Heater Tenders
Heater Tenders
DEPT OF THE NAVY USA Tender
Chemical Products
United States
Closing Soon29 Jan 2025
Tender AmountRefer Documents
Description: Contact Information|4|n774.3|gys|717-605-3918|russell.w.kreider.civ@us.navy.mil|
item Unique Identification And Valuation (jan 2023)|19||||||||||||||||||||
inspection Of Supplies--fixed-price (aug 1996)|2|||
wide Area Workflow Payment Instructions (jan 2023)|16|invoice And Receiving Report (combo)||to Be Determined|n00104|to Be Determined|to Be Determined|see Schedule|to Be Determined|see Schedule||to Be Determined||||||
navy Use Of Abilityone Support Contractor - Release Of Offeror Information (3-18))|1|wss Mechanicsburg|
equal Opportunity (sep 2016)|2|||
option For Increased Quantity (mar 1989)|1|365 Days After Contract Award Date |
alternate A, Annual Representations And Certifications (oct 2024)|13|x|||||||||||||
buy American-balance Of Payments Program Certificate-basic (feb 2024)|1||
annual Representations And Certifications (jan 2025)|13|333414|500|x|x||||||||||
notice Of Priority Rating For National Defense, Emergency Perpardeness, And Enrgy Progam Use (april 2008))|2||x|
a. Electronic Submission Of Any Quotes, Representations, And Any Necessary Certifications Shall Be Accomplished Via An Email Directed To Russell.w.kreider.civ@us.navy.mil.
b. General Requirements: Mil-std Packaging, Government Source Inspection, Fob Source, Cav Reporting.
c. This Rfq Is For Repair. The Resultant Award Of This Solicitation Will Be Issued Bilaterally, Requiring The Contractor's Written Acceptance Prior To Execution. Verify Nomenclature, Part Number, And Nsn Prior To Responding.
d. Only A Firm-fixed (ffp), Not-to-exceed (nte), Or Estimated (est) Price For The Repair Of The Subject Item(s) Will Be Accepted. Quotes Limited To Test And Evaluation (t&e) Will Not Be Accepted. The Quoted Price Must Be For The Repair Of The Item(s).
e. Must Adhere To Iuid Requirements Of Dfars 252.211-7003
f. The Ultimate Awardee Of The Proposed Contract Action Must Be An Authorized Repair Source. Award Of The Proposed Contract Action Will Not Be Delayed While An Unauthorized Source Seeks To Obtain Authorization.
g. The Government Is Requesting A Repair Turnaround Time (rtat) Of: 192 Days After Receipt Of Asset. Repair Turnaround Time (rtat) Definition: The Resultant Contractual Delivery Requirement Is Measured From Asset Return To The Date Of Asset Acceptance Under The Terms Of The Contract. For Purposes Of This Section, Return Is Defined As Physical Receipt Of The
f-condition Asset At The Contractor's Facility As Reflected In The Action Date Entry In The Commercial Asset Visibility (cav) System. In Accordance With The Cav Statement Of Work, The Contractor Is Required To Accurately Report All Transactions By The End Of The
fifth Regular Business Day After Receipt And The Action Date Entered In Cav Must Be Dated To Reflect The Actual Date Of Physical Receipt. The Contractor Must Obtain Final Inspection And Acceptance By The Government For All Assets Within The Rtats Established In
this Contract.
please Note Freight Is Handled By Navy Cav Or Proxy Cav As Stated In Navsupwssfa24 Or Navsupwssfa25.
throughput Constraint: Contractor Must Provide A Throughput Constraint For Each Nsn(s). Total Assets To Be Repaired Monthly After Initial Delivery Commences: _____/month (contractor Is To Fill In #). A Throughput Of "0" (zero) Per Month Reflects No Throughput
constraint.
induction Expiration Date: 365 Days After Contract Award Date. Any Asset Received After This Date In Days Is Not Authorized For Repair Without Bi-lateral Agreement Between The Contractor And Navsup Wss Contracting Officer.
h. Important Note:
reconciliation Price Reduction:
any Asset(s) For Which The Contractor Does Not Meet The Required Rtat Will Incur A Price Reduction Per Unit/per Month The Contractor Is Late. However, Any Delay Determined To Be Excusable (e.g. Government Delay) Will Not Result In A Price Reduction. If The
contractor Does Not Meet The Required Rtat Due To Inexcusable Contractor Delay, The Contracting Officer Will Implement The Aforementioned Price Reduction Via A "reconciliation Modification" At The End Of The Contract Performance. Price Reductions Made Pursuant To This Section Shall Not Limit Other Remedies Available To The Government For Failure To Meet Required Rtats, Including But Not Limited To The Government's Right To Terminate For Default.
in Reference To The Above Important Note, The Contractor Provides The Following Price Reduction Amount Per Unit/per Month The Contractor Does Not Meet The Rtat: $___________, Up To A Maximum Of: $__________. (vendor Is To Fill In Amount)
i. Your Quote Must Include The Following Information For Justification Purposes:
- Repair Unit Price ________________
- Total Price________________
- Repair Turnaround Time (rtat) _____________ Days
note: If You Are Not Quoting The Government's Requested Repair Turnaround Time (rtat) Or Sooner, You Must Provide Your Company's Capacity Constraints Below:
___________________________________________________________________________
___________________________________________________________________________
___________________________________________________________________________
- Indicate Price Type: Firm-fixed-price _____ Not-to-exceed (ceiling Price) _____ Estimated _____
- New Unit Price_________________
- New Unit Delivery Lead Time____________ Days
- T&e Fee/price (if Asset Is Determined Br/ber): If An Item Is Determined Br, And The Contractor Provides Documentation That Costs Were Incurred During Evaluation And Determination Of Br/ber, The Contracting Officer Will Negotiate A Reduced Contract Price, Not-to
exceed (nte) $___________associated With The Repair Effort To Reflect The Br Status Of The Equipment.
- The T&e Fee (if Asset Is Determined Br/ber) Was Determined Based On: ____________________________________________________________________
____________________________________________________________________
- Award To Cage:________
- Inspection & Acceptance Cage, If Not The Same As Award To Cage: _________
- Facility/subcontractor Cage (where The Asset Should Be Shipped To), If Not Same As Award To Cage. __________
- Facility/subcontractor Or Packaging Facility Cage (where The Asset Will Be Shipped From), If Not The Same As Award To Cage. ________
- Basis Of Quoted Pricing: ; Estimated Costs____ ; Historical Repair Pricing___ ;other ______________________________________________
- Cost Breakdown Requested, Including Profit Rate (if Feasible).
- Quote Expiration Date _______________________ (min Of 90 Days Is Requested).
- Delivery Vehicle (if Delivery Order Requested) (if Your Company Has A Current Boa/idiq, For Example)
j. Options
prospective Option Quantity Up To 100%
notes:
the Government Intends To Add An Option Quantity To The Resultant Contract. In Reference To The Option Quantity, The Government Requests Up To A 100% (2 Ea) Option For A Period Of 365 Days. The Option Grants The Government The Unilateral Authority To Increase
this Order Up To The Above Quantity Within 365 Days Of The Contract Award Date. This Will Incorporate Far Clause 52.217-6 (option For Increased Quantity) Into The Award. The Government May Increase The Quantity Of Supplies Called For In The Schedule At The Unit
price Specified. The Contracting Officer May Exercise The Option By Written Notice To The Contractor Within The Number Of Days In Far 52.217-6 Herein. Delivery Of The Added Items Shall Continue At The Same Rate As The Like Items Called For Under The Contract,
unless The Parties Otherwise Agree. A Modification Will Be Completed At The Time The Option Is Exercised And All Current Contract Terms And Conditions Will Apply To The Option Quantity.
please Indicate If The Contracting Officer May Exercise The 100% Option Quantity For The Contract.
yes ____ Or No ____
or If You Request A Variation To The Option Please Let Me Know In Your Quote.
\
1. Scope
1.1 This Contract/purchase Order Contains The Requirements For Repair And The Contract Quality Requirements For The Heater,fluid,electr .
2. Applicable Documents
2.1 Applicable Documents - The Document(s) Listed Below Form A Part Of This Contract/purchase Order Including Modifications Or Exclusions.
2.1.1 "document References" Listed Below Must Be Obtained By The Contractor. Ordering Information Is Included As An Attachment To This Contract/purchase Order.
3. Requirements
3.1 Cage Code/reference Number Items - The Heater,fluid,electr Repaired Under This Contract/purchase Order Shall Meet The Operational And Functional Requirements As Represented By The Cage Code(s) And Reference Number(s) Listed Below. All Repair Work Shall
be Performed In Accordance With The Contractors Repair/overhaul Standard Practices, Manuals And Directives Including But Not Limited To Drawings, Technical Orders, Manufacturing Operations, Tooling Instructions, Approved Repair Standards And Any Other
contractor Or Government Approved Documents Developed To Provide Technical Repair Procedures.
cage___ref. No.
;74924 350-142167;
3.2 Marking - This Item Shall Be Physically Identified In Accordance
with ;mil-std-130, Rev N, 16 Nov 2012; .
3.3 Changes In Design, Material Servicing, Or Part Number - Except For A Code 1 Change, Which Shall Be Processed As Provided In The Code Statement Shown Below, No Substitution Of Items Shall Be Made Until The Navicp-mech Contracting Officer Has Notified And
approval Has Been Given By Issuance Of A Written Change Order. When Any Change In Design, Material, Servicing Or Part Number Is Made To Replace Or Substitute Any Item To Be Furnished On This Contract/purchase Order, The Contractor Shall Furnish, For The
substituting/replacement Item, A Drawing And An Explanation Of The Reason For The Change, Explaining The Reason Therefor. If Finished Detail Drawings Are Not Available, Shop Drawings In The Form Used By The Manufacturer Will Be Acceptable For Government
evaluation. When Notifying The Procurement Contracting Officer Of The Reasons For Making Substitutions, The Type Of Change Shall Be Indicated By Code Number In Accordance With One Of The Following Statements:
code 1: Part Number Change Only - If The Manufacturer's Part Number Indicated Thereon Has Changed, But The Parts Are Identical In All Respects, Supply The Item And Advise Navicp-mech Immediately Of The New Part Number.
code 2: Assembly (or Set Or Kit) Not Furnished - Used Following Detail Parts.
code 3: Part Not Furnished Separately - Use Assembly.
code 4: Part Redesigned - Old And New Parts Are Completely Interchangeable.
code 5: Part Redesigned - New Part Replaces Old. Old Part Cannot Replace New.
code 6: Part Redesigned - Parts Not Interchangeable.
4. Quality Assurance
4.1 Responsibility For Inspection - Unless Otherwise Specified In The Contract/purchase Order, The Contractor Is Responsible For The Performance Of All Inspection Requirements As Specified Herein. Except As Otherwise Specified In The Contract/purchase Order,
the Contractor May Use His Own Or Any Other Facilities Suitable For The Performance Of The Inspection Requirements Specified Herein, Unless Disapproved By The Government. The Government Reserves The Right To Perform Any Of The Inspections Set Forth In The
specification Where Such Inspections Are Deemed Necessary To Assure Supplies And Services Conform To Prescribed Requirements.
4.2 Responsibility For Compliance - All Items Must Meet All Requirements Of This Contract/purchase Order. The Inspection Set Forth In This Specification Shall Become A Part Of The Contractor's Overall Inspection System Or Quality Program. The Absence Of Any
inspection Requirements Shall Not Relieve The Contractor Of The Responsibility Of Assuring That All Products Or Supplies Submitted To The Government For Acceptance Comply With All Requirements Of The Contract/purchase Order. Sampling In Quality Conformance
does Not Authorize Submission Of Known Defective Material, Either Indicated Or Actual, Not Does It Commit The Government To Acceptance Of Defective Material.
4.3 Records - Records Of All Inspection Work By The Contractor Shall Be Kept Complete And Available To The Government During The Performance Of Contract/purchase Order And For A Period Of 365 Calendar Days After Final Delivery Of Supplies.
4.4 Inspection/testing Repaired Items - The Contractor Shall Perform All Inspection And Testing Requirements As Specified In The Original Manufacturer's Specifications And Drawings.
5. Packaging
5.1 Preservation, Packaging, Packing And Marking - Preservation, Packaging, Packing And Marking Shall Be In Accordance With The Contract/purchase Order Schedule And As Specified Below.
mil-std 2073 Packaging Applies As Found Elsewhere In The Schedule
6. Notes
6.1 Ordering Information For Document References - The Department Of Defense Single Stock Point (dodssp), Website Http://www.dsp.dla.mil/, Provides Product Information For The Department Of Defense Index Of Specifications And Standards (dodiss)
(i.e.military/federal Specifications And Standards), Data Item Descriptions (dids), And Other Dodssp Products. Most Specifications Can Obtained Directly From Http://quicksearch.dla.mil/
a. Availability Of Cancelled Documents - The Dodssp Offers Cancelled Documentsthat Are Required By Private Industry In Fulfillment Of Contractual Obligationsin Paper Format. Documents Can Be Requested By Phoning The Subscription Services Desk.
b. Commercial Specifications, Standards, And Descriptions - These Specifications, Standards And Descriptions Are Not Available From Government Sources. Theymay Be Obtained From The Publishers Of The Applicable Societies.
c. Ordnance Standards (os), Weapons Specifications (ws), And Navord Ostd 600 Pages - These Type Publications May Be Obtained By Submitting A Request To:
commander, Indian Head Division, Naval Surface Warfare Center
code 8410p, 101 Strauss Avenue
indian Head, Md 20640-5035
d. On Post-award Actions, Requests For "official Use Only" And "noforn" (not Releasable To Foreign Nationals) Documents Must Identify The Government Contractnumber, And Must Be Submitted Via The Cognizant Defense Contract Management Command (dcmc) For
certification Of Need For The Document. On Pre-award Actions Such Requests Must Be Submitted To The Pco For Certification Of Need For The Document.
e. Noforn Military Specifications And Standards (including Amendments, Change Notices And Supplements, But Not Interim Changes) To Be Ordered From:
contracting Officer
navsup-wss
code 87321
5450 Carlisle Pike
p.o. Box 2020
mechanicsburg, Pa. 17055-0788
f. Nuclear Reactor Publications Assigned Navsea Documents And Identification Numbers (i.e. Navsea Welding Standard, Navsea 250-1500-1) Are To Be Ordered Enue:
commanding Officer
navsup-wss
code 009
5450 Carlisle Pike
p.o. Box 2020
mechanicsburg, Pa. 17055-0788
g. Technical Manuals Assigned Navsea Identification Numbers (i.e. Navsea Welding And Brazing Procedure, Navsea S9074-aq-gib-010/248) Are To Be Ordered From:
commanding Officer
navsup-wss
code 1 Support Branch
700 Robbins Avenue
philadelphia, Pa. 19111-5094
h. Interim Changes And Classified Specifications Must Be Obtained By Submitting A Request On Dd Form 1425 To Navsup-wss.
6.2 In Accordance With Opnavinst 5510.1 All Documents And Drawings Provided By The U.s. Navy To Perspective Contractors Must Include A "distribution Statement" To Inform The Contractor Of The Limits Of Distribution, And The Safeguarding Of The Information
contained On Those Documents And Drawings. There Are 7 (seven) Seperate Distribution Statement Codes Used For Non-classified Documents And Drawings. The Definition For Each Is As Follows:
a... Approved For Public Release; Distribution Is Unlimited.
b... Distribution Authorized To Us Governments Agencies Only.
c... Distribution Authorized To Us Government Agencies And Their Contractors.
d... Distribution Authorized To Dod And Dod Contractors Only.
e... Distribution Authorized To Dod Components Only.
f... Further Distribution Only As Directed By Commander, Naval Sea Systems Command, Code 09t.
x... Distribution Is Authorized To Us Government Agencies And Private Individuals Or Enterprises Eligible To Obtain Export Controlled Technical Data In Accordance With Opnavinst 5510.161.
6.3 Notice To Distributors/offerors - Consideration For Award Of Contract Shall Be Given Only To Authorized Distributors Of The Original Manufacturer's Item Represented In This Solicitation. If You Desire To Be Considered As A Potential Source For Award Of
this Contract, Proof Of Being An Authorized Distributor Shall Be Provided On Company Letterhead Signed By A Responsible Company Official And Sent With Your Offer To The Procurement Contracting Officer.
Department Of Energy Tender
Others
United States
Closing Date13 Jan 2026
Tender AmountRefer Documents
Details: Precision Steam Generation For High-temperature Electrolysis efficient, Low-temperature Hydrogen-steam Mixtures For Industrial Applications the Challenge consistent And Stable Steam Generation Is A Cornerstone Of High-temperature Electrolysis Systems, Where Fluctuating Flow Rates, Pressure Variations, And Imprecise Fuel Compositions Can Severely Hinder Efficiency. Traditional Methods, Such As Boilers, Bubblers, Or Hot Plate Vaporizers, Often Fall Short Due To Their High Energy Demands And Inability To Utilize Low-temperature Waste Heat Effectively. For Industries Advancing Hydrogen Production And Energy Efficiency, There’s A Critical Need For A Solution That Ensures Reliability Without Adding Significant Thermal Load. how It Works the Hydrogen Enhanced Evaporation System Offers An Innovative Method For Creating Hydrogen-steam Mixtures: hydrogen Injection: Controlled Hydrogen Flow Enters A Packed Column Designed For Maximum Surface Area Contact. thermal Gradient Control: A Temperature-controlled Gradient Is Established Along The Column, From Cooler Inlets To Heated Outlets, Using Electric Heaters Or Embedded Heat Exchangers. water Integration: Water Is Introduced At Specific Column Points, Mass Flow-controlled, And Evaporated Into The Hydrogen Stream Via Contact With Heated Surfaces, Achieving Precise Mixture Compositions. low-temperature Efficiency: Steam Is Generated At Sub-boiling Temperatures (<100°c), Significantly Lowering The Energy Threshold And Enabling The Use Of Low-grade Waste Heat. this Method Marries The Precision Of Vaporization With The Stability Of Evaporation While Eliminating The Pitfalls Of Condensation Or Pressure Fluctuations. key Advantages reduced Energy Demands: Operates With Low-grade Heat Sources, Reducing Thermal Energy Costs. exact Control: Achieves Precise Hydrogen-steam Ratios Through Controlled Flow And Temperature Management. minimized Pressure Variations: Evaporation-based Process Prevents Pressure Inconsistencies Common In Traditional Methods. enhanced Efficiency: Fully Evaporates Water Without Boiling, Optimizing Heat Utilization And Stability. versatility: Works With Various Thermal Energy Sources, Including Renewable And Waste Heat Systems. market Applications hydrogen Electrolysis Systems: Supporting Consistent Fuel Input For Optimal Electrolyzer Efficiency In Hydrogen Production Plants. industrial Heating Systems: Enabling Better Integration Of Low-grade Heat Sources In Processes Requiring Controlled Steam Mixtures. energy Recovery Systems: Utilizing Waste Heat From Industrial Operations To Produce Hydrogen-steam Mixtures Economically. renewable Energy Integration: Supporting Green Hydrogen Initiatives By Reducing Dependency On High-temperature Energy Inputs. inl’s Technology Deployment Department Focuses Solely On Licensing Intellectual Property And Collaborating With Industry Partners Who Can Commercialize Our Innovations. we Do Not Engage In Purchasing, Procurement, Or Hiring External Services For Technology Development. Our Objective Is To Connect With Companies Interested In Licensing And Bringing Our Technologies To Market.
EN PROCURE LIMITED Tender
United Kingdom
Closing Date16 May 2026
Tender AmountRefer Documents
Details: This Procurement Will Establish And Maintain A Dynamic Purchasing System (dps) For Energy Efficiency Retrofit Installation Works Predominantly To Social Housing And Private Domestic Properties But May Extend To Other Property Types That Are Owned Or Managed By En:procure Members/licensees. The Lots Are: • Lot 1: Cavity Wall Insulation Including That Installed In Party Walls (b1) • Lot 2: Draught Proofing (b2) • Lot 3: Energy Efficient Glazing And Doors Including Replacement Insulating Glass Units (igu) (b3) • Lot 4: External Wall Insulation (b4) • Lot 5: Flat Roof Insulation (b5) • Lot 6: Floor Insulation (b6) • Lot 7: Hybrid Wall Insulation (b7) • Lot 8: Internal Wall Insulation (b8) • Lot 9: Loft Insulation (b9) • Lot 10: Pitched Roof Insulation (b10) • Lot 11: Room-in-roof Insulation (b12) • Lot 12: Multiple Insulation Measures And/or Draughtproofing (2 Or More B1,2,3,4,5,6,7,9,9,10 And/or 12) • Lot 13: Condensing Boilers, Natural Gas-fired And Liquefied Petroleum Gas-fired And Flue-gas Heat Recovery Devices (c1 & C3) • Lot 14: Heating, Hot Water System, Air Conditioning Or Ventilation Controls And Components (chp Etc) (c5) • Lot 15: Mechanical Ventilation With Heat Recovery (c7) • Lot 16: Warm-air Heating Systems (c9) • Lot 17: Electric Storage Heaters (including Electric Warm Air Heating Units That Incorporate Heat Storage) (d1) • Lot 18: Lighting Fittings, Lighting Systems And Lighting System Controls (d2) • Lot 19: Solar Pv • Lot 20: Solar Thermal • Lot 21: Air Source Heat Pump • Lot 22: Ground Source Heat Pump • Lot 23: Smart Heating Controls/monitoring • Lot 24: Integrated Systems (solar Pv, Battery Storage And Heat Pump) • Lot 25: Whole House Retrofit Solutions (combinations Of Any Measures From Above) Each Lot Will Be Subdivided Into A, B & C Where Each Lot Predominantly Covers The Following Geographical Areas Within England: • A Is Yorkshire And Humber • B Is East Midlands And • C Is North West Regions This Is Supplementary To Previous Notice - Https://www.contractsfinder.service.gov.uk/notice/be165d89-07ff-4151-b420-e55597b46473?origin=searchresults&p=1 Tender Documents Can Be Accessed Free Of Charge At - Https://procontract.due-north.com/advert?advertid=13ac382b-c990-eb11-810c-005056b64545&fromprojectdashboard=true
DEPT OF THE AIR FORCE USA Tender
Civil And Construction...+3Building Construction, Consultancy Services, Civil And Architectural Services
United States
Closing Date6 Feb 2025
Tender AmountRefer Documents
Details: Synopsis For Firm-fixed-price Contract – Architect-engineering (a-e) Services (full
and Open) To Support The Design Of The Renovation Project Xtlf 21-1035 Add_repair Fire Station,
f140 At Vance Afb, Oklahoma. this Announcement Is Not A Request For Proposal. Neither The Government Nor
asrc Federal Field Services (affs) Will Pay Or Reimburse Any Costs Associated
with Responding To This Request. The Government And Affs Is Under No
obligation To Award A Contract As A Result Of This Announcement. 1. Contract Information
this Requirement Is Being Procured In Accordance With The Brooks Act As Implemented In Far 36.6. Firms
will Be Selected For Negotiation Based On Demonstrated Competence And Qualifications For The Required
work. Refer To Section, “5. Selection Process”, For General Information On The A-e Selection Process.
a-e Services Are Required For Site Investigation, Engineering Studies, Concept Design, Final Design, And
minimal Construction Phase Services For The Subject Project. The Applicable Naics Code Is 5413,
architectural, Engineering, And Related Services. This Announcement Is Open To All Businesses
regardless Of Size. Affs Is Contemplating Awarding A Firm Fixed Price Contract. The Contract Is Anticipated
to Be Awarded In March 2025 And Design Completed In Or Before March 2026. all Firms Will Be Required To Submit Sf330 For This Sources Sought Notice. Only A-e Teams Responding To
this Solicitation And Found To Be Qualified Will Be Considered For The Award Of The Design Project. 2. Project Information this Project Is To Renovate The Combination Fire Station, F140. The Facility Is A One-story
building And Was Constructed In 1968. The Facility Was Expanded With Building Additions In 1995 And
2004. The Current Size Of The Building Is 18,116 Gross Square Feet. The Size, Configuration, And
condition Of This Facility Do Not Align With Requirements Of Dafman 32-1084 And Ufc 4-730-10.
renovation Scope To Include Site, Building Envelope, Building Interiors, And Engineering Systems. site Scope Includes Grading And Drainage Design, Utility Relocation, Establishment Of An Aba
accessible Route From Parking To The Building’s Main Entrance, Parking Lot Striping, And
miscellaneous Sidewalk Repairs. the Project Will Require The Demolition Of A Portion Of The Facility Which Includes Office Areas. A
building Addition Consisting Of A New Training Room, Designed To Meet Storm Shelter Criteria,
administrative Offices And Public Toilet Rooms Will Be Constructed Where The Existing Office Area Has Been Demolished. building Envelope Scope Includes Replacement Of All Exterior Glazing And Glazing Systems,
replacement Of All Roofing, Refinishing Of Exterior Walls, Modifications To Apparatus Bay Door
openings, And Replacement Of All Exterior Doors And Frames. the Architectural Interior Scope Of Work Consists Of A Redesign Of Several Interior Spaces To
enable The Enlargement Of The Firefighter Toilet/shower Rooms, The Relocation And Proper Sizing Of
additional Support Offices And Functions, The Complete Removal And Replacement Of All Finishes Down
to The Metal Studs In The Existing Dorm Rooms. In The Dorm Rooms The Demolition May Also Include
metal Wall Framing If It Is Determined To Need Replacement. Finishes Such As Paint, Ceiling Tiles,
and Flooring Will Be Replaced In Rooms Not Otherwise Modified For Changes In Function. renovation Scope To Achieve Aba Compliance For Spaces That Are Lightly Renovated Includes New
signage, Adjustments To Door Hardware, And Relocation Of Controls, Light Switches, And Outlets As
required. The Vestibules To The Day Room Are Not Aba Compliant And Will Be Demolished And
reconstructed As A Part Of This Project. structural Scope Consists Of The Engineering Design Required To Support The New Building Addition,
the Modifications Necessary To Increase The Size Of The Apparatus Bay Openings, Modifications To
load Bearing Walls Where New Openings Are Required, And General Modifications Where Required To
incorporate The Work Of Other Engineering Disciplines, And/or Because Of An Observed Deficiency, Or
code Or Ufc Related Deficiency. renovations To The Existing Fire Protection Systems Includes Adjusting The Existing Fire Sprinkler
system As Required To Accommodate Both Floor Plan And Ceiling Changes. Additionally, This Project
will Upgrade The Fire Alarm System To Include An Emergency Voice Communication System, A Gas
detection System, Provide A New Fire Alarm Interface To Building Life Safety Systems Including Fire
sprinkler Monitoring, Provide Low Temperature Sensors In The Apparatus Bays, An Hvac Interface,
in-building Mass Notification System, And An Automatic Fire Sprinkler System Throughout The
building. The Fire Alarm Control Unit (facu) Will Be Relocated To The New Primary Building
entrance. plumbing Scope To Include Engineering Design To Support Replacement Of The Existing Domestic Water
hot Water Heater, Replacement Of All Existing Plumbing Fixtures And Installation Of New Connections
where Required By Changes To The Floor Plan. Additionally, All Domestic Water Piping To Be Replaced
back To The Point Of The Incoming Service. hvac Scope Includes Engineering Design To Support Completely New Systems Throughout The Facility.
all Existing Below Grade Ductwork Will Be Abandoned And Sealed. A New Building Automation System
will Be Installed For The Facility. electrical Engineering Scope Includes Design Necessary To Replace Multiple Existing Electrical
panels, New Automatic Transfer Switches For Separating The Load From The Generator Into Emergency
loads And Backup Loads. Lighting Will Be Replaced Throughout The Facility. environmental Scope Of Work Requires Preparation Of Criteria To Address The Abatement Of Acm In
vibration Joints In The Mechanical Room And Encapsulated In The Fire Doors. project Will Require Sustainability Design And Compliance With Either The Gbci “guiding Principles
assessment For Department Of Defense” Program Or The Gbi “department Of Defense Guiding Principles
compliance For New Construction & Comprehensive Replacement” Program. sequencing Plans Will Be Required To Demonstrate How The Renovation Will Take Place Without
impacting The Mission Of The Firefighters. 3. Response To Solicitation Submission Requirements:
a-e Teams Will Be Selected In Accordance With Far Section 36.602-1. A-e Teams Must Submit A Sf330
package Of Qualifications For Review By Affs And Approved By Vance Afb Government Personnel. 4. Solicitation Submission Requirements
the Sf330, Parts A Thru G Should Be Limited To 25 Numbered Pages (8.5”x11”) Of Easily Readable Text
(size 11 Font), Graphics And Pictures. Part H May Also Be Included, Is Not Limited In Length, And
is Not Required, But Is Encouraged. 5. Selection Process
the Intent Of The Affs And A-e Team Arrangement Is To Facilitate The Timely, Transparent, And Efficient Teaming Between The A-e Teamand Affs To Meet The Needs Of Vance Afb.
upon Receipt Of The Sf330 Packages, A Committee Comprised Of Affs Staff Architects, Engineers, And
leadership Will Review The Package According To Far 36.602-2 Thru 36.602-4.
submissions Will Be Evaluated Based On Stated Services In The Sf330. 1. Each Committee Member Will Independently Review The Sf330s And Evaluate The Suitability Of Each A-e Team For This Contract Based On The Submission Requirements Listed Above. 2. The Committee Will Meet, And By Consensus Agree To A Short-list Of The Most Qualified A-e Teams For Progessing To The Next Step For The Selection Process Based On The Provided Information In The Sf330. 3. The Most Qualified Teams Will Be Invited To An Aprpoximately 30 Minute Telephone/virtual Interview For The Purpose Of Answering Clarifying Questions Related To Their Sf 330 Submission. 4. Upon Conclusion Of The Interviews, The Committee Will Rank The Most Qualified Teams. The Rankings Will Be Shared With The 71st Iss/ce Flight Representatives. With Concurrence, Affs Local Purchase Will Provide The Highest Rank Team The Statement Of Work In Order To Begin Negotiating A Fee For The Project. upon Successful Conclusion Of The Fee Negotiations, The A-e Team Will Proceed With The Design
process In Accordance With The Statement Of Work And At The Direction Of The Affs Managing
architect Or Engineer. please See All Attached Forms: Please Submit All Qualifications To The Following Email Address: shari.lamunyon.ctr@us.af.mil please Note That All Attached Forms Should Be Filled Out And Sent Separately From The #4 Solicitation Submission Requirements .do Not Included These As Part Of The (limited To 25 Numbered Pages). all Qualifications Are Due By The 6th Of February 2025 11:00 Am (cst)
DEPT OF THE NAVY USA Tender
Others
United States
Closing Soon29 Jan 2025
Tender AmountRefer Documents
Details: ***this Is A Sources Sought Notice Only*** this Is A Sources Sought Announcement For The Purposes Of Market Research Only In Support Of “b983 Renovate Galley The U.s. Naval Air Facility (naf), Atsugi, Japan”. The Information Received Will Be Utilized Within The Navy To Facilitate The Decision Making Processes And Will Not Be Disclosed Outside Of The Agency. No Reimbursement Will Be Made For Any Costs Associated With Providing Information In Response To This Notice Or Any Follow-up Information Requests. This Notice Does Not Constitute A Request For Proposal, Request For Quote, Or Invitation For Bid And Is Not Construed As A Commitment By The Government For Any Purpose Other Than Market Research. naval Facilities Engineering Systems Command Far East (navfac Fe), Public Works Department (pwd) Atsugi Is Seeking Information On Eligible Business Firms Capable Of Performing Replace Chiller At The Naval Air Facility Atsugi, Japan. general Information per Federal Acquisition Regulation (far) 15.201(e), Responses To This Notice Are Not Offers And Cannot Be Accepted By The Government To Form A Binding Contract. the North American Industry Classification System (naics) Code For This Procurement Is 236220: Commercial And Institutional Building Construction. The Contractor Is Required To Complete The Entire Work, Ready For Beneficial Occupancy Date (bod) Not Later Than 330 Calendar Days From The Date Of Award, And Execute Contract Completion Date (ccd) Within 90 Calendar Days After Bod. To Secure The Government Operation Over Entire On-site Work Period Including Change Of Season, Some Particular Work Including But Not Limited To, Disconnection And Reconnection Of Some Pipings, Must Complete Within A Whole April When An Air-conditioning System Is Expected To Turn Off. The Magnitude Of This Project Is 100,000,000 Jpy – 500,000,000 Jpy. description Of Work the Contractor Shall Provide All Labor, Management, Supervision, Tools, Material, And Equipment Required For Replacement Of Existing Utilities, Floor, Walls, Toilet Rooms, Freezer Room, Unit Coolers, Walk-in Refrigerator And Freezer, Electrical Panel Heaters, Exhaust Fans, Domestic Water System, Dishwasher, And Removal Of Asbestos Containing Material And Material Containing Lead. The Work Also Includes Related Work Which Is Defined As Temporary Work And Relevant Work Required To Accomplish This Project. This Work Does Not Include Unforeseen Site Conditions. contractor License Requirement any Contract Resulting From This Solicitation Will Be Awarded And Performed In Its Entirety In The Country Of Japan. Contractors Must Be Duly Authorized To Operate And Conduct Business In Japan And Must Fully Comply With All Laws, Decrees, Labor Standards, And Regulations Of Japan During The Performance Of The Contract. Contractors Must Be Registered To Do Business And Possess An Appropriate License Issued By The Ministry Of Land, Infrastructure And Transport Or Prefectural Government In Order To Perform Work Under This Contract. status Of Forces Agreement (sofa) the U.s. Government Will Not Offer “united States Official Contractor” Status Under Article Xiv Of The U.s.-japan Status Of Forces Agreement (sofa) To Any Offeror Awarded A Contract Under This Solicitation; Nor Will The U.s. Government Intend To Certify Any Employees Of A Contractor As “members Of The Civilian Component” Under Article I (b) Of The Sofa. submittal Requirements: interested Firms Should Submit Information As To The Capabilities, Capacity And Experience To Perform The Tasks Set Forth Above. The Statement Of Capability (soc) Will Determine The Feasibility And/or Basis For The Navy’s Decision To Proceed With Acquisition. interested Firms Must Submit An Soc, Which Describes, In Detail, The Firm’s Capability Of Providing These Services At Various Military And Other Federal Facilities Worldwide. Your Soc Shall Include The Following: (1) Full Name And Address Of The Firm; (2) Indicate If The Firm Is Registered In The Department Of Defense (dod) System For Award Management (sam) Database, Include Unique Entity Id And Cage Code; And (3) List Up To Three (3) Similar Projects Performed Within The Last Five (5) Years. Provide The Following Information For Each Project As Much As Possible: a) Contract Number And Project Title; b) Name Of Contracting Activity; c) Administrative Contracting Officer’s Name, Current Telephone Number; d) Period Of Performance (start Date And Completion Date); e) Basic Contract Award Amount And Final Contract Value; f) Summary Of Contract Work; interested Sources Do Not Need To Meet Joint-venture Requirements At This Point Since This Sources Sought Notice Is Solely For Market Research Purposes And Not For A Bid. respondents Will Not Be Notified Of The Results Of The Navy’s Market Research. Navfac Fe Will Utilize The Information For Acquisition Planning Purposes. All Data Received In Response To This Source Sought Notice Marked Or Designated, As Corporate Or Proprietary Information Will Be Fully Protected From Release Outside The Government. please Respond To This Sources Sought Announcement Electronically To Ms. Rie Hanazato At Rie.hanazato.ln@us.navy.mil By 29 January 2025 At 17:00 (japan Standard Time) Using The Email Subject Line “sources Sought N4008425b8005 B983 Renovate Galley”. responses Received After The Deadline Or Without The Required Information Will Not Be Considered. Since This Is A Sources Sought Announcement Only, Evaluation Letters Will Not Be Issued To Any Respondent.
NATIONAL INSTITUTE OF STANDARDS AND TECHNOLOGY USA Tender
Others
United States
Closing Soon31 Jan 2025
Tender AmountRefer Documents
Details: Nist-ss25-13 6695 / 334516 title: Low-noise And Low-drift Closed-loop Cryogenic Microscope System, Including Nanopositioners And Cryogenic High-na Optical Objective background the Mission Of The Quantum Optics Group Of The Quantum Measurement Division Is To Develop And Characterize Measurement Methods That Take Advantage Of The Quantum Nature Of Light To Achieve Better Performance And Uncertainties Or To Enable New Applications That Are Not Possible With Classical Methods And Light Sources. Therefore, One Of The Most Important Aspects Of Quantum Measurement Division’s Research Is To Demonstrate A Prototype Of A High-efficiency Deterministic Single-photon Source In A Telecom Band. This Source Is An Essential Component For Quantum Communications And For Future Scalable Quantum Computer Networks. Operation Of The Source Requires A Low-noise And Low-drift Closed-loop Cryogenic Microscope System, Including Nanopositioners And Cryogenic High-na Optical Objective. nist Will Use The System To Accommodate A High-efficiency Deterministic Single-photon Source In Telecom C-band, For Applications Ranging From Classical And Quantum Telecommunication Networks, In-situ Source Recognition And Classification, And Quantum Effects In Biological Systems. This Device Shall Be Optimized For High-efficiency Coupling Of C-band Telecom Photons Produced By Quantum Dots. This Device Will Be An Integral Component In Nist’s Physical Measurement Laboratory’s Quantum Measurement Division’s Laboratory. It Will Be Used To Study Single-photon And Entangled Light State Generation For Quantum Networks And Quantum Information Science. Light Emitted From The Quantum Dots Will Be Coupled Into The Fiber For Experiments And Characterization. nist Has A Need For A Low-noise And Low-drift Closed-loop Cryogenic Microscope System, Including Nanopositioners And Cryogenic High-na Optical Objective That Meet Or Exceed The Following Draft Minimum Specifications: contract Line-item Number (clin) 0001: The Contractor Shall Provide A Closed-loop Helium Cryostat With Compressor And Vacuum Pump To Include Free-space Experimental Chamber With Xyz Nanopositioning Stages And High Numerical Aperture (na) Objective That Meet The Following Minimum Specifications: operating Ambient Temperature: Between 295 K Or Less And 305 K Or More experimental Chamber: cold Stage Base Temperature ≤ 3.8 K. temperature Range: 3.8k To 320k (cold Plate With No Additional Stages) temperature Stability < 15 Mk Peak-to-peak Fluctuations With Damped Sample Mount cooling Power ≥ 170 Mw At 5 K Or ≥ 130 Mw At 4.2 K cooldown Time To 5 K ≤ 4.5 Hours. cold Plate Vibration Stability <5 Nm Peak-to-peak Fluctuation In X, Y,& Z Axis dc Electrical Access: ≥ 16 Available Dc Feed-throughs For Future Ues (i.e. Not Counting Feed-throughs Already In Use E.g. For Nanopositioning Stage, Temperature Monitoring, Etc.). rf Electrical Access: ≥ 2 X Rf Connections (50 Ohm Coaxial, 18 Ghz). nanopositioning Stage (see Description Below) Installed. the System Includes Two Fiber Optic Feedthroughs Compatible With Smf-28. at Least 5 Optical Access Ports, With Two Windows (one Cold And One Warm) On Each Port. Ports Must Be Reconfigurable To Easily Replace Windows. free-space Optical Access: ≥ 5 Windows (≥ 25 Mm Diameter) With <5 % Loss At Wavelengths From 1450 Nm To 1650 Nm the System Should Be Deployable To An Optical Lab With Optical Tables. internally Housed And Vertically Mounted Microscope Objective Holder. The Holder Must Be Temperature-regulated With A Heater And Thermometer, Allowing The User To Select And Hold The Objective Between 250 K – And 310 K Throughout The Entire Duration Of The Cooldown Cycle. the System To Include At Least Two Interchangeable Sample Holders: One With 16 Dc Wires, And One Flat Sample Holder. the Top Optical Access Window Must Have Threaded Holes (or Set Screw Holes) That Allow For An External Fiber Coupler Mount Via Thorlabs 30 Mm Cage System. objective: ≥0.8 Na Objective. working Distance: < 1.3 Mm. optical Loss <20% Everywhere In The Wavelengths Range From 1150 Nm To 1620 Nm. temperature And Pressure Compatible With The Experimental Chamber. mounted In The Experimental Chamber Using A User-removable Mount. vertical Mount Compatible. nanopositioning Stage: installed In The Experimental Chamber – Thermally Coupled To Cold Plate. system Needs To Include Integrated Cryogenic Closed-loop X, Y, And Z Nanopositioners And Controller. Each Axis Equipped With A Travel Range Of At Least 4.8mm Or More. sensor Resolution Per Direction: <= 200 Nm. ability To Operate The Nanopositioner In An Open Loop Mode With Fine (sub-nm) Positioning Via Adjusting A Dc Voltage. non-magnetic. unidirectional Repeatability: <= 5 Microns (closed Loop). operating Temperature: <= 3 K. operating Pressure: <= 10-8 Torr. closed Loop Control For All Nanopositioners; Pc Control With Applicable Software. vibrations On The Sample Holder (peak-to-peak): xy: 100 Nm Or Smaller z: 50 Nm Or Smaller bandwidth: Up To At Least 100 Hz Or More relative Drift Between A Sample And Objective Focal Point At The Base(fixed) Temperature, Without A Thermal Load: < 50 Nm/hour Or Smaller compressor: type: Air-cooled. helium Connection: Appropriate ≥ 30 Ft Flexible Tubing(hoses) electrical Connection: 208 V @60 Hz 1 Phase Or 110 V @60hz 1 Phase As Appropriate To Provide And Maintain The Above Performance. continuous Operation Cryostat Without The Use Of Extra-instrument Liquid Cryogens fully Automated Pump, Cooldown, Temperature Stabilization, And Warmup. The System Should Include All Necessary Pumps, Controllers, And Compressors. vacuum: the Cryostat System Shall Have The Vacuuming Capability That Results In The Above-required System Features And Performance Capacities. software the Cryostat System Shall Include Automated Operational And Temperature Control Software And Motion Control Software. control Software That Is Capable Of Running Automated Program Scripts From Matlab, Labview, And Python additional Requirements: the Cryostat Temperature Should Be Held For At Least 24 Hours With No Thermal Load system Shall Be Air-cooled target Temperature At The Sample Of 3.8 K Or Lower 110v Or 208v @60hz/1-phase Compressor the System Must Support The Modification To A Different Wavelength Range By The User E.g. To Support Replacement Of Installed Optical Elements With The Elements With Different Antireflection Coating how To Respond To This Notice in Responding To This Notice, Please Do Not Provide Proprietary Information. Please Include Only The Following Information, Readable In Either Microsoft Word 365, Microsoft Excel 365, Or .pdf Format, In The Response. Submit The Response By Email To The Primary Point Of Contact And, If Specified, To The Secondary Point Of Contact Listed At The Bottom Of This Notice As Soon As Possible, And Preferably Before The Closing Date And Time Of This Notice. provide The Complete Name Of Your Company, Address, Name Of Contact For Follow-up Questions, Their Email, Their Phone Number And, If Your Company Has An Active Registration In Https://sam.gov, Your Company’s Unique Entity Id (uei). details About What Your Company Is Capable Of Providing That Meets Or Exceeds Nist’s Minimum Requirements. whether Your Company Is An Authorized Reseller Of The Product Or Service Being Cited And Evidence Of Such Authorization. identify Any Aspects Of The Description Of The Requirements In The Background Section Above That Could Be Viewed As Unduly Restrictive Or Create Unnecessary Barriers That Adversely Affect Your Firm’s Ability To Fully Participate In A Procurement For Such Services And Explain Why. Please Offer Suggestions For How The Requirements Could Be Organized Or Structured To Encourage The Participation Of Small Businesses. for The Naics Code indicate Whether Your Company Is (a) A Small Business Or (b) Other Than Small Business. See The Table Of Small Business Size Standards And The Associated .pdf Download File For Small Business Size Standards And Additional Information. if You Believe The Naics Code Listed In This Notice Is Not The Best Naics Code For The Type Of Product Addressed In This Notice, Identify An Alternative Naics Code That You Believe Would Be More Appropriate For The Planned Procurement. if Your Firm Has Existing Federal Supply Schedule Contract(s) Or Other Contracts For Products Or Services Against Which The Department May Be Able To Place Orders, Identify The Contract Number(s) And Other Relevant Information. describe Your Firm’s Experience (as A Prime, Subcontractor, Or Consultant) Providing The Products Or Services Described In Background Section. provide Any Other Information That You Believe Would Be Valuable For The Government To Know As Part Of Its Market Research For This Requirement. please Let Us Know If You Would Like To Engage To Get A Better Understanding Of The Requirement Or Need Additional Information About The Government’s Requirement For The Products Or Services Described In The Background Section. questions Regarding This Notice questions Regarding This Notice May Be Submitted Via Email To The Primary Point Of Contact And The Secondary Point Of Contact Listed In This Notice. Questions Should Be Submitted So That They Are Received By 5:00 P.m. Eastern Time On January 23, 2025. Questions Will Be Anonymized And Answered Via Sources Sought Notice Amendment Following The Question Submission Deadline. important Notes the Information Received In Response To This Notice Will Be Reviewed And Considered So That The Nist May Appropriately Solicit For Its Requirements In The Near Future. this Notice Should Not Be Construed As A Commitment By The Nist To Issue A Solicitation Or Ultimately Award A Contract. this Notice Is Not A Request For A Quotation. Responses Will Not Be Considered As Proposals Or Quotations. no Award Will Be Made As A Result Of This Notice. nist Is Not Responsible For Any Costs Incurred By The Respondents To This Notice. nist Reserves The Right To Use Information Provided By Respondents For Any Purpose Deemed Necessary And Appropriate. thank You For Taking The Time To Submit A Response To This Request.
Stadt Finsterwalde Tender
Others...+2Civil And Construction, Civil Works Others
Germany
Closing Soon30 Jan 2025
Tender AmountRefer Documents
Details: Lot 20 Heating/ventilation/sanitary 10 pcs. Floor drains With sludge bucket Approx. 50 m stainless steel drinking water pipe 1 sink system With small instantaneous water heater 1 pc. Heating pump group With distributor bar Approx. 70 m stainless steel system pipe Heating up to Dn 25 5 pcs. Ceiling radiant panels Delivery lengths 2-5 m 1 pc. Flat radiator 6 pcs. Pendulum fan With control
Airports Authority Of India - AAI Tender
Electrical Cables And Wires...+1Electrical and Electronics
GEM
India
Closing Soon27 Jan 2025
Tender AmountINR 3.5 Million (USD 41.6 K)
Description: BOQ ITEMS: Supply of 1.5 Sq.mm of Single core multi strand FR-LSH PVC Insulated Industrial Grade Copper Conductor (Unsheathed) Flexible cables, 1100 Volt Conforming to IS 694, Supply of 2.5 Sqmm. Single core multi strand FR-LSH PVC Insulated Industrial Grade Copper Conductor (Unsheathed) Flexible cables, 1100 Volt Conforming to IS 694, Supply of 4.0 Sqmm. Single core multi strand FR-LSH PVC Insulated Industrial Grade Copper Conductor (Unsheathed) Flexible cables, 1100 Volt Conforming to IS 694, Supply of 3CX1.5 Sq.mm FRLS PVC insulated and PVC Sheathed, Multicore, Multi strand Annealed Bare Copper Conductor (flexible) industrial cable for Voltage Grade 1100 Volt, Conforming to IS 694, Supply of 3CX2.5 Sq.mm FRLS PVC insulated and PVC Sheathed, Multicore, Multi strand Annealed Bare Copper Conductor (flexible) industrial cable for Voltage Grade 1100 Volt, Conforming to IS 694, Supply of 3CX4 Sq.mm FRLS PVC insulated and PVC Sheathed, Multicore, Multi strand Annealed Bare Copper Conductor (flexible) industrial cable for Voltage Grade 1100 Volt, Conforming to IS 694, Supply of 4CX1.5 Sq.mm FRLS PVC insulated and PVC Sheathed, Multicore, Multi strand Annealed Bare Copper Conductor (flexible) industrial cable for Voltage Grade 1100 Volt, Conforming to IS 694, Supply of 4CX2.5 Sq.mm FRLS PVC insulated and PVC Sheathed, Multicore, Multi strand Annealed Bare Copper Conductor (flexible) industrial cable for Voltage Grade 1100 Volt, Conforming to IS 694, Supply of 4CX4 Sq.mm FRLS PVC insulated and PVC Sheathed, Multicore, Multi strand Annealed Bare Copper Conductor (flexible) industrial cable for Voltage Grade 1100 Volt, Conforming to IS 694, Supply of 4CX10 Sq.mm FRLS PVC insulated and PVC Sheathed, Multicore, Multi strand Annealed Bare Copper Conductor (flexible) industrial cable for Voltage Grade 1100 Volt, Conforming to IS 694, Supply of 4CX16 Sq.mm FRLS PVC insulated and PVC Sheathed, Multicore, Multi strand Annealed Bare Copper Conductor (flexible) industrial cable for Voltage Grade 1100 Volt, Conforming to IS 694, Supply of 6A to 32A rating, 240/415V, 10kA, C Curve miniature circuit breaker suitable for inductive load of Single pole in the existing MCB DB, Supply of 6A to 32A rating, 240/415V, 10kA, C Curve miniature circuit breaker suitable for inductive load of Double pole suitable for existing MCB DB, Supply of 6A to 32A rating, 240/415V, 10kA, C Curve miniature circuit breaker suitable for inductive load of Triple pole suitable for the existing MCB DB, Supply of 6A to 32A rating, 240/415V, 10kA, C Curve miniature circuit breaker suitable for inductive load of Triple pole and Neutral suitable for the existing MCB DB, Supply of 63 Amp rating, 240/415V, 10kA, C Curve miniature circuit breaker suitable for inductive load of Triple pole and Neutral suitable for the existing MCB DB, Supply of 63 Amp rating, 240/415V, 10kA, C Curve miniature circuit breaker suitable for inductive load of Triple pole suitable for the existing MCB DB, Supply of 40A rating, Four Pole, 415V, 50Hz isolator suitable for the existing MCB DB, Supply of 63A rating, Four Pole, 415V, 50Hz isolator suitable for the existing MCB DB, Supply of 25A rating, double Pole, 240V Residual current circuit breaker (RCCB) having a sensitivity current 30mA suitable for the existing MCB DB, Supply of 25A rating, Four Pole, 240V Residual current circuit breaker (RCCB) having a sensitivity current 30mA suitable for the existing MCB DB, Supply of 40A rating, double Pole, 240V Residual current circuit breaker (RCCB) having a sensitivity current 30mA suitable for the existing MCB DB, Supply of 40A rating, Four Pole, 240V Residual current circuit breaker (RCCB) having a sensitivity current 30mA suitable for the existing MCB DB, Supply of 63A rating, double Pole, 240V Residual current circuit breaker (RCCB) having a sensitivity current 30mA suitable for the existing MCB DB, Supply of 63A rating, Four Pole, 240V Residual current circuit breaker (RCCB) having a sensitivity current 30mA suitable for the existing MCB DB, Supply of suitable size GI box with modular plate and cover including providing 1 no.3 pin 5/6A modular socket outlet and 1 no. 5/6A modular switch etc. Complete as required, Supply of suitable size GI Box with modular plate and cover including providing 1 no.6 pin 5/6A & 15/16A modular socket outlet and 1 no. 15/16A modular switch etc. Complete as required, Supply of suitable size GI box with modular plate and cover including providing 1 no.3 pin 5/6A modular socket outlet and 02 no. 5/6A modular switch etc. Complete as required, Supply of suitable size GI Box with modular plate and cover including providing 1 no.6 pin 5/6A & 15/16A modular socket outlet and 02 no. 15/16A modular switch etc. Complete as required, Supply of suitable size GI box with modular plate and cover including providing 2 nos. 3 pin 5/6A modular socket outlet and 2 nos. 5/6A modular switch etc. Complete as required, Supply of suitable size GI box with modular plate and cover including providing 2 nos. 6 pin 15/16A modular socket outlet and 2 nos. 15/16A modular switch etc. Complete as required, Supply of suitable size GI box with modular plate and cover including providing 3 nos. 3 pin 5/6A modular socket outlet and 2 nos. 5/6A modular switch etc. Complete as required, Supply of suitable size GI box with modular plate and cover including providing 3 nos. 3 pin 15/16A modular socket outlet and 2 nos. 15/16A modular switch etc. Complete as required, Supply of heavy duty PVC Casing Capping- casing bearing ISI mark of size 20mmX12mm, Supply of heavy duty PVC Casing Capping- casing bearing ISI mark of size 25mmX16mm, Supply of 5/6 Amp switch modular type switch/socket for the existing modular plate & switch box etc. Complete as required, Supply of 15/16 Amp switch modular type switch/socket for the existing modular plate & switch box etc. Complete as required, Supply of 3 pin 5/6 Amp socket outlet modular type switch/socket for the existing modular plate & switch box etc. Complete as required, Supply of 6 pin 15/16 Amp socket outlet modular type switch/socket for the existing modular plate & switch box etc. Complete as required, Supply of 3 Module Modular type base & cover plate combined (Complete set) suitable for the existing Switch/Socket/Modular Box etc. Complete as required, Supply of 4 Module Modular type base & cover plate combined (Complete set) suitable for the existing Switch/Socket/Modular Box etc. Complete as required, Supply of 1 Module Modular type base & cover plate combined (Complete set) suitable for the existing Switch/Socket/Modular Box etc. Complete as required, Supply of 6 Module Modular type base & cover plate combined (Complete set) suitable for the existing Switch/Socket/Modular Box etc. Complete as required, Supply of 8 Module Modular type base & cover plate combined (Complete set) suitable for the existing Switch/Socket/Modular Box etc. Complete as required, Supply of 3- Pin, 5/6 Amp ISI marked Plug top suitable for operation on single phase 230V, 50Hz power supply, Supply of 3- Pin, 15/16 Amp ISI marked Plug top suitable for operation on single phase 230V, 50Hz power supply, Supply of 240 Volts/50 Hz supply, 800 Watts, Quartz type Room Heater with 02 years Warranty and should bearing ISI Mark, Supply of Electric Flying Insect Trapper/Insect Killer(with 02 years Warranty and should bearing ISI Mark) of Power supply 50 cycle AC, 220-230 Volts, Light Source 3 Nos. U.V. Tube/Halogen Tube Lights of 18 inch X 15 Watt each, Size 20 inch X 14 inch X 5 inch, Covering Area 850 X 900 sq. feet (Approx.), Glue Board UV Resistant Fly Glue board, as and when required, Supply of 2X2 feet 36 Watts LED light fixture recess type with fitting, LED driver and other accessories (complete set as per site requirement) suitable for operation on single phase 230V, 50Hz power supply complete as required as per enclosed technical specification, Supply of 36 Watts LED Linear light with fitting, LED driver and other accessories (complete set as per site requirement) suitable for operation on single phase 230V, 50Hz power supply complete as required as per enclosed technical specification, Supply of 14 Watts recessed COB downlight made up of die-cast aluminium housing and robust heat sink for excellent thermal management of BLACK-GOLDEN COLOUR REFLECTOR with fitting, LED driver and other accessories (complete set suitable as per site requirement), Make- LEGERO or equivalent, Supply of 120 watts Highly efficient top opening LED Street Light with Lens made of pressure die-cast aluminium housing and enclosed with toughened glass with fitting, and other accessories (complete set suitable as per site requirement), Make- HALONIX or equivalent, Supply of 12 Watts recessed type LED downlighter of specifications Ceiling cutout 160 mm, height 23 mm+-1 mm, Slim, Compact, Auminum die cast edge lit panel recess mounted round fixture with opal diffuser including separate electronic driver and other accessories (Complete set as per site requirement), Supply of 4 KVA capacity voltage stabilizers (for 1.5 TR inverted type split AC) with having range of 160 to 280 voltage single phase, 50 Hz AC supply i/c necessary fixing arrangements, clamps, screws, metal clad top, connecting 3 core cable of standered length as per OEM, complete, etc as required, Supply of 4 way, 6 Amp rating, 4 Sockets Extension Board/Spike Guard suitable as per site requirement with 02 years Warranty and should bearing ISI Mark, Supply of 4 way, 10 Amp- 16 Amp rating, 4 Sockets Extension Board/Spike Guard suitable as per site requirement with 02 years Warranty and should bearing ISI mark, Supply of Silica Gel in good Condition for existing Transformer suitable as per site requirement, Supply of 3 blade Pedestal Fan of Blade sweep 400mm-450mm, 240 Volts, 50 Hz supply, with High speed Copper winding motor, rated speed around 2000 revolutions per minute, Low noise level, maximum limit of Power consumption not more than 150 Watts complete as required, Supply of 3 blade Wall mounting Fan of Blade sweep 400mm, 240 Volts, 50 Hz supply, with High speed Copper winding motor, rated speed around 1400 revolutions per minute, Low noise level, maximum limit of Power consumption not more than 60 Watts complete as required, Supply of 3 blade Ceilling Fan of Blade sweep 1200mm, 240 Volts, 50 Hz supply, with High speed Copper winding motor, rated speed around 400 revolutions per minute, Low noise level, maximum limit of Power consumption not more than 60 Watts complete as required, Supply of Red Outer lens for RWY END light suitable for existing Airfield Ground Lighting System (AGL) complete as required .( Existing light fixture is of VARDHMAN make), Supply of Green Outer lens for RWY Threshold light suitable for existing Airfield Ground Lighting System (AGL) complete as required .( Existing light fixture is of VARDHMAN make), Supply of Yellow filter for runway Edge light suitable for existing Airfield Ground Lighting System (AGL) complete as required .( Existing light fixture is of VARDHMAN make), Supply of 5 KV grade plug & receptacle type-I suitable for single core 6 sqmm airfield cable complete as required, Supply of 150W, 6.6/6.6A Halogen Lamp PK30D(64361 HLX-Z), make -OSRAM or equivalent suitable for existing AGL/ CAT-I Fittings complete as required, Supply of 200W, 6.6/6.6A Halogen Lamp PK30D(64382 HLX-C) make - OSRAM or equivalent suitable for existing AGL/ CAT-I Fittings complete as required, Supply of 105 W, 6.6/6.6A Halogen Lamp PK30D(64339 A 105W-10 20X1) make - OSRAM or equivalent suitable for existing AGL Inset Fittings(Make ATG) complete as required, Supply of Isolating transformer of 45 watts, 6.6A/6.6A, 5KV, 50Hz suitable for existing AGL/CAT-I Light fixtures complete as required, Supply of Isolating transformer of 100 watts, 6.6A/6.6A, 5KV, 50 Hz suitable for existing AGL/CAT-I Light fixtures complete as required, Supply of Isolating transformer of 150 watts, 6.6A/6.6A, 5KV, 50 Hz, suitable for existing AGL/CAT-I Light fixtures complete as required, Supply of Isolating transformer of 200 watts, 6.6A/6.6A, 5KV, 50 Hz suitable for existing AGL/CAT-I Light fixtures complete as required, Supply of HRC High Speed Fuse-Semi Conductor Protection Fuse-BS88 Type, 100FE, 100A Rating,Voltage 690Vac,BREAKING CAPACITY 200ka suitable for existing switch gear (Make-Bussmann series EATON or equivalent), Supply of HRC High Speed Fuse-Semi Conductor Protection Fuse-BS88-4 Type, 56ET, 56 A Rating,Voltage 690 Vac,BREAKING CAPACITY 200 ka suitable for existing switch gear (Make-Bussmann series EATON or equivalent), Supply of HRC protectection fuse Model Name/No-3NA7822-ORC,63 A rating,Voltage 500 V ,suitable for existing switch gear (Make-Bussmann series EATON or equivalent), Supply of HRC protectection fuse Model Name/No-3NA7807-ORC,20 A rating,Voltage 500 V ,suitable for existing switch gear (Make-Bussmann series EATON or equivalent), Supply of HRC protectection fuse Model Name/No-3NA7830-ORC,100 A rating,Voltage 500 V ,suitable for existing switch gear (Make-Bussmann series EATON or equivalent), Supply of HRC protectection fuse Model Name/No-3NA7812-ORC,32 A rating,Voltage 500 V ,suitable for existing switch gear (Make-Bussmann series EATON or equivalent), Supply of contactor of model name/number - 3TF477 AC- 1,IE - 90 Amp , voltage rating 400/690 V.(Make - siemens) for existing switch gear, Supply of contactor of model name/number - 3TF46 AC- 1,IE - 80 Amp , voltage rating 400/690 V.(Make - siemens) for existing switch gear, Supply of contactor of model name/number - 3TF3400-0A, AC- 1,IE - 55 Amp , voltage rating 400/690 V.(Make - siemens) for existing switch gear, Supply of CI Base Cover plate of Thickness 5 mm for C.I. Housing boxes/ C.I. Collar of 330 mm outer dia including 6 nos M10 tapped hole, Supply of wind sock(CLOTH) for WDI(WHITE/RED), Supply of 1 x 6 sq.mm airfield copper conductor cable, PVC insulated, PVC sheathed unshielded, anti-termite and anti- rodent treated UG cable of 5 KV grade conforming to IS 1554 (Part II) as amended upto date and as specified in AAI particular specification, Supply of 9W E27 LED Cool Day Light LED Bulb suitable for Existing Landing T indicator(Make Electro System), Supply of PAPI Dichoric Red Filter suitable for existing PAPI System.( Existing PAPI is of Vardhman Make and code of dichoric red filter is PAPI-H001-0010B), Supply of 360 degree Outer Clear Lens for Runway Edge light Fitting suitable for Existing light fixture of VARDHMAN make, Supply of Clear Spreader Lens for Approach light Fitting suitable for Existing light fixture of VARDHMAN make, Supply of Base Plate Gasket suitable forexisting CI Housing Box of 330 mm OD, Supply of Clear Lens for PAPI suitable for existing PAPI System of VARDHMAN make
DEPT OF THE ARMY USA Tender
Civil And Construction...+1Others
United States
Closing Soon29 Jan 2025
Tender AmountRefer Documents
Details: The Us Army Corps Of Engineers Will Be Hosting Two (2) Industry Days For The Albeni Falls Dam Replacement Spillway Gates Project. One Will Be Held Virtually And One On Site. Below Contains The Information For Both Days. location: Virtual. Zoom Information Provided Below. date: 29 January 2025 time: 10:00 Am To 12:00 Pm Pst location: Onsite. Location Information Provided In Attachment 1. The Onsite Visit Is Restricted To Two Personnel Per Company. Follow Pre-registration Steps Provided Below. date: 30 January 2025 time: 10:00 Am To 2:00 Pm Pst project Description: the Seattle District, U.s. Army Corps Of Engineers Has A Requirement To Replace Existing Steel Spillway Gates At Albeni Falls Dam (afd), Oldtown Idaho. Afd Is A Concrete Gravity Structure Consisting Of Two Main Sections, The Spillway And Powerhouse. The Spillway With A Total Of 10 Spill-bays, Which Are Controlled By 32 Feet High By 41 Feet Wide Vertical Steel Lift Gates. These Gates Consist Of An Upper And Lower Leaf. One Additional Gate Is Available With Each Leaf Being Stored At The Top Of A Maintenance Slot To Be Used During Emergencies Or When Maintenance Is Required On Another Gate. The Gates Underwent Inspection In 2012 Which Identified Repairs And Maintenance That Were Needed To Ensure That The Gates Are In Good Operating Condition. A Contract Was Awarded In 2022 For The Repair And Maintenance Of The Gates. However, The Rehabilitation Efforts Will Be Stopped After The Return Of The First Rehabilitated Gate Has Been Returned To The Dam. The Project Is Seeking To Fabricate Replacement Gates. Replacement Spillway Gates Components Include: fabricate Minimum Three (3) And Maximum Eleven (11) New Vertical Lift Steel Spillway Gates Offsite including Paint, Non-destructive Testing (ndt), Seals And Seal Heaters, Cathodic Protection, Wheels, Dogging And Latching Mechanisms. fabricate Two (2) New Lifting Beams For New Spillway Gates. including Paint, Ndt, And Three (3) Electric Gear Motor Driven Actuators For Latching And Dogging Mechanisms On Lifting Beam And Gates. mobilize/demobilize A Crane To Transition Each Leaf Of The Gate(s) To A Designated Location In The Vertical Position For The Operating Project To Transfer And Install The Gate Into The Designated Slot With The Project Intake Gantry Cranes. Provide Fixture To Hold Gate Leaf In Vertical Position. retrieve The Existing Gates From The Designated Location For Removal And Disposal Of The Existing Spillway Gates. verify The New Spillway Gate, Lifting Beam Equipment, And Electrical Features Are Properly Fitted And Tested. delivery Of New Fabricated Gates Need To Be Staged And Scheduled So That Usace Dam Operations Are Not Impacted. the Contract Solicitation And Award Is Planned In Fy26 For The First 3 Gates. The Remaining 8 Gates Will Be Optional Award Items To The Contract With Anticipated Award In The Subsequent Years. the Anticipated Naics Code May Be 332312, Fabricated Metal Product Manufacturing (supply). Or Naics Code Is 237990, Other Heavy And Civil Engineering, Construction. the Proposed Project Is Anticipated To Be A Competitive, Firm-fixed-price Contract To Be Procured In Accordance With The Federal Acquisition Regulation (far) Part 15 (contracting By Negotiation), Using The Tradeoff Process To Acquire Gates In The Most Expeditious Manner Possible. the Virtual Industry Day Event Will Take Place On 29 January 2025 At 10:00 Am Pdt Via Zoom. Below Is The Link To Register In Advance For This Webinar. https://boisestate.zoom.us/webinar/register/wn_bl_wtmhztsezxzhazwle8q after Registering, You Will Receive A Confirmation Email Containing Information About Joining The Webinar. you Must Pre-register To Attend This Onsite Industry Day By Submitting The Attached Rsvp Form In An Email To Jeannette Patton, Contract Specialist, At Jeannette.k.patton@usace.army.mil And Daisy Douglass, Project Manager, At Daisy.p.douglass@usace.army.mil, And Reference The Albeni Falls Dam Spillway Gate Replacement Project Onsite Industry Day In The Subject Line. Rsvp By 22 January 2025 At 4:00 Pm Pst. Required Personal Protective Equipment For The Onsite Visit Includes Safety Vest And Boots/safety Shoes. If Attendee Is A Foreign National, This Information Must Be Provided By 17 January 2025 At 4:00 Pm Pdt. Late Respondents, Those Not Pre-registered, Or Those Not Providing The Correct Information Will Not Be Granted Access To The Site. Participation Is Limited To Two Representatives From Each Interested Entity. The Slide Deck And Attendance Participation Will Be Available After Both Industry Days Via Sam.gov. attending The Site Visit Day Is Highly Recommended Since It Is Unlikely That An Additional Site Visit Will Be Offered Until The Solicitation Period. in-processing Begins For All Vendors At The Main Entrance. When You Approach Gate 1 (marker 2), You Will Be Required To State That You Are Attending The “afd Spillway Gate Replacement Industry Day”. At Marker 2, You Will Use The Pedestal Call Box To Contact The Administrative Assistant At The Extension Listed On The Plaque. Your Name Will Be Checked Against The Pre-registered Attendees’ List And You Will Then Be Directed To Drive To The Main Parking Lot, Between Markers 2 And 3, Where You Will Park Your Vehicle For The Entirety Of The Site Visit. At Gate 2 (marker 3), You Will Be Required To Present Photo Identification And Afd Staff Will Direct You To The Conference Room For The Safety Briefing And Project Overview Prior To Proceeding Out To The Project Site. Your Safety Gear Will Be Inspected Before Entry Into Any Additional Areas. the Following Documents Are Attached In Support Of This Special Notice. attachment 1-location Information For Onsite Industry Day attachment 2- Questions From Usace To Industry Regarding The Afd Spillway Gate Replacement attachment 3- Rsvp Form if You Would Like To Provide Feedback For Consideration On The Documents, Please Provide Them By Email To: Jeannette Patton, Contract Specialist, At Jeannette.k.patton@usace.army.mil By 6 February 2025, 12:00 Pm Pst. small Business Program Inquiries: enshane Hill-nomoto: Enshane.nomoto@usace.army.mil https://www.nws.usace.army.mil/business-with-us/small-business/ thank You For Your Interest In This Usace Project. 1/7/2025: Amendment 1 - Remove Set Aside Requirement. 1/10/25: Amendment 2 - Add A N To Contract Specialist Name In The Description Section. The Correct Spelling Is Jeannette Patton Email @ Jeannette.k.patton@usace.army.mil
VETERANS AFFAIRS, DEPARTMENT OF USA Tender
Others
United States
Closing Date7 Feb 2025
Tender AmountRefer Documents
Details: Pre-solicitation For Asbestos Containing Material, Acm, Removal Activities In Building 3- Veterans Canteen Service the Department Of Veterans Affairs, Network Contracting Office (nco 6) At The Fayetteville, Nc Anticipates Issuing A Solicitation For A Construction Project To Perform Acm Removal And Disposal Activities In Building 3 At The Fayetteville Va Medical Center Located At 2300 Ramsey Street, Fayetteville Nc 28301. the Fayetteville Vamc Campus Will Need A Cm Removal And Disposal In The Veterans Canteen Service Storage Room 105, Canteen Office Area Room 114 & 114b, And The Retail Store Area Room 112. Acms To Be Removed Are Category 1 Non-friable Materials. The Va Medical Center Considers Removing The Asbestos-containing Materials As A Regulated, Class Ii Asbestos Removal That Shall Be Cleared By Visual Inspection, And The Collection Of Multiple Air Samples Will Be Analyzed By Tem Analysis. A Third-party Air Monitoring Firm, Retained By The Va, Shall Conduct Continuous Project Monitoring During Removal Activities And Perform The Final Visual Inspection And Clearance Sampling. The Vendor Shall Be Responsible For Acquiring Appropriate Permits. This Project Shall Be Completed In Three Separate Phases. Phase 1 Will Be The Removal Of Acm In Rooms 105 And Room 114. Phase Ii Will Be The Removal Of Acm In The Retail Store Area Room 112 During The Proposed Remodel. Phase Iii Will Be Replacing The Flooring Throughout With A Luxury Vinyl Tile (lvt). Coordinate The Color And Pattern Of Flooring With The Va Cor.
general Scope:
1. Isolate And Regulate Work Areas With Negative Pressure Enclosures (npes). Npes Must Be Constructed Of 6-mil Fire-retardant Polyethylene Sheeting, Appropriate Framing, And Maintain -0.02 Inches Of Water Column Monitored Via A Magnehelic Gauge Or Continuous Chart Recorder. 2. Npes Shall Be Equipped With A Fully Functional Three-stage Decontamination Unit And A Separate Loadout. 3. Hepa-filtered Air, From Within The Npes, Shall Be Exhausted Outside The Building If Possible. 4. Once The Npe Has Been Cleared And Demobilized, The Vendor Shall Be Responsible For Repairing Finished Surfaces That Are Damaged By Contact With Spray Glue Or Adhesive Tape. The Vendor Shall Ensure Finished Surfaces That Have Been In Contact With Spray Glue Or Adhesive Tape Are Satisfactorily Cleaned. 5. In The Veterans Canteen Service Areas Acm Removal Is As Outlined Below And In The Attached Asbestos Survey Report: a. Asbestos- Retail Store Area - Multiple Layers Of Flooring/mastic-brown Top Layer (rm 112 1894 Sq.ft.) b. Asbestos Retail Store Area - Brown Vinyl Plank (rm 112) c. Asbestos Canteen Office Area - 12x12 Floor Tiles/ Mastic Under Carpet (rm 114 333 Sq. Ft.) d. Asbestos Canteen Storage Room - 12x12 Floor Tile/black Mastic (rm 105 399 Sq. Ft.). although The Va Medical Center Does Not Dictate The Method Of Removal, The Va Medical Center Requests The Vendor Use The Removal Method That Is The Most Suitable To The Existing Work Site Conditions. All Work Shall Be Done To Ensure That The Asbestos Abatement Is Done In Accordance With All Applicable Regulations, Standards, And Va Medical Center Policies. If Additional Unforeseen Conditions Are Found, Notify The Va Immediately And Submit An Estimate And Anticipated Schedule. The Abatement Activities Are To Be Completed Safely In The Shortest Time Possible. The Va Requests The Removal Activities For Each Phase Are To Be Completed During A Single Weekend (three Consecutive Days Or Less). Interior Mobilization Shall Begin No Earlier Than 4:00 Pm Friday And Conclude No Later Than 5:00 Monday. The Preference Is To Complete The Work Over A Three-day Or 4-day Holiday Weekend (ex. Veterans Day Weekend, November 08 November 11, 2024), Or Martin Luther King Jr. Day Weekend January 17 January 20, 2025) But Ultimately The Date Will Need To Be Accepted By All Stakeholders Involved. outages/shutdowns: If For Any Reason The General Contractor Or Its Sub-contractors Require An Outage/shutdown, The General Contractor Must Pre-coordinate All Outage Activities With The Va Cor And Alternate Cor Prior To Undertaking Any Such Activity. The Va Will Provide A Copy Of An Outage Request That Is The Responsibility Of The General Contractor Superintendent To Complete, Execute, And Return To The Va Cor. The Normal Timeline To Obtain Va Approval Of A Request Is Two Weeks. Therefore, Please Plan Accordingly. An Outage Would Include But Is Not Limited To The Following: Fire Pumps, Fire Suppression, Fire Alarms, Ats, Med Gas Pumps, Chillers, Hot Water Heaters, Potable Water, Chilled Water, Natural Gas, Boilers, Da Tanks, Steam Traps, Controls, Elevators, Space (hallways, Exam, Procedural, Office, Or Patient Rooms), Generators, Ups, Emergency And Normal Power (partial Or Full). a Final Visual Inspection Will Be Conducted Immediately After The Conclusion Of Removal Activities. Clearance Tem Air Sample Collection Will Be Conducted Within 24 Hours Of Achieving Final Visual Clearance. the Estimated Construction Magnitude Is Between $100,000 And $250,000.
naics Code: 562910 Size Standard: $25 Million
this Solicitation Is Anticipated To Be A Total Service-disabled Veteran-owned Small Business Set Aside. Solicitation Material Will Be Available On/about January 07, 2025. Any Specifications, Drawings, And Amendments Will Be Posted On This Website. Proposals Will Be Due Approximately 30 Days After Issuance Of The Solicitation. Location And Points Of Contact For Site Visits Will Be Identified In The Solicitation.
this Notice Is For Informational Purposes Only And Is Not A Request For Proposals. The Government Is Not Obligated To Issue A Solicitation As A Result Of This Notice. No Other Information Is Available Until The Issuance Of The Solicitation. No Bidder S List Is Maintained. All Interested Vendors Should Register On This Website. It Is The Offeror's Responsibility To Check The Website Periodically For Any Amendments/notices To The Solicitation. Prospective Contractors Must Be Registered In The System For Award Management (sam) Database In Order To Obtain Access To Sam.gov And Vetcert Registration Must Be Current And Active To Be Eligible For Contract Award. Contractors, Please Note: Online Representations And Certifications Applications (orca) Apply To This Solicitation. With Orca, You Now Have The Availability To Enter And Maintain Your Reps And Certs With Your Proposal. any Questions Regarding This Announcement And All Future Announcements Regarding This Project Must Be Emailed To Angelo.harris@va.gov. No Telephone Request For Bidding Material Will Be Accepted At This Time.
461-470 of 485 active Tenders