Hvac Tenders

Hvac Tenders

DEPT OF THE ARMY USA Tender

Civil And Construction...+1Civil Works Others
United States
Details: W9123625b5000 field Office/work Space, Great Bridge Reservation Chesapeake, Virginia this Is A Pre-solicitation Notice. This Is Not A Solicitation. Do Not Submit Proposals Or Questions In Response To This Notice. it Is Anticipated That The Solicitation Will Be Posted On Procurement Integrated Enterprise Environment (piee) Website At Https://piee.eb.mil/ On Or About 1st Quarter Fiscal Year 2025. The Solicitation Is Anticipated To Be Posted For 30 Calendar Days. the U.s. Army Corps Of Engineers (usace) Norfolk District (nao) Intends To Issue An Invitation For Bid (ifb) Acquisition For The Construction Of A Field Office/work Space At The Great Bridge Reservation Chesapeake, Virginia. This Procurement Will Be Conducted In Accordance With Far Part 14, Invitation For Bid (ifb). the Government Intends To Award A Firm-fixed-price (ffp) Contract. The Requirement Will Be Solicited As A 100% Small Business Set-aside. The Applicable Naics Code Is 236220, Commercial And Institutional Building Construction, With A Small Business Standard Of $45 Million. in Accordance With Far 36.204 - Disclosure Of The Magnitude Of Construction Projects, The Magnitude Of Construction Is Between $1,000,000 And $5,000,000 Million. description Of Work the Norfolk District, Corps Of Engineers Is Contemplating A Firm-fixed-price Contract For The Construction Of A Field Office/work Space At The Great Bridge Reservation Chesapeake, Virginia. the Project Consists Of The Construction Of A New 40’x 80’ Building. The New Building Is To Have Office Space For 2 Desks Plus A Common Area With A Table For A Total Of 5 Personnel And A Unisex Bathroom. The Office Area Is To Have Hvac. The Remaining Space In The Building Is To Be A Workshop And Storage Which Has No A/c. There Are To Be Bay Doors At Each End Of The Building. There Is To Be An Additional Concrete Pad Adjacent To The Building With An Optional Shed Cover. The New Building Shall Have Electricity, Communications, Water And Sewer And The Electricity And Water Are To Be Metered. The Office Shall Have Two Computer Drops And The Workshop Area Will Need To Supply Power For A Compressor And A Welder (the Equipment Is Not A Part Of The Design). The Site Shall Have Sidewalks, Grass And 5 Stabilized Grass Parking Spaces But No Other Landscaping. Provide Electrical Shore Power Service (75 Kw, 3 Phase, 480 Vac) To The Wharf To The East Where A Portion Of The Infrastructure Has Already Been Installed. Provide An Emergency Generator To Provide Power To The New Building And The Wharf. The Asphalt Pavement At The Adjacent Historic Buildings At The Great Bridge Reservation Is Failing In Some Areas. Determine If Repaving, Rebuilding, Resurfacing, Or Regrading Is Required. Enlarge The Existing Entry Gate And Asphalt Approach Entrance To The Great Bridge Reservation. The Shed Cover, Parking, Gate, Generator, And Pavement Are To Be Construction Options Due To Funding Constraints. the Construction Completion Date Will Be Approximately 365 Calendar Days From The Issuance Of Notice To Proceed (ntp). this Project Is A 100% Small Business Set-aside Procurement Sealed Bid. the Government Intends To Award A Firm Fixed Price Contract Using Invitation For Bid With Pre-award Survey And Procedures Outlined In Far 36 And Far 14. Pre-award Survey Will Determine Contractor Responsibility In Accordance With Far 9.104 And 9.106. Bidders Will Be Evaluated On Both Pre-award Survey And Conformance To The Solicitation And Price. The Government Reserves The Right To Reject Any Or All Bids; And To Award The Contract To Other Than The Lowest Total Price And To Award To The Bidder Submitting The Lowest Bid Determined By The Government To Be Responsible. Bid Bonds Will Be Required With Bid Submittals. In Addition, The Awardee Must Be Found Responsible In Accordance With Far 9.1. The Below Pre-award Survey Information Will Be Requested Of The Apparent Low Offeror. This Information Is Not Required To Be Responsive To The Invitation For Bid. a) Current Commitments And Expected Dates Of Completion. b) One (1) Signed Bank Reference Demonstrating Adequate Financial Resources. If Bidder’s Firm Has A Line Of Credit – Provide Information On How Many Figures Bidder Can Borrow Against The Line Of Credit (i.e. Medium 6 Figures – Exact Line Of Credit Is Not Required). c) The Bidder Shall Provide The Latest Three (3) Complete Fiscal Year Financial Statements For The Prime Contractor, Certified By An Independent Accounting Firm, If Practicable, Or Signed By An Authorized Officer Of The Organization. Submit Evidence Of Availability Of Working/operating Capital, Which Will Be Used For The Performance Of The Resultant Contract. For Joint Venture Arrangements, Submit The Latest Three Complete Fiscal Year Financial Statements For Each Company In The Joint Venture And Discuss The Financial Responsibilities Among The Companies. The Government May Also Utilize Dun & Bradstreet Reports To Evaluate The Financial Capacity Of The Bidder. this Notice Does Not Constitute An Invitation For Bid. The Ifb And Accompanying Documents Will Be Issued Electronically And Will Be Uploaded To The Procurement Integrated Enterprise Environment (piee) Website At Https://piee.eb.mil/ On Or About 1st Quarter Fiscal Year 2025. Notification Of Any Changes To This Pre-solicitation Will Only Be Made On This Website. Therefore, It Is The Offerors Responsibility To Check The Website Regularly For Any Posted Changes To The Pre-solicitation Notice, Release Of The Solicitation, Specification, Drawings, And All Subsequent Amendments. Telephone Calls Or Written Requests For The Ifb Package Will Not Be Accepted. Prospective Bidders Are Responsible For Monitoring At Https://piee.eb.mil/ To Respond To The Solicitation And Any Amendments Or Other Information Regarding This Acquisition. it Is The Sole Responsibility Of The Offeror To Continually View The Website For Changes. No Hard Copies Will Be Available. prospective Bidders Are Responsible For Monitoring Sam.gov To Respond To The Solicitation And Any Amendments Or Other Information Regarding This Acquisition. Prospective Bidders Are Required To Be Registered In Sam When Submitting An Offer And Shall Continue To Be Registered Until Time Of Award, During Performance, And Through Final Payment Of Any Contract. note: Online Representations And Certifications Applications Apply To This Solicitation. inquires Must Be Directed To Projnet In Accordance With The Forthcoming Solicitation Document.
Closing Date31 Dec 2024
Tender AmountRefer Documents 

DEPT OF THE ARMY USA Tender

Corrigendum : Closing Date Modified
United States
Details: The United States Army Corps Of Engineers (usace), Transatlantic Middle East District (tam), Is Releasing The Following Presolicitation Notice For The Purpose Of Making Notification To The Public And To Solicit Responses For The Prequalification Of Sources. While All Attempts Have Been Made To Ensure The Accuracy Of The Information Presented Below, The Government Does Not Guarantee Its Accuracy, And Prior To Award, Reserves The Right To Make Any Changes To The Project As Deemed Necessary. this Notice Is For Construction Of The Fleet Maintenance Facility & Tactical Operations Center (p992) Project At Shaikh Isa Air Base In The Kingdom Of Bahrain. The P992 Project Is A Programmed Military Construction (milcon) Project. project Scope: The P992 Project Will Construct A Two-story, Steel-frame Fleet Maintenance Facility (fmf) Using Pre-engineered Metal Building (pemb) On A Concrete Slab Foundation And Structural Floor, Insulated Metal Roof Panels On Steel Purlins, Interior Prefabricated Metal Module Units, And Exterior Rf Shielding Membrane. The Facility Will Include Maintenance And Repair Areas, Personnel Support Areas And Storage. Its Function Is To Support Associated Asset Of P-8a Aircraft Housed In The Adjacent P-8a Hangar. Project Also Constructs A Single-story Tactical Operations Center (toc); The Facility Will Be Composed Of Pemb On A Concrete Slab Foundation. The Facility Will Include Administrative And Operational Areas. The Facility Will Consolidate Requirements Currently Housed In Multiple Relocatable Facilities As Well As Provide Operational Support To The P-8a Aircraft. this Project Alters Building #5070 (133.78 M2). Alterations Will Involve Minor Repair To No More Than 30% Of The Existing Gypsum Board Walls/ceilings And Painting Of All The Existing Gypsum Board Wall/ceiling Surfaces. information Systems Include Basic Telephone And Secure Telephone, Secure Computer Network, Fiber Optics, Cable Television, Security (ids/ess) And Fire Alarm Systems And Infrastructure. this Project Will Provide Anti-terrorism/force Protection (at/fp) Features And Comply With At/fp Regulations And Physical Security Mitigation In Accordance With Dod Minimum Anti- Terrorism Standards For Buildings. User Generated Unit Costs Were Used Were Used For This Project And Include The Cost Of Features To Meet The Minimum Dod At/fp Standards. built-in Equipment Includes 60 Hz And 400 Hz Power Converters And Systems, Power Filters, Emergency Back-up Power Generator At The Toc, Three Oversize Access Doors, Acu-902 Pod Cooler, Storage Rack Shelving And Raised Access Flooring. pavement Facilities Include Pads For Generators, Hvac Equipment And A Concrete Airfield Access Ramp Extension. Paving And Site Improvements Include Grading, Asphalt Road Repair, Security Fencing, Entry Control Points, And Concrete Paver Installation. site Preparation Includes Site Clearing Of Existing Structures, Underground Utility Relocations And Preparation For Construction. electric Utilities Include Site Lighting, Prime-rated Generators, Underground Electric Distribution Systems, Antenna Infrastructure, Telecommunications Infrastructure, Antenna Cable, And Relocation Of Existing Underground Electrical And Telecommunications Systems. Mechanical Utilities Include Storm Water Lines And Fire Water Supply Lines. The Project Includes Force Protection Barriers. this Project Contains A Secure Hotel Component And Will Require A U.s. Contractor With A Defense Counterintelligence And Security Agency Issued Active Facilities Clearance Listing (fcl) At The Secret Level Or Higher. magnitude Of Construction: The Magnitude Of Construction For This Project Is Estimated To Be Between $10,000,000.00 And $25,000,000.00. period Of Performance: The Estimated Overall Period Of Performance (pop) Is Five Hundred Ninety-nine (599) Calendar Days From Notice To Proceed (ntp) For The Entire Scope Of Work. location Of The Work: The Location Of The Project Is Shaikh Isa Air Base In The Kingdom Of Bahrain. tentative Milestone Dates: The Design-bid-build (d-b-b) Solicitation Is Scheduled For Release In May Of 2022. Offeror’s Proposals May Be Due 30 Days Following Release Of The Solicitation And Contract Award Is Estimated To Be In August Of 2022. project Classification: The Project Is Classified Through The North American Industry Classification System (naics) Under Code 236220 Commercial And Institutional Building Construction With A Small Business Size Of $39.5 Million. However, As This Requirement Will Be Performed Oconus, Small Business Set Asides Will Not Be Used. This Solicitation Will Be Advertised As A Full And Open Requirement Using Prequalification Of Sources. solicitation Documents: Solicitation Documents Will Only Be Provided To Offerors Who Have Responded To This Notice And Have Been Determined To Be Qualified In Accordance With This Notice. To Be Qualified, Interested Firms Must Have An Active Registration In Sam.gov And Possess A Facility Clearance Level (fcl) Of Secret Or Higher, Issued In Accordance With The National Industrial Security Program Operating Manual (nispom), Dod 5220.22-m By The Closing Of This Posting. If The Interested Firm Is A Joint Venture (jv), All Members Of The Jv And The Jv Itself Must Possess A Secret Fcl Or Higher At The Date And Time Of The Close Of This Posting. Any Interested Firm Must Provide A Response To This Pre-solicitation Notice Identifying Its Name, Physical Address, Email Address, And Commercial And Government Entity (cage) Code. A Copy Of The Offerors Fcl Must Be Provided. interested Offerors Are Required To Sign And Return The Attached Controlled Unclassified Non-disclosure Agreement (nda). Upon Government Receipt Of A Signed Nda And Verification Of A Firm's Sam Registration, Cage Code And Fcl, Specifications/drawings And Other Related Project Documents Will Be Released To Eligible Offerors By Secure Document Transfer Method, Such As Dod Safe Site. Paper Copies Of The Solicitation Will Not Be Issued, And Solicitation Documents Will Not Be Posted Publicly. Telephone And Fax Requests For This Solicitation Will Not Be Honored. Project Files Are Portable Document Format (pdf) Files And Can Be Viewed, Navigated, Or Printed Using Adobe Acrobat Reader. the Request For Proposal Will Only Be Released To Offerors Who Have Met The Prequalification Of Sources Requirment. interested Offerors Are Required To Respond To This Notice By Submitting A Copy Of Their Active Fcl And Nda Documents And Emailing Them To Sam Cornwell At Samuel.i.cornwell@usace.army.mil And Jesse Hobbs At Jesse.a.hobbs@usace.army.mil No Later Than 13 May, 2022 By 4:00 Pm Eastern Daylight Time. be Advised That This Is A Presolicitation Notice Only And Is Not A Solicitation. This Notice Does Not Restrict The Government From Utilizing A Different Acquisition Approach Or Making Any Changes To The Project Scope Or Terms, Or To Award Some, All, Or No Resultant Contracts. The Government Will Not Reimburse Respondents For Any Costs Incurred In Preparation Of A Response To This Notice. If You Have Any Questions, Please Email Both Sam Cornwell At Samuel.i.cornwell@usace.army.mil And Jesse Hobbs At Jesse.a.hobbs@usace.army.mil.
Closing Date13 May 2025
Tender AmountRefer Documents 

Philippine Merchant Marine Academy Tender

Machinery and Tools
Philippines
Details: Description Quantity Unit Item Description 3 Units Pedestal Grinder • Grinding Wheel Diameter - 200 Mm" • No-load Speed - 3600 Rpm" • Grinding Wheel Widths - 25 Mm" • Grinding Wheel Bore - 32 Mm" • Grit - 24 , 60" • Rated Power Input - 600 W" • Weight - 10 Kg" • Tool Dimensions (length) - 370 Mm" • Tool Dimensions (width) - 230 Mm" • Tool Dimensions (height) - 260 Mm" • Voltage/frequency - 220/60" 6 Units Electric Power Hand Drill With At Least 13 Mm Diameter Drilling Capacity "• Drill Capacity:13mm" "• Voltage/frequency:230-60hz." "• Input Power:500w" "• No-load Speed:0-3100r/min" "packaging Dimension: ( L X W X H ) Cm 23.3 X 6.5 X 21.0cm" "weight 1.4 Kg" 6 Sets Electric Power Hand Grinder/cutter "• Rated Input Power 710 W" "• No-load Speed 12,000 Rpm" "• Speed Output No-load, Nominal Max. 12,000 Rpm" "• Disc Diameter 100 Mm" "• Voltage, Electrical 220 V" "• Grinding Spindle Thread M10" "• Wire Cup Brush, Diameter 75 Mm" "• Cup Wheel, Diameter 100 Mm" "• Polishing Sponge, Diameter 100 Mm" "• Surface Brush, Diameter 100 Mm" "• Grinding Head, Diameter 100 Mm" "• Weight 1.7 Kg" "• Switch Safety Switch" 6 Pcs Inside And Outside Micrometers "• Metric Or Inch Models" "• Zero-point Adjustment " "• Inside Measurements Of Cylinders, Rings And Parallel Surfaces" "• Accuracy And Wear Resistance" "• Scale On Thimble And Sleeve Is Laser Etched " "• Tubular Inside Micrometers Up To 200mm / 8″ Diameter Measurements Supplied In A Fitted Plastic Case" "• Tubular Inside Micrometers Over 200mm / 8″ Diameter Measurements Supplied In A Wooden Case." 6 Sets Wrench, Socket Type, 10mm To 24mm "• Drive System: 1/2” Drive" "• Finish Type: Black Manganese Phosphate Coating" 6 Pcs Wrench, Open Type (metric), 10 Mm To 24mm "• Alloy Steel" "• Head Style Open End" 6 Pcs Drill Bit, 13-25 Mm, Tapered Shank "• Material: High Speed Steel" "• Cutting Diameter: 0.06 Inches" "• Finish Type :titanium" "• Shank Type :straight" "• Cutting Angle String :135 Degrees" 6 Pcs Drill Bit, 15-30 Mm, Cylinder Shank "• Quality Rank: Mpp+" "• Diameter Range: 15mm To 30mm" "• Shank Type: 1/2"" Reduced Cylindrical Shank" "• Drilling Purposes: Metal Work" 1 Set Hydraulic Pipe Bender With Accessories "• Weight: 65.3lb (29.6 Kg) " "• Hydraulic Oil Model: No. 15" "• Adjustable Height: 13” ~ 18” (330-460 Mm)" "• Side Of Dies: ½”, ¾: 1”, 1 ¼ ”, 1-½ ”, 2” " 6 Pcs Dial Micrometer With Magnetic Base "• Material :metal" "• Product Dimensions: 11.81""l X 7.06""w" "• Range : 1 Inches" "• Measurement Accuracy: 0.0005"" (0.01mm)" 3 Sets Drilling Machine (approx. 13 Mm Min Diameter Drill Capacity) "• Power Source: Corded Electric" "• Maximum Rotational Speed:3084 Rpm" "• Voltage:220 Volts" "• Amperage:7.5 Amps" Materials 6 Pcs Metal Cutting Shear (snip) 6 Pcs Anvil 6 Pcs Inside And Outside Steel Vernier Caliper -size: 200mm -hardened Stainless Steel For Long Lasting Performance And Resistance To Corrosion -clear Engraved Scales -offers High Precision Readings Down To 0.02mm -four Way Measurement. Enables Internal,external,depth, And Step Measurements 2 Set Flaring Tool Kit Set -45-degree Flares -brake Line Hvac System -tube Cutter; 7 Adapters -durable Material 24 Pcs Steel Ruler -12” Length 6 Pcs Flat Chisel 6 Pcs Cross-cut Chisel 6 Pcs Diamond Point Chisel 6 Pcs Round Nose Chisel 6 Pcs Center Punch, 60 Mm 6 Pcs Center Punch, 90 Mm 6 Pcs Hacksaw 6 Sets Tap And Dies -110 Pcs Metric Tap & Dies Per Set -complete Threading Tool Kit With Accessories & Storage Case -stainless Steel 6 Sets Die Nuts -6mm To 12mm 6 Pcs Double-cut Rough Files 6 Pcs Second-cut Smooth Files 6 Pcs Single-cut Smooth Files 6 Pcs Second Cut Files 6 Sets Machinist’s Combination Set -adjustable 3 In 1 Combination: Angle Ruler, Engineer Square & Protractor 6 Pcs Try Square (steel) 6 Pcs Protractor (steel) 6 Pcs Dividers (steel) 6 Pcs Sledge Hammer (various Sizes, Steel/wooden) -3pcs Per Set -2lbs, 3lbs, 4lbs 6 Pcs Ball Peen Hammer 6 Sets Welding Tongs (various Sizes) -8pcs Per Set -3.5 In. 6.5 In. 7.5 In. 9.5 In .12 In. 18 In. 6 In. 8 In. 6 Sets Pliers, Mechanical (various Sizes) -3pcs Per Set -6”, 8”, 10” -with A Forged, Chrome-nickel Steel Construction Which Meets Or Exceeds Ansi Standards -rust-resistant Finish -hardened Cutting Edges For Strength -machined Jaws For Slip-resistant Grip 6 Pcs Screw Driver, Philips (various Sizes) - 6pcs /set - 50mm, 75mm, 90mm, 100mm,120mm, 150mm 6 Pcs Screw Driver, Flat (various Sizes) - 6pcs /set - 50mm, 75mm, 90mm, 100mm,120mm, 150mm 6 Pcs Vise Grip 6 Pcs Feeler Gauge - Material: Stainless Steel - 32 Set Feeler Gauge Blade - Gauge 0.04mm-0.88mm 6 Pcs Pitch Gauge - Material: Stainless Steel - Blade Quantity 58pcs - 55 Degree & 60 Degree Thread / Screw Pitch Gauge. - Blade Thickness 0.4cm - Measuring Range: - Metric (mm) - 60° 6.0, 5.5, 5.0, 4.5, 4.0, 3.5; "3.0, 2.5, 2.0, 1.75, 1.5, 1.25, 1.0, 0.9, 0.8, 0.75, 0.7, 0.6; 0.5, 0.45, 0.4, 0.35, 0.3, 0.25" - Imperial - 55° 62g, 60g 1/16, 48g 3/32, 40g, 36g, 32g 5/32, 30g, 28g, 26g, 25g, 24g 3/16 7/32, 22g, 20g 1/4, 19g, 18g 5/16, 16g 3/8, 14g 7/16, 13g, 12g, 11g 5/8, 10g 3/4, 9g 7/8, 8g 1", 7g 1 1/8 1 1/4, 6g 1 3/8 1 1/2, 5g 1 5/8 1 3/4, 4 1/2 G 1 7/8 2, 4g 2 1/4 2 1/2 6 Pcs Drift Punch - 3pcs Per Set; - ¾”,1/2”,3/8” 3 Set Pipe Wrench Various Sizes (6”,8”,10”,12”,14”) 3 Sets Grease Gun 6 Pcs Oil Applicator 3 Sets Wire Gauge 3 Sets Surface Gauge 3 Pcs Blow Torch 3 Pcs Reamer Handset, Assorted - Carbon Steel And High Speed Steel (hss) Material. - ¼” To 3/8” Per Set 3 Sets Torque Wrench - 6pcs Per Set - 1/2-inch Drive Click Torque Wrench Set, 24tooth, (10-150 Ft.-lb. / 13.6-203.5 Nm), Adjustable Torque Wrench Set W/ 17-19-21m Socket, 5” Extension Bar And 3/8” Adapter 3 Sets Pipe Cutter 1 Set Ratchet Threader Set -manual Pipe Threader -6pcs Per Set -1/8”,1/4”,3/4”,3/8”,1/2”,1” "other Requirements: 1. Submission Of Pictures: Suppliers Must Submit Photographs Of The Actual Power Tools At The Opening Of Bids. 2. Physical Presentation: Suppliers Should Present The Physical Power Tools During The Ocular Visit For Inspection. Warranty: A Minimum Warranty Period Of 6 Months Is Required Specifically For Power Tools. Warranty Is Not Needed For Consumable Items. Delivery Period: All Items Must Be Delivered Within 60 Calendar Days Upon Receipt Of Notice To Proceed (ntp)."
Closing Soon26 Nov 2024
Tender AmountPHP 1.1 Million (USD 19 K)

EllisDon Construction Services Inc Tender

Aerospace and Defence
Canada
Details: Advanced Procurement Notice Future Fighter Capabilities Project (ffcp) Cfb Cold Lake, Ab (with Security Requirements) Purpose Of This Advanced Procurement Notice This Is Not A Bid Solicitation. This Is An Advanced Procurement Notice (apn) Of Potential Contracts With Anticipated Security Requirements To Provide Interested Contractors, Suppliers, And Vendors An Opportunity To Begin The Sponsorship Request Process For Potentially Obtaining The Required Security Clearance(s) That Are Anticipated. Note That There Is No Guarantee That These Contracts Will Proceed Or That Any Security Clearance(s) Will Be Granted Under The Sponsorship Process In A Timely Fashion Or Otherwise. Description Of The Project Ellisdon Construction Services Inc. (ellisdon) As The Design Builder, Along With Its Design Partner, Stantec Have Been Contracted To Provide Design Services And Constructability Oversight To Complete The Design Of The Royal Canadian Air Force (rcaf) Infrastructure That Will Support The Future Fighter Capability Project (ffcp). The Infrastructure Will Provide Shelter And A Working Environment Capable Of Supporting The Operation And Maintenance Of A Yet To Be Determined Advanced Fighter Aircraft. Design Has Progressed Significantly With Various Tender Packages Forthcoming Tentatively To Start In Q3 2024, With Project Construction Being Conditional On The Project Receiving Approval To Proceed From Dnd. details On Upcoming Projected Tender Packages To Follow Via Amendment. Prior To This, Ellisdon Is Seeking Interested Parties Consisting Of Trade Contractors, Vendors, And Suppliers To Ensure That They Have All Necessary Security Clearances In Place Prior To This As This Is A Requirement For This Project.    Description Of The Scope Of Works Project Construction Is Conditional On The Project Receiving Approval To Proceed From Dnd. Project Scope And Summary Are Noted Below. Contract Number:  71947 Title:  Modified Design Build Services For Fighter Squadron Facility Building Size: Approximately 555,000 Sf Anticipated Posting Date: q3 2024 Description: construction Of A New A Fighter Squadron Facility Consisting Of Two Fully Operational tactical Fighter Squadrons (tfs) And The Operational Training Unit (otu),  including But Not Limited to: Offices, Administrative Spaces, Mission Planning Rooms, Briefing / De-briefing Rooms, Meeting rooms, Classrooms, Auditorium, Speciality Training Rooms Including Simulators (sims) accommodations And Part-task Trainers Accommodations, Hangars, Maintenance Bay Facilities, specialty Aircraft Maintenance Labs, Shops And Storage, It Offices And Server Rooms, Building support Spaces, And Common Spaces. This Work Package Will Also Include The Construction Of Nearby Airfield Pavements, Apron And Taxiway Access Lane Edge Lighting, And Apron Flood Lighting consisting Of Concrete And Asphalt. Construction Of Infrastructure Will Encompass The Following Scopes Of Work. Scope Of Work, Using Masterformat Divisional Breakdown As A Reference, May Include, But Are Not Limited To: Masterformat Division             Scope Of Work 01 45 00                                 Surveying 01 45 00                                 Material Testing 01 45 00                                  Third Party Inspection (roof, Structural, Geotechnical) 01 52 00                                  Temporary Facilities (trailers, Toilets, Fencing, Waste Bins) 01 54 19                                  Tower Cranes 01 54 23                                  Scaffolding 02 41 19                                  Selective Demolition 03 11 00                                  Concrete Formwork 03 15 00                                  Concrete Accessories 03 20 00                                  Reinforcing Steel 03 30 00                                  Concrete Supply 03 35 00                                  Concrete Placing & Finishing 03 45 00                                  Precast Specialties 04 00 00                                  Masonry 05 10 00                                  Structural Steel 05 30 00                                  Metal Decking 05 50 00                                  Miscellaneous Steel 05 70 00                                  Ornamental (specialized) Metals 06 20 00                                  Millwork / Architectural Woodwork 07 10 00                                  Damp Proofing & Waterproofing 07 40 00                                  Metal Roofing, Cladding & Siding 07 50 00                                  Membrane Roofing 07 80 00                                  Firestopping & Fireproofing 07 90 00                                  Caulking 08 10 00                                  Openings – Doors, Frames & Hardware 08 33 00                                  Coiling Doors & Grilles 08 34 16                                  Hanger Doors 08 35 00                                  Folding Doors & Grilles 08 36 00                                  Overhead Doors 08 40 00                                  Aluminum Entrances, Storefronts & Curtain Wall 08 80 00                                  Glazing 08 87 00                                  Window Film 09 21 16                                  Gypsum Board Assemblies 09 51 14                                  Acoustic Panels 09 60 00                                  Flooring 09 66 00                                  Tiling 09 67 00                                  Fluid Applied Flooring 09 69 00                                  Access Flooring 09 90 00                                  Painting 10 11 00                                  Visual Display Boards 10 14 00                                  Signage 10 22 19                                  Demountable Partitions 10 26 00                                  Wall, Corner, Door Protection 10 28 00                                  Bathroom Accessories & Toilet Partitions 10 51 00                                  Lockers 10 75 00                                  Flagpoles 11 30 00                                  Appliances 11 61 00                                  Theater And Stage Equipment 11 66 00                                  Athletic Equipment 11 81 29                                  Fall Arrest Systems 11 98 00                                  Detention Equipment 12 00 00                                  Furnishings 12 20 00                                  Window Coverings 14 20 00                                  Elevator & Lifts 21 00 00                                  Fire Suppression 22 00 00                                  Mechanical – Plumbing 23 00 00                                  Mechanical – Heating, Ventilation And Air Conditioning (hvac) 25 00 00                                  Integrated Automation 26 00 00                                  Electrical 28 10 00                                  Access Control            31 00 00                                  Earthworks 31 60 00                                  Piling 32 10 00                                  Paving 32 16 00                                  Sidewalk Curb & Gutter 32 31 00                                  Fencing 32 90 00                                  Landscaping 33 00 00                                  Utilities & Underground 34 73 00                                  Airfield Construction - Apron 41 22 00                                  Overhead Cranes 48 16 00                                  Geothermal Energy Project Prequalification And Anticipated Security Requirements In Order To Be Eligible To Participate In The Upcoming Project Prequalification Process, The Interested Party Will Be Required To, Among Other Things, Actively Hold All Required Security Clearance(s) At The Time Of Closing. this Will Also Be Noted in All Upcoming Solicitation Tender Documents. As Of The Date Of Posting Of This Advance Procurement Notice, The Required Security Clearance(s) Are Anticipated To Be: * for Areas Established As Security And High Security Zones - A Valid And Active Facility Security Clearance (fsc) At The Level Of Secret Granted Or Approved By The Contract Security Program (csp), Public Works And Government Services Canada (pwgsc)   * For Areas Established As Public, Reception And Operations Zones - A Valid And Active Designated Organization Screening (dos) At The Level Of Reliability Granted Or Approved By The Contract Security Program (csp), Public Works And Government Services Canada (pwgsc) Industrial Security Program (isp) Sponsorship Defence Construction Canada (dcc) Is Providing Interested Parties Early Access To The Security Clearance Application Process Through Sponsorship Under Its Industrial Security Program (isp). Accordingly, Interested Parties That Are Interested In Submitting Or Participating In A Proposal/bid For These Procurements That Fall Under This Program And That Do Not Actively Hold The Above Identified Security Clearance(s) Should Begin The Security Clearance Application Process By Applying Through Dcc’s Isp. To Begin The Security Clearance Sponsorship Process, Please Submit A Sponsorship Request Application To Dcc By Following The Steps Identified On Dcc’s Website At: Https://www.dcc-cdc.gc.ca/industry/security-requirements In Their Sponsorship Request Application To Dcc, Interested Parties Are Asked To Quote The Following Information, Among Other Things: * Contract Number As Referenced Above; And * Level Of Clearance Requested To Be Sponsored For. Sponsorship Process Timeline Sponsorship Timeline Is Currently As Follows: * Thirty (30) Calendar Days Prior To Planned Tender Closing, For Designated Organization Screening (dos); And * Sixty (60) Calendar Days Prior To Planned Solicitation/tender Closing, For Facility Security Clearance (fsc) At The Level Of Secret. Questions Any Questions Pertaining To The Isp Sponsorship Process Outlined In This Advanced Procurement Notice Can Be Addressed To: Telephone: (613) 998-8974 Email Address: Isp.sponsorship@dcc-cdc.gc.ca Any Questions, Exclusive Of Security Sponsorship, Relating To This Advanced Procurement Notice Can Be Addressed To: Scott Barabash, Cet, Gsc, Cec Senior Estimator Ellisdon Construction Services Inc. 780-444-3042 Sbarabash@ellisdon.com Disclaimer Dcc Nor Ellisdon Do Not Provide Any Assurances Or Guarantees That A Sponsorship Request Package Or A Security Clearance Application Forwarded To The Contract Security Program (csp), Public Works And Government Services Canada (pwgsc) On Behalf Of A Interested Party Will Be Successful Or Result In The Granting Of The Requested Security Clearance(s) By The Csp, Pwgsc, In A Timely Fashion. At All Times, The Processing Of A Sponsorship Request Package Or A Securiy Clearance Application Is Subject To The Respective Terms, Conditions, And Timelines Of Dcc's Isp Sponsorship Process And The Csp, Pwgsc's Security Clearance Granting Process. By Applying To Either Of The Aforementioned Processess, The Interested Party Accepts And Agrees To Bear Any Risks Associated With: (i) The Completeness Or Accuracy, Or Lack Thereof, Of Its Application Or Related Documents Submitted Under Or In Connection With Either Said Processes, And (ii) The Timeliness, Or Lack Thereof, Of Any Processing Or Granting Of Security Clearance(s) Under Or In Connection With Either Said Processes.
Closing Date6 Jan 2025
Tender AmountRefer Documents 

Ministry Of Culture Tender

Electrical and Electronics...+1Electrical Works
France
Details: The purpose of the contract is to provide maintenance services for the National Archives of the World of Work (ANMT) building. These services include electrical maintenance, SSI, HVAC, climate engineering, structural work, finishing work, coordination, rodent control, pigeon control, automatic doors and gates. They include the presence of a technician on site 5 days a week, inspection rounds and a 24-hour on-call service.
Closing Date7 Jan 2025
Tender AmountRefer Documents 

Ministry Of Culture Tender

Others
Corrigendum : Closing Date Modified
France
Details: Lot 01: Common Site Facilities – Scaffolding – Hoist – Masonry – Reinforced Concrete – Plastering Lot 02: Roofers’ Scaffolding – Metal Roofing – Lightning Rod Lot 03: Exterior Metal Joinery – Ironwork – Wood Joinery Lot 04: Self-Protected Waterproofing Lot 05: Electricity Lot 06: HVAC – Smoke Extraction Lot 07: Standard Painting Lot 08: Blinds – Zenithal Blinds
Closing Date12 Dec 2024
Tender AmountRefer Documents 

Social security organizations Tender

Others...+1Housekeeping Services
France
Details: The purpose of this consultation is the development of meeting rooms within the primary health insurance fund of Indre-et-Loire on the 1st and 4th floors. The contract is divided into 5 lots, as follows: - Lot No. 1 - Signage, wall-mounted light screens, - Lot No. 2 - Partitions/ Joinery/ False ceilings, - Lot No. 3 - Floor coverings/ Paintings, - Lot No. 4 - Plumbing/ Vmc / Hvac, - Lot No. 5 - Electricity/ Low currents.
Closing Date13 Dec 2024
Tender AmountRefer Documents 

Ministry Of Culture Tender

Others...+2Civil And Construction, Civil Works Others
Corrigendum : Closing Date Modified
France
Details: This Contract Concerns the "Refurbishment Work on the Goya, Piazetta/Murillo and Rosa Rooms Located Within the Louvre Museum". All of the Expected Work, Execution Terms and Site Constraints Are Detailed in the Common Technical Clauses1 (cctc or Lot 00: Clauses Common to All Lots) Common to All Lots and the Special Technical Clauses (cctp) Specific to Each Lot. The Work Concerns More Particularly: - The Restoration of the Floors, - The Recoloring of the Walls and Ceilings, The Integration of the Devices Necessary for Accessibility for People with Reduced Mobility. This operation will be carried out in conjunction with: 1. The operation known as the Pavillon des Sessions, for which a call for applications has been launched, 2. An operation to upgrade the security installations, a PMR lift and the toilets located in the work zone. The CFO/CFA and HVAC/Plumbing Works Will Be Carried Out by the Companies Responsible for Maintenance Work Within the EP.ML This Operation Is Broken Down According to the Following Lots: - Lot 01 - Site Installations - Scaffolding - Painting - Lot 02 - Carpentry The Works Will Be Broken Down Into 4 Operational Phases: - Phase I: Goya and Piazetta/Murillo Rooms - Phase II: Piazetta/Murillo Room - Phase III: Circulation Between the Piazetta/Murillo and Rosa Rooms - Phase IV: Rosa Room All of the Expected Works, Execution Conditions and Site Constraints Are Detailed in the Common Technical Clauses Booklet2 (CCTC) Common to All Lots and the Special Technical Clauses Booklet (CCTP) Specific to Each Lot.
Closing Soon27 Nov 2024
Tender AmountRefer Documents 
501-510 of 508 active Tenders