Tenders of Offizielle Bezeichnung

Tenders of Offizielle Bezeichnung

Offizielle Bezeichnung Tender

Civil And Construction...+1Others
Germany
Closing Date10 Jan 2025
Tender AmountRefer Documents 
Contract notice – Sector Directive, Standard arrangements Open procedure (supplies) Track construction material Baunatal-Großenritte Lot 1: Regionalbahn Kassel - supply of a simple switch Wb121 Lot 2: Regionalbahn Kassel - supply of a simple switch Wb122 Lot 3: Hessische Landesbahn ... Multi-track construction material Baunatal-Großenritte Lot 1: Regionalbahn Kassel - supply of a simple switch Wb121 Lot 2: Regionalbahn Kassel - supply of a simple switch Wb122 Lot 3: Hessische Landesbahn - supply of a track frame Grns120 Position 1 - Position 2 - Position 3 -

Offizielle Bezeichnung Tender

Civil And Construction...+2Civil Works Others, Machinery and Tools
Germany
Closing Date23 Jan 2025
Tender AmountRefer Documents 
Contract notice - General guideline, standard regulation Open procedure (construction work) Extension and renovation of the lagoon adventure pool, 34508 Willingen (upland), painting work, painting, plastering, varnishing and scaffolding work Extension and renovation of the lagoon adventure pool, 34508 Willingen (upland), ... Multiple extension and renovation of the lagoon adventure pool, 34508 Willingen (upland), painting work, painting, plastering, varnishing and scaffolding work Extension and renovation of the lagoon adventure pool, 34508 Willingen (upland), painting work Plastering and painting work = approx. 3,750 sqm walls Plastering and painting work = approx. 650 sqm ceilings Plastering and painting work = approx. 60 sqm stairs Painting work = approx. 20 m supports Painting work = around 10 doors

Offizielle Bezeichnung Tender

Others...+2Civil And Construction, Civil Works Others
Germany
Closing Date21 Jan 2025
Tender AmountRefer Documents 
Contract notice – General guideline, standard rule Open procedure (construction work) Preliminary measure – roofing work Roofing work Preliminary measure – roofing work General project description The Julius-Leber-Schule, vocational school for business, administration and ... More Preliminary measure – roofing work Roofing work Preliminary measure – roofing work General project description The Julius-Leber-Schule, vocational school for business, administration and health at Seilerstrasse 32 in 60313 Frankfurt am Main will be renovated and converted from 2024 to 2027. The construction work will be carried out in three construction phases while the school is in operation. 1st phase: canopy + attic (roof terrace), 6th + 5th + 4th floors, 3rd floor south 2nd phase: 3rd + 2nd + 1st. Og, Eg South 3rd Ba: Eg+kg Estimated completion time for the entire project: 1st Ba Approx. end of February 2025 – June 2026 2nd Ba Approx. July 2026 – July 2027 3rd Ba Approx. August 2027 – end of May 2028 The roofing work is part of the 1st Ba and is expected to be carried out from May 2025 to November 2025. The following specifications regarding working hours must be strictly adhered to during execution: During school hours Monday - Friday: Noisy work starting from 2:00 p.m. to 8:00 p.m., work inside the building from 2:00 p.m. to 11:00 p.m. Saturday: Noisy work from 7:00 a.m. to 8:00 p.m. (optional) During the holiday period Monday - Saturday: 7:00 a.m. to 8:00 p.m. (noise-intensive work) The school complex consists of three independent, interconnected building sections: - Building section 1 School, main building, built in 1955 - Building section 2 Pavilion (film room) and service residential building, built in 1955 - Building section 3 Sports hall, built in 1981 Urban location of the property: The school is in Frankfurt's inner city area. The property borders on the Friedberger Anlage public green space to the north and the busy Seilerstrasse to the south. Building class: The 7-storey existing building (school) and the sports hall are classified as building class 5 in accordance with Section 2 Paragraph 3 No. 5 Hbo, the pavilion/film hall is classified as building class 2 in accordance with Section 2 Paragraph 3 No. 2 Hbo. School, main building: BGF 10,700 m²; Bri 36,800 m³ Pavilion (film room): BGF 510 m²; Bri 2,200 m³ Basement, playground roof: BGF 260 m²; Bri 770 m³ Sports hall: BGF 1,860 m²; Bri 12,970 m³ BGF total: 13,330 m²; Bri total: 52,740 m³ Scope of roofing work: Canopy: demolition of existing. Roof construction, multi-layer bitumen sheets, including fittings, approx. 1,000 m² demolition of roof gutters, 8 pieces demolition existing. Roof edge profiles and finishes (ridge, eaves, verge), zinc sheet, multi-part, approx. 160 m roof sealing and plumbing work: roof surface - flying roof, substrate preparation (pumice boards with lightweight concrete leveling layer), approx. 1,000 m² 1st roof sealing membrane, elastomer bitumen, welded, approx. 1,000 m² top layer, polymer bitumen, slated, welded, proof of "hard roofing", approx. 1,000 m² repair work on defective areas, pumice boards and leveling layer, approx. 1,000 m² pumice boards, suction protection subsequently on support flange, with head/foot plate, approx. 200 pcs. roof hatch windows, 60x80 cm, installation, 1 pc. ventilator elements, titanium zinc sheet, approx. 35 pcs. sealing of Roof penetrations, e.g. rope safety system, lightning protection, ventilator, gutter drain/gully, etc., approx. 70 pieces. Roof edge cladding ridge, eaves, verge, titanium zinc, multi-part, including aluminum substructure, approx. 160 m. Other: rung ladder with extendable exit and entry aid, permanently installed, L = approx. 4.50 m. Fall protection, safety devices and drive-over rope safety system, stainless steel, L = approx. 95 m. Roof terrace: Note: Demolition of roof terrace structure up to the top of the roof ceiling (stb. ribbed ceiling) by the customer by a pollutant remediation company. Demolition of existing. One-piece roof gutter, approx. 7 pieces of roof sealing and plumbing work: roof surface-roof terrace, substrate preparation, approx. 900 m² vapor barrier, elastomer bitumen, welded on, approx. 900 m² thermal insulation, Pu 023 Daa Dh, glued, approx. 900 m² slope insulation, Pu 023 Daa Dh, glued, approx. 220 m² 1st roof sealing membrane, underlay membrane, top elastomer bitumen, cold self-adhesive, approx. 900 m² top layer polymer bitumen, slated, welded on, proof of "hard roofing", approx. 900 m² existing gutter, substrate preparation, approx. 190 m² vapor barrier, elastomer bitumen, welded on, approx. 190 m² thermal insulation, Pu 023 Daa Dh, glued, approx. 190 m² 1. Roof sealing membrane underlayment membrane, top elastomer bitumen, cold self-adhesive, approx. 225 m² concrete gutter sealing with liquid sealing, development length = approx. 1.10 m, approx. 225 m² gutter drain/gully, stainless steel, approx. 7 pcs. sealing of penetrations with liquid sealing, parapet railing posts etc., approx. 130 pcs. parapet cover, titanium zinc, width = approx. 80 cm, incl. Uk, approx. 180 m terrace covering: separating layer made of reinforced PE film, 1-layer, approx. 900 m² surface drainage, drainage/filter layer with fleece, diameter = 16 mm, approx. 900 m² drain gravel strip, height adjustable up to 150 mm, approx. 170 m bedding, chippings/gravel mixture, 2/5 mm, D = approx. 4 cm, approx. 900 m² terrace covering, concrete slabs, 40/40/4 cm, R12, approx. 900 m² floor recesses for railing posts etc., approx. 130 pieces.

Offizielle Bezeichnung Tender

Others
Germany
Closing Date28 Jan 2025
Tender AmountRefer Documents 
Contract notice - General guideline, standard regulation Open procedure (deliveries) Purchase vehicles for Hessen Forst Delivery of purchase vehicles for Hessen Forst SUV with windows, all-wheel drive, 5 doors Delivery of 24 SUVs with windows, all-wheel drive, 5 doors such as Dacia Duster, V ... Multiple purchase vehicles for Hessen Forst Delivery of purchase vehicles for Hessen Forst SUV with windows, all-wheel drive, 5 doors Delivery of 24 SUVs with windows, all-wheel drive, 5 doors such as Dacia Duster, VW Tiguan or equivalent If required, the service can be extended by 10 additional vehicles by means of a framework agreement item. The contractor will be informed by September 30, 2025 at the latest whether use will be made of the framework agreement quantity. High roof station wagon with windows, all-wheel drive, 5 doors Delivery of 49 high roof station wagons with windows, all-wheel drive, 5 doors such as the VW Caddy 4-motion or an equivalent type. If required, the service can be extended by 10 further vehicles using a framework agreement item. The contractor will be informed by September 30, 2025 at the latest whether the framework agreement quantity will be used. SUV with windows, all-wheel drive, 5 doors Delivery of an SUV with windows, all-wheel drive, 5 doors If required, the service can be extended by one further vehicle using a framework agreement item. The contractor will be informed by September 30, 2025 at the latest whether the framework agreement quantity will be used. High roof station wagon as a panel van, closed, all-wheel drive Delivery of a high roof station wagon as a panel van, closed, all-wheel drive Pickup off-road vehicle as a double cab with flatbed Delivery of 8 pickup off-road vehicles as a double cab with flatbed such as a Mitsubishi L 200, Ford Ranger, VW Amarok or an equivalent type Bus, all-wheel drive Delivery of a bus with all-wheel drive such as a VW Transporter station wagon, Mercedes-Benz Vito or an equivalent type If required, the service can be extended by 1 further vehicle using a framework agreement item. The contractor will be informed by September 30, 2025 at the latest whether use will be made of the framework agreement quantity. Bus, all-wheel drive Delivery of a bus, all-wheel drive such as the VW Caravelle Comfortline, Mercedes Benz Vito or equivalent Chassis for the construction of a flatbed vehicle, all-wheel drive and double cab Delivery of 14 chassis for the construction of a flatbed vehicle, all-wheel drive and double cab such as the VW Transporter / Crafter, Ford Transit or equivalent If required, the service can be extended by 1 further vehicle by means of a framework agreement item. The contractor will be informed by September 30, 2025 at the latest whether use will be made of the framework agreement quantity.

Offizielle Bezeichnung Tender

Civil And Construction...+3Excavation, Consultancy Services, Civil And Architectural Services
Germany
Closing Date7 Jan 2025
Tender AmountRefer Documents 
Contract notice - general guideline, standard rule open procedure (construction work) Ejustice data cabling Ag Bensheim low and medium voltage systems up to 36 kV (DIN 18 382); Ejustice data cabling Ag Bensheim the service put out to tender includes the construction of a new ... Moreejustice data cabling Ag Bensheim low and medium voltage systems up to 36 kV (DIN 18 382); Ejustice data cabling Ag Bensheim the service put out to tender includes the construction of a new, independent and additional network structure in the existing building. This is exclusively passive network infrastructure. There are no active components. Ancillary work on the existing network infrastructure cannot be ruled out. In the event of a disruption in the existing network caused by the construction work, it must be possible to carry out immediate repairs to the network infrastructure.

Offizielle Bezeichnung Tender

Electrical Goods and Equipments...+1Electrical and Electronics
Germany
Closing Date13 Jan 2025
Tender AmountRefer Documents 
Contract notice – general guideline, standard regulation, open procedure (construction work) Heating and cooling Heating systems and central water heating systems (DIN 18 380); Air conditioning systems (DIN 18 379); Heating and cooling Renewal of the heating installation from the house inlet F ... More heating and cooling Heating systems and central water heating systems (DIN 18 380); Air conditioning systems (DIN 18 379); Heating and cooling Renewal of the heating installation from the house inlet District heating as well as construction of cold generation and distribution in the building. The listed building is being completely renovated and an extension is being added. The dismantling and pollutant remediation of the existing building has already been carried out. Execution of the heating installation including renewal of the district heating transfer station (approx. 365 kW) for heating the building with approx. 290 radiators divided into 3 heating circuits and the heating connection of four RLT systems. Installation of a new cooling system consisting of three propane chillers with a recooler on the roof (approx. 165 kW) as well as provisions for a local cooling connection on site. Execution of the cooling distribution and transfer to ULKS in technical rooms (approx. 15 units), ULKS in laboratory rooms (approx. 10 units), on-site compressors and cooling water transfer points in laboratory areas (approx. 55 units) as well as cooling-side connection to three air conditioning systems

Offizielle Bezeichnung Tender

Consultancy Services
Germany
Closing Date9 Sep 2025
Tender AmountNA 
Preliminary information for information purposes only - general guidelines (deliveries) Introduction of a learning management system It is intended due to the unique selling points: - administration-specific content that is designed to be methodically and didactically varied, motivating, learning-promoting and interactive and - "all-in-one solution" regarding internal and external training for our employees of Wtt Campus One GmbH Königsallee 37, 71638 Ludwigsburg Telephone: +49 7141 50 530 20 Fax: +49 7141 50 530 62 E-mail: Info@wtt-campusone.com To place the order.

Offizielle Bezeichnung Tender

Germany
Closing Date4 Feb 2025
Tender AmountRefer Documents 
Contract notice - general guideline, standard regulation Open procedure (deliveries) Command vehicle Delivery of two command vehicles 1 (elw 1) with partial loading for the professional fire brigade of the city of Offenbach am Main Command vehicle The subject of the service is the delivery of two ... Multi-operation command vehicle Delivery of two command vehicles 1 (elw 1) with partial loading for the professional fire brigade of the city of Offenbach am Main Command vehicle The subject of the service is the delivery of two command vehicles (elw 1) box van chassis with fire service technical conversion to Elw 1 and partial loading in accordance with DIN Spec 14507-2 and DIN En 1846 for the professional fire brigade of the city of Offenbach am Main

Offizielle Bezeichnung Tender

Germany
Closing Date5 Feb 2025
Tender AmountRefer Documents 
Contract notice - general guideline, standard rule, open procedure (construction work) Timber construction, windows, sun protection, facade cladding, scaffolding Manufacture of timber construction, windows, sun protection, facade cladding, scaffolding. Timber construction, windows, sun protection, facade cladding, scaffolding ... Multi-timber construction, windows, sun protection, facade cladding, scaffolding Manufacture of timber construction, windows, sun protection, facade cladding, scaffolding. Timber construction, windows, sun protection, facade cladding, scaffolding Timber construction, window, sun protection, facade, scaffolding work. The service is part of the construction project "Arheilgen district school - renovation and extension of buildings B and C" of the Science City of Darmstadt, represented by the property management company of the Science City of Darmstadt (ida).

Offizielle Bezeichnung Tender

Germany
Closing Date30 Jan 2025
Tender AmountRefer Documents 
Contract notice – General guidelines, standard rules Open procedure (construction work) New leisure pool construction – Rheinhöhe sports park, Wiesbaden Lot 010.2 Ventilation technology New leisure pool construction – Rheinhöhe sports park, Wiesbaden Key services provided by the measure: 2 x partial air conditioning systems with dehumidification/cooling, together approx. 35,000 m3/h 6 x partial air conditioning systems for swimming pool atmosphere, together approx. 185,000 m3/h 2 x exhaust air units for underground car park, together approx. 110,000 m3 19 x other ventilation systems, together approx. 60,000 m3 approx. 18,000 m3 rectangular air ducts and approx. 4,500 linear meters of round ventilation ducts including duct fittings and insulation. Assembly partly within the roof structure including provision of space scaffolding over the swimming pool and artificial ice rink. 8 stainless steel ventilation towers up to approx. 13 m high and approx. 2.6 m in diameter. Including test operation.
391-400 of 409 active Tenders