Hvac Tenders
Hvac Tenders
MUNICIPALITY OF GENERAL LUNA, SURIGAO DEL NORTE Tender
Civil And Construction...+1Building Construction
Philippines
Details: Description Completion Of Multi-purpose Building( Convention Center) With Advanced Mechanical And Electrical Works Including Energy-efficient Hvac Systems, Reliable Power Distribution, And Modern Fire Safety; Efficient Sanitary Works With Sustainable Water Management And Hygienic Restroom Facilities; Cutting-edge Video And Audio Systems With High-quality Sound, Visuals, And Centralized Control For Seamless Presentations; Premium Finishes Such As Durable Flooring, Acoustic Treatments, And Elegant Interiors; And Robust Civil Works Ensuring Structural Integrity, Ample Parking, And Landscaped Surroundings, All Tailored To Provide A Versatile And Exceptional Venue For The Tourism Industry.
Closing Date20 Jan 2025
Tender AmountPHP 50 Million (USD 861.5 K)
DEPT OF THE AIR FORCE USA Tender
Civil And Construction...+1Civil Works Others
United States
Details: The Contractor Shall Provide All Services, Materials, Supplies, Facilities, Supervision, Labor, And Equipment, Except That Specified Herein As Government-furnished, To Perform Functions That Support Base Operations At Joint Base Langley-eustis, Va. The Contractors Tasks Shall Include, But Are Not Limited To: Building And Structure Maintenance; Surface Area Maintenance; Utility Systems Operation And Maintenance (o And M); Hvac Systems O And M; Dining Facility Maintenance; And Pest Control. The Contractor Is Also Responsible For All Contractor Planning, Programming, Administration, Management, And Execution Necessary To Provide Specified Services.
Closing Date4 Feb 2025
Tender AmountRefer Documents
UNITED STATES GOVERNMENT PUBLISHING OFFICE USA Tender
Civil And Construction...+1Building Construction
United States
Details: Government Publishing Office (gpo),secure & Intelligent Documents (sid) Requires A Design-build (db) Project To Repair/renovate Building (a) 5th Floor Room A-501.a Contractor Will Be Selected And Required To Develop A Full Realized Design Based Off A Provided Conceptual Drawing. The Contractor Will Also Perform The Required Repairs And Renovations For The Facility To Be Utilized As A New Smart Card Reader Manufacturing Hub.repair And Renovation Shall Include All Systems (hvac, Electrical, Architecture Of The Interior And Exterior, Fire Protection, And Security) In Accordance With The Applicable Codes Of National Design And Construction Standards.gpo Is Located At 732 N. Capitol Street Washington, Dc 20401.
Closing Date18 Feb 2025
Tender AmountRefer Documents
DEFENSE LOGISTICS AGENCY USA Tender
Others
United States
Details: See Attachment For Full Details.
this Is A Request For Information (rfi). Defense Logistics Agency (dla) Troop Support's Europe And Africa, Maintenance, Repair, And Operation (mro) Prime Vendor Program Is Interested In Your Comments Related To Tailored Logistics Support (tls) For Mro Requirements In The Europe And Africa Areas Of Responsibility (aors). Mro Products Include All Commercial Items Associated With The Maintenance, Repair, And Operation Of A Facility. The Scope Includes But Is Not Limited To: Heating, Ventilation, And Air Conditioning (hvac) Supplies; Plumbing Supplies (e.g. Bath And Shower Fixtures, And Ablution Units); Electrical Products (e.g. Generators, Wire, Connectors, Sockets, Outlets, Lights, Etc.); Tools; Chemical, Lubricating, And Rubber Products; Construction Supplies (e.g. Cement, Lumber, Plywood, Bricks, Blocks, Steel, Aluminum, And Other Metal Products); Conduits; Prefabricated Structures (e.g. Re-locatable Buildings, And Prefabricated Buildings Complete With Furnishings, Appliances, Etc.); Appliances; Utility Vehicles; Perimeter Security Items Such As: Barriers, Barbed Wire, Concertina Wire, And Sand Bags (also Used For Erosion Prevention); Communication Devices (e.g. Walkie-talkies And Two-way Radios Used By The Maintenance Personnel); And Various Other Commercial Supplies Required By The War-fighters To Accomplish Their Mission. Mro Support Also Includes Related Incidental Services. Incidental Services Are Standard Commercial Services Performed In Connection With Supplying Items Under The Scope Of The Contract (an Example Of An Incidental Service May Be Requiring Installation Of An Hvac System Purchased Under The Contract).
Closing Date24 Jan 2025
Tender AmountRefer Documents
Department Of Transportation Tender
Civil And Construction...+1Civil Works Others
United States
Details: This Project Is A Standard Low Bid ... This Project Is A Standard Low Bid Project And Includes General Hvac Plumbing And Electrical Construction Project Title District 2 7 Maintenance Garage Construction Of A New County Maintenance Garage Estimated Range 1 General 16 000 000 17 000 000 2 Hvac 1 000 000 2 000 000 3 Plumbing 1 000 000 2 000 000 4 Electrical 2 000 000 3 000 000 Liquidated Damages 1 6 000 00 Per Day 2 1 000 00 Per Day 3 1 000 00 Per Day 4 1 500 00 Per Day There Is No Bid Guaranty Required For This Project Date For Receiving Bids Is Thursday February 13 2025 At 2 00 P M The Pre Bid Conference Will Take Place On Friday January 3 2025 At 12 00 P M At Penndot District Office 2 7 Conference Room 1200 4th Street Lewistown Pa 17044 The Department Of General Services Capital Programs And The Bureau Of Diversity Inclusion And Small Business Opportunities Bdisbo Identified This Procurement As Eligible For The Setting Of Small Diverse Business Sdb And Or Veteran Business Enterprise Vbe Participation Goals However Bdisbo Did Not Set Sdb And Or Vbe Participation Goals For Those Procurements That Are Less Than The 600 000 Threshold Required To Set Either Goal In Addition There Will Be No Points Allocated Toward Sdb Sb Participation For This Procurement This Is A Significant Programmatic Change From The Sdb And Sb Participation Program Contained In Prior Projects Issued By Capital Programs Bidders Now Must Agree To Meet The Sdb And Vbe Participation Goals In Full Or Demonstrate That They Have Made Good Faith Efforts To Meet The Goals Refer To The Instructions To Bidders Section Regarding Small Diverse Business And Veteran Business Enterprise Participation For Further Information The Goals For Each Prime Contract Is As Follows Sdb And Vbe Goals 1 General Construction All Base Bids 1 2 3 Sdb 10 Vbe 3 2 Hvac Construction All Base Bi...
Closing Date13 Feb 2025
Tender AmountRefer Documents
Andhra Pradesh Capital Region Development Authority - APCRDA Tender
Works
Civil And Construction...+6Road Construction, Drainage Work, Security and Emergency Services, Water Storage And Supply, Electrical Works, Electrical and Electronics
India
Details: World Bank And Adb Financed Amaravati Capital City Development Program Related To Completion Of Balance Works In External Infra Development Viz., Providing Water Supply, Underground Sewerage System, Storm Water Drainage System, Street Lighting, Internal Roads, External Electrical, Plumbing And Sanitary Systems, Firefighting Systems, Hvac Systems, Building Security Systems, Landscaping Etc., For 1440 Nos. Of Multi-storeyed Apartment Quarters In 14 Towers Of (s Plus 12) Floors Pattern Buildings For Gazetted Officers Type I And Ii And Group-d Officials Near Nelapadu, Amaravati, Andhra Pradesh On Lumpsum Contract ( Percentage Tender) System With The Dlp Of 2 Years
Closing Date28 Jan 2025
Tender AmountINR 1.7 Billion (USD 20.1 Million)
Offizielle Bezeichnung Land Hessen, Vertreten Durch Den Landesbetrieb Bau Und Immobilien Hessen, Zentrale Vergabe Tender
Software and IT Solutions
Germany
Description: Public tender Vob/a building automation (DIN 18 386); 6 automation focal points for the control and regulation of system automation and room automation with approx. 420 physical and approx. 510 communicative data points. ... Multi-building automation (DIN 18 386); 6 automation focal points for the control and regulation of system automation and room automation with approx. 420 physical and approx. 510 communicative data points. Furthermore, 3 RLT systems with their own control are to be connected to the MBE via Bacnet/IP. A BSK bus system is planned for the approx. 45 fire dampers. Key service items for building and system automation: Common I/Os in the respective ASP with master-slave (redundant automation station): Lecture hall building: ASP07: Heating/sanitary trades, BSK bus system, 2 fields ASP08: Control of air conditioning systems, cooling, room automation House 1-4 (existing buildings): 1 ASP each for heating, hot water preparation The room automation includes the control of the HVAC systems such as underfloor heating, reheaters/coolers, volume flow controllers, but not blinds, lighting, etc. For automation management, an MBE is planned as a tower workstation as an operating station including printer as a complete system. The electrical cable installations are carried out by the electrical contractor, here the coordination services and the final cabling are to be carried out.
Closing Soon17 Jan 2025
Tender AmountRefer Documents
Central Public Works Department - CPWD Tender
Works
Paints and Enamels...+1Civil Works Others
Corrigendum : Closing Date Modified
India
Details: Execution Of Balance Work In The Campus Of New Technology Centre Of Msme At Durg For Finishing Work Of Internal Partitions, False Ceiling, Aluminium Windows, Flooring, Painting, External Development Work Such As Roads, Boundary Wall, Paver Blocks, Storm Water Drain Etc. Including Internal & External Mep Works Comprising Of Fire Fighting Hvac System, Access Control System, Solar Hot Water System, Ups System, Dg Set, Street Lighting With Led, Stp, Cctv System, Compressor And Accessories, Lan System, Ip Based Epabx System, Solar Photo Voltaic Power Generation System, Pa System Etc, Along With Landscaping And Horticulture Works For All The Buildings Of Training Block, Production Block, Staff Accommodation, Girls Hostel, Boys Hostel, Dining Hall, Utility Building And Guard Room.
Closing Soon13 Jan 2025
Tender AmountINR 224 Million (USD 2.6 Million)
Sefton Council Tender
Software and IT Solutions
United Kingdom
Details: Sefton Council Operates 6 Leisure Centres, Both Wet And Dry Facilities, Plus The Atkinson Centre In Southport, Home For Music, Theatre, Art, Literature, And History. Sefton Mbc Invites Tenders For The Renewal Of Our Maintenance Support Contract For The Building And Energy Management System (bms) Installed At All The Above-named Sites, Due In February 2025, Using The Platform Iqvision Software To Enhance Our Building Management System (bms). The Objective Is To Improve Energy Efficiency, System Integration, And Overall Building Management. We Require An Experienced Service Partner For The Maintenance, Regulation, And Monitoring Of All Mechanical And Electrical Equipment (hvac) To Allow The Facilities To Operate Efficiently To Control The Buildings Energy Usage Whilst Achieving Optimum Environmental Conditions And Reduced Energy Costs, Using The Software Trend Iqvision. The Current Bms Server Utilised For Iqvision Is Hosted Within The Smbc On-premises Data Centre.
Closing Soon17 Jan 2025
Tender AmountRefer Documents
FEDERAL EMERGENCY MANAGEMENT AGENCY USA Tender
Civil And Construction...+1Civil Works Others
Corrigendum : Closing Date Modified
United States
Details: Update 6: Additional Question And Answer Provided.
question: Is The Hvac Subcontractor Expected To Replace Any Components Of The Hvac System That Do Not Work Properly Such As The Evaporator Coils, Drain Pans, The Return And Supply Plenums As Well As The Ductwork (if Cant Be Cleaned) And Does This Need To Be Included In The Quote, Or Will The Replacement Of Parts Be A Change Order?
no, Contractor Is Not Expected To Replace Major Hvac Components. The Hvac Duct Cleaning As Was Specified By The Company That Did The Mold Testing: “if Ductwork Is Uncleanable, The Remediation Contractor Shall Poly Off Both Ends And Discard As Necessary”
update 5:additional Questions And Answers Provided.
original Question: Any Pictures Of The Affectedareas?
frf Is Designated As A Temporary Secure Work Area (tswa) & No Pics Are Allowed.
follow-up Question: How Were The Pictures Acquired On The Brighton Solutions Documents Attached On Sam.gov? Can Other Photos Of The Ceiling And Other Areas Not Be Acquired?
those Items (shoes / Chair) Were Temporarily Pushed Outside The Frf And Pics Taken Outside The Frf.
2. Original Question: Is There Any Affected Insulation Material Above The Grid? It Is Often Overlooked And Usually Has To Be Replaced Once The Ceiling Tiles Are Relaced, The Sow Makes No Mention Of This. If We Find It Damaged And In Need Of Replacement,will This Be A Bilateral Agreement Added Later On?
maintenance Techs Inspected And Stated That The Insulation Does Not Rest On The Ceiling Tiles. The Insulation Is Suspended Above The Tiles By Wire Mesh.
follow-up Question: So The Insulation Is Not Part Of The Remediation? As Stated In Section 1.3?
no. (i Am Told By Maintenance Personnel That The Insulation Is Suspended By Wire Above The Ceiling Tiles).
3. Original Question: Sow Mentioned Damaged Framework Above Grid Needs To Be Repaired.are There Any Pictures Of The Damaged Areas?
frf Is Designated As A Temporary Secure Work Area (tswa) & No Pics Are Allowed.
follow-up Question: Same As #1
no Picture Taking Is Allowed Inside The Frf Room.
4. Original Question: At Which Point Will A Decision To Be Made Of Repair Or Total Replacement Of The Grid If It Needs To Be Replaced In Its Entirety?
the Replacement Of All Ceiling Tiles And All Metal Framing Is Stated On The Sow As A Requirement.
follow-up Question: The Sow Only Reference Grid Straightening Not Replacement.
the Sow Was Updated To Indicate That Al Ceiling Tiles And Supporting Metal Framing Is Required To Be Replaced.
6. Original Question: Is There A Mold Remediation Protocol As Completed By A Licensed Tdlr Mac? Can That Be Provided?
unfortunately, We Do Have The Experience Nor Have An Sme On Site To Answer Those Questions.
follow-up Question: The Brighton Solutions, If They Are A Tdlr Mac, Then They Would Be The Company To Create The Remediation Protocol.
the Sow Sated That Vendor Must Sub Contract That Out Separately.
8. Original Question: Will The 3rd Party Clearance Be The Original Mac Or Will The Remediation Contractor Be Required To Coordinate That Effort?
it Is Our Understanding That Contractor Needs To Acquire Clearance Thru And Independent And Certified Vendor.
follow-up Question: If There Is Already A Consultant (brighton Solutions) Then They Would Be The Company To Perform The Clearance. This Is Not A Function Of The Remediation Company Under Tdlr Mold Rules.
we Fema Do Not Have The Expertise To Answer This.
9. Original Question: The Sow Calls For The Cleaning Of It Equipment; Are Those Units Running And Will They Remain Running During The Remediation?
yes,one It Rack Will Be Running.
follow-up Question: This Will Have To Be Wrapped According To The Protocol And Will Possibly Cause A Problem Of Heat Could Be An Issue.
it Is My Understanding That The It Rack Hasn't Be Cleaned Also. Once Cleaned, Fema Has Two Options To Mitigate The Heating Issue; 1 Is To Relocate The It Rack Outside The Frf Room.
10. Original Question: What Was The Identified Underlying Cause Of The Fungal Growth? Has This Been Addressed Or Will That Be On The Contractor?
hvac Leak And Not Cooling Caused Excessive Moisture Buildup.ac Leak To Be Repaired By Separate Contractor.
follow-up Question: Hvac Duct Cleaning Cannot Be Completed During A Mold Remediation Per Tdlr Regulation.
the Sow States If This Is Needed, Is The Contractor’s Responsibility To Ensure This Gets Done.
update 4: Additional Questions And Answers Provided.
additional Questions And Answers:
1. Any Pictures Of The Affectedareas?
frf Is Designated As A Temporary Secure Work Area (tswa) & No Pics Are Allowed.
2.is There Any Affected Insulation Material Above The Grid? It Is Often Overlooked And Usually Has To Be Replaced Once The Ceiling Tiles Are Relaced, The Sow Makes No Mention Of This. If We Find It Damaged And In Need Of Replacement, Will This Be A Bilateral Agreement Added Later On?
maintenance Techs Inspected And Stated That The Insluation Does Not Rest On The Ceiling Tiles. The Insulation Is Suspended Above The Tiles By Wire Mesh.
3.sow Mentioned Damaged Framework Above Grid Needs To Be Repaired. Are There Any Pictures Of The Damaged Areas?
frf Is Designated As A Temporary Secure Work Area (tswa) & No Pics Are Allowed.
4.at Which Point Will A Decision Be Made Of Repair Or Total Replacement Of The Grid If It Needs To Be Replaced In Its Entirety?
the Replacement Of All Ceiling Tiles And All Metal Framing Is Stated On The Sow As A Requirement.
5.there Are Stages At Which The Remediated Area Will Need To Be Put Back Into Service, Once Clearance Is Achieved. 1.1 Replacement Of Hvac Duct Work If It Is Found Uncleanable (this Will Be Skipped If Ductwork Is Cleaned) 1.2 Bent Framework Needs To Be Corrected 1.3 Insulation Needs To Be Replaced 1.4 Tiles Will Need To Be Replaced And Any Fitting Of Tiles Will Be Done At This Time. 1.5 Final Cleaning And Turnover To Client. The Question Will Be, Is The Awarded Vendor Responsible For The Purchasing Of Ceiling Tiles And Insulation, And Subcontracting The Hvac Contractor If The Ductwork Is Uncleanable?
yes.
6.is There A Mold Remediation Protocol As Completed By A Licensed Tdlr Mac? Can That Be Provided?
unfortunately, We Do Have The Experience Nor Have An Sme On Site To Answer Those Questions.
7.this Is A Tdlr Notifiable Project. That Must Be Completed And Filed Will It Be A Routine Or Emergency Project?
unfortunately, We Do Have The Experience Nor Have An Sme On Site To Answer Those Questions.
8. Will The 3rd Party Clearance Be The Original Mac Or Will The Remediation Contractor Be Required To Coordinate That Effort?
it Is Our Understanding That Contractor Needs To Acquire Clearance Thru And Independent And Certified Vendor.
9.the Sow Calls For The Cleaning Of It Equipment; Are Those Units Running And Will They Remain Running During The Remediation?
yes, One It Rack Will Be Running.
10.what Was The Identified Underlying Cause Of The Fungal Growth? Has This Been Addressed Or Will That Be On The Contractor?
hvac Leak And Not Cooling Caused Excessive Moisture Buildup. Ac Leak To Be Repaired By Separate Contractor.
11.the Sow 2.0a States “service Area(s) – Vsab 1 Frf Approximate Amount Of Impacted Material - Shoes And Leather Chair, And Less Than 25 Sf Of Contiguous Visible Mold Growth” Was This Determined By A Tdlr Mac?
yes, Brighton Solutions.
12.was There A Previous Project For This Requirement Or Is This A New Requirement? We Would Like To Know If This Is A Brand New Contract Or If There Is (was) An Incumbent Performing These Services. If Not Brand New, Could You Please Provide The Current / Previous Contract Number?
no Previos Project. New Contract.
13.is There A Wage Determination?
wage Determination For The Denton Area Is Attached To This Solicitation.
14.can You Please Provide The Specifications Of The Ceiling Tiles?
fifth Avenue 280; 2 Ft X 4 Ft X 5/8 Inch; Commercial Equivalent, Fissured 562.
15.could You Kindly Confirm Which Section Or Specifications Detail The Protocol For This Project? Your Guidance Will Be Greatly Appreciated To Ensure My Understanding Aligns With The Requirements.
the Sow Lists This.
update 3: Poc Email For Site Visit Has Been Updated As Incorrect Email Was Provided Previously And Two Attachments Have Been Added Which Are The Two Reports Received From Brighton Solutions Regarding Theinitial Mold Assessment Report Of What They Discovered In The Frf Room.
update 2: Submission Deadline Extended To January 14, 2025 By 5:00 Pm Et.
update 1: Questions And Answers And Wage Determination Attached.
questions And Answers:
what Is The Square Footage Of The Frf Room Requiring Remediation? Frf Room Measures Approx 50’ X 50’, So 2,500 Sq Ft.
are There Any Known Water Sources/leaks That Need To Be Addressed As Part Of The Remediation? No Known Sources
what Type Of Mold Has Been Identified Through Testing, If Any? I Believe It Was Black Mold, (this Should Be In The Sow)
are There Any Special Security Clearance Requirements For Personnel? Yes, Every Employee Will Have To Have Pass An Ncic (national Crime Information Center) Check
what Are The Working Hours Allowed For Remediation Work? 7am To 4pm (m-f)
is There A Required Timeline For Completion After Award? The Sow Provides The Period Of Performance
are There Any Containment Requirements For Adjacent Spaces? No, However From The Contracting Officer's Representative Who Is A Non-sme, In Reading The Requirements From The Testing Company, Two Other Adjacent Areas At Least Need To Be Air-scrubbed. This Is Listed In The Sow.
what Is The Current Hvac System Configuration In The Affected Area? The Frf Has Its Own 15 Ton Conventional Ac Unit. It Is Dedicated Solely To The Frf Room.
are There Any Sensitive Equipment Or Materials That Need Special Protection During Remediation? Yes, There Is Some Rf Radio Equipment Racks And One It Equipment Rack.
is There A Designated Staging Area For Equipment And Materials? Yes.
the Awardee Will Provide All Necessary Labor And Materials To Perform The Work Required To Eradicate All Mold In The Frf Room.
1) Please See The Attached Statement Of Work For Requirements.
2) The Evaluation Criteria Is Shown In The Request For Proposal Attached To This Solicitation. The Offeror Must Address The Specifics Of The Evaluation Factors To Be Considered For Award.
3) Please Email The Contracting Officer Listed In The Request For Proposal With Any Questions You May Have.
site Visits Will Be Offered On January 8th, 2025 From 9:30am-2:00pm Cst. Please Contact David Perez At David.perez3@fema.dhs.gov To Schedule. Proposals Are Due January 14th, 2025 By 5:00 Pm/et.
Closing Soon14 Jan 2025
Tender AmountRefer Documents
451-460 of 551 active Tenders