Tenders of Offizielle Bezeichnung
Tenders of Offizielle Bezeichnung
Offizielle Bezeichnung Tender
Germany
Contract notice - General guideline, standard regulation Open procedure (construction work) Vocational school centre - new building at the Friedrich-list-schule site, Wiesbaden Essential services of this tender: Approx. 1425 m2 substructure curtain wall made of stainless steel Approx. 1540 m2 substructure curtain wall made of wood Approx. 1425 m2 thermal insulation Mw Wlg 032 D ... More essential services of this tender: Approx. 1425 m2 substructure curtain wall made of stainless steel Approx. 1540 m2 substructure curtain wall made of wood Approx. 1425 m2 thermal insulation Mw Wlg 032 D 240mm 2-layer Approx. 1540 m2 thermal insulation Mw Wlg 032 D 160mm 2-layer Approx. 1325 m2 profiled fibre cement panel Approx. 1640 m2 smooth fibre cement panel Approx. 395 m door and window reveal on steel substructure Approx. 730 M Door and window reveal on wooden substructure approx. 485 M Horizontal fire barrier Mw D 260mm
Closing Date30 Sep 2024
Tender AmountRefer Documents
Offizielle Bezeichnung Tender
Germany
Contract notice – general guideline, standard rule open procedure (construction work) Vocational school centre – new building at the Friedrich-List-Schule site, Wiesbaden Essential services of this tender: Low-voltage main distribution. Sub-distributions including KNX bus actuators on each floor. Emergency lighting system consisting of emergency lights and ... More essential services of this tender: Low-voltage main distribution. Sub-distributions including KNX bus actuators on each floor. Emergency lighting system consisting of emergency lights and central battery system Voice alarm system including intercoms, loudspeakers and central technology. NGRS system in all classrooms and office areas. Fire alarm system as full protection in the entire building.
Closing Date30 Sep 2024
Tender AmountNA
Offizielle Bezeichnung Tender
Germany
Contract notice – general guidelines, standard rules, open procedure (construction work) sanitation, heating, cooling, fire extinguishing lines. The services put out to tender include the technical equipment for the system groups Kg 410 sewage, water and gas systems; Kgr 420 heat supply systems; Kgr 434 refrigeration systems; Kgr 474 fire extinguishing systems. In accordance with the preliminary remarks, for the new construction of the two to four-storey, staggered city and district archives without a basement, with a gross floor area of approx. 1,770 m² in reinforced concrete skeleton construction, infilled with non-load-bearing masonry. The technical installations for the lightning protection and earthing system and the laying of underground pipes and shafts under the floor slab and in the outdoor area were included in the shell construction plan. For further information, see the specifications in the tender documents.
Closing Date1 Oct 2024
Tender AmountRefer Documents
Offizielle Bezeichnung Tender
Laboratory Equipment and Services
Germany
Contract notice – General guideline, standard arrangements Negotiated procedure with prior publication of a call for competition/negotiated procedure (supplies) Exhibition construction Exhibition construction for the learning and remembrance site in Giessen emergency reception camp
Closing Date7 Oct 2024
Tender AmountNA
Offizielle Bezeichnung Tender
Germany
Contract notice - general guidelines, standard rules, open procedure (construction work) Electrical engineering Bad Hersfeld city and district archives Description of the electrical engineering trades The services advertised include the technical equipment for the Kg 440 high-voltage systems and Kgr ... Bad Hersfeld multi-city and district archives Description of the electrical engineering trades The services advertised include the technical equipment for the Kg 440 high-voltage systems and Kgr 450 telecommunications and information technology systems. For the new construction of the two to four-storey, staggered city and district archives with no basement and a gross floor area of approx. 1,770 m² in reinforced concrete skeleton construction filled with non-load-bearing masonry. The technical installations for the lightning protection and earthing system trades and the laying of underground cables and shafts under the floor slab and in the outdoor area were included in the shell construction plan. For further information, see the service description in the tender documents.
Closing Date1 Oct 2024
Tender AmountRefer Documents
Offizielle Bezeichnung Tender
Germany
Contract notice - General guideline, standard rule Open procedure (services) Lot 1 (hls): Technical equipment, plant groups 1, 2 and 3. Project description: The city of Groß-Gerau would like to clear a still-developed plot of land and then build a new daycare center for children aged 3-6 on it. The currently existing border development cannot be retained. A feasibility study was already drawn up in 2023, which confirmed that the implementation was positive. The new building is to be built using modular construction and therefore commissioned by a general contractor. Now, in several tendering procedures, a planning team is to be found which will implement the project across all performance phases and also take over the interfaces with the general contractor. The existing study is to be understood as a fundamental review of feasibility; no concrete planning or coordination was carried out. +++ Scope of services for lot 1 (hls): Technical equipment for phases 1-9 in accordance with Sections 53 ff. of the Hoai, system groups 1, 2 and 3, with adapted scope of services due to general contract award (see attachments for details). +++ A phased contract is planned. The individual project stages will be called up successively as the project progresses. If the client decides that the project will be terminated after completion of a project stage, no further calls will be made. The contractor has no right to call up further project stages. +++ Project period: As things stand, a project duration of 3 years is envisaged. +++ Project costs: Based on the project study, the following eligible costs are currently roughly assumed in accordance with Hoai: Kg 300: approx. €2.4 million, Kg 410 to 430: approx. €480,000, Kg 440 to 460: approx. €330,000. Lot 2 (elt): Technical equipment, system groups 4, 5 and 6. Project description: The city of Groß-Gerau would like to clear a plot of land that is still being built on and then redevelop it with a daycare center for children aged 3-6. The current border development cannot be retained. A feasibility study was already drawn up in 2023, which confirmed the implementation positively. The new building is to be built using modular construction and is therefore to be commissioned by a general contractor. Now, in several tendering procedures, a planning team is to be found which will implement the project across all performance phases and also take over the interfaces with the general contractor. The existing study is to be understood as a fundamental review of feasibility; no concrete planning or coordination was carried out. +++ Scope of services for lot 2 (elt): Technical equipment for phases 1-9 in accordance with Sections 53 ff. Hoai, system groups 4, 5 and 6, with adapted performance profile due to general contractor award (see attachments for details). +++ A phased contract is planned. The individual project stages will be called up successively as the project progresses. If the client decides that the project will be terminated after completion of a project stage, no further calls will be made. The contractor has no right to call up further project stages. +++ Project period: As things stand, a project duration of 3 years is envisaged. +++ Project costs: Based on the project study, the following eligible costs are currently assumed in accordance with the Hoai: Kg 300: approx. €2.4 million, Kg 410 to 430: approx. €480,000, Kg 440 to 460: approx. €330,000.
Closing Date1 Oct 2024
Tender AmountNA
Offizielle Bezeichnung Tender
Germany
Contract notice - general guideline, standard regulation negotiated procedure with prior publication of a call for competition/negotiated procedure (services) Extension of the Karl-Gärtner School, Wiesbaden; Sustainability certification according to the sustainable construction assessment system - BNB (BNB coordinator) Basics: The Karl-Gärtner School at Wilhelm-Dietz-Strasse 5 is located on the outskirts north of Delkenheim, on a bend in the Wickerbach in a natural landscape with old trees. The ... More basics: The Karl-Gärtner School at Wilhelm-Dietz-Strasse 5 is located on the outskirts north of Delkenheim, on a bend in the Wickerbach in a natural landscape with old trees. The school property of the Karl-Gärtner School (plot no. 1/6) has a size of 21,178 m². The school complex, which is listed as a cultural monument in accordance with Section 2 Paragraph 1 of the Hdschg, was built in two phases between 1963 and 1967 by the architect Daniel Jourdan. The loosely grouped one- and two-storey, flat-roofed pavilions in reinforced concrete construction with reddish-brown clinker bricks are connected to one another via walkways and spatially enclose the school yard. The school complex consists of a main building (old building) with an adjoining administration wing and cafeteria, a toilet building, a classroom wing (new building), a pavilion building, a school gym, a youth traffic school including a workshop (see attachments). The demolition of the school gym and the construction of the new double sports hall with club annex as well as the restructuring of the administration are currently being planned. Subject of the service to be commissioned: The services advertised include the services necessary to achieve a very good BNB silver status. This includes the coordination, moderation, testing and documentation of the services of all those technically involved in the project. Sustainability certification according to the Federal Sustainable Construction Assessment System (BNB) for classroom buildings 2017 (UN17). Certification of the buildings and outdoor facilities. The aim is to achieve a very good silver certificate (at least 75%). An 80% target (gold certificate) must be at least checked (see Appendix 6). The services to be offered include advising the client, architects and specialist engineers, certification services during the planning and construction phases and after completion, and evaluation, participation in regular planning meetings and individual coordination with engineering firms in accordance with the BNB sustainability coordinator service profile and the funding management services (Appendix 8 and Appendix 8.1). In addition, the program based on the BNB "Guidelines for Sustainable Construction for the State Capital Wiesbaden" (appendix 6), Resolution No. 0368 of September 28, 2023 of the City Council (STVV) (appendix 7) must be observed. The guideline defines additional requirements based on the BNB parameters. In addition, the aim is to achieve and register the QNG-NW23 seal with the "plus" requirement level. Project registration with the BNB Conformity Testing Office (KPS) of the Steinbeis Transfer Institute for the Construction and Real Estate Industry (STI) and support of the testing process. Funding management for federal, state and municipal funding (grants and loan programs), advice to the client, funding calculation, preparation of funding applications and submission to the client. Preparation of proof of use and submission to the client. Cost framework (net manufacturing costs) as per Appendix 1: Kg 300, building structures €1,969,141.51 Kg 400, technical systems €790,203.40 Kg 500, outdoor systems €86,641.00 For any optional services required that are not included in the scope of work, the corresponding hourly fees must be stated in the offer. These are to be broken down as follows: - Office owner - Project manager - Other employees The ancillary costs are to be billed as a percentage of the net fee. Options: The services are called up in stages (entire service phases or individual partial services). The contracting authority initially commissions the contractor only with the services from service phases 1 to 5 in accordance with the contracting authority's scope of work. After committee resolutions have been made, service phases 6 to 8 can be commissioned in further processing stages if necessary; The further processing stages are therefore subject to committee approval and can only be carried out with the approval of the necessary committee resolution to be applied for by the client. Stage I: Performance stages 1 - 3 (performance phases 1-4 according to Hoai), performance stage 4 (performance phase 5 according to Hoai), stage II: Performance stages 5 + 6 (performance phases 6-8 according to Hoai) The contractor has no right to call up individual and/or all stages and cannot derive any further claims (e.g. for damages or fee increases) from non-calling up. Schedule for service provision: Start of service provision: Immediately after completion of the procedure approx. November/December 2024 Completion of service phase 3: approx. March 2025 (= provision of documents for the plausibility check) Completion of plausibility check: approx. June 2025 Start of construction: approx. February 2026 Completion ready for occupancy: approx. July 2027
Closing Date2 Oct 2024
Tender AmountRefer Documents
Offizielle Bezeichnung Tender
Germany
Contract notice - General guideline, standard rule Open procedure (services) Lot 1 (hls): Technical equipment, plant groups 1, 2 and 3. Project description: The city of Groß-Gerau would like to clear a still-developed plot of land and then build a new daycare center for children aged 3-6 on it. The currently existing border development cannot be retained. A feasibility study was already drawn up in 2023, which confirmed that the implementation was positive. The new building is to be built using modular construction and therefore commissioned by a general contractor. Now, in several tendering procedures, a planning team is to be found which will implement the project across all performance phases and also take over the interfaces with the general contractor. The existing study is to be understood as a fundamental review of feasibility; no concrete planning or coordination was carried out. +++ Scope of services for lot 1 (hls): Technical equipment for phases 1-9 in accordance with Sections 53 ff. of the Hoai, system groups 1, 2 and 3, with adapted scope of services due to general contract award (see attachments for details). +++ A phased contract is planned. The individual project stages will be called up successively as the project progresses. If the client decides that the project will be terminated after completion of a project stage, no further calls will be made. The contractor has no right to call up further project stages. +++ Project period: As things stand, a project duration of 3 years is envisaged. +++ Project costs: Based on the project study, the following eligible costs are currently roughly assumed in accordance with Hoai: Kg 300: approx. €2.4 million, Kg 410 to 430: approx. €480,000, Kg 440 to 460: approx. €330,000. Lot 2 (elt): Technical equipment, system groups 4, 5 and 6. Project description: The city of Groß-Gerau would like to clear a plot of land that is still being built on and then redevelop it with a daycare center for children aged 3-6. The current border development cannot be retained. A feasibility study was already drawn up in 2023, which confirmed the implementation positively. The new building is to be built using modular construction and is therefore to be commissioned by a general contractor. Now, in several tendering procedures, a planning team is to be found which will implement the project across all performance phases and also take over the interfaces with the general contractor. The existing study is to be understood as a fundamental review of feasibility; no concrete planning or coordination was carried out. +++ Scope of services for lot 2 (elt): Technical equipment for phases 1-9 in accordance with Sections 53 ff. Hoai, system groups 4, 5 and 6, with adapted performance profile due to general contractor award (see attachments for details). +++ A phased contract is planned. The individual project stages will be called up successively as the project progresses. Should the client decide that the project will be terminated after completion of a project stage, no further calls will be made. The contractor has no right to call up further project stages. +++ Project period: As things stand, a project duration of 3 years is envisaged. +++ Project costs: Based on the project study, the following eligible costs are currently assumed in accordance with the Hoai: Kg 300: approx. €2.4 million, Kg 410 to 430: approx. €480,000, Kg 440 to 460: approx. €330,000.
Closing Date1 Oct 2024
Tender AmountRefer Documents
91-100 of 388 archived Tenders