Tenders of Offizielle Bezeichnung
Offizielle Bezeichnung Tender
Civil And Construction...+2Consultancy Services, Civil And Architectural Services
Germany
Contract notice – general guideline, standard regulation negotiated procedure with prior publication of a call for competition/negotiated procedure (services) Architectural and engineering services (general planning services) for the renovation of the indoor and leisure pool Architectural and engineering services (only basic investigation and preliminary planning) for subsequent ... Multi-architectural and engineering services (general planning services) for the renovation of the indoor and leisure pool Architectural and engineering services (only basic investigation and preliminary planning) for subsequent scope of services - Object planning for buildings and interiors in accordance with Hoai 2013, Part 3 - Object planning for outdoor areas in accordance with Hoai 2013, Part 3 - Specialist planning for structural planning in accordance with Hoai 2013, Part 4 - Specialist planning for technical equipment in accordance with Hoai 2013, Part 4 Note: Only the planning services in accordance with Hoai service phases 1 and 2 are to be commissioned. The start of these planning services is planned for 2025. Once the planning results have been presented, the city of Laubach will decide on further project development and the commissioning of further architectural and engineering services. Architectural and engineering services (general planning services) for the renovation of the indoor and leisure pool Architectural and engineering services (phases 1 + 2) for the renovation of the indoor and outdoor pool with the following partial services (net): Buildings and interior spaces: Kg 300: approx. EUR 3,000,000.00 Outdoor facilities: Kg 500: approx. EUR 3,500,000.00 Technical equipment: Kg 400: approx. EUR 3,500,000.00 Note: Only the planning services in accordance with HOAI service phases 1 and 2 are to be commissioned. The start of these planning services is planned for 2025. After the planning results have been presented, the city of Laubach will decide on further project development and the commissioning of further architectural and engineering services.
Closing Date17 Feb 2025
Tender AmountRefer Documents
Offizielle Bezeichnung Tender
Others
Germany
Contract notice - general guideline, standard rule, open procedure (construction work) Ve 300-037 Metalworking As part of an international research project, Fair GmbH is planning to build the new accelerator complex "fair" (facility for antiproton and ion research) ... Moreve 300-037 Metalworking As part of an international research project, Fair GmbH is planning to build the new accelerator complex "fair" (facility for antiproton and ion research) - hereinafter referred to as the Fair project - with a connection to the existing GSI accelerator facility. The subject of this tendering procedure (ve300-037) is the metalworking services inside and outside for the execution of metalwork structures for beamline crossings, external stairs, roof crossings, grating levels and pump sump covers. Ve 300-037 Metalworking The subject of the contract is the execution of metalwork in the interior and exterior of the new building of the International Accelerator Center for Research with Ions and Antiprotons with the execution of metal constructions for beamline crossings, external stairs, roof crossings, grating levels and pump sump covers, including the application of corrosion protection layers. The main services are: - Approx. 36 beamline crossings as two-flight stringer staircase constructions with grating platform and grating steps as well as with railing, width approx. 0.60 m, height up to approx. 2.30 m, with up to approx. 26 steps, I-, L- and U-shaped - 1 external staircase as two-flight stringer staircase constructions with 2 grating platforms and 30 grating steps as well as with railing, width approx. 1.00 m, height up to approx. 5.00 m - 2 roof crossings as stringer staircase constructions, grating platform and railing as well as 2 reinforced concrete foundations each, height up to approx. 2.30 m, with up to approx. 15 steps - Approx. 140 grating levels in TGA shafts in various sizes, grating area from approx. 1.50 m² to approx. 25 M², including support angles, recesses and ladder - approx. 160 grating covers on pump sumps in various sizes, ZT including substructure, dimensions (lxw) from approx. 0.40 x 0.40 m to approx. 2.00 x 0.80 m, including recesses, size from approx. 450 to 600 cm² in max. 3 openings - approx. 90 anchor points/securing devices, made of stainless steel, inner diameter approx. 30 mm, thread height approx. 80 mm
Closing Date17 Feb 2025
Tender AmountRefer Documents
Offizielle Bezeichnung Tender
Software and IT Solutions
Germany
Contract notice – general guideline, standard regulation Open procedure (services) Procurement of support and consulting services for SAP standardization and automation based on the software product Streamworks The aim of this tender is to conclude a framework agreement for the procurement of support and consulting services for SAP standardization and automation based on the software product Streamworks. Procurement of support and consulting services for SAP standardization and automation based on the software product Streamworks The main focus for SAP infrastructure projects during the term of the framework agreement is - the migration of the central systems to the S4/HANA world of SAP. Due to the state’s requirements for SAP systems, an on-premise solution will continue to be operated in the HZD’s Rz. - Other current projects will only be listed here in bullet points. - Introduction and expansion of SAP Middleware (SAP-PO) - Expansion of the use of Solution Manager (ALM) - Introduction of various tools to optimize operational processes (Focused Run, Ansible, Bluecopy) - Introduction and expansion of hybrid solutions with cloud connection to the current on-premise solutions The relevant project tasks require external support and advice. Against this background, the contractor is expected to be familiar with the working methods in an SAP-certified CCOE (basic certification), compliance-compliant working methods (including IDW PS 330), process-supported incident management, change management and problem management in accordance with ITIL V3 and Prince2 as a process model for project management, as well as the respective processes, and to be practiced by the people he employs. For the services advertised, only one person should be offered for each role (R 1.1 and R 1.2) (so a maximum of two people in total). If appropriately qualified, the same person can be specified for two roles. Description of the service: In detail, it can be assumed that services are to be provided for the following areas of responsibility: - Role 1.1: Further development of the standardization and automation of process flows, in particular using Streamworks - Role 1.2: Operation and maintenance of Streamworks and associated components The advertised service is divided into two profiles. In order to successfully solve the tasks named below, for each area of responsibility, many years of practical experience in the enterprise environment in the tasks named is a prerequisite. Tasks (role R1.1): By taking on this area of responsibility, the independent and uninstructed completion of the following tasks is planned: - standardization and automation of repetitive processes in SAP Basis operations, in particular payroll accounting, in particular using Streamworks This task is typically divided into the following individual steps: - Identify processes worthy of standardization and automation - Create a solution concept for this - Implement the solution concept using tools (preferably with Streamworks or SAP's own Tools) - Implementation in own programming (batch scripts, Perl, ...) - Quality assurance - Documentation - Creating and revising higher-level concepts for standardization and automation in SAP-basis operations - Maintenance and further development of automation areas already implemented with the help of Streamworks (particularly in payroll accounting) - Knowledge transfer to employees of the HZD and the HCC Qualification: College or university degree in IT or an IT-related subject (e.g. computer science, business informatics, natural sciences, mathematics) or comparable knowledge and skills acquired in practice. At least 36 months of experience for each of the following required qualifications: - Standardization and automation of repetitive processes in SAP Basis operations - identification of processes worthy of standardization and automation - Creation of solution concepts - Creation and revision of higher-level concepts for standardization and automation in SAP Basis operations At least 60 months of experience for each of the following required qualifications: - Tool-supported implementation of automation projects with Streamworks and SAP's own tools - Maintenance and further development of processes that are already automated with Streamworks - Implementation through in-house programming (batch scripts, Perl) At least 12 months of experience for each of the following required skills: - Collaboration in higher-level projects and committees - Communication and documentation of decisions and processes - Application of processes for knowledge transfer Tasks Role R1.2: Taking on this area of responsibility means completing the following tasks independently and without instructions Intended: - Operation and maintenance of Streamworks and associated components This task is typically divided into the following individual steps: - Activities related to the Streamworks server, in particular the installation of release upgrades and updates - Operation of the Streamworks GUI, in particular the installation of release upgrades and updates, as well as configurations - Operation and setup of additional functionalities in Streamworks, primarily reporting and the self-service portal, including configuration and certificate import - Operation of the Streamworks agents, in particular their installation, upgrades, configuration and certificate import - Operation of the interfaces required for Streamworks, in particular their configuration and upgrades - Support in the event of faults - Knowledge transfer to employees of the HZD and the HCC The qualification requirements can be found in the service description. All other requirements for the provision of services and the description of the work environment can also be found in the service description (file "service description").
Closing Date17 Feb 2025
Tender AmountRefer Documents
Offizielle Bezeichnung Tender
Others
Germany
Contract notice – General guidelines, standard rules, open procedure (supplies) Supply of a rescue and firefighting group vehicle Hlf10 in accordance with DIN 14530-26. Construction and supply of a rescue and firefighting group vehicle Hlf10 in accordance with DIN 14530-26. Supply of a rescue and firefighting group vehicle Hlf10 in accordance with DIN 14530-26. Delivery of a rescue and firefighting group vehicle Hlf10 in accordance with DIN 14530-26. Construction and supply of a rescue and firefighting group vehicle Hlf10 in accordance with DIN 14530-26.
Closing Date13 Feb 2025
Tender AmountRefer Documents
Offizielle Bezeichnung Tender
Civil And Construction...+2Consultancy Services, Civil And Architectural Services
Germany
Contract notice – Sector Directive, standard regulation negotiated procedure with prior publication of a call for competition/negotiated procedure (services) Specialist planning for technical equipment 50hz Pfa South 1 (VE0433) for the infrastructure project Regionaltangente West (RTW) Specialist planning for technical equipment 50hz Pfa South 1 for the infrastructure project Region ... Multiple planning for technical equipment 50hz Pfa South 1 (VE0433) for the infrastructure project Regionaltangente West (RTW) Specialist planning for technical equipment 50hz Pfa South 1 for the infrastructure project Regionaltangente West (RTW) Specialist planning for technical equipment 50hz Pfa South 1 (VE0433) for the infrastructure project Regionaltangente West (RTW) The Regionaltangente West (RTW) is a new tangential rail connection in the Rhine-Main area to improve local public rail passenger transport in the Frankfurt am Main metropolitan area. Its primary purpose is to improve the connection between the western districts of the city of Frankfurt am Main and the surrounding districts, cities and municipalities and to improve the connection to Frankfurt Airport. The project is divided into the planning approval sections Pfa North, Pfa Middle and Pfa South I and South II. The subject of this tender is the implementation planning (commissioning planning) as well as the preparation and participation in the award of the contract. This invitation to tender relates to planning services for the technical trade of high-voltage systems (50 Hz systems) in accordance with Section 55 Hoai in conjunction with Appendix 15 (phases 5-9 as basic services including special services) and construction management planning services in accordance with DB Ril 406. The planning services include the services listed below: Specialist planning for technical equipment 50 Hz in accordance with Section 55 Hoai in conjunction with Appendix 15 Hoai (transferred services phases 5, 6, 7 and 9). A detailed description of the services to be provided can be found in the tender documents.
Closing Date13 Feb 2025
Tender AmountRefer Documents
Offizielle Bezeichnung Tender
Others
Germany
Contract notice - general guideline, standard regulation open procedure (construction work) Old Opera, fire protection renovation drywall work Ba 6.2 - 8.2 drywall work Mozart Hall, walkways, general ceilings + walls, protective measures Old Opera, fire protection renovation drywall work ... More Old Opera, fire protection renovation drywall work Ba 6.2 - 8.2 drywall work Mozart Hall, walkways, general ceilings + walls, protective measures Old Opera, fire protection renovation drywall work Ba 6.2 - 8.2 The city of Frankfurt am Main intends to carry out the complete fire protection renovation of the property "Old Opera, Concert and Congress Center, Opera Square, Frankfurt am Main". This will be implemented in individual construction phases. The content of the tender are measures from construction phases 6.2-8.2. The execution periods are as follows: Start of term for preparatory services: June 9th, 2025 Ba 6.2: 07 - 08 / 2025 Theater holidays from July 7th to August 31st Ba 7.1: 09 / 2025 - 05 / 2026 Ba 7.2: 06 - 08 / 2026 Theater holidays from June 29th to August 23rd Ba 8.1: 09 / 2026 - 06 / 2027 Ba 8.2: 07 - 09 / 2027 Theater holidays from June 28th and end on August 29th. End of term for follow-up services: September 30, 2027 The following measures are planned as part of this construction phase, among others: - Drywall work in the Mozart Hall - Drywall work in the corridors - General drywall work - Protective measures The renovation is to be carried out essentially during ongoing operations, during the 8-week theater holiday that is available for the construction measures. Under no circumstances may these be exceeded by construction delays or order deadlines. Due to the tight time frame, the contractor must allow for 2-shift operation from 6 a.m. to 10 p.m. for the work.
Closing Date13 Feb 2025
Tender AmountRefer Documents
Offizielle Bezeichnung Tender
Others
Germany
Contract notice - general guideline, standard rule, open procedure (construction work) Timber construction, windows, sun protection, facade cladding, scaffolding Manufacture of timber construction, windows, sun protection, facade cladding, scaffolding. Timber construction, windows, sun protection, facade cladding, scaffolding ... Multi-timber construction, windows, sun protection, facade cladding, scaffolding Manufacture of timber construction, windows, sun protection, facade cladding, scaffolding. Timber construction, windows, sun protection, facade cladding, scaffolding Timber construction, window, sun protection, facade, scaffolding work. The service is part of the construction project "Arheilgen district school - renovation and extension of buildings B and C" of the Science City of Darmstadt, represented by the property management company of the Science City of Darmstadt (ida).
Closing Date12 Feb 2025
Tender AmountRefer Documents
Offizielle Bezeichnung Tender
Others
Germany
Contract notice – general guideline, standard rule open procedure (construction work) Diesterwegschule, ventilation installation Ventilation installation Diesterwegschule, ventilation installation Type and scope of work: The construction work involves the renovation and extension of the school, consisting of an existing building and the construction of a new school building with two gymnasiums and a cafeteria. Number of floors: 7 full floors The following services are carried out: Ventilation installation: - 8 central air conditioning units - 12 decentralized classroom ventilation units - 14 decentralized small fans - 3 small refrigeration systems - Approx. 655 m² galvanized ducts - Approx. 1350 m² galvanized duct fittings - Approx. 86 m² galvanized ducts, grease-proof - Approx. 75 m² galvanized duct fittings, grease-proof - Approx. 8 m² V2a ducts - Approx. 14 m² V2a duct fittings - Approx. 876 m pipes Dn80 to Dn400 - Approx. 390 pipe fittings Dn80 to Dn400 - 90 constant volume flow regulators, square/round, with silencer - 15 variable volume flow regulators, square/round, with silencer - 13 roof ducts with rain collar - Approx. 171 pieces Ventilation inlets and outlets - 3 stainless steel kitchen ventilation hoods - Approx. 80 square/round fire dampers - Approx. 53 fire damper motors - Approx. 750 m² duct and pipe insulation - Approx. 62 m² L90 duct insulation
Closing Date13 Feb 2025
Tender AmountRefer Documents
Offizielle Bezeichnung Tender
Civil And Construction...+1Road Construction
Germany
Contract notice – general guidelines, standard rules Open procedure (construction work) K 165, 166, 167 - Ge Der Od Lich - St. Muschenheim K 165, 166, 167 - Ge Der Od Lich - St. Muschenheim K 165, 166, 167 - Ge Der Od Lich - St. Muschenheim Type and scope of work: Road construction, concrete work, sidewalks, water supply, sewer construction. Community measure: No award of individual titles possible. Be, Br, Vs, sidewalks, street lighting - Ag Stadt Lich: Construction site setup and clearing, traffic safety, approx. 6,850 m² asphalt removal, approx. 3,900 m³ excavated soil, approx. 2,200 m³ coarse gravel, approx. 2,370 m³ frost protection material, approx. 30 pieces of street drains, approx. 300 m² asphalt superstructure, approx. 60 m gutter stones, approx. 3,500 m curbs, approx. 6,600 m² concrete paving stones, approx. 2,600 m empty pipes, approx. 11 pieces of masts for street lighting, other services / ancillary work. Road construction - Ag Landkreis Gießen: Approx. 8,500 m² asphalt removal, approx. 6,200 m³ excavated soil, approx. 3,000 m³ coarse gravel, approx. 2,000 m³ frost protection material, approx. 45 pieces of road drains, approx. 9,000 m² asphalt surface, approx. 2,650 m gutter stones, other services / ancillary work. Sewer construction - Ag Stadtwerke Lich: Approx. 90 m² asphalt construction, Approx. 100 m² concrete paving, Approx. 9,240 m³ soil excavation, Approx. 2,500 m³ soil preparation, Approx. 2,750 m³ bedding material, Approx. 4,250 m³ soil material, Approx. 1,560 m³ frost protection material, Approx. 515 m³ coarse gravel, Approx. 10,600 m² shoring, Approx. 7 pieces of open groundwater management, Approx. 2 pieces of groundwater lowering, Approx. 1,600 m sewer demolition concrete/reinforced concrete and GRP Dn 250 to Dn 1000, Approx. 190 m sewer backfilling, Approx. 39 pieces of shaft demolition concrete/reinforced concrete, Approx. 1,600 m sewer reinforced concrete Dn 300-1000, Approx. 37 pieces of prefabricated concrete/reinforced concrete shafts, Approx. 1,660 m of connecting lines, Approx. 135 pieces of connecting lines, Approx. 3 pieces of road drains, Approx. 190 m² of asphalt superstructure, Approx. 10 m of gutter stones, Approx. 20 m of curbs, Other services/ancillary work. Water supply - Ag Stadtwerke Lich: Approx. 10 m² concrete paving stones, approx. 2,600 m³ excavated soil, approx. 540 m³ soil preparation, approx. 1,100 m³ bedding material, approx. 670 m³ soil material, approx. 720 m³ frost protection material, approx. 4,300 m² shoring, approx. 170 m pipeline expansion, approx. 3,000 m emergency water supply, approx. 1,230 m water pipe Dn 80 - 200, approx. 13 underground hydrants, approx. 100 drilling fittings, approx. 740 m house connection lines, core drilling, wall penetrations, other services / ancillary work.
Closing Date13 Feb 2025
Tender AmountRefer Documents
Offizielle Bezeichnung Tender
Civil And Construction...+2Consultancy Services, Civil And Architectural Services
Germany
Contract notice - general guideline, standard rule Open procedure (services) ZKJF GmbH - Lot-based award of primary school care services as part of the Hessian state program "Pact for All-Day Care" from the 2025/2026 school year. The subject of the award procedure is the lot ... MoreZKJF GmbH - Lot-based award of primary school care services as part of the Hessian state program "Pact for All-Day Care" from the 2025/2026 school year. The subject of the award procedure is the lot-based award of primary school care services as part of the Hessian state program "Pact for All-Day Care" from the 2025/2026 school year at thirteen different primary schools in the Main-Kinzig district. Lot 1: Biebertal Primary School Biebergemünd-bieber - Address: Biebertalstraße 12, 63599 Biebergemünd - Start of service: August 1st, 2025 - Number of students: 110 - Students to be supervised: 110 + Of which 90 in Module 1 + Of which 20 in Module 2 - Rooms: The primary school consists of two main buildings and a gymnasium. Around the building there is a spacious outdoor area with a playground and meadows. The total size of the school grounds, including the built-up areas, is 15,030 square meters. The area is not fenced. In the lower building on the ground floor there is the school administration, a teachers' room and a meeting room, as well as the staff toilets. On the 1st floor there are a total of 4 classrooms, a small multifunctional room with games and a larger multifunctional room with the option for exercise and a kitchenette. In the upper building there are a total of 6 classrooms, a workshop, a library and a small meeting room. The support association currently has two classrooms available for the care facility. Other rooms can be used for doing homework. All rooms used across grades and subjects (e.g. library or workshop) are available. As the upper building is in dire need of renovation, the school will be building a new building in the next few years. Plans for this already exist and are currently being revised. There is no specific date for the start of construction yet. This new building complex will include a cafeteria and multi-purpose rooms that can be used as part of the all-day program. A temporary spatial solution must be found for the start on August 1, 2025, as the school does not currently have a cafeteria with a serving kitchen. The support association has set up a room in the school with furniture and toys for the care facility, which is used exclusively for care. There is also a small kitchenette here. Water is heated by an electric boiler. Since the start of the last school year, the childcare service has used a second classroom for lunch and homework support. As part of the all-day pact, the school authority is planning to set up and use as many as four classrooms as possible in a multifunctional manner. One room (or two rooms if necessary) must be converted into a serving kitchen and temporary cafeteria for lunch at short notice. The upcoming new building will mean that some work will be carried out using mobile serving equipment. The primary school gym can also be used for afternoon activities. As it is currently also frequently used by the gymnastics club, clear agreements between all those involved and, if necessary, a reorganization of the times of use are necessary. - Further information can be found in the Biebertal Biebergemünd-Bieber primary school's concept for implementing the all-day pact (appendix II.2.a of the service description). Lot 2: Wilhelm-hauff-schule Flörsbachtal-lohrhaupten - Address: Gartenstraße 28, 63639 Flörsbachtal - Start of service: August 1st, 2025 - Number of students: 82 - Students to be supervised: 30 + of which 25 in module 1 + of which 5 in module 2 - Rooms: The school has sufficient and varied space. Grades 1-4 are housed in building I. Since there have been two classes in year 2 since last school year, there is an additional classroom in building III. The workshop, which is used by all classes, is also located in building III. The religious studies room is in the basement. Since two classes are expected to start in year 1 in the 2025/2026 school year, the religious studies room will move. In the administration building there is an auditorium on the first floor, which is used for parties and celebrations, as well as a school kitchen. The music room is on the first floor. For all parties and celebrations in the auditorium, this means that there are short distances when it comes to transporting instruments, etc. On the ground floor of the administration building there is a reading corner, which is very popular with the students. The school has a paved schoolyard on three levels. There are painted hopscotch games on the third level, a table tennis table on the lower level, a games cupboard in the entrance area in which all the available play equipment is stored, and mobile equipment that is stored in the teaching materials room (ground floor), movable soccer goals, a reading corner in the entrance area with lounge furniture for "lounging" and/or as a place of retreat, a beanbag in the reading corner, a mobile bookshelf in the reading corner, a "green" classroom with an awning on the former gymnastics lawn. The following rooms will be made available for all-day care in the 2025/2026 school year: 1. School kitchen with adjoining, former preparation room as a dining room; the corresponding furniture is not yet available. 2. The existing support association rooms will be included. The rooms for doing homework are known to the students. This room is currently equipped with 14 chairs and corresponding tables. There is also a room opposite for playing and relaxing (= rest area). 3. The schoolyard can be used as a place to play and exercise. The playground games are in the entrance area of the administration. The gym is available to the students and all clubs. Based on current knowledge, it should be possible to use the hall for the all-day offer. 4. There is a cooperation with the local library, which supplies the students with books every week - a selection of books is also available in the book corner. 5. The classrooms in building I can be used as needed. 6. The school premises are not barrier-free. 7. There are no rooms for special education and care for pupils with physical disabilities, for example. 8. The parents' room, the teachers' room or the DAZ room are available for meetings and administrative work by the care provider. 9. The Nawi room in building 3 is available for experiments and projects. In the future, corresponding working groups could take place here. - Further information can be found in the Wilhelm-Hauff-Schule Flörsbachtal-Lohrhaupten concept for implementing the pact for all-day schooling (appendix II.2.b of the service description). Lot 3: School at the village square Freigericht-Altenmittlau - Address: Kegelbahnstraße 59, 63579 Freigericht-Altenmittlau - Start of service: August 1st, 2025 - Number of students: 80 - Students to be supervised: 50 + of which 35 in module 1 + of which 15 in module 2 - Rooms: The school comprises three parts of the building: On the ground floor of the new building there are three classrooms, the student toilets and the technical room. On the first floor there is another classroom, the computer room, administration wing (teachers' room, school management office, caretaker's office and secretary's office) and the teachers' toilets. On the second floor/top floor there are two former classrooms that are used as a school kitchen and music room (choir, guitar and flute course, music club). These rooms were formerly used as care rooms and were renovated by the support association and the caretaker after the move to the old building. Directly past the administration wing is the passage to the attached community hall/gymnasium, which is mainly used for school sports. There are also changing rooms and other toilet facilities there. The gymnasium is currently available for sports activities on 2 afternoons (Zumba courses on Wednesdays, sports club on Thursdays). In the old building (110 years old) the windows were renovated/replaced 2 years ago so that the rooms can still be used. On the ground floor, after the extensive renovation last year, there is a former classroom that serves as a play and care room, the new school kitchen/canteen (former workshop), a laundry/cleaning room and student toilets. On the first floor you will find the lavishly expanded student library, which extends over 2 rooms (wall opening). It also houses the care office and, in the future, the office of the all-day coordinator. Two further rooms are connected by a hole in the wall and are available for educational homework supervision, free learning times and afternoons. On the 2nd floor/attic there are table/chair storage rooms and an attic that is not used. - Further information can be found in the concept of the school at Dorfplatz Freigericht-Altenmittlau for the implementation of the pact for all-day schooling (appendix II.2.c of the service description). Lot 4: Igelsgrundschule Gelnhausen Höchst - Address: Schulstraße 11, 63571 Gelnhausen - Start of service: August 1st, 2025 - Number of pupils: 161 - Pupils to be supervised: 120 + of which 90 in module 1 + of which 30 in module 2 - Rooms: There are currently two separate rooms in the classroom wing available for school supervision. In addition, other multifunctional rooms are used for learning, play and relaxation phases. There is a kitchen with seating for eating meals. The school library also serves as a quiet room and the auditorium is used by children to play together when the weather is bad. Homework support and support group work takes place in classrooms, as these promote a learning atmosphere by being equipped with tables and chairs. The study groups take place in the multifunctional rooms and also in the playground, in the gym or in the garden area. However, the current space is not sufficient for around 90 students. The kitchen is not designed for such a high number of students. In particular, there is no cafeteria. The concept and use of the rooms is to be re-planned and urgently required structural renovation measures are to be implemented as quickly as possible. These are currently planned for 2026. - Further information can be found in the concept of the Igelsgrundschule Gelnhausen Höchst for the implementation of the pact for the whole day (appendix II.2.d of the service description). Lot 5: Herzbergschule Roth Gelnhausen Roth - Address: Rathausstraße 1, 63571 Gelnhausen - Start of service: August 1st, 2025 - Number of students: 84 - Students to be supervised: 55 + of which 35 in module 1 + of which 20 in module 2 - Rooms: The space situation at the Herzbergschule is severely restricted by its location in the middle of town and the right of use of the clubs in the town hall. Nevertheless, an attempt was made to use the little space as best as possible, which in turn leads to increased staff deployment, especially during the full day. The division of the school into two buildings means that double supervision is necessary. The distribution of the number of children according to the number of seats available in the rooms is also a factor. The current spatial conditions can only be reconciled with the school development goals of the Herzbergschule to a limited extent. The existing conditions were optimized together with the school authority. The buildings are separated by a traffic-calmed street. The two buildings, some of which are listed buildings, contain 5 classrooms ranging in size from 49m² to 56m² with ergonomic furniture. There is a multifunctional room (54m²) for the preparatory course, the intensive course, ethics lessons, work time and study groups. There is also a care room (50m²) with a kitchenette and a PC workstation, a PC room, the school library, the secretary's office, the teachers' room and a consultation room. Depending on the weather, the municipal playground and the neighboring village square are used as the schoolyard. The public village square is on the Mkk property, but due to its dual use it can only be included in the Herzbergschule's educational concept to a limited extent. The school relies on flexible, mobile equipment, but the limited storage options mean that the capacity is exhausted. Thanks to the cooperation with the Roth Music Association and TV Roth, their club rooms can be used to counteract the ever-increasing lack of space. The music association room is used as a music room and as an alternative for supervision when it rains. It is not possible to design the room to be child-friendly. The TV Roth club room is available for dance groups and the pre-holiday parties that take place four times a year. For sports lessons, the Willi Bechtold Hall is within walking distance. Unfortunately, the city of Gelnhausen rents out the room at regular intervals, which means that it is not used at all. The teachers' room was redesigned in 2017 and offers limited opportunities for preparing for or following up on lessons. Specialist teachers without a classroom do not have the opportunity to store their own materials in the teachers' room. The staff meeting of the teaching team takes place in the care room on the children's furniture. The furniture does not meet the requirements of ergonomics in the workplace. The serving kitchen and the administrative computer of the all-day coordinator are also located in this room. Due to the age of the school building and the former town hall, the buildings do not have spacious hallway areas. In this respect, there is no possibility of expanding the space available. Since the school does not have a large room for the whole school community, all events have to take place outdoors and are therefore always dependent on the weather. - Further information can be found in the Herzbergschule Roth Gelnhausen Roth concept for implementing the pact for all-day schooling (appendix II.2.e of the service description). Lot 6: School at the Hofgut Mittel-gründau - Address: Hofweg 1, 63584 Gründau - Start of service: August 1st, 2025 - Number of students: 86 - Students to be cared for: 35 + Of which 25 in Module 1 + Of which 10 in Module 2 - Rooms: The school's existing rooms, including the multifunctional rooms and the container building, are used for all-day care. The outdoor area with the play equipment also offers space for exercise and play. The school at the Hofgut has four classrooms, two multifunctional rooms and an outdoor area with play equipment. One multifunctional room is currently used as an additional classroom due to the high number of students in class 4, as well as an inclusion room for the individual instruction of a child with a focus on learning. The other multifunctional room serves as a school library, PC and media room, as well as a room for remedial teaching and school social work. One of the classrooms is a little larger and has a separate outside door that faces the schoolyard playground and the current care building. Due to its location and size, it is ideally suited as one of the future rooms for homework supervision and other all-day activities. Like the classrooms, the multifunctional rooms have digital whiteboards and some work tables with chairs. Another room serves as a materials and workshop room. The administration (school management and secretariat) use two connected office rooms. The school itself has no cafeteria, dining rooms or suitable kitchen for lunch. There is only a fitted kitchen in the teachers' room. The municipality's container building, which is currently used by the "villa Krake" care center, is also possibly available. It could possibly continue to be used as a care and leisure center if the necessary renovation work on the kitchen were carried out in a timely manner. Long-term planning for the construction of a needs-based cafeteria with a kitchen and other rooms on the school premises or the adjacent municipal property is being developed in cooperation with the municipality and the district. In the near future, there will probably be minor adjustments and extensions to the furniture and equipment in the school rooms and the care rooms. In order to be able to use the classrooms both as teaching rooms and as care rooms for homework and other activities, multifunctional furniture, rollable shelves, rollable room divider shelves and, above all, additional height-adjustable seating are essential. - Further information can be found in the concept of the school at Hofgut Mittel-Gründau for the implementation of the pact for all-day schooling (appendix II.2.f of the service description). Lot 7: Geisbergschule Linsengericht Eidengesäß - Address: Schulstraße 29, 63589 Linsengericht - Start of service: August 1st, 2025 - Number of students: 227 - Students to be supervised: 110 + 80 of them in module 1 + 30 of them in module 2 - Rooms: The Geisbergschule is spread over three wings with the administration rooms, the teachers' room, the specialist rooms and the classrooms, all of which are connected to each other but are accessible via different entrances from the upper and lower schoolyard. There are currently 10 classes belonging to the Geisbergschule. The teachers' room is used jointly by the staff of the Geisbergschule and the Brentanoschule. In addition to a first aid room and three administrative rooms, there is a relaxation room that was newly furnished in the 2023/24 school year as part of the project week. The school has additional specialist rooms: a movement room, a multi-purpose room (music/meeting room), a kitchen, a workshop, a network room and a school library. All specialist rooms are shared with the speech therapy school and are regularly and actively used by both schools during morning lessons. The seven speech therapy classes of the Brentano School with a total of 54 pupils are represented at the Geisberg School and are therefore primarily housed in the classrooms in the wing on the upper school yard. Due to the almost daily presence of the speech therapists, an additional support room is primarily used by the Brentano School. Time overlaps between the speech therapy lessons at the speech therapy school and the preparatory course at the Geisberg School recently made it necessary for the latter to take place in a room next to the workshop. The supervision of the pupils before and after lessons currently takes place in an extension with adjacent containers on the upper school yard. There are four rooms in the care center, the fourth of which was built on as a residential container. The kitchen and dining room are also housed in a container built specifically for this purpose. The school's classrooms are available for homework support. The care center also uses the outdoor area and the gymnasium and, depending on staff capacity, parts of the former caretaker's house, which is also on the school premises but urgently needs to be renovated and equipped with furniture and play materials. The gymnasium is shared with the speech therapy school in the mornings and used by the care center and the Geislitz gymnastics club in the afternoons. For swimming lessons in the third year, all children go to the indoor pool in Gelnhausen with their swimming teachers. Due to the high birth rate and the looming three-stream system at the Geisberg School, as well as the steadily growing speech therapy department at the Brentano School, the spatial situation at the Geisberg School is becoming increasingly problematic. The school is in contact with the school authority in this regard. With regard to the rooms, the following measures have already been planned or will be continued: The homework groups are distributed across different classrooms. AGs can take place in the classrooms and specialist rooms in the afternoon, but in the morning lessons the options for moving to other rooms outside of classrooms are limited. Fixed plans for the specialist rooms are not possible due to the fact that two schools are under one roof and share the specialist rooms. With regard to the gym, the Brentano School has been allocated a fixed day of the week for physical education and another fixed period for the weeks in which the indoor pool is closed and no swimming lessons can take place. The situation is similar with the kitchen and other specialist rooms. There will probably still be four lunch groups and these will be mixed together, also changing daily, depending on when lessons end for the respective classes. Every change in the timetable makes a change in the composition of the meal groups unavoidable. The options in the container have proven to be extremely limited. There is still no solution for this. It still needs to be clarified with the school authority how the lunch situation can be alleviated. As part of the digital pact, the network room was re-equipped. There are now a total of 56 iPads available, 20 of which always remain in the network room, while the others can be borrowed for the classrooms (e.g. when doing homework, for research). The room and the iPads can also be used in support lessons and extracurricular activities. - Further information can be found in the Geisbergschule Linsengericht Eidengesäß concept for implementing the pact for all-day schooling (appendix II.2.g of the service description). Lot 8: Erich-Simdorn-Schule Neuberg - Address: Rüdigheimer Straße, 63543 Neuberg - Start of service: August 1st, 2025 - Number of students: 192 - Students to be supervised: 105 + 80 of them in module 1 + 25 of them in module 2 - Rooms: The student care service is currently using an extension consisting of 2 maxi containers, two former classrooms in the pavilion, and in the afternoons the rooms on the ground floor in the main building (2 classrooms and the craft/music room for homework and homework supervision). As part of the all-day school, the library in the main building can be integrated into the room concept. Support offers take place in the existing rooms in the main building. The sports hall is used by the school in the mornings and by local clubs from 2:45 p.m. The sports hall is used for sports groups in alternating mode from 12.15 p.m. to 1.45 p.m. In the summer, the Erich Simdorn School uses the neighboring sports grounds of the municipality of Neuberg. There is currently space for 36 pupils to eat lunch in the cafeteria kitchen. Lunch is currently served to 90 children in five shifts. The kitchen has a food counter with heating devices, a cold food counter, a plate warmer, a crockery cupboard, a refrigerator, an industrial dishwasher, a washing machine, a tumble dryer and a sink with a hand basin. There is also a kitchenette with a sink, two stoves and two ovens. The school has two exercise rooms, the gym and the schoolyard. There are also a number of project rooms, such as a library and a music and craft room. The school also has options for teacher workstations and a teacher's room. - Further information is available in the concept The Erich-Simdorn-Schule Neuberg for the implementation of the pact for all-day schooling (appendix II.2.h of the service description). Lot 9: Adolf-Reichwein-Schule Rodenbach - Address: Alzenauer Str. 25, 63517 Rodenbach - Start of service: August 1st, 2025 - Number of students: 770 in total, of which 398 in the elementary school - Students to be supervised: 150 + of which 100 in module 1 + of which 50 in module 2 - Rooms: The rooms currently available are in the elementary school wing, in the so-called "b-wing". In the two-story building, there is a classroom, the media library, the secondary school workshop and the toilets on the ground floor. On the first floor there are three rooms of the supervised elementary school, a school kitchen and the cafeteria. Opposite there are two more classrooms and toilets on the first floor of the so-called "a-wing", on the ground floor there is the preparatory class, a storage room and the art room, which is currently used by the secondary school. In an extension, in the "e-wing", on the edge of the schoolyard there is the auditorium, which is used for teaching purposes in the morning. The auditorium is also used for a variety of events such as conferences, information events, parents' evenings, parents' cafe on the first day of school, as an exercise room, as a practice room for clubs and much more. From the 2025/26 school year, the new room concept envisages the classrooms being used for lessons in the morning and at lunchtime/afternoons for homework supervision, study time or for the support of individual children or small groups. Appropriate furniture should enable multifunctional use of the rooms (lockable, with wheels). Discussions with the school authority are already taking place. There are currently two sports halls available, which are very busy in the mornings due to physical education classes for primary and secondary school students. In the afternoons, the gyms are mainly used by clubs. Since the halls are to be used all day, discussions with the clubs are planned with a view to cooperation. It must already be taken into account that, given the increasing number of pupils, there are not enough classrooms and that more containers will have to be provided. The auditorium will continue to be available primarily for lessons in the mornings. It will also still be possible to use it for school events and parties. The auditorium can be used as part of the all-day offerings, e.g. for a theater group, for arts activities or quiet exercise activities (relaxation, yoga). - Further information can be found in the Adolf Reichwein School Rodenbach's concept for implementing the all-day pact (Appendix II.2.i of the service description). Lot 10: Sterntalerschule Schöneck - Address: Wiesenau 3, 61137 Schöneck - Start of service: August 1st, 2025 - Number of students: 173 - Students to be supervised: 130 + 85 of them in module 1 + 45 of them in module 2 - Rooms: After completion of the new building, the Sterntalerschule will have 8 classrooms, three multifunctional specialist/ag/care rooms, an open differentiation area, a multifunctional room, a cafeteria and a parents' meeting room (approx. 3m³). There are different rooms in which different activities take place for the children: four classrooms are available as permanent rooms for homework supervision after the end of lessons. There is a games room with a table football table, air hockey, board games, puzzles, a Barbie house and role-playing games. In the creative room you will find everything to do with handicrafts, painting, gluing, cutting, ironing beads etc. The construction room is used for building, playing with Lego, includes a marble run, construction toys and much more. The room is equipped with floor mats, tables and chairs. There is also a so-called mat room, which is used for romping. This is equipped with mats, cushions, foam building blocks, swimming noodles and more. Here 10 children can romp around at the same time for half an hour under the supervision of a carer. There is also a relaxation room and a music room for musical activities. Like the aforementioned rooms, the classrooms are also available for multifunctional use. There is a gym and a fairly spacious outdoor area on the school premises. - Further information can be found in the Sterntalerschule Schöneck concept for implementing the pact for the whole day (appendix II.2.h of the service description). Lot 11: Friedrich-ebert-schule Schöneck - Address: Bleichstraße 9, 61137 Schöneck - Start of service: August 1st, 2025 - Number of students: 240 - Students to be supervised: 135 + of which 90 in module 1 + of which 45 in module 2 - Rooms: Classrooms are available for homework or individual learning time. It is possible to set up different learning groups that are spatially separated. Further supervision takes place in three rooms in the cafeteria wing. There are classrooms and a supervision room with sufficient workstations available, in which both the preparatory courses and support offers take place. There is a gymnasium. The hall plan is adapted annually to the needs of the all-day concept. In the outdoor area, the existing facilities (green classroom, play bushes, school garden, etc.) have been supplemented by a balance bar, among other things. In bad weather, the Erich-Simdorn-Halle right next to the school can be used - in consultation with AGS and clubs. The school also has a room for breaks and lunch. The cafeteria set up for this purpose serves the school and is also used for teaching purposes. - Further information can be found in the Friedrich-Ebert-Schule Schöneck concept for implementing the pact for all-day schooling (appendix II.2.k of the service description). Lot 12: Aufenau Primary School Wächtersbach/aufenau - Address: Frankfurter Str. 26, 63607 Wächtersbach - Start of service: August 1st, 2025 - Number of students: 110 - Students to be supervised: 80 + 60 of them in module 1 + 20 of them in module 2 - Rooms: The primary school's rooms consist of two building complexes: an old building from 1910 and an extension from 1997. In total, the following are available for school purposes: seven classrooms, a cafeteria with kitchen, a multi-purpose room, a teachers' room with materials room, a multifunctional room (craft and music room, room for preparatory course, etc.), a library and two office rooms. The school grounds have a fenced-in playground with climbing equipment, a swing, a play tower with a slide and a sandpit, a large lawn, a green classroom, a playhouse with balls, ropes, pedalos etc., an asphalted schoolyard and a football pitch, a paved area between the two parts of the building with a table tennis table and a car park with 9 spaces. As the school does not have a gymnasium, physical education classes take place in the rooms of the cultural centre in Aufenau. The all-day offer takes place mainly in the old building and in the multi-purpose room of the new building. Classrooms are occasionally used. After meals, the children can play outside or keep themselves busy inside when it rains. - Further information can be found in the concept of the Aufenau Wächtersbach/Aufenau primary school for the implementation of the all-day pact (appendix II.2.l of the service description). Lot 13: Hasela School Linsengericht-Altenhaßlau - Address: Bergstrasse 18, 63589 Linsengericht - Start of service: August 1st, 2025 - Number of students: 137 - Students to be supervised: 70 + 50 of them in module 1 + 20 of them in module 2 - Rooms: The Hasela School has 8 classrooms, a teachers' room, three administration rooms, a tea kitchen and an auditorium/atrium. There are no additional specialist rooms such as music, art or craft rooms, kitchen, parent-teacher room or differentiation or rest rooms. One administration room (the secretariat) was divided: In the rear area, a workstation for the secretary was created; in the front area there is a small student library. A container for supervision is used by the preparatory course in the mornings. The gym is a three-field hall and is used by both the Hasela School and the Brentano School. Occupancy is coordinated with the Brentano School every six months. As the Brentano School is an all-day school, capacity is limited. Swimming lessons, which are given in the third year, take place in the indoor and outdoor pools of the town of Gelnhausen. The following rooms are available for the implementation of the so-called exercise activities: schoolyard, adventure playground behind the school and sports field (artificial turf) directly opposite the school (also used as a play area during recess). - Further information can be found in the Hasela School Linsengericht-Altenhaßlau concept for implementing the pact for all-day schooling (appendix II.2.m of the service description).
Closing Date13 Feb 2025
Tender AmountRefer Documents
81-90 of 2302 archived Tenders