum Of P 1,932,273.18 Being The Approved Budget For The Contract (abc) To Payments Under The Contract For Completion Of Child Minding Center, Buhanginan Hills, Brgy. Pala-o, Iligan City With Project No. Cb(b)-24-138 (ceo-infra) Re-bid. Bids Received In Excess Of The Abc Shall Be Automatically Rejected At Bid Opening. The Iligan City Government Bids And Awards Committee Now Invites For The Supply And Delivery Of Items Below-stated: Particulars Completion Of Child Minding Center, Buhanginan Hills, Brgy. Pala-o, Iligan City •masonry Works -chb Walling For Interior Walls (ground Floor & 2nd Floor) •plumbing -installation Of Plumbing Fixtures And Water Tank 2nd Floor) •steel Reinforcement -installation Of Deformed Steel Reinforcing Bars For Masonry Structures •ceillng Works -installation Of Ceiling Frame And Ceiling Boards (ground Floor & 2nd Floor) •electrical -installation Of Electrical Lines & Fixtures •doors -fabrication & Installation Of Interior Doors (ground Floor & 2nd Floor) I.project Billboard (q = 2.00 Sets) Includes 4' X 8' Tarpaulin, 8' X 8' Tarpaulin, 2"x3"x 14" Coco Lumber, 2"x3"x10" Coco Lumber, 2"x2"x8" Coco Lumber, Assorted Sizes C.w. Nails. Ii.occupational Safety And Health Program (q = 1.00 L.s.) Includes Safety Shoes, Safety Helmet, Safety Gloves, Specialized Ppe. Iii. Mobilization / Demobilization ( Q = 1.00 Lot) Iv.masonry Work (q = 287.21 Sq.m.) Includes 4" X 8" X 16" Chb (700psi), Portland Cement Type 1astm C-150 Pns 07, Washed Sand, Skim Coat (20kg). V. Steel Reinforcement (q = 843.80 Kgs.) Includes 10 Mmø X 6000mm Dsb (grade 40), #16 Gi Tie Wire. Vi. Ceiling Works (q = 456.05 Sq.m.) Includes 3.5mm Thk X 4" X 8" Hardilite Board, Double Furring (0.60mm Thk. X 17 X 49 X 17 X 5.00m), Blind Rivets, Concrete Nails (1-1/2"), Riveter (heavy Duty). Vii. Doors (q = 19.00- Units) Includes D1: 800mm X 2100mm Half Glass Door, Including Door Knob, Jambs And Accessories; D2: 800mm X 2100mm Panel Door, Including Door Knob, Jambs And Accessories; D3: 800mm X 2100mm Flush Door, Including Door Knob, Jambs And Accessories; D4: 700mm X 2100 Pvc Polydoor (heavy Duty), Including Door Knob, Jambs And Accessories. Viii. Plumbing (q = 1.00 Lot) Includes Water Closet With Complete Fittings And Accessories, American Standard; Lavatory With Complete Fittings And Accessories; Stainless Steel Kitchen Sink; 1hp Water Pump; 2000l Horizontal Stainless Steel Water Tank; Faucet, Us Patented. Ix. Electrical (q = 1.00 Lot) Includes Electric Wire (3.5mm2 Thhn Stranded Copper Wire); Electric Wire (5.5mm2 Thhn Stranded Copper Wire); Electric Wire (8.0mm2 Thhn Stranded Copper Wire); Electric Wire (14.0mm 2 Thhn Stranded Copper Wire); Electric Wire (30.0mm2 Thhn Stranded Copper Wire); Electric Wire (50.0mm2 Thhn Stranded Copper Wire); Switch, 1 Gang Switch W/ Led Set 10a 220v; Switch, 2 Gang Switch W/ Led Set 10a 220v; Switch, 3 Gang Switch W/ Led Set 10a 220v; Switch, 3 Way Single Gang W/ Led Set 10a 220v;led Downlight 12w; Led Panel Light 20w(300x300 Mm) Daylight Recessed Type; Duplex Convenience Outlet; Gfci 20a 2 Gang Gfci Safety Outlet; Range Outlet W/ Plate And Metal Box 50a; Air Conditioning Outlet 20a 250v; Electrical Tape 3/4" X 20 Yds; Junction Box, Pvc Octagonal W/ Cover 2"x 4"depth-type; Utility Box, 2"x 3" Depth-type W/ Cover; Circuit Breaker, 15at/50af 2pcb 230vac Bolt-on Type; Circuit Breaker, 20at/50af 2pcb 230vac Bolt-on Type; Circuit Breaker, 30at/50af 2pcb 230vac Bolt-on Type; Circuit Breaker, 60at/50af 2pcb 230vac Bolt-on Type Tqc; Circuit Breaker, 100at/50af 2pcb 230vac Bolt-on Type Tqd; Circuit Breaker, 150at/50af 2pcb 230vac Bolt-on Type Tqd; Panelboard, 8 Branches Bolt-on Type 2 Pole W/ Tqd Main Breaker; Panelboard, 12 Branches Bolt-on Type 2 Pole W/ Tqd Main Breaker; Enclosure For Main Circuit Breaker 150at Tqd; Service Entrance Cap, 32mm Dia. Emt; Electrical Metallic Tubing 32mm Dia.; Emt Clamp (32mm); Tox With Screw, Size 10; Emt Connector Set, Screw Type 32mm; Emt Elbow, 32mm; Cable Tie, Black Nylon 100pc/pack; Secondary Rack, 2 Pole Insulator; Grounding Rod, 5/8" X 4.75 Ft. W/ Clamp. Approved Budget For The Contract (abc): P 1,932,273.18 Required Bid Security: 2% Of The Abc If Cash, Manager’s Check; Bank Draft/guarantee, Irrevocable Letter Of Credit Confirmed Or Authenticated By A Universal Or Commercial Bank; And 5% Of The Abc If Surety Bond Callable Upon Demand Issued By A Surety Or Insurance Company Duly Certified By The Insurance Commission As Authorized To Issue Such Security Delivery Period Is Within Sixty-four (64) Calendar Days From Receipt Of Notice To Proceed. Bidders Should Have Completed, Within Three (3) Years From The Date Of Submission And Receipt Of Bids, A Contract Similar To The Project. The Description Of An Eligible Bidder Is Contained In The Bidding Documents, Particularly, In Section Ii. Instruction To Bidders. Bidding Will Be Conducted Through Open Competitive Bidding Procedures Using A Non-discretionary “pass/fail” Criterion As Specified In The Implementing Rules And Regulations (irr) Of Republic Act (ra) 9184, Otherwise Known As The “government Procurement Reform Act”. Bidding Is Restricted To Filipino Citizens/sole Proprietorships, Partnerships, Or Organizations With At Least Sixty Percent (60%) Interest Or Outstanding Capital Stock Belonging To Citizens Of The Philippines, And To Citizens Or Organizations Of A Country The Laws Or Regulations Of Which Grant Similar Rights Or Privileges To Filipino Citizens, Pursuant To Ra 5183 And Subject To Commonwealth Act 138. Interested Bidders May Obtain Further Information From Iligan City Government And Inspect The Bidding Documents During Office Hours From 8:00 A.m. – 12:00 P.m. And 1:00 P.m. – 5:00 P.m. At The Bac Office, 2nd Floor, Room 205, Left Wing, 2nd Floor, Sp Bldg., Buhanginan Hills, Palao, Iligan City. The Complete Schedule Of Activities Is Listed, As Follows: Activities Schedule 1. Issuance Of Bid Documents: January 7 – January 28, 2025 – 8:00 A.m. At Room 205, Left Wing, 2nd Floor, Sp Bldg., Buhanginan Hills, Palao, Iligan City. 2. Pre-bid Conference: January 14, 2025 – 9:30 A.m. At Casimero P. Cabigon Hall, 2nd Floor City Hall Main Bldg., Buhanginan Hills, Pala-o, Iligan City 3. Submission Of Bids: January 28, 2025 – 9:30 A.m. At Casimero P. Cabigon Hall, 2nd Floor City Hall Main Bldg., Buhanginan Hills, Pala-o, Iligan City 4. Opening Of Bids: January 28, 2025 – 9:30 A.m. At Casimero P. Cabigon Hall, 2nd Floor City Hall Main Bldg., Buhanginan Hills, Pala-o, Iligan City A Complete Set Of Bidding Documents Will Be Available To Prospective Bidders Upon Payment Of A Non-refundable Amount Of P 5,000.00 To The Iligan City Government Cashier, At The Bac Office, 2nd Floor, Room 205, Left Wing, 2nd Floor, Sp Bldg., Buhanginan Hills, Palao, Iligan City. The Iligan City Government Reserves The Right To Accept Or Reject Any Bid, To Annul The Bidding Process, And To Reject All Bids At Any Time Prior To Contract Award, Without Thereby Incurring Any Liability To The Affected Bidder Or Bidders. Furthermore, The City Government Of Iligan Assumes No Responsibility Whatsoever To Compensate Or Indemnify Bidders For Any Expense Or Loss Incurred In The Preparation And Submission Of The Eligibility Statements And Bids. Approved By: (signed)darwin J. Manubag, Phd. Bac Chairman Date Of Advertisement/posting: January 7, 2025 Place Of Posting/advertisement: City Hall/ibjt Bulletin Boards, Iligan Official Website, Phil-geps Itb No. 24-138 (ceo-infra)
Closing Date28 Jan 2025
Tender AmountPHP 1.9 Million (USD 33.2 K)

DEPT OF THE NAVY USA Tender

Machinery and Tools
United States
Description: Contact Information|4|n744.10|er4|n/a|zachary.r.morrill.civ@us.navy.mil| item Unique Identification And Valuation (jan 2023)|19|||||||||||||||||||| higher-level Contract Quality Requirement (navicp Review Feb 1991)(feb 1999)|1|see Specifications Section C And Section E.| inspection Of Supplies--fixed-price (aug 1996)|2||| production Lot Testing|1|186| inspection And Acceptance - Short Version|8|x||x|||||| desired And Required Time Of Delivery (june 1997)|29|clin0001aa|17|186|clin0001ab|18|186|||||||||||||||||||||||| general Information-fob-destination|1|b| wide Area Workflow Payment Instructions (jan 2023)|16|stand-alone Receiving Report - Certifications; Combo - Receiving Report & Invoice - Material|n/a|tbd|n00104|tbd|tbd|w25g1u - 17; W62g2t - 18|tbd|n/a|n/a|n/a|n/a|n/a|n/a|see Dd1423|| navy Use Of Abilityone Support Contractor - Release Of Offeror Information (3-18))|1|wss| equal Opportunity (sep 2016)|2||| warranty Of Supplies Of A Noncomplex Nature (june 2003)|6|one Year From Date Of Delivery.|one Year From Date Of Delivery.||||| warranty Of Data--basic (mar 2014)|2||| equal Opportunity For Workers With Disabilities (jun 2020)|2||| first Article Approval--contractor Testing (sep 1989)|10|1|w25g1u|30 Days |tbd|zachary Morrill & Zachary.r.morrill.civ@us.navy.mil|tbd|w62g2t|tbd||| option For Increased Quantity (mar 1989)|1|180| notice Of Total Small Business Set-aside (oct 2020)(deviation 2020-o0008)|1|| alternate A, Annual Representations And Certifications (oct 2024)|13||x |||||||||||| annual Representations And Certifications (may 2024)|13|332991|1250|||||||||||| notice Of Priority Rating For National Defense, Emergency Perpardeness, And Enrgy Progam Use (april 2008))|2||x| evaluation Of First Article Testing|3|||| 1. This Requirement Is Pursuant To Emergency Acquisition Flexibilities (eaf). 2. The Resultant Award Of This Solicitation Will Be Issued Bilaterally, Requiring The Contractor's Written Acceptance Prior To Execution. 3. All Contractual Documents (i.e. Contracts, Purchase Orders, Task Orders, Delivery Orders, And Modifications) Related To The Instant Procurement Are Considered To Be "issued" By The Government When Copies Are Either Deposited In The Mail, Transmitted By facsimile, Or Sent By Other Electronic Commerce Methods Such As Email. The Government's Acceptance Of The Contractor's Proposal Constitutes Bilateral Agreement To "issued" Contractual Documents As Detailed Herein. 4. If Requirement Will Be Packaged At A Location Different From The Offeror's Address, The Offeror Shall Provide The Name, Street Address, And Cage Of The Facility. 5. Any Contract Awarded As A Result Of This Solicitation Will Be Do Certified For National Defense Under The Defense Priorities And Allocations System (dpas). Provision 52.211-14, Notice Of Priority Rating For National Defense, Emergency Preparedness, And Energy program Use, Shall Be Inserted In Solicitations When The Contract To Be Awarded Shall Be A Rated Order. 6. If Drawings Are Included In The Solicitation, Access Needs To Be Requested On The Individual Solicitation Page Under Contract Opportunities On Sam.gov Website. After Requesting Access, Send An Email To The Poc Listed On The Solicitation. 7. The Government Retains The Option To Order An Additional Quantity Up To 100% Of This Order For 180 Days Aro At The Same Price. The Government May Choose To Exercise This Option Or Not. 8. This Solicitation Requires First Article Testing (fat). See Far 52.209-3 First Article Approval - Contractor Testing For More Details. \ 1. Scope 1.1 ;this Procurement Specification Contains The Requirements For Manufacture And The Contract Quality Requirements For ;bearing, Mast; For Use On Navy Submarines.; 2. Applicable Documents 2.1 Applicable Documents - The Document(s) Listed Below Form A Part Of This Contract/purchase Order Including Modifications Or Exclusions. 2.1.1 Documents, Drawings, And Publications Supplied Are Listed Under "drawing Number". These Items Should Be Retained Until An Award Is Made. 2.1.2 "document References" Listed Below Must Be Obtained By The Contractor. Ordering Information Is Included As An Attachment To This Contract/purchase Order. 2.1.3 The "document Changes" Section Provides Supersessions/changes To Referenced Documents. 2.2 Order Of Precedence - In The Event Of A Conflict Between The Text Of This Contract/purchase Order And The References And/or Drawings Cited Herein, The Text Of This Contract/purchase Order Shall Take Precedence. Nothing In This Contract/purchase Order, however, Shall Supersede Applicable Laws And Regulations Unless A Specific Exemption Has Been Obtained. drawing Data=4491147 |53711| J| |d|0001 | J|49998|0437522 document Ref Data=mil-std-973 | | | |000930|a| |04| document Ref Data=mil-std-130n | | | |121116|a| |01| document Ref Data=asme B46.1 | | | |090101|a| | | document Ref Data=iso 10012 | | | |030415|a| | | document Ref Data=ncsl Z540.3 | | | |060803|a| | | document Ref Data=fed-std-28/20b | | | |940310|a| | | document Ref Data=mil-i-45208a | | | |951103|a|2 | | document Ref Data=astm B150/b150m-2019 | | | | |a| | | document Ref Data=iso9001 | | | |150915|a| | | document Change Data=mil-b-24059 |astm B150/b150m 3. Requirements 3.1 ;design And Manufacturing - The ;bearing, Mast; Furnished Under This Contract/purchase Order Shall Meet The Material, Physical And Mechanical Requirements As Specified On Drawing 4491147, Item No. 7 Including Associated Specifications Mentioned In This procurement.; 3.1.1 ;the ;bearing, Mast; Shall Be Manufactured From Nickel-aluminum-bronze Material Per Specification Astm B150/150m In Lieu Of Mil-b-24059 Listed On Drawing 4491147, Item No. 7.; 3.2 ;marking Requirements - The Supplier Shall Permanently Identify And Mark Each Production Lot Unit ;bearing, Mast; In Accordance With Notes 5 And 12 (a) And (b) Of Drawing 4491147 Per Mil-std-130.; 3.2.1 ;the Supplier Shall Mark ;bag Or Tag; Each Part With Contract And Heat Number Per Mil-std-130.; 3.3 ;notification - The Supplier Shall Notify Naval Surface Warfare Center, Philadelphia Division, (nswcpd), 5001 S. Broad Street, Philadelphia, Pa 19112-1403 By Email Matthew.ogilvie@navy.mil, Code 242mo After Award Of Contract.; 3.3.1 ;the Nswcpd Is The Acceptance Activity For The Contract Data Requirements List (dd1423) Data Items. Nswcpd Wawf/irapt ;acceptor; Dodacc Is ;n64498;.; 3.4 Configuration Control - Mil-std-973 Entitled "configuration Management", Paragraph 5.4.8, Configuration Control (short Form Procedure), Is Hereby Incorporated. The Contractor Shall Submit All Engineering Change Proposals In Accordance With Mil-std-973, paragraph 5.4.8.2 And Appendix D. Requests For Deviations Shall Be Processed In Accordance With Mil-std-973, Paragraph 5.4.8.3 And Appendix E. Requests For Waivers Shall Be Processed In Accordance With Mil-std-973, Paragraph 5.4.8.4 And Appendix E. (original and Two Copies Shall Be Submitted To Contracting Officer, Navicp-mech, P. O. Box 2020, Mechanicsburg Pa. 17055-0788.) 3.4.1 Configuration Control - When The Contractor Has Received Authorization On A Prior Contract For The Same Nsn For The Use Of A Drawing Of A Later Revision Status, That Authorization Is Hereby Extended To All Succeeding Contracts/purchase Orders Until another Drawing Revision Is Approved. The Contractor Will Notify The Pco Of This Occurrence In Each Instance, In The Response To The Solicitation. Such Notification Shall Be In Writing Setting Forth The Contract Under Which The Prior Authorization Was Granted, the Date Of The Granting Of The Authorization, And The Name Of The Granting Authority. Contractors Shall Also Refer Technical Inquiries (other Than Those Covered By Mil-std-973) On Company Letterhead Signed By A Responsible Company Official, With Copies Distributed As Stated Below. The Original And Two Copies Of All Contractor Generated Correspondence Regarding Configuration Shall Be Submitted To Contracting Officer, Navicp-mech, P.o. Box 2020, Mechanicsburg, Pa 17055-0788. Contractors Are Cautioned That Implementing Engineering Changes, Waivers, Deviations Or Technical Inquiries Into The Contract/purchase Order Without Approval Of The Contracting Officer Will Be At The Sole Risk Of The Contractor. 3.5 Mercury Free - The Material Supplied Under This Contract/purchase Order Is Intended For Use On Submarines/surface Ships And Therefore Shall Contain No Metallic Mercury And Shall Be Free From Mercury Contamination. Mercury Contamination Of The Material will Be Cause For Rejection. If The Inclusion Of Metallic Mercury Is Required As A Functional Part Of The Material Furnished Under This Contract, The Contractor Shall Obtain Written Approval From The Procurement Contracting Officer Before Proceeding With Manufacture. The contractor's Request Shall Explain In Detail The Requirements For Mercury, Identify Specifically The Parts To Contain Mercury, And Explain The Method Of Protection Against Mercury Escape. Such A Request Will Be Forwarded Directly To The Procurement Contracting officer With A Copy To The Applicable Government Inspector. Upon Approval By The Contracting Officer, The Vendor Will Provide A "warning Plate" Stating That Metallic Mercury Is A Functional Part Of The Item And Will Include Name And Location Of That Part. The Use Of Mercury, Mercury Compounds, Or Mercury-bearing Instruments And/or Equipment In A Manner Which Might Cause Contamination In The Manufacture, Assembly, Or Test Of Material On This Contract Is Prohibited. The Most Probable Causes Of contamination Are Direct-connected Manometers, Mercury Vacuum Pumps, Mercury Seals, Or The Handling Of Mercury In The Immediate Vicinity. Mercury Switches, Mercury In Glass Thermometers, Standard Cells And Other Items Containing Mercury May Be Used If They Are located So As Not To Constitute A Contamination Hazard. If External Contamination By Metallic Mercury Occurs Or Is Suspected, The Following Test May Be Used To Determine Whether Contamination By Metallic Mercury Exists Or Whether Corrective Cleaning Measures Have Been Effective. Enclose The Equipment In A polyethylene Bag Or Close-fitting Airtight Container For Eight Hours At Room Temperature (70 Degrees F Minimum).sample The Trapped Air And If Mercury Vapor Concentration Is 0.01 Mg/cu Meter Or More, The Material Is Mercury Contaminated Insofar As The requirements Of This Contract Are Concerned. These Requirements Shall Be Included In Any Subcontract Or Purchase Order Hereunder And The Contractor Shall Insure Subcontractor Compliance With These Requirements. Technical Questions Pertaining To These Requirements Shall Be Referred To The Procurement Contracting Officer Via The Cognizant Administrative Contracting Officer. For Background, The Following Information Is Provided: Mercury Is Corrosive To Gold, Silver, Nickel, Stainless Steels, Aluminum And Copper Alloys. Stainless Steels, Nickel, And Copper Alloys Are Widely Used In Reactor Plants And Other Submarine/surface Ship Systems. Accidental Trapping Of Mercury In A component Could Cause Serious Damage To Vital Parts. Mercury Is Also Toxic If Inhaled, Ingested, Or Absorbed Through The Skin. It Is Evident That Grave Consequences Could Result From Small Amounts Of Mercury Vapor Present In An Unreplenished Submarine/surface ship Atmosphere. 4. Quality Assurance 4.1 Responsibility For Inspection - Unless Otherwise Specified In The Contract/purchase Order, The Contractor Is Responsible For The Performance Of All Inspection Requirements As Specified Herein. Except As Otherwise Specified In The Contract/purchase Order, the Contractor May Use His Own Or Any Other Facilities Suitable For The Performance Of The Inspection Requirements Specified Herein, Unless Disapproved By The Government. The Government Reserves The Right To Perform Any Of The Inspections Set Forth In The specification Where Such Inspections Are Deemed Necessary To Assure Supplies And Services Conform To Prescribed Requirements. 4.2 Responsibility For Compliance - All Items Must Meet All Requirements Of This Contract/purchase Order. The Inspection Set Forth In This Specification Shall Become A Part Of The Contractor's Overall Inspection System Or Quality Program. The Absence Of Any inspection Requirements Shall Not Relieve The Contractor Of The Responsibility Of Assuring That All Products Or Supplies Submitted To The Government For Acceptance Comply With All Requirements Of The Contract/purchase Order. Sampling In Quality Conformance does Not Authorize Submission Of Known Defective Material, Either Indicated Or Actual, Not Does It Commit The Government To Acceptance Of Defective Material. 4.3 Records - Records Of All Inspection Work By The Contractor Shall Be Kept Complete And Available To The Government During The Performance Of Contract/purchase Order And For A Period Of 365 Calendar Days After Final Delivery Of Supplies. 4.4 ;inspection System - The Supplier's Quality Inspection System Shall Be In Accordance With Mil-i-45208 Or Iso 9001 And Ncsl Z540.3 Or Iso 10012. The Supplier Shall Develop And Submit Their Written Quality Inspection And Test Plan As Indicated On The contract Data Requirements List (dd Form 1423). Government Approval Of The Supplier's Written Quality Inspection And Test Plan Is Required By The Contract. cdrl: Quality Inspection & Test Plan Per Mil-i-45208, Ncsl Z540.3 And Di-qcic-81110; 4.5 ;surface Roughness - All Surface Finishes Are In Rms Measurements. Where The Degree Of Surface Roughness Is Indicated, The Surface Shall Free From All Visible Imperfections As Defined By Standard Asme B46.1.; 4.6 ;finished Edges - Finished Edges Shall Be In Accordance With The Applicable Drawing Requirements.; 4.7 ;threads - Threads Shall Be Inspected In Accordance With Fed-std-h28/20 System 21 Requirements. Thread Inspection Shall Include The Measurement And Recording Of The Major Diameter For External Threads And The Minor Diameter For Internal Threads.; 4.8 ;material Control - The Supplier Shall Have An Effective Material Control System That Provides For Certified Quantitative Mill Or Industrial Laboratory Reports Of Chemical And Physical Analysis By Heat, Lot Or Batch For Raw Material Ordered For production Units. If The Material(s) Is Subsequently Heat-treated, A Certification Of Physical Analysis, After Heat Treatment, Is Also Required For Each Heat, Lot Or Batch. Also, Where The Applicable Material Specification Calls Out (e.g. Corrosion Resistance test, Macro-etch Test, Etc.,) These Test Results Shall Also Be Reported On The Applicable Mill Or Industrial Laboratory Report. The Physical Analysis Shall Establish The Following Properties For Metallic Part: Ultimate Tensile Strength, Yield Strength And elongation.; 4.9 ;production Lot.; 4.9.1 ;visual/dimensional Inspection - The Supplier Shall Visually And Physically Inspect 100% The Production Lot Units And Record The Actual Measurements Of Each Dimension And Thread (including The Minor Diameter For Internal Threads) Identified On The applicable Drawing. Threads Shall Be Inspected 100% And Results Recorded.; 4.10 ;production Lot Inspection/acceptance - (supplier Testing/inspection). The Supplier Shall Submit For The Production Lot Units, The Inspection And Test Reports Identified In The Objective Quality Evidence Records Section Of This Document And As indicated On The Contract Data Requirements List (dd Form 1423). Government Approval Is Required Prior To Shipment Of Production Units.; 4.11 ;final Inspection And Acceptance - Final Inspection And Acceptance Of Production Lots Shall Be Made By The Cognizant Dcma-qar. Nswcpd Shall Either Issue Specific Government Inspection Instructions Or Inspection Hold Points Based On Whether Dcma Or nswcpd Will Be Performing The Required Inspections/tests. In Addition To The Normal Dcma Surveillance, The Production Unit(s) Shall Be Under The Surveillance Of Nswcpd Quality Assurance Specialist As Required.; 4.12 ;objective Quality Evidence Records - The Supplier Shall Maintain Objective Quality Evidence Data (oqeds) Of Raw Material And Finished Parts. Records Shall Be Traceable By Drawing/item, Heat And Contract Number. All Oqeds Shall Be Clearly Legible including Name And Title. The Supplier May Provide Exact (quality) Photocopies Of Objective Quality Evidence Records Being Delivered Under This Purchase Order Instead Of Originals.; 4.12.1 ;the Supplier Shall Furnish A Copy Of The Following Oqeds Listed Below And As Indicated On The Contract Data Requirements List (dd Form 1423) For Acceptance. The Reports Shall Be Correlated To The Drawing/item, Heat And Contract Number. Supplier format Is Acceptable For The Below Listed Cdrls. A. Certified Quantitative Mill Or Industrial Laboratory Certification (chemical And Physical Analysis). cdrl: Certified Quantitative Mill Certification Per Di-misc-80678 B. Visual/dimensional Inspection Reports Shall Show All The Characteristics, The Actual Measurement Of Each Dimension Inspected Including Threads (also The Minor Diameter For Internal Threads) Contract Number, Name Of Supplier, Drawing/item Number, Drawing revision Letter And Heat Number Of Finished Parts, Item Nomenclature And Inspector's Acceptance Signature And Date. cdrl: Visual/dimensional Inspection Report Per Di-ndti-80809b C. Mercury Exclusion Certification (representing The Contract Units Shipment) cdrl: Mercury Exclusion Certification Per Di-misc-80678; 5. Packaging 5.1 Preservation, Packaging, Packing And Marking - Preservation, Packaging, Packing And Marking Shall Be In Accordance With The Contract/purchase Order Schedule And As Specified Below. 5.2 Special Marking Requirements - Carderock Division, Naval Surface Warfare Center, Code 9613, Will Furnish The Dcmc-qar With A Special Stamp And Instruction For Marking The Package Of Each Acceptable Production Unit. The Dcmc-qar Or The Contractor (as directed) Shall Stamp The Package Of Each Accepted Production Unit Prior To Shipment. mil-std 2073 Packaging Applies As Found Elsewhere In The Schedule 6. Notes 6.1 Statement Of Prior Approval Data - If The Item(s) Being Offered Meet The Requirements Specified In The Contract/purchase Order And Is An Exact Duplicate Of Item(s) Previously Approved By The Government, Furnish The Nsn, Name Of Prime Manufacturer, Drawing number, Technical Manual Number, And Previous Contract Number. Provide This Information On Company Letterhead Signed By A Responsible Company Official. 6.2 Special Assistance From Submarine Sail Systems Department (sssd) - Commander, Carderock Division, Naval Surface Warfare Center (cdnswc),code 961, U.s. Naval Base, Philadelphia, Pa 19112-5083, Will Make Available Trained And Experienced Personnel Who Are qualified To Offer Assistance And Guidance To The Contractor By Pointing Out Areas Of Usual Difficulty. This Will Aid The Contractor In Producing A Higher Percentage Of Acceptable Material. Contractors Who Have Not Previously Furnished This Material To The Government And Whose Plant Facilities Have Not Been Evaluated, Or Personnel Have Not Been Given Special Instruction By A Representative From Submarine Sail Systems Department (sssd), Are requested To Contact Cdnswc Through The Cognizant Contract Administration Service Component Representative Office. Sssd May Initially Contact The Contractor To Make Arrangements For These Services. The Sssd Representative Will Coordinate His Work Closely With The Contract Administration Services Component Representative. However, Any Recommended Changes In Specifications Relative To Navicp Contract Shall Be Presented To Navicp For Approval And confirmation Via The Contract Administration Service Component Representative. The First Article And Production Units(s) Shall Be Under The Surveillance Of Cdnswc Quality Assurance Specialist As Required. 6.3 In Accordance With Opnavinst 5510.1 All Documents And Drawings Provided By The U.s. Navy To Perspective Contractors Must Include A "distribution Statement" To Inform The Contractor Of The Limits Of Distribution, And The Safeguarding Of The Information contained On Those Documents And Drawings. There Are 7 (seven) Seperate Distribution Statement Codes Used For Non-classified Documents And Drawings. The Definition For Each Is As Follows: a... Approved For Public Release; Distribution Is Unlimited. b... Distribution Authorized To Us Governments Agencies Only. c... Distribution Authorized To Us Government Agencies And Their Contractors. d... Distribution Authorized To Dod And Dod Contractors Only. e... Distribution Authorized To Dod Components Only. f... Further Distribution Only As Directed By Commander, Naval Sea Systems Command, Code 09t. x... Distribution Is Authorized To Us Government Agencies And Private Individuals Or Enterprises Eligible To Obtain Export Controlled Technical Data In Accordance With Opnavinst 5510.161. 6.4 Ordering Information For Document References - The Department Of Defense Single Stock Point (dodssp), Website Http://www.dsp.dla.mil/, Provides Product Information For The Department Of Defense Index Of Specifications And Standards (dodiss) (i.e.military/federal Specifications And Standards), Data Item Descriptions (dids), And Other Dodssp Products. a. Availability Of Cancelled Documents - The Dodssp Offers Cancelled Documents That Are Required By Private Industry In Fulfillment Of Contractual Obligations In Paper Format. Documents Can Be Requested By Phoning The Subscription Services Desk. b. Commercial Specifications, Standards, And Descriptions - These Specifications, Standards And Descriptions Are Not Available From Government Sources. They May Be Obtained From The Publishers Of The Applicable Societies. C. Ordnance Standards (os), Weapons Specifications (ws), And Navord Ostd 600 Pages - These Type Publications May Be Obtained By Submitting A Request To: Commander, Indian Head Division, Naval Surface Warfare Center Code 8410p, 101 Strauss Avenue Indian Head, Md 20640-5035 d. On Post-award Actions, Requests For "official Use Only" And "noforn" (not Releasable To Foreign Nationals) Documents Must Identify The Government Contract Number, And Must Be Submitted Via The Cognizant Defense Contract Management Command (dcmc) For certification Of Need For The Document. On Pre-award Actions Such Requests Must Be Submitted To The Pco For Certification Of Need For The Document. e. Noforn Military Specifications And Standards (including Amendments, Change Notices And Supplements, But Not Interim Changes) To Be Ordered From: Contracting Officer Navicp-mech Code 87321 5450 Carlisle Pike P.o. Box 2020 Mechanicsburg, Pa. 17055-0788 f. Nuclear Reactor Publications Assigned Navsea Documents And Identification Numbers (i.e. Navsea Welding Standard, Navsea 250-1500-1) Are To Be Ordered From: Commanding Officer Navicp-mech Code 009 5450 Carlisle Pike P.o. Box 2020 Mechanicsburg, Pa. 17055-0788 g. Technical Manuals Assigned Navsea Identification Numbers (i.e. Navsea Welding And Brazing Procedure, Navsea S9074-aq-gib-010/248) Are To Be Ordered From: Naval Inventory Control Point Code 1 Support Branch 700 Robbins Avenue Phildelphia, Pa. 19111-5094 h. Interim Changes And Classified Specifications Shall Be Obtained By Submitting A Request On Dd Form 1425 To Navicp-mech. 6.5 Information Regarding Abbreviations, Symbols And Codes Appearing On Dd Form 1423 - The Following Information Is Provided To Assist In Understanding The Intent Of The Requirement To Provide A Deliverable Item To The Government. The Explanation Of abbreviation, Symbols And Codes Found In A Block Follows The Block Number As They Appear On The Dd Form 1423. block A: Is The Actual Contract Line Item No. block B: Is The Actual Collective Physical List Of The Deliverable Item(s) Which Are Part Of The Total Requirement Of The Contract/purchase Order. block C: Is The Category Of Data Required, Tdp Is Defined In Mil-t-31000. Tm Is Defined In Part 1x, Section B Of Dodi 5000.2. Navicp Has Reasoned That Most Dd Form 1423's Included In Our Solicitations Meet The Requirement Of Tdp As Navicp Does Not Regularly Purchase Only Technical Manuals Without Purchasing Hardware And Related Tdp Software. Therefore, Most Navicp Dd Form 1423 Category Code Will Be Tdp. block D: Is The Name Of The Parent System, Next Higher Assembly, Or The Item Being Purchased. block E: Is The Purchase Request Number, Request For Proposal Number, Invitation For Bid Number Or Another Number For Tracking And Monitoring Purposes. block F: Is The Successful Offerors Name And Or Cage Code. block G: Is The Name Of The Individual And Or The Code/activity Of The Individual Who Prepared The Dd Form 1423 And Included The Requirement In The Technical Data Package (tdp). block H: Self Explanatory. block I: Is The Name And Signature Of The Individual Who Approved The Content And The Need For Inclusion Of The Dd Form 1423 In The Tdp. block J: Self Explanatory. block 1: Is The Exhibit Line Item Number (elin). block 2: Is The Title Of The Data Item Cited In Block 4. block 3: Is The Subtitle Of The Data Item Cited In Block 4 And Is Used If The Title Requires Clarification. block 4: Is The Actual Data Item Description (did) Number Or The Actual Technical Manual Contract Requirements Number. In The Event The Dd Form 1423 Is Requiring A Technical Manual The Numbered Tmcr Will Be An Attachment To The Contract/purchase Order. block 5: Is The Section And Paragraph Area, Where The Requirement Statement For The Dd Form 1423 Will Be Found. block 6: Is The Activity That Will Inform The Contractor Of Approval, Conditional Approval Or Disapproval Of The Deliverable Item. block 7: Is A Code Which Designates Authority For Inspection And Acceptance Of The Deliverable Item. The Definition Of The Codes Is As Follows: Dd Form 250 Code Inspection Acceptance Ss (1) (2) Dd (3) (4) Sd (1) (4) Ds (3) (5) Lt (6) (7) No (8) (8) Xx (9) (9) (1) Inspection At Source. (2) Acceptance At Source. (3) No Inspection Performed At Source. Final Inspection Performance At Destination. (4) Acceptance At Destination. (5) Acceptance At Source. Acceptance Based On Written Approval From The Contract Officer. (6) Letter Of Transmittal Only. Lt Should Not Be Used When Inspection Is Required. The Data Is Sent By The Contractor Directly To The Personnel Listed In Block 14 Of The Dd Form 1423. Lt Is Used When The Contracting Agency Does Not Desire To Have A Dd Form 250 For Each And Every Piece Of Data Developed By The Contractor. The Only Other Authorized Use Of Lt Is The Special Case Where The Contracting Agency Does Not Desire To Have Separate Dd Forms 250 But Desires To Have A Government Quality Assurance Representative Perform Inspection. The Government Quality Assurance Representative Shall Be Listed On The Distribution In Block 14 And Requested To Provide Comments Via The Quality Assurance Letter Of Inspection. Use Of The Symbol Lt Is Not Authorized For Data Comprising Final Delivery Of Technical Data Package Of For Technical Manuals. (lt May, However, Be Used For Delivery Of Preliminary Tdp's Or Tm's). (7) As Specified In Block 8 Of The Dd Form 1423. (8) No Inspection Or Acceptance Required. No Dd Form 250 Or Letter Of Transmittal Required. Use Of The Symbol No Is Not Authorized For Data Comprising Technical Data Packages Or For Technical Manuals. (9) Inspection And Acceptance Requirements Specified Elsewhere In The Contract. block 8: Is The Approval Code - Items Of Critical Data Requiring Specific Advanced Written Approval Prior To Distribution Of The Final Data Item Will Be Identified By Placing An "a" In This Field. This Data Item Requires Submission Of A Preliminary Draft Prior To Publication Of A Final Document. When A Preliminary Draft Is Required, Block 16 Of The Dd Form 1423 Will Show Length Of Time Required For Government Approval/disapproval And Subsequent Turn-around Time For The Contractor To Resubmit The Data After Government Approval/disapproval Has Been Issued. Block 16 Will Also Indicate The Extent Of The Approval Requirements, E.g., Approval Of Technical Content And/or Format. block 9: Is The Distribution Statement Code Which Explains How The Government Can Circulate The Deliverable Item. The Definition Of Codes A, B, C, D, E, F Or X Is As Follows: A. Distribution Of The Item Is Unrestricted. B. Distribution Of The Item Is Limited To Agencies Only. C. Distribution Of The Item Is Limited To Contractors With A Cage Code And Have A Dd Form 2345 On File With The Defense Logistics Service Center (dlsc) Battle Creek, Mich. Or Government Activities. D. Distribution Of The Item Is Limited To Dod Activities And Dod Contractors Only. E. Distribution Of The Item Is Limited To Dod Components Only. F. Distribution Of The Item Is Restricted From Foreign Nations And Forign Nationals. block 10: Is The Frequency Which The Deliverable Item Is Expected To Be Delivered To The Government. The Abbreviations And Their Meaning. Annly Annually Asgen As Generated Asreq As Required Bi-mo Every Two Months Bi-we Every Two Weeks Daily Daily Dfdel Deferred Delivery Mthly Monthly One/r One Time With Revisions Qrtly Quarterly Semia Every Six Months Wekly Weekly Xtime Number Of Times To Be Submitted (1time, 2times...9times) Use Of These Codes Requires Further Explanation In Block 16 To Provide The Contractor With Guidance Necessary To Accurately Price The Deliverable Data Item. Other Abbreviations Not Appearing On The Above List May On Occasion Be Used In Block 10 Of The Dd Form 1423. When Other Abbreviations Are Used They Will Be Fully Explained In Block 16 Of The Dd Form 1423. block 11: Is The Last Calendar Date, Expressed In Year/month/day Format, The Deliverable Item Is To Be Received By The Requiring Office Cited In Block 6 Of The Dd Form 1423 For An Item With A Block 10 Entry Indication A Single Delivery. If The Item Is To Be Submitted Multiple Times, The Number Stated Is The Number Of Calendar Days After The Frequency Cited In Block 10 The Item Is To Be Received By The Requiring Office Cited In Block 6 Of The Dd Form 1423. On Occasion The Deliverable Item Will Be Required To Be Submitted Prior To The End Of The Frequency Cited In Block 6. In That Event The Requirement Will Be Fully Explained In Block 16 Of The Dd Form 1423. block 12: Is The Date Of First Submission Of The Deliverable Item To The Requiring Office (block 4) Expressed In Year/month/day Format. The Abbreviations And Their Meaning Are As Follows: Asgen As Generated Asreq As Required Dac Days After Contract Date Dfdel Deferred Delivery Eoc End Of Contract Eom End Of Month Eoq End Of Quarter Specific Instructions For These Requirements Will Be Provided In Block 16. If The Deliverable Item Is Constrained By A Specific Event Or Milestone The Constraint Will Be Fully Explained In Block 16 Of The Dd Form 1423. "as Generated", "as Required", And "deferred Delivery" Will Always Be Fully Explained In Block 16. block 13: Is The Date Of Subsequent Submission Of The Deliverable Item, After The Initial Submission. Subsequent Submission Is Only Used To Indicate The Specific Time Period. The Data Is Required When Block 10 Of The Dd Form 1423 Indicates Multiple Delivery Is Required. This Does Not Apply To Resubmission Of A Deliverable Item That Has Been Reviewed By The Requiring Office And Determined To Be Only Conditionally Acceptable Or Unacceptable. block 14a: Will Contain The Activity Name(s) Where The Deliverable Item Is To Be Sent. If The Activity Is Other Than Dcmc Or Nspcc The Full Name, Address (including Code) Will Be Specified. That Specific Information Will Be Located In Block 16 Of The Dd Form 1423. block 14b: Is The Number Of Copies Of Draft And Or Final Copies To Be Submitted. When Final "repro" Copies Ar To Be Submitted Block 16 Will Clarify The Type Of Repro Copies Required. (e.g., Vellum, Negative, Etc.) block 15: Is The Total Of Each Type Of Copies To Be Submitted As Required By Block 14. block 16: Is The Block Used To Provide Additional Or Clarifying Information Blocks 1 Through 15. This Block Is Also The Only Area Used To Tailor The Document Listed In Block 4. Only Deletions To The Minimum Requirements Stated In The Document In Block 4 Are Allowed. Block 16 May Also Be Used To Specify The Medium For Delivery Of The Data. block 17: Is The Block Where The Bidder Or Offerer Is To Enter The Appropriate Price Group. The Price Group Are Defines As Follows: A. Group I - Data Which The Contractor Prepares To Satisfy The Government's Requirements. The Contractor Does Not Need This Type Of Data To Perform The Rest Of The Contract. Price Would Be Based On Identifiable Direct Costs, Overhead, General And Administrative (g&a) And Profit. B. Group Ii - Data Essential To Contract Performance Which Must Be Reworked Or Amended To Conform To Government Requirements. The Price For Data In This Group Would Be Based On The Direct Cost To Convert The Original Data To Meet Government Needs And To Deliver It, Plus Allocable Overhead, G&a And Profit. C. Group Iii - Data Which The Contractor Must Develop For His Own Use And Which Requires No Substantial Change To Conform To Government Requirements Regarding Depth Of Content, Format, Frequency Of Submittal, Preparation, And Quality Of Data. Only The Costs Of Reproducing, Handling And Delivery, Plus Overhead, G&a And Profit, Are Considered Inpricing Data In This Group. D. Group Iv - Data Which The Contractor Has Developed As Part Of His Commercial Business. Not Much Of This Data Is Required And The Cost Is Insignificant. The Item Should Normally Becoded "no Charge." An Example Is A Brochure Or Brief Manual Developed For Commercial Application Which Will Be Acquired In Small Quantities, And The Added Cost Is Too Small To Justify The Expense Of Computing The Charge That Otherwise Would Go With The Acquisition. block 18: Enter The Total Estimated Price Equal To That Portion Of The Total Price Which Is Estimated To Be Attributable To The Production Or Development For The Government Of That Item Of Data. The Entry "n/c" For "no Charge" Is Acceptable. date Of First Submission=asreq ;approval Of The Quality Inspection Plan By Nswc Philadelphia Division Is Required Prior To Production.; ;nswcpd Is The Acceptance Activity For Cdrl Data Item A001. Nswcpd Wawf/irapt Acceptor Dodacc Is "n64498".; date Of First Submission=asreq ;supplier Format Is Acceptable.; ;approval Of The Certification By Nswc Philadelphia Division Is Required Prior To Shipment Of Production Lot Units.; ;nswcpd Is The Acceptance Activity For Cdrl Data Item A002. Nswcpd Wawf/irapt Acceptor Dodacc Is "n64498".; date Of First Submission=asreq ;approval Of The Report By Nswc Philadelphia Division Is Required Prior To Shipment Of Production Lot Units.; ;nswcpd Is The Acceptance Activity For Cdrl Data Item A003. Nswcpd Wawf/irapt Acceptor Dodacc Is "n64498".; date Of First Submission=asreq ;supplier Format Is Acceptable.; ;approval Of The Certification By Nswc Philadelphia Division Isrequired Prior To Shipment Of Production Lot Units.; ;nswcpd Is The Acceptance Activity For Cdrl Data Item A004. Nswcpd Wawf/irapt Acceptor Dodacc Is "n64498".;
Closing Date21 Jan 2025
Tender AmountRefer Documents 

DEPT OF THE NAVY USA Tender

Others
United States
Description: Item Unique Identification And Valuation (jan 2023)|19|||||||||||||||||||| higher-level Contract Quality Requirement (navicp Review Feb 1991)(feb 1999)|1|mil-i-45208 Or Iso 9001 Ansi/ncsl Z540.3 Or Iso 10012 | inspection Of Supplies--fixed-price (aug 1996)|2||| production Lot Testing|1|30 | navy Use Of Abilityone Support Contractor - Release Of Offeror Information (3-18))|1|wss-n00104| warranty Of Data--basic (mar 2014)|2||| first Article Approval--contractor Testing (sep 1989)|10| Fat Details Are Included In The Drawing||15|120|n64498|tbd|30|||| notice Of Total Small Business Set-aside (oct 2020)(deviation 2020-o0008)|1|| alternate A, Annual Representations And Certifications (oct 2024)|13|x||||x||||||||| annual Representations And Certifications (may 2024)|13|339991|600|x|x|x||||||||| notice Of Priority Rating For National Defense, Emergency Perpardeness, And Enrgy Progam Use (april 2008))|2||x| evaluation Of First Article Testing|3|||x| any Order Resulting From This Solicitation Will Be Issued Bi-laterally Requiring The Contractor's Written Acceptance Prior To Execution. _______________ - Place Of Material Inspection _______________ - Place Of Packaging Inspection & Final Acceptance requested Delivery Is 210 Days After Date Of Contract. quoted Delivery Is____ Days Adc. dfars 252.232-7006, Wide Area Workflow Payment Instructions, Is Incorporated By Reference Into This Request For Quotation(rfq). Any Resulting Order Will Require Electronic Submittal Of Invoices And Receiving Reports Through Piee-wawf, And Will Include The Clause In Full Text, Complete With Submittal Instructions. far Clause 52.213-4, Terms And Conditions-simplified Acquisitions (other Than Commercial Products And Commercial Services), Is Incorporated By Reference Into This Rfq. This Clause Is A Compilation Of The Most Commonly Used Clauses That Apply To Simplified acquisitions And Incorporates Them By Reference As Well. all Contractual Documents (i.e. Contracts, Purchase Orders, Task Orders, Delivery Orders And Modifications) Related To The Instant Procurement Are Considered To Be "issued" By The Government When Copies Are Either Deposited In The Mail, Transmitted By Facsimile, or Sent By Other Electronic Commerce Methods Such As Email. The Government's Acceptance Of The Contractor's Proposal Constitutes Bilateral Agreement To "issue" Contractual Documents As Detailed Herein. drawing Requests Shall Be Submitted At Sam.gov Using The Link In The Solicitation Posting. Vendors Must Have An Approved Dd2345 Of File In Order To Be Granted Access To Controlled Drawings. this Procurement Requires Contractor First Article Testing And Production Lot Testing. \ 1. Scope 1.1 ;this Procurement Specification Contains The Requirements For Manufacture And Contract Quality Requirements For ;seal Plain, Encased (dash 2); For Use On Navy Submarines.; 2. Applicable Documents 2.1 Applicable Documents - The Document(s) Listed Below Form A Part Of This Contract/purchase Order Including Modifications Or Exclusions. 2.1.1 Documents, Drawings, And Publications Supplied Are Listed Under "drawing Number". These Items Should Be Retained Until An Award Is Made. 2.1.2 "document References" Listed Below Must Be Obtained By The Contractor. Ordering Information Is Included As An Attachment To This Contract/purchase Order. 2.1.3 The "document Changes" Section Provides Supersessions/changes To Referenced Documents. 2.2 Order Of Precedence - In The Event Of A Conflict Between The Text Of This Contract/purchase Order And The References And/or Drawings Cited Herein, The Text Of This Contract/purchase Order Shall Take Precedence. Nothing In This Contract/purchase Order, however, Shall Supersede Applicable Laws And Regulations Unless A Specific Exemption Has Been Obtained. drawing Data=6878818 |53711| B| |d|0001 | B|49998|0043129 document Ref Data=mil-std-130 | | |n |121116|a| 1| | document Ref Data=mil-std-973 | | | |950113|a|3 | | document Ref Data=iso 9001 | | | |150915|a| | | document Ref Data=iso10012 | | | |030415|a| | | document Ref Data=mil-i-45208 | | |a |810724|a| 1| | document Ref Data=ncsl Z540.3 | | | |060803|a| | | document Ref Data=eia-649-2/19 | | |c | |a| | | document Ref Data=adiprene L-100 (50-60a) Com'l | | | | |a| | | 3. Requirements 3.1 ;design And Manufacturing - The ;seal Plain, Encased (dash 2); Furnished Under This Contract/purchase Order Shall Meet The Material, Physical And Mechanical Requirements As Specified On Drawing 6878818, Dash 2 Including Associated Specifications mentioned In This Procurement. ; 3.1.1 ;the,;seal Plain, Encased (dash 2); Shall Be Supplied With No Fillers, Color Additives, Coatings Or Finishes As Specified On Drawing 6878818, Note 4.; 3.2 ;marking Requirements - The Supplier Shall Mark Bag Each First Article And Production Lot Unit Seal Plain, Encased In Accordance With Drawing 6878818, Note 7 Including With Contract, Lot Or Batch And Serial Number Per Mil-std-130.; 3.3 ;first Article Testing/inspection - (supplier Testing/inspection). The Article Testing/inspection Procedure And Approval Are Required For The ;seal Plain, Encased.(dash 2);government Approval Is Required Prior To Commencement Of Firstarticle Unit.; 3.4 ;notification - The Supplier Shall Notify Naval Surface Warfare Center, Philadelphia Division,(nswcpd), 5001 S. Broad Street, Philadelphia, Pa 19112-1403 By Email Matthew.j.ogilvie.civ@us.navy.mil, Code 242mo After Award Of Contract.; 3.4.1 ;the Nswcpd Is The Acceptance Activity For The Contract Data Requirements List (dd1423) Data Items. Nswcpd Wawf/irapt ;acceptor; Dodacc Is ;n64498;.; 3.5 Configuration Control - Mil-std-973 Entitled "configuration Management", Paragraph 5.4.8, Configuration Control (short Form Procedure), Is Hereby Incorporated. The Contractor Shall Submit All Engineering Change Proposals In Accordance With Mil-std-973, paragraph 5.4.8.2 And Appendix D. Requests For Deviations Shall Be Processed In Accordance With Mil-std-973, Paragraph 5.4.8.3 And Appendix E. Requests For Waivers Shall Be Processed In Accordance With Mil-std-973, Paragraph 5.4.8.4 And Appendix E. (original and Two Copies Shall Be Submitted To Contracting Officer, Navicp-mech, P. O. Box 2020, Mechanicsburg Pa. 17055-0788.) 3.5.1 Configuration Control - When The Contractor Has Received Authorization On A Prior Contract For The Same Nsn For The Use Of A Drawing Of A Later Revision Status, That Authorization Is Hereby Extended To All Succeeding Contracts/purchase Orders Until another Drawing Revision Is Approved. The Contractor Will Notify The Pco Of This Occurrence In Each Instance, In The Response To The Solicitation. Such Notification Shall Be In Writing Setting Forth The Contract Under Which The Prior Authorization Was Granted, the Date Of The Granting Of The Authorization, And The Name Of The Granting Authority. Contractors Shall Also Refer Technical Inquiries (other Than Those Covered By Mil-std-973) On Company Letterhead Signed By A Responsible Company Official, With Copies Distributed As Stated Below. The Original And Two Copies Of All Contractor Generated Correspondence Regarding Configuration Shall Be Submitted To Contracting Officer, Navicp-mech, P.o. Box 2020, Mechanicsburg, Pa 17055-0788. Contractors Are Cautioned That Implementing Engineering Changes, Waivers, Deviations Or Technical Inquiries Into The Contract/purchase Order Without Approval Of The Contracting Officer Will Be At The Sole Risk Of The Contractor. 3.6 Mercury Free - The Material Supplied Under This Contract/purchase Order Is Intended For Use On Submarines/surface Ships And Therefore Shall Contain No Metallic Mercury And Shall Be Free From Mercury Contamination. Mercury Contamination Of The Material will Be Cause For Rejection. If The Inclusion Of Metallic Mercury Is Required As A Functional Part Of The Material Furnished Under This Contract, The Contractor Shall Obtain Written Approval From The Procurement Contracting Officer Before Proceeding With Manufacture. The contractor's Request Shall Explain In Detail The Requirements For Mercury, Identify Specifically The Parts To Contain Mercury, And Explain The Method Of Protection Against Mercury Escape. Such A Request Will Be Forwarded Directly To The Procurement Contracting officer With A Copy To The Applicable Government Inspector. Upon Approval By The Contracting Officer, The Vendor Will Provide A "warning Plate" Stating That Metallic Mercury Is A Functional Part Of The Item And Will Include Name And Location Of That Part. The Use Of Mercury, Mercury Compounds, Or Mercury-bearing Instruments And/or Equipment In A Manner Which Might Cause Contamination In The Manufacture, Assembly, Or Test Of Material On This Contract Is Prohibited. The Most Probable Causes Of contamination Are Direct-connected Manometers, Mercury Vacuum Pumps, Mercury Seals, Or The Handling Of Mercury In The Immediate Vicinity. Mercury Switches, Mercury In Glass Thermometers, Standard Cells And Other Items Containing Mercury May Be Used If They Are located So As Not To Constitute A Contamination Hazard. If External Contamination By Metallic Mercury Occurs Or Is Suspected, The Following Test May Be Used To Determine Whether Contamination By Metallic Mercury Exists Or Whether Corrective Cleaning Measures Have Been Effective. Enclose The Equipment In A polyethylene Bag Or Close-fitting Airtight Container For Eight Hours At Room Temperature (70 Degrees F Minimum).sample The Trapped Air And If Mercury Vapor Concentration Is 0.01 Mg/cu Meter Or More, The Material Is Mercury Contaminated Insofar As The requirements Of This Contract Are Concerned. These Requirements Shall Be Included In Any Subcontract Or Purchase Order Hereunder And The Contractor Shall Insure Subcontractor Compliance With These Requirements. Technical Questions Pertaining To These Requirements Shall Be Referred To The Procurement Contracting Officer Via The Cognizant Administrative Contracting Officer. For Background, The Following Information Is Provided: Mercury Is Corrosive To Gold, Silver, Nickel, Stainless Steels, Aluminum And Copper Alloys. Stainless Steels, Nickel, And Copper Alloys Are Widely Used In Reactor Plants And Other Submarine/surface Ship Systems. Accidental Trapping Of Mercury In A component Could Cause Serious Damage To Vital Parts. Mercury Is Also Toxic If Inhaled, Ingested, Or Absorbed Through The Skin. It Is Evident That Grave Consequences Could Result From Small Amounts Of Mercury Vapor Present In An Unreplenished Submarine/surface ship Atmosphere. 4. Quality Assurance 4.1 Responsibility For Inspection - Unless Otherwise Specified In The Contract/purchase Order, The Contractor Is Responsible For The Performance Of All Inspection Requirements As Specified Herein. Except As Otherwise Specified In The Contract/purchase Order, the Contractor May Use His Own Or Any Other Facilities Suitable For The Performance Of The Inspection Requirements Specified Herein, Unless Disapproved By The Government. The Government Reserves The Right To Perform Any Of The Inspections Set Forth In The specification Where Such Inspections Are Deemed Necessary To Assure Supplies And Services Conform To Prescribed Requirements. 4.2 Responsibility For Compliance - All Items Must Meet All Requirements Of This Contract/purchase Order. The Inspection Set Forth In This Specification Shall Become A Part Of The Contractor's Overall Inspection System Or Quality Program. The Absence Of Any inspection Requirements Shall Not Relieve The Contractor Of The Responsibility Of Assuring That All Products Or Supplies Submitted To The Government For Acceptance Comply With All Requirements Of The Contract/purchase Order. Sampling In Quality Conformance does Not Authorize Submission Of Known Defective Material, Either Indicated Or Actual, Not Does It Commit The Government To Acceptance Of Defective Material. 4.3 Records - Records Of All Inspection Work By The Contractor Shall Be Kept Complete And Available To The Government During The Performance Of Contract/purchase Order And For A Period Of 365 Calendar Days After Final Delivery Of Supplies. 4.4 ;inspection System - The Supplier?s Quality Inspection System Shall Be In Accordance With Mil-i-45208 Or Iso 9001 And Ncsl Z540.3 Or Iso 10012. The Supplier Shall Develop And Submit Their Written Quality Inspection And Test Plan As Indicated On The contract Data Requirements List (dd Form 1423). Government Approval Of The Supplier?s Written Quality Inspection And Test Plan Is Required By The Contract. cdrl: Quality Inspection & Test Plan Per Mil-i-45208, Ncsl Z540.3 And Di-qcic-81110 ; 4.5 ;material Control - The Supplier Shall Have An Effective Material Control System That Provides For Certified Industrial Laboratory Analysis By Lot Or Batch For Raw Material Ordered For First Article And Production Lot Units.the Analysis Shall Establish the Properties For The Non-metallic Material As Specified On Drawing 6878818, Note 4.; 4.6 ;first Article Testing/inspection. (supplier Testing/inspection).the Supplier Shall Perform First Article Testing/inspection On The ;seal Plain,encased(dash 2); In Accordance With The Applicable Drawing And Their Approved First Article Procedure.; 4.6.1 ;the First Article Inspection Shall Be Made By The Cognizant Dcma-qar At The Supplier's And/or Subcontractor Facility. The Supplier Shall Notify Nswcpd, Code 242mo Two Weeks In Advance Prior To The Scheduled First Article Testing/ Inspection, So An nswcpd Representative Has The Option Of Being Present During During The First Article Testing/inspection.; 4.6.2 ;first Article Approval For Testing/inspection Procedure And Acceptance- (supplier Testing/inspection).the Supplier Shall Prepare And Submit Their First Article Testing/inspection Procedure ;seal Plain, Encased (dash 2); In Accordance With The requirements Of Di-ndti-80603 And Applicable Drawing As Indicated On The Contract Data Requirements List (dd Form 1423).government Approval Of The Procedure Is Required Prior To Commencement Of First Article Unit. cdrl: First Article Testing/inspection Procedure Per Di-ndti-80603a; 4.6.3 ;first Article Visual/dimensional Inspection - The Supplier Shall Visually And Physically Inspect 100% The First Article Unit And Record The Actual Measurement Of Each Dimension Including Hardness Identified On The Applicable Drawing.; 4.6.4 ;first Article Testing/inspection Report And Acceptance-(supplier Testing/ Inspection).the Supplier Shall Submit For The First Article Unit ;seal Plain, Encased (dash 2); Testing/inspection Reports In Compliance With The Requirementof Di-ndti-80603 And applicable Drawing.the Report Shall Also Include A Copy Of;certified Industrial Laboratory Analysis For Adiprene L-100 Material And Visual/dimensional Inspection Report; Identified In The Objective Quality Evidence Records Section Of This Document, And As indicated On The Contract Data Requirements List (dd Form 1423).government Approval Of The First Article Testing/inspection Report Is Required Prior To Commencement Of Production Units. cdrl: First Article Testing/inspection Report Per Di-ndti-80809b; 4.7 ;production Lot.; 4.7.1 ;visual/dimensional Inspection - The Supplier Shall Visually And Physically Inspect 100% The Production Lot Units And Record The Actual Measurements And Results Of Each Dimension Including Hardness Identified On The Applicable Drawing. ; 4.7.2 ;production Lot Testing/inspection Report And Acceptance- (supplier Testing/ Inspection).the Supplier Shall Submit For The Completed Production Units ;seal Plain, Encased (dash 2); Testing/inspection Reports In Compliance With The Applicable Data Item descriptions (dids) And Drawing. The Production Lot Testing/inspection Report Shall Consist Of ;certified Industrial Laboratory Analysis For Adiprene L-100 Material; Visual/dimensional Inspection Report And Mercury Exclusion Certification; Identified In The objective Quality Evidence Records Section Of This Document, And As Indicated On The Production Lot Test/ Inspection (plt) Contract Data Requirements List (dd Form 1423).government Government Approval Of The Production Lot Testing/inspection Report Is requiredprior To Shipment Of Production Lot Units. cdrl: Production Lot Testing/inspection Report Per Di-ndti-80809b; 4.8 ;production Lot Inspection/acceptance - (supplier Testing/inspection). The Supplier Shall Submit For The Production Lot Units, The Inspection Andtest Reports Identified In The Objective Quality Evidence Records Section Of This Document And As Indicated on The Production Lot Testing/inspection (plt) Contract Data Requirements List (dd Form 1423).government Approval Is Required Prior To Shipment Of Production Units. ; 4.9 ;final Inspection And Acceptance - Final Inspection And Acceptance Of Productionlots Shall Be Made By The Cognizant Dcma-qar In Conjunction With The Specific Government Inspection Instructions (sgiis) Furnished By Nswcpd.in Addition To The Normal Dcma surveillance, The Production Unit(s) Shall Be Under The Surveillance Of Nswcpd Quality Assurance Specialist As Required.; 4.10 ;objective Quality Evidence Records - The Supplier Shall Maintain Objective Quality Evidence Data (oqeds) Of Raw Material And Finished Parts Of ;seal Plain, Encased (dash 2);. Records Shall Be Clearly Legible Including Nameand Title. The Supplier May provide Exact (quality) Photocopies Of Objective Quality Evidence Records Being Delivered Under This Purchase Order Instead Of Originals.; 4.10.1 ;the Supplier Shall Furnish A Copy Of The Following Oqeds Listed Below And As Indicated On The Contract Data Requirements List (dd Form 1423) For Acceptance. The Reports Shall Be Correlated To The D Drawing/part, Lot Or Batch, Serial And Contract number. Supplier Format Is Acceptable For The Below Listed Cdrls. a. Certified Industrial Laboratory Analysis For Adiprene L-100 (50-60a) Material (the Analysis Shall Establish The Properties For Material As Specified On Drawing 6878818, Note4.). cdrl: Certified Industrial Lab Analysis Per Di-misc-82386 b.visual/dimensional Inspection Reports Shall Show All The Characteristics, The Actual Measurement Results Of Each Dimension Inspected Including Hardness, Contract Number, Name Of Supplier, Drawing/part Number, Drawing Revision Letter, Lot Or Batch And Serial number Of Finished Parts, Item Nomenclature, Inspector's Acceptance Signature And Date. cdrl: Visual/dimensional Inspection Report Per Di-ndti-80809b c.mercury Exclusion Certification (representing The Contract Units Shipment) cdrl: Mercury Exclusion Certification Per Di-misc-82386; 5. Packaging 5.1 Preservation, Packaging, Packing And Marking - Preservation, Packaging, Packing And Marking Shall Be In Accordance With The Contract/purchase Order Schedule And As Specified Below. mil-std 2073 Packaging Applies As Found Elsewhere In The Schedule 6. Notes 6.1 Ordering Information For Document References - The Department Of Defense Single Stock Point (dodssp), Website Http://www.dsp.dla.mil/, Provides Product Information For The Department Of Defense Index Of Specifications And Standards (dodiss) (i.e.military/federal Specifications And Standards), Data Item Descriptions (dids), And Other Dodssp Products. a. Availability Of Cancelled Documents - The Dodssp Offers Cancelled Documents That Are Required By Private Industry In Fulfillment Of Contractual Obligations In Paper Format. Documents Can Be Requested By Phoning The Subscription Services Desk. b. Commercial Specifications, Standards, And Descriptions - These Specifications, Standards And Descriptions Are Not Available From Government Sources. They May Be Obtained From The Publishers Of The Applicable Societies. C. Ordnance Standards (os), Weapons Specifications (ws), And Navord Ostd 600 Pages - These Type Publications May Be Obtained By Submitting A Request To: Commander, Indian Head Division, Naval Surface Warfare Center Code 8410p, 101 Strauss Avenue Indian Head, Md 20640-5035 d. On Post-award Actions, Requests For "official Use Only" And "noforn" (not Releasable To Foreign Nationals) Documents Must Identify The Government Contract Number, And Must Be Submitted Via The Cognizant Defense Contract Management Command (dcmc) For certification Of Need For The Document. On Pre-award Actions Such Requests Must Be Submitted To The Pco For Certification Of Need For The Document. e. Noforn Military Specifications And Standards (including Amendments, Change Notices And Supplements, But Not Interim Changes) To Be Ordered From: Contracting Officer Navicp-mech Code 87321 5450 Carlisle Pike P.o. Box 2020 Mechanicsburg, Pa. 17055-0788 f. Nuclear Reactor Publications Assigned Navsea Documents And Identification Numbers (i.e. Navsea Welding Standard, Navsea 250-1500-1) Are To Be Ordered From: Commanding Officer Navicp-mech Code 009 5450 Carlisle Pike P.o. Box 2020 Mechanicsburg, Pa. 17055-0788 g. Technical Manuals Assigned Navsea Identification Numbers (i.e. Navsea Welding And Brazing Procedure, Navsea S9074-aq-gib-010/248) Are To Be Ordered From: Naval Inventory Control Point Code 1 Support Branch 700 Robbins Avenue Phildelphia, Pa. 19111-5094 h. Interim Changes And Classified Specifications Shall Be Obtained By Submitting A Request On Dd Form 1425 To Navicp-mech. 6.2 Information Regarding Abbreviations, Symbols And Codes Appearing On Dd Form 1423 - The Following Information Is Provided To Assist In Understanding The Intent Of The Requirement To Provide A Deliverable Item To The Government. The Explanation Of abbreviation, Symbols And Codes Found In A Block Follows The Block Number As They Appear On The Dd Form 1423. block A: Is The Actual Contract Line Item No. block B: Is The Actual Collective Physical List Of The Deliverable Item(s) Which Are Part Of The Total Requirement Of The Contract/purchase Order. block C: Is The Category Of Data Required, Tdp Is Defined In Mil-t-31000. Tm Is Defined In Part 1x, Section B Of Dodi 5000.2. Navicp Has Reasoned That Most Dd Form 1423's Included In Our Solicitations Meet The Requirement Of Tdp As Navicp Does Not Regularly Purchase Only Technical Manuals Without Purchasing Hardware And Related Tdp Software. Therefore, Most Navicp Dd Form 1423 Category Code Will Be Tdp. block D: Is The Name Of The Parent System, Next Higher Assembly, Or The Item Being Purchased. block E: Is The Purchase Request Number, Request For Proposal Number, Invitation For Bid Number Or Another Number For Tracking And Monitoring Purposes. block F: Is The Successful Offerors Name And Or Cage Code. block G: Is The Name Of The Individual And Or The Code/activity Of The Individual Who Prepared The Dd Form 1423 And Included The Requirement In The Technical Data Package (tdp). block H: Self Explanatory. block I: Is The Name And Signature Of The Individual Who Approved The Content And The Need For Inclusion Of The Dd Form 1423 In The Tdp. block J: Self Explanatory. block 1: Is The Exhibit Line Item Number (elin). block 2: Is The Title Of The Data Item Cited In Block 4. block 3: Is The Subtitle Of The Data Item Cited In Block 4 And Is Used If The Title Requires Clarification. block 4: Is The Actual Data Item Description (did) Number Or The Actual Technical Manual Contract Requirements Number. In The Event The Dd Form 1423 Is Requiring A Technical Manual The Numbered Tmcr Will Be An Attachment To The Contract/purchase Order. block 5: Is The Section And Paragraph Area, Where The Requirement Statement For The Dd Form 1423 Will Be Found. block 6: Is The Activity That Will Inform The Contractor Of Approval, Conditional Approval Or Disapproval Of The Deliverable Item. block 7: Is A Code Which Designates Authority For Inspection And Acceptance Of The Deliverable Item. The Definition Of The Codes Is As Follows: Dd Form 250 Code Inspection Acceptance Ss (1) (2) Dd (3) (4) Sd (1) (4) Ds (3) (5) Lt (6) (7) No (8) (8) Xx (9) (9) (1) Inspection At Source. (2) Acceptance At Source. (3) No Inspection Performed At Source. Final Inspection Performance At Destination. (4) Acceptance At Destination. (5) Acceptance At Source. Acceptance Based On Written Approval From The Contract Officer. (6) Letter Of Transmittal Only. Lt Should Not Be Used When Inspection Is Required. The Data Is Sent By The Contractor Directly To The Personnel Listed In Block 14 Of The Dd Form 1423. Lt Is Used When The Contracting Agency Does Not Desire To Have A Dd Form 250 For Each And Every Piece Of Data Developed By The Contractor. The Only Other Authorized Use Of Lt Is The Special Case Where The Contracting Agency Does Not Desire To Have Separate Dd Forms 250 But Desires To Have A Government Quality Assurance Representative Perform Inspection. The Government Quality Assurance Representative Shall Be Listed On The Distribution In Block 14 And Requested To Provide Comments Via The Quality Assurance Letter Of Inspection. Use Of The Symbol Lt Is Not Authorized For Data Comprising Final Delivery Of Technical Data Package Of For Technical Manuals. (lt May, However, Be Used For Delivery Of Preliminary Tdp's Or Tm's). (7) As Specified In Block 8 Of The Dd Form 1423. (8) No Inspection Or Acceptance Required. No Dd Form 250 Or Letter Of Transmittal Required. Use Of The Symbol No Is Not Authorized For Data Comprising Technical Data Packages Or For Technical Manuals. (9) Inspection And Acceptance Requirements Specified Elsewhere In The Contract. block 8: Is The Approval Code - Items Of Critical Data Requiring Specific Advanced Written Approval Prior To Distribution Of The Final Data Item Will Be Identified By Placing An "a" In This Field. This Data Item Requires Submission Of A Preliminary Draft Prior To Publication Of A Final Document. When A Preliminary Draft Is Required, Block 16 Of The Dd Form 1423 Will Show Length Of Time Required For Government Approval/disapproval And Subsequent Turn-around Time For The Contractor To Resubmit The Data After Government Approval/disapproval Has Been Issued. Block 16 Will Also Indicate The Extent Of The Approval Requirements, E.g., Approval Of Technical Content And/or Format. block 9: Is The Distribution Statement Code Which Explains How The Government Can Circulate The Deliverable Item. The Definition Of Codes A, B, C, D, E, F Or X Is As Follows: A. Distribution Of The Item Is Unrestricted. B. Distribution Of The Item Is Limited To Agencies Only. C. Distribution Of The Item Is Limited To Contractors With A Cage Code And Have A Dd Form 2345 On File With The Defense Logistics Service Center (dlsc) Battle Creek, Mich. Or Government Activities. D. Distribution Of The Item Is Limited To Dod Activities And Dod Contractors Only. E. Distribution Of The Item Is Limited To Dod Components Only. F. Distribution Of The Item Is Restricted From Foreign Nations And Forign Nationals. block 10: Is The Frequency Which The Deliverable Item Is Expected To Be Delivered To The Government. The Abbreviations And Their Meaning. Annly Annually Asgen As Generated Asreq As Required Bi-mo Every Two Months Bi-we Every Two Weeks Daily Daily Dfdel Deferred Delivery Mthly Monthly One/r One Time With Revisions Qrtly Quarterly Semia Every Six Months Wekly Weekly Xtime Number Of Times To Be Submitted (1time, 2times...9times) Use Of These Codes Requires Further Explanation In Block 16 To Provide The Contractor With Guidance Necessary To Accurately Price The Deliverable Data Item. Other Abbreviations Not Appearing On The Above List May On Occasion Be Used In Block 10 Of The Dd Form 1423. When Other Abbreviations Are Used They Will Be Fully Explained In Block 16 Of The Dd Form 1423. block 11: Is The Last Calendar Date, Expressed In Year/month/day Format, The Deliverable Item Is To Be Received By The Requiring Office Cited In Block 6 Of The Dd Form 1423 For An Item With A Block 10 Entry Indication A Single Delivery. If The Item Is To Be Submitted Multiple Times, The Number Stated Is The Number Of Calendar Days After The Frequency Cited In Block 10 The Item Is To Be Received By The Requiring Office Cited In Block 6 Of The Dd Form 1423. On Occasion The Deliverable Item Will Be Required To Be Submitted Prior To The End Of The Frequency Cited In Block 6. In That Event The Requirement Will Be Fully Explained In Block 16 Of The Dd Form 1423. block 12: Is The Date Of First Submission Of The Deliverable Item To The Requiring Office (block 4) Expressed In Year/month/day Format. The Abbreviations And Their Meaning Are As Follows: Asgen As Generated Asreq As Required Dac Days After Contract Date Dfdel Deferred Delivery Eoc End Of Contract Eom End Of Month Eoq End Of Quarter Specific Instructions For These Requirements Will Be Provided In Block 16. If The Deliverable Item Is Constrained By A Specific Event Or Milestone The Constraint Will Be Fully Explained In Block 16 Of The Dd Form 1423. "as Generated", "as Required", And "deferred Delivery" Will Always Be Fully Explained In Block 16. block 13: Is The Date Of Subsequent Submission Of The Deliverable Item, After The Initial Submission. Subsequent Submission Is Only Used To Indicate The Specific Time Period. The Data Is Required When Block 10 Of The Dd Form 1423 Indicates Multiple Delivery Is Required. This Does Not Apply To Resubmission Of A Deliverable Item That Has Been Reviewed By The Requiring Office And Determined To Be Only Conditionally Acceptable Or Unacceptable. block 14a: Will Contain The Activity Name(s) Where The Deliverable Item Is To Be Sent. If The Activity Is Other Than Dcmc Or Nspcc The Full Name, Address (including Code) Will Be Specified. That Specific Information Will Be Located In Block 16 Of The Dd Form 1423. block 14b: Is The Number Of Copies Of Draft And Or Final Copies To Be Submitted. When Final "repro" Copies Ar To Be Submitted Block 16 Will Clarify The Type Of Repro Copies Required. (e.g., Vellum, Negative, Etc.) block 15: Is The Total Of Each Type Of Copies To Be Submitted As Required By Block 14. block 16: Is The Block Used To Provide Additional Or Clarifying Information Blocks 1 Through 15. This Block Is Also The Only Area Used To Tailor The Document Listed In Block 4. Only Deletions To The Minimum Requirements Stated In The Document In Block 4 Are Allowed. Block 16 May Also Be Used To Specify The Medium For Delivery Of The Data. block 17: Is The Block Where The Bidder Or Offerer Is To Enter The Appropriate Price Group. The Price Group Are Defines As Follows: A. Group I - Data Which The Contractor Prepares To Satisfy The Government's Requirements. The Contractor Does Not Need This Type Of Data To Perform The Rest Of The Contract. Price Would Be Based On Identifiable Direct Costs, Overhead, General And Administrative (g&a) And Profit. B. Group Ii - Data Essential To Contract Performance Which Must Be Reworked Or Amended To Conform To Government Requirements. The Price For Data In This Group Would Be Based On The Direct Cost To Convert The Original Data To Meet Government Needs And To Deliver It, Plus Allocable Overhead, G&a And Profit. C. Group Iii - Data Which The Contractor Must Develop For His Own Use And Which Requires No Substantial Change To Conform To Government Requirements Regarding Depth Of Content, Format, Frequency Of Submittal, Preparation, And Quality Of Data. Only The Costs Of Reproducing, Handling And Delivery, Plus Overhead, G&a And Profit, Are Considered Inpricing Data In This Group. D. Group Iv - Data Which The Contractor Has Developed As Part Of His Commercial Business. Not Much Of This Data Is Required And The Cost Is Insignificant. The Item Should Normally Becoded "no Charge." An Example Is A Brochure Or Brief Manual Developed For Commercial Application Which Will Be Acquired In Small Quantities, And The Added Cost Is Too Small To Justify The Expense Of Computing The Charge That Otherwise Would Go With The Acquisition. block 18: Enter The Total Estimated Price Equal To That Portion Of The Total Price Which Is Estimated To Be Attributable To The Production Or Development For The Government Of That Item Of Data. The Entry "n/c" For "no Charge" Is Acceptable. 6.3 In Accordance With Opnavinst 5510.1 All Documents And Drawings Provided By The U.s. Navy To Perspective Contractors Must Include A "distribution Statement" To Inform The Contractor Of The Limits Of Distribution, And The Safeguarding Of The Information contained On Those Documents And Drawings. There Are 7 (seven) Seperate Distribution Statement Codes Used For Non-classified Documents And Drawings. The Definition For Each Is As Follows: a... Approved For Public Release; Distribution Is Unlimited. b... Distribution Authorized To Us Governments Agencies Only. c... Distribution Authorized To Us Government Agencies And Their Contractors. d... Distribution Authorized To Dod And Dod Contractors Only. e... Distribution Authorized To Dod Components Only. f... Further Distribution Only As Directed By Commander, Naval Sea Systems Command, Code 09t. x... Distribution Is Authorized To Us Government Agencies And Private Individuals Or Enterprises Eligible To Obtain Export Controlled Technical Data In Accordance With Opnavinst 5510.161. date Of First Submission=asreq ;;approval Of The Quality Inspection Plan By Nswc Philadelphia Division Is Required Prior To First Article.;; ;;nswcpd Is The Acceptance Activity For Cdrl Data Item A001. Nswcpd Wawf/irapt Acceptor Dodacc Is "n64498".;; date Of First Submission=asreq ;approval Of The Procedure By Nswc Philadelphia Division Is Required Prior To Commencement Of First Article Unit.; ;nswcpd Is The Acceptance Activity For Cdrl Data Item A002. Nswcpd Wawf/irapt Acceptor Dodacc Is "n64498".; date Of First Submission=asreq ;;approval Of The Report By Nswc Philadelphia Division Is Required Prior To Commencement Of Production Lot Units.;; ;;nswcpd Is The Acceptance Activity For Cdrl Data Item A003. Nswcpd Wawf/irapt Acceptor Dodacc Is "n64498".;; date Of First Submission=asreq ;;supplier Format Is Acceptable.; ; ;;plt Report Shall Consist Of Oqed Records Listed In Contract Section E: Certified Industrial Laboratory Analysis Material; Visual/dimensional Inspection Report And Mercury Exclusion Certification.;; ;;approval Of The Report By Nswc Philadelphia Division Is Required Prior To Shipment Of Production Lot Units.;; ;;nswcpd Is The Acceptance Activity For Cdrl Data Item A004. Nswcpd Wawf/irapt Acceptor Dodacc Is "n64498".;;
Closing Date27 Jan 2025
Tender AmountRefer Documents 

Department Of Agriculture Tender

Machinery and Tools
Philippines
Details: Description Section I. Invitation To Bid Da8-goods-2025-21 (pr No. Bt-24- Goods-nupap-57204-0001) 1. The Department Of Agriculture-regional Field Office No. 8, Through The Nupap-2025 Current Fund Intends To Apply The Sum Of Seven Million One Hundred Eighty Thousand Seven Hundred Fifty Pesos Only (p7,180,750.00) Being The Approved Budget For The Contract (abc) To Payments Under The Contract For “supply And Delivery Of Farm Supplies & Garden Tools”. Bids Received In Excess Of The Abc Shall Be Automatically Rejected At Bid Opening. 2. The Department Of Agriculture-regional Field Office No. 8, Undertakes The Bidding Of This Procurement Project As “short-of-award.” Hence, The Notice Of Award To The Winning Bidder Shall Be Issued After Enactment By The Congress Of The General Appropriation Act (gaa) For 2025. 3. The Department Of Agriculture-regional Field Office No. 8, Now Invites Bids For The Above Procurement Project. Delivery Of The Goods Is Required Thirty (30) Calendar Days From Receipt Of Ntp. Bidders Should Have Completed, Within Two (2) Years From The Date Of Submission And Receipt Of Bids, A Contract Similar To The Project. The Description Of An Eligible Bidder Is Contained In The Bidding Documents, Particularly, In Section Ii. Instructions To Bidders. Qty Uom Item Description Unit Cost Total Cost Supply And Delivery Of Other Farm Supplies And Garden Tools Lot 1: 3,918,050.00 941 Pcs Bolo, ( Length: 8 Inches X Width: 2.5 Inches Long Wooden Handle) Fabricated, Made Of Leaf Spring) 350 329,350.00 87 Pcs Culture Net Or Trellising Net , 7 Inches X 7 Inches Grid X Length =100 Meters X Width =2.4 Meter 2,500.00 217,500.00 230 Pcs Garden Hoe (head - 230 X 175 Millimeter, 1.36 Kilogram In Forged Steel, With Varnished Hard Wood Handle Length 110-120 Centimeter) 400 92,000.00 790 Pcs Hand Trowel, Metal; Length = 12 Inches, Width = 3 Inches; Painted 250 197,500.00 225 Pcs Pickmattock (4l Pounds, Blade Edge And Pick Made Of Durable Forged Steel, Hard Wood Handle) 500 112,500.00 795 Pcs Pruning Shears, Total Length = 7 1/2 Inches High Carbon Steel Blades, Stainless Steel Spring, Locking Feature 500 397,500.00 1688 Pcs Seedling Tray (105 Holes) Made Of Plastic Material 100 168,800.00 225 Pcs Shovel: Material-carbon Steel; Handle-wooden; Shovel Head, Length: 12 Inches X Width 13 Inches 924 207,900.00 190 Pcs Spade With D-handle (total Length = 48 Inches, Blade Length = 8 Inches; Steel Handle, High Impact D-grip, Heavy Duty 400 76,000.00 225 Pcs Spading Fork (42 Inches Long, Steel Handle, With 4 Forged Steel Tines With 10 Inches Long And 7 Inches Wide, 4-5 Pounds Weight) 392 88,200.00 600 Set Stackable Plastic Pot With 1 Platter; 5 Trays/layers 12x12x7 Inches Dimensions; 1,200.00 720,000.00 146 Roll Uv Film, 200 Microns, Length = 50 Meters, Width = 8 Feet 6,000.00 876,000.00 76 Roll Garden Hose With Nozzle, Length = 50 Meters, 1/2 Inches Diameter 2,800.00 212,800.00 555 Pcs Plastic Water Sprinkler (8 Liters Capacity) 400 222,000.00 Lot 2: 965,400.00 201 Pcs Plastic Crates With The Following Size: 27.4 Inches X 15 Inches X15.7 Inches, Food Grade, Perforated, Full Grip Handle: 850 170,850.00 36 Pcs Hdpe Plastic Drum With Cover And Faucet, Open Top, 200 Li Capacity, Preferably Blue 3,500.00 126,000.00 1273 Pcs Hdpe Plastic Pots, 30 Centimeter Top Diameter., 2 Millimeter Thickness 150 190,950.00 724 Pcs Rake (14 Inches Straight, Heavy Duty With 48 Inches Steel Handle Length) 400 289,600.00 47 Pcs Plastic Mulch, Black, 1.20 Meters X 0.03 Millimeter X 400 Meters 4,000.00 188,000.00 Lot 3: 1,263,000.00 300 Box Hydroponics Box With Plastic Net Cups 1,330.00 399,000.00 A. Length:23.60 Inches.; Width: 15.75 Inches.; Height:4.5 Inches. B. 15 Holes Snap-lock Cover C. Preferably Blue Color D. Plastic Net Cups Diameter 3.5 Inches.; Height 3.25 Inches 144 Bed Mapal Bed 6,000.00 864,000.00 A. Length: 3000 Millimeter; Width:1000 Millimeter; Height:160 Millimeter B. Thickness: 0.75 Millimeter Black Hdpe C. Welded With Accessories With Drain Hole Lot 4: 1,034,300.00 189 Roll Polynet (fine Mesh Net) 3,700.00 699,300.00 A. Mesh Size: 24 Mesh B. Length = 8 Meter, Width = 12 Feet, Color: White 246 Pcs Pressure Sprayer (8 Liters Capacity; Pump Hand Pressure Operation) 500 123,000.00 225 Pcs Sharp Bolo, Blade Material: Molye/pure Leaf Spring; Handle Materials: Wooden With Ring; Total Length:19-20 Inches; Blade Length: 13-14 Inches; Blade Width: 2.5-3 Inches 600 135,000.00 11 Roll Fine Net (black Shading Net), 54 Mesh Or 80% Shading, 1.2 Meters X 100 Meters 7,000.00 77,000.00 Terms And Conditions: A. During The Opening Of Bids, Bidder/s Shall: 1. Submit Duly Notarized Affidavit Of Stock Sufficiency; 2. Bidder/s May Indicate The Brand That They Offered; B. Winning Bidder/s Shall: 1. Deliver New Items To Abuyog Experiment Station, Leyte. 2. Deliver The Items 30 Calendar Days Upon Receipt Of Ntp. 3. Inform The Gss Section And End User One (1) Week Before The Delivery Schedule; 4. Present Samples Of All The Garden Tools, Before Delivery. 5. Deliver The Items As Specified In The Contract Agreement; 6. Assemble All Necessary Items During The Delivery To The Drop Off Point. C. Any Delay Of Delivery Of The Item Shall Be Subjected To Liquidated Damages Equivalent To 1/10 Of 1% Of The Contract Price Per Day Of Delay Of The Undelivered Items; D. Payment Shall Be Made After Complete Delivery, Inspection, Acceptance And Submission Of All Necessary Documents Required For The Processing Of The Payment. E. Winning Bidder Shall Submit A Snapshot Of A Business Of A Business Bank Account (preferably Landbank) To Effect Payment. 4. Bidding Will Be Conducted Through Open Competitive Bidding Procedures Using A Non-discretionary “pass/fail” Criterion As Specified In The 2016 Revised Implementing Rules And Regulations (irr) Of Republic Act (ra) 9184. Bidding Is Open To All Interested Bidders, Whether Local Or Foreign, Subject To The Conditions For Eligibility Provided In The Irr Of Ra 9184. 5. Prospective Bidders May Obtain Further Information From Department Of Agriculture – Regional Field Office 8 And Inspect The Bidding Documents At The Address Given Below During Office Hours From 8:00am To 5:00 Pm. 6. A Complete Set Of Bidding Documents May Be Acquired By Interested Bidders On December 24, 2024 To January 21, 2025 From The Given Address And Website(s) Below And Upon Payment Of The Applicable Fee, Pursuant To The Latest Guidelines Issued By The Gppb. The Cost Of The Bidding Documents Shall Correspond To The Total Abc Of The Selected Lot/s On Which The Supplier Intends To Bid, With A Range As Indicated In The Table Below. Approved Budget For The Contract Maximum Cost Of Bidding Documents (in Philippine Peso) 500,000 And Below 500.00 More Than 500,000 Up To 1 Million 1,000.00 More Than 1 Million Up To 5 Million 5,000.00 More Than 5 Million Up To 10 Million 10,000.00 7. The Department Of Agriculture-rfo 8 Will Hold A Pre-bid Conference On January 07, 2025, 9:00 Am (bac-secretariat Time) At Da8 Bac Office, 4th Floor Green Bldg., Kanhuraw Hill, Tacloban City And Through Face To Face Or Video Conferencing Or Webcasting Via Google Meet, Which Shall Be Open To Prospective Bidders. 8. Bids Must Be Duly Received By The Bac Secretariat Through Manual Submission At The Office Address Indicated Below On Or Before January 21, 2025, 9:00 Am (bac-secretariat Time). Late Bids Shall Not Be Accepted. 9. All Bids Must Be Accompanied By A Bid Security In Any Of The Acceptable Forms And In The Amount Stated In Itb Clause 14. 10. Bid Opening Shall Be On January 21, 2025, 9:00 Am (bac-secretariat Time) At Da8 Bac Office, 4th Floor Green Bldg., Kanhuraw Hill, Tacloban City. Bids Will Be Opened In The Presence Of The Bidders’ Representatives Who Choose To Attend Either Physically Or Through Video Conferencing Via Google Meet. 11. The Department Of Agriculture-rfo 8 Reserves The Right To Reject Any And All Bids, Declare A Failure Of Bidding, Or Not Award The Contract At Any Time Prior To Contract Award In Accordance With Sections 35.6 And 41 Of The 2016 Revised Irr Of Ra No. 9184, Without Thereby Incurring Any Liability To The Affected Bidder Or Bidders. 12. Da Does Not Condone Any Form Of Solicitation On Any Prospective Winning And Losing Bidders By Any Of Our Staff/employees Or Any Other Party. Any Sort Of This Kind Shall Be Reported Immediately To The Office Of The Secretary Or The National Bureau Of Investigation (nbi) For Entrapment And Proper Investigation. 13. For Further Information, Please Refer To: Martins A. Alde Head, Bac-secretariat Department Of Agriculture, Regional Field Office-8 Kanhuraw Hill, Tacloban City Darfo8.bacsec@gmail.com Mobile No. 09061694318 Easternvisayas.da.gov.ph 14. You May Visit The Following Websites: For Downloading Of Bidding Documents: Www.philgeps.gov.ph Or Easternvisayas.da.gov.ph Approved By: (sgd.) Larry U. Sultan, Jd Chairman, Bids And Awards Committee
Closing Date21 Jan 2025
Tender AmountPHP 7.1 Million (USD 123.7 K)

DEPT OF THE NAVY USA Tender

Civil And Construction...+2Others, Pipe Line Project
Corrigendum : Closing Date Modified
United States
Details: Notice Type: Sources Sought solicitation No: N4008525r2522 response Date: 11/1/2024 2:00 Pm Eastern Time classification Code: Y naics Code: 236220 magnitude Of Construction: Between $25,000,000 And $100,000,000 this Is A Sources Sought Notice Only. This Is Not A Request For Proposal Or Invitation For Bid. There Will Not Be A Solicitation, Specifications Or Drawings Available At This Time. the Naval Facilities Engineering Command, Mid-atlantic Is Seeking Eligible Small Businesses, Hub Zone Small Businesses, Small Disadvantaged Businesses, Veteran-owned Small Businesses, Service-disabled Veteran-owned Small Businesses, And Women-owned Small Businesses Capable Of Performing Design-bid-build, For The P502 Replace Mcas Beaufort Fuel Pier, Marine Corps Air Station Beaufort, South Carolina. this Project Will Replace A Circa 1957 Pier With A New Fuel Pier That Meets Mil-hdbk- 1025/department Of Defense (dod) Unified Facilities Criteria (ufc) 2-000-05n, Facility Planning Criteria For Navy/marine Corps Shore Installations, Ccn 151-40, Ufc 4-150-02, Dockside Utilities For Ship Service, Ufc 3-201-01 Civil Engineering, Updated Sept 2020, And Ufc 4-152-01 Design: Piers And Wharves. Construction Will Include A Single Deck Fueling Pier Approximately 40 Linear Feet (lf) Wide And 169 Lf Long With A Pile Supported Concrete Approach That Is Approximately 25 Lf Wide And 200 Lf Long, With A Minimum 20 Lf Wide (inside Curb-to-curb) Vehicle One-way Travel Lane. The Piping Will Be Protected By Curbing On Either Side And Will Also Provide Containment In The Event Of A Leak. connecting The Pier And Approach Is A Section Of The Pier Which Measures Approximately 40 Lf Wide By 63 Lf Long, Creating A Pier Resembling A T Shape. the New Facility Will Be Constructed Concurrently With Demolition Of The Existing Facility, Allowing Ability To Maintain Existing Operations. Once Completed, The New Facility Will Also Serve As A Berthing/mooring Pier For Barges And At The Height Required Due To Slr. Primary Facilities Include New Concrete Piles, Decking, Storage Shed, Mooring Dolphins And Fuel Piping To/from The Loading Arm. Providing New Pier With Fueling Arm So That The Facility Will Have Two Defueling Options Instead Of Just One. This Added Redundancy Will Prove Advantageous In Case Of Maintenance On Either Defueling Access Point. Access To The Existing Small Support Crafts Will Be Maintained Throughout Construction, And The Approach Will Be In Almost The Same Footprint As Original, To Maintain Fuel Services, Temporary Lines May Be Required Or Existing Lines Supported In Place During Demolition And Construction. the Fuel Pier Site Is Located In The 100-year Flood Plain. The 2018 Marine Corp Air Station Beaufort (mcas Be) Fuel Pier Analysis Concluded That Equipment Could Be Negatively Affected By Floodwaters Elevated To Two-feet Above The High-water Level Of A Projected 100-year Flood. The Recommended Elevation Was To Be 11.4 Feet. in Sept 2020, The Ufc 3-201-01 Civil Engineering Was Updated For New Requirements, And Was Used In The 2021 Mcas Be Sea Level Rise (slr) Modeling Report. The Report Has Shown The Projected Slr Elevation In Coordination With The Updated Ufc 3-201-01 Civil Engineering, Ufc 3-460-01 Design: Petroleum Fuel Facilities, And Ufc 4-152-01 Design: Piers And Wharves. The Navfac Slr Subject Matter Expert (sme) Advised That P502 Will Fall Within Subcategory 3b: (high Risk, Essential Facilities) From Table 2-1 For Design Flood Elevation In Ufc 3-201-01. The Slr Sme Further Recommended Following The Department Of Defense Regional Sea Level (drsl) Database Approach, To Determine The Pier Deck Elevation. The Second Approach Outlined By Ufc 3-201-01 Is The Drsl Approach That Bases The Design Flood Elevation On The Drsl 2065 High Slr Scenario. Based On The Drsl Approach, The Bottom Of The Deck Would Need To Be At An Elevation Of 14.66 Feet Above Current Sea Level. this Project Includes The Realignment And Elevation Of Quilali Road To The Extent Required In Order To Provide Proper Access And Slope To The New Pier Deck Height. The New Road Will Be Elevated And Extended To Allow For Gradual Grading, With Sloped Embankments And Riprap Revetment On The Waterside To Prevent Erosion. [navfac Structural Engineer] tie-ins To Existing Infrastructure Such As Pump Stations And Storage Tanks Will Be Needed. additional Items Include Flexible Connections Where The Trestle Ties Into The Bulkhead/roadway. There Will Be Around A 6% Slope Along Quilali Road To Accompany The Adjusted Height Of The Pier. There Needs To Be An Elevation Difference Less Than 6.4 Ft From The Shore To The Deck Of The New Wharf. Elevate Parts Of Quilali Road Eight Percent To Support Smooth Transition Of Trucks/mobile Cranes From Trestle To Wharf, And Having A Floating Wharf For Defueling In Accordance With Ufc 4-152-01 Design: Piers And Wharves. [2021 Slr Modeling Report.] the Existing Small Boat Facility Will Have A Gangway Added From The Newly Constructed Pier Along With Connections To A New Water Line. The Length Of The Gangway May Need To Be Altered To Avoid Becoming Too Steep After The Increase In Pier Height Requirement. In Addition, Breasting Platforms May Need To Be Elevated And According To Exwc Report From 2018 Marine Corp Air Station Beaufort (mcas Be) Fuel Pier Analysis The Small Boat Facility May Need To Be Replaced Due To Structural Deficiencies And Maintenance Issues. operations And Maintenance Support Information (omsi) Is Included In This Project. facilities Will Be Designed To Meet Or Exceed The Useful Service Life Specified In The Dod Unified Facility Criteria. Facilities Will Incorporate Features That Provide The Lowest Practical Life Cycle Cost Solutions Satisfying The Facility Requirements With The Goal Of Maximizing Energy Efficiency. supporting Facilities Include Utilities And Connections (lighting, Power, And Potable Water Lines), Minor Site Civil Work (riprap, Fill, Etc.) And Site Demolition. Site Demolition Will Include Removing The Existing Decking, Beams, Vertical Piles, Utility Lines, Fuel Piping, Potable Water Piping, And Mooring. Existing Equipment Such As Oil Booms, Etc. Will Be Reused If Available And In Good Condition. Along With The Utilities, The Assumption Is That A Fire Protection Would Be Required In The Form Of A Stand-pipe System. this Project Will Provide Anti-terrorism/ Force Protection (at/fp) Features And Comply With At/fp Regulations And Physical Security Mitigation In Accordance With Ufc 4-020-01 Dod Security Engineering Facilities Planning Manual. special Costs Include Post Construction Contract Award Services (pcas), Geospatial Surveying & Mapping, And Cybersecurity Commissioning. facility-related Control Systems Include Cybersecurity Features In Accordance With Current Dod Criteria. dod And Department Of The Navy Principles For High Performance And Sustainable Building Requirements Will Be Included In The Design And Construction Of The Project In Accordance With Federal Laws And Executive Orders. Low Impact Development Will Be Included In The design And Construction Of This Project As Appropriate. facilities Will Be Designed To Meet Or Exceed The Useful Service Life Specified In Dod unified Facility Criteria. Facilities Will Incorporate Features That Provide The Lowest practical Life Cycle Cost Solutions Satisfying The Facility Requirements With The Goal Of maximizing Energy Efficiency. the Appropriate Northern American Industry Classification System (naics) Code For This Procurement Is 236220 – Commercial And Institutional Building Construction, And The Small Business Size Standard Is $45,000,000. In Accordance With Dfars 236.204, The Magnitude Of Construction For This Project Is Between $25,000,000 And $100,000,000. The Contract Will Include Far Clause 52.219-14 Limitations On Subcontracting, Which States That “the Concern Will Perform At Least 15 Percent Of The Cost Of The Contract, Not Including The Cost Of Materials, With Its Own Employees.” This Office Anticipates Award Of A Contract For These Services By Nov 2025. it Is Requested That Interested Small Businesses Submit To The Contracting Officer A Capabilities Package, To Include The Sources Sought Contractor Information Form, Sources Sought Project Information Form And Sources Sought Project Matrix, Provided As Attachments To This Notice. the Sources Sought Project Information Form And Sources Sought Project Matrix Shall Be Used To Document A Minimum Of One (1) Fuel Transfer Facility And Up To A Maximum Of Five (5) Relevant Construction Projects Completed In The Past Ten (10) Years That Best Demonstrate Experience On Projects That Are Similar In Size, Scope And Complexity To The Project Described Herein. a Relevant Project Is Further Defined As: size: Final Construction Cost Of $10 Million Or Greater. Total Construction Area Of More Than 5,000 Square Feet. scope: Prime And/or Subcontractor With Construction Of Municipal, Governmental, Industrial Fuel Transfer Facility With Reinforced Concrete Pile Supported Waterfront Structure Experience. Fuel Facilities Will Include Fuel Transfer Equipment. complexity: While Also Meeting The Scope Requirements Set Out Above, The Following Complexity Requirements Shall Be Met Collectively By The Projects Submitted, I.e. Each Submitted Project Does Not Require Demonstrated Experience With All Of The Following Components, But Collectively, Experience With All Of The Complexity Elements Below Must Be Established Throughout The Submitted Relevant Projects. Each Project Submitted Must Demonstrate Experience Constructing A New Reinforced Concrete Pile Supported Structure In A Waterfront Environment: dod, Commercial, Or Municipal Fuel Transfer Facility; dod, Commercial, Or Municipal Waterfront Reinforced Concrete Pier. ensure That The Project Description Clearly Identifies Whether The Project Is New Construction Or Repair/renovation, Addresses How The Project Meets The Scope And Complexity Requirements As Delineated Above, And Provides The Final Construction Cost. please Note That If You Are Responding As An 8(a) Mentor-protégé, You Must Indicate The Percentage Of Work To Be Performed By The Protégé. a Copy Of The Sba Letter Stating That Your 8(a) Mentor-protégé Agreement Has Been Approved Would Be Required With Your Proposal, If Requested. this Notice Is A Market Research Tool Being Used To Determine The Availability And Adequacy Of Potential Small Business Sources Prior To Determining The Method Of Acquisition And Ultimate Issuance Of A Solicitation. upon Review Of Industry Response To This Sources Sought Notice, The Government Will Determine Whether Set-aside Procurement In Lieu Of Full And Open Competition Is In The Government’s Best Interest. Large Business Submittals Will Not Be Considered. The Government Is Not Obligated To And Will Not Pay For Any Information Received From Potential Sources As A Result Of This Notice. the Information Provided In This Notice Is Subject To Change And In No Way Binds The Government To Solicit For Or Award A Contract. The Government Will Not Provide Debriefs On The Results Of This Research, But Feedback Regarding The Decision To Set Aside Or Not Set Aside The Procurement Will Be Accomplished Via Pre-solicitation Synopsis Or Solicitation For These Services, As Applicable. all Information Submitted Will Be Held In A Confidential Manner And Will Only Be Used For The Purpose Intended. Points Of Contact Listed May Be Contacted For The Purpose Of Verifying Performance. responses Are Due Nlt 01 Nov 2024, 2:00 Pm Est. the Package Shall Be Sent Via Electronic Mail To Scott Schulz At Scott.c.schulz.civ@us.navy.mil. attachments Are Limited To A Total Of 5mb.
Closing Date24 Jan 2025
Tender AmountRefer Documents 
7461-7470 of 7489 active Tenders