Heater Tenders
Heater Tenders
Indian Army Tender
Goods
Automobiles and Auto Parts
GEM
India
Description: CATEGORY: SELF STARTER ASSY , TURBOCHARGER ASSY , OIL FILTER ,
FUEL FILTER , AIR FILTER , FUEL FLEXIBLE PIPE , MAIN
BEARING , PACKING KIT , ALTERNATOR ASSY , BIG END BRG
CELL , CYLINDER HEAD WITH VALVE , HEATING ROD ,
KEROSENE HEATER WICK
Closing Date19 Feb 2025
Tender AmountINR 500 K (USD 5.7 K)
Offizielle Bezeichnung Gemeindevorstand Der Gemeinde Haina Kloster Tender
Civil And Construction...+1Civil Works Others
Germany
Description: Restricted invitation to tender with public participation competition Vob/a heating-ventilation-sanitary 1. The construction project involves the new extension of the fire station with 4 vehicle parking spaces and the necessary social rooms. The existing building will be partially demolished and rebuilt. The base to be added to the vehicle hall, including the foundation and upstands, will be built using solid construction. The social wing on the ground floor and the building dividing wall to the hall will be newly built using solid construction. The upper floor of the social wing and the roof and walls of the vehicle hall will be made of wood. The "sports center" part of the existing building will be retained and in use during the construction period. Fire service access roads, the access to the building yard (fire service location during construction) and escape and rescue routes must be kept clear throughout the entire construction phase, see appendix. Everything else must be agreed with the construction management, particularly exceptions. 2. During the project, some work may be carried out by building yard employees and fire service members on their own. This may result in various items being omitted altogether or quantities in parts of various items being reduced. The omission or reduction in quantities of these items does not entitle the contractor to make claims for lost profits or claims for an increase in unit prices. The price inquiry or requirement items must be filled in without fail, as it is possible that these items will also be implemented. The bidder acknowledges these preliminary remarks by signing the list of services. 3. The material costs and wage cost shares requested in the individual items must be filled in without fail. Reference is made to the Vob/a (§25 ff). Here, if certain items are no longer required, the order may be for just the delivery of materials. 4. Each contractor must provide their own construction site toilets and break rooms. Energy, water and electricity are provided free of charge. 5. A weekly construction meeting is held with all contractors in the community center/construction site. Company representatives who are currently working on the construction site and who will begin work in the next three weeks are required to attend and coordinate construction progress. Any costs must be included in the EPs. 6. Upon acceptance of the order, the contractor acknowledges the dates stated in the preliminary remarks and the construction schedule as binding and will, if necessary, carry out any work required outside of working hours at no extra cost so as not to jeopardize the dates for subsequent work. He undertakes to provide the number of workers according to the amount of work and the working days. 7. the contractually binding partial deadlines are set out in the construction schedule. 8. the work advertised must be carried out in partial deliveries in accordance with the construction progress. This does not give the contractor any right to assert additional claims. 9. waste and rubble disposal must be carried out every two days at most, analogous to the work steps. Each contractor is responsible for this himself. 10. all further details can be found in the list of services. 11. contrary to DIN 1961 Vob Part B § 13 (4), the limitation period for claims for defects is set at five years. 12. services that exceed the contract value require prior written approval, otherwise no payment will be made! Accordingly, supplementary offers must be approved in good time (at least three weeks) before execution. 13. daily construction reports must be kept. The forms from "Zweckform - Construction Daily Reports No. 177" or similar are to be used as templates. These are to be presented to the construction supervisor every 2-3 days for signature and countersignature. The work carried out, the number of workers and the hours worked are to be entered here. 14.Depending on the trade, all inventory and audit documents are to be enclosed with the final invoice in duplicate in paper form and digitally (copied onto a CD or data carrier): Final payment will only be approved once the Vg documents have been submitted. 15.The bidder acknowledges these preliminary remarks by signing the list of services. PRELIMINARY REMARKS The basis of the contract is - Vob, Part B (DIN 1961) - Vob, Part C (DIN 18 299) - Vob, Part C (DIN 18 380) - Vob, Part C (DIN 18 421) in the version valid at the time of the tender. When carrying out the services, the following standard sheets and guidelines in particular must be observed: - Second Ordinance Amending the Drinking Water Ordinance of December 5, 2012 - Drinking water dimensioning according to DIN 1988-300 - DIN 1986 and DIN 1988 - Energy Saving Ordinance (ENEV) - Water Management Act (WHG) - Here: Section 19 - Safety equipment for heating systems DIN 4751 and VDI 2715 - House chimneys DIN 181 60 - Calculation of chimney dimensions DIN 4705 - Masonry standard DIN 1053, Part 3 - Model guideline on fire protection requirements for pipe systems (model pipe system guideline MLAR) - Electrical equipment for combustion systems DIN VDE 0116 - Technical rules for hazardous substances TRGS 905 and 952 - Technical rules for gas installation TRGI Ï68 - 1996 - DVGW worksheet G 459 - Gas house connections for operating pressures up to 4 bar; installation - Technical rules for liquefied petroleum gas (TRF) 1996 - Guidelines for the use of liquefied petroleum gas Zh 1/455 (GUV 19.9) - Technical connection conditions of the local electricity and gas supply company - Contract template for maintenance (servicing, inspection, repair) of technical systems and facilities in public buildings (Maintenance 90) - as well as all relevant standard sheets and guidelines. The electrical connection and electrical installation of the items advertised must be carried out by the contractor in accordance with the VDI regulations (DIN VDE 0100) and the technical connection regulations of the electricity supply company and must be included in the unit prices. The supply lines are laid on site, and the contractor is responsible for laying and connecting them. Official rules and regulations, rules of the statutory accident insurance provider remain unaffected. The bidder is free to inspect the construction site in order to be able to take all the work that determines the price into account. Additional demands due to insufficient knowledge of the assembly conditions and the scope of work cannot be granted. All travel costs, parking fees, construction site facilities, construction meetings and the like are to be included in the unit prices and are not reimbursed separately. Participation in weekly construction meetings is to be included in the calculation. The use of subcontractors is only permitted with the express consent of the client. Particular care/caution is required when securing the construction site and when arriving and leaving the construction site. In deviation from DIN 18 379 and DIN 18 380, the following are agreed: 1.)Special measures for sound insulation in accordance with DIN 4109 and vibration dampening of system components against the building structure are to be included in the corresponding items. 2.)Delivery and assembly of pipe sleeves are to be included in the unit prices. 3.)Services in accordance with DIN 18 380, points 4.2.11 and 4.2.13 are to be included. 4.)Adapting system components to services not carried out to size by other contractors is not remunerated separately and is to be included in the unit prices. 5.)Checking the electrical cabling and the control and regulation system that is not carried out by the contractor is to be included in the unit prices. 6.) Chiselling and drilling for inserting brackets must be included in the unit prices. 7.) Erection and dismantling as well as provision of scaffolding whose working platforms are more than 2 m above the ground or floor must be included. 8.) Preparation of inventory and inspection plans must be included in the unit prices (unless shown as a separate item). EXECUTION - GENERAL: Fire protection: All soldering and welding work must be carried out with particular caution; additional fire protection measures, such as providing filled water buckets or fire extinguishers, must be taken. Before leaving the construction site, all work areas must be carefully checked for possible fire nests - this applies in particular to the ceiling and floor cavities. Accident prevention: Please note that the respective contractor is responsible for keeping the construction site tidy. In particular, the contractor is obliged to clean the construction site at regular intervals to remove any leftover materials, waste, etc. If the contractor does not comply with the construction management's request to clean, another company will be commissioned to carry out the work. The contractor must bear the resulting costs or the costs will be passed on to the companies involved in the construction. EXECUTION: Checking equivalence: The items in the tender are advertised in a completely product-neutral manner. Product details are only given where existing components are to be reused or need to be expanded, such as control systems. If equivalent types are offered that do not comply with the manufacturing and type designations for materials, valves, etc. specified in the tender, then in order to obtain clear price comparison options, brochures must be enclosed with the tender showing the equivalence of the items offered. Accessories such as controls, mixer motors, exhaust systems, etc. must be offered by the same manufacturer as the heating system in order to guarantee the system warranty. Sound insulation: The contractor must observe and take all measures in accordance with DIN 4109 "Sound insulation in building construction" and VDI 2715 "Noise reduction in warm and hot water heating systems" to avoid noise transmission. Thermal insulation: The Vob, Part C, DIN 18 421 and the Energy Saving Ordinance (enev) apply to the execution of the work. For the "direct handling" (i.e. placing on the market, processing, removal, etc.) of products made of artificial or natural, inorganic mineral fibers, TRGS 905 and TRGS 952 apply, in the version valid at the time of the tender. Attention! Only insulation materials that meet the acquittal criteria of TRGS 905 or that have the rating "free from suspected cancer" may be offered and processed! Proof of the classification of the insulation material must be included in the offer! Technical room - heating-water: Thermal insulation made of mineral fiber shells, aluminum-laminated with PVC foil sheathing. Cold water with rubber insulation. The sheathing must be processed correctly so that an increased release of fiber dust does not pose a health risk! DESCRIPTION OF THE SYSTEM General: The measure involves the conversion and extension of an existing fire station, Goethestrasse 32, 35114 Haina (kloster). A conversion and extension of the existing fire station is being carried out. The conversion includes the renewal of the sanitary facilities and the sanitary installation. The fire station will receive new underfloor heating and new radiators. The heating remains in the house connection room. The extension will be equipped with underfloor heating on the ground floor and first floor. Hot water is prepared for the ground floor using the existing hot water preparation centrally in the boiler room. On the first floor, hot water is prepared using instantaneous water heaters. Sanitary installation: Waste water pipes will be re-laid and connected to the new toilets and washbasins. Hot water is prepared decentrally using instantaneous water heaters. Cold and hot water is supplied to the individual taps using copper pipes and metal composite pipes. Prefabricated wall installations will be installed in the washrooms. The prefabricated wall installations must be integrated using drywall. The pipes are laid from above in clad installation shafts or in the suspended ceiling and in the prefabricated walls to be created. A hygienic drinking water installation is planned with flushing stations at the end of the installation or in ring mains. Drinking water samples taken before the system is handed over are to be included in the unit price of the contract unless specifically advertised. Careful and clean work must be carried out on the construction site. All components of the drinking water system must be transported and stored in such a way that internal contamination is avoided. To keep the system components in perfect condition, their protective devices must not be removed until immediately before assembly. The system must first be leak-tested dry using oil-free compressed air or inert gas in accordance with the Zvshk information sheet. All pipes, cold and hot water pipes are 100% insulated. Cold water is to be laid separately from hot water pipes. Heating installation: A new heating circuit distributor is to be installed in the building's technical room. Circuit regulating valves are provided, which are regulated using a measuring computer. All circuits are hydraulically balanced. The pipes are laid in copper pipe. This must be factored into the unit prices. Careful and clean work must be carried out on the construction site. All pipes, supply and return lines are to be 100% insulated. Heating lines are to be laid separately from cold water pipes. The utmost care and consultation with all companies involved in the construction and the construction management is required. The construction site must always be staffed with enough specialist personnel in order to adhere to the construction schedule. Measurements must be numbered and carried out room by room. Timesheets must be submitted to the construction management by the end of the week at the latest. Hourly work must always be announced to the construction management before execution and only carried out after approval. Timesheets submitted without prior consultation with the construction management will not be accepted. Timesheets must also be numbered. A measurement summary must be prepared for each invoice. This must be taken into account in the calculation. ACCEPTANCE Acceptance must be formal. The contractor will be given the opportunity to put the system into operation before acceptance. During this time, the operating personnel should be instructed if possible. Acceptance will only take place if the system is already running safely, all of the instructions listed below have been provided and appropriate labels have been put up on the system components. In addition, the system must meet the required conditions in terms of function and performance. The following must be submitted in duplicate for acceptance: inventory and inspection documents for the entire heating and sanitary system must be submitted in duplicate, 1 set in color and digitally (copied onto a CD or data carrier). Divided into the following chapters: 1. System description 2. Calculations/design data 3. Certificates/proof 4. Measurement reports 5. Manufacturer list/hotline 6. Component documents 7. Maintenance information 8. Spare parts list/consumable parts list 9. Diagrams 10. Drawings with the following contents: - System description - System log for filling and make-up water - Setting report for flushing stations - Reports on leak tests and pressure tests carried out - Certificates for flushing pipes - Commissioning reports - Instruction of operating personnel - Measurement reports for air volumes - Proof of hydraulic balancing - Technical data sheets - Operating and maintenance instructions - Manufacturer's assembly and service documents - Table of contents and dividers - Specialist contractor declaration in accordance with Enev - Contractor declaration for technical building equipment - Acceptance reports for chimney sweeps - Heating + ventilation circuit diagrams - Declarations of conformity for fire protection - Spare parts lists/consumable parts lists - Inspection drawings (inventory plans) - Diagrams (existing plans) in A4 folders and 1 copy in digital form (USB stick/CD). Additional contract terms § 1 The latest version of the procurement and contract regulations (parts B and C) apply. § 2 Before submitting a tender, the construction site and access roads must be inspected and the drawings viewed so that the tenderer is familiar with the local conditions. A lack of information about the location, the scope of work or any other opinion does not entitle the tenderer to make subsequent demands. § 3 Tender prices are fixed prices. Wage increases cannot be taken into account until 12 months after the tender has been submitted. After this date, collectively agreed wage increases can only be taken into account if they were not previously announced. § 4 Each contractor must ensure that the preconditions for his work are met before starting work; otherwise the construction management must be informed in writing. Hourly wage work may only be carried out on the basis of a prior order from the construction management. The required daily wage reports must be submitted to the construction management in writing for signature no later than 3 days after completion. Daily wage reports that are not recognized will not be taken into account in the billing. § 5 The client reserves the right to delete individual items from the list of services in whole or in part. If this occurs, the contractor has no claim to lost profits. Changes in quantity do not entitle the contractor to a price change. § 6 The contractor's special delivery and payment terms will not be recognized. § 7 The client is entitled to retain a security amount of 5% of the final sum for the duration of the liability for claims for defects after defect-free acceptance and invoice verification (not for scaffolding work). This amount can be replaced by a bank guarantee. 10% of the interim invoices submitted will be retained as security for contract fulfillment. § 8 The contractor expressly confirms that the expertise and performance capability of his company and his specialists is given to accept this order. § 9 The contractor must pay a contractual penalty of 0.2% of the gross order amount for each calendar day of delay. The contractual penalty is limited to a maximum of 5% of the gross order amount. § 10 Warranty period: in accordance with Vob, but the duration is extended to 5 years! § 11 Acceptance takes place formally with an acceptance protocol; fictitious acceptance is excluded. § 12 The award period ends on March 18, 2020. The bidder remains bound to his offer until the end of this period. § 13 The contractor is obliged to verify the location and route of underground cables and channels. § 14 The client reserves the right to request daily construction reports from the contractor every working day. § 15 Notices of disability must also be in writing if the disability is obvious. End of the preliminary remarks
Closing Date21 Feb 2025
Tender AmountRefer Documents
NATIONAL INSTITUTE OF STANDARDS AND TECHNOLOGY USA Tender
Others
United States
Details: The Purpose Of This Sources Sought Notice Is To Conduct Market Research And Identify Potential Sources Of Commercial Products/services That Satisfy The Government’s Anticipated Needs.
background
the Information Technology Laboratory (itl) At The National Institute Of Standards And Technology (nist) Performs Research In Quantum Communications And Networking. Itl Is Investigating Integrated Optics Using The Thin-film Lithium Niobate (tfln) Platform For Manipulating Optical States And For Performing Quantum Measurements.
requirements:
the Contractor Shall Provide A Product That Meets All Technical Specifications Identified Below.
design Support For Tfln Photonic Chips
the Contractor Shall Provide The Government With A Design Manual And Process Development Kit (pdk) Which Allows The Government To Custom-design Tfln Photonic Chips. At A Minimum, The Design Manual And Pdk Shall Allow For The Following Design Capabilities:
optical Components Including Waveguides, Micro Rings, Delay Lines, 1x2 And 2x2 Couplers, Edge Couplers And Surface Grating Couplers.
electronic Components Including Electrical Lines And Heaters
chip Size Of At Least 45 Mm2
the Contractor Shall Provide Consultation Support Services To Aid In The Chip Design Process. Consultation Support Shall Confirm That The Custom-design Is Viable For Fabrication And Use. Nist Will Approve The Final Design.
fabrication Of Designed Tfln Photonic Chips
the Contractor Shall Fabricate Seven Tfln Photonic Chips In Accordance With The Final Custom-design Tfln Photonic Chip Developed Under Requirement A Above.
chips Shall Be Fabricated Using X-cut Thin-film Lithium Niobate (tfln)
the Lithium Niobate Film Thickness Shall Be Between 400 Nm To 700 Nm.
the Tfln Layer Shall Sit On Top Of A Silicon Dioxide Layer Of At Least 2 Micrometers, Which Shall Sit On Top Of A Silicon Handle Wafer
Fabrication Shall Be Completed Within Four Months Following Design Finalization
nist Is Seeking Information From Sources That May Be Capable Of Providing A Solution That Will Achieve The Objectives Described Above.
how To Respond To This Notice
in Responding To This Notice, Please Do Not Provide Proprietary Information. Please Include Only The Following Information, Readable In Either Microsoft Word 365, Microsoft Excel 365, Or .pdf Format, In The Response: Submit The Response By Email To The Primary Point Of Contact And, If Specified, To The Secondary Point Of Contact Listed In This Notice As Soon As Possible, And Preferably Before The Closing Date And Time Of This Notice. Please Note That To Be Considered For Award Under Any Official Solicitation, The Entity Must Be Registered And “active” In Sam At The Time Of Solicitation Response.
provide The Complete Name Of Your Company, Address, Name Of Contact For Follow-up Questions, Their Email, Their Phone Number And, If Your Company Has An Active Registration In Https://sam.gov, Your Company’s Unique Entity Id (uei).
identify The Product That Your Company Sells That Can Meet The Objectives Addressed In The Background Section Of This Notice. For Each Product Recommended To Meet The Government’s Requirement, Provide The Following:
manufacturer Name
design Specifications And Design Support Consultation Services
fabrication Specifications
if Your Company Is Not The Manufacturer, Provide Information On Your Company’s Status As An Authorized Reseller Of The Product(s)
describe Performance Capabilities Of The Product(s) Your Company Recommends To Meet The Government’s Requirements. Additionally, If There Are Other Features Or Functions That You Believe Would Assist Nist In Meeting Its Objectives Described Above, Please Discuss In Your Response.
discuss Whether The Product That Your Company Sells And Which You Describe In Your Response To This Notice Has Any Limits To Customization.
identify Any Aspects Of The Nist Market Research Notice, Including Instructions, And Draft Minimum Specifications In The Background Section You Cannot Meet And State Why. Please Offer Suggestions For How The Market Research Notice And Draft Minimum Specifications Could Be Made More Competitive.
state Whether The Proposed Product Is Manufactured In The United States And, If Not, State The Name Of The Country Where The Product Is Manufactured.
identify Any Plans/possibilities For Changes In Manufacturing Location Of The Aforementioned Product And Provide Relevant Details, Including Timeline.
for The Naics Code Listed In This Notice:
indicate Whether Your Company Is (a) A Small Business Or (b) Other Than Small Business. See The Table Of Small Business Size Standards And The Associated .pdf Download File For Small Business Size Standards And Additional Information.
if You Believe The Naics Code Listed In This Notice Is Not The Best Naics Code For The Type Of Product Addressed In This Notice, Identify An Alternative Naics Code That You Believe Would Be More Appropriate For The Planned Procurement.
describe Services That Are Available With The Purchase Of The Aforementioned Product From Your Company Such As Consultation Support.
describe Standard Terms And Conditions Of Sale Offered By Your Company For The Recommended Products Such As: Delivery Time After Your Company Accepts The Order; Fob Shipping Terms; Manufacturer Warranty (including Details Regarding Nature And Duration).; If Available, Description(s) Of Available Extended Warranty; Product Setup And Test; Operator And Service Instruction Manual(s); Cleanup After Installation; And If Applicable, Other Offered Services. Provide A Copy Of Manufacturer Standard Terms And Conditions That Typically Relate To The Sale Of The Specified Product, If Available.
state Published Price, Discount, Or Rebate Arrangements For Recommended Products And/or Provide Link To Access Company’s Published Prices For Product And Services.
if The Recommended Products And Related Services Are Available For Purchase On Any Existing Federal Supply Schedule Contract(s) Or Other Contracts Against Which Nist May Be Able To Place Orders, Identify The Contract Number(s) And Other Relevant Information.
identify Any Customers In The Public Or Private Sectors To Which You Provided The Recommended Or Similar Products. Include Customer(s) Information: Company Name, Phone Number, Point Of Contact, Email Address.
provide Any Other Information That You Believe Would Be Valuable For Nist To Know As Part Of Its Market Research For This Requirement.
state If You Require Nist To Provide Additional Information To Improve Your Understanding Of The Government’s Requirement And/or Would Like To Meet With Nist Representatives To Discuss The Requirement And The Capabilities Of The Identified Product.
questions Regarding This Notice
questions Regarding This Notice May Be Submitted Via Email To The Primary Point Of Contact And The Secondary Point Of Contact Listed In This Notice. Questions Should Be Submitted So That They Are Received By February 7, 2025, 12:00 P.m. Et. If The Contracting Officer Determines That Providing A Written Amendment To This Notice To Document Question(s) Received Would Benefit Other Potential Respondents, The Questions Would Be Anonymized, And A Written Response To Such Question(s) Would Be Provided Via An Amendment To This Notice.
important Notes
this Notice Is For Market Research Purposes And Should Not Be Construed As A Commitment By Nist To Issue A Solicitation Or Ultimately Award A Contract. There Is No Solicitation Available At This Time.
this Notice Does Not Obligate The Government To Award A Contract Or Otherwise Pay For The Information Provided In Response.
nist Reserves The Right To Use Information Provided By Respondents For Any Purpose Deemed Necessary And Legally Appropriate.
any Organization Responding To This Notice Should Ensure That Its Response Is Complete And Sufficiently Detailed To Allow The Government To Determine The Organization’s Capability.
respondents Are Advised That The Government Is Under No Obligation To Acknowledge Receipt Of The Information Received Or Provide Feedback To Respondents With Respect To Any Information Submitted.
after A Review Of The Responses Received, A Synopsis And Solicitation May Be Published On Gsa’s Ebuy Or Sam.gov. However, Responses To This Notice Will Not Be Considered An Adequate Response To Any Such Solicitation(s).
the Responses Shall Not Exceed 3 Pages Including All Attachments, Charts, Etc.
thank You For Taking The Time To Submit A Response To This Request!
Closing Date7 Feb 2025
Tender AmountRefer Documents
Fife Council Tender
Electrical and Electronics...+1Electrical Works
United Kingdom
Description: Repairs And Maintenance Of Block Storage And Other Heaters
Closing Date3 Mar 2025
Tender AmountGBP 300 K (USD 370.5 K)
Department Of Energy Tender
Machinery and Tools
United States
Description: Stock Order For Mitsubishi Tank Heaters
Closing Date10 Feb 2025
Tender AmountRefer Documents
DEPT OF THE ARMY USA Tender
Electrical Goods and Equipments...+1Electrical and Electronics
United States
Description: Electrolux Professional 504263 (eht8ilg8) Dishwasher Must Come With The Following Features And Required Options: Hood Type, (60) Racks/hour, Hot Water Sanitizing With Built-in Booster Heater, Corner Mounted Electronic Controls With Built-in Programming, 57/84/150 Seconds Cycles, Soft Start Feature, Wash Safe Control, Zero Lime Device, Clear Blue Advanced Filtering, Automatic Self-cleaning Cycle, Detergent And Rinse Aid Pumps, 304 Stainless Steel Construction, Adjustable Feet, Includes: (2) Cutlery Container (864242), Plate Basket (867002) And Cup Basket (867007), 208v/60/3-ph, 28 Amps, 2 Hp, 12.9 Kw Heat, Cetlus, Etl-sanitation, Energy Star� (field Convertible Corner Or Straight Thru), Capable Of Washing 63 Racks Or 1,134 Dishes Per Hour.
Closing Date7 Feb 2025
Tender AmountRefer Documents
1-10 of 479 active Tenders