Hvac Tenders

Hvac Tenders

VETERANS AFFAIRS, DEPARTMENT OF USA Tender

Civil And Construction...+1Building Construction
Corrigendum : Closing Date Modified
United States
Details: Cope:provide Construction Services For The Renovate Halls, Walls, And Ceilings Of Ground Floor Building 1 Project, Including Interior Finishes, Hazardous Material Remediation In Sections Of The Ground Floor Construction Space And All Associated Work As Per Attached Plans And Specifications At Durham, Nc Va Medical Center. background:ground Floor Consists Of Some Original Finishes And Some Refinished Surfaces. Unknown Of Last Renovation Date. The Ground Floor Is Outdated And In Desperate Need Of Renovation And Repair. Pictures And Descriptions Of Existing Conditions Can Be Found In The Drawings And Specifications Provided. general: Work Includes, But Is Not Limited To Alterations, Architectural, Demolition, Asbestos Abatement, Interior Finishes, Hvac, And Electrical Work, And Certain Other Items To Install New Finishes. Trades Needed To Complete Work Include Hvac, Electrical, Fire Protection, Carpenter, And Any Other Trades Deemed Necessary By The Contractor Will Be Obtained To Complete The Construction As Required By Plans And Specifications. Contractor Shall Completely Prepare Site For Building Operations, Including Demolition And Removal Of Existing Finishes, Remediation Of Substrates To Receive New Finishes, And Installation Of New Finishes In Building 1 On The Ground Floor As Required By Drawings And Specifications. offers Should Consider The Availability Of Materials And Cost Of Materials For Finishes Prior To Submitting A Bid. place Of Performance:tasks Will Be Performed At The Va Medical Center, Durham, Nc 27705. business Hours: Normal Business Hours Are Monday Through Friday From 8am To 4:30pm. Work Will Be Completed Outside Of Normal Business Hours. On Page 26 Of Specs The Allowed Work Hours Are Stated For Each Phase. This Facility Is In Operation 24 Hours A Day, And The Schedule Will Keep The Construction Work To Times Of Lower Traffic. phasing: Project Construction Will Be Phased As Indicated In Drawings And Specifications. Work Will Be Scheduled To Minimize The Disruption To The Medical Center And Other Contractors. all Work Is To Be Performed Outside Of Normal Business Hours Unless Otherwise Noted In Construction Documents. Work Shall Be Coordinated With The Va Contracting Officers Representative (cor) In Advance To Minimize Disruption Of Facility Operations. Deviations Or Change Requests To Work Hours Must Be Approved Through The Cor. no Work Is To Be Performed On Federal Holidays Without Written Permission Of Cor. utility Outages Shall Be Performed Outside Of Normal Business Hours Unless Approved By The Cor. All Outages Shall Be Scheduled Through The Cor And Approved By The Medical Center Prior To Taking Place. Outages Must Be Requested In Writing A Minimum Of 14 Days In Advance. The Va Has The Right To Cancel All Outages At The Last Moment Without Notice Due To Patient Safety Related Issues, Severe Weather, Electrical Power Outages Or Other Concerns Deemed Important. The Contractor Shall Create, Present, And Have A Cor Approved Work Plan Prior To Commencing With Any Work. Work Plan Shall List All Steps To Be Taken For Removing Each Piece Of Equipment From Service, Steps To Be Taken For Installation, And Steps To Be Taken In Case Of An Emergency.
Closing Date18 Mar 2025
Tender AmountRefer Documents 

NATIONAL OCEANIC AND ATMOSPHERIC ADMINISTRATION USA Tender

Civil And Construction...+1Building Construction
United States
Details: Project Description - Generally Described As Follows But Not Limited To: a Brief Description Of The Existing Three (3) Buildings And Site, And Anticipated Basic Scope Are Provided Below: visitor Center Building: approximately 2,550 Gsf built In The 1940s, Interior Completely Renovated And Partial Exterior Renovation In 2011. Lead Based Paint On Exterior Remediated 2017. two-story With Visitor Center On First Floor And Offices On Second Floor And In The Third Story/cupola. situated On Shoreline With Exposure To Strong Daily Winds And Blowing Sand. historic Fishpond, Rocky Coastline, And Near Shore Reef Flat Provide Some Protection From Wave Action And Shoreline Erosion. anticipated Scope Includes: Roof Replacement, Window Replacement, Pv System Replacement, And Minor Interior Renovations. learning Center Building: approximately 4,600 Gsf built In 2009 elevated One-story Building With Garage, Offices, Public Restrooms, Multipurpose Conference Room, Storage. anticipated Scope Includes: Complete Interior Renovation To Accommodate Programmatic Changes, Roofing Replacement, Window Replacement, Pv System Replacement, Complete Hvac Replacement, Fire Alarm System Replacement, Adding A Fire Sprinkler System, And Other Miscellaneous Repair Items. classroom/office Building: approximately 1,900 Gsf built In The 1950s. Concrete Block Building Was Renovated In 2013 With Exterior Siding And Flood Protections anticipated Scope Includes: Complete Interior Renovation To Accommodate Programmatic Changes, Raising The Existing Floor Level To Mitigate Flooding Risk, Provision Of New Flood Gates, Roofing Replacement, Window Replacement, Exterior Painting, Pv System Replacement, Complete Hvac Replacement, Electrical Improvements, Fire Alarm System Improvements, And Other Miscellaneous Repair Items. site Improvements: complete Replacement And Regrading Of The Parking Lot To Provide Positive Drainage And Mitigate Flooding/ponding, Including Permeable Surfaces Where Possible. address Existing Site Drainage Issues Through Renovation Of Existing French Drain, Addition Of Swales, Improved Drainage, Addition Of Landscaping, And Other Approaches. provide/replace Water Lines To Existing Facilities, Including A New Fire Water Line To Learning Center. retain Or Improve Existing Sand Storage. provide A New 6-10 Car Covered Parking Structure With Pv On The Roof, With A Minimum Of 1 Enclosed Secure Parking Space, And Ev Charging For A Minimum Of 1 Vehicle provide Safe And Improved Pedestrian Access To And Through The Site. electrical Conduit Upgrade. other Potential Underground Utility Replacements And Repairs. the Proposed Contract Will Consist Of Contract Line Item Number (clin) 0001 For All Design And Preconstruction Services And Clin 0002 For All Demolition And Construction Work. The Contract May Include Additional Option Clins For Additional Scope Items That Can Be Added To The Scope If Funding Becomes Available. this Is A New Requirement For Design-build Services For The Hihwnms Campus. The Solicitations And Resulting Contract Will Provide All Design And Construction Services For The Hihwnms Building And Site Improvement Project. see Attachment For Additional Information.
Closing Date5 Feb 2025
Tender AmountRefer Documents 

Qatar Energy Tender

Civil And Construction...+1Building Construction
Qatar
Details: Future Tenders (infrastructre & Civil Projects) Construction Of Qatarenergy Wellness Center At West Bay Tender Description: "the Scope Of Work Is For The Construction Of Qatarenergy Wellness Center Classified By Ministry Of Public Health As A Diagnostic & Treatment Center, Located In West Bay, Doha, Over A Plot Area Of 6,407 Sqm. The Proposed Healthcare Facility Is Envisaged To Be Equipped With The State-of-the-art Medical Equipment, Amenities And Landscaped Features Along With The Gsas 5 Star Rating Criteria. Construction Is For 3 Basements, Ground Plus 6 Floors Building With A Total Built Up Area Of Circa 37,000sqm. The Building Envelope Is Fully Glazed With A Contemporary Screening Element That Wraps The Entire Façade. 2 Skylights Provide Daylighting Through A Central Atrium And Lightwell. The Entire Roof Of The Building Is Provided With Photo Voltaic Along With The Building Services And Equipment. Hvac Design Utilizes Available District Cooling From Qatar Cool. The Facility Comprises Of Medical Departments For Urgent Care, Pcr Testing, Day Surgery With 2 Operating Theatres, Cssd, Laboratory, Pharmacy, Medical Imaging With X-ray, Ultrasound, Ct, Mri & Bone Densitometry, Primary Care, Specialized Clinics, Dental With Dental Lab & Cssd, Psychology, Physiotherapy, Occupational Health, Day Care Rooms. Also Included Are Admin Offices And Central Stores, Medical Records, And Prayer Rooms And Commercial Spaces. Planned Tender Issue: 06/04/25 Planned Contract Award: 26/10/25
Closing Date26 Oct 2025
Tender AmountRefer Documents 

Ziekenhuis Aan De Stroom ZAS Vzw Tender

Works
Civil And Construction...+1Civil Works Others
Belgium
Details: Title: Zas Augustinus Afwerking En Technieken Nicu Incl. Aanleveren As-built Dossier description: Afwerking Bouw (incl. Coördinatie-opdracht) En Installatie Technieken Voor De Nieuwe Nicu Afdeling En Het Fertiliteitscentrum Op De Site Zas Augustinus. Het Betreft De Realisatie Van Een Nieuwbouw (waarbij Het Lot Ruwbouw Reeds In Uitvoering Is) Voor De Diensten Nicu En Fertiliteit Binnen Zas. Het Gebouw Bestaat Uit 4 Bouwlagen, Waarbij Op Het Gelijkvloers En De Eerste Verdieping Ca. 3.450 M² Bruto Vloeroppervlakte Voorzien Wordt Voor De Afdeling Nicu En Waarbij Op De Tweede Verdieping Ca. 1.400 M² Bruto Vloeroppervlakte Voorzien Wordt Voor De Afdeling Fertiliteit. De Technische Ruimte Is Geïntegreerd In De Tweede Verdieping En De Kelderverdieping, Waardoor Er Geen Technieken Op Het Dak Dienen Geplaatst Te Worden. De Horizontale Aansluiting Tussen Het Bestaande Gebouw En De Nieuwbouw Verloopt Via Een Glazen Verbindingsgang Op De Drie Niveaus. De Opdracht Is Opgedeeld In Volgende Percelen: Perceel 1 Afwerking Bouw En Vast Meubilair + Coördinatieopdracht Perceel 2 Hvac Perceel 3 Elektriciteit Perceel 4 Sanitair En Brandbestrijding Perceel 5 Medische Gassen En Ln2
Closing Date14 Feb 2025
Tender AmountRefer Documents 

INDIAN HEALTH SERVICE USA Tender

Software and IT Solutions
United States
Details: Special Notice/sole Source:the Billings Area Indian Health Service (ihs) Intends To Award A Non-competitive Purchase Order To Automated Logic, 10419 E. Trent Avenue, Spokane, Washington 99206-4515, For Annual Preventative Maintenance Services On The Automated Logic Control Systems At The Crow Service Unit, Crow Agency, Lodge Grass And Pryor, Montana; Fort Peck Service Unit, Poplar And Wolf Point, Montana; Fort Belknap Service Unit, Harlem And Hays, Montana; Wind River Service Unit, Arapahoe, Wyoming. The Automated Logic Webctrl Building Control System Is A Proprietary Direct Digital Control System That Controls The Hvac Mechanical Systems Within The Healthcare Facilities. Automated Logic Is The Local Authorized Distributor And Manufacturer Authorized Company To Service The System. The Procurement Will Be Conducted Pursuant To The Authority Of Federal Acquisition Regulation (far) Part 13, Simplified Acquisition Procedures; 41 U.s.c. 3304(a)(1), As Implemented By Far 6.302-1, Only One Responsible Source And No Other Supplies Or Services Will Satisfy Agency Requirements; And Far 37.101, Non-personal Services Contract. The Ihs Anticipates The Award Of A Fixed-price Purchase Order For The Period Of February 1, 2025 Through January 31, 2026. This Is Not A Request For Competitive Proposal And No Solicitation Is Available. Firms That Believe They Can Provide Theservice Are Encouraged To Identify Themselves And Give Written Notification During The Publication Of This Notice. A Determination By The Government Not To Compete This Action Issolely Within The Discretion Of The Government.any Information Received Will Be Used For Market Research Purposes For Future Considerations.
Closing Soon14 Jan 2025
Tender AmountRefer Documents 

Dublin City Council Tender

Works
Civil And Construction...+1Building Construction
Ireland
Details: Title: Dcc - Expression Of Interest For Parnell Square Project – Phase 1 description: Dublin City Council Are Seeking To Carry Out Construction Works At Parnell Square North For Phase 1 Which Includes The Following Works: 1. Construction Of A New 5-storey Building Over Basement Of Approximately 6,100m2 (excluding Roof Plant Space) Located At The Rear Of Georgian Houses Nos. 23-28 Parnell Square North, Dublin 1 To Form The Core Of The New City Library. This Includes Connections To The Georgian House No. 26 And To The Hugh Lane Gallery. 2. The Partial Renovation/essential Works Of Georgian Houses Nos. 23-28 Parnell Square North, Measuring Approximately 5,500m2. 3. Restoration Of Georgian House No. 26 Parnell Square North Of Approximately 700m2. This Includes The Partial Refurbishment Of No. 27 And Roof And Basement Refurbishment Of No. 25. 4. Refurbishment Works To The 1930’s Wing Of The Hugh Lane Gallery, Charlemont House, Parnell Square, Dublin 1 Of Approximately 2,100 M2 . This Includes Repair And Upgrade Of Roof Works And Rooflights To 1930s Wing And Francis Bacon Studio, New Hvac Systems, Cabling And Lighting To 1930’s Wing And Associated Bms And New Environmental Control Lobbies To Main And Rear Entrances. The Construction Value Is In The Order Of €100m. Please Note That This Project Is Subject To Funding. For Further Information Please Refer To Documentation Available To Download From Www.etenders.gov.ie Resource Id 4664774.
Closing Soon10 Jan 2025
Tender AmountEUR 100 Million (USD 102.7 Million)

Virginia Department Of General Services Tender

Civil And Construction...+3Building Construction, Consultancy Services, Civil And Architectural Services
United States
Details: Temple University Temple Is Se ... Temple University Temple Is Seeking Qualified Contractors To Bid On Work For The Plumbing And Fire Protection Construction Package For The New Klein Cpca Building Project Project At Temple University Located At 1830 N Broad Street Philadelphia Pa The Project Will Be A New Facility For The Klein College Of Media And Communication And The Center For Performing And Cinematic Arts Cpca The Project Is Planned To Be A New Ground Up Mixed Use Building That Will Be Located On Broad Street This New State Of The Art Facility Will Include 146 000 Gsf For Academic Programs And A 52 000 Gsf Theater Program For A Project Total Of Approximately 198 000 Gsf The New Facility Will Consolidate Uses From Other Campus Locations The Program Consists Of Classrooms Studios Faculty Offices Administrative Offices And Student Areas The Project Is Seeking Leedv4 Silver Certification And Wellv2 Silver Certification This Project Is Subject To A Delegation Agreement Between Temple The Pennsylvania Department Of General Services And The Governor S Office Of The Budget This Project Will Be A Multi Prime Project Delivered Pursuant To A Multi Prime Contract Delivery Structure The Prime Contractors Will Include General Construction Mechanical Hvac Electrical And Plumbing And Fire Protection Low Voltage Av It Telco And Each Other Contractor Engaged Directly By Temple To Perform Construction Or Supply Machinery Materials Equipment Or Labor For Construction Of The Project And Which Are Identified By Temple As Being A Prime Contractor For The Project Plumbing And Fire Protection Construction The Scope Of Work For The Plumbing And Fire Protection Construction Package Shall Include All Necessary Services Work Labor Materials Supervision Tools Supplies Equipment Insurance And Applicable Taxes Necessary To Complete Plumbing And Fire Protection Construction Package As Shown In The Contract Documents For The Above Referenced Project ...
Closing Date29 Jan 2025
Tender AmountRefer Documents 

Virginia Department Of General Services Tender

Civil And Construction...+3Building Construction, Consultancy Services, Civil And Architectural Services
United States
Details: Temple University Temple Is Se ... Temple University Temple Is Seeking Qualified Contractors To Bid On Work For The General Construction Package For The New Klein Cpca Building Project Project At Temple University Located At 1830 N Broad Street Philadelphia Pa The Project Will Be A New Facility For The Klein College Of Media And Communication And The Center For Performing And Cinematic Arts Cpca The Project Is Planned To Be A New Ground Up Mixed Use Building That Will Be Located On Broad Street This New State Of The Art Facility Will Include 146 000 Gsf For Academic Programs And A 52 000 Gsf Theater Program For A Project Total Of Approximately 198 000 Gsf The New Facility Will Consolidate Uses From Other Campus Locations The Program Consists Of Classrooms Studios Faculty Offices Administrative Offices And Student Areas The Project Is Seeking Leedv4 Silver Certification And Wellv2 Silver Certification This Project Is Subject To A Delegation Agreement Between Temple The Pennsylvania Department Of General Services And The Governor S Office Of The Budget This Project Will Be A Multi Prime Project Delivered Pursuant To A Multi Prime Contract Delivery Structure The Prime Contractors Will Include General Construction Mechanical Hvac Electrical And Plumbing And Fire Protection Low Voltage Av It Telco And Each Other Contractor Engaged Directly By Temple To Perform Construction Or Supply Machinery Materials Equipment Or Labor For Construction Of The Project And Which Are Identified By Temple As Being A Prime Contractor For The Project General Construction The Scope Of Work For The General Construction Package Shall Include All Necessary Services Work Labor Materials Supervision Tools Supplies Equipment Insurance And Applicable Taxes Necessary To Complete General Construction Package As Shown In The Contract Documents For The Above Referenced Project The Scope Of Work For The General Construction Package Is Further Specified In The...
Closing Date28 Jan 2025
Tender AmountRefer Documents 

Virginia Department Of General Services Tender

Civil And Construction...+3Building Construction, Electrical and Electronics, Electrical Works
United States
Details: Temple University Temple Is Se ... Temple University Temple Is Seeking Qualified Contractors To Bid On Work For The Electrical Construction Package For The New Klein Cpca Building Project Project At Temple University Located At 1830 N Broad Street Philadelphia Pa The Project Will Be A New Facility For The Klein College Of Media And Communication And The Center For Performing And Cinematic Arts Cpca The Project Is Planned To Be A New Ground Up Mixed Use Building That Will Be Located On Broad Street This New State Of The Art Facility Will Include 146 000 Gsf For Academic Programs And A 52 000 Gsf Theater Program For A Project Total Of Approximately 198 000 Gsf The New Facility Will Consolidate Uses From Other Campus Locations The Program Consists Of Classrooms Studios Faculty Offices Administrative Offices And Student Areas The Project Is Seeking Leedv4 Silver Certification And Wellv2 Silver Certification This Project Is Subject To A Delegation Agreement Between Temple The Pennsylvania Department Of General Services And The Governor S Office Of The Budget This Project Will Be A Multi Prime Project Delivered Pursuant To A Multi Prime Contract Delivery Structure The Prime Contractors Will Include General Construction Mechanical Hvac Electrical And Plumbing And Fire Protection Low Voltage Av It Telco And Each Other Contractor Engaged Directly By Temple To Perform Construction Or Supply Machinery Materials Equipment Or Labor For Construction Of The Project And Which Are Identified By Temple As Being A Prime Contractor For The Project Electrical Construction The Scope Of Work For The Electrical Construction Package Shall Include All Necessary Services Work Labor Materials Supervision Tools Supplies Equipment Insurance And Applicable Taxes Necessary To Complete Electrical Construction Package As Shown In The Contract Documents For The Above Referenced Project The Scope Of Work For The Electrical Construction Package Is Further S...
Closing Date30 Jan 2025
Tender AmountRefer Documents 

Historical And Museum Commission Tender

Civil And Construction...+1Civil Works Others
United States
Details: Project Number Dgs C 0976 0001 P ... Project Number Dgs C 0976 0001 Phase 1 Project Title Ephrata Cloister Renovation Expansion Of Visitor Center Project Location 632 West Main Street Ephrata Pa 17522 This Project Is Advertising For Professional Selections For Design And Or Engineering Services Brief Description The Scope Of Work Includes But Is Not Limited To Transforming The Ephrata Cloister Visitor Center Into A Modern Welcoming And Functional Facility That Enhances The Experience Of Patrons While Respecting The Site S Historic Context The Project Involves Expanding And Reconfiguring Spaces It Aims To Create An Efficient Entrance That Seamlessly Guides Visitors From The Parking Area To The New Lobby And Exhibit Spaces Providing A More Cohesive And Accessible Presentation Of Pennsylvania History The Museum S Collections And Artifact Storage Should Be Consolidated Into Single Secure Climate Controlled Spaces The Energy Efficiency Performance Of The Building Envelope And Hvac Systems Should Be Improved Estimated Construction Cost 3 360 000 00 B Application Due Date Thursday January 16 2025 At 4 30 P M B The Department Of General Services Capital Programs And The Bureau Of Diversity Inclusion And Small Business Opportunities Identified This Procurement As Eligible For The Setting Of Small Diverse Business Sdb And Or Veteran Business Enterprise Vbe Participation Goals Applicants Must Agree To Meet All Sdb And Vbe Participation Goals In Full Or Demonstrate That They Have Made Good Faith Efforts To Meet The Goals Refer To The Project Trimble Unity Construct Previously E Builder Solicitation Folder For Instructions Regarding Small Diverse Business And Veteran Business Enterprise Participation The Goals For Sdb Participation 0 The Goals For Vbe Participation 0 Project Documents Including The Application And Project Development Study Pds Can Be Viewed In And Downloaded From The Project S Trimble Unity Construct Sol...
Closing Soon16 Jan 2025
Tender AmountRefer Documents 
481-490 of 553 active Tenders