Tenders of Offizielle Bezeichnung
Tenders of Offizielle Bezeichnung
Offizielle Bezeichnung Tender
Civil And Construction...+3Civil Works Others, Consultancy Services, Civil And Architectural Services
Germany
Preliminary information as a call for competition – general guidelines, standard regulations (services) General planning service Hoai for the expansion of the 2nd biological stage 1. Initial situation The Sindlingen sewage treatment plant has currently been expanded to include 4 aeration tanks and 3 secondary clarification tanks. Contents of the project are: planning and construction of 2 aeration tanks and 1 secondary clarification tank, as well as the integration of these tanks into the existing structure. 2. Description of the project 2.1 New aeration tank The aeration tanks are rectangular tanks with longitudinal flow. Their internal dimensions (LxWxH) are approximately 59.6x11.6x5.0m. An underground distribution channel runs along the northern front of the four existing aeration tanks. Next to a large wastewater area, a smaller channel for the return sludge is installed. A pipe branches off from each of these two channels to feed the aeration tanks. These pipes cross an open space in front of the aeration tank that is approx. 5.3 m deep and covered with grid plates. There is a manually operated slide valve, a flow meter and an electric slide valve for each pipe string. The wastewater now crosses the tanks lengthways. The air distribution line runs through 3 separately controlled areas and is led downwards in the middle of each zone. At the southern end of the tank, the wastewater falls over an overflow edge into a collecting channel. The channel directs the wastewater via a distribution structure to the secondary clarifiers. 2.2 Distribution structure The channel leads from the outlet of the aeration tanks via a coagulant addition to the distribution structure. The wastewater is then led via a siphon into a round spring pot. The source tank is divided into three equally sized drainage areas, which then lead to the respective secondary settling tanks. 2.3 New secondary settling tank The secondary settling tanks are designed as round tanks. The wastewater is led from the distribution structure into the secondary settling tanks via underground pipes. It flows into the middle of the tanks. The drainage channel is suspended on the edge of the secondary settling tanks. The clear water can flow into the drainage channel on both sides. It is fed to the further treatment steps via a collecting line. The round tanks have a bottom clearing shield and a floating sludge scraper. The settled sludge is led via the bottom clearing shield into the middle of the tank and from there via a collecting line to the screw pumping station. There it is lifted and returns to the aeration tanks by free fall. The floating sludge is led via pumps on the secondary settling tank in a separate line towards the return sludge pumping station. Two centrifugal pumps lift the floating sludge there. 2.4 Connections and integrations The required inlet and outlet channels to and from the planned basins must be provided. In particular, the distribution structure must be examined in detail to clarify whether a new construction or an extension of the existing structure is possible. The electrical components required in each case must be integrated into the existing switchgear and the control panel extended. The vertical distance between the aeration basins to be planned and the switchgear is around 90m as the crow flies. The distance between the secondary clarification basin to be planned and its switchgear is around 200m as the crow flies. Additional content is the planning and construction of a new service road around 240m long. The creation of an accompanying landscape management plan in conjunction with the Hessian compensation ordinance is also part of this project. 2.5 Tests and simulations At the start of the measure, the existing structure is to be recorded and tested. The results of this will then be incorporated into the further planning of the new structures to be built. The hydraulic cross-section must be checked and revised in accordance with the planning. The return sludge pumping station and the air supply to the aeration tanks are to be tested for their capacities in order stage 1. Various load scenarios are to be represented by a simulation. No further planning is being carried out for the return sludge pumping station and the air supply. Flow simulations are to be carried out using CFD for the existing inlet channels, including the new ones to be built, to the aeration and secondary clarifiers, in particular the distributor structure. Three load cases or operating states to be determined by the SEF are to be simulated. A preliminary test in accordance with Uvpg §5 Paragraph 1 Number 1 is required for the planned expansion of the Sindlingen wastewater treatment plant. Whether this results in the requirement for a formal EIA depends on the results of the preliminary examination. 3. Planning services according to Hoai 2021 The following service descriptions, special and additional services are to be carried out. According to Hoai §11 (1), the fees for each object are to be calculated separately. 3.1 Hoai service descriptions Landscape management accompanying plan according to §26, §31 para. 1 in conjunction with Appendix 7 Hoai object planning for civil engineering structures according to §41ff.; §44 para. 4 in conjunction with Appendix 12 Hoai object planning for traffic systems according to §45ff.; §47 para. 2 in conjunction with Appendix 13 Hoai specialist planning for structural planning according to §49ff.; §51 para. 5 in conjunction with Appendix 14 Hoai specialist planning for technical equipment according to §53ff.; §55 Paragraph 3 in conjunction with Annex 15 Hoai 3.2 Special services are commissioned across all service profiles with the following breakdown: - Commissioning level 1: approx. 20% - Commissioning level 2: approx. 50% - Commissioning level 3: approx. 85% The full range of special services is defined in the tender documents 3.3 Additional services Various additional services, such as: - BBQ acc. to DIN 1054 - On-site construction monitoring - Geotechnical investigations The full range of additional services is defined in the tender documents 4. Division of the future contract into contract stages The contract is divided into a total of three contract stages, which are called up after completion of the previous stage: 4.1 Commissioning level 1 Performance phases 1-4 4.2 Commissioning level 2 Performance phases 5-7 4.3 Commissioning level 3 Performance phase 8 General planning service Hoai For The Expansion Of The 2nd Biological Stage The Frankfurt am Main municipal drainage system intends to expand the second biological stage of the Frankfurt-Sindlingen wastewater treatment plant at Roter Weg 4 with around 470,000 inhabitants, essentially consisting of: - Two aeration tanks - A secondary clarifier - Inlet and outlet channels to the tanks - New construction or reconstruction of a distribution structure for the secondary clarifiers - Traffic systems - Accompanying landscape management plan The technical equipment and the geometry of the tanks should be designed as similarly to the existing ones as possible, although technical innovations can be incorporated. The planned units are to be connected to the power supply and the existing control room at the Ara Sindlingen in terms of electrical, measurement, control, and instrumentation.
Closing Date3 Jan 2025
Tender AmountRefer Documents
Offizielle Bezeichnung Tender
Others
Germany
Contract notice – general guidelines, standard rules, restricted procedure (services) Outsourcing of the data center at the DRV Hessen The German Pension Insurance Fund in Hessen intends to rent space for IT hardware (server room/cage or lockable racks) in a colocation data center in the Rhine-Main area. Outsourcing of the data center at the DRV Hessen The German Pension Insurance Fund in Hessen intends to rent space for IT hardware (server room/cage or lockable racks) in a colocation data center in the Rhine-Main area. Outsourcing of the data center at the DRV Hessen Allocation of the parking spaces The following parking spaces are to be made available at one location in separate fire compartments. The installation must take place in a separate cage area or room that is only accessible to the client. Location A: - Server 1 area, own fire compartment - Server 2 area, own fire compartment - Backup 1 area, own fire compartment Location B, geo-redundant to location A (distance 200 km, but at least 100 km) - Backup 2 area, own fire compartment Total connected load The client will probably require a total connected load of around 173 kW for the IT systems for the start-up phase. The contractor must provide a 50% connected load per area as an expansion reserve. The connected load is divided between the productive operation of the "server" and the "backup" as follows. - Productive operation server 1: 82.5 kW - Productive operation server 2: 82.5 kW - Backup 1: 4 kW - Backup 2: 4 kW Floor space / cage As a minimum requirement, the server for productive operation is set up in a cage within the total IT area with 19-inch racks (47 U, minimum dimensions 220 x 80 x 120 (height x width x depth in cm). A work area of 1.20 m must be provided in front of and behind the racks. The setup for backup 1 or 2 is to be priced both as a cage variant and for installation in a lockable colo rack (in an "open-colo area"). The interior of a cage must not be visible from the outside (privacy protection). Number of racks Currently, a total of approx. 108 U (height units) are installed due to servers, network, firewall and backup systems, which are independent of The technically possible performance capacity of a single rack must be divided up into the individual areas as a minimum as follows: - Server area 1: approx. 50 U, number of racks: 3 - Server area 2: approx. 50 U, number of racks: 3 - Backup area 1: approx. 12 U, number of racks: 1 - Backup area 2: approx. 12 U, number of racks: 1 The racks are to be provided by the contractor as lockable 19-inch racks with 47 U with the minimum dimensions 220 x 80 x 120 (height x width x depth in cm). As an expansion reserve, the contractor must provide space for 1 rack per server area. No reserve is to be kept for the Backup 1 and 2 areas.
Closing Date2 Jan 2025
Tender AmountRefer Documents
Offizielle Bezeichnung Tender
Others
Germany
Contract notice - General guideline, standard regulation Open procedure (services) Waste disposal at all locations of the Lahn-Dill-Kliniken GmbH Waste disposal of grease trap contents Disposal of grease trap contents (ASN 02 02 04 Sludge from the company's own waste water treatment ... Multi-waste disposal at all locations of the Lahn-Dill-Kliniken GmbH Waste disposal of grease trap contents Disposal of grease trap contents (ASN 02 02 04 Sludge from the company's own waste water treatment) Paper and cardboard Disposal of paper and cardboard (ASN 15 01 01 Packaging made of paper and cardboard; material flow contains ASN 20 01 01) Scrap metal, mixed Disposal of mixed scrap metal (ASN 17 04 07 Mixed metals; material flow contains ASN 20 01 40 + 15 01 04) Electronic waste Disposal of electronic waste (ASN 16 02 Wastes from electrical and electronic equipment; material stream contains Asn 20 01 21* + Asn 20 01 23* + Asn 17 04) Body parts, organs Disposal of body parts, organs (asn 18 01 02 Body parts and organs, including blood bags and blood reserves (except 18 10 03)) Together with lots 6, 8 and 9 Infectious hospital waste Disposal of infectious hospital waste (asn 18 01 03* Wastes whose collection and disposal are subject to special requirements from a infection prevention perspective) Together with lots 5, 8 and 9 Hospital-spec. Residual waste disposal Hospital-specific residual waste (asn 18 01 04 Wastes for the collection and disposal of which no special requirements are made from an infection prevention perspective (e.g. wound and plaster dressings, laundry, disposable clothing, diapers)) Cytostatic waste Disposal of cytostatic waste (asn 18 01 08* Cytotoxic and cytostatic drugs) Together with lots 5, 6 and 9 Drugs Disposal of drugs (asn 18 01 09 Drugs with the exception of those falling under 18 01 08) Together with lots 5, 6 and 8 Files for destruction Disposal of files for destruction (asn 20 01 01 Paper and cardboard; BDSG specifications and DIN standard 66399 must be observed) Leftover food (piece goods) Disposal of leftover food / canteen waste - piece goods (asn 20 01 08 Biodegradable kitchen and canteen waste) Together with lot 13 Food waste (tankware) Disposal of food waste / canteen waste - wet waste disposal tank (asn 20 01 08 Biodegradable kitchen and canteen waste) Used fat Disposal of used fat (asn 20 01 25 Cooking oils and fats) Together with lot 11 Bulky waste Disposal of bulky waste (asn 20 03 07 Bulky waste) Green waste Disposal of green waste (asn 20 02 01 Grass clippings, green waste, landscaping material)
Closing Date10 Jan 2025
Tender AmountRefer Documents
Offizielle Bezeichnung Tender
Others
Germany
Contract notice - General guideline, standard rule, open procedure (services) Leaf clearing and disposal in February/March 2025 for a total of 26 lots divided into 3 districts (8 lots in the east district, 5 lots in the middle district and 13 lots in the north district). A one-off leaf removal from the unpaved areas or green spaces is to take place in February/March 2025. 22.1 City center - Old town Leaf removal - Unpaved areas / green areas City center - Old town 21,485.00 sqm Divided into 11 sub-areas 22.4 Ostend Leaf removal - Unpaved areas / green areas Ostend 51,753.00 sqm Divided into 5 sub-areas 22.9 Riederwald Leaf removal - Unpaved areas / green areas Riederwald 23,415.00 sqm Divided into 3 sub-areas 22.10 Bornheim Leaf removal - Unpaved areas / green areas Bornheim 31,762.00 sqm Divided into 14 sub-areas 22.11 Nordend Leaf removal - Unpaved areas / green areas Nordend 35,394.27 sqm Divided into 13 sub-areas 22.12 Eckenheim Leaf removal - Unpaved areas / green areas Eckenheim 54,759.00 sqm Divided into 6 sub-areas 22.14 Berkersheim Leaf removal - Unpaved areas / green areas Berkersheim 997.00 sqm Divided into 2 sub-areas 22.15 Frankfurter Berg Leaf removal - Unpaved areas / green areas Frankfurter Berg 54,350.00 sqm Divided into 10 sub-areas 23.1 Gutleutviertel, Baunhof, Innenstadt Leaf removal - Unpaved areas / green areas Gutleutviertel / Bahnhof / Innenstadt 53,312.00 sqm Divided into 9 sub-areas 23.5 Westend North + South Leaf removal - Unpaved areas / green areas Westend North + South 14,693.00 sqm Divided into 11 sub-areas 23.6 Bockenheim Leaf removal - Unpaved areas / green areas Bockenheim 81,389.00 sqm Divided into 33 sub-areas 23.7 Nordend - West Leaf removal - Unpaved areas / green spaces Nordend West 38,614.00 sqm Divided into 5 sub-areas 23.9 Dornbusch - Mitte Leaf removal - Unpaved areas / green spaces Dornbusch - Mitte 22,210.00 sqm Divided into 3 sub-areas 24.1 Dornbusch - Nord Leaf removal - Unpaved areas / green spaces Dornbusch-nord 88,596.00 sqm Divided into 5 sub-areas 24.2 Ginnheim Leaf removal - Unpaved areas / green spaces Ginnheim 155,960.00 sqm Divided into 22 sub-areas 24.3 Eschersheim Leaf removal - Unpaved areas / green spaces Eschersheim 89,177.00 sqm Divided into 13 sub-areas 24.4 Praunheim Leaf removal - Unpaved areas / green spaces Praunheim 305,535.00 sqm divided into 30 sub-areas 24.5 Römerstadt Leaf removal - Unpaved areas / green areas Römerstadt 96,867.00 sqm divided into 23 sub-areas 24.6 Nordweststadt Leaf removal - Unpaved areas / green areas Nordweststadt 135,394.00 sqm divided into 47 sub-areas 24.7 Heddernheim Leaf removal - Unpaved areas / green areas Heddernheim 135,859.00 sqm divided into 24 sub-areas 24.9 Kalbach Leaf removal - Unpaved areas / green areas Kalbach 85,890.00 sqm divided into 21 sub-areas 24.10 Nieder-eschbach Leaf removal - Unpaved areas / green areas Nieder-eschbach 82,553.00 sqm divided into 15 sub-areas 24.11 Bonames Leaf removal - Unpaved areas / green areas Bonames 16,716.00 sqm Divided into 6 sub-areas 24.12 Harheim Leaf removal - Unpaved areas / green areas Harheim 32,544.00 sqm Divided into 14 sub-areas 24.13 Nieder-erlenbach Leaf removal - Unpaved areas / green areas Nieder-erlenbach 34,474.00 sqm Divided into 10 sub-areas 24.14 Riedberg Leaf removal - Unpaved areas / green areas Riedberg 224,483.00 sqm Divided into 26 sub-areas
Closing Date7 Jan 2025
Tender AmountRefer Documents
Offizielle Bezeichnung Tender
Civil And Construction...+1Others
Germany
Contract notice - general guideline, standard regulation open procedure (construction work) City of Mörfelden-Walldorf, renovation and expansion of the sewage treatment plant 44201-18 operating building 02, conversion of the social building City of Mörfelden-Walldorf, renovation and expansion of the sewage treatment plant Conversion of the existing social building into operating building 02 - Dismantling, demolition and dismantling work in the area of changing rooms, toilets, showers and existing kitchen/break room - Steel beams and supports in the area of the breakthrough and enlargement of the door opening - Masonry work - Plastering, screeding and tiling work to restore the dismantled areas. - Installation of F-90 door in the interior - Creation of core drillings - Installation of the kitchen in the new operating building 01
Closing Date8 Jan 2025
Tender AmountRefer Documents
Offizielle Bezeichnung Tender
Civil And Construction...+1Civil Works Others
Germany
Contract notice - general guideline, standard regulation open procedure (construction work) Stadtwerke Mörfelden-Walldorf, renovation and expansion of the Mörfelden-Walldorf sewage treatment plant 44201-23 Ba3 operating building 01, laboratory equipment Stadtwerke Mörfelden-Walldorf, renovation and expansion ... Mehrstadtwerke Mörfelden-Walldorf, renovation and expansion of the Mörfelden-Walldorf sewage treatment plant 44201-23 Ba3 operating building 01, laboratory equipment Stadtwerke Mörfelden-Walldorf, renovation and expansion of the Mörfelden-Walldorf sewage treatment plant Laboratory equipment for the wastewater examination room in the new operating building 01, including assembly and connection of washbasins, eye shower, emergency shower and dishwasher, including assembly and installation of table extractors, the safety cabinet, acid and alkali cabinet including assembly of furniture
Closing Date8 Jan 2025
Tender AmountRefer Documents
Offizielle Bezeichnung Tender
Civil And Construction...+2Others, Construction Material
Germany
Contract notice - General guideline, standard regulation Open procedure (construction work) Steinachtalschule, Abtsteinach - General renovation with new building - Facade construction work - suspended facade (t3) Suspended, ventilated facade, wall areas 1,040.00 m² - Metal substructure on ... Mehrsteinachtalschule, Abtsteinach - General renovation with new building - Facade construction work - suspended facade (t3) Suspended, ventilated facade, wall areas 1,040.00 m² - Metal substructure on wall substrate made of reinforced concrete - Facade thermal insulation, mineral wool 0.032 W/(m*k), 200mm - Facade cladding, fiber cement facade panels Steinachtalschule, Abtsteinach - General renovation with new building - Facade construction work - suspended facade (t3) Suspended, ventilated facade, wall areas 1,040.00 m² - Metal substructure on wall substrate Made of reinforced concrete - facade thermal insulation, mineral wool 0.032 W/(m*k), 200mm - facade cladding, fiber cement facade panels
Closing Date9 Jan 2025
Tender AmountRefer Documents
Offizielle Bezeichnung Tender
Textile, Apparel and Footwear
Germany
Contract notice - general guideline, standard regulation open procedure (construction work) Gedern-fwgh: Carpentry work/wooden interior doors and steel fire doors Carpentry work/wooden interior doors and steel fire doors for the new fire station in Gedern Gedern-fwgh: Sch ... Mehrgedern-fwgh: Carpentry work/wooden interior doors and steel fire doors Carpentry work/wooden interior doors and steel fire doors for the new fire station in Gedern Gedern-fwgh: Carpentry work/wooden interior doors and steel fire doors Carpentry and joinery work with a focus on carpentry work as well as metal construction and locksmith work for the new fire station in Gedern
Closing Date10 Jan 2025
Tender AmountRefer Documents
Offizielle Bezeichnung Tender
Others
Germany
Contract notice – general guideline, standard regulation negotiated procedure with prior publication of a call for competition/negotiated procedure (services) Object planning for a building for the extension of the Otfried-Preußler-School, Dillenburg Object planning for a building for the extension of the Otfried-Preußler-School, Dillenburg Object planning services for buildings Ge ... Multi-object planning for a building for the extension of the Otfried-Preußler-School, Dillenburg Object planning for a building for the extension of the Otfried-Preußler-School, Dillenburg Object planning services for buildings in accordance with Part 3, Section 1 HOAI, LPH 1-9 for the extension of the Otfried-Preußler-School, Dillenburg. The district committee of the Lahn-Dill district, represented by the building department - schools, is the sponsor of schools according to the Hessian school law. In this capacity, it is planning the extension of the Otfried-Preußler-School in Dillenburg. The Otfried-Preußler-Schule was built in 1974 and has since been a special needs school with a focus on intellectual development and a department for physical and motor development in Dillenburg in central Hesse. The school currently has around 131 pupils in grades 1 to 10 in 19 classes. Due to the steadily increasing number of pupils and a lack of classroom space, two primary school classes have been taught at the Donsbach primary school since the 2021/2022 school year; in the 2022/2023 school year, further classes were relocated. The current project is intended to supplement the range of classroom space and enable the reintegration of the relocated school classes. In order to be able to optimally reflect the school's space requirements, a feasibility study for the extension/new building was drawn up in May 2022. The existing floor plans of the Otfried-Preußler-Schule and variant 5 from the feasibility study by the architectural firm Freischlad + Partner, Haiger, as of May 2022, are attached to this document for information. The planning services in question for the building project planning are awarded as a staged contract. It is intended to initially commission service phases 1 to 4 for the overall project.
Closing Date14 Jan 2025
Tender AmountRefer Documents
Offizielle Bezeichnung Tender
Others
Germany
Contract notice – General guideline, standard rule Open procedure (supplies) Framework agreement for the supply of office consumables from April 1, 2025 to March 31, 2027 Framework agreement for the supply of office consumables from April 1, 2025 to March 31, 2027 Office consumables ... Multi-framework agreement for the supply of office consumables from April 1, 2025 to March 31, 2027 Framework agreement for the supply of office consumables from April 1, 2025 to March 31, 2027 Office consumables and calendars Lot I includes the supply of office consumables and calendars to around 250 different locations in the state capital of Wiesbaden. Plotter paper Lot II includes the supply of various plotter papers and photo papers to around 15 different locations in the state capital of Wiesbaden.
Closing Date14 Jan 2025
Tender AmountRefer Documents
1-10 of 261 archived Tenders