Hvac Tenders

Hvac Tenders

PUBLIC BUILDINGS SERVICE USA Tender

Civil And Construction...+2Others, Real Estate Service
United States
Details: Reference Project Number: 2pr0074 general Services Administration (gsa) Seeks To Lease The Following Space: state: Puerto Rico city: Hato Rey delineated Area: north: Beginning At The Intersection Of Pr 165 / Pr 24 And Pr 22, Follow Pr 22 East From Pr 165 / Pr 124 To Pr 18. Follow Pr 18 South From Pr 22 To Calle Juan Kalaf. Follow Calle Juan Kalaf East From Pr 18 To Pr 1. east: Follow Pr 1 South From Calle Juan Kalaf, Continuing On Av. De La Constitución And Av. Juan Ponce De León To Pr 17. south: Follow Pr 17 West From Av. Juan Ponce De León To Pr 20. west: Follow Pr 20 North From Pr 17 To Pr 2. Follow Pr 2 East From Pr 20 To Pr 24. Follow Pr 24 North From Pr 2 To The Point Of Beginning At The Intersection Of Pr 22 And Pr 165 / Pr 24. minimum Sq. Ft. (aboa):23,588 Aboa Sf maximum Sq. Ft. (aboa): 24,174 Aboa Sf space Type: Office, Warehouse, And Laboratory parking Spaces (total): 173 Spaces parking Spaces (surface): 30 Onsite, Reserved Spaces For Government Owned Vehicles (govs). 115 Parking Spaces For Employees And Visitors Must Be Publicly Available Within A One (1) Block Walking Distance Of The Proposed Building. parking Spaces (structured): 28 Reserved Structured Spaces Located On The Second Floor Or Higher. full Term: 10 Years firm Term: 5 Years option Term: N/a additional Requirements: general Office Space Must Have A Ceiling Height Of A Minimum 9’-0” Aff. Ceiling Heights In The Mdf, Idf Or Other Equipment Rooms Shall Be A Minimum Of 9’-0” Clear And Have Sufficient Space Above The Ceiling For Independent Hvac Units, Ducting, Cable Trays, Or Other Necessary Devices. A Minimum Ceiling Height Of 12’ Is Required In Warehouse Areas as Part Of The Tenant Improvement Scope, The Lessor Shall Provide Six (6) Single Electric Vehicle Supply Equipment (evse) Supporting Charging Station(s) And Reserved Parking Spaces For Electric Vehicles. Infrastructure Shall Comply With All Local Electrical Codes, And If None, The National Electrical Code (current Edition). for Effective Space Utilization, A Minimum Of 20’-0” O.c. Between Structural Elements (columns, Core, Curtain Wall, Etc.) Is Required. For Most Efficient Office Layouts On Window Walls, Mullion Spacing Of 5’-0” O.c. Is Preferred. contiguous Space Is Preferred. If All Space Cannot Be Contiguous, And Space Is On More Than One Floor, Adjacent Floors Are Required. Non-contiguous Space Must Consist Of No More Than Six (6) Blocks Of Space Meeting The Following Ansi Boma Square Footage Range Requirements. block 1 - 1,078 - 1,132 block 2 - 5,849 - 6,141 block 3 - 5,115 - 5,371 block 4 - 3,331 - 3,498 the Following Two Block(s) Of Space Must Be Located On The First Floor And Can Either Be Collocated Or At A Minimum Be Contiguous To Each Other. block 5 - 4,186 - 4,341 block 6 - 4,029 - 4,231 the Government Will Utilize Fiber Optic And/or Copper Twisted Pair Cabling For Backbone Services. Offered Premises Must Provide At Least One (1) Internet/telecom Service Provider, Two (2) Are Preferred With Connections Terminating Directly Inside Secured Telecommunications Room (mdf). the Offered Space Must Have A Full Load Generator Or Capacity To Add A Full Load Generator To Allow The Continued Agency Operation. to Demonstrate The Potential For Efficient Layout, Offerors Will Be Required To Provide A Test Fit Layout, At The Offeror's Expense, Demonstrating That The Government's Requirement Can Be Efficiently Accommodated Within The Space Offered. public Transportation Should Preferably Be Within Approximately 0.5 Miles Or 10 Minutes Walking Distance. a Building Loading Area Is Required. subleases Are Not Acceptable. offered Space Must Meet Government Requirements For Fire Safety, Accessibility, Seismic, And Sustainability Standards Per The Terms Of The Lease. A Fully Serviced Lease Is Required. Offered Space Shall Not Be In The 1-percent-annual Chance Floodplain (formerly Referred To As “100-year” Floodplain). entities Are Advised To Familiarize Themselves With The Telecommunications Prohibitions Outlined Under Section 889 Of The Fy19 National Defense Authorization Act (ndaa), As Implemented By The Federal Acquisition Regulation (far). ). For More Information, Visit: Https://acquisition.gov/far-case-2019-009/889_part_b. expressions Of Interest Due: January 10, 2025, 5:00 Pm Edt market Survey (estimated): January 15, 2025 occupancy (estimated): September 30, 2026 send Expressions Of Interest To: name/title: Helga Peneiro phone: 787-627-5737 email Address: Hpineiro@hmppropertiespr.com government Contact Information: lease Contracting Officer: Eduardo Vidal broker, Cbre:matt Bartlett, Transaction Management Director
Closing Soon10 Jan 2025
Tender AmountRefer Documents 

AGRICULTURAL RESEARCH SERVICE USA Tender

Environmental Service
United States
Details: Type Of Notice: Sources Sought title: Sources Sought (ss) Notice 12905b25ss00003 For Usda Ars Pacific West Area - Mechanical, Electrical, Plumbing (mep) Idiq background And Site Description the Agricultural Research Service (ars) Is The U.s. Department Of Agriculture’s Chief Scientific In-house Research Agency. Our Job Is Finding Solutions To Agricultural Problems That Affect Americans Every Day From Field To Table. the Performance Of These Activities Results In The Need For Repair And Maintenance, Alteration, And/or New Modernization Construction Projects For Its Research Laboratory Facilities. With 47 Research Units At 21 Locations, And Several Additional Worksites, Where Ars Employees Are Located Throughout Eight States (hawaii, Washington, Oregon, California, Idaho, Nevada, Arzona And Utah), The Pacific West Area (pwa) Is The Largest And Most Diverse Of The Eight Areas In Ars. For More Information On The Pwa Go To Https://ars.usda.gov/pacific-west-area/. description Of Work this Requirement Would Be For An Area-wide Mechanical, Electrical, Plumbing (mep) Indefinite Delivery – Indefinite Quality (idiq) Contract. Fixed-price Task Orders Would Be Issued Off This Contract For Hazardous Waste Disposal Throughout The Pwa Service Area. The Contractor Shall Provide Mechanical, Electrical, Plumbing Services. Following Is Only An Example Of What Types Of Mep Services That Would Be Included, But Not Limited To Under Coverage Of The Idiqs: cooling Tower Installation heating, Ventilation, And Air-conditioning (hvac) Contractors duct Work (e.g., Cooling, Dust Collection, Exhaust, Heating, Ventilation) Installation lawn Sprinkler System Installation fire Sprinkler System Installation mechanical Contractors fireplace, Natural Gas, Installation refrigeration System (e.g., Commercial, Industrial, Scientific) Installation furnace Installation sewer Hookup And Connection, the Resultant Contract Could Cover The Entire Area Or Be Divided Into Geographical Areas. Multiple Idiqs Could Be Awarded And Task Orders Competed Among Contract Holders. The Results Of This Sources Sought Will Help Determine The Best Geographical Acquisition Strategy And Small Business Set-aside, If Any. The Anticipated Ceiling Of The Entire Idiq Is $5,000,000.00 For Five One-year Ordering Periods. this Is A Sources Sought (ss) Notice Only. This Is Not A Solicitation For Proposals, Proposal Abstracts, Or Quotations. This Ss Is Issued For Information And Planning Purposes Only As Part Of Usda Ars Market Research And Does Not Itself Constitute A Request For Proposal (rfp). This Requirement Is Covered Under Naics Code 238220. The Purpose Of This Notice Is To Obtain Information Regarding The Availability And Capability Of Qualified Sources; Small Businesses; Hubzone Small Business; Service-disabled Veteran-owned Small Business; 8(a) Small Business; Veteran-owned Small Business; Woman-owned Small Business; Small Disadvantaged Businesses; Or Large Businesses. It Will Also Serve To Ascertain The Ability Of Mechanical, Electrical, Plumbing (mep) Companies To Serve The Entire Pwa Or Parts Of It. Responses To The Information Requested Will Assist The Government In Determining The Appropriate Acquisition Method, Including Whether A Set-aside Is Possible. the Government Does Not Intend To Make An Award Based On Responses To This Inquiry. This Notice Does Not Constitute A Commitment By The Government. capability Statement all Information Submitted In Response To This Announcement Is Voluntary, And The Government Will Not Pay For Information Requested, Nor Will It Compensate Any Respondent For Any Cost Incurred In Developing Information Provided To The Government. Business Concerns That Possess The Capabilities Necessary To Undertake This Work Should Submit Complete Documentation Of Their Capabilities To The Contracting Officer. Capability Statements Shall Include The Contractors Contact Point To Discuss Their Response. the Capability Statement Should Include: acknowledgement The Company Is Legally Licensed To Provide Hazardous Waste Removal Services. indication Of Their Size Standards In Accordance With The Small Business Administration. at Least Three Previous Requirements That Were Performed Within The Pwa That Are Within The Scope Of This Requirement; Include A Discussion Of The Contract Type, Delivery Method, Duration, Etc. indicate Which Of The Eight States, If Not All, That Encompass The Usda Ars Pwa That The Company’s Legally Able And Willing To Perform Services In. include The Firm’s Sam Unique Entity Id (uei) Number And Cage Code. any Other Information Considered Relevant To This Requirement. the Government Requests That No Proprietary, Classified, Confidential, Or Sensitive Information Should Be Included In The Response. responses Are Limited To One Digital Pdf Submission Not To Exceed Ten (10) Pages. Please Use The Email Subject Line “sources Sought Usda Ars Pwa Mechanical, Electrical, Plumbing (mep) Services Idiq”. any Contractor Responding To This Notice Should Ensure Its Response Is Complete And Sufficiently Detailed To Allow The Government To Determine Their Qualifications To Perform The Work. Respondents Are Advised That The Government Is Under No Obligation To Acknowledge Receipt Of The Information Received Or Provided Feedback To Respondents With Respect To Any Information Submitted. After Review Of The Responses Received, A Solicitation May Be Published On Sam.gov Depending On The Responses Received. all Responses To This Ss Must Be Received By The Notice’s Poc By The Deadline In Order To Be Considered. Responses May Not Be Returned. Responders Are Solely Responsible For All Expenses Associated With Responding To This Inquiry. Do Not Submit Pricing Information In Response To This Ss. the Notice Poc Is Robert Skipper: Robert.skipper@usda.gov
Closing Soon13 Jan 2025
Tender AmountRefer Documents 

Centre Hospitalier Universitaire Dinant Godinne Sainte Elisabeth UCL Namur Tender

Works
Civil And Construction...+1Civil Works Others
Belgium
Details: Title: Reconditionnement Us 44/46 - Hématologie - Godinne description: Le Présent Marché Porte Sur Des Travaux Relatifs À La Rénovation Des Unités 44 Et 46 Pour Un Nouveau Service D’hématologie Avec Une Partie En « Nouvelle Construction », Sur Le Site De Godinne. Il S'agit De Lourds Travaux De Rénovation Du Niveau 4 - Ailes 4 Et 6, Pour La Création De Chambres Neuves (avec Sas D'entrée Et Salle De Bain Individuelle) Pour Le Service D'hématologie Dont Les Chambres Actuelles Ne Sont Plus Conformes Et Ne Permettent Plus Un Service De Qualité : - Démolition Complète Des Cloisons Intérieures Et De L'aménagement Intérieur, - Construction De Nouvelles Cloisons Intérieures, Chapes, Sols, Murs Et Plafonds,... - Rénovation De La Façade (nouveaux Châssis), - Réalisation D'une Extension Suspendue "liaison Vers L'us46", - Travaux De Techniques Spéciales : Désaffectation Complète Des Installations Existantes Vétustes Et Devenues Non Conformes, - Nouvelles Installations Techniques (électricité, Hvac, Sanitaires Et Fluides Médicaux). Les Sas Demandent Une Technologie Poussée De Ventilation Et Vont Entrainer De Grosses Modifications De La Toiture Pour Gaines Techniques. Il Y A Un Phasage Des Travaux À Prévoir. Soit La Création De 19 Chambres Simples (pression Positive - Classées Iso7) Avec Sas (pression Positive - Classés Iso8) Et De 6 Chambres Doubles (non Classées), Soit 31 Lits. Les Locaux Classifiés Respecteront Les Prescriptions De La Norme Nf S 90-351. I.5.3 Visite Des Lieux Sous Peine De Nullité De Son Offre, Le Soumissionnaire Est Tenu D'effectuer Une Visite Des Lieux. Les Dates De Visite Ont Été Fixées Comme Suit : - Le Lundi 02 Décembre 2024 – De 9 À 10h30 – Rendez-vous Entrée A - Le Jeudi 05 Décembre 2024 – De 9 À 10h30 – Rendez-vous Entrée A Merci De Préciser La Date Choisie Par Retour De Mail À : O Ce.andre@chuuclnamur.uclouvain.be O Philippe.demazy@chuuclnamur.uclouvain.be O Gg_infrastructures@chuuclnamur.uclouvain.be L’attestation De Visite Jointe En Annexe B, Au Présent Cahier Spécial Des Charges, Devra Être Présentée Pour Signature Le Jour De La Visite Et Jointe Au Dossier De Soumission. Une Unique Visite Est Autorisée, L’attestation De Visite Sera Signée Avant La Visite. Iii.3 Durée - Délais D’exécution Delai Global = Debut Des Travaux + 640 Jours Ouvrables, Correspond À La Réalisation De La Totalité Des Ouvrages De L’unité D’hématologie, Toutes Phases Comprises, Réception Provisoire Et Levée Des Remarques Réalisées Le Délai De Commencement Des Travaux Sera Fixé Conformément À L’article 76, §2, Rge. Les Travaux S’exécutent En Phase, Conformément Aux Plans De Phasage Et Au Planning Cadre De Soumission. Le Maître De L’ouvrage Se Réserve Le Droit De Modifier Les Phases Du Chantier, En Fonction Des Impératifs De Fonctionnement Et D’organisation Des Services Médicaux De L’hôpital. Par Ailleurs, Il Est Possible Que Des Travaux Connexes Se Déroulent De Manière Concomitante À Ceux De L’unité, Dans Des Services Hospitaliers Proches. Les Entreprises Devront S’adapter À Ces Contraintes De Cohabitation Avec D’autres Acteurs. Les Travaux S’organisent Autour De Plusieurs Phases, Entre-coupées De Périodes D’emménagement, Mise En Service Et Déménagement. Pendant Ces Périodes, Les Entreprises Doivent Laisser Le Temps Aux Utilisateurs De Procéder À Leurs Emménagement/déménagement. Les Entreprises Devront Prendre En Compte Ces Contraintes D’organisation. Le Planning Impose : • Un Delai Partiel De Rigueur N°1, Le Dp1 = Debut Des Travaux + 392jours Ouvrables Dp1 : Correspond À La Fin Des Travaux, Y Compris Les États Des Lieux Et La Levée Des Remarques, Pour Permettre L’emménagement De La Phase 1a, Soit L’emménagement Opérationnel De 7 Chambres (côté Ne). • Un Delai Partiel De Rigueur N°2, Le Dp2 = Dp1 + 80jours Ouvrables Dp2 : Correspond À La Fin Des Travaux, Y Compris Les États Des Lieux Et La Levée Des Remarques, Pour Permettre L’emménagement De La Phase 1b, Soit L’emménagement Opérationnel De Toutes Les Chambres Situées Dans Le 44 (toutes Les Chambres Individuelles). Le Début Des Travaux Est Fixé Au 29/09/2025 Pour Se Terminés Au 24/04/2028. Ces Dates Peuvent Être Amenées À Être Adaptées En Cours De Procédure
Closing Date24 Jan 2025
Tender AmountRefer Documents 

Chambers Of Commerce And Industry CCI - CCI Tender

Civil And Construction...+1Others
Corrigendum : Closing Date Modified
France
Details: These Modernization and Optimization Works of the HVAC Installations Aim to Reduce the Energy Consumption of the Consular Palace in Accordance with the Requirements of Decree No. 2019-771 of July 23, 2019 Relating to the Obligations of Actions to Reduce Final Energy Consumption in Tertiary Use Buildings
Closing Soon10 Jan 2025
Tender AmountRefer Documents 

Social security organizations Tender

Civil And Construction...+2Others, Civil Works Others
France
Details: The purpose of this contract is the preventive, evolutionary and corrective maintenance of all the centralized technical management (gtc) of the technical equipment (HVAC equipment, lighting management, electrical fault management) of the real estate union of social security organizations of Haute-garonne (uioss 31), as well as the supply and delivery of equipment necessary for them.
Closing Soon8 Jan 2025
Tender AmountRefer Documents 

DEPT OF THE ARMY USA Tender

Corrigendum : Closing Date Modified
United States
Details: The United States Army Corps Of Engineers (usace), Transatlantic Middle East District (tam), Is Releasing The Following Presolicitation Notice For The Purpose Of Making Notification To The Public And To Solicit Responses For The Prequalification Of Sources. While All Attempts Have Been Made To Ensure The Accuracy Of The Information Presented Below, The Government Does Not Guarantee Its Accuracy, And Prior To Award, Reserves The Right To Make Any Changes To The Project As Deemed Necessary. this Notice Is For Construction Of The Fleet Maintenance Facility & Tactical Operations Center (p992) Project At Shaikh Isa Air Base In The Kingdom Of Bahrain. The P992 Project Is A Programmed Military Construction (milcon) Project. project Scope: The P992 Project Will Construct A Two-story, Steel-frame Fleet Maintenance Facility (fmf) Using Pre-engineered Metal Building (pemb) On A Concrete Slab Foundation And Structural Floor, Insulated Metal Roof Panels On Steel Purlins, Interior Prefabricated Metal Module Units, And Exterior Rf Shielding Membrane. The Facility Will Include Maintenance And Repair Areas, Personnel Support Areas And Storage. Its Function Is To Support Associated Asset Of P-8a Aircraft Housed In The Adjacent P-8a Hangar. Project Also Constructs A Single-story Tactical Operations Center (toc); The Facility Will Be Composed Of Pemb On A Concrete Slab Foundation. The Facility Will Include Administrative And Operational Areas. The Facility Will Consolidate Requirements Currently Housed In Multiple Relocatable Facilities As Well As Provide Operational Support To The P-8a Aircraft. this Project Alters Building #5070 (133.78 M2). Alterations Will Involve Minor Repair To No More Than 30% Of The Existing Gypsum Board Walls/ceilings And Painting Of All The Existing Gypsum Board Wall/ceiling Surfaces. information Systems Include Basic Telephone And Secure Telephone, Secure Computer Network, Fiber Optics, Cable Television, Security (ids/ess) And Fire Alarm Systems And Infrastructure. this Project Will Provide Anti-terrorism/force Protection (at/fp) Features And Comply With At/fp Regulations And Physical Security Mitigation In Accordance With Dod Minimum Anti- Terrorism Standards For Buildings. User Generated Unit Costs Were Used Were Used For This Project And Include The Cost Of Features To Meet The Minimum Dod At/fp Standards. built-in Equipment Includes 60 Hz And 400 Hz Power Converters And Systems, Power Filters, Emergency Back-up Power Generator At The Toc, Three Oversize Access Doors, Acu-902 Pod Cooler, Storage Rack Shelving And Raised Access Flooring. pavement Facilities Include Pads For Generators, Hvac Equipment And A Concrete Airfield Access Ramp Extension. Paving And Site Improvements Include Grading, Asphalt Road Repair, Security Fencing, Entry Control Points, And Concrete Paver Installation. site Preparation Includes Site Clearing Of Existing Structures, Underground Utility Relocations And Preparation For Construction. electric Utilities Include Site Lighting, Prime-rated Generators, Underground Electric Distribution Systems, Antenna Infrastructure, Telecommunications Infrastructure, Antenna Cable, And Relocation Of Existing Underground Electrical And Telecommunications Systems. Mechanical Utilities Include Storm Water Lines And Fire Water Supply Lines. The Project Includes Force Protection Barriers. this Project Contains A Secure Hotel Component And Will Require A U.s. Contractor With A Defense Counterintelligence And Security Agency Issued Active Facilities Clearance Listing (fcl) At The Secret Level Or Higher. magnitude Of Construction: The Magnitude Of Construction For This Project Is Estimated To Be Between $10,000,000.00 And $25,000,000.00. period Of Performance: The Estimated Overall Period Of Performance (pop) Is Five Hundred Ninety-nine (599) Calendar Days From Notice To Proceed (ntp) For The Entire Scope Of Work. location Of The Work: The Location Of The Project Is Shaikh Isa Air Base In The Kingdom Of Bahrain. tentative Milestone Dates: The Design-bid-build (d-b-b) Solicitation Is Scheduled For Release In May Of 2022. Offeror’s Proposals May Be Due 30 Days Following Release Of The Solicitation And Contract Award Is Estimated To Be In August Of 2022. project Classification: The Project Is Classified Through The North American Industry Classification System (naics) Under Code 236220 Commercial And Institutional Building Construction With A Small Business Size Of $39.5 Million. However, As This Requirement Will Be Performed Oconus, Small Business Set Asides Will Not Be Used. This Solicitation Will Be Advertised As A Full And Open Requirement Using Prequalification Of Sources. solicitation Documents: Solicitation Documents Will Only Be Provided To Offerors Who Have Responded To This Notice And Have Been Determined To Be Qualified In Accordance With This Notice. To Be Qualified, Interested Firms Must Have An Active Registration In Sam.gov And Possess A Facility Clearance Level (fcl) Of Secret Or Higher, Issued In Accordance With The National Industrial Security Program Operating Manual (nispom), Dod 5220.22-m By The Closing Of This Posting. If The Interested Firm Is A Joint Venture (jv), All Members Of The Jv And The Jv Itself Must Possess A Secret Fcl Or Higher At The Date And Time Of The Close Of This Posting. Any Interested Firm Must Provide A Response To This Pre-solicitation Notice Identifying Its Name, Physical Address, Email Address, And Commercial And Government Entity (cage) Code. A Copy Of The Offerors Fcl Must Be Provided. interested Offerors Are Required To Sign And Return The Attached Controlled Unclassified Non-disclosure Agreement (nda). Upon Government Receipt Of A Signed Nda And Verification Of A Firm's Sam Registration, Cage Code And Fcl, Specifications/drawings And Other Related Project Documents Will Be Released To Eligible Offerors By Secure Document Transfer Method, Such As Dod Safe Site. Paper Copies Of The Solicitation Will Not Be Issued, And Solicitation Documents Will Not Be Posted Publicly. Telephone And Fax Requests For This Solicitation Will Not Be Honored. Project Files Are Portable Document Format (pdf) Files And Can Be Viewed, Navigated, Or Printed Using Adobe Acrobat Reader. the Request For Proposal Will Only Be Released To Offerors Who Have Met The Prequalification Of Sources Requirment. interested Offerors Are Required To Respond To This Notice By Submitting A Copy Of Their Active Fcl And Nda Documents And Emailing Them To Sam Cornwell At Samuel.i.cornwell@usace.army.mil And Jesse Hobbs At Jesse.a.hobbs@usace.army.mil No Later Than 13 May, 2022 By 4:00 Pm Eastern Daylight Time. be Advised That This Is A Presolicitation Notice Only And Is Not A Solicitation. This Notice Does Not Restrict The Government From Utilizing A Different Acquisition Approach Or Making Any Changes To The Project Scope Or Terms, Or To Award Some, All, Or No Resultant Contracts. The Government Will Not Reimburse Respondents For Any Costs Incurred In Preparation Of A Response To This Notice. If You Have Any Questions, Please Email Both Sam Cornwell At Samuel.i.cornwell@usace.army.mil And Jesse Hobbs At Jesse.a.hobbs@usace.army.mil.
Closing Date13 May 2025
Tender AmountRefer Documents 

VETERANS AFFAIRS, DEPARTMENT OF USA Tender

Civil And Construction...+1Building Construction
United States
Details: Introduction network Contracting Office 1 (nco 1), Supporting Va New England Healthcare System (visn 1) And The Va Boston Healthcare System (hcs) Is Seeking Potential Sources For An Upcoming Requirement As Described In The Attached Statement Of Work For The Project; Upgrade Visn 1 Laundry Building 45. This Notice Is Not A Request For Proposals. This Notice Is A Market Research Tool And Has Not Been Set-aside For Any Small Business Category, However The Notice Is Issued To Determine Appropriate Set-aside Categories. Responses To This Notice, In Conjunction With Other Government Market Research Resources, Will Be Used By The Contracting Officer To Determine The Applicable Socio-economic Set-aside For The Procurement. the Purpose Of This Notice Is To Determine If There Are Qualified Sdvosbs Or Vosbs, Wosbs, And Small Businesses That Have The Experience With This Type Of Work And If Such Firms Are Interested In This Procurement. Once The Appropriate Set-aside Is Determined, A Separate Public Announcement Requesting Bids Or Proposals Will Be Publicized On Sam.gov Contract Opportunities In Accordance With 40 U.s. Code § 1101 And Far 36.601. The Solicitation Is Estimated To Be Released In March 2025. general Project Description, Magnitude, And Naics the Va Boston Hcs In Brockton, Ma, Requires A Contractor To All Labor, Equipment, Materials And Supervision For The Renovation And Improvements Of The Visn 1 Laundry, Building 45 For Veterans Affairs Medical Center, Brockton, Massachusetts In Accordance With Contract Documents. the Renovation Includes Selective Demolition Of All Existing Mechanical, Electrical And Plumbing (mep) Systems, Selective Demolition Of Existing Finishes, Doors, Structural Slab, And Other Existing Items. The Renovation Also Includes The Construction Of Structural Improvements, Doors, Electrical Systems, Hvac Systems, Plumbing Systems, Start-up Of Previously Installed Elevator By Renovating Associated Electrical And Mechanical Components, And Interior And Exterior Finishes. In Addition To The Renovation, The Improvements To Building 45 Include Ensuring Exterior Envelop Around Doors, Windows, And Stair Towers Along With Any Penetrations Are Sealed Properly. Moreover, Renovation Includes Construction Of A Service Platform And Stairs For Dedicated Emergency Generator System. The Focus Of The Project Is To Provide Structural Slab Repairs And Replacement To Sustain Required Laundry Equipment Loads And Vibrations. this Project Also Requires Specialized Personnel, With Specified Experience, To Assist In The Cqc System Manager For The Following Areas, As Applicable: Electrical, Mechanical, Civil, Structural, Environmental, Architectural, Materials Technician Submittals Clerk, Commissioning Agent/leed Specialist, And Low Voltage Systems. These Individuals Or Specified Technical Companies Are Directly Employed By The General Contractor And Cannot Be Employed By A Supplier Or Subcontractor On This Project; Be Responsible To The Cqc System Manager; Be Physically Present At The Construction Site During Work On The Specialized Personnel S Areas Of Responsibility; Have The Necessary Education Or Experience In Accordance With The Experience Matrix Listed Herein. These Individuals Can Perform Other Duties But Need To Be Allowed Sufficient Time To Perform The Specialized Personnel S Assigned Quality Controls Duties As Described In The Cqc Plan. A Single Person Can Cover More Than One Area Provided That The Single Person Is Qualified To Perform Qc Activities In Each Designated And That Workload Allows. experience Matrix area qualifications civil graduate Civil Engineer Or Construction Manager With 2 Years Experience In The Type Of Work Being Performed On This Project Or Technician With 5 Years Related Experience. mechanical graduate Mechanical Engineer With 2 Years Experience Or Construction Professional With 5 Years Of Experience Supervising Mechanical Features Of Work In The Field With A Construction Company. electrical graduate Electrical Engineer With 2 Years Related Experience Or Construction Professional With 5 Years Of Experience Supervising Electrical Features Of Work In The Field With A Construction Company. structural graduate Civil Engineer (with Structural Track Or Focus), Structural Engineer, Or Construction Manager With 2 Years Experience Or Construction Professional With 5 Years Experience Supervising Structural Features Of Work In The Field With A Construction Company. architectural graduate Architect With 2 Years Experience Or Construction Professional With 5 Years Of Related Experience. environmental graduate Environmental Engineer With 3 Years Experience. submittals submittal Clerk With 1 Year Experience. concrete, Pavement, And Soils materials Technician With 2 Years Experience For The Appropriate Area. testing, Adjusting, And Balancing (tab) specialist Must Be A Member Of Aabc Or An Experienced Technician Of The Firm Certified By The Nebb. design Quality Control Manager registered Architect Or Professional Engineer the Estimated Magnitude Of This Construction Project Is Between $5,000,000.00 And $10,000,000.00. This Information Is Provided Per Vaar 836.204. The Naics Code Is 236220 And The Small Business Size Standard Is $45 Million. Interested Parties Should Indicate Their Interest To Kyle Kiepke No Later Than 4:00 Pm Est Friday, January 17, 2025, Via Email At Kyle.kiepke@va.gov. information Sought a) Sam Unique Entity Id (uei) b) Bonding Capability; Per Contract And Aggregate. Provide Amount Of Aggregate Bonding Currently Available (i.e., Amount Not Committed). c) Experience. Submission Of A Maximum Of Three (3) Recent And Relevant Examples Of Completed Or Substantially Completed (eighty Percent (80%)) Projects Between $5,000,000.00 And $10,000,000.00, Of Similar Scope To The Upgrade Visn 1 Laundry Building 45 Project. relevant Experience Shall Include Repair And Strengthening Of Existing Heavy Load-bearing Reinforced Concrete Structural Elements (such As Beams, Columns, Slabs, And Foundations) And Structural Framing In Already Completed Building, Cast In Place Concrete (to Include Footing, Pier And Foundation Installation), Reinforced Cmu Wall Installation, Concrete Beam Enlargement, Epoxy Injection Crack Repair, Slab Repair, Underside Slab Repair, And All Other Work Similar In Scope. Recent Is Defined As Completed Within The Last Five (5) Years. submission Instructions interested Firms Shall Hold Active Sam Registration. Visit Www.sam.gov To Register In This Database. sdvosb Or Vosb Firms Shall Be Certified By Veterans Small Business Certification (vetcert) (veterans Small Business Certification (sba.gov). all Information Must Be Submitted In Sufficient Detail For A Decision To Be Made. Failure To Submit All Information Requested In Addition To The Below Form May Result In A Contractor Not Being Considered As An Interested Concern. If Adequate Interest Is Not Received By 4:00 Pm Est On December 1, 2024, This Action May Not Be Set-aside For Sdvosbs, Vosbs, Wosbs, Or Small Business Firms. Interested Firms Must Reply Via E-mail To Kyle.kiepke@va.gov With The Subject Attention: 36c24125r0008 - Upgrade Visn 1 Laundry Building 45 . disclaimer this Sources Sought Is Issued Solely For Information And Planning Purposes Only And Does Not Constitute A Solicitation. All Information Received In Response To This Request That Is Marked As Proprietary Will Be Handled Accordingly. In Accordance With Far 15.201(e), Responses To This Notice Are Not Offers And Cannot Be Accepted By The Government To Form A Binding Contract. Responders Are Solely Responsible For All Expenses Associated With Responding To This Notice.
Closing Date17 Jan 2025
Tender AmountRefer Documents 

DEPT OF THE ARMY USA Tender

Civil And Construction...+3Others, Consultancy Services, Civil And Architectural Services
United States
Details: The Nevada Air National Guard, 152nd Mission Support Group Contracting Office 1776 National Guard Way Reno Nv 89502 Is Issuing This Sources Sought Synopsis As A Means Of Conducting Market Research To Identify Potential Sources Having An Interest And Industry Technologies Available To Support/provide Professional Artchitect-engineering Services (title I) Necessary To Develop A New Design For The Construction Of The Fuel Cell Hangar At The Nevada Air National Guard Base, Reno, Nv. the Result Of This Market Research Will Contribute To Determining The Method Of Procurement, If A Requirement Materializes. Based On The Responses To This Sources Sought Notice/market Research, This Requirement May Be Set-aside For Small Businesses (in Full Or In Part) Or Procured Through Full And Open Competition. Multiple Awards May Be Made. All Small Business Set-aside Categories Will Be Considered. Telephone Inquiries Will Not Be Accepted Or Acknowledged, And No Feedback Or Evaluations Will Be Provided To Companies Regarding Submissions. disclaimer this Sources Sought Is For Informational Purposes Only. This Is Not A Request For Proposal (rfp) To Be Submitted. It Does Not Constitute A Solicitation And Shall Not Be Construed As A Commitment By The Government. Responses In Any Form Are Not Offers And The Government Is Under No Obligation To Award A Contract As A Result Of This Announcement. No Funds Are Available To Pay For Preparation Of Responses To This Announcement. Any Information Submitted By Respondents To This Technical Description Is Strictly Voluntary. objectives Of The Sources Sought understand The Level Of Interest And Availability Of Potential Vendors That Could Provide The Requested Design Solution. identify Issues, Roadblocks, And Barriers To Successful Solution Implementations. obtain Vendor Feedback On If The Vendor Will Utilize Any Subcontractors Or Teaming Arrangements. identify If A Total Solution Can Be Provided Via Open Market Contractors. provision Of Other Benefits Of Leveraging A Turnkey Solution. comments Regarding Any Ambiguities Or Needed Clarifications Of The Draft Technical Specifications. obtain Vendor Feedback On Any Other Pre-existing Contracts That Might Meet This Need. program Background the Fuel Cell Hangar Was Designed In 1997 And Was Constructed In 1999 To Support C-130 Aircraft Maintenance Operations. Since 1997, The Authorized Square Footage (sf) For A C-130 Fuel Cell Hangar Has Increased Due To Safety Requirements, Maintenance Procedures, And Airframe Size. Per Current Ufc, The Buffer Zone Around The Aircraft Nose And Wingtip Is 15 Feet. Currently, The Clearanace At The Nose Is 9 Feet While The Clearance In Front Of The Engines Are 10 Feet To The Nearest Structure. The Fuel Cell Hangar Primarily Supports Two Aircraft Maintenance Functions, Maintenance Dock, And Corrosion Control. The Fuel Cell Maintenance Dock Currently Operates At 83% Of The Authorized Sf. To 1-1-691, Requires Aircraft Be Washed Every 180 Days And At Completion Of An Isochronal Inspection (iso). Aircraft Washing Is Crucial For Nevada’s Aircraft Due To The Fire-retardant Chemical That Is Utilized As Part Of The Modular Airborne Fire Fighting System (maffs). Insufficient Sf In The Maintenance Dock Doesn’t Allow For Ground Cleaning Equipment To Transition Around The Aircraft Without Placing The Main Hangar Door In The Open Position. During The Winter Months, The Open Hangar Door Allows For Freezing Rain And Snow To Deposit On The Maintenance Dock Floor Creating A Safety Hazard And An Extremely Cold Work Environment. Corrosion Control Operates At 55% Of The Authorized Sf. This Sf Shortfall Forces Equipment And Aircraft Parts Be Stored In The Paint And Media Blasting Preparation Area. Equipment And Parts Are Constantly Relocated Outside Of The Facility, Or Placed On The Maintenance Dock Floor To Allow Access To The Preparation Area. Additionally, The Primary Media Blasting Room Is Currently Inoperable Due To A Risk Assessment Code (rac) For Improper “dirty/clean” Transition Zones Per Ufc 4-211-02. All Media Blasting Is Currently Performed In Smaller Self-contained Blasting Cabinets. The Blasting Cabinets Only Accommodate Smaller Parts And Require Additional Operating Space For Parts Handling And Circulation. required Capabilities the Government Requires Designs For The Construction Of A New Fuel Cell/corrosion Control Facility Utilizing Conventional Design And Construction Methods To Accommodate The Mission Of The 152nd Aircraft Maintenance Group. Facilities Will Be Designed As Permanent Construction In Accordance With The Dod Unified Facilities Criteria (ufc) 1-200-01, General Building Requirements And Ufc 1-200-02, High Performance And Sustainable Building Requirements. Provide Reinforced Concrete Foundation And Floor Slab With Steel Framed Walls And Roof Structure. Include Fire Suppression, Hvac And Electrical Distribution. Exterior Work Includes Pavements, Utilities, Drainage, And Communication Support. Air Conditioning 12 Tons.the A-e Is Responsible For Determining What Disciplines And Skill Sets Are Required For Accomplishing The Work And Form A Team Accordingly. The A-e Will Need To Work Extensively To Ensure Understanding And Compliance With All Federal, State, And Local Codes, Criteria, And Permitting Requirements. The A-e Must Accomplish The Required Services And Furnish To The Government Reports And Other Data Together With Supporting Material Developed During The Period Of Performance As Set Forth Herein. The A-e Must Provide Services To The Government During Solicitation And Construction Of The Project As They Pertain To Correcting Ambiguities, Errors, Deficiencies, And Omissions In The Design. special Requirements any Resulting Contract Shall Be Compliant With The Specialty Metals Restriction Of The Berry Amendment (10 U.s.c. 2533a And 2533b) In Accordance With Dfars Clauses 252.225-7008 And 252.225-7009. eligibility the Applicable Naics Code For This Requirement Is 541330 With A Small Business Size Standard Of $25.5m. Large And Small Businesses Interest Is Being Requested. The Product Service Code (psc) Is C211. submission Details interested Businesses Should Submit A Brief Capabilities Statement Package (no More Than Ten 8.5 X 11 Inch Pages, Font No Smaller Than 10 Point) Demonstrating Ability To Provide The Products/systems Listed In This Technical Description. Documentation Should Be In Bullet Format. No Phone Or Email Solicitations With Regards To The Status Of The Rfp Will Be Accepted Prior To Its Release. your Response To This Sources Sought, Including Any Capabilities Statement, Shall Be Electronically Submitted To The Contracting Officer, Alex Norris, In Either Microsoft Word Or Portable Document Format (pdf), Via Email Alex.norris@us.af.mil No Later Than 1:00 P.m. Pdt On 14 January 2025 And Reference This Synopsis Number In Subject Line Of E-mail And On All Enclosed Documents. Information And Materials Submitted In Response To This Request Will Not Be Returned. Do Not Submit Classified Material. if Your Organization Has The Potential Capacity To Provide The Required Products/systems, Please Provide The Following Information: 1) Organization Name, Address, Primary Points Of Contact (pocs) And Their Email Address, Fax, Web Site Address, Telephone Number, And Type Of Ownership For The Organization; And 2) Tailored Capability Statements Addressing The Requirements Of This Notice, With Appropriate Documentation Supporting Claims Of Organizational And Staff Capability. If Significant Subcontracting Or Teaming Is Anticipated In Order To Deliver Technical Capability, Organizations Should Address The Administrative And Management Structure Of Such Arrangements. all Data Received In Response To This Sources Sought That Is Marked Or Designated As Corporate Or Proprietary Will Be Fully Protected From Any Release Outside The Government.
Closing Soon14 Jan 2025
Tender AmountRefer Documents 

DEPT OF THE ARMY USA Tender

Civil And Construction...+2Others, Building Construction
United States
Details: A Market Survey Is Being Conducted To Determine If There Are A Reasonable Number Of Interested Small Business Concerns To Set This Future Project Aside For Them. If Your Firm Is A Small Business, Certified Hubzone, 8a, Woman-owned Small Business Or Service-disabled Veteran Owned Business And You Are Interested In This Project Please Respond Appropriately. project Location: Wright-patterson Afb, Dayton, Oh project Description: Facility 20145 Requires Construction Services For A Design-bid-build Reconfiguration Of An Existing High-bay Space By Constructing New Endo-skeleton Structure Within An Existing Facility And Renovating Existing Space To Create Secure Laboratory Space. the Project Includes Construction Of 4 Floors At The High-bay Area In Facility 20145 By Providing Three Additional Separate Elevated Floors (total 17,941 Sf) Above The Existing Basement Floor. These Spaces Will Create Additional Secure Laboratory Space Within The Building Envelope Of The High Bay Existing Footprint. 2. Additionally, A Renovation Shall Include 9,666 Sf Of Existing Space. space Will Include Modeling, Simulation & Analysis (ms&a) Laboratories, Control Rooms, And Network Operations Center (noc) Rooms. Repairs Include Necessary Work To Supporting Mechanical, Electrical & Plumbing (mep) Systems And Applicable Communications. project Will Comply With Intelligence Community Directive (icd) 705 Requirements, As Well As Standards Established In Ufc-3-410-01 (hvac Systems), Ufc 3-401-01 (mechanical Engineering), Ufc 3-520-01 (design, Interior Electric Systems), Ufc 3-530-01 (design, Interior & Exterior Lighting And Controls), Nfpa 13 (standard For The Installation Of Sprinkler Systems), Nfpa 101 (life Safety Code), Nfpa 70 (national Electrical Code). contract Duration Is Estimated At 820 Calendar Days. The Estimated Cost Range Is Between $10-$25 Million. Naics Code Is 236220. All Interested Small Businesses, Certified Hubzone, 8a, Woman-owned Small Business Or Service-disabled Veteran-owned Business Contractors Should Respond To This Survey Via Email No Later Than Friday, 6 December 2024 At 3:00 Pm Eastern Standard Time. responses Should Include: identification And Verification Of The Company’s Small Business Status. contractor’s Unique Entity Identifier (uei)) And Cage Code(s). documentation From The Firm’s Bonding Company Showing Current Single And Aggregate Performance And Payment Bond Limits. description Of Experience – Provide Descriptions Of Your Prime Contractor Past Experience Up To Three (3) Projects With Greater Than 95% Construction Complete Or Those Projects Completed Within The Last Five Years Which Are Similar To This Project In Size And Scope. Provide Documentation Demonstrating Experience For Construction Of Similar Type Buildings And Managing Multiple Sub-contractors. Demonstrate Experience Including Self-performing 15% Of The Construction. Provide Documentation Demonstrating Experience For Projects Of Similar Type Projects. Each Project Must Include The Name, Title, Project Role, E-mail Address, And Telephone Number Of At Least One Reference. References May Be Used To Verify Project Size, Scope, Dollar Value, Percentages, And Quality Of Performance. projects Similar In Scope To This Project Included: New Steel Frame Multi-floor Construction With Micro-pilings. Installation Of Structural, Mechanical, Electrical, Fire Protection, Building Control Systems And Fixtures Associated With New Construction. Space Will Include Modeling, Simulation & Analysis (ms&a) Laboratories, Control Rooms, And Network Operations Center (noc) Rooms. Renovations Will Consist Of Mechanical, Electrical, Fire Protection, Building Control Systems And Fixtures Associated With Renovated Lab Facility Construction. a. Projects Similar In Size To This Project Include: New Construction Of At Least 10,000 Square Foot Endo-skeleton Building Within A Building And Renovation Of At Least 6,000 Square Feet Of Lab Space. b. Based On Definitions Above, For Each Project Submitted Include: current Percentage Of Construction Complete And The Date When It Was Or Will Be Completed. size Of The Project scope Of The Project the Dollar Value Of The Construction Contract the Percentage Of Work That Was Self-performed As Project And/or Construction Management Services Or Physical Construction Type Work. Must Be At Least 15% Self-performed. 5.small Businesses Are Reminded Under Far 52.219-14, Limitations On Subcontracting; They Must Perform At Least 15% Of The Cost Of The Contract, Not Including The Cost Of Materials, With The Firm’s Own Employees For General Construction-type Procurement. Include The Percentage Of Work That Will Be Self-performed On This Project, And How It Will Be Accomplished. note: Total Submittal Package Shall Be No Longer Than 8 Pages. Please Only Include A Narrative Of The Requested Information; Additional Information Will Not Be Reviewed. email Responses And Any Questions To Morgan Greenwell At Morgan.l.greenwell@usace.army.mil. This Is Not A Request For Proposal And Does Not Constitute Any Commitment By The Government. Responses To This Sources-sought Notice Will Be Used By The Government To Make Appropriate Acquisition Decisions. All Interested Sources Must Respond To Future Solicitation Announcements Separately For Responses To This Market Survey. notice: The Following Information Is Provided For Situational Awareness And Is Not Required To Respond To This Sources Sought. all Contractors Must Be Registered In The System For Award Management (www.sam.gov) Prior To Award Of A Contract. All Proposed Contractors Are Highly Encouraged To Review Far Clause 52.232-33 Payments By Electronic Funds Transfer – System For Award Management, Which Indicates “all Payments By The Government Under This Contract Shall Be Made By Electronic Funds Transfer (eft).” Those Not Currently Registered Can Obtain Registration By Going To The Website Http://www.sam.gov. The Process Can Usually Be Completed From 24 To 48 Hours After Submission. Contractors Will Need To Obtain A Unique Entity Identifier (formerly Duns Number) For Processing Their Registration. If You Do Not Already Have A Unique Entity Identifier, One Can Be Obtained From Http://www.sam.gov. Refer To Www.sam.gov For Information Formerly Found In Ccr, Epls, Orca And Fedreg. please Begin The Registration Process Immediately In Order To Avoid Delay Of The Contract Award Should Your Firm Be Selected. alert: You Must Submit A Notarized Letter Appointing The Authorized Entity Administrator Before Your Registration Will Be Activated. This Requirement Now Applies To Both New And Existing Entities. Effective 29 April 2018, The Notarized Letter Process Is Now Mandatory On All Current Registrants At Sam Who Have A Requirement To Update Data On Their Sam Record. The Notarized Letter Is Mandatory And Is Required Before The Gsa Federal Service Desk (fsd) Will Activate The Entity's Registration. effective 29 June 2018, Vendors Creating Or Updating Their Registration Can Have Their Registration Activated Prior To The Approval Of The Required Notarized Letter. However, The Signed Copy Of The Notarized Letter Must Be Sent To The Gsa Federal Service Desk (fsd) Within 30 Days Of Activation Or The Vendor Risks No Longer Being Active In Sam. vendors Can Check Whether An Account Is Active By Performing A Query By Their Cage Or Unique Entity Identifier (known As Duns). The New Registration Process May Now Take Several Weeks, So Vendors Are Highly Encouraged To Begin Registering As Soon As Possible To Avoid Any Possible Delays In Future Contract Awards. Remember, There Is No Cost To Use Sam. to Find Out Additional Information About The Changes Of The Sam Registration Process, Contractors Should Visit The Frequently Asked Questions (faq) Link Located At The Top Of The Sam Homepage (www.sam.gov).
Closing Date6 Dec 2025
Tender AmountRefer Documents 

PUBLIC BUILDINGS SERVICE USA Tender

Others
Corrigendum : Closing Date Modified
United States
Details: 47pb0024r0049amendment 007 amendment 7 Will Attach Three Documents. Attachment 127 Is The Updated Rfi Spreadsheet. Look Specifically At The Last Tab Dated 12/17/2024 For Responses To Various Offeror's Questions.attachment 128 Will Replace Attachment 26 A.0 Sow Cmc Houlton Lpoe Final 2024 08 02 And Is Titled As "128. A.0 Sow Cmc Houlton Lpoe Final Revised 2024 12 17." Note That The Cover Page Incorrectly Still Shows The Previous Date Of August 2, 2024. Attachment 129 Will Replace Attachment 77. Exhibit D 2325-gsa-houlton Me Lpoe_design Options By Specifically Updating Page 2 And Page 3 In Item 77. It Will Be Added As Attachment 129. Exhibit D 2325-gsa-houlton Me Lpoe_design Options. As A Reminder, Amendment 6 Stated Which Attachments Were Deleted (78 Through 94) As Those Are The Updated Files That May Have Been Duplicated. We Are Not Be Reloading Any Of Those Files That Replaced The Deleted Files. 47pb0024r0049amendment 006 the Contracting Officer Has Approved An Extension To January 16, 2025, 2:00 Pm Est For Receipt Of Proposals. The Following Changes Have Been Made: Attachments 78 Through 94 Have Been Deleted In Their Entirety And Replaced With Updated Attachments From The Final Concept Development Documents. The Following Attachments Were Updated And Numbered 99 Through 102; 104 Through 108a; 110 Through 123; And 125 Through 129.specifically, Attachment 126. Houlton Lpoe Cmc Rfi Tracker Sheet Is Updated Through December 6, 2024 Only As Shown Under The Last Tab Of That Document.access To These Documents Will Be Contained Through The Google Drive: Houlton Cmc Secure Documents That May Have Been Granted To Offerors If Already Requested. If You Have Not Completed A Form B And Cbp Nda Form, Please Do So Access Can Be Provided To These Documents. if You Have Any Problems With Access, Please Contact Paul Murphy At Paul.murphy@gsa.gov. 47pb0024r0049amendment 005 the Contracting Officer Has Approved An Extension To December 12, 2024, 2:00 Pm Est For Receipt Of Proposals.additionally, Attachment 99. Houlton Lpoe Cmc Rfi Tracker Sheet 2024 11 22 Is Provided As The Government Response To Additional Comments/question By An Offeror And Hereby Shared With All Offeror's. 47pb0024r0049amendment 004 the Contracting Officer Has Approved An Extension To December 5, 2024, 2:00 Pm Est For Receipt Of Proposals. 47pb0024r0049amendment 003 added Attachments 33. A.7 Gsa P-100 2021 With 2022 Addendum Final (326), 35. D.4 P100 Submittal Matrix V10 cmc 2021, 58. Gsa Program Development Study 100% Pds Report 2021 02 08 (559), And 69. Roof Moisture Analysis Report houlton 2020 06 23 (22) Did Not Get Posted On 10/04/2024. They Are Added Under Amendment 0003. additionally, Attachment 98. Rfi Site Visit Tracker Is Provided As The Government Response To Rfi By Offerors. 47pb0024r0049amendment 002 added Attachment 72 Final Houlton Pre-proposal Meeting Presentation 2024 10 10. A Courtesy Copy Was Sent Via Email To People That Were On The Invitation List Even If They Did Not Attend The Individual Meetings. It It Attached Here So All Contractors, Whether They Requested Attendance Or Not, Will Know Of The Discussions. added Clarifying Price Proposal Language Below: under Volume Ii - Price Proposal - Part 3 - Price Proposal "other Than Certified Cost And Pricing Data" Documentation. Uniformate Ii Classification Framework. under Volume Ii - Price Proposal (1) Contents · Price Proposal On Sf-1442 (signed) â Solicitation, Offor, And Award. The Price Proposal Shall Consist Of The Sf-1442 And The Agreement. Indicate The Total Contract Price From The Completed Contract Price Form In Block 17 Of The Sf 1442, Which Must Be Fully Executed By The Offeror. · A Completed Contract Price Form Included As Part Of The Sf-1442 And In Section Ii Of The Agreement. · Other Than Certified Cost And Pricing Dataâ Documentation. Cost Proposals Must Be Organized And Submitted Using The Uniformat Ii Classification Framework Developed By The American Society For Testing And Materials (astm), Specifically Under The Designation E1557. Costs Shall Be Provided For Project Work At The Level 3 Individual Elements Classification (e.g. A1010 Standard Foundations), And Summarized At The Level 2 Classification (e.g. A10 Foundations). Any Additional Costs That The Offeror Believes Must Be Included Shall Be Well Defined And Included At The Summary Level. the Ira Designated Clins Shall Be Broken Out Separately From The Remaining Requirement. our Uniformat Ii â Level 3 Detail Reference Guide Is Provided To Assist You With This Documentation (see Attachment 97). note: The Price Proposal Must Be Separately Bound From The Phase Ii Technical Proposal. iv.l. Requiring Certified Cost Or Pricing Data [15.403-4] iv.l.a. Far 52.215-20 Requirements For Certified Cost Or Pricing Data And Data Other Than Certified Cost Or Pricing Data (nov 2021), Alternate Iv (oct 2010) (a) Submission Of Certified Cost Or Pricing Data Is Not Required. (b) Provide Data Described Below: Cost Proposals Must Be Organized And Submitted Using The Uniformat Ii Classification Framework Developed By The American Society For Testing And Materials (astm), Specifically Under The Designation E1557. Costs Shall Be Provided For Project Work At The Level 3 Individual Elements Classification (e.g. A1010 Standard Foundations), And Summarized At The Level 2 Classification (e.g. A10 Foundations). Any Additional Costs That The Offeror Believes Must Be Included Shall Be Well Defined And Included At The Summary Level. the Ira Designated Clins Shall Be Broken Out Separately From The Remaining Requirement. our Uniformat Ii â Level 3 Detail Reference Guide Is Provided To Assist You With This Documentation (see Attachment 97). added Attachment 75 Presolicitation In Sam 2024 08 27. added Attachment 76 Pre-proposal Site Visit Attendance Sheet 2024 10 17 added Attachments 77 - 94 Provide Additional Design Information As Requested. 77 Exhibit D_2325-gsa-houlton Me Lpoe_design Options; 78 Exhibit D.1_lpoe Houlton Concept Development Design Package; 79 Exhibit E_ Lpoe Houlton Concept Development Calculation Package; 80 Exhibit E.1_mpbroof Structure; 81 Exhibit F_mep Basis Of Design Narrative; 82 Exhibit G_mep Concept Development Design Alternates; 83 Exhibit G.1 Mepfp Equipment; 84 Exhibit H_houlton Lpoe_facade Options & Ira Lec Materials_concept Development Memo; 85 Exhibit J Houlton Leed Nc Scorecard; 86 Exhibit J.1_gsa Sustainable Buildings_checklist; 87 Exhibit J.2_conceptdevelopmentenergyanalysisnarrative; 88 Exhibit U_(cui) Houlton Me Dbt_msr_fsl; 89 Exhibit V_houlton Lpoe Pre-renovation Rbm Survey Report 2024-06-25; 90 exhibit X_2325-gsa-houlton Me Lpoe_mechanical-electrical Resilience_rev 1; 91 Exhibit Y_flood Level Diagram From 2024-07-02_2325-gsa-houlton Me Lpoe_mechanical-electrical Resilience_rev 1; 92 Exhibit Z_(cui) Passwords; 93 Exhibit Aa_national Operational Excellence Checklists_concept Development; And 94 Exhibit Bb_houlton Me Lpope_concept Development Specifications Table Of Contents. several Required A Completed Form B Under Attachment 5 And A Completed Cbp Nda Authorization Letter Signed For Access. If You Have Alreadysubmitted These To The Contracting Officer Prior To October 24, 2024, Just Email Again For Access. note: The Facade - Precast Panels And Terracotta Rainscreen - Colors Will Be Selected In The Next Phase By The Architecture Engineering (ae) Design Firm Marvel Architectures. Additionally, Hvac - Vrf, The A/e Will Select The Vendor That Meets Most Of The Gsa Requirements (hvac And Controls). added Attachment 95 Ira Program Construction Solicitation Desk Guide - Dated October 1, 2024. This Is A Revision of Any Previous Construction Solicitation Desk Guide That Provides Guidance For Ira-funded Construction Projects that Contain Low Embodied Carbon (lec) Materials, Including Pre-solicitation, Solicitation, And Agreement Guidance, evaluation Factor Requirements, Review And Approval Requirements, And Post-award Requirements. It Also Includes standard Scope Of Work Language For Actions Related To The Construction Project (design Services, Cma, And Cxp services) For Lec Materials, High Performance Green Buildings, And Emerging And Sustainable Technology Projects. added Attachment 96 Houlton Lpoe Cmc Rfi Tracker Sheet 2024 10 23 - Conference Rfis Containing Questions asked By Offeror's And Official Government Responses For The Pre-proposal Conference Only. added Attachment 97 Solicitation Document L - Uniformat Ii - Level 3 Detail Reference Guide Reference Above In pricing Information Area. 47pb0024r0049amendment 001 the Following Changes Were Made Effective On 10/08/2024: a. Replaced 5. Form B - Request For Construction Documents 2024 10 04 With 5. Form B - Request For Construction Documents 2024 10 08 And Unlocked It. b. Replaced6. Cbp Non-disclosure Agreement Form 2024 10 04 With6. Cbp Non-disclosure Agreement Form 2024 10 08 And Unlocked It. c. Replaced 7. Pre-proposal Conference R1 2024 10 04 With 7. Pre-proposal Conference R1 2024 10 08 Which Provides The Following Clarification: 1. Thepre-proposal Conferencewill Be Held Virtually Onoctober 10, 2024 At 10:00 Am. 2.questions/requests For Information/clarificationsfrom The Offerorswillbe Due Nltoctober 18, 2024, At 2:00 Pm.these Should Be Sent Topaul.murphy@gsa.gov. 3. The Government Will Post Responses To The Offeror'squestions/requests For Information/clarificationsas An Amendment To The Solicitation In Sam.govon Or About October 25, 2024. d. Replaced 8. Pre-proposal Site Visit R1 2024 10 04 With Attachment - 8. Pre-proposal Site Visit R1 2024 10 08 Which Provides The Following Clarification: 1. The Site Visitwill Be Held Onoctober 17, 2024 At 1:00 Pm. 2.questions/requests For Information/clarificationsfrom The Offerorswillbe Due Nltoctober 25, 2024, At 2:00 Pm.these Should Be Sent Topaul.murphy@gsa.gov. 3. The Government Will Post Responses To The Offeror'squestions/requests For Information/clarificationsas An Amendment To The Solicitation In Sam.govon Or About November 1, 2024. e. Added New Attachment - 73. Contract Price Form Spreadsheet 2024 08 28. f. Added New Attachment - 74. Cost Accounting Standards Board Disclosure Statement Casb Ds-1 Omb Form Number 0348-0051 a. The Corrected Proposal Due Date Is Thursday, November 21, 2024. this Is A Construction Manager As Constructor (cmc) / Construction Manager As Risk (cmar) Services For U.s. Customs And Border Protection (cbp) Land Port Of Entry (lpoe) At Houlton, Maine. The Cmc/cmar Services Is For The Facilities Repair And Alterations Project And Includes Requirements For Design Phase Services And Construction Phase Services. design Phase Services Will Be Awarded On A Firm-fixed Price Basis. Construction Phase Services Will Be Awarded With A Guaranteed Maximum Price (gmp). This Project Is Part Of The Bipartisan Infrastructure Law (bil) And Is Also Targeted For Inflation Reduction Act (ira) Funding. this Solicitation Sets Forth Requirements For Proposals For A Contract To Construct The Project Described In The Solicitation Documents. Proposals Conforming To The Solicitation Requirements Will Be Evaluated In Accordance With The Method Of Award Set Forth Herein. the Government Will Award The Contract To The Selected Offeror, Subject To The Conditions Set Forth Herein. the Offeror's Proposal Submitted In Response To This Solicitation Shall Constitute A Firm Offer. No Contract Shall Be Formed Unless And Until The Contracting Officer Has Countersigned The Sf 1442 Submitted By An Offeror And Delivered Back To The Contractor, A Copy Of The Sf 1442 With Original Signatures Together With The Agreement Reflecting The Offeror's Proposed Prices. offers Providing Less Than One Hundred And Twenty (120) Calendar Days For Government Acceptance After The Date Offers Are Due Will Not Be Considered And Will Be Rejected. the Magnitude Of Construction Is Estimated Within The Range Of $22,000,000 And $32,000,000. Offeror's Are Cautioned That Price Proposals Exceeding This Range May Be Determined Ineligible For Award Based On Budgetary Limitations. This Range Does Include Potential Inflation Reduction Act (ira Funding). price Proposal Exceeding This Range May Be Eligible To Have Their Technical And Price Proposal Evaluated Unless The Contracting Officerdetermines That The Number Of Proposals That Would Otherwise Be In The Competitive Range Exceeds The Number At Which An Efficient Competition Can Be Conducted. The Contracting Officer May Limit The Number Of Proposals In The Competitive Range To The Greatest Number That Will Permit An Efficient Competition Among The Most Highly Rated Proposals. technical And Price Proposals Must Be Clearly Labeled And Must Be Sent As Separate Attachments So They Can Be Evaluated Separately. Failure To Do So Will Determine The Offeror's Submission As Non-responsive And Will Be Eliminated. The Contracting Officer And/or Contracts Specialist Will Not Be Responsible To Separate Any Technical Document That Contains Pricing Information. this Solicitation Is Not Set Aside For Small Business, However, Both Small And Large Businesses Are Encouraged To Participate. Offeror's Must Ensure That Sam.gov Shows That The Offeror Has North American Industry Classification System (naics) Code 236220 (commercial And Institutional Building Construction) And Meets The Small Business Size Standard Is $39.5 Million Average Annual Receipts. It Is The Responsibility Of The Offeror To Ensure This Information Is Updated At The Time Of Submission Of Their Proposal. see The "a. Presolicitation In Sam 2024 08 27" For Additional Details. Changes To The Presolicitation Include:the Solicitation Posting Date Has Changed From September 26, 2024 To October 3, 2024.the Proposal Submission Date Has Changed From November 26, 2024, 2:00 Pm Est To November 11, 2024, 2:00 Pm Est. for Access To Public Building Services (pbs) General Services Administration (gsa) Documents, See "b. Form B - Request For Construction Documents 2024 08 07" That Must Be Completed In Its Entirety And Signed.failure To Complete This Document In A Timely Manner Does Not Warrant Any Request For An Extension To The Proposal Due Date. The Document Must Be Sent To Paul.murphy@gsa.govbefore Access To These Pbs/gsa Documents Are Provided. additionally, The Department Of Homeland Security, U.s. Customs And Border Protection, Facilities Management And Engineering Field Operations, Facilities Program Management Office, Non-disclosure Agreement. See "6. Cbp Non-disclosure Agreement Form 2024 10 04" That Must Be Completed In Its Entirety And Signed. This Document Must Be Sent To Lawrence.a.comiskey@cbp.dhs.gov And A Copy Sent To Paul.murphy@gsa.gov Before Access To Cbp Documents Are Provided. a Pre-proposal Conference Is Scheduled For Thursday, October 10, 2024, At 10:00 Pm Est. A Letter Is Attached To This Solicitation "7. Pre-proposal Conference 2024 10 04". a Pre-proposal Site Visit Is Scheduled Forthursday, October 17, 2024, At 01:00 Pm Est.a Letter Is Attached To This Solicitation "8. Pre-proposal Site Visit 2024 10 04". there Are 71 Attachments To This Solicitation.
Closing Date16 Jan 2025
Tender AmountRefer Documents 
511-520 of 533 active Tenders