Fabrication Tenders
Fabrication Tenders
BARANGAY SACME, TANAUAN, LEYTE Tender
Civil And Construction...+1Civil Works Others
Philippines
Details: Description I. Standard Project Billboard Ii. Construction Safety & Health Iii. 6mm Marine Plywood On Metal Frame Ceiling Iv. Prepainted Metal Sheets V. Plumbing Works Vi. Electrical Works Vii. Carpentry And Joinery Works 1. Barangay Sacme, Tanauan, Leyte Through The Bids And Awards Comm.) Invites Suppliers, Contractors, & Distributors Of Construction Materials For The Project: Rehabilitation Of Multi-purpose Building 2. The Bids And Awards Committee Will Use A Non-discretionary Pass/fail Criterion In The Eligibility Check/screening As Well As The Preliminary Examination Of Bids. 3. The Following Eligibility Documents In Two (2) Copies Duly Certified Must Be Submitted To The Bids And Awards Committee (bac) Not Later Than December 5, 2024: A.) Letter Of Intent; B.) Business License Permit/valid And Current Mayor’s Permit/municipal License; C.) Dti Business Name Registration Or Sec Registration Certificate; D.) Latest Audited Financial Statement; E.) Company Profile; F.) Tax Identification No. (tin); G.) Sworn Statement By The Prospective Bidder That He Is Not “barred” Or “blacklisted” From Participating In The Government Biddings, Including Non-inclusion In The Consolidated Blacklisting Report Issued By Gppb; H.) Other Appropriate License As Maybe Required By The Procuring Entity; I.) Statement Of Prospective Bidder Of All Its Ongoing And Completed Government And Private Contracts Within The Period Specified In The Iaeb, Including Contracts Awarded But Not Yet Started; J.) Articles Of Incorporation, Partnership Or Cooperation, Whichever Is Applicable, Including Amendments Thereto, If Any; K.) Sworn Affidavit Of The Bidder That Is Not Related To The Head Of The Procuring Entity, Members Of The Bac, Twg And Secretariat And The Members Of The Pmo And The Designers Of The Project, By Consanguinity Or Affinity Up To The Third Civil Degree; L.) Valid Joint Venture Agreement In Case Of Joint Venture; M.) Letter Authorizing The Bac Or Its Duly Authorized Representative/s To Verify Any Or All Of The Documents Submitted For Eligibility Check; Certification Under Oath That Each Of The Documents Submitted In Satisfaction Of Eligibility Requirements Is An Authentic And Original Copy, Or A True And Faithful Reproduction Of The Original Complete And That All Statements And Information Provided Therein Are True And Correct; N.) Other Appropriate Licenses As May Be Required By The Procuring Entity Concerned; O.) Copies Of End-user’s Acceptance Letter For Completed Contracts; P.) Specification Of Whether Or Not Prospective Bidder Is A Manufacturer Supplier Or Distributor; Q.) Audited Financial Statement “received” By The Ir Or Its Duly Accredited And Authorized Institutions, For Immediately Preceding Calendar Year, Showing Among Others The Total Assets And Liabilities; R.) Computation Of Net Financial Contracting Capacity (nfcc) Or S.) Certificate Of Commitment Specific To The Contract At Hand, Issued By A Licensed Bank To Extend To The Bidder A Credit Line If Awarded The Contract Or; T.) A Cash Deposit Certified Certifying A Hold Out On Cash Deposits Issued By A Licensed Bank Which Shall Also Be Specific To The Contract To Be Bid, In An Amount Not Lower That The Set By The Procuring Entity In The Bidding Documents, Which Shall Be At Least Equal To 10% Of The Approved Budget For Contract. 4. Sealed Two (2) Envelope System Will Be Received By The Bac At The Barangay Hall Not Later Than 2:00 Pm On December 5, 2024. 5. Barangay Sacme, Tanauan, Leyte Responsibility Whatsoever To Compensate Or Indemnify Bidders For Any Expense Incurred In The Preparation Of Their Bids. 6. Barangay Sacme, Tanauan, Leyte Reserves The Right To Reject Or All Bids To Waive Any Defect And Informally Therein. Hon. Marites B. Salvaña Barangay Chairman Instructions To Bidders 1.1 Only Firms/entities Duly Qualified Eligibility Requirements By The Bids And Awards Committee(bac) To Participate In The Bidding May Submit Proposals. 1.2 Bids /tenders Shall Be Considered Only From Bidders Who Have Visited The Site And Who Have Secured Bid Documents With The Equipment Specification At The Bac Secretary, 1.3 All Bids/tenders Shall Be Prepared In English And Submitted To Bac Secretary; 1.4 The Bidder Shall Prepare His Bid By Accomplishing And Submitting Three (3) Copies Of The Bid/tender Documents(e.i. Prescribed Forms)including The Required Enclosed Attachments. All Blank Space Must Be Properly Filled Out By The Typewriter Except Where Specifically Otherwise Stated. 1.5 If Erasures Or Changes Are Made ,each Erasures Or Changes Must Initiated By The Person Signing The Bid/tender. 1.6 Bid/tenders Will Be Submitted For Any Items. Bids/tenders Must Be For All Items In The Bill Of Quantities Of Any Items. Bid/tenders Shall Be Written In Words As Well As In Figures, The Price In Words Shall Prevail. In Case Of Discrepancy In The Unit Price And The Extension Thereof, The Unit Price Shall Govern. 1.7 All Pages In Bid Tender Documents, Including Annexes Shall Be Signed In Ink. The Bid/tender Must Signed By The Bidder Himself Or Duly Authorized Person Or Persons. 1.8 The Bid/tender Shall Contain All The Information And Data Required To Be Furnished By The Bidder/tender. 1.9 The Bidder Required To Make A Careful Examination And Contemplated In The Bid Documents, Specifications, Special Provisions If Any, And The Form Of Contract, And Fully Informs Himself As To Quality Of Materials. The Submission Of Bids By Any Bidder Shall Be Deemed That He Has Made Such Examination And Is Satisfied As To The Condition To Be Encountered In Performing The Work Contemplated And Has Familiarized Him With All The Requirements Governing Or Affecting Him And His Operations. 1.10 The Barangay Assumes No Obligations Whatsoever To Compensate Or Indemnify The Bidders /tenders For Any Expense Or Loss That May Occur In The Preparation Of Their Proposals, Nor Does The Barangay Guarantee That An Award Will Be Made Under The Contract Documents. Bid Security 1.11 All Bids Shall Be Accomplished By The Bid Security Least Equal To, And Not Lower Than One Percent(1%)as Approved Budget For The Contract To Be Bid In The Form Of Cash, Certified Check, Cashier’s Check ,managers Check, Bank Draft Or Irrevocable Letter Of Credit ,one And One Half Percent(1 ½%) In The Form Of Bank Guarantee, Two And One Half Percent (2 ½%)in The Form Of Surety Bond Callable Upon Demand Issued By A Reputable Surety Or Insurance Company Payable To Barangay Sacme, Tanauan, Leyte As A Guarantee That The Successful Bidder Within Ten Calendar Days(10) Or Less From Receipt Of Notice Of Award ,enter Into Contract With The Barangay And F6rnish The Performance Bond. Bid Securities Shall Be Valid For A Reasonable Period As Indicated Which Shall Not Be Less Than One Hundred Twenty (120) Calendar Days Following The Opening Of Bids. 1.12 No Bid Securities Shall Be Returned To Bidders After The Opening Of Bids And Before Contract Signing, Except Of Those That Failed To Comply With Any Of The Requirement Tone Be Submitted In The First Bid Envelop Of The Bid. 1.13 Failure To Enclose The Required Bid Security In The Form And Amount Prescribed Herein Shall Automatically Disqualify The Bid Concerned. Submission And Receipt Of Bids 1.14 Bid/proposals In The Prescribed Form, Shall Be Submitted In Two (2) Sealed Envelope Properly Marked In Capital Letters The Name/title Of The Project To Be Bid And The Name Of The Bidders, And Must Be Addressed To; The Bac Chairman, Bids And Awards Committee(bac) And Or, Type Bac Chairman, Barangay Sacme, Tanauan, Leyte. The Bidders Shall Mark The Two Envelopes; Do Not Open (date And Time Of Opening Of Bids). 1.15 The First Envelope Which Should Be Marked “1st” Shall Contain The Following; 1.bid Security As To Form Amount And Validity Period ;2.authority Of The Signatory ;3.production /delivery Schedule; 4.manpower Requirements;5.after Sales Service/parts; If Applicable;6.technical Specifications;7. Commitment From The Suppliers/distributors/manufacturer’s Bank To Extend To Him A Credit Line If Awarded The Contract To Be Bid Or Cash Deposit Equivalent To Ten Percent (10%) Of The Abc (p137,721.21);8.duly Signed Certificate In Compliance With The Disclosure Provision Under Section 47 Of The Act In Relation To Other Provisions Of Ra3019 ;duly Signed Statement Attesting To Have Complied With Responsibilities Listed In Gpra Irr-a And Other Documents /materials As Stated In The Instruction To Bidders. 1.16 The Second Envelope, Which Should Be Marked “2nd” Shall Contain The Following; 1.the Bid Prices In The Bill Of Quantities In The Prescribed Bid Form; 2.the Recurring And The Maintenance Costs, If Applicable. Withdrawal Of Bids 1.17 A Bidder May Modify Its Bid Before Deadline For The Submission And Receipt Of Bids Not Allowed To Retrieve Its Original Bid, But Shall Send Another Bid Equally Sealed, Properly Identified And Marked As A Modification And Stamped Received By Bac. 1.18 A Bidder Will Be Allowed To Withdraw His Bid Prior To The Time Set For Its Opening Provided He Communicated His Purpose In Writing To The Bac; In This Case The Bid/tender Shall Return To Him Un Opened .no Bid Can Be Withdrawn For Any Reason Whatsoever After Opening Of Bids Has Commenced. 1.19 The Bidder Shall Be Responsible For Having Taken Steps To Carefully Examine All The Contract Documents ,have Fully Informed Himself With All Conditions, Local Or Otherwise ,relative To The Carrying Out Of The Contract Work; 1.20 The Barangay Shall Not Assume Any Responsibility Regarding Erroneous Interpretations Or Conclusions Obtained By The Bidder Out Of The Data Furnished By The Barangay Or Its Consultant, Either Before Or Conditions Contained In The Contract. Laws, Ordinances , Rules And Regulations 1.21 In Submitting A Proposal/bid ,the Bidder Is Considered To Have Familiarized Himself, Acts, Rules And Regulations Of The Republic Of The Philippines, Including Any Or All Local Ordinances Or Rules Or Regulations, Which In Any Manner May Affect Or Apply To The Operation And Activities Of The Bidders. The Bidder Shall Be The Employer Of The Personnel Whom He Will Engage The Prosecution Of The Contract And Is Under Obligation To Comply With The Labor Laws Of The Philippines. 1.22 In Addition , The Bidder Is Advised To Carefully Examine And To Inform And To Familiarized Himself With All The Ordinances ,rules, And Regulations Adopted By The Barangay In Regards With The Procurement Of Goods. Bidders Competence 1.23 The Barangay Reserves The Right To Fully Examine The Competence And Responsibility Of The Bidder At Any Time Before Award Of Contract By Aby Means And To Reject Any Bid/tender When Statement As To Business And Technical Organizations Or Financial Resources Or Construction Performance Have Been Found To Be False /and Or Fabricated And In The Barangay’s Opinion Would Justify Rejection. Pre Bid Conference 1.24 No Pre Bid Conference Will Be Conducted Except Upon Written Request Of Any Prospective Bidder Which Shall Be Held Within A Reasonable Period Before Prospective To Adequately Prepare The Bids Subject To The Approval Of The Bac. 1.25 Bids Will Be Opened On December 5, 2024 At Exactly 2:00 Pm At The Barangay Hall. Bidders Or Authorized Representative May Attend The Opening Of Bids. 1.26 Immediately After Opening Of Bids The Bac Of The Barangay Will Undertake A Thorough Study And Bid Evaluation Of Proposed Submitted. Award Of The Contract Shall Be Made To The Bidder With The Lowest Calculated Responsive Bid. 1.27 The Barangay Reserves The Right To Reject Any Or All Bids /tenders ,to Waive Informality In The Bid/tender Received .the Right Is Also Reserve To Reject The Bid/tender Of Any Bidder Who (a)have Previously Failed To Satisfactorily Perform Or Complete Any Construction Contract Undertaken By Him. (b)was Qualified In The Eligibility Requirement On The Basis Of Suppressed Or False Information; Or (c) Such Other Compelling Grounds As Determined During Bid Evaluation Of The Proposal Of Bids; 1.28 Within A Period Not Exceeding Fifteen (15) Calendar Days From The Declaration By The Bac Of The Lowest Calculated Responsive Bid Or Highest Rated Responsive Bid And Immediately After Approval Of The Recommendation Of The Bac By The Local Chief Executive Of His Duly Authorized Representative Shall Issue The Notice Of Award To The Winning Bidder. Created By: Hon. Marites B. Salvaña Barangay Chairman
Closing Date5 Dec 2024
Tender AmountPHP 137.7 K (USD 2.3 K)
BARANGAY STO NI O, TANAUAN, LEYTE Tender
Civil And Construction...+2Road Construction, Drainage Work
Philippines
Details: Description Drainage Canal With Cover I. Clearing And Grubbing Ii. Structure Excavation (common Soil) Iii. Structure Concrete For Slab On Fill Iv. Reinforcing Steel Of Reinforced Concrete Structures V. Formworks And Falseworks Road Concreting Vi. Clearing & Grubbing (with Stripping) Vii. Subgrade Preparation (common Material) Viii. Aggregate Subbase Course Ix. Aggregate Base Course X. Pcc Pavement (plain)- Conventional Method, 150mm Thk. 1. Barangay Sto. Niño, Tanauan, Leyte Through The Bids And Awards Comm.) Invites Suppliers, Contractors, & Distributors Of Construction Materials For The Project: Road Concreting With Drainage Canal W/ Cover 2. The Bids And Awards Committee Will Use A Non-discretionary Pass/fail Criterion In The Eligibility Check/screening As Well As The Preliminary Examination Of Bids. 3. The Following Eligibility Documents In Two (2) Copies Duly Certified Must Be Submitted To The Bids And Awards Committee (bac) Not Later Than November 26, 2024: A.) Letter Of Intent; B.) Business License Permit/valid And Current Mayor’s Permit/municipal License; C.) Dti Business Name Registration Or Sec Registration Certificate; D.) Latest Audited Financial Statement; E.) Company Profile; F.) Tax Identification No. (tin); G.) Sworn Statement By The Prospective Bidder That He Is Not “barred” Or “blacklisted” From Participating In The Government Biddings, Including Non-inclusion In The Consolidated Blacklisting Report Issued By Gppb; H.) Other Appropriate License As Maybe Required By The Procuring Entity; I.) Statement Of Prospective Bidder Of All Its Ongoing And Completed Government And Private Contracts Within The Period Specified In The Iaeb, Including Contracts Awarded But Not Yet Started; J.) Articles Of Incorporation, Partnership Or Cooperation, Whichever Is Applicable, Including Amendments Thereto, If Any; K.) Sworn Affidavit Of The Bidder That Is Not Related To The Head Of The Procuring Entity, Members Of The Bac, Twg And Secretariat And The Members Of The Pmo And The Designers Of The Project, By Consanguinity Or Affinity Up To The Third Civil Degree; L.) Valid Joint Venture Agreement In Case Of Joint Venture; M.) Letter Authorizing The Bac Or Its Duly Authorized Representative/s To Verify Any Or All Of The Documents Submitted For Eligibility Check; Certification Under Oath That Each Of The Documents Submitted In Satisfaction Of Eligibility Requirements Is An Authentic And Original Copy, Or A True And Faithful Reproduction Of The Original Complete And That All Statements And Information Provided Therein Are True And Correct; N.) Other Appropriate Licenses As May Be Required By The Procuring Entity Concerned; O.) Copies Of End-user’s Acceptance Letter For Completed Contracts; P.) Specification Of Whether Or Not Prospective Bidder Is A Manufacturer Supplier Or Distributor; Q.) Audited Financial Statement “received” By The Ir Or Its Duly Accredited And Authorized Institutions, For Immediately Preceding Calendar Year, Showing Among Others The Total Assets And Liabilities; R.) Computation Of Net Financial Contracting Capacity (nfcc) Or S.) Certificate Of Commitment Specific To The Contract At Hand, Issued By A Licensed Bank To Extend To The Bidder A Credit Line If Awarded The Contract Or; T.) A Cash Deposit Certified Certifying A Hold Out On Cash Deposits Issued By A Licensed Bank Which Shall Also Be Specific To The Contract To Be Bid, In An Amount Not Lower That The Set By The Procuring Entity In The Bidding Documents, Which Shall Be At Least Equal To 10% Of The Approved Budget For Contract. 4. Sealed Two (2) Envelope System Will Be Received By The Bac At The Barangay Hall Not Later Than 2:00 Pm On November 26, 2024. 5. Barangay Sto. Niño, Tanauan, Leyte Responsibility Whatsoever To Compensate Or Indemnify Bidders For Any Expense Incurred In The Preparation Of Their Bids. 6. Barangay Sto. Niño, Tanauan, Leyte Reserves The Right To Reject Or All Bids To Waive Any Defect And Informally Therein. Hon. Alex L. Miralles Barangay Chairman Instructions To Bidders 1.1 Only Firms/entities Duly Qualified Eligibility Requirements By The Bids And Awards Committee(bac) To Participate In The Bidding May Submit Proposals. 1.2 Bids /tenders Shall Be Considered Only From Bidders Who Have Visited The Site And Who Have Secured Bid Documents With The Equipment Specification At The Bac Secretary, 1.3 All Bids/tenders Shall Be Prepared In English And Submitted To Bac Secretary; 1.4 The Bidder Shall Prepare His Bid By Accomplishing And Submitting Three (3) Copies Of The Bid/tender Documents(e.i. Prescribed Forms)including The Required Enclosed Attachments. All Blank Space Must Be Properly Filled Out By The Typewriter Except Where Specifically Otherwise Stated. 1.5 If Erasures Or Changes Are Made ,each Erasures Or Changes Must Initiated By The Person Signing The Bid/tender. 1.6 Bid/tenders Will Be Submitted For Any Items. Bids/tenders Must Be For All Items In The Bill Of Quantities Of Any Items. Bid/tenders Shall Be Written In Words As Well As In Figures, The Price In Words Shall Prevail. In Case Of Discrepancy In The Unit Price And The Extension Thereof, The Unit Price Shall Govern. 1.7 All Pages In Bid Tender Documents, Including Annexes Shall Be Signed In Ink. The Bid/tender Must Signed By The Bidder Himself Or Duly Authorized Person Or Persons. 1.8 The Bid/tender Shall Contain All The Information And Data Required To Be Furnished By The Bidder/tender. 1.9 The Bidder Required To Make A Careful Examination And Contemplated In The Bid Documents, Specifications, Special Provisions If Any, And The Form Of Contract, And Fully Informs Himself As To Quality Of Materials. The Submission Of Bids By Any Bidder Shall Be Deemed That He Has Made Such Examination And Is Satisfied As To The Condition To Be Encountered In Performing The Work Contemplated And Has Familiarized Him With All The Requirements Governing Or Affecting Him And His Operations. 1.10 The Barangay Assumes No Obligations Whatsoever To Compensate Or Indemnify The Bidders /tenders For Any Expense Or Loss That May Occur In The Preparation Of Their Proposals, Nor Does The Barangay Guarantee That An Award Will Be Made Under The Contract Documents. Bid Security 1.11 All Bids Shall Be Accomplished By The Bid Security Least Equal To, And Not Lower Than One Percent(1%)as Approved Budget For The Contract To Be Bid In The Form Of Cash, Certified Check, Cashier’s Check ,managers Check, Bank Draft Or Irrevocable Letter Of Credit ,one And One Half Percent(1 ½%) In The Form Of Bank Guarantee, Two And One Half Percent (2 ½%)in The Form Of Surety Bond Callable Upon Demand Issued By A Reputable Surety Or Insurance Company Payable To Barangay Sto. Niño, Tanauan, Leyte As A Guarantee That The Successful Bidder Within Ten Calendar Days(10) Or Less From Receipt Of Notice Of Award ,enter Into Contract With The Barangay And F6rnish The Performance Bond. Bid Securities Shall Be Valid For A Reasonable Period As Indicated Which Shall Not Be Less Than One Hundred Twenty (120) Calendar Days Following The Opening Of Bids. 1.12 No Bid Securities Shall Be Returned To Bidders After The Opening Of Bids And Before Contract Signing, Except Of Those That Failed To Comply With Any Of The Requirement Tone Be Submitted In The First Bid Envelop Of The Bid. 1.13 Failure To Enclose The Required Bid Security In The Form And Amount Prescribed Herein Shall Automatically Disqualify The Bid Concerned. Submission And Receipt Of Bids 1.14 Bid/proposals In The Prescribed Form, Shall Be Submitted In Two (2) Sealed Envelope Properly Marked In Capital Letters The Name/title Of The Project To Be Bid And The Name Of The Bidders, And Must Be Addressed To; The Bac Chairman, Bids And Awards Committee(bac) And Or, Type Bac Chairman, Barangay Sto. Niño, Tanauan, Leyte. The Bidders Shall Mark The Two Envelopes; Do Not Open (date And Time Of Opening Of Bids). 1.15 The First Envelope Which Should Be Marked “1st” Shall Contain The Following; 1.bid Security As To Form Amount And Validity Period ;2.authority Of The Signatory ;3.production /delivery Schedule; 4.manpower Requirements;5.after Sales Service/parts; If Applicable;6.technical Specifications;7. Commitment From The Suppliers/distributors/manufacturer’s Bank To Extend To Him A Credit Line If Awarded The Contract To Be Bid Or Cash Deposit Equivalent To Ten Percent (10%) Of The Abc (p839,994.72);8.duly Signed Certificate In Compliance With The Disclosure Provision Under Section 47 Of The Act In Relation To Other Provisions Of Ra3019 ;duly Signed Statement Attesting To Have Complied With Responsibilities Listed In Gpra Irr-a And Other Documents /materials As Stated In The Instruction To Bidders. 1.16 The Second Envelope, Which Should Be Marked “2nd” Shall Contain The Following; 1.the Bid Prices In The Bill Of Quantities In The Prescribed Bid Form; 2.the Recurring And The Maintenance Costs, If Applicable. Withdrawal Of Bids 1.17 A Bidder May Modify Its Bid Before Deadline For The Submission And Receipt Of Bids Not Allowed To Retrieve Its Original Bid, But Shall Send Another Bid Equally Sealed, Properly Identified And Marked As A Modification And Stamped Received By Bac. 1.18 A Bidder Will Be Allowed To Withdraw His Bid Prior To The Time Set For Its Opening Provided He Communicated His Purpose In Writing To The Bac; In This Case The Bid/tender Shall Return To Him Un Opened .no Bid Can Be Withdrawn For Any Reason Whatsoever After Opening Of Bids Has Commenced. 1.19 The Bidder Shall Be Responsible For Having Taken Steps To Carefully Examine All The Contract Documents ,have Fully Informed Himself With All Conditions, Local Or Otherwise ,relative To The Carrying Out Of The Contract Work; 1.20 The Barangay Shall Not Assume Any Responsibility Regarding Erroneous Interpretations Or Conclusions Obtained By The Bidder Out Of The Data Furnished By The Barangay Or Its Consultant, Either Before Or Conditions Contained In The Contract. Laws, Ordinances , Rules And Regulations 1.21 In Submitting A Proposal/bid ,the Bidder Is Considered To Have Familiarized Himself, Acts, Rules And Regulations Of The Republic Of The Philippines, Including Any Or All Local Ordinances Or Rules Or Regulations, Which In Any Manner May Affect Or Apply To The Operation And Activities Of The Bidders. The Bidder Shall Be The Employer Of The Personnel Whom He Will Engage The Prosecution Of The Contract And Is Under Obligation To Comply With The Labor Laws Of The Philippines. 1.22 In Addition , The Bidder Is Advised To Carefully Examine And To Inform And To Familiarized Himself With All The Ordinances ,rules, And Regulations Adopted By The Barangay In Regards With The Procurement Of Goods. Bidders Competence 1.23 The Barangay Reserves The Right To Fully Examine The Competence And Responsibility Of The Bidder At Any Time Before Award Of Contract By Aby Means And To Reject Any Bid/tender When Statement As To Business And Technical Organizations Or Financial Resources Or Construction Performance Have Been Found To Be False /and Or Fabricated And In The Barangay’s Opinion Would Justify Rejection. Pre Bid Conference 1.24 No Pre Bid Conference Will Be Conducted Except Upon Written Request Of Any Prospective Bidder Which Shall Be Held Within A Reasonable Period Before Prospective To Adequately Prepare The Bids Subject To The Approval Of The Bac. 1.25 Bids Will Be Opened On November 26, 2024 At Exactly 2:00 Pm At The Barangay Hall. Bidders Or Authorized Representative May Attend The Opening Of Bids. 1.26 Immediately After Opening Of Bids The Bac Of The Barangay Will Undertake A Thorough Study And Bid Evaluation Of Proposed Submitted. Award Of The Contract Shall Be Made To The Bidder With The Lowest Calculated Responsive Bid. 1.27 The Barangay Reserves The Right To Reject Any Or All Bids /tenders ,to Waive Informality In The Bid/tender Received .the Right Is Also Reserve To Reject The Bid/tender Of Any Bidder Who (a)have Previously Failed To Satisfactorily Perform Or Complete Any Construction Contract Undertaken By Him. (b)was Qualified In The Eligibility Requirement On The Basis Of Suppressed Or False Information; Or (c) Such Other Compelling Grounds As Determined During Bid Evaluation Of The Proposal Of Bids; 1.28 Within A Period Not Exceeding Fifteen (15) Calendar Days From The Declaration By The Bac Of The Lowest Calculated Responsive Bid Or Highest Rated Responsive Bid And Immediately After Approval Of The Recommendation Of The Bac By The Local Chief Executive Of His Duly Authorized Representative Shall Issue The Notice Of Award To The Winning Bidder. Created By: Hon. Alex L. Miralles Barangay Chairman
Closing Soon26 Nov 2024
Tender AmountPHP 839.9 K (USD 14.2 K)
Bureau Of Fisheries And Aquatic Resources Region Iv b Tender
Machinery and Tools...+1Scraps
Philippines
Details: Description 1. The Bureau Of Fisheries And Aquatic Resources (bfar) Regional Fisheries Office - Mimaropa, Department Of Agriculture Intends To Apply The Sum Of Eight Million Eighty-three Thousand (php 8,083,000.00) Pesos Only Being The Abc To Payments Under The Contract For Bid Reference No.: 2025-001 Entitled “supply And Delivery Of Fishing Boats, Fishing Gears And Other Fishing Paraphernalia As Livelihood Development Program In Mimaropa Region For 2025”. The Said Procurement Project Composed Of Three (3) Lots Is Particularly Described As Follows: Procurement Details Pr # 2024-11-0422 End User: Josehari M. Sarabia, Oic-fpssd Item/description Lot No. 1: Supply And Delivery Of Fishing Gears/ Paraphernalia Approved Budget For The Contract: Php 6,703,000.00 Price Of Bid Documents: Php 8,000.00 Sub-lot 1: Two Thousand (2,000) Sets Of Multiple Hook And Line The Specification For One Set Of Multiple Hook And Line Includes The Following: Set A: A) 3 Coil Mononylon, #100 Mm B) 2 Coil Mononylon, #60 Mm C) 2 Coil Mononylon, #40 Mm D) 10 Pcs Swivel Bronze, #4 E) 3 Boxes Hook, #559 F) 3 Boxes Hook, #560 G) 2 Boxes Hook, #562 H) 1/4 Kg Lead Sinker, #2 I) 10 Pcs Multicolored Crystalline/crystalet Bait, 10 Inches X 11 Inches Note: Place The Complete Accessories Of One Set Of Multiple Hook And Line Set A In A Sack With Printed “bfar Mimaropa – Mh& L Set A” Marking And Logo. To Be Delivered To The Following Provinces/locations: Pfo-southern Palawan (puerto Princesa City): 500 Sets Pfo-marinduque: 200 Sets Set B: A) 3 Coil Mononylon, #30 Mm B) 2 Coil Mononylon, #60 Mm C) 2 Coil Mononylon, #40 Mm D) 3 Coil Mononylon #80 Mm E) 10 Pcs Swivel Bronze, #4 F) 3 Boxes Hook, #569 G) 3 Boxes Hook, #568 H) 3 Boxes Hook, #570 I) 1/4 Kg Lead Sinker #2 J) 10 Pcs Multicolored Crystalline/crystalet Bait, 10 Inches X 11 Inches Note: Place The Complete Accessories Of One Set Of Multiple Hook And Line-set B In A Sack, With Printed “bfar Mimaropa – Mh& L Set B - Sub-office, Coron, Palawan” Marking And Logo. To Be Delivered To The Following Province/location: Pfo Sub-office, Coron, Palawan: 380 Sets Set C: A) 3 Coil Mononylon, #80 Mm B) 3 Coil Mononylon, #70 Mm C) 2 Coil Mononylon, #45 Mm D) 2 Coil Mononylon, #50 Mm E) 10 Pcs Swivel Bronze, #4 F) 5 Boxes Hook, #567 G) 5 Boxes Hook, #568 H) 1/4 Kg Lead Sinker, #2 I) 10 Pcs Multicolored Crystalline/crystalet Bait, 10 Inches X 11 Inches Note: Place The Complete Accessories Of One Set Of Multiple Hook And Line-set C In A Sack, With Printed “bfar Mimaropa - Mh& L Set C” Marking And Logo. To Be Delivered To The Following Provinces/locations: Pfo Occidental Mindoro (san Jose): 280 Sets Pfo Oriental Mindoro (pinamalayan): 340 Sets Pfo Romblon (odiongan): 300 Sets Sub-lot 2: Materials Of Fifty (50) Units Of Fish Aggregating Device (fad) – Payao Project The Specification For One Unit Includes The Following: A) 1 Pc, Cylinder Styrofoam (drum Size: 21" Diameter X 36" Length) B) 2 Rolls, Polypropylene Rope #24 (12mm Diameter/200m) C) 1 Roll, P.e. Rope # 14 D) 1 Pc, Fabricated Swivel (3/4) E) 2 Bags, Cement (40 Kgs) F) 10 Pcs, Buri Leaves G) 5 Pcs, Tricycle Tires (used) To Be Delivered To The Following Provinces/locations: Pfo-occidental Mindoro (san Jose): 7 Units Pfo-oriental Mindoro (calapan City) : 9 Units Pfo-marinduque (boac) : 5 Units Pfo-romblon (odiongan): 7 Units Pfo-northern Palawan (coron): 10 Units Pfo-southern Palawan (puerto Princesa City): 12 Units Sub-lot 3: Two Hundred Fifty (250) Sets Of Bottom Set Gill Net The Specification For One Set Of Bottom Set Gill Net Includes The Following: A) 400 M Monofilament (.025mm X 7 Knots X100 Mesh Down) B) 3 Kgs Monoline (110mm/90 Lbs) C) 20 Kgs Lead Sinker (xx) D) 300 Pcs Rubber Floaters (r1a) E) 3 Spools Monofilament (30mm/100 Grams) Note: Place The Complete Accessories Of One Set Of Bottom Set Gill Net In A Bag, With Printed “bfar Mimaropa – Bgsn” Marking And Logo. To Be Delivered To The Following Provinces/locations: Pfo Occidental Mindoro (san Jose) - 35 Sets Pfo Oriental Mindoro (pinamalayan) - 40 Sets Pfo Marinduque (boac) - 25 Sets Pfo Romblon (odiongan) - 40 Sets Pfo Northern Palawan (coron) - 50 Sets Pfo Southern Palawan (puerto Princesa City) - 60 Sets Sub-lot 4: One Hundred Thirty (130) Sets Of Spear Fishing Gadget Specifications: Locally-made Simple Night Dive Spear Fishing Gun; 50 Cm Double Rubber 10 X 3 Mm; Hardwood; And 70 Cm Shaft 3/16 Simple Trigger All Stainless With Floppers Note: Place The Complete Set Of Spear Fishing Gadget In A Sack, With Printed “bfar Mimaropa – Spear Gun” Marking And Logo. To Be Delivered To The Following Provinces/locations: Pfo Occidental Mindoro (san Jose) - 18 Sets Pfo Oriental Mindoro (pinamalayan) - 22 Sets Pfo Marinduque (boac) - 13 Sets Pfo Romblon (odiongan) - 20 Sets Pfo Northern Palawan (coron) - 20 Sets Pfo Southern Palawan (puerto Princesa City) - 37 Sets Lot 2: Eighty (80) Units Of 7.5 Hp Gasoline Marine Engine Approved Budget For The Contract: Php 840,000.00 Price Of Bid Documents: Php 1,000.00 Specification: 3600 Rpm; 212 Cc; And 4 Stroke To Be Delivered To The Following Provinces/locations: Pfo Occidental Mindoro (san Jose) - 11 Units Pfo Oriental Mindoro (calapan City) - 14 Units Pfo Marinduque (boac) - 8 Units Pfo Romblon (odiongan) - 12 Units Pfo Northern Palawan (coron) - 15 Units Pfo Southern Palawan (puerto Princesa City) - 20 Units Lot 3: Four (4) Units Of 24-footer Fiberglass Reinforced Motorized Fishing Boats With 10 Hp Marine Engine Diesel And Underwater Fitting Accessories Approved Budget For The Contract: Php 540,000.00 Price Of Bid Documents: Php 1,000.00 A) 24-footer Fiberglass Reinforced Motorized Fishing Boats B) Underwater Fitting Accessories: Specifications: 1) 1 Unit Stainless Shaft 5/8"x 6" With Thread Ring Nut & Lock Pin 2) 1 Unit Brass Pipe 5/8" X 4" 3) 1 Unit Stainless Propeller 5/8" X 7" 4) 1 Unit Rudder Assembly 5/8" X 3" 5) 1 Unit Cross Joint 5/8" X ( ) 6) 4 Pcs Stud Bolt With Nut & Washers, 3/8" X 2" Note: 1 Unit 10 Hp Marine Engine Is Included To Be Delivered To The Following Province/location: Bfar Mimaropa Regional Office - 4 Units 2. Bfar-mimaropa Now Invites Bids For The Above Procurement Project. Bids Received In Excess Of The Abc Shall Be Automatically Rejected At Bid Opening. Delivery Of The Goods Is Required Within Sixty (60) Days After The Receipt Of Notice To Proceed. Bidders Should Have Completed, Within Five (5) Years From The Date Of Submission And Receipt Of Bids, A Contract Similar To The Project. The Description Of An Eligible Bidder Is Contained In The Bidding Documents, Particularly, In Section Ii (instructions To Bidders). 3. Bidding Will Be Conducted Through Open Competitive Bidding Procedures Using A Non-discretionary “pass/fail” Criterion As Specified In The 2016 Revised Implementing Rules And Regulations (irr) Of Republic Act (ra) No. 9184. Bidding Is Restricted To Filipino Citizens/sole Proprietorships, Partnerships, Or Organizations With At Least Sixty Percent (60%) Interest Or Outstanding Capital Stock Belonging To Citizens Of The Philippines, And To Citizens Or Organizations Of A Country The Laws Or Regulations Of Which Grant Similar Rights Or Privileges To Filipino Citizens, Pursuant To Ra No. 5183. 4. Prospective Bidders May Obtain Further Information Through Mr. Joriel R. Aclan, Bac Secretariat Head Of The Bfar Mimaropa Bac Office, At Telephone No. (043) 288-6322 And Inspect The Bidding Documents At The Address Given Below From 8:00 Am To 5:00 Pm Only, During Mondays Thru Fridays. 5. A Complete Set Of Bidding Documents May Be Acquired By Interested Bidders From The Given Address And Website Below And Upon Payment Of The Applicable Fee For The Bidding Documents, Pursuant To The Latest Guidelines Issued By The Gppb, Until December 9, 2024; 8:30 Am, And May Opt To Purchase Any Or All Lots. 6. The Bfar-mimaropa Will Hold A Pre-bid Conference On November 27, 2024; 10:00 Am At The Address Given Below And/or Through Videoconferencing/webcasting Via Google Meet. Participants As Well As Qualified Bidders Shall Be Notified Of The Link By The Bac Secretariat. 7. Bids Must Be Duly Received By The Bac Secretariat Through Manual Submission At The Office Address Indicated Below, On Or Before December 9, 2024; 10:00 Am. Late Bids Shall Not Be Accepted. 8. All Bids Must Be Accompanied By A Bid Security In Any Of The Acceptable Forms And In The Amount Stated In Itb Clause 14. 9. Bid Opening Shall Be On December 9, 2024; 10:00 Am At The Given Address Below And/or Through Videoconferencing/webcasting Via Google Meet. Bids Will Be Opened In The Presence Of The Bidders’ Representatives Who Choose To Attend The Activity. 10. The Bfar-mimaropa Does Not Condone Any Form Of Solicitation On Any Prospective Winning And Losing Bidders By Any Of Our Staff/ Employees Or Any Other Party. Any Sort Of This Kind Shall Be Reported Immediately To The Office Of The Secretary Or The National Bureau Of Investigation (nbi) For Entrapment And Proper Investigation. 11. The Bfar-mimaropa Reserves The Right To Reject Any And All Bids, Declare A Failure Of Bidding, Or Not Award The Contract At Any Time Prior To Contract Award In Accordance With Sections 35.6 And 41 Of The 2016 Revised Irr Of Ra No. 9184, Without Thereby Incurring Any Liability To The Affected Bidder Or Bidders. 12. For Further Information, Please Refer To: Mr. Joriel R. Aclan, Head, Bids And Awards Committee (bac) Secretariat Bfar Mimaropa Bac Office 2/f Le Grace Bldg., Brgy. Guinobatan, Calapan City, Oriental Mindoro Bac.4b@bfar.da.gov.ph Tel: (043) 288-6322 13. You May Visit This Website: Https://mimaropa.bfar.da.gov.ph/
Closing Date9 Dec 2024
Tender AmountPHP 8 Million (USD 137.1 K)
BARANGAY ATIPOLO, TANAUAN, LEYTE Tender
Civil And Construction...+1Drainage Work
Philippines
Details: Description I. Project Signboard Ii. Occupational Safety And Health Program Iii. Clearing & Grubbing, Removal Of Obstruction Iv. Structure Excavation V. Gravel Bedding Vi. Forms And Falseworks Vii. Drainage Viii. Cross Drain 1. Barangay Atipolo, Tanauan, Leyte Through The Bids And Awards Comm.) Invites Suppliers, Contractors, & Distributors Of Construction Materials For The Project: Construction Of Drainage System W/ Box Culvert 2. The Bids And Awards Committee Will Use A Non-discretionary Pass/fail Criterion In The Eligibility Check/screening As Well As The Preliminary Examination Of Bids. 3. The Following Eligibility Documents In Two (2) Copies Duly Certified Must Be Submitted To The Bids And Awards Committee (bac) Not Later Than December 6, 2024: A.) Letter Of Intent; B.) Business License Permit/valid And Current Mayor’s Permit/municipal License; C.) Dti Business Name Registration Or Sec Registration Certificate; D.) Latest Audited Financial Statement; E.) Company Profile; F.) Tax Identification No. (tin); G.) Sworn Statement By The Prospective Bidder That He Is Not “barred” Or “blacklisted” From Participating In The Government Biddings, Including Non-inclusion In The Consolidated Blacklisting Report Issued By Gppb; H.) Other Appropriate License As Maybe Required By The Procuring Entity; I.) Statement Of Prospective Bidder Of All Its Ongoing And Completed Government And Private Contracts Within The Period Specified In The Iaeb, Including Contracts Awarded But Not Yet Started; J.) Articles Of Incorporation, Partnership Or Cooperation, Whichever Is Applicable, Including Amendments Thereto, If Any; K.) Sworn Affidavit Of The Bidder That Is Not Related To The Head Of The Procuring Entity, Members Of The Bac, Twg And Secretariat And The Members Of The Pmo And The Designers Of The Project, By Consanguinity Or Affinity Up To The Third Civil Degree; L.) Valid Joint Venture Agreement In Case Of Joint Venture; M.) Letter Authorizing The Bac Or Its Duly Authorized Representative/s To Verify Any Or All Of The Documents Submitted For Eligibility Check; Certification Under Oath That Each Of The Documents Submitted In Satisfaction Of Eligibility Requirements Is An Authentic And Original Copy, Or A True And Faithful Reproduction Of The Original Complete And That All Statements And Information Provided Therein Are True And Correct; N.) Other Appropriate Licenses As May Be Required By The Procuring Entity Concerned; O.) Copies Of End-user’s Acceptance Letter For Completed Contracts; P.) Specification Of Whether Or Not Prospective Bidder Is A Manufacturer Supplier Or Distributor; Q.) Audited Financial Statement “received” By The Ir Or Its Duly Accredited And Authorized Institutions, For Immediately Preceding Calendar Year, Showing Among Others The Total Assets And Liabilities; R.) Computation Of Net Financial Contracting Capacity (nfcc) Or S.) Certificate Of Commitment Specific To The Contract At Hand, Issued By A Licensed Bank To Extend To The Bidder A Credit Line If Awarded The Contract Or; T.) A Cash Deposit Certified Certifying A Hold Out On Cash Deposits Issued By A Licensed Bank Which Shall Also Be Specific To The Contract To Be Bid, In An Amount Not Lower That The Set By The Procuring Entity In The Bidding Documents, Which Shall Be At Least Equal To 10% Of The Approved Budget For Contract. 4. Sealed Two (2) Envelope System Will Be Received By The Bac At The Barangay Hall Not Later Than 2:00 Pm On December 6, 2024. 5. Barangay Atipolo, Tanauan, Leyte Responsibility Whatsoever To Compensate Or Indemnify Bidders For Any Expense Incurred In The Preparation Of Their Bids. 6. Barangay Atipolo, Tanauan, Leyte Reserves The Right To Reject Or All Bids To Waive Any Defect And Informally Therein. Hon. Glen Carlo Tiolo Barangay Chairman Instructions To Bidders 1.1 Only Firms/entities Duly Qualified Eligibility Requirements By The Bids And Awards Committee(bac) To Participate In The Bidding May Submit Proposals. 1.2 Bids /tenders Shall Be Considered Only From Bidders Who Have Visited The Site And Who Have Secured Bid Documents With The Equipment Specification At The Bac Secretary, 1.3 All Bids/tenders Shall Be Prepared In English And Submitted To Bac Secretary; 1.4 The Bidder Shall Prepare His Bid By Accomplishing And Submitting Three (3) Copies Of The Bid/tender Documents(e.i. Prescribed Forms)including The Required Enclosed Attachments. All Blank Space Must Be Properly Filled Out By The Typewriter Except Where Specifically Otherwise Stated. 1.5 If Erasures Or Changes Are Made ,each Erasures Or Changes Must Initiated By The Person Signing The Bid/tender. 1.6 Bid/tenders Will Be Submitted For Any Items. Bids/tenders Must Be For All Items In The Bill Of Quantities Of Any Items. Bid/tenders Shall Be Written In Words As Well As In Figures, The Price In Words Shall Prevail. In Case Of Discrepancy In The Unit Price And The Extension Thereof, The Unit Price Shall Govern. 1.7 All Pages In Bid Tender Documents, Including Annexes Shall Be Signed In Ink. The Bid/tender Must Signed By The Bidder Himself Or Duly Authorized Person Or Persons. 1.8 The Bid/tender Shall Contain All The Information And Data Required To Be Furnished By The Bidder/tender. 1.9 The Bidder Required To Make A Careful Examination And Contemplated In The Bid Documents, Specifications, Special Provisions If Any, And The Form Of Contract, And Fully Informs Himself As To Quality Of Materials. The Submission Of Bids By Any Bidder Shall Be Deemed That He Has Made Such Examination And Is Satisfied As To The Condition To Be Encountered In Performing The Work Contemplated And Has Familiarized Him With All The Requirements Governing Or Affecting Him And His Operations. 1.10 The Barangay Assumes No Obligations Whatsoever To Compensate Or Indemnify The Bidders /tenders For Any Expense Or Loss That May Occur In The Preparation Of Their Proposals, Nor Does The Barangay Guarantee That An Award Will Be Made Under The Contract Documents. Bid Security 1.11 All Bids Shall Be Accomplished By The Bid Security Least Equal To, And Not Lower Than One Percent(1%)as Approved Budget For The Contract To Be Bid In The Form Of Cash, Certified Check, Cashier’s Check ,managers Check, Bank Draft Or Irrevocable Letter Of Credit ,one And One Half Percent(1 ½%) In The Form Of Bank Guarantee, Two And One Half Percent (2 ½%)in The Form Of Surety Bond Callable Upon Demand Issued By A Reputable Surety Or Insurance Company Payable To Barangay Atipolo, Tanauan, Leyte As A Guarantee That The Successful Bidder Within Ten Calendar Days(10) Or Less From Receipt Of Notice Of Award ,enter Into Contract With The Barangay And F6rnish The Performance Bond. Bid Securities Shall Be Valid For A Reasonable Period As Indicated Which Shall Not Be Less Than One Hundred Twenty (120) Calendar Days Following The Opening Of Bids. 1.12 No Bid Securities Shall Be Returned To Bidders After The Opening Of Bids And Before Contract Signing, Except Of Those That Failed To Comply With Any Of The Requirement Tone Be Submitted In The First Bid Envelop Of The Bid. 1.13 Failure To Enclose The Required Bid Security In The Form And Amount Prescribed Herein Shall Automatically Disqualify The Bid Concerned. Submission And Receipt Of Bids 1.14 Bid/proposals In The Prescribed Form, Shall Be Submitted In Two (2) Sealed Envelope Properly Marked In Capital Letters The Name/title Of The Project To Be Bid And The Name Of The Bidders, And Must Be Addressed To; The Bac Chairman, Bids And Awards Committee(bac) And Or, Type Bac Chairman, Barangay Atipolo, Tanauan, Leyte. The Bidders Shall Mark The Two Envelopes; Do Not Open (date And Time Of Opening Of Bids). 1.15 The First Envelope Which Should Be Marked “1st” Shall Contain The Following; 1.bid Security As To Form Amount And Validity Period ;2.authority Of The Signatory ;3.production /delivery Schedule; 4.manpower Requirements;5.after Sales Service/parts; If Applicable;6.technical Specifications;7. Commitment From The Suppliers/distributors/manufacturer’s Bank To Extend To Him A Credit Line If Awarded The Contract To Be Bid Or Cash Deposit Equivalent To Ten Percent (10%) Of The Abc (p249,982.78);8.duly Signed Certificate In Compliance With The Disclosure Provision Under Section 47 Of The Act In Relation To Other Provisions Of Ra3019 ;duly Signed Statement Attesting To Have Complied With Responsibilities Listed In Gpra Irr-a And Other Documents /materials As Stated In The Instruction To Bidders. 1.16 The Second Envelope, Which Should Be Marked “2nd” Shall Contain The Following; 1.the Bid Prices In The Bill Of Quantities In The Prescribed Bid Form; 2.the Recurring And The Maintenance Costs, If Applicable. Withdrawal Of Bids 1.17 A Bidder May Modify Its Bid Before Deadline For The Submission And Receipt Of Bids Not Allowed To Retrieve Its Original Bid, But Shall Send Another Bid Equally Sealed, Properly Identified And Marked As A Modification And Stamped Received By Bac. 1.18 A Bidder Will Be Allowed To Withdraw His Bid Prior To The Time Set For Its Opening Provided He Communicated His Purpose In Writing To The Bac; In This Case The Bid/tender Shall Return To Him Un Opened .no Bid Can Be Withdrawn For Any Reason Whatsoever After Opening Of Bids Has Commenced. 1.19 The Bidder Shall Be Responsible For Having Taken Steps To Carefully Examine All The Contract Documents ,have Fully Informed Himself With All Conditions, Local Or Otherwise ,relative To The Carrying Out Of The Contract Work; 1.20 The Barangay Shall Not Assume Any Responsibility Regarding Erroneous Interpretations Or Conclusions Obtained By The Bidder Out Of The Data Furnished By The Barangay Or Its Consultant, Either Before Or Conditions Contained In The Contract. Laws, Ordinances , Rules And Regulations 1.21 In Submitting A Proposal/bid ,the Bidder Is Considered To Have Familiarized Himself, Acts, Rules And Regulations Of The Republic Of The Philippines, Including Any Or All Local Ordinances Or Rules Or Regulations, Which In Any Manner May Affect Or Apply To The Operation And Activities Of The Bidders. The Bidder Shall Be The Employer Of The Personnel Whom He Will Engage The Prosecution Of The Contract And Is Under Obligation To Comply With The Labor Laws Of The Philippines. 1.22 In Addition , The Bidder Is Advised To Carefully Examine And To Inform And To Familiarized Himself With All The Ordinances ,rules, And Regulations Adopted By The Barangay In Regards With The Procurement Of Goods. Bidders Competence 1.23 The Barangay Reserves The Right To Fully Examine The Competence And Responsibility Of The Bidder At Any Time Before Award Of Contract By Aby Means And To Reject Any Bid/tender When Statement As To Business And Technical Organizations Or Financial Resources Or Construction Performance Have Been Found To Be False /and Or Fabricated And In The Barangay’s Opinion Would Justify Rejection. Pre Bid Conference 1.24 No Pre Bid Conference Will Be Conducted Except Upon Written Request Of Any Prospective Bidder Which Shall Be Held Within A Reasonable Period Before Prospective To Adequately Prepare The Bids Subject To The Approval Of The Bac. 1.25 Bids Will Be Opened On December 6, 2024 At Exactly 2:00 Pm At The Barangay Hall. Bidders Or Authorized Representative May Attend The Opening Of Bids. 1.26 Immediately After Opening Of Bids The Bac Of The Barangay Will Undertake A Thorough Study And Bid Evaluation Of Proposed Submitted. Award Of The Contract Shall Be Made To The Bidder With The Lowest Calculated Responsive Bid. 1.27 The Barangay Reserves The Right To Reject Any Or All Bids /tenders ,to Waive Informality In The Bid/tender Received .the Right Is Also Reserve To Reject The Bid/tender Of Any Bidder Who (a)have Previously Failed To Satisfactorily Perform Or Complete Any Construction Contract Undertaken By Him. (b)was Qualified In The Eligibility Requirement On The Basis Of Suppressed Or False Information; Or (c) Such Other Compelling Grounds As Determined During Bid Evaluation Of The Proposal Of Bids; 1.28 Within A Period Not Exceeding Fifteen (15) Calendar Days From The Declaration By The Bac Of The Lowest Calculated Responsive Bid Or Highest Rated Responsive Bid And Immediately After Approval Of The Recommendation Of The Bac By The Local Chief Executive Of His Duly Authorized Representative Shall Issue The Notice Of Award To The Winning Bidder. Created By: Hon. Glen Carlo Tiolo Barangay Chairman
Closing Date6 Dec 2024
Tender AmountPHP 249.9 K (USD 4.2 K)
Department Of Public Works And Highways Tender
Civil And Construction...+1Bridge Construction
Philippines
Details: Description Republic Of The Philippines Department Of Public Works And Highways Regional Office Ii Dalan Na Pavvurulun, Rgc, Carig Sur, Tuguegarao City, Cagayan Invitation To Bid For 25b00029 : Oo1: Ensure Safe And Reliable National Road System: Bridge Program - Construction Of New Bridges - Claveria Viaduct Along Maharlika North Rd 1. The Dpwh Regional Office Ii, Through The Dpwh Fy 2025 Nep (epa - Early Procurement Activity) Intends To Apply The Sum Of ₱285,192,000.00 Being The Approved Budget For The Contract (abc) To Payments Under The Contract 25b00029: Oo1: Ensure Safe And Reliable National Road System: Bridge Program - Construction Of New Bridges - Claveria Viaduct Along Maharlika North Rd. Bids Received In Excess Of The Abc Shall Be Automatically Rejected At Bid Opening. 1. The Dpwh Regional Office Ii Through Its Bids And Awards Committee Now Invites Bids For The Hereunder Works: Name Of Contract : Oo1: Ensure Safe And Reliable National Road System: Bridge Program - Construction Of New Bridges - Claveria Viaduct Along Maharlika North Rd Contract Id No. : 25b00029 Location : Claveria, Cagayan Brief Project Description : Completion Of The First 2-lanes Including Slope Protection & Approach Slab Concreting Of 8pcs. - 2.0m Dia. X 46.20m Bored Pile @ Abutment A Piers 5 To 7 Concreting Of 2pcs. – 1.60m Dia. X 36.20m Bored Pile @ Abutment B Installation Of 7 Pcs. Single Arm Led Roadway Lighting 12m Pole @ Pier Coping 1 To 7 Steel Gravel Platform Concreting Of 11pcs. – 2.0m Dia. X 46.20m Bored Pile @ Piers 2 To 7 (other 2-lanes) Scope Of Works : Facilities For The Engineer • Provision (rental Basis), Operation And Maintenance Of Combined Field Office, Laboratory And Living Quarters Building For The Engineer • Provision Of Furniture /fixtures & Appliances For The Field Office Of The Engineer • Provision Of 4x2 Pickup Type Service Vehicle For The Engineer (rental Basis) • Operation And Maintenance Of 4x2 Pickup Type Service Vehicle For The Engineer Other General Requirements • Project Billboard/signboard (dpwh, Coa, Denr) • Occupational Safety And Health Program • Traffic Management • Mobilization/demobilization • Environmental Management And Monitoring Earthworks • Removal Of Structures And Obstruction (0.30m Thick – Pccp, Steel, Steel H-piles) • Excavation (unsuitable, Surplus Common, Structure) • Embankment (from Borrow) • Subgrade Preparation Subbase And Base Course • Aggregate Subbase Course Surface Courses • Pccp, 0.30m Thick, 14-day Concrete Road/bridge Construction • Steel H-piles, (furnished, Driven) • Concrete Piles Cast In Drilled Holes • Permanent Casing • Concrete Railing Standard • Pile Integrity Testing, Crosshole-sonic • High Strain Dynamic Testing (p.d.a) • Structural Steel, (furnished, Fabricated & Erected) Grade 36 • Bolts With Nuts And Washers • Reinforcing Steel Grade (40 & 60) (bridge) • Structural Concrete (20.68 & 27.58) Mpa Class A 28 Days • Structural Concrete, Painting Works • Prestressed Structural Concrete Members (24.00, 30.00, 36.00) M Type Iv-b I-girders • Lean Concrete, Class B, 16.5 Mpa • Paint • Premolded Expansion Joint Filler With Sealant • Expansion Joint • Elastomeric Bridge Bearing • Elastomeric Bridge Bearing (accessories) Drainage And Slope Protection Structures • Grouted Riprap A • Gabions 0.5m X 1m X 2m Metallic Coated • Filter Cloth • Drainpipe Galvanized Miscellaneous Structures • Metal Guardrail (metal Beam) Including Post Single W-beam • Metal Beam End Piece Bull Nose • Road Signs (warning, Regulatory) • Hazard Markers (one-way Hazard Markers, Chevron Signs) • Reflectorized Thermoplastic Pavement Markings (white & Yellow) • Reflectorized Thermoplastic Rumble Strips • Roadway Lighting • Road Safety Barrier System Plastic Jersey Type – Waterfilled • Impact Attenuator/crash Cushion Stationary Gating - Sand Filled Barrels Bank And Slope Protection Works • Geotextile (bridge) • Separation Geotextile Approved Budget For The Contract (abc) : ₱285,192,000.00 Contract Duration : 448 Calendar Days Inclusive Of 30 Unworkable/rainy Days, 88 Sundays And Holidays 2. The Major Category Of Work For The Project Is Bcccp - Bridges: Construction-concrete (superstructure) With Cast-in-place Piles. 3. Prospective Bidders Should Be Registered With And Classified By The Philippine Contractors Accreditation Board (pcab) With Pcab License Size Range Of At Least Medium B For Bridges. Contractors/applicants Who Wish To Participate In This Bidding Are Encouraged To Enroll In The Dpwh Civil Works Application (cwa) At The Dpwh Procurement Service (prs), 5th Floor, Dpwh Bldg., Bonifacio Drive, Port Area, Manila, While Those Already Enrolled Shall Keep Their Records Current And Updated. The Contractor’s Eligibility To Bid On The Project Will Be Determined Using The Dpwh Contractor Profile Eligibility Process (cpep) And Subject To Further Post-qualification. Information On Registration Can Be Obtained From The Prs During Working Weekdays From 7:00 Am To 4:00 Pm Or At The Dpwh Website Www.dpwh.gov.ph. 4. Pursuant To Gppb Resolution No. 15- 2021 Dated October 14, 2021, Prospective Bidders Shall Submit In Their First Envelope The Updated Philgeps Certificate Of Platinum Registration And Membership In Accordance With Sections 23.3, 24.4.3 And 54 Of Republic Act 9184 (ra9184), All Class “a” Eligibility Documents Covered By Section 8.5.2 Of The 2016 Revised Irr Of Ra 9184 Supporting The Veracity, Authenticity And Validity Of The Certificate Shall Remain Current And Updated, And That Failure By The Prospective Bidder To Update Its Philgeps Certificate Of Platinum Registration And Membership With The Current And Updated Class “a” Eligibility Documents Covered By Section 8.5.2 Of The 2016 Revised Irr Of Ra 9184 Shall Result In The Automatic Suspension Of The Validity Of Its Certificate Of Platinum Registration And Membership Until Such Time That All Of The Expired Class “a” Eligibility Documents Has Been Updated. 5. Bidders Are Required To Update Their Existing Philgeps Registration (platinum) In The Dpwh Civil Works Registry Prior To The Scheduled Receipt And Opening Of Bids. 6. Bidding Will Be Conducted Through Open Competitive Bidding Procedures Using Non-discretionary “pass/fail” Criterion As Specified In The 2016 Revised Implementing Rules And Regulations (irr) Of Republic Act 9184 (ra 9184), Otherwise Known As The "“government Procurement Reform Act”. The Contract Shall Be Awarded To The Lowest Calculated Responsive Bidder (lcrb) Who Was Determined As Such During Post-qualification. 7. Interested Bidders May Obtain Further Information From The Dpwh Regional Office Ii And Inspect The Bidding Documents At Procurement Staff, 4th Floor, Dpwh Regional Office No. Ii Extension Bldg. 2, Regional Government Center, Carig Sur, Tuguegarao City, Cagayan During Weekdays From 8:00 A.m. To 5:00 P.m.. 8. A Complete Set Of Bidding Documents May Be Acquired By Interested Bidders On November 13 - December 02, 2024, From The Address Given Below And Upon Payment Of The Applicable Fee For The Bidding Documents, Pursuant To The Latest Guidelines Issued By The Gppb, In The Amount Of Fifty Thousand Pesos Only (₱50,000.00). Pursuant To Section 17. 5 Of The 2016 Revised Irr Of Ra 9184, Bidding Documents Fee May Be Refunded In Accordance With The Aforementioned Guidelines Based On The Grounds Provided For Under Section 41 Of Ra 9184 And Its Irr. 9. The Bidding Documents May Also Be Downloaded Free Of Charge From The Website Of The Philippine Government Electronic Procurement System (philgeps), And The Website Of The Procuring Entity, Provided That Bidders Shall Pay The Applicable Fee For The Bidding Documents Not Later Than The Submission Of Their Bids. 10. The Dpwh Regional Office Ii Will Hold A Pre-bid Conference On November 20, 2024, 10:00 Am At The Procurement Conference Room, 4th Floor, Dpwh Regional Office Ii Extension Bldg. 2, Regional Government Center, Carig Sur, Tuguegarao City, Cagayan, And/or Through Webcasting Via Youtube Channel (dpwh Regional Office Ii Procurement Livestream) Which Shall Be Open To Prospective Bidders. Prospective Bidders Are Encouraged To Send Their Technical Personnel To Attend The Pre-bid Conference. 11. Bid Submission May Be Done Manually Or Electronically. However, Bidders Should Only Select One Mode Of Submission, Either Manual Or Electronic. Similar To Manual Submission, The Guidelines For The Preparation And Submission Of An Electronic Bid Are Contained In The Bds Clause 17. 12. Bids Must Be Duly Received By The Bac Secretariat For Manual Submission At The Procurement Conference Room, 4th Floor, Dpwh Regional Office Ii Extension Bldg. 2, Regional Government Center, Carig Sur, Tuguegarao City, Cagayan Or At Electronicbids_r2@dpwh.gov.ph For Electronic Submission And Receipt Of Bids On Or Before December 02, 2024 At 10:00 Am. Late Bids Shall Not Be Accepted. 13. All Bids Must Be Accompanied By A Bid Security In Any Of The Acceptable Forms And In The Amount Stated In Bds Clause 15.1. 14. Bid Opening Shall Be On December 02, 2024, Immediately After The Deadline For The Submission Of Bid At The Procurement Conference Room, 4th Floor, Dpwh Regional Office Ii Extension Bldg. 2, Regional Government Center, Carig Sur, Tuguegarao City, Cagayan. Bids Will Be Opened In The Presence Of The Bidders’ Representatives Who Choose To Attend At The Address Below. 15. The Dpwh Regional Office Ii Reserves The Right To Reject Any And All Bids, Declare A Failure Of Bidding, Or Not Award The Contract At Any Time Prior To Contract Award In Accordance With Sections 35.6 And 41 Of The 2016 Revised Irr Of Ra 9184, Updated As Of July 19, 2024, Without Thereby Incurring Any Liability To The Affected Bidder Or Bidders. 16. You May Visit The Following Websites; For Downloading Bidding Documents: Dpwh Website: Www.dpwh.gov.ph Philgeps Website: Www.philgeps.gov.ph Livestreaming Website: Https://www.youtube.com/@dpwh.ro.2 For Online Bid Submission: Electronicbids_r2@dpwh.gov.ph 17. For Further Information, Please Refer To: Hilario Y. Casem Engineer Iv Head, Procurement Staff Dpwh Regional Office Ii Carig Sur, Tuguegarao City, Cagayan Contact No.: 0935-176-0624 Email Address: Casem.hilario@dpwh.gov.ph Bernard T. Calabazaron Chief, Qah Division Bac Chairperson Dpwh Regional Office Ii Carig Sur, Tuguegarao City, Cagayan Calabazaron.bernard@dpwh.gov.ph Date Of Posting: Dpwh And Philgeps Websites: November 13-19, 2024 Conspicuous Place (procurement Bulletin Board): November 13-19, 2024
Closing Date2 Dec 2024
Tender AmountPHP 285.1 Million (USD 4.8 Million)
Department Of Public Works And Highways Tender
Civil And Construction...+1Building Construction
Corrigendum : Closing Date Modified
Philippines
Details: Description Republic Of The Philippines Department Of Public Works And Highways Regional Office Ii Dalan Na Pavvurulun, Rgc, Carig Sur, Tuguegarao City, Cagayan Invitation To Bid For 24b00126 (re-advertisement) : Department Of Health - Fy 2024 Health Facilities Enhancement Program (hfep) - Rural Health Units (rural Health Unit): 1. Completion/ Equipping Of Super Health Centers Echague Super Health Center Echague, Isabela - 2. Completion/ Equipping Of Super Health Centers San Mateo Super Health Center San Mateo, Isabela - 3. Completion/ Equipping Of Super Health Centers San Isidro Super Health Center San Isidro, Isabela 1. The Dpwh Regional Office Ii, Through The Ra 11975 (gaa Fy 2024) Intends To Apply The Sum Of ₱17,910,000.00 Being The Approved Budget For The Contract (abc) To Payments Under The Contract 24b00126: Department Of Health - Fy 2024 Health Facilities Enhancement Program (hfep) - Rural Health Units (rural Health Unit): 1. Completion/ Equipping Of Super Health Centers Echague Super Health Center Echague, Isabela - 2. Completion/ Equipping Of Super Health Centers San Mateo Super Health Center San Mateo, Isabela - 3. Completion/ Equipping Of Super Health Centers San Isidro Super Health Center San Isidro, Isabela. Bids Received In Excess Of The Abc Shall Be Automatically Rejected At Bid Opening. Project Name Abc 1 Completion/ Equipping Of Super Health Centers Echague Super Health Center Echague, Isabela ₱ 5,970,000.00 2 Completion/ Equipping Of Super Health Centers San Mateo Super Health Center San Mateo, Isabela ₱ 5,970,000.00 3 Completion/ Equipping Of Super Health Centers San Isidro Super Health Center San Isidro, Isabela ₱ 5,970,000.00 Total Abc ₱ 17,910,000.00 Note: 1. The Bidder Must Bid All Projects Provided That The Bid Amount Per Project Must Not Exceed Its Corresponding Abc. 2. The Bidder Must Include In Its Financial Document The Respective Bill Of Quantities And Detailed Estimates Per Project. 1. The Dpwh Regional Office Ii Through Its Bids And Awards Committee Now Invites Bids For The Hereunder Works: Name Of Contract : Department Of Health - Fy 2024 Health Facilities Enhancement Program (hfep) - Rural Health Units (rural Health Unit): 1. Completion/ Equipping Of Super Health Centers Echague Super Health Center Echague, Isabela - 2. Completion/ Equipping Of Super Health Centers San Mateo Super Health Center San Mateo, Isabela - 3. Completion/ Equipping Of Super Health Centers San Isidro Super Health Center San Isidro, Isabela Contract Id No. : 24b00126 Location : Isabela Brief Project Description : Construction Of Patient's Waiting Area, Powerhouse, Ambulance Bay, Placenta Vault, Sharps And Needles Vault And Catch Basin, Improvement Of Ramp, Installation Of Sewer Lines, Storm Drainage, And Water Line System, Electrical Works, Fire Alarm And Air Conditioning Unit, Construction Of Cabinets Scope Of Works : Other General Requirement • Permits And Clearances • Project Billboard / Signboard • Occupational Safety And Health Program • Mobilization/demobilization Earthworks • Removal Of Structures And Obstruction • Excavation (surplus Common, Structure) • Embankment (from Structure Excavation And Borrow) • Gravel Fill • Subgrade Preparation Subbase And Base Course • Aggregate Subbase Course Surface Courses • Pccp – 0.15 M Thick, 14 Day Concrete Plain And Reinforced Concrete Works • Structural Concrete, 3000 Psi, Class A, 28 Days • Reinforcing Steel (deformed) Grade (40 & 60) • Formworks And Falseworks Finishing And Other Civil Works • Soil Poisoning • Catch Basin • Sewer Line Works • Storm Drainage And Downspout • Sanitary/plumbing Fixtures • Cold Water Lines • Ceiling (aluminum Metal Cladding) • Ceiling (4.5mm Thick Ficem Board, Prepainted Metal Panel) On Metal Frame • Wall • Carpentry And Joinery Works • Finishing Hardware • Fire Rated Fire Exit Steel Door • Steel Doors And Frames • Aluminum Glass Windows (sliding, Awning & Fixed) Type • Roll-up Door (steel) • Special Performance Glass Or Processed Glass - 10mm Thk • Fabricated Metal Roofing Accessory, 0.60 Mm, (flashing And Gutters) • Waterproofing, Liquid • (glazed, Unglazed & Granite) Tiles • Vinyl Tiles (anti-bacterial) • Cement (plaster, Broom, Floor) Finish • Stamped Concrete • Non -slip Finish • Decorative Stones • Painting Works, (masonry/concrete, Wood, Steel) • Metal Deck Panel • Pvc Doors And Frames • Reflective Insulation • Chb Non-load Bearing (including Reinforcing Steel) (100mm & 150mm) • Louver Block • Metal Structure Accessories, (turnbuckle, Bolts And Rods, Sagrods, Cross Bracing & Steel Plates) • Structural Steel (purlins) • Stainless Steel Railing Electrical Works • Rigid Polyvinyl Chloride Pipes (pvc/upvc) – (20, 25, 65 & 90) Mm Dia. • Conduits, Boxes & Fittings (conduit Works/conduit Rough-in) • Electric Wire (2.0, 3.5, 5.5, 14.0, 30.0, 80.0, 125.0) Mm² Tw/thhn/thwn - Stranded) • Single Pole Wall Switch On One Switch Plate • Duplex (2 Single Pole Wall Switches On One Switch Plate) • Triplex (3 Single Pole Wall Switches On One Switch Plate) • Single Convenience Outlet/receptacle, Grounding Type (gt) • Duplex Convenience Outlets/receptacles (gt) • Heavy Duty Convenience Outlet/receptacle, Grounding Type • Wires And Wiring Devices • Panelboard With Main & Branch Breakers • Pole Mounted Power Transformer (oisc) With Complete Accessories, Single Or Three Phase, Pole Type Or Flatform • Generator Single Or Three Phase Stand-by • Lighting Fixtures • Rc Pole Mechanical Works • Exhaust Fan, (wall Mounted) • Water Tank, Stainless • (ventilating, Water Pumping, Fire Alarm & Air Conditioning) System Approved Budget For The Contract (abc) : ₱17,910,000.00 Contract Duration : 85 Calendar Days Inclusive Of 6 Unworkable/rainy Days, 19 Sundays And Holidays 2. The Major Category Of Work For The Project Is Bicwoplc - Buildings: Construction-without Piles-low Rise-concrete Frame(1 To 5 Storey ). 3. Prospective Bidders Should Be Registered With And Classified By The Philippine Contractors Accreditation Board (pcab) With Pcab License Size Range Of At Least Small B For Buildings. Contractors/applicants Who Wish To Participate In This Bidding Are Encouraged To Enroll In The Dpwh Civil Works Application (cwa) At The Dpwh Procurement Service (prs), 5th Floor, Dpwh Bldg., Bonifacio Drive, Port Area, Manila, While Those Already Enrolled Shall Keep Their Records Current And Updated. The Contractor’s Eligibility To Bid On The Project Will Be Determined Using The Dpwh Contractor Profile Eligibility Process (cpep) And Subject To Further Post-qualification. Information On Registration Can Be Obtained From The Prs During Working Weekdays From 7:00 Am To 4:00 Pm Or At The Dpwh Website Www.dpwh.gov.ph. 4. Pursuant To Gppb Resolution No. 15- 2021 Dated October 14, 2021, Prospective Bidders Shall Submit In Their First Envelope The Updated Philgeps Certificate Of Platinum Registration And Membership In Accordance With Sections 23.3, 24.4.3 And 54 Of Republic Act 9184 (ra9184), All Class “a” Eligibility Documents Covered By Section 8.5.2 Of The 2016 Revised Irr Of Ra 9184 Supporting The Veracity, Authenticity And Validity Of The Certificate Shall Remain Current And Updated, And That Failure By The Prospective Bidder To Update Its Philgeps Certificate Of Platinum Registration And Membership With The Current And Updated Class “a” Eligibility Documents Covered By Section 8.5.2 Of The 2016 Revised Irr Of Ra 9184 Shall Result In The Automatic Suspension Of The Validity Of Its Certificate Of Platinum Registration And Membership Until Such Time That All Of The Expired Class “a” Eligibility Documents Has Been Updated. 5. Bidders Are Required To Update Their Existing Philgeps Registration (platinum) In The Dpwh Civil Works Registry Prior To The Scheduled Receipt And Opening Of Bids. 6. Bidding Will Be Conducted Through Open Competitive Bidding Procedures Using Non-discretionary “pass/fail” Criterion As Specified In The 2016 Revised Implementing Rules And Regulations (irr) Of Republic Act 9184 (ra 9184), Otherwise Known As The "“government Procurement Reform Act”. The Contract Shall Be Awarded To The Lowest Calculated Responsive Bidder (lcrb) Who Was Determined As Such During Post-qualification. 7. Interested Bidders May Obtain Further Information From The Dpwh Regional Office Ii And Inspect The Bidding Documents At Procurement Staff, 4th Floor, Dpwh Regional Office No. Ii Extension Bldg. 2, Regional Government Center, Carig Sur, Tuguegarao City, Cagayan During Weekdays From 8:00 A.m. To 5:00 P.m.. 8. A Complete Set Of Bidding Documents May Be Acquired By Interested Bidders On November 6 - 26, 2024, From The Address Given Below And Upon Payment Of The Applicable Fee For The Bidding Documents, Pursuant To The Latest Guidelines Issued By The Gppb, In The Amount Of Twenty Five Thousand Pesos Only (₱25,000.00). Pursuant To Section 17. 5 Of The 2016 Revised Irr Of Ra 9184, Bidding Documents Fee May Be Refunded In Accordance With The Aforementioned Guidelines Based On The Grounds Provided For Under Section 41 Of Ra 9184 And Its Irr. 9. The Bidding Documents May Also Be Downloaded Free Of Charge From The Website Of The Philippine Government Electronic Procurement System (philgeps), And The Website Of The Procuring Entity, Provided That Bidders Shall Pay The Applicable Fee For The Bidding Documents Not Later Than The Submission Of Their Bids. 10. The Dpwh Regional Office Ii Will Hold A Pre-bid Conference On November 13, 2024, 1:00 Pm At The Procurement Conference Room, 4th Floor, Dpwh Regional Office Ii Extension Bldg. 2, Regional Government Center, Carig Sur, Tuguegarao City, Cagayan, And/or Through Webcasting Via Youtube Channel (dpwh Regional Office Ii Procurement Livestream) Which Shall Be Open To Prospective Bidders. Prospective Bidders Are Encouraged To Send Their Technical Personnel To Attend The Pre-bid Conference. 11. Bid Submission May Be Done Manually Or Electronically. However, Bidders Should Only Select One Mode Of Submission, Either Manual Or Electronic. Similar To Manual Submission, The Guidelines For The Preparation And Submission Of An Electronic Bid Are Contained In The Bds Clause 17. 12. Bids Must Be Duly Received By The Bac Secretariat For Manual Submission At The Procurement Conference Room, 4th Floor, Dpwh Regional Office Ii Extension Bldg. 2, Regional Government Center, Carig Sur, Tuguegarao City, Cagayan Or At Electronicbids_r2@dpwh.gov.ph For Electronic Submission And Receipt Of Bids On Or Before November 26, 2024 At 10:00 Am. Late Bids Shall Not Be Accepted. 13. All Bids Must Be Accompanied By A Bid Security In Any Of The Acceptable Forms And In The Amount Stated In Bds Clause 15.1. 14. Bid Opening Shall Be On November 26, 2024, Immediately After The Deadline For The Submission Of Bid At The Procurement Conference Room, 4th Floor, Dpwh Regional Office Ii Extension Bldg. 2, Regional Government Center, Carig Sur, Tuguegarao City, Cagayan. Bids Will Be Opened In The Presence Of The Bidders’ Representatives Who Choose To Attend At The Address Below. 15. The Dpwh Regional Office Ii Reserves The Right To Reject Any And All Bids, Declare A Failure Of Bidding, Or Not Award The Contract At Any Time Prior To Contract Award In Accordance With Sections 35.6 And 41 Of The 2016 Revised Irr Of Ra 9184, Updated As Of July 19, 2024, Without Thereby Incurring Any Liability To The Affected Bidder Or Bidders. 16. You May Visit The Following Websites; For Downloading Bidding Documents: Dpwh Website: Www.dpwh.gov.ph Philgeps Website: Www.philgeps.gov.ph Livestreaming Website: Https://www.youtube.com/@dpwh.ro.2 For Online Bid Submission: Electronicbids_r2@dpwh.gov.ph 17. For Further Information, Please Refer To: Hilario Y. Casem Engineer Iv Head, Procurement Staff Dpwh Regional Office Ii Carig Sur, Tuguegarao City, Cagayan Contact No.: 0935-176-0624 Email Address: Casem.hilario@dpwh.gov.ph Bernard T. Calabazaron Chief, Qah Division Bac Chairperson Dpwh Regional Office Ii Carig Sur, Tuguegarao City, Cagayan Calabazaron.bernard@dpwh.gov.ph Date Of Posting: Dpwh And Philgeps Websites: November 6 -12, 2024 Conspicuous Place (procurement Bulletin Board): November 6 -12, 2024
Closing Soon26 Nov 2024
Tender AmountPHP 17.9 Million (USD 303.8 K)
City Of Malaybalay Tender
Machinery and Tools...+1Automobiles and Auto Parts
Philippines
Details: Description Lot 1 1 Unit Multi-crop Tthresher Technical Specifications: 1. Power Required: Water Cooled Diesel Engine, 12-12.5hp 2. Usage/application: Multi-crop Threshing 3. Category: Thresher 4. Materials: Steel/iron 5. Main Frame: A Bar 5mm X 1 ½, A Bar 5mm X 1 6. Sliding: Bi Plate # 18 (1.2mm) 7. Threshing Cylinder Cover & Cover Frame: Bi Plate #14 (2.0mm),flat Bar 5mm X 1 ¼ , Flat Bar 5mm X 1 ¾ 8. Threshing Cylinder Shaft Main: 1 ¼ 9. Peg Tooth: Flat Bar8.5mm X 1 ¼, Plain Bar 16mm 10. Blower Shaft: 1” Dia. 11. Blower Housing Bi Plate # 18 (1.2mm) 12. Feed Tray Bi Plate #18 (1.2mm) A Bar 4mmx1” 13. Screen/sieve Bolted Wire # 16x1/2 14. Cart Gi Pipe 2 ½” Dia. Schedule 40 15. Beam: A Bar 4mm X 1” 16. Tire: #14 17. Automation Grade: Automatic 18. Threshing Capacity:3000-5000 Kg/hr 19. Additional Requirements: With Operator’s Instruction Manual With Basic Tools Such As Three (3) Pieces Open Wrenches; One (1) Piece Each Of Philips And Flat Screw Driver, One (1) Piece Adjustable Wrench 12”; 1 Piece Vise Grip 10” With Amtec Test Report On Agricultural Machinery-multi Purpose Thresher Registered Of Ownership Of Multi-crop Thresher Thru Cmo-abe Division Unit Should Be Labeled: Two (2) Pieces Reflectorized/ Laminated Lgu-malaybalay City Sticker(see Attached Specification) Availability Of The Sales Services (service Center And Mechanics/ Technician Within Region 10 -services Of Mechanic/technical Personnel Are Free Of Charge For Replacing Parts Under Warranty To Put The Unit In Running Condition During Warranty Period. -repair Of Defective Units And Provision Of Other After Sales Services Shall Be Undertaken Within 5 Working Days Upon Receipt Of Complaints. Test Run Id Required -to Be Scheduled With The Presence Of A Test Engineer Of Abed And The Supplier With Their Technician. -materials To Be Provided By The Supplier To Test Run Purposes Minimum Of 1 Year Warrant -manufacturer/distributor/dealer Shall Issue A Warranty Certificate To The Buyer. Warranty Against Defective Materials And Workmanship Shall Be Provided For Parts And Services Except For Normal Wear And Tear Of Expandable Or Consumables Maintenance Parts Provided Services On Repair After Warranty At Reasonable Cost. Lot 2 2 Unit Floating Tiller-turtle Type (100,000.00/unit) Technical Specifications: 1. Primeover: A. Rated Power: Minimum, 6.71 Kw, (9hp) B. 8hp Diesel Engine (air-cooled), Not Made In China C. Continuous Power: Minimum 80% Or Rated Power D. Fuel Consumption At Continuous Power: Maximum 350g/kwh 2. Peak Transmission Efficiency: Minimum 80% 3. Forward Speed Range: 2.5 Kph To 4 Kph 4. Width Of Rotary Tilling Wheel: Minimum 1.0m (rotary Tiller- 2” X ¼” Flat Bar) 5. Wheel Spikes Flat Bar ¼” X ½” 6. Threshing Cylinder Shaft Main Flat Bar ¼ X ½” 7. Body (ms Plate) A. #14 (2.0mm) Thickness-concave Bullet Type, B. #16 (1.50mm) Thickness-fender C. #18 (1.2mm) Thickness-siding 8. Handle Bar (gi Pipe Schedule 40) 1” Dia. 9. Additional Requirements: With Operator’s Instruction Manual With Basic Tools Such As Three (3) Pieces Open Wrenches; One (1) Piece Each Of Philips And Flat Screw Driver, One (1) Piece Adjustable Wrench 12”; 1 Piece Vise Grip 10” With Amtec Test Report On Agricultural Machinery-rotary Tiller Registered Of Ownership Of Multi-crop Thresher Thru Cmo-abe Division Unit Should Be Labeled: Two (2) Pieces Reflectorized/ Laminated Lgu-malaybalay City Sticker(see Attached Specification) Availability Of The Sales Services (service Center And Mechanics/ Technician Within Region 10 -services Of Mechanic/technical Personnel Are Free Of Charge For Replacing Parts Under Warranty To Put The Unit In Running Condition During Warranty Period. -repair Of Defective Units And Provision Of Other After Sales Services Shall Be Undertaken Within 5 Working Days Upon Receipt Of Complaints. Test Run Id Required -to Be Scheduled With The Presence Of A Test Engineer Of Abed And The Supplier With Their Technician. -materials To Be Provided By The Supplier To Test Run Purposes Minimum Of 1 Year Warrant -manufacturer/distributor/dealer Shall Issue A Warranty Certificate To The Buyer. Warranty Against Defective Materials And Workmanship Shall Be Provided For Parts And Services Except For Normal Wear And Tear Of Expandable Or Consumables Maintenance Parts Provided Services On Repair After Warranty At Reasonable Cost. Lot 3 1 Unit Grain Collector 1. Primeover 5.60 Kw Si Engine 2. Engine: 7.5hp Gasoline 3. Capacity: 2,701 Kg/hr 4. Fuel Tank Capacity: 3.60 Liters 5. Fuel Consumption: 1.76 Liters/hour 6. Method Operation: Walk Behind 7. Additional Requirements: With Operator’s Instruction Manual With Basic Tools Such As Three (3) Pieces Open Wrenches; One (1) Piece Each Of Philips And Flat Screw Driver, One (1) Piece Adjustable Wrench 12”; 1 Piece Vise Grip 10” With Amtec Test Report On Agricultural Machinery-grain Collector Registered Of Ownership Of Multi-crop Thresher Thru Cmo-abe Division Unit Should Be Labeled: Two (2) Pieces Reflectorized/ Laminated Lgu-malaybalay City Sticker(see Attached Specification) Availability Of The Sales Services (service Center And Mechanics/ Technician Within Region 10 -services Of Mechanic/technical Personnel Are Free Of Charge For Replacing Parts Under Warranty To Put The Unit In Running Condition During Warranty Period. -repair Of Defective Units And Provision Of Other After Sales Services Shall Be Undertaken Within 5 Working Days Upon Receipt Of Complaints. Test Run Id Required -to Be Scheduled With The Presence Of A Test Engineer Of Abed And The Supplier With Their Technician. -materials To Be Provided By The Supplier To Test Run Purposes Minimum Of 1 Year Warrant -manufacturer/distributor/dealer Shall Issue A Warranty Certificate To The Buyer. Warranty Against Defective Materials And Workmanship Shall Be Provided For Parts And Services Except For Normal Wear And Tear Of Expandable Or Consumables Maintenance Parts Provided Services On Repair After Warranty At Reasonable Cost. Lot 4 1 Unit Corn Mill 1. Compact Corn Mill Medium With Bucket Plus 2. Primeover: Water Cooled Diesel Engine, 14hp, With Complete Accessories 3. Main Product Recovery: 55-62% (depending On The Size Of The Grits) 4. Components A. One (1) Unit Single Deck Corn Degerminator/peller (fitted With 6 Screen Huller Top And Bottom) B. One (1) Set Single Deck Grinder With Horizontal And Vertical Corrugation C. One (1) Unit Bucket Elevator Fitted With Tensioner D. One (1) Unit Corn Grits Separator Fitted With 5/16 Offset Eccentric Mechanism E. One (1) Set Double Suction Blower With 16 Inches And 18 Inches Diameter With Dust Collection System F. One (1) Set Of Heavy-duty Frames For Various Machineries G. One (1) Set Of Transmission Unit Fitted With Combinations Of Flat And V Pulleys. All Pulleys Used In The Compact Corn Mill Were All V-pulleys Providing Better Power Transmission H. All Of Pillow Block Bearing Used Were Screw Type. I. Additional Requirements: With Operator’s Instruction Manual With Basic Tools Such As Three (3) Pieces Open Wrenches; One (1) Piece Each Of Philips And Flat Screw Driver, One (1) Piece Adjustable Wrench 12”; 1 Piece Vise Grip 10” With Amtec Test Report On Agricultural Machinery-corn Mill Registered Of Ownership Of Multi-crop Thresher Thru Cmo-abe Division Unit Should Be Labeled: Two (2) Pieces Reflectorized/ Laminated Lgu-malaybalay City Sticker(see Attached Specification) Availability Of The Sales Services (service Center And Mechanics/ Technician Within Region 10 -services Of Mechanic/technical Personnel Are Free Of Charge For Replacing Parts Under Warranty To Put The Unit In Running Condition During Warranty Period. -repair Of Defective Units And Provision Of Other After Sales Services Shall Be Undertaken Within 5 Working Days Upon Receipt Of Complaints. Test Run Id Required -to Be Scheduled With The Presence Of A Test Engineer Of Abed And The Supplier With Their Technician. -materials To Be Provided By The Supplier To Test Run Purposes Minimum Of 1 Year Warrant -manufacturer/distributor/dealer Shall Issue A Warranty Certificate To The Buyer. Warranty Against Defective Materials And Workmanship Shall Be Provided For Parts And Services Except For Normal Wear And Tear Of Expandable Or Consumables Maintenance Parts Provided Services On Repair After Warranty At Reasonable Cost. Lot 5 2 Unit Corn Sheller (p 250,000.00/unit) 1. Primeover: A. Diesel Engine, 14 Hp, Water Cooled, Condenser Type, Direct Injection, Complete With Tools, Manual And Stub Shaft 2. Component A. Corn Sheller, Double Drum/suction Type, Dual Sifter, Locally Fabricated B. Capacity: 2-2.5 Tons/hour (50-60 Cobs Bags/hour) C. With Tires & Draw Bar D. Frame: A Bar 5mm X 2” (60-40-32-24) E. Feeding Hopper (bandiha): G.i. Plate 1.2mm (48-6) Reinforced W/ A Bar 4mmx 1 ½” F. Outer Casing (aparato): A Bar 3/16 X2 B.i Plate 2.0mm G. Blower: B.i Plate 2.0mm (20 X 1 ½-15 X 1 ½-9) H. Shaker (centric): A Bar 3/16 X 1, Bolted Screen ½ (upper), 1/8 X 61” Stainless/g.i Screen (lower) I. Drum Wheel: Shafting 1 ½-40 -1 ¼-38 J. Pulley: 12xbx1 ½, 8 X 1 ½, 4 X2x 1 ½( Fbar 5mm X 2) 10 X 2 X 1 ¼, 11 X 2 X 1 ¼, 6x2x1 ¼ (fbar 5mm X2) 10 X2x1 , 3 X2 X1 (fbar 5mmx2) K. V-belt Drum Wheel 48 X 3 L. Drum Wheel Blower 79 X2 M. Drum Wheel Centric 63 X 2 N. Pvc Elbow Series 1000-4” O. 0 Pillow Block 208-1 ½,207 -1 ¼,205 -1 P. Karo: B.i Pipe 2 ½” Schedule #40, A Bar 3/16 X 1 ½ 50-34-10 Q. #14 Tire 3. Accessories: - Two (2) Pcs. 3.50” X 2’ X30”mm V-pully - One (1)pc. 5/16” X ¾ Setscrew - Four (4) Pcs 3/8” X 2 ½ Bolt - Four (4) Pcs 3/8” X 2” Bolt - Eight (8) Pcs Plain Washer - Two (2) Pcs B-110 V-belts 4. Drawbar Stand - A Bar-5 Mm X2, Fbar 5mmx2 5. Additional Requirements: With Operator’s Instruction Manual With Basic Tools Such As Three (3) Pieces Open Wrenches; One (1) Piece Each Of Philips And Flat Screw Driver, One (1) Piece Adjustable Wrench 12”; 1 Piece Vise Grip 10” With Amtec Test Report On Agricultural Machinery-corn Sheller Registered Of Ownership Of Multi-crop Thresher Thru Cmo-abe Division Unit Should Be Labeled: Two (2) Pieces Reflectorized/ Laminated Lgu-malaybalay City Sticker(see Attached Specification) Availability Of The Sales Services (service Center And Mechanics/ Technician Within Region 10 -services Of Mechanic/technical Personnel Are Free Of Charge For Replacing Parts Under Warranty To Put The Unit In Running Condition During Warranty Period. -repair Of Defective Units And Provision Of Other After Sales Services Shall Be Undertaken Within 5 Working Days Upon Receipt Of Complaints. Test Run Id Required -to Be Scheduled With The Presence Of A Test Engineer Of Abed And The Supplier With Their Technician. -materials To Be Provided By The Supplier To Test Run Purposes Minimum Of 1 Year Warrant -manufacturer/distributor/dealer Shall Issue A Warranty Certificate To The Buyer. Warranty Against Defective Materials And Workmanship Shall Be Provided For Parts And Services Except For Normal Wear And Tear Of Expandable Or Consumables Maintenance Parts Provided Services On Repair After Warranty At Reasonable Cost.
Closing Soon27 Nov 2024
Tender AmountPHP 1.4 Million (USD 24.5 K)
Philippine Merchant Marine Academy Tender
Others
Philippines
Details: Description Quantity Unit Item Description 1 Lot Procurement Of Integrated Full Mission Bridge And Engine Room Simulator With Desktop Station Full Mission Bridge Simulator (fmbs) And Mini Bridge Stations’ Features And Applications, Major Components, Bridge Simulator Performance Standards And Hardware 1. Major Components The Full Mission Bridge Simulators That Can Be Integrated With Engine Simulators Shall Consist Of The Following Major Components: A. One (1) Full Mission Bridge Station With 270° Horizontal Display (class A Configuration); B. Seven (7) Mini Bridge Stations With 120° Horizontal Display (class B Configuration); C. One (1) Server Station; D. One (1) Instructor Station; E. One (1) Simulator Scenario Development Station; And F. One (1) Briefing/ Debriefing Station. 2. Features And Applications 2.1 The Bridge Simulator Should Provide A Realistic, Ship-like Environment Based On Real Hardware Consoles And High-quality Visualization. The Systems Include Major Components Such As Conning, Radar/ Arpa And Ecdis, Gmdss, Navigation Equipment, Bearing Finder, Steering Control Console, Engine Control, Auto Pilot System, Overhead Display, Etc. 2.2 The Bridge Simulator Product Shall Be Certified And Compliant As Class A (full Mission), B (multi-task), C (limited Task), And D (cloud-based Distant Learning) Type-approved Maritime Simulator System By An Internationally Recognized Classification Society. The Compliance With Classification Shall Be Reflected In The Certificate Of The Product. 2.3 The Simulator Can Be Utilized To A Variety Of Navigation Techniques Under Different Environmental Conditions, Serving A Wide Range Of Purposes As Follows: 1. Control Of The Ship While Navigating In The Operational And Emergency Modes In Various Weather Conditions With The Possibility Of Setting Wind And Current Parameters; 2. Analysis Of The Above-water Situation In Day And Night Conditions; In Poor Visibility By Visible Navigation Lights And Information Received From Radar/ Arpa; 3. Use Of The Electronic Chart-based Navigational Information System (ecdis); 4. Practical Use Of Radio Equipment And Global Maritime Distress And Safety System (gmdss) Facilities; 5. Application Of The International Regulations For Preventing Collisions At Sea; 6. Ship Control During Anchoring And Mooring; 7. Ship Control During Towing Operations; 8. Ship Control During Maneuvers "man Overboard"; 9. Rational Methods Of Ship Control In Case Of Main Engines (me) And Ship And Navigation Equipment Failures During Movement; 10. Eye Survey Of Above-water And Radar Situation, Determination Of Vessel Movement Elements; 11. Navigational Situation Assessment By Visual Observation During Daytime, By Lights At Night Time And By Observation Of Transmission Of Echo Signals On Ppi Simulators In Conditions Of Limited Visibility; 12. Visual Determination Of Vessel Movement Patterns, Maneuvering Capabilities And Dimensions; 13. Selection And Execution Of Collision Avoidance Maneuvers In Open Sea, During Night And In Limited Visibility Conditions Using Radar/arpa; 14. Evaluation Of Accuracy Of Primary And Secondary Information Received From Arpa, Consideration Of Factors Affecting Accuracy Of Arpa And Delay In Formation Of Secondary Radar Information; 15. Orientation Of Ships In Complex Navigation Conditions In Daytime And Nighttime And In Conditions Of Limited Visibility; 16. Use Of Ecdis For Preliminary And Executive Plotting, Practicing Correct Response To Emergency Signals Produced By Ecdis, Solution Of Chart-metric Tasks And Ensuring Safety Of Navigation With The Use Of Information Received From Ecdis; 17. Use Of Basic Capabilities Of Marine Mobile Service And Marine Mobile Satellite Service. 2.4 The Bridge Simulator Product Shall Be Able To Address The Following Stcw Competencies And Shall Be Reflected In The Certificate. · Table A-ii/1.1 - Plan And Conduct A Passage And Determine Position. • Table A-ii/1.2 - Maintain A Safe Navigational Watch. • Table A-ii/1.3 - Use Of Radar And Arpa To Maintain Safety Of Navigation. § Table A-ii/1.4 - Use Of Ecdis To Maintain The Safety Of Navigation. • Table A-ii/1.5 - Respond To Emergencies. • Table A-ii/1.6 - Respond To A Distress Signal At Sea. • Table A-ii/1.8 - Transmit And Receive Information By Visual Signaling. • Table A-ii/1.9 - Manoeuvre The Ship. • Table A-ii/2.1 - Plan A Voyage And Conduct Navigation. • Table A-ii/2.2 - Determine Position And The Accuracy Of Resultant Position Fix By Any Means. • Table A-ii/2.3 - Determine And Allow For Compass Errors. • Table A-ii/2.4 - Co-ordinate Search And Rescue Operations. • Table A-ii/2.5 - Establish Watchkeeping Arrangements And Procedures. • Table A-ii/2.6 - Maintain Safe Navigation Through The Use Of Information From Navigation Equipment And Systems To Assist Command Decision-making. • Table A-ii/2.7 - Maintain The Safety Of Navigation Through The Use Of Ecdis And Associated Navigation Systems To Assist Command Decision Making. • Table A-ii/2.10 - Maneuver And Handle A Ship In All Conditions. • Table A-ii/2.11 - Operate Remote Controls Of Propulsion Plant And Engineering Systems And Services. • Table A-ii/3.1 - Plan And Conduct A Coastal Passage And Determine Position. • Table A-ii/3.2 - Maintain A Safe Navigational Watch. • Table A-ii/3.3 - Respond To Emergencies. • Table A-ii/3.4 - Respond To A Distress Signal At Sea. • Table A-ii/3.5 - Manoeuvre The Ship And Operate Small Ship Power Plants. • Table A-ii/4.1 - Steer The Ship And Also Comply With Helm Orders In The English Language. • Table A-ii/4.2 - Keep A Proper Look-out By Sight And Hearing. § Table A-ii/5.2 - Contribute To Berthing, Anchoring And Other Mooring Operations. • Table A-v/4-1.1 - Contribute To Safe Operation Of Vessels Operating In Polar Waters. • Table A-v/4-1.2 - Monitor And Ensure Compliance With Legislative Requirements. • Table A-v/4-1.3 - Apply Safe Working Practices, Respond To Emergencies. • Table A-v/4-1.4 - Ensure Compliance With Pollution-prevention Requirements And Prevent Environmental Hazards. • Table A-v/4-2.1 - Plan And Conduct A Voyage In Polar Waters. • Table A-v/4-2.2 - Manage The Safe Operation Of Vessels Operating In Polar Waters. • Table A-v/4-2.3 - Maintain Safety Of The Ship's Crew And Passengers And The Operational Condition Of Life- Saving, Firefighting And Other Safety Systems. 2.5 The Bridge Simulator Shall Allow For Training And Certification Of Watch Officers, Chief Officers, Captains, And Pilots Serving On Commercial And Fishing Vessels Of 500 Gross Tonnage Or More In Accordance With The Requirements Of The Imo Stcw Convention And Model Courses: · 1.07 – Radar Navigation, Radar Plotting And Use Of Arpa; · 1.08 – Radar, Arpa, Bridge Teamwork And Search & Rescue; · 1.22 – Ship Simulator And Bridge Teamwork; · 1.27 – Operational Use Of Electronic Chart Display And Information System (ecdis); · 1.32 – Operational Use Of Integrated Bridge System; · 1.34 – Operational Use Of Ais; · 2.02 – Maritime Sar Coordinator; · 3.11 – Marine Accident And Incident Investigation With Compendium; · 3.19 – Ship Security Officer; · 3.23 – Actions To Be Taken To Prevent Acts Of Piracy And Armed Robbery; · 7.01 – Master And Chief Mate; · 7.03 – Officer In Charge Of Navigational Watch; · 7.05 – Officer In Charge Of Navigational Watch Of Fishing Vessel; · 1.25 – General Operator’s Certificate For The Gmdss; · 1.26 – Restricted Operator’s Certificate For The Gmdss. 2.6 The Bridge Simulator Shall Have All The Ownship Models, Target Ship Models , Objects And Exercise Areas Available In The Database Of The Simulator Product. It Shall Also Include Polar Areas, The Existing Models And Areas In Current Simulator, Naval And Coast Guard Ship Models, Ship Models Ready For Integration With Engine Simulators And Ship/engine Models Using Future Fuels. 2.7 The Simulator Shall Have Intercom Installed In The Instructor Station And All Bridge Stations. 2.8 The Simulator Shall Have An Evaluation And Assessment Method Designed For The Evaluation And Assessment Of A Range Of Predefined Assessment Parameters From The Following Categories: • Planning And Conducting A Passage And Determine Position; • Maintain Safe Navigational Watch; • Using Radar And Arpa To Maintain Navigational Safety; • Ability To Operate And Analyze Information Obtained From Arpa; • Respond To Emergencies; • Use Imo Standard Marine Communication Phrases And Use English Inwriting And Speaking; • Transmit And Receive Information Using Visual Signals; • Maneuver The Ship; • Colreg. 2.9 The Simulator Shall Have The Ability To Set Up A Scoring And Grading System To Evaluate The Operator’s Performance. The Program Allows The Instructor To Monitor The Results Of The Bridge Team / Operator Workstation Performance. 2.10 The Simulator Shall Be Capable Of Simulating Ship Operation In Polar Waters Or Ice Navigation According To The Polar Code And Shall Have The Following Training Capabilities: - Ice Management Of Offshore Installations In An Arctic Environment, - Use Of Radar Data And Ice Charts In Ecdis While Navigating In Ice Conditions, - Following Of Icebreakers, - Offshore Loading Operations To Include Mooring To Single Point Mooring And Floating Production Storage And Offloading Equipment In Ice Conditions, And - Navigation In Shattered Ice, Along Hard Ice Edges, Bumping Against Ice Edges, In Open Pack Ice, In Ice Holes, And Spots Of Ice-free Water. 2.11 The Ice Navigation Environment Shall Have The Following Characteristics: - Capable Of Ice Accumulation On Ship Superstructure, - Ship’s Tracks On Ice Fields Re-freeze As Programmed By The User, - Ice Mounds And Channels Can Be Added By The User, - Characteristics Of Ice Resistance Are Based On The Type Of Ice, Thickness, And Accumulation, - Capable Of Traversing Large Ice Areas, And - Realistic Representation Of Iceberg Objects. 3. Bridge Simulator Performance Standards 3.1 Physical Realism The Bridge Simulator Stations Shall Have The Following Physical Realism: A. The Equipment, Consoles, And Workstations Shall Be Installed, Mounted, And Arranged In A Manner That Mimics An Actual Bridge Of A Ship. B. The Workstations Shall Have Standard Rubber Mat Flooring. The Simulator Shall Have The Following Equipment: C. Controls Of Propulsion Plant Operations, Including Engine Telegraph, Pitch-control And Thrusters. There Shall Be Indicators For Shaft(s) Revolutions And Pitch Of Propeller(s). There Shall Be Controls For At Least One Propeller And One Bow Thruster. D. Controls Of Propulsion Plant For Mooring Operations. By Any Method, It Shall Be Possible To Observe The Ship's Side And The Dock During Operation Of Such Controls. E. Controls Of Auxiliary Machinery. There Shall Be Controls For At Least Two Auxiliary Engines, Including Electric Power Supply Control. F. Steering Console, Including Equipment For Hand Steering And Automatic Steering With Controls For Switchover. There Shall Be Indicators Of Rudder Angle And Rate Of Turn. G. Steering Compass And Bearing Compass (or Repeater) With An Accuracy Of At Least 1 Degree. H. At Least One Radar/arpa Display/unit (automatic Radar Plotting Aid). It Shall Be Possible To Simulate Both A 10 Cm (s-band) And A 3 Cm (x-band) Radars. The Radar Shall Be Capable To Operate In The Stabilised Relative-motion Mode And Sea- And Ground-stabilised True-motion Modes (see Stcw Section A-1/12.4.1 And 1/12.5 And Paragraph 2 Of Section B-i/12). I. Communication Equipment Per Gmdss (global Maritime Distress Safety System) Framework, Covering At Least The Requirements For The Relevant Area. J. The Simulator Shall Include A Communications System That Will Allow For Internal Ship Communications To Be Conducted. K. Ecdis (electronic Chart Display And Information System) Displaying Selected Information From A System Electronic Navigational Chart (senc) With Positional Information From Navigation Sensors Like Ais And Radar To Assist The Mariner In Route Planning And Route Monitoring, And By Displaying Additional Navigation-related Information. (see Stcw Section B-i/12). L. Gps (global Positioning System), Echo-sounder And Speed Log Showing Speed Through The Water (1 Axis) For Ships Below 50,000 Grt And In Addition Speed And Distance Over Ground In Forward And Athwart Ship Direction For Ships Above 50,000 Grt. M. Instrument (anemometer) For Indication Of Relative Wind- Direction And Force. N. Ship Sound Signal Control Panel According To Colreg. O. Instrument For Indication Of Navigational Lights. P. Function For Transmitting Visual Signals (morse Light). Q. Control System For General Alarm And Fire Detection/alarm And Other Alarms. R. Ais (automatic Identification System). S. Ship-borne Meteorological Instrument. The Simulator Shall Have The Following Additional Requirements For Training In Ice Navigation: T. Controls For Propulsion Plant Operations, Including Engine Telegraph, Pitch Control, And Thrusters. There Shall Be Indicators For Shaft Revolutions And Pitch Of Propeller. There Shall Be Controls For At Least One Propeller And One Bow Thruster. U. Two Speed And Distance Measuring Devices. Each Device Should Operate On A Different Principle, And At Least One Device Should Be Capable Of Being Operated In Both The Sea And The Ground Stabilized Mode. V. Searchlight Controllable From Conning Positions. W. Manually Operated Flashing Red Light Visible From Astern To Indicate When The Ship Is Stopped. X. Vdr (voyage Data Recorder) Or Capability For Vessel History Track And Learner Actions Log From The Instructor And The Assessor Position. Y. Equipment Capable Of Receiving Ice, Icing Warnings, And Weather Information Charts. Z. Anchoring And Towing Arrangements. The Simulator Shall Have The Following Additional Requirements For Training In Integrated Bridge Systems Including Integrated Navigation Systems: Aa. Workstation For Navigating, Maneuvering And Monitoring Consisting Of: · Radar/arpa · Ecdis · Conning Display · Binoculars Control · Autopilot Control · Observer Position/ Visual Control · Information On Position-fixing Systems · Information On Ship Automatic Identification System (ais) · Heading Control System · Flags, Daytime Shapes And Sound Signals · Control For The Main Engine Including Emergency Stop · Control For The Main Rudder Using Helm · Controls For Thruster · Two-way Vhf Radiotelephone (walkie-talkie) With Charging Connection · Internal Communication Equipment · Public Address System · Vhf With Channel Selector · Remote Control For Searchlight · Rudder Pump Selector Switch · Steering Mode Selector Switch · Steering Position Selector Switch · Illumination Of Equipment And Displays In The Surrounding Darkness · Sound Reception System · Acknowledgment Of The Watch Alarm · Controls For Console Lighting · Indicators For: - Propeller Revolutions (actual And Desired) - Main Engine Revolution In The Case Of Reduction Geared Engine - Propeller Pitch In The Case Of Controllable Pitch Propeller - Torque - Starting Air - Lateral Thrust - Speed - Rudder Angle - Rate-of-turn - Gyro Compass Heading - Magnetic Compass Heading - Heading Reminder (pre-set Heading) - Water Depth Including Depth Warning Adjustment - Time - Wind Direction And Velocity - Air And Water Temperature - Clinometer - Alarms · Signal Transmitter For: - Whistle - Automatic Device For Fog Signals - Alarms, (general Alarm, Emergency Alarm, Etc.) - Morse Signaling Light Bb. Workstation For Manual Steering (wheelhouse) Consisting Of: · Steering Wheel · Rudder Pump Selector Switch · Indications For: - Gyro Compass Heading - Magnetic Compass Heading - Pre-set Heading - Rudder Angle - Rate Of Turn Cc. Workstation For Planning And Documentation Consisting Of: · Ecdis Including Navigation Planning Station · Route Planning Devices · Chart Table · Paper Charts · Plotting Aids Dd. Workstation For Communications Consisting Of: · Gmdss Equipment As Required For The Applicable Sea Area · Vhf-dsc, Radiotelephone · Mf-dsc, Radiotelephone · Mf/hf-dsc, Nbdp, Radiotelephone · Mf/hf Mf/hf Radio Telex · Inmarsat-ses, Egc Rx With Lrit And Ssas · Navtex/egc/hf Direct Printing Telegraph · Fbb/iridium · Cospas-sarsat Epirb · Sart · Ais Sart · Main Station For Two-way Vhf Radiotelephone · Aircraft Vhf Radiotelephone · Gmdss Alarm Panel · Radio Direction Finder Rt-500-m (marine) · Power Switchboard · Battery Charger · Virtual Printer Ee. All Systems Related To The Integrated Bridge System Shall Include Failure Control(s) And Method(s) To Train And Assess The Learner In The Use Of Advanced Equipment, Technology And Enable Familiarization And Training To Understand The Limitations Of Automatic Systems. 3.2 Behavioral Realism The Bridge Simulator Stations Shall Have The Following Behavioral Realism: A. The Simulation Of Ownship Shall Be Based On A Mathematical Model With 6 Degrees Of Freedom. B. The Model Shall Realistically Simulate Own Ship Hydrodynamics In Open Water Conditions, Including The Effects Of Wind Forces, Wave Forces, Tidal Stream And Currents. C. The Model Shall Realistically Simulate Own Ship Hydrodynamics In Restricted Waterways, Including Shallow Water And Bank Effects, Interaction With Other Ships And Direct, Counter And Sheer Currents. D. The Simulator Shall Include Mathematical Models Of Different The Types Of Ownships. E. The Simulator Shall Include Tug Models That Can Realistically Simulate Tug Assistance During Maneuvering And Escort Operations. It Shall Be Possible To Simulate Pull, Push, Reposition Towing And Escorting. F. The Simulator Shall Include Exercise Areas Including Correct Data For Landmass, Depth, Buoys, Tidal Streams And Visual As Appropriate To The Nautical Chart And Publication Used For The Relevant Training Objectives. G. The Radar Simulation Equipment Shall Be Capable Of Model Weather, Tidal Streams, Current, Shadow Sectors, Spurious And False Echoes And Other Propagation Effects, And Generate Coastlines, Navigational Buoys And Search And Rescue Transponders. H. The Arpa Simulation Equipment Shall Incorporate The Facilities For: - Manual And Automatic Target Acquisition - Fast Track Information - Use Of Exclusion Areas - Vector/graphic Time-scale And Data Display - Trial Maneuvers. I. The Ecdis Simulation Equipment Shall Incorporate The Facilities For: - Integration With Other Navigation Systems - Own Position - Sea Area Display - Mode And Orientation - Chart Data Displayed - Route Monitoring - User-created Information Layers - Contacts (when Interfaced With Ais And/or Radar Tracking) - Radar Overlay Functions. J. The Simulator Shall Provide An Own Ship Engine Sound, Reflecting The Power Output. K. The Simulator Shall Provide Capabilities For Realistically Conduct Anchoring Operations. L. The Model Shall Realistically Simulate Own Ship Hydrodynamics In Interaction With Applicable Anchor And Chain Dimensions With Different Bottom Holding Grounds, Including The Effects Of Wind Forces, Wave Forces, Tidal Stream And Currents. M. The Simulator Shall Provide Capabilities For Realistically Simulate The Function Of Mooring And Tug Lines And How Each Line Functions As Part Of An Overall System Taking Into Account The Capacities, Safe Working Loads, And Breaking Strengths Of Mooring Equipment Including Mooring Wires, Synthetic And Fiber Lines, Winches, Anchor Windlasses, Capstans, Bitts, Chocks And Bollards. The Simulator Shall Have The Following Additional Requirements For Training In Ice Navigation: N. The Own Ship Model Shall Realistically Simulate Hydrodynamics In Interaction With Solid Ice Edge. O. The Own Ship Model Shall Realistically Simulate Hydrodynamics And Ice Pressure In Interaction With Solid And Packed Ice. Ship Motion In Solid Ice Should Affect At Least Ship Speed And Turning Radius. P. The Own Ship Model Shall Realistically Simulate The Effects Of Reduced Stability As A Consequence Of Ice Accretion. Q. It Shall Be Possible To Simulate The Effect Of The Following Ice Conditions With Variations: - Ice Type - Ice Concentration - Ice Thickness. R. It Shall Be Possible To Realistically Simulate The Towing Of Ownship – Ownship, And Own Ship Target Ship And Target Ownship. It Shall Be Possible To Introduce Different Towing Gear Like Rope Or Steel Wire With Different Strength And Elasticity, Forward, Stern And Side Towing. S. It Shall Be Possible To Realistically Simulate The Interaction Between The Ships Propeller Wash And The Ice. T. It Shall Be Possible To Realistically Simulate Ice Drift. U. The Simulator Shall Be Equipped With Iceberg Targets Of At Least Six Different Sizes Including Realistic Underwater Bodies Which Interacts With The Sea Bottom. The Icebergs Should Be Visible On The Ship's Radar. V. Motion Through Ice Hummocks Should Be Simulated Realistically Considering Ship Icebreaking Capabilities And Affect Ship's Speed, Roll And Pitch. The Simulator Shall Have The Following Additional Requirements For Training In Integrated Bridge Systems Including Integrated Navigation System: W. The Integrated Navigation System Should Combine Process And Evaluate Data From All Sensors In Use. The Integrity Of Data From Different Sensors Should Be Evaluated Prior To Distribution. X. The Integrated Navigation System Shall Ensure That The Different Types Of Information Are Distributed To The Relevant Parts Of The System, Applying A Consistent Common Reference System For All Types Of Information. Y. The Integrated Navigation System Shall Provide Information On Position, Speed, Heading, And Time. Z. The Integrated Navigation System Shall Be Able To Automatically, Continually And Graphically Indicate The Ship's Position, Speed And Heading And, Where Available, Depth In Relation To The Planned Route As Well As To Known And Detected Hazards. Aa. The Integrated Navigation System Shall, In Addition, Provide Means To Automatically Control Heading, Track Or Speed, And Monitor The Performance And Status Of These Controls. Bb. Alarms Shall Be Displayed So That The Alarm Reason And The Resulting Functional Restrictions Can Be Easily Understood. 3.3 Operating Environment The Bridge Simulator Shall Exhibit The Following Operating Environment: A. The Simulator Shall Be Able To Present Different Types Of Target Ships, Each Equipped With A Mathematical Model, Which Accounts For Motion, Drift And Steering Angles According To Forces Induced By Current, Wind Or Wave. B. The Targets Shall Be Equipped With Navigational And Signal-lights, Shapes, And Sound Signals, According To Rules Of The Road. The Signals Shall Be Individually Controlled By The Instructor, And The Sound Signals Shall Be Directional And Fade With Range. Each Ship Shall Have An Aspect Recognizable At A Distance Of 6 Nautical Miles In Clear Weather. A Ship Underway Shall Provide Relevant Bow- And Stern Wave. C. The Simulator Shall Be Equipped With Targets Enabling Search And Rescuing Persons From The Sea, Assisting A Ship In Distress And Responding To Emergencies Which Arise In Port. Such Targets Shall At Least Be: · Rocket Parachute Flares · Hand Flares · Buoyant Smoke Signals · Sart (search And Rescue Transponder) · Satellite Epirb (emergency Position Indicating Radio Beacon) · Lifeboat · Life Raft · Rescue Helicopter · Rescue Aircraft · People In Water. D. The Simulator Shall Be Able To Present At Least 20 Target Ships At The Same Time, Where The Instructor Shall Be Able To Programme Voyage Routes For Each Target Ship Individually. (see Stcw Section A-1/12.4.3) E. The Simulator Shall Provide A Realistic Visual Scenario By Day, Dusk Or By Night, Including Variable Meteorological Visibility, Changing In Time. It Shall Be Possible To Create A Range Of Visual Conditions, From Dense Fog To Clear Conditions. F. The Visual System And/or A Motion Platform Shall Replicate Movements Of Own Ship According To 6 Degrees Of Freedom. G. The Projection Of The View Shall Be Placed At Such A Distance And In Such A Manner From The Bridge Windows That Accurate Visual Bearings May Be Taken To Objects In The Scene. It Shall Be Possible To Use Binocular Systems For Observations. H. The Visual System Shall Present The Outside World By A View Around The Horizon (360°). The Horizontal Field Of View May Be Obtained By A View Of 270° And Where The Rest Of The Horizon May Be Panned (to Move The “camera”). (applicable Only To Full Mission Bridge Station With 270° Horizontal Display) I. The Visual System Shall Present The Outside World By A View Of At Least 120° Horizontal Field Of View. In Addition, At Least The Horizon From 120° Port To 120° Starboard Shall Be Able To Be Visualised By Any Method. (applicable Only To Mini Bridge Station With 120° Horizontal Display). J. The Visual System Shall Present A Vertical View From The Workstations For Navigation, Traffic Surveillance And Manoeuvring Enabling The Navigator To Detect And Monitor Objects Visually On The Sea Surface Up To The Horizon Within The Required Horizontal Field Of View When The Ship Is Pitching And Rolling. In Addition, By Any Method, It Shall Be Possible To Observe The Ship's Side And The Dock During Mooring Operations. K. The Visual System Shall Present All Navigational Marks According To Charts Used. L. The Visual System Shall Show Objects With Sufficient Realism (detailed Enough To Be Recognized As In Real Life). M. The Visual System Shall Show Mooring And Towing Lines With Sufficient Realism In Accordance With The Forces Effecting The Tension. N. The Visual System Shall Provide A Realistic Set Of Bow Wave, Sea Spray And Wakes In Accordance With Ships Power Output, Speed And Weather Conditions. O. The Visual System Shall Provide A Realistic Set Of Flue Gas Emission And Waving Flag Effect In Accordance With Ships Power Output, Speed And Weather Conditions. P. The Simulator Shall Be Capable Of Providing Environmental Sound According To Conditions Simulated. Q. The Navigated Waters Shall Include A Current Pattern, Changeable In Time, According To The Charts Used. Tidal Waters Shall Be Reflected. R. The Simulation Shall Include The Depth According To Charts Used, Reflecting Water Level According To Tidal Water Situation. S. The Simulator Shall Provide At Least Two Different Wave Spectra, Variable In Direction Height And Period. T. The Visual System Shall Provide A Realistic Set Of Wind Waves Including White Caps According To The Beaufort Wind Force Scale. The Simulator Shall Have The Following Additional Requirements For Training In Ice Navigation: U. The Visual System Shall Be Capable Of Showing Concentrations Of Solid And Broken Ice Of Different Thickness. V. The Visual System Shall Be Capable Of Showing The Result Of Icebreaking Including Opening, Twin Breaking And Compacting Channel. W. The Visual System Shall Be Capable Of Showing The Effects Of Searchlight. X. The Visual System Shall Be Capable Of Showing The Effects Of The Ice Accretion To The Own Ship Model. The Simulator Shall Have The Following Additional Requirements For Training In Integrated Bridge Systems Including Integrated Navigation Systems: Y. There Shall Be A Field Of View Around The Vessel Of 360° Obtained By An Observer Moving Within The Confines Of The Wheelhouse Or May Be Panned (to Move The Camera). 4. Hardware Requirements 1 Set 4.1 Full Mission Bridge Simulator (horizon Field View Of 270 Degrees) A. Steel Fabrication Of Main Bridge Consoles Consisting Of: I. Conning/maneuvering Console Ii. Radar Console Iii. Ecdis Console Iv. Bearing Console V. Navigation Aid Equipment Console Vi. Gmdss Console Vii. Steering Stand/console Viii. Chart Table Ix. Overhead Panel X. Gyro Repeater With Pelorus Stand Xi. Binoculars Xii. The Console Must Made Of Steel W/ Handrails B. Visual Specification (minimum Requirements) I. 9x 70” Visual Screens Led Backlit 1. Pc Visual Channel 2. Intel Core I5 Processor 3. 16 Gb Ram 4. 256 M.2 Ssd 5. Rtx 4070 Or Higher 6. Keyboard/mouse 7. Hdmi Cable 8. Ups 1.5kva A. Surge Protection B. W/ Automatic Voltage Regulator C. 1x Conning Console (minimum Requirements) 1. Intel Core I5 Processor 2. 8 Gb Ram 3. 256 M.2 Ssd 4. 2x Monitor 24” 5. Keyboard/mouse 6. Ups 1.5kva A. Surge Protection B. W/ Automatic Voltage Regulator 7. Console Made Of Steel (tct 0.8 Mm To 2 Mm) 8. Instrument Adds On Conning Console. D. 2x Ecdis Console (minimum Requirements) 1. Intel Core I5 Processor 2. 8 Gb Ram 3. 256 M.2 Ssd 4. Monitor 24” 5. Keyboard/mouse 6. Ups 1.5kva A. Surge Protection B. W/ Automatic Voltage Regulator 7. Console Made Of Steel (tct 0.8 Mm To 2 Mm) E. 2x Radar / Arpa Console (minimum Requirements) 1. Intel Core I5 Processor 2. 8 Gb Ram 3. 256 M.2 Ssd 4. Monitor 24” 5. Keyboard/mouse 6. Ups 1.5kva A. Surge Protection B. W/ Automatic Voltage Regulator 7. Console Made Of Steel (tct 0.8 Mm To 2 Mm) F. Binocular And Instrument (minimum Requirements) 1. Intel Core I5 Processor 2. 8 Gb Ram 3. 256 M.2. Ssd 4. Rtx 4070 Or Higher 5. Keyboard/mouse 6. 2x 24" Monitor 7. Ups 1.5kva A. Surge Protection B. W/ Automatic Voltage Regulator 8. Console Made Of Steel (tct 0.8 Mm To 2 Mm) G. Overhead Panel Display 1. Intel Core I5 Processor 2. 8 Gb Ram 3. 256 M.2 Ssd 4. At Least 1width And 0.4height 5. Keyboard/mouse 6. Ups 1kva A. Surge Protection B. W/ Automatic Voltage Regulator H. Radar/arpa I. Radar/arpa Keyboard (1 Set) Specifications: 1. Usb Interface 2. Console Mount Type I. Handset I. Handset Includes: 1. Handset 2. Cradle With A Ptt Switch 3. Usb Interface Board 4. Handset Box J. 1x Chart Table Console 1300mm X 1312mm (minimum Requirements) 1. Intel Core I5 Processor 2. 8 Gb Ram 3. 256 M.2 Ssd 4. 2x Monitor 24” 5. Keyboard/mouse 6. Ups 1kva A. Surge Protection B. W/ Automatic Voltage Regulator Ii. 1x Parallel Ruler Iii. 1x One-hand Compass Divider Steel Iv. 10x Plotting Triangle With Handle V. 1x Deck Log Book Vi. 1x Night Order Book Vii. 1x Bell Book Viii. 1x Chronometer Ix. Admiralty Paper Charts Related To Installed Maps In Simulator K. Gyro Repeater With Pelorus Stand 1. Bearing Repeater Compass 2. Pelorus Stand 3. Power: 24vd 4. Signal: Rs422 Nmea L. Weather Instruments 1. 1x Ships Clock 2. 1x Aneroid Barometer 3. 1x Hygrometer. M. Speaker With Subwoofer I. Channel Sound System Specification: 1. Interface With Visual Pc 2. Realization Of 3d Sound Effect System 3. Atleast 450watts Speaker With Subwoofer 4. Port: Mini Jack 7 Sets 4.2 Mini Bridge Simulator (horizon Field View Of 120 Degrees) A. Consoles Made In Formica Laminated Board Fabrication Of Main Bridge Consoles Consisting Of: I. Conning Console Ii. Radar Console Iii. Ecdis Console Iv. Maneuvering Console V. Chart Table With Gooseneck Dimming Light B. Mini Bridge Desktop Station (bridge Image Generator Computer For Visual, Conning, Radar, Maneuvering And Overhead Display) I. 3x 45” 4k Display For Visual (minimum Requirements) Ii. 1x Computer (minimum Requirements) 1. 256 M.2 Ssd 2. Rtx 4070 Or Higher 3. 1 X Keyboard/mouse 4. Ups 1.5kva A. Surge Protection B. W/ Automatic Voltage Regulator Iii. 1 X Computer (minimum Requirements) 1. Intel Core I5 Processor 2. 8 Gb Ram 3. 256 M.2 Ssd 4. Keyboard/mouse 5. 24” Monitor 6. Ups 1.5kva A. Surge Protection B. W/ Automatic Voltage Regulator Iv. 1 X Overhead Panel Display V. 1 X Speakers (minimum Requirements) 1. Interface With Visual Pc 2. Realization Of 3d Sound Effect System 3. Atleast 150 Watts Speaker With Subwoofer 4. Port: Mini Jack Vi. 1 X Goose Neck Microphone Vii. 1 X Set Desktop Instrument Console Including: 1. Steering System / Autopilot / Nfu 2. Steering Wheel Viii. Dual Telegraph 1. 1 X Console Tables 2. 1 X Handheld Uhf Equipment 3. 1 X Console Made In Formica Laminated Board (tct 3/4 Inches) Ix. Chart Table And Plotting Aids (minimum Requirements) 1. Intel Core I5 Processor 2. 8 Gb Ram 3. 256 M.2 Ssd 4. 1x Monitor 24” 5. Keyboard/mouse 6. Ups 1kva A. Surge Protection B. W/ Automatic Voltage Regulator X. 1x Parallel Ruler Xi. 1x One-hand Compass Divider Steel Xii. 1x Plotting Triangle With Handle Xiii. 1x Chart Table At Least 1000mm X 700mm Xiv. 1x Deck Log Book Xv. 1x Night Order Book Xvi. 1x Bell Book Xvii. 1x Chronometer 1 Set 4.3 Bridge Instructor Station A. Instructor Station I. 1x Computer (minimum Requirements) 1. 2x 24” Monitor 2. Intel Core I5 Processor 3. 16 Gb Ram 4. 256 M.2 Ssd 5. Rtx 4070 Or Higher 6. Keyboard/mouse 7. Ups 1.5kva 1. Surge Protection 2. W/ Automatic Voltage Regulator Ii. 1x Handset 1. Handset 2. Cradle With A Ptt Switch 3. Usb Interface Board 4. Handset Box Iii. 1x Speaker 1. Type: Desktop 2. Port: Mini Jack Iv. 1x Steel Cabinet W/ Lock 1. Metal Drawer Office Drawer 2. File Cabinet Storage With Wheel V. 1x Drone View Monitor W/ Smart Tv 55” Tv Led (environment View Of Instructor) Vi. 1x Smart Tv 55” Tv Led For Cctv Vii. 1x Printer 1. Laser Printer A4 2. A4 Print Speed Up To 48 Ppm 3. Auto 2-sided (duplex) Printing, 1-line Lcd 4. Wifi, Airprint, Mopria, Wifi Direct, Lan, Usb 2.0 5. Colored Printer Viii. Instructor Station Table Specification: Ix. 1x Table Size: At Least L 1700 X W 700 X H 750 Mm 1. Material: Formica Matt Laminate On Chipboard X. Intercom Telephone / Public Announcement System Xi. 9x Two-way Vhf Radiotelephone (walkie-talkie) With Charging Connection Xii. 1x Ergodynamic Chair Xiii. 1x Document Metal Cabinet With Glass Sliding Door 1. Size: 1850x 400mmx 900mm 2. Door Lock 1 Set 4.4 Bridge Simulator Scenario Development Station B. Scenario Development Station As An Instructor Station Capable Of Deploying Scenarios To Other Stations. I. 1x Computer (minimum Requirements) 1. 2x 24” Monitor 2. Intel Core I5 Processor 3. 16 Gb Ram 4. 256 M.2 Ssd 5. Rtx 4070 Or Higher 6. Keyboard/mouse 7. Ups 1.5kva 1. Surge Protection 2. W/ Automatic Voltage Regulator Ii. 1x Table Size: At Least L 1200 X W 800 X H 750 Mm 1. Material: Formica Matt Laminate On Chipboard Iii. 1x Ergodynamic Chair 5. Software Requirements 5.1 Full Mission Bridge Simulator The Full Mission Bridge Simulator Shall Have The Following Software And Controls For The Following Workstations: A. Workstation For Navigating, Maneuvering And Monitoring Consisting: · One (1) Ecdis Master Software · One (1) Ecdis Slave Software · One (1) Conning Display Software · One (1) Radar/arpa 3cm · One (1) Radar/arpa 10cm · Nine (9) Realistic Visualization Software With 270° Field Of View · Keyboard And Trackball Controls For Ecdis, Radar Apra And Conning Display · Two (2) Vhf Dsc Radio W Ch16 · One (1) Overhead Panel Display · One (1) Main Engine Telegraph Including Emergency Stop Control With Printer · One (1) Bow And Stern Thruster Control · One (1) Gps Software · One (1) Bridge Navigational Watch Alarm System (bnwas) · One (1) Echo Sounder · One (1) Speed Log · One (1) Vr Binoculars · One (1) Observer Position/ Visual Control · One (1) Anchor Gear And Mooring Operations Control · One (1) Towing Control · One (1) Tugs Control · One (1) Autopilot Control System · Nfu/ Fu Controls · One (1) Tiller Controls · One (1) Information On Ship Automatic Identification System (ais) · One (1) Intercom Telephone Capable For Public Address System · One (1) Conference Microphone · One (1) Control For Searchlight · One (1) Gyro Repeater/pelorus Stand That Can Display Magnetic And Gyro Compass · One (1) Bearing Finder · One (1) Alarm System Panel For General Alarm, Fire Alarm, And Other Alarms · Navigation Lights Control · Flags, Daytime Shapes And Sound Signals Control · One (1) Two-way Vhf Radiotelephone (walkie-talkie) With Charging Connection · Sound Reception System · Acknowledgment Of The Watch Alarm · Information Indicators For: - Propeller Revolutions (actual And Desired) - Main Engine Rpm - Main Engine Revolution In The Case Of Reduction Geared Engine - Propeller Pitch In The Case Of Controllable Pitch Propeller - Torque - Starting Air - Lateral Thrust - Log Speed And Speed Over The Ground - Bow And Stern Speed - Athwartship Speed - Rudder Angle - Rate-of-turn - Gyro Compass Heading - Magnetic Compass Heading - Heading Reminder (pre-set Heading) - Water Depth Including Depth Warning Adjustment - Vessel Time - Wind Direction And Velocity - Air And Water Temperature - Clinometer - Alarms - Pilot Card - Maneuvering Characteristics - Scoring Exercise/ Assessment · Signal Transmitter For: - Whistle - Automatic Device For Fog Signals - Alarms, (general Alarm, Emergency Alarm, Etc.) - Morse Signaling Light B. Workstation For Manual Steering (wheelhouse) Consisting Of: · One (1) Steering Wheel · Rudder Pump Selector Switch · Steering Mode Selector Switch · Steering Position Selector Switch · Indications For: - Gyro Compass Heading - Magnetic Compass Heading - Pre-set Heading - Rudder Angle - Rate Of Turn - Steering Mode (fu/nfu) – Track Control/auto Navigation C. Workstation For Route Planning And Documentation Consisting Of: · Computer For Route Planning Devices (ecdis) · Chart Table With Drawers For Paper Charts, Flags And Pennants · Paper Charts · Plotting Aids · Chronometer · Weather Facsimile D. Workstation For Communications Consisting Of: · One (1) Handset For Radiotelephone · Gmdss Equipment As Required For The Applicable Sea Area · Vhf-dsc, Radiotelephone · Mf-dsc, Radiotelephone · Mf/hf-dsc, Nbdp, Radiotelephone · Mf/hf Mf/hf Radio Telex · Inmarsat-ses, Egc Rx With Lrit And Ssas · Navtex/egc/hf Direct Printing Telegraph · Fbb/iridium · Cospas-sarsat Epirb · Sart · Ais Sart · Main Station For Two-way Vhf Radiotelephone · Aircraft Vhf Radiotelephone · Gmdss Alarm Panel · Radio Direction Finder Rt-500-m (marine) · Power Switchboard · Battery Charger · Virtual Printer 5.2 Mini Bridge Simulator The Mini Bridge Simulators Shall Have Each Of The Following Software And Controls For The Following Workstations: E. Workstation For Navigating, Maneuvering And Monitoring Consisting: · One (1) Ecdis Master Software · One (1) Conning Display Software · One (1) Radar/arpa Interchangeable To 3cm & 10cm · Three (3) Realistic Visualization Software With 120° Field Of View · Keyboard And Trackball Controls For Ecdis, Radar Apra And Conning Display · One (1) Vhf Dsc Radio W Ch16 · One (1) Overhead Panel Display · One (1) Main Engine Telegraph Including Emergency Stop Control With Printer · One (1) Bow And Stern Thruster Control · One (1) Gps Software · One (1) Bridge Navigational Watch Alarm System (bnwas) · One (1) Echo Sounder · One (1) Speed Log · One (1) Vr Binoculars · One (1) Observer Position/ Visual Control · One (1) Anchor Gear And Mooring Operations Control · One (1) Towing Control · One (1) Tugs Control · One (1) Autopilot Control System · Nfu/ Fu Controls · One (1) Tiller Controls · One (1) Information On Ship Automatic Identification System (ais) · One (1) Intercom Telephone Capable For Public Address System · One (1) Conference Microphone · One (1) Control For Searchlight · One (1) Vdr Remote Alarm Panel · One (1) Bearing Finder · One (1) Alarm System Panel For General Alarm, Fire Alarm, And Other Alarms · Navigation Lights Control · Flags, Daytime Shapes And Sound Signals Control · One (1) Two-way Vhf Radiotelephone (walkie-talkie) With Charging Connection · Sound Reception System · Acknowledgment Of The Watch Alarm · Information Indicators For: - Propeller Revolutions (actual And Desired) - Main Engine Rpm - Main Engine Revolution In The Case Of Reduction Geared Engine - Propeller Pitch In The Case Of Controllable Pitch Propeller - Torque - Starting Air - Lateral Thrust - Log Speed And Speed Over The Ground - Bow And Stern Speed - Athwartship Speed - Rudder Angle - Rate-of-turn - Gyro Compass Heading - Magnetic Compass Heading - Heading Reminder (pre-set Heading) - Water Depth Including Depth Warning Adjustment - Vessel Time - Wind Direction And Velocity - Air And Water Temperature - Clinometer - Alarms - Pilot Card - Maneuvering Characteristics - Scoring Exercise/ Assessment · Signal Transmitter For: - Whistle - Automatic Device For Fog Signals - Alarms, (general Alarm, Emergency Alarm, Etc.) - Morse Signaling Light F. Workstation For Manual Steering (wheelhouse) Consisting Of: · One (1) Steering Wheel · Rudder Pump Selector Switch · Steering Mode Selector Switch · Steering Position Selector Switch · Indications For: - Gyro Compass Heading - Magnetic Compass Heading - Pre-set Heading - Rudder Angle - Rate Of Turn - Steering Mode (fu/nfu) G. Workstation For Route Planning And Documentation Consisting Of: · Computer For Route Planning Devices (ecdis) · Chart Table With Drawers For Paper Charts, Flags And Pennants · Paper Charts · Plotting Aids · Chronometer H. Workstation For Communications Consisting Of: · One (1) Handset For Radiotelephone · Gmdss Equipment As Required For The Applicable Sea Area · Vhf-dsc, Radiotelephone · Mf-dsc, Radiotelephone · Mf/hf-dsc, Nbdp, Radiotelephone · Mf/hf Mf/hf Radio Telex · Inmarsat-ses, Egc Rx With Lrit And Ssas · Navtex/egc/hf Direct Printing Telegraph · Fbb/iridium · Cospas-sarsat Epirb · Sart · Ais Sart · Main Station For Two-way Vhf Radiotelephone · Aircraft Vhf Radiotelephone · Gmdss Alarm Panel · Radio Direction Finder Rt-500-m (marine) · Power Switchboard · Battery Charger · Virtual Printer 5.3 Instructor Station 1. The Instructor Workstation Is An Integral Part Of The Simulator And Is Designed To Control The Training Complex, Design (develop) Exercises, Perform Exercises In Real Time, Control Exercise Performance By Trainees, Change Environmental Conditions And Sailing Circumstances, As Well As Enter Own Ship Failure Variables, Document, And Archive The Position And Activity Of The Ship Involved In The Exercise. The Instructor Station Software Should Contain Navigation Areas As Well As Sub-tasks For Each Area, Allowing The Control Of All Active Vessels And Target Ships. 2. Navigation Instructor Software Includes: · Navigation Instructor · Evaluation And Assessment · Tug And Mooring · Radar/arpa · Electronic Navigational Chart: · Bird Eye Of Instructor · Debriefing System 3. Simulator Session(s) Control: • Exercise(s) Start, Pause, Re-start After The Pause, Stop On Bridge(s); • Setting The Initial Position For Own Ships; • Entering Faults Of Navigation Systems, Steering Gear, Propulsion Plant, Fire And General Alarm; • Ability To Set Faults Of Navigational Equipment; • Pulling Apart Ships That Have Collided Or Run Aground; • Control Of Target Vessels, Hoisting Flags Of The International Code Of Signals, Turning Their Sound Signals On And Turning Their Lights On/off; 4. The Software Modules Should Provide A Possibility To Flexibly Configure The Required Bridge Configuration. General: · An Integrated Application For Exercise Editing, Conducting And Debriefing; · Highly Accurate Data Representation Based On Vector Diagrams (ability To Automatically Load All Diagrams Related To The Selected Game Area); · Tools For Creating Exercises And Automatic Competency Assessment Scenarios; · Displaying Of The Actual Ship Contours; · Display Of Object Tracks: Contour Or Point With Selectable Resolution, Track History And Time Stamps; · Using The Mouse Wheel For Chart Scaling; · Control Of Simulator Session(s); · Continuous Automatic Recording Of Data During Exercise (main, Audio And Video Log Files); · Real Time, Slow Time, And Fast Time Modes; · Ability To Display And Print A New Pilot Card And A Table Of Maneuvering Characteristics Of The Ship; · Setting Parameters And Faults Of Navigation Equipment: Radar, Gps, Loran C, Log, Gyro, Echo Sounder, Uais; · Setting Weather And Bathymetric Conditions: Global And Local Zones, Import Of Tide And Current Databases (ecdis); · Working With Measuring Tools: - Ability To Set Erbl; - Ability To Attach, Move Or Delete Erbl During An Exercise; 9. Ability To Attach Sart To The Life Raft; 5. Ability To Move Own Ship During Exercise Without Grounding Or Collision; 6. Ability To Apply Virtual Tug Force To 8 Points Of The Vessel’s Hull In Any Direction; 7. Display Of Actual Ship's Contours; 8. Continuous Display Of Parameters Of Vessel Movement And Environment Conditions: Course And Speed Of The Vessel, Course Over The Ground, Transversal Component Of Speed On The Bow And On The Stern, Gyro Heading, Rate Of Turn, Speed And Direction Of The Current And Wind, Height And Direction Of A Wave, Depth; 9. Independent Instructor Control For Wind And Swell Components Of The Wave; 10. Ability To Set Sea State Spectrum: · Pierson-moskowitz; · Phillips; · Ittc (international Towing Tank Conference); · Jonswap (joint North Sea Wave Project); · User. 11. Ability To Exclude Hydrodynamic Interaction With Mooring Walls In The Required Area; 12. Ability To Create A Template Containing A Set Of Objects (ships), Save And Use This Template In Other Exercises; 13. Ability To Save Environment Settings As A Template And Load A Previously Saved Template In Any Exercise And Area; 14. Mooring Operations: · Ability To Set The Rope Material; · Ability To Set The Initial State Of The Mooring Winch (render, Slack Away, Stop); · Ability To Set Mooring Winch Parameters (speed, Pulling Force, Holding Force); · Ability To Operate The Mooring Winch At The Instructor Workplace. 15. Anchor Operations: · Ability To Set User Ground Type With Required Anchor Holding Force Coefficients; · Display Of Anchor Position On The Instructor's Chart On The Ground. 16. Control Of Navigational Lights And Shapes: · Ability To Control The Navigational Lights; · Ability To Switch On/off Deck Lights On Target Ships. 17. Loading/discharging Of Own Ship During Exercises; 18. Weather Conditions Manager: · Ability To Set Predefined Weather Conditions By Beaufort Number (wind, Wave, Whitecaps And Foam, 3d Clouds, Cloud Layer, Visibility) On The Fly; · Ability To Set Customized Weather Conditions; · Visual Effects: Rain And Snow (low, Medium, High), Lightning, Reflection, Translucency, Sea With White Caps, Foam, Splashes, Bow-wave; · Separate Settings For Wind Wave And Swell; · Manual Control Of Wind Direction And Strength; · Adjustment Of Atmospheric Parameters – Temperature, Humidity, Pressure; · Ability To Use Thunderstorm, Precipitation; · Automatic Calculation Of The Position Of The Sun, Moon, Major Stars (up To 100) And Constellations, The Angle And Phase Of The Moon; · Ability To Set Wave Spectrum Type: Pierson-moskowitz; Jonswap (joint North Sea Wave Project); Phillips; User-defined; · Ability To Use Thunderstorm, Precipitation. 19. Rcc, Ship And Coast Stating Assignment; 20. Log Module With Possibility To Print Out And Create Archives; 21. Window For Listening/monitoring Of The Radiotelephone Traffic Including Possibilities To Interfere With Radiotelephone Traffic; 22. Ability To Introduce Background Noise From A List And Instrument Faults To The Trainee Stations. 23. Ability To Change Names, Call Signs, Mmsi, Telex Numbers And Inmarsat Mobile Numbers Of All Emulated Ship Stations And Coast Station According To The Needs Of Different Exercises; 24. Electronic Chart With Vessel Position Indication And The Ability To Change Position, Course And Speed; 25. Ability To Display And Instantly Change Trainee Station Positions On The Electronic Map For Search And Rescue (sar) Exercises; 26. Full Monitoring Of Any Trainee Workstation – The Ability To Monitor The Status Of Each Gmdss Unit And Listen To The Radio Traffic Of Each Trainee Station; 27. Connection To An External Printer; 28. Connection To An Active Speaker For Simultaneous Viewing Of Channels; 29. Providing Functions Of A Coast Telex Or Telephone Subscriber, Coast Radio Station And Rcc Operator From The Log Window; 30. Status Window For All Instruments At Any Workstation; 31. Ability To Log Communication And Trainee Actions For Playback And Later Review; 32. Database Of Coastal Stations, Navtex And Msi Stations And Inmarsat Shore-based Stations Plotted On The Chart; 33. Information About The Gmdss Sea Areas On The Chart; 34. Approximate Estimation Of Radio Wave Propagation In The Selected Frequency Range; 35. Evaluation And Assessment Module; 36. Navtex Functionality: · Ability To Send Navtex Messages On Behalf Of A Navtex Station; · Ability To Edit And Use The Navtex Station Used-defined List; · Ability To Save And Use Navtex Message Templates. 37. “intercom” Panel. To Monitor Intercom Communication, Execute Voice Messages From The Instructor's Side. 38. Vhf Radio Station Module. To Monitor Vhf Communication, Send Voice Messages From The Instructor’s Side, Play Pre-recorded *.wav Files. 39. Coastal Radio Station Module. Screen Layout: 40. Use Of The Mouse Wheel For Chart Centering And Scaling; 41. On-screen Display Of Mooring Walls And Piers; 42. On-screen Display Of Actual Contours Of Any Ship; 43. On-screen Display Of The Object’s Route Line And Its Actual Track; 44. On-screen Display Of The True And Relative Speed Vectors; 45. Selectable Display Mode: True Motion, Relative Motion, Course Up Or North Up; 46. Display Of Prompt And Other Information In The Status Bar: · Bearing And Distance From The Current Cursor On-chart Position To The Reference Point; · Coordinates Of The Current Cursor On-chart Position; · Depth In The Current Cursor Position; · Current Exercise Time (absolute And Relative). 47. Displaying Of Object Tracks: Contour Or Point With Selectable Resolution, Track History And Time Stamp; 48. Displaying Of Walls And Piers; 49. Use Of A Mouse Wheel For Chart Centering And Scaling; 50. User Configurable Workplace; 51. Different Panels For The Control And Monitoring Of The Exercise Fulfillment: · Reports Panel – To Form And Print Exercise Fulfillment Reports; · Ship Info Panel – To Display Courses, Longitudinal And Transverse Speeds, Rates Of Turn For All The Ships Involved In The Exercise. · Evaluation And Assessment Module Panel; · Target Panel – To Control Vessel Target And Flight And Sar Objects; · Objects Panel – To Promptly Select An Object On The Chart From The List Of All The Objects Available In The Exercise; · Flags Panel – To Hoist/lower Ics Flag Signals On Any Of The Ships, Including Ability To Set And Keep Flag Templates · Events Panel – For The Automatic Recording Of Any Important Events Related To The Incorrect Trainee Actions; · Flash Light Panel – To Send Light Signals From Target Vessels, Including Automated Translation Into Morse Code; · Magnetic Deviation Panel – To Configure The Magnetic Deviation Panel For The Vessels, Participating In The Exercise, Save The Panel And Apply Desired Template To Any Own Vessel, Print The Magnetic Deviation Table; · Procedural Alarms Panel – For Defining User Set Of Alarm For Dedicated Vessels. 52. Setting Navigational Equipment Parameters And Faults: Radar, Gps, Loran C, Log, Gyro, Echo Sounder, Uais; 53. Setting The Exercise Weather And Bathymetric Conditions: Global And Local Zones, Import Of Tide And Current Databases; 54. Observing Own Ships And Targets On The Chart: Ship Info Panel, Cpatcpa Panel, Events Panel; 55. Control Of Own Ships And Targets On The Chart: Direct Control Of Steering And Propulsion Systems, Autopilot, Mooring Lines, Anchors; 56. Setting Faults Of Navigational Equipment, Steering And Propulsion System, Fire And General Alarms; 57. Continuous Data Logging During Exercises; 58. Playback Of Recorded Exercises In Real And Fast-time Modes; 59. Performing Preliminary Exercises On The Map To Check Their Suitability For Training On The Simulator; 60. Distress Signals (flare, Smoke Signals, Dye Markers); 61. Adding New Target Ships; 62. Changing Weather Conditions; 63. Moving Buoys, Turning Off Lights On Them And Hiding Them On Both The Visualization System And Radar; 64. Control Of Automatic Tugboats On Commands From The Bridge Or From The Instructor; 65. Generating And Printing Exercise Reports 5.4 Simulator Scenario Development Station 1. The Simulator Scenario Development Station Shall Be Integrated With All Engine Stations And Instructor Stations, And Can Act As An Instructor Station Capable Of Deploying Scenarios To Other Stations (bridge And Engine) 2. The Simulator Scenario Development Station Shall Have The Same Software And Control Capabilities As The Instructor Station. (see Section A 5.5.3) B. Full Mission Engine Room Simulator (fmers) And Mini Er Stations’ Features And Applications, Major Components And Engine Room Simulator Performance Standards 1. Major Components The Full Mission Engine Simulators That Can Be Integrated With Bridge Simulators Shall Consist Of The Following Major Components: A. One (1) Full Mission Engine Room Station (class A Configuration) B. Ten (10) Mini Engine Room Stations (class B Configuration) C. One (1) Server Station D. One (1) Instructor Station E. One (1) Simulator Scenario Development Station F. One (1) Briefing/ Debriefing Station 2. Features And Applications 2.1 The Man Electronic Engine Model Simulates A Suez Max Crude Oil Carrier With A Man Slow Speed Turbo Charged Diesel Engine As Propulsion Unit Modeled With Fixed Propeller. The Main Engine Models Respond Dynamically To Variations In Operation And Conditions Of The Ship Model, And The Ship Models Have Mutual Responses To The Main Engine Models. The Model Is Based On Real Engine Data That Makes The Dynamic Behavior Of The Simulator Close To Real Engine Response. In Addition To The Man Engine, The Vessel Has An Electrical Power Plant Including Three 1125 Kva Diesel Generators And One 250 Kva Emergency Generator. The Steam Plant Includes Two D-type Steam Boilers, Based On Alfa Laval And One Composite Boiler (aalborg), 3 Cargo Turbines, Condensing And Feed Water Systems. Control Room Operator Station, Bridge And Steering Panels Are Included. The System Shall Also Be Connected To The High Voltage Engine Simulator. 2.2 The Simulator Models Complies With The Requirements In The Stcw Convention, Regulation 1/12 And Fulfill The Standards Of An Internationally Recognized Classification Society For Maritime Simulator Systems. 2.3 The Engine Model Main Specifications High Fidelity Engine Room Systems Include: - Sea & Lt/ht Fresh Water Systems, Incl. Fw Generator - Electrical Power Plant, Incl. Diesel Generators And Power Management - Start & Service Air Compressors, Incl. Compressor Intermediate Coolers And Emergency Compressor - Integrated Automation System, Incl. Vessel Performance Monitor - Steam Plant Incl. D-type Oil Fired Boilers And Combined Exhaust/oil Fired Boiler - Diesel/heavy Fuel/oil Systems, Incl. Hfo, Lshfo And Mdo Tanks, Separators, Viscometers - Lubricating Oil Systems, Incl. Separator - Stern Tube Systems - Steering Gear - Main Engine Control System (man) - Main Engine Remote Control System (ac 600) - Main Engine Maneuvering System - Main Engine Hydraulic Oil System - Main Engine Hydraulic Cylinder Units System - Cylinder Indication Diagrams - Air Ventilation System - Bilge Wells & Bilge Separator - Sewage Treatment Plant - Incinerator Plant - Inert Gas System - Ballast System - Refrigeration System - Ship Loading System - Fire Detection System - Fire Fighting System - Remote Co2 Release, Emergency Stops And Quick Release Valves - Emission Control System (water Scrubbing And Me Low Nox Mode) 2.4 The Engine Simulator Product Shall Be Able To Address The Following Stcw Competencies And Shall Be Reflected In The Certificate: · Table A-iii/1.1 – Maintain Safe Engineering Watch · Table A-iii/1.3 – Used Of Internal Communication Systems · Table A-iii/1.4 – Operate Main And Auxiliary Machinery And Associated Controls · Table A-iii/1.5 – Operate Fuel, Lubrication, Ballast And Other Pumping Systems And Associated Control Systems · Table A-iii/1.6 – Operate Electrical, Electronic And Control Systems · Table A-iii/1.7 – Maintenance And Repair Of Electrical And Electronic Equipment · Table A-iii/1.11 – Maintain Seaworthiness Of The Ship 2.5 Interface To Engine Room High Voltage System - The Engine Room Model Will Be Interfaced To A Corresponding High Voltage Simulator And Gas Turbine Installed In The Academy. 3. Engine Room Simulator Performance Standards 3.1 Physical Realism The Engine Simulator Stations Shall Have The Following Physical Realism: A. Equipment And Consoles Shall Be Installed, Mounted, And Arranged In A Ship-like Manner B. The Control Room Consoles Shall Include Control And Monitoring Of The Main Engine, Auxiliary Engines And Electrical Power Generation, Steam Boiler, Pump, Compressors And All Other Alarms. C. The Remote Monitoring And Control Systems Shall Be In Compliance With The Functional Requirements Of The Classification Societies For Periodically Unattended Machinery Spaces. D. The Main Engine Remote Control Console Shall Include Command Functions And Status Indication Normally Found On Board Ships. E. The Electric Power Generation Shall Be Under Automatic Or Manual Control. Such System Should Be Able To Constantly Monitor Demand And Supply. When Deviation From Pre-set Limits Arises, The System Should Be Able To Act In Order To Normalize The Situation. The System Shall Also Perform Continuous Control Of The Frequency And Load Sharing. F. The Electric Power Supply System Shall Be Operated Either From The Switchboard Or The Power Management System. - Remote Start/stop Of Auxiliary Diesel Generators - Operation For Shaft Generator - Connect/ Disconnect Of All Generators - Automatic And Priority Selection - Non-essential Systems Trip - Constant Frequency Mode - Different Control Modes Of Load Sharing G. The Main Switchboard Shall Be A Full Scale Model Of A Typical Switchboard, And Comprise The Necessary Controls And Indicators Usually Available Of Real Generators. H. The Remote Control And Automation System Must Include Control Of The Following Equipment: - Me Lubricating Oil Pumps - Me Fresh Water Cooling Pumps - Me Sea Water Cooling Pumps - Me Auxiliary Blowers - Fuel Oil System And Pumps - Air Compressors - Steering Gear Pumps - Fire Pump Each Of The Above Individual Units Shall Allow Manual Start And Stop From The Control Room Consoles. It Shall Also Be Possible To Use Automatic Start And Stop Where Applicable. I. The Alarm Monitoring System Shall Consist Of A Typical Shipboard Alarm System. J. An Alarm Shall Be Announced By Sound And By Flashing Light In The Control Room. K. A Printer Or A Computer In The Engine Room Control Shall Be Used As An Alarm Log And Event Log. L. “dead Man Alarm System” The Simulator Shall Have The Following Additional Requirements For Low Speed Engine: M. The Simulated Engine Room Shall As A Minimum Reflect Typical Machinery Found On Merchant Ships. The Following Main Components Shall Be Simulated And All Necessary Sub-systems Included For A Low Speed Engine: - Main Engine Including Turbocharger System - 2 Auxiliary Diesel Generators - Lubrication Oil Separator - Steering Gear System - Fire Pump - Shaft Generator - Cooling Water System Including Freshwater Generation System - Turbo Generator - Fuel Oil Bunkering System - Fuel Oil Settling And Service Systems - 2 Heavy Fuel Oil Separators - 1 Diesel Oil Separator - Steam Generation Plant Including Exhaust And Oil-fired Boilers - Diesel Oil And Heavy Fuel Oil Supply To Main And Auxiliary Engines - Main Engine Operation From Engine Room, Engine Control Room And Bridge - Turbocharger System - Air Ventilation System For Engine And Control Room - Bilge Water System Including Oily Water Treatment Systems - Stern Tube System - Deck Machinery Applicable To The Ship Model - Ballast System - Sewage Treatment System The Simulator Shall Have The Following Additional Requirements For Medium And High Speed Engine: N. The Simulated Engine Room Shall Consist Of Typical Machinery Found On Merchant Ships. The Following Main Components Shall Be Simulated And All Necessary Sub-systems Included For A Medium And High Speed Engine: - One Or More Main Engines - Main Sw System - 2 Auxiliary Engines - Fuel Oil Tanks - Fuel Oil Separator - Lubrication Oil Separator - Main Engine(s), Including: • Fresh Water System • Lubrication System • Turbocharger System • Me Sw System - Reduction Gear System - Controllable Propeller Pitch Were Applicable - Steam Generation System As Applicable - Freshwater Generator - Bilge Wells And Bilge Separation System - 2 Air Compressors - Steering Gear System - Fire Pump - Electrical Power Plant - Deck Machinery Applicable To The Ship Model - Ballast System - Sewage Treatment System The Simulator Shall At Least Have The Following Additional Requirements For Machinery Spaces: O. The Simulated Machinery Spaces Shall At Least Include One Dedicated Room For This Purpose. P. At Least The Following Main Components Of The Machinery Spaces Shall Be Graphically Presented Or Represented By Mock-ups Or In Realistic Visualization (to Illustrate Physical Presence) In The Simulated Machinery Spaces: - Main Engine - Auxiliary Diesel Generators - Steam Boiler - Fire Pump Q. The Facilities For Local Operation In The Simulated Machinery Spaces Shall Consist Of Local Operating Stations For Each System. Each Station Shall Be Furnished With Start/stop (open/closed) Buttons And Status Lights, Various Numbers Of Pressure -, Temperature Indicators, Etc. The Local Operating Stations Shall At Least Give Means To Operate The Following: - Main Engine (me) - Me Lubricating Oil Systems Including Separator - Me Fresh Water Cooling System - Me Sea Water Cooling System - Me Auxiliary Blowers - 2 Auxiliary Diesel Generators - Steam Boiler - Fuel Oil System (diesel And Heavy Fuel Oil) Including Separator - 2 Air Compressors - Steering Gear System - Bilge Water System - Fire Pump R. All Valves Typically Associated With The Operation Of Above Machinery May Be Operated At The Computer Screen In A 3d Visual Form Or Mouse Operated By The Candidate. S. Internal Communication System. 3.2 Behavioral Realism The Engine Simulator Stations Shall Have The Following Behavioral Realism: A. The Simulator Models Shall Be Able To Replicate The Dynamic Behaviour Of The Machinery Systems And All Its Visual Parameters As Well As The Interactions Between The Sub-systems. B. The Simulator Models Shall Simulate The Engine Room Components With Their Procedures, As Well As Modelled Controller Systems (sensors, Controllers, Actuators, And Valves) Connected To The Processes. C. When Simulating Real Equipment The Behaviour Of Such Simulated Equipment Should Behave As Identical Aw Possible As The Original. Critical Parameters Of The Behaviour Shall Be Documented D. The Simulator Model Shall Make Applicable Controllers Available And Adjustable With Regards To Pid (proportional-integral-derivative Controller) Parameters. E. The Simulator Model Shall Provide Facilities To Allow The Injection And Resetting Of Malfunctions At Appropriate Times During Operation As Necessary. F. It Shall Be Possible To Simulate Change In Seawater Temperature And Demonstrate How This Affects The Complete Simulation Model. G. It Shall Be Possible To Simulate A Change In Air Temperature And Demonstrate How This Affects The Complete Simulation Model. H. The Simulator Shall Have All Heat Exchangers Available And Adjustable With Regards To Their Parameters (heat-transfer Factor, Heat Dissipation Are Etc.) I. The Simulator Shall Make All Pumps Available And Adjustable With Regards To Their Parameters (pump Capacity, Wear, Etc.) J. It Shall Be Possible To Demonstrate Systematically The Tests That Are Made On The Ums (unmanned Machinery Space) Alarm System. K. It Shall Be Possible To Simulate Auto Slow-down And Emergency Shut Down L. It Shall Be Possible To Simulate Safe Methods To Test Inert Gas Generator (ig) Alarms And Control. M. It Shall Be Possible To Simulate Testing Of The 24v D.c. Power Supply To The Navigation, Communication And Engine Room Control Console In Event Of Power Failure. N. It Shall Be Possible To Simulate Safe Method Of Testing The Insulation For Rotor And Stator. O. It Shall Be Possible To Simulate Of Reading A Power Factor Meter With Reference To Four Segments P. It Shall Be Possible To Simulate Testing Of The Devices And Relays Provided For Generator Protection Q. It Shall Be Possible To Simulate Tests Related To Avr (automatic Voltage Regulator) R. It Shall Be Possible To Simulate Methods Of Cooling And Checking Of Air Gap S. It Shall Be Possible To Simulate The Precautionary Measures When Megger Testing The Rotor Of A Brushless Generator T. It Shall Be Possible To Simulate Routine Tests On An Emergency Generator U. It Shall Be Possible To Simulate How A Generator Circuit Breaker Ocr (over Current Relay) Is Set And Tested. V. It Shall Be Possible To Simulate The Process Of Connecting A Shaft Generator On Load And Specific Conditions For Taking Off Load. W. It Shall Be Possible To Simulate The Procedure For Megger Testing A High Voltage System X. It Shall Be Possible To Simulate The Maintenance And Checks Carried Out On An Acb (air Circuit Breaker) Y. It Shall Be Possible To Simulate Recovery From “dead Ship” Condition. Z. It Shall Be Possible To Simulate Methods Test The “preferential Tripping Sequence” Aa. It Shall Be Possible To Simulate Methods To Tests Auto “cut In” Of Stand Fault Bb. It Shall Be Possible To Simulate Methods Of Diagnosing Single Phasing Fault. Cc. It Shall Be Possible To Simulate Operation And Maintenance Of Variable Speed Motor Starters. Dd. It Shall Be Possible To Simulate Operational Test Methods Of Oily Water Separator Monitors Ee. It Shall Be Possible To Simulate Test Methods For Level Alarms And Function Tests Of Bilge Pumping Arrangement Ff. It Shall Be Possible To Simulate The Functional Tests Of Odmcs (oil Discharge Monitoring And Control System) And Odme (oil Discharge Monitoring Equipment) System Gg. It Shall Be Possible To Simulate The Function Test Of Ows (oily Water Separator) And Ppm (parts Per Million) Unit. 3.3 Operating Environment The Engine Simulator Stations Shall Have The Following Operating Environment: A. It Shall Be To Adjust The Noise Level In The Simulated Machinery Spaces Infinite From No Added Noise Up To Minimum 100 Db(a). The Noise Shall Have A Frequency Distribution Typical For Machinery Spaces. Headset Is Provided For Each Workstation. B. It Shall Be Possible To Simulate The Sea Water Temperature At Least Infinite Between +1ºc And +30 ºc C. An Alarm Can Be Heard Through Headset Of A Candidate And By Flashing Light In The Machinery Spaces 4. Hardware Requirements 1 Set 4.1 Full Mission Engine Room Simulator A. Engine Control Room Consoles I. Ecr Pump Compressor And Power Management Console 1. 1 X Console 2. 1 X Computer 3. 2 X 24 Touch Monitors Ii. Ecr2 Alarm, Monitoring And Remote-control Console: 1. 1 X Console 2. 1 X Computer 3. 1 X Keyboard 4. 1 X 24” Touch Monitor 5. 1 X Industrial Tracker Ball Iii. Ecr3 Main Engine Remote Control And Indication Console 1. 2 X Console 2. 1 X Computer 3. 3 X 24” Touch Monitors 4. 1 X Speed Set Lever For Main Engine Remote Control And 5. Indication Console 6. Dead Man Alarm (dma) 7. Engineers Reset 8. Included Power Relay To Which Illumination In Engine Control Room And Engine Room Can Be Connected, Causing Lights In The Rooms To Go Out During A Blackout To Increase Realism. Iv. Simulated Cctv Touch Monitor 1. 1 X Computer 2. 1 X 24 Monitor V. Internal Telephone At The Following Locations 1. Instructors Station 2. Engine Control Room 3. Engine Room 4. Emergency Generator Room Vi. Main Switchboard 1. 14 X Touch Screen Monitors 2. 7 X Computers 3. 1 Set Of Speakers 4. Installed In A Switchboard Manner Vii. Engine Room Equipment 1. 4 Dome Type Virtual Walkthrough 2. 4 X High Resolution Short Throw Projector 3. 4 X Computer With Graphics Card 4. 4 X Controller Viii. Local Operating Station Console 1. 1 X Console 2. 1 X Computer 3. 1 X Keyboard 4. 1 X 24” Touch Monitor 5. 1 X Industrial Tracker Ball Ix. Engine Room Sound 1. 1 X Sub Woofer 2. 4 X Satellite Speaker X. Alarm Horn And Lamp 1. 1 X Column With Lights And Sirens Xi. Emergency Generator Room 1. 1 X Dome Type Virtual Walkthrough 2. 1 X High Resolution Short Throw Projector 3. 1 X Computer With Graphics Card 4. 1 X Controller 5. With Sound System B. All Computers Must Be The Latest Generation This Includes Processors, Memory, Graphics Card And Storage. I. Monitors: Full Hd Resolution Ii. Storage: Solid-state Drive (ssd) Iii. Processor Generation: Must Be From The Latest Generation Of Processors Iv. Graphics: Integrated Graphics Dedicated Gpu If Needed. C. Touchscreens For Durability, Responsiveness, And Multi-touch Support. D. Each Computer Must Be Paired With A Ups Unit Rated For At Least 1.5 Kva And Automatic Voltage Regulation To Handle Voltage Fluctuations. E. The Engine Control Console Must Be Made From Steel W/ Handrails 10 Sets 4.2 Mini Engine Room Simulator A. 1x Computer Specification (minimum Requirement) 1. Intel Core I5 Processor 2. 16 Gb Ram 3. 256 M.2. Ssd 4. Video Card 5. Keyboard/mouse 6. 2x At Least 24" Monitor (touchscreen) 7. Ups 1.5kva A. Surge Protection B. W/ Automatic Voltage Regulator B. 1x Table Size: At Least L 1200 X W 800 X H 750 Mm C. 1x Chairs 1 Set 4.3 Engine Instructor Station A. Instructor Station I. 1x Computer (minimum Requirements) 1. 3x 24” Monitor 2. Intel Core I5 Processor 3. 16 Gb Ram 4. 256 M.2 Ssd 5. Keyboard/mouse 6. Ups 1.5kva A. Surge Protection B. W/ Automatic Voltage Regulator Ii. 1x Speaker 1. Type: Desktop 2. Port: Mini Jack Iii. 1x Steel Cabinet W/ Lock 1. Metal Drawer Office Drawer 2. File Cabinet Storage With Wheel Iv. 1x Smart Tv 55” Tv Led For Cctv V. 1x Printer 1. Laser Printer A4 2. A4 Print Speed Up To 48 Ppm 3. Auto 2-sided (duplex) Printing, 1-line Lcd 4. Wifi, Airprint, Mopria, Wifi Direct, Lan, Usb 2.0 5. Colored Printer Vi. Instructor Station Table Specification: Vii. 11x Two-way Vhf Radiotelephone (walkie-talkie) With Charging Connection Viii. 1x Table Size: At Least L 1700 X W 700 X H 750 Mm 1. Material: Formica Matt Laminate On Chipboard Ix. 1x Ergodynamic Chair X. 1x Document Metal Cabinet With Glass Sliding Door 1. Size: 1850x 400mmx 900mm 2. Door Lock 1 Set 4.4 Engine Simulator Scenario Development Station A. Scenario Development Station As An Instructor Station Capable Of Deploying Scenarios To Other Stations (bridge And Engine) 1. 1x Computer (minimum Requirements) 2. 2x 24” Monitor 3. Intel Core I5 Processor 4. 16 Gb Ram 5. 256 M.2 Ssd 6. Rtx 4070 Or Higher 7. Keyboard/mouse 8. Ups 1.5kva A. Surge Protection B. W/ Automatic Voltage Regulator B. 1x Table Size: At Least L 1200 X W 800 X H 750 Mm I. Material: Formica Matt Laminate On Chipboard Ii. 1x Ergodynamic Chair 5. Software Requirements 5.1 Full Mission Engine Room Simulator 5.2 Mini Engine Room Simulator 5.3 Instructor Station 5.4 Simulator Scenario Development Station 1. The Simulator Scenario Development Station Shall Be Integrated With All Engine Stations And Instructor Stations, And Can Act As An Instructor Station Capable Of Deploying Scenarios To Other Stations (bridge And Engine) 2. The Simulator Scenario Development Station Shall Have The Same Software And Control Capabilities As The Instructor Station. (see Section B 5.5.3) 1 Set C. Briefing/ Debriefing Station For Bridge And Engine A. 2x Computer (minimum Requirements) 1. 1 X Pc 2. Intel Core I5 Processor 3. 16 Gb Ram 4. 500gb Ssd 5. Low Profile Video Card 6. 1x Keyboard/mouse 7. 1x Ups 1kva 8. 1x W/ Computer Table Size: At Least L 1700 X W 700 X H 750 Mm 9. Briefing And Debriefing Rooms With Playback Capability (playing Of Recorded Exercise And Assessment In Simulator B. 50x Chairs C. 1x Solid Round Table (at Least 6100 X 1220 Mm) (for Bridge Briefing/debriefing) I. (metal Legs With Laminate Board Or Solid Wood Table) D. 1x Solid Round Table (at Least 4880 X 1220 Mm) (for Engine Briefing/debriefing) I. (metal Legs With Laminate Board Or Solid Wood Table) E. 1x Smart Tv At Least 70" 4k 1. Wall Mounted. 2. 2x Hdmi 10meters F. 4x Bridge And 4x Engine) Hardware For Virtual Bridge Familiarization (minimum Requirements) 1. Display: A. Type: Lcd B. Resolution: 2064 X 2208 Per Eye C. Refresh Rate: 120 Hz D. Field Of View: E. Horizontal: 97 Degrees F. Vertical: 93 Degrees 2. Processor: A. Chipset: Qualcomm Snapdragon Xr2 Gen 2 3. Ram: 12gb 4. Storage: A. Options: 128gb, 256gb, And 512gb Variants 5. Audio: 6. Hand Tracking: Improved Hand Tracking Capability 7. Controllers: A. Type: Meta Touch Pro Controllers B. Features: Haptic Feedback, Improved Ergonomics, Rechargeable Batteries 8. Battery: A. Headset: Approximately 2-3 Hours Of Active Use B. Charging: Usb-c Fast Charging 9. Connectivity: A. Wireless: Wi-fi 6e Support B. Bluetooth: 5.2 10. Inclusions: A. Headset B. Touch Pro Controllers (pair) C. Charging Cable (usb-c) D. Power Adapter W/ Extra 1 Battery Each E. Controller Lanyards F. Glasses Spacer Ii. Add On’s: 1. 2x Strap With Battery 2. 8x Silicone Cover Face Cover 3. 4x Silicone Protective Case 4. 8x Silicone Case For Controller 5. 3 Row Vr Storage Cabinet With Lock G. The Virtual Reality Bridge Must Be Complete With Hotspots, Identification Tags And Descriptions. It Shall Also Be Available On An Offline System, Navigable. H. Playback Capability With The Following Functions: · Loading A Previously Created Exercise On A Chart Or In Engine Room; · Playing The Exercise To Explain The Task; · Uploading A Sample Log Of The Same Exercise To Explain The Correct Actions. I. Virtual Bridge Familiarization W/ Virtual Reality Device The Vr System Aims To Simulate The Overhauling Process, Enabling Immersive, Hands-on Learning And Pre-assessment Without Direct Physical Intervention On The Engine. This Approach Will Enhance Technical Skills, Reduce Risk, And Improve Efficiency In Real-world Engine Maintenance And Overhauling. The Supplier Shall Provide A Virtual Bridge And Engine With The Use Of Virtual Reality Providing The Following Visualizations: 1. Bridge Wing Equipment 2. Speaker Mic 3. Rate Of Turn 4. Engine Rpm 5. Quick Release Lifebouy 6. Remote Panel 7. Gyro Compass Repeater 8. Fire Box 9. Hatch For Maintenance 10. Thermometer Ii. Main Bridge 1. Epirb 2. Sart 3. Clear View Screen 4. Location Of Fire Extinguishers 5. Pantry With Equipment 6. Pilot Chair 7. Smoke Detectors 8. Damage Control Plans 9. Radar 1 And 2 And 3 10. Gps With Other Equipment 11. Helm Wheel 12. Indicator Control 13. Deck Light Control 14. Admiralty And Other Maritime Publications 15. Fireplan 16. Rudder Angle Indicator 17. Voice Recorder 18. Whistle Horn 19. Water Tight Door Indicators 20. Window Wipers 21. Pa Systems 22. Cargo Hold Fan Control 23. Smoke Alarm System 24. Fire Alarm System 25. General Alarm System 26. Vhf System 27. Log Books And Other Documentation 28. Ecdis Voyage Planner 29. Pressure Recorder 30. Portable Uhfs 31. Lifejackets, Rocket Flare, And Rocket Line 32. Location Of Immersion Suits 33. Barometer 34. Utc Clock 35. Radio Room Configuration 36. Posters 37. Charts 38. Compass Deck / Monkey Island 39. Radar Equipment 40. Antennas 41. Anemometer 42. And Other Equipment On The Monkey Bridge Iii. The Me-b Main Engine Vr Overhauling System Cover The Following Features Full-scale, Interactive Models Allowing For A Detailed Exploration Of All Engine Components, Including: Iv. Connection Rod & Crosshead Assembly V. Stuffing Box Assembly Vi. Piston Assembly Vii. Cylinder Liner Assembly Viii. Cylinder Cover Assembly Ix. Exhaust Valve Assembly X. The Vr Simulation Guides Users Through Disassembling, Inspecting, And Reassembling The Exhaust Valve, Focusing On Critical Tasks Like Checking Valve Seats, Spindle Condition, And Wear On Sealing Surfaces. Users Can Also Simulate Tasks Such As Lapping The Valve, Inspecting Hydraulic Actuators, And Ensuring Proper Seating Of The Valve During Reassembly. 1 Set D. Server Station For Bridge And Engine A. 2x Set Computer (minimum Requirements) 1. Intel Core I5 Processor 2. 16 Gb Ram 3. 4x 500 Ssd 4. Keyboard/mouse 5. License Operating System B. 1x Nas And Exercise Server 1. 4 Bay Nas Disk Station Quadcore Processor 2. 4x 4 Tb Hdd C. 1x Server Rack 1. Server Rack At Least 32u 2. W/ Fan D. 1x Ups 1. 5kva (5kw) 2. Sealed Lead-acid (sla) Or Lithium-ion 3. Output Voltage: 230v Ac 4. Surge Protection 5. Stabilizes Incoming Voltage Without Switching To Battery Mode 25 Sets E. Cloud Simulator-ready Computers A. Laptop 1. 13th Gen Intel Core I5-1335u 2. 16 Gb, 2 X 8 Gb, Ddr4. 2666 Mhz 3. 512 Gb, M2, Pcie Nvme, Ssd 4. Intel Iris Xe Graphics 5. Windows 11 Pro License 6. Wi-fi 6 Wireless Lan And Bluetooth 7. Keyboard With Numeric Keypad 8. 15.6", Fhd 1920x1080, 120hz, Wva, Non-touch, Anti-glare, 250 Nit, Narrow Border, Led-backlit 9. Ports: Usb 2.0, Headset Jack, Power Jack,hdmi 1.4, Usb 3.2 Gen 1 Type-a, Usb 3.2 Gen 1 Type-c™ 10. Power Adapter: 220v Ac Input, 65w 11. Accessories: Wireless Mouse 1 Set F. Network And Cctv A. 1 X High Speed Router For Remote Support B. Network Switch 1. Network Switch Specifications Manage: 2. 4x 24 Ports 10/100/1000mbps Rj45 Ports 3. 1x 8 Ports 10/100/1000mbps Rj45 Ports C. Set Cctv Monitoring 1. 1x Nvr At Least 32 Channel 2. 20x 6 Mp Fixed Dome Network Camera With Mic 3. 3x 6tb Storage (design For Cctv) D. Network Requirements: I. 72x Lan Port Ii. 1x Lot: Of Upvc, Conduit, Pull Box, Fittings, Hanger, And Support And Other Materials If Needed. Including Utp Cat6 Shielded Pure Copper, Fiber Optic Cable, Patch Panels. Iii. Installation, Engineering Labor For Entire Project. Iv. Cable Laying, Labeling, Harnessing V. Mobilization And Di-mobilization Vi. All Cabling Will Be Endpoint At Server Room (back Of Full Mission Bridge Simulator) E. Structured Cabling Systems Standard I. Stations Must Include Lan Outlets And Patch Cords. Ii. Backbone Cabling Will Be Using The Cable Tray For Lan Distribution. Iii. Lan Outlets Must Have Network Labeling Iv. Patch Panels Are Required G. Civil Works A. Program Of Work Separate Documents (attached) Part Ii. Other General Requirements 1 Ea. Project Billboard/signboard 1 L.s Occupational Safety And Health Program 1 L.s Mobilization/demobilization Part Iii. Civil, Mechanical, Electrical, & Sanitary/plumbing Works Part A. Earthworks 1 L.s Removal Of Structures And Obstruction Part C. Finishings And Other Civil Works 179.71 M² Wall, Metal Frame, Fiber Cement Board 6mm 37.92 M² Tempered Glass Door, 12mm, Reflective 23.04 M² Aluminum Glass Window 4.05 M² Doors, Solid Panel 406.28 M² Acoustical Ceiling Panel 745.2 M² Painting Works, Masonry/concrete 4.05 M² Painting Works, Wood 48.38 M² 150mm Chb Nonload Bearing(including Reinforcing Steel) 48.38 M² Plain Cement Plaster Finish 116 M² Floor Tiles, Imo Rubber, On Finish Floor 211.6 M² Floor Tiles, Imo Rubber, On Raised Floor System Part D. Electrical 1 L.s Panelboard With Main And Branch Breakers 1 L.s Wires And Wiring Devices 1 L.s Lighting Fixtures And Lamps 1 L.s Conduit, Boxes, And Fittings 1 L.s Pole Mounted Power Transformer (oisc) 1 L.s Network Cabling Part E. Mechanical 1 L.s. Door Access And Card Reader System Part F. Simulator Equipment 1 L.s Airconditioning, Package/split Type H. Terms And Conditions 1. A 3-year Warranty For The Computer Hardware And Console Peripherals 2. All Workstations Shall Have Imo Standard Rubber Mat Flooring. 3. The Software Comes With A 3-year Warranty Inclusive Of New Updates. 4. The Project Will Be Implemented Within 150 Cd. Liquidating Damages Will Be Applicable For Any Delays. 5. A Comprehensive Guide Will Be Provided, Offering Detailed Instructions On System Operation And Maintenance Activities, Facilitating Ease Of Use And System Upkeep. 6. Onsite Training Sessions Will Be Conducted By Certified Instructors And Technical Experts, Facilitating Smooth Knowledge Transfer And Ensuring Proficient System Operation. Certificates Will Be Provided Upon Completion Of Training Sessions. 7. Structured Cabling Standards To Establish A Reliable And Efficient Network Infrastructure. 8. The Simulator Manufacturer Should Be An Iso 9001:2015 And Iso 14001:2015 Certified Business. 9. The Simulator Should Be Certified By An Internationally Recognized Classification Society And May Also Be Certified By National Authorities. 10. The Software Must Be Perpetual License. 11. The Supplier Shall Conduct An Annual Face-to-face Maintenance Session To Ensure The System's Optimal Functionality And Performance. 12. The Supplier Must Resolve Any Software Or Hardware Issues Within 2 To 5 Cd Of Their Occurrence To Minimize Downtime And Disruptions. 13. All Hardware Installations Must Adhere To Software Specifications To Guarantee Seamless Integration And Operation. 14. The Computer Hardware Supplied Must Be Sourced From Proven Technology Hardware Companies, Quality And Performance Standards To Ensure Optimal Functionality And Compatibility With The Software. 15. Bidders Are Required To Offer Continuous Retraining Sessions Free Of Charge During The Warranty Period To Ensure Users' Proficiency With The System. 16. Bidders Should Provide Manufacturer Authorization Or Exclusivity Certificate To Ensure The Authenticity And Legality Of The Supplied Products. 17. The Bidder Is Responsible For Performing A Thorough Site Inspection, And A Site Inspection Certificate Issued By The Agency Shall Be Submitted As Part Of The Eligibility Requirements. 18. The Bridge Simulator Shall Be Integrated With The Engine Simulator Ensuring Compatibility And Functionality. 19. All Simulator Stations Can Connect And Enable Them To Interact With Each Other In A Coordinated Scenario. 20. The Simulator Scenario Development Station Shall Be Capable Same As An Instructor Station Capable Of Deploying Scenarios To Other Stations. 21. All Other Simulator Specifications And Capabilities Not Indicated Herein, The Simulator Shall Comply With The Simulator Performance Standards As Required In Maritime Industry Authority (marina) Evaluation Instrument For Full Mission Bridge And Engine Simulator. 22. The Bidders Should Provide A Breakdown Of The Unit Prices Of The Major Components In The Original Of Duly Signed And Accomplished Price Schedule(s) Under Financial Component Envelope Upon Bid Submission. Furthermore, They Should Provide A More Detailed Breakdown As A Condition For Issuance Of Notice To Proceed. ~~~~nothing Follows~~~~
Closing Date9 Dec 2024
Tender AmountPHP 79.9 Million (USD 1.3 Million)
Department Of Agriculture Tender
Machinery and Tools
Corrigendum : Tender Amount Updated
Philippines
Details: Description Section I. Invitation To Bid Da8-goods-2025-02 (pr No. Bt-25-goods-consol-39879-0004) 1. The Department Of Agriculture-regional Field Office No. 8, Through The Multiple Fund Intends To Apply The Sum Of Nine Million One Hundred Thirty Thousand Pesos (p9,130,000.00) Being The Approved Budget For The Contract (abc) To Payments Under The Contract For “supply And Delivery Of Agricultural Equipment” Bids Received In Excess Of The Abc Shall Be Automatically Rejected At Bid Opening. 2. The Department Of Agriculture-regional Field Office No. 8, Undertakes The Bidding Of This Procurement Project As “short-of-award.” Hence, The Notice Of Award To The Winning Bidder Shall Be Issued After Enactment By The Congress Of The General Appropriation Act (gaa) For 2025. 3. The Department Of Agriculture-regional Field Office No. 8, Now Invites Bids For The Above Procurement Project. Delivery Of The Goods Is Required Within Per Lot (terms And Conditions). Bidders Should Have Completed, Within Two (2) Years From The Date Of Submission And Receipt Of Bids, A Contract Similar To The Project. The Description Of An Eligible Bidder Is Contained In The Bidding Documents, Particularly, In Section Ii. Instructions To Bidders. Qty Uom Item Description Unit Cost Total Cost Lot 1: 2 Number Recirculating Dryer 2,950,000.00 5,900,000.00 Technical Specifications: 1. Type: Recirculating Batch Type 2. Total Maximum Height: 7.2 M 3. Product Quality A. Cracked Grain, % Increase: 3%, Max B. Head Rice, % Decrease: 5% Maximum C. Hulled/damaged Grain % Increase:2% Maximum 4. Drying System A. Holding Capacity: 6 Tons Wet Palay @ 24% Moisture Content, Minimum B. Moisture Gradient: 2%, Maximum C. Drying Efficiency: 75%, Minimum D. Drying Rate: 1% /hr, Maximum E. Drying Loss/spillage: 1%, Maximum F. With Compatible Electric Motor For Drying System G. Vertical Rectangular Bin- Consist Of Rectangular Vertically Installed Drying Chamber H. With Control Panel I. With Mimic Flow Of Operation J. With Basic Electrical Meter Such As Ammeter And Voltmeter Display 5. With Basic Safety Cut-off Features: A. Emergency Shutdown Button B. With On-off Pilot Lights Switch Button And Indicating Operating Motor, Each Component With Motor Should Have Individual Circuit Breaker C. With Magnetic Starter With Overload D. With Interlocking System And Emergency Button 6. Construction: Stainless Steel-astm 304 For Following Parts Such As: A. Drying Bin Wall/cover B. Discharge Chute C. Elevator Casing D. Bottom Boot Section Of The Elevator E. Drying Chamber: Perforated Screen For Non-lsu Type Or Inverted V-duct For Lsu Type F. Auger G. Auger Casing H. Receiving Hopper 7. Mounting Frame A. Steel Angular Bar (50mmx50mmx6mm, Minimum) B. Mounting Frame Shall Be Fitted With Brackets For Contrete Floor Installation 8. With The Following Components: A. Heating System 1 I. Petroleum Based Fuel: Direct Fired Ii. Heating System Efficiency: 90%, Minimum Iii. With Following Accessories: Flame Sensor Electronic Ignition System Automatic Fuel Shut-off Adjustable Fuel Vaporizer Automatic Temperature Control Temperature Monitoring System Galvanized Fuel Container Made Of Non-corrosive And Heat-resistant Material At 200 Liters Capacity, Minimum Compatible Electric Motor For The Heating System B. Heating System 2 I. Biomass Fuel: Indirect-fired Ii. Heating System Efficiency: 50%, Minimum Iii. Can Provide The Required Heating Temperature Or Can Provide 70°c Drying Temperature Iv. Heat Exchanger: Made Of Fire Tubes V. Burning Chamber: Made Of Refractory Bricks With Automatic Fuel Feeder: Auger/air Blown/plunger Type (provided That The Feeder Is Not Directly Exposed To The Burning Fuel) Vi. With The Following Accessories: With Temperature Control With Compatible Electric Motor Vii. Burning Efficiency Of Biomass Furnace: 95%, Minimum With Compatible Electric Motor C. With Provision Of Ducting To Divert Heat Source From Heating System 1 Or Heating System 2 I. Made Of Stainless Steel Or Primer Painted And Powder Coated B.i Or G.i Sheet D. Dust Collection System Consist Of Cyclone Separator/collector And Suction Blower. All Ducting Shall Be Fabricated From Sheet Metal And The Connectors Must Be Airtight. 9. With Following Accessories: A. Generator Set I. Capacity: Compatible To The Drying System, Able To Provide Sufficient Continuous And Peak Power Requirements Of The Drying System Ii. Voltage Requirement Compatible To The System Iii. Power Supply/generating System Should Be Brand New Iv. Provided With Mechanical Transfer Switch (mts) V. The Electrical Wire, Wire Accessories, And Piping To Connect The Power Generating Unit To The Mts And The Dryer Control Panel/system Shall Be Provided By The Bidder Vi. With The Thermal Insulation And Noise Suppressor B. Portable Handheld Moisture Meter I. Grain: Paddy, Rice, And Other Grains (optional) Ii. Type: Capacitance Iii. Moisture Range:12-25% Or Wider Iv. Accuracy: ≠0.5% Or Better V. Lcd/led Display Vi. Battery Operated Vii. Automatic Density And Temperature Compensation Viii. Product Brochure With Technical Specifications In English C. Standard Heavy Duty Tools: Made Of Tempered Steel And Chrome Vanadium I. One (1) Set Socket Wrench (no. 8,9,10,11,12,13,14,15,16,17,18,19,20,21,22,23,24,27,30,32, Minimum) Ii. One (1) Set Combination Wrench (open And Box, 10 Pcs-size Appropriate To The Drying System) Iii. Electrical Plier, 200mm, Minimum Iv. Screwdriver: Philips And Flat Head, 300mm,minimum V. Grease Gun, 250mm Cylinder Length, Minimum Vi. Mechanical Pliers, 200mm, Minimum Vii. Heavy Duty Toolbox And Roll Up Tools Holder Size That Could Accommodate The List Of Tools D. Vacuum Cleaner With Air Blower I. Rated Input Power:1,000 W, Minimum Ii. Vacuum Cord: 5m, Minimum E. Basic Safety Kits F. Personal Protective Equipment Dust Mask Safety Goggle Ear Muff/ear Plug G. One (1) Unit Fire Extinguisher H. Dry Chemical, Stored Pressure Type, 6.80 Kg, Minimum I. Automatic Portable Bag/sack Closer/sewer 10. With Compatible Biomass Furnace 11. With Compatible Transformer 12. Provide Reflectorized And Waterproof Da-rice Logo (12" X 12") Lot 2: 2 Number Walk Behind Transplanter 400,000.00 800,000.00 Technical Specifications: 1. 4 Stroke Gasoline Engine At 4 Hp, Minimum 2. Number Of Planting Rows: 4 Rows, Minimum 3. Row Spacing: 30 Cm 4. Hill Spacing: 12-21cm, Adjustable 5. Field Efficiency: 80%, Minimum 6. Percent Damaged Hills And Percent Missing Hills: 10%, Maximum 7. Noise Emitted: 92db, Maximum 8. With Low Bed Trailer 9. With Manually Operated Seed Sowing Machine With Valid Amtec Test Report 10. With Compatible Seedling Tray: 500 Pcs, Minimum A. Dimension: 60cm X 30cm X 3.5cm (length X Width X Thickness) B. Hole Aperture: 1-1.5mm 11. Holder And Accessories Required For Maintenance With Full Dealer Optional Parts 12. With Original Equipment Manufacturers Manual Written In English. 13. With The Following Standard Heavy Duty Tools And Accessories: A. Open Wrench Set B. Adjustable Wrench (12") C. Grease Gun D. Philips And Flat Screw Driver E. Roll Up Tools Holder F. Provide Personalized/ Fitted Material (water Resistant) For Covering G. With Personal Protective Equipment (minimum Of 3 Sets Each) I. Dust Mask Ii. Earmuff Iii. Eye Protection (safety Goggles) Iv. Hand Gloves H. Provide With Engine Driven Power Sprayer/ Pressure Washer Automatic Type I. .provide With Extra 2 Liters Engine Oil 14. Provide Reflectorized And Water Resistant Da-rice And Da-noap Logo (4" X 4") 15. Conform To Paes/pabes 151:2015 16. With Engrave Nameplate Containing Atleast The Chasis And Engine Number Lot 3: 1 Number Float-assist Type Walking Type Tractor (floating Tiller) 130,000.00 130,000.00 Technical Specifications: 1. Type: Mudboat 2. Rated Power: Minimum Of 10 Hp Diesel Engine, Aircooled 3. Fuel Consumption: Maximum Of 2.5li/hr 4. Continuous Power: 85% Of Rated Power, Minimum 5. Peak Transmission: 80%, Minimum 6. Total Cutting Width: 1.0 Meter Minimum 7. Noise Emitted: 95 Db, Maximum 8. Complete With Throttle Lever And Clutch Lever On The Handle Bar 9. The Unit Should Be Painted Finish, With Rust-proofing Primer And Final Paint Color 10. With The Following Standard Heavy Duty Tools And Accesories: A. Open Wrench Set B. Adjustable Wrench (12") C. Grease Gun D. Philips And Flat Screw Driver E. Roll Up Tools Holder F. Provide Personalized/ Fitted Material (water Resistant) For Covering G. With Personal Protective Equipment (minimum Of 3 Sets Each) I. Dust Mask Ii. Earmuff Iii. Eye Protection (safety Goggles) Iv. Hand Gloves H. Provide With Engine Driven Power Sprayer/ Pressure Washer Automatic Type I. Provide With Extra 2 Liters Engine Oil 11. Provide Reflectorized And Water Resistant Da-rice Logo (4" X 4") 12. Conform To Paes/pabes 347:2022 13. With Engrave Nameplate Containing Atleast The Chasis And Engine Number Lot 4 2 Number Rice Mill (single Pass) 1,150,000.00 2,300,000.00 Technical Specifications: 1. Rubber Roll Dehuller 2. Input Capacity: Minimum Of 0.5 Ton/hr At 98% Purity 3. Hulling Efficiency: 75% Minimum 4. Prime Mover: 23 Hp Diesel Engine (minimum), Watercooled With Brand New Battery (atleast 3sm) 5. Milling Recovery Index: 0.98 Min. 6. Percent Head Rice Index: 0.90 Min. 7. With Protection For All Moving Parts 8. With Pre-cleaner A. Input Capacity: Should Be Compatible With The Hulling Capacity Of The Units To Be Supplied (375kg/hr Minimum) 9. With Trailer A. Steel Made Channel Reinforced By Steel Angular Bars B. Leaf Spring Suspension System C. With Brand New Tires (pneumatic) D. With Reflectorized Slow Moving Vehicle Emblem 10. With Bucket Elevator A. Material: Plastic 11. With The Following Standard Heavy Duty Tools And Accessories: A. One (1) Unit Weighing Scale With 500kg Capacity Minimum B. One (1) Piece Calibrated Grain Moisture Monitoring Device (portable Handheld Moisture Meter) J. Grain: Paddy And Rice Ii. Type: Capacitance Iii. User’s Manual In English C. With Fire Extinguisher For Fire Caused By Flammable Liquids I .class B Ii. Six (6) Liters Capacity D. Open Wrench Set E. Adjustable Wrench (12") F. Grease Gun G. Philips And Flat Screw Driver H. Roll Up Tools Holder I. Provide Personalized/ Fitted Material (water Resistant) For Covering J. With Personal Protective Equipment (minimum Of 3 Sets Each) I. Dust Mask Ii. Earmuff Iii. Eye Protection (safety Goggles) Iv. Hand Gloves K. Provide With Electric Driven Power Sprayer/ Pressure Washer Automatic Type L. Provide With Electric Blower That Has Minimum Of 700w Rated Input Power M. Provide With Extra 2 Liters Engine Oil 12. Provide Operation Equipment Manual 13. Provide Reflectorized And Water Resistant Da-rice Logo (6" X 6") 14. With Engrave Nameplate Containing Atleast The Chasis And Engine Number Terms And Conditions: A During The Opening Of Bids, Bidders Shall Submit: 1 Certificate Of Accredited Service Center Within The Region That Could Respond Within 72 Hours (including Holidays And Weekends) Upon Request Of The End-user/beneficiary; 2 Namdac Certificate Of Accreditation; 3 Section Vii (technical Specifications) Of Bidding Document, Which Must Be Signed And Sealed By Licensed Agricultural Engineer/agricultural Biosystems Engineer; 4 Valid Amtec Test Report: I. Recirculating Dryer With A Similar Drying System Conform To The Pns.paes 201:2015 Standard For Moisture Gradient, Drying Rate, Product Quality, Drying Loss/spillage, Drying Efficiency, And Heating System Efficiency. Should Be Provided With Separate Amtec Test Report For Both Heating System. Ii. Engine Iii. Float-assist Type Walking Type Tractor (floating Tiller) Coupled With The Offered Engine Iv. Mechanical Rice Transplanter (walk-behind) Coupled With The Offered Engine V. Rice Mill (single Pass) Coupled With The Offered Engine 5 Warranty Certificate For Services, Parts, And Other Components Due To Manufacturing Defects Upon Acceptance With Minimum Of Two (2) Years For Lot 1 Only; 6 Warranty Certificate For The Machinery And Equipment Being Offerred For Lot 2, 3, & 4 Only: A. Minimum Of 1 Year For Engine From Date Of Acceptance B. Minimum Of 1 Year On Parts And Services From Date Of Acceptance. 7 Valid Certificate Of Dealership/distributorship/authority To Sell; 8 Certification Guaranteed Spare Parts Availability For At Least Five (5) Years For Lot 1 Only; 9 Permit To Operate (pto) From Bafe; B During Post-qualification, The Bidder Shall Submit: 1 Provide Certification Of Very Satisfactory Performance Of The Recirculating Dryer Being Offered As To: I) Machinery Performance; Ii) Machinery Durability And; Iii) Availability Of Parts And Service, Issued By Any Government Or Private Company Agency/company In Asian Countries, Excluding Da-rfo8, Duly Signed By The Current Head Of Agency/company Within The Last One (1) Year. The Bidder Shall Provide List Of Five (5) Customer/clients With Addresses And Contact Numbers, And Certification From At Least One (1) Customer/client Issued By Any Government For Lot 1 Only; 2 Manufacturer's Distributor's Or Bidder's Certification That The Proposed Grain Dryer Brand Has Been In The Market For The Last 5 Years, Accompanied Or Duly Supported By Documentary Proof. The Documentary Proof Must Be Verifiable Through Phone Call, Ocular Inspection Or Both, Covering The Period Beginning From 2019 Or Erlier And Maybe Any Or A Combination Of The Following (for Lot 1 Only): A. Record Of Sales B. Dealership Or Servicing Agreements Indicating The Brand Subject Thereof C. Manufacturer's Or Distributor's Certification Of Market Presence, Indicating The Name/s And Address/es Of The Dealers D. Bill Of Lading And/or Other Similar Records Indicating Shipment Or Delivery Of The Grain Dryer Brand To The Philippines E. Client's Affidavit Indicating Client's Complete Address And Telephone Number, Brand, Type, And Model Of Grain Dryer, Date Of Purchase And Duly Supported By Physical Proof Of Grain Dryer 3 Copy Of Equipment Manufacturer's Manual (in English) For Lot 1 Only: A. Recirculating Dryer Unit And Each Component Such As Drying Unit, Drying System, Generator Set, And Portable Handheld Moisture Meter Written In English/filipino 4 Certificate Of Conformity From Bafe I. Recirculating Dryer Ii. Mechanical Rice Transplanter (walk-behind) Iii. Float-assist Type Walking Type Tractor (floating Tiller) Iv. Rice Mill (single Pass) C Winning Bidder/s Shall: 1 Deliver And Install Genuine, Unaltered, And Brand New Units; 2 Conduct Formal Training, After Complete Delivery And Installation Of The Items, For The Operation And Maintenance Of The Equipment To At Least Two (2) Operators And Provide Copies Of The Training Module Written In English/filipino; 3 Deliver And Install (if Necessary) The Units To The Intended Recipients As Indicated In The Attached List Of Delivery Points Upon Receipt Of Ntp. Lot 1: Within 60 Calendar Days Lot 2: Within 30 Calendar Days Lot 3: Within 20 Calendar Days Lot 4: Within 60 Calendar Days 4 Shoulder The Delivery And Handling Cost To The Specified Drop-off Point, Materials For Testing, Fuels, And Other Necessary Requirements. 5 Inform The End-user And General Services Section (gss) Seven (7) Calendar Days Prior To The Schedule Of Delivery; 6 Non-stainless Material Should Be Painted With Rust-proofing Primer And Final Paint Color For Lot 1 Only D Any Delay Of Delivery Of Item Shall Be Subjected To Liquidated Damges Equivalent To 1/10 Of 1% Of The Contract Price Per Day Of Delay Of The Undelivered Items; E Payment Scheme: A. 100% Payment Shall Be Made Upon Complete Delivery, Inspection, Amtec System Testing (test Report With Acceptable Rating), After The Conduct Of Training In The Operation And Maintenance Of The Machineries And Equipment; And Acceptance Per Lot F Winning Bidder/s Shall Submit A Snapshot Of Business Bank Account (preferably Landbank) To Effect Payment. 4. Bidding Will Be Conducted Through Open Competitive Bidding Procedures Using A Non-discretionary “pass/fail” Criterion As Specified In The 2016 Revised Implementing Rules And Regulations (irr) Of Republic Act (ra) 9184. Bidding Is Open To All Interested Bidders, Whether Local Or Foreign, Subject To The Conditions For Eligibility Provided In The Irr Of Ra 9184. 5. Prospective Bidders May Obtain Further Information From Department Of Agriculture – Regional Field Office 8 And Inspect The Bidding Documents At The Address Given Below During Office Hours From 8:00am To 5:00 Pm. 6. A Complete Set Of Bidding Documents May Be Acquired By Interested Bidders On November 09 To December 03, 2024 From The Given Address And Website(s) Below And Upon Payment Of The Applicable Fee, Pursuant To The Latest Guidelines Issued By The Gppb. The Cost Of The Bidding Documents Shall Correspond To The Total Abc Of The Selected Lot/s On Which The Supplier Intends To Bid, With A Range As Indicated In The Table Below. Approved Budget For The Contract Maximum Cost Of Bidding Documents (in Philippine Peso) 500,000 And Below 500.00 More Than 500,000 Up To 1 Million 1,000.00 More Than 1 Million Up To 5 Million 5,000.00 More Than 5 Million Up To 10 Million 10,000.00 7. The Department Of Agriculture-rfo 8 Will Hold A Pre-bid Conference On November 19, 2024, 9:00 Am (bac-secretariat Time) At Da8 Bac Office, 4th Floor Green Bldg., Kanhuraw Hill, Tacloban City And Through Face To Face Or Video Conferencing Or Webcasting Via Google Meet, Which Shall Be Open To Prospective Bidders. 8. Bids Must Be Duly Received By The Bac Secretariat Through Manual Submission At The Office Address Indicated Below On Or Before December 03, 2024, 9:00 Am (bac-secretariat Time). Late Bids Shall Not Be Accepted. 9. All Bids Must Be Accompanied By A Bid Security In Any Of The Acceptable Forms And In The Amount Stated In Itb Clause 14. 10. Bid Opening Shall Be On December 03, 2024, 9:00 Am (bac-secretariat Time) At Da8 Bac Office, 4th Floor Green Bldg., Kanhuraw Hill, Tacloban City. Bids Will Be Opened In The Presence Of The Bidders’ Representatives Who Choose To Attend Either Physically Or Through Video Conferencing Via Google Meet. 11. The Department Of Agriculture-rfo 8 Reserves The Right To Reject Any And All Bids, Declare A Failure Of Bidding, Or Not Award The Contract At Any Time Prior To Contract Award In Accordance With Sections 35.6 And 41 Of The 2016 Revised Irr Of Ra No. 9184, Without Thereby Incurring Any Liability To The Affected Bidder Or Bidders. 12. Da Does Not Condone Any Form Of Solicitation On Any Prospective Winning And Losing Bidders By Any Of Our Staff/employees Or Any Other Party. Any Sort Of This Kind Shall Be Reported Immediately To The Office Of The Secretary Or The National Bureau Of Investigation (nbi) For Entrapment And Proper Investigation. 13. For Further Information, Please Refer To: Martins A. Alde Head, Bac-secretariat Department Of Agriculture, Regional Field Office-8 Kanhuraw Hill, Tacloban City Darfo8.bacsec@gmail.com Mobile No. 09061694318 Easternvisayas.da.gov.ph 14. You May Visit The Following Websites: For Downloading Of Bidding Documents: Www.philgeps.gov.ph Or Easternvisayas.da.gov.ph Approved By: (sgd.) Larry U. Sultan, Jd Chairman, Bids And Awards Committee
Closing Date3 Dec 2024
Tender AmountPHP 9.1 Million (USD 154.8 K)
Ministry Of Science And Technology Cotabato City Maguindan Tender
Solar Installation and Products...+1Electrical and Electronics
Philippines
Details: Description Procurement Of Supply, Delivery, Installation, And Commissioning Of Processing Equipment Under Bangsamoro Assistance For Grassroots Innovation (bagi) - Tdif 2023 Ben. #1 Supply, Delivery And Installation Of Processing Equipment Of Charcoal Briquetting Process Of Sabaken Maguyaga Fishermen Cooperative Place Of Delivery: Brgy. Sabaken Northern Kabuntalan, Maguindanao Del Norte 1 .) Charcoal Crusher Machine = 1 Pc Specifications: Power Supply: Single-phase (220v, 50hz) Motor Power: 2.2kw – 3.5kw (high-torque Electric Motor) Crushing Capacity: 300 – 500 Kg/h (depending On Charcoal Hardness And Moisture Content) Rotor Speed: 1,500 – 2,000 Rpm Feed Inlet Size: 300mm X 200mm Crushing Mechanism: Charcoal (lump Charcoal, Briquettes), Coal, And Biomass (optional) Hopper Capacity: 50 – 100 Kg Per Batch Machine Dimensions: Approx. 1200mm (l) X 800mm (w) X 1100mm (h) Construction Material: Frame: Heavy-duty Steel Frame Blades/hammers: Hardened Steel For Durability Screens: Replaceable Stainless Steel Or Carbon Steel Mesh Discharge System: Gravity-based Or Optional Conveyor For Continuous Discharge Cooling System: Air-cooled Motor With Thermal Protection Safety Features: Emergency Stop Button Protective Covers Over Moving Parts Safety Lock On The Hopper Lid Lubrication: Manual Grease Lubrication For Bearings And Other Moving Parts Dust Control: Optional Dust Collection System Or Enclosed Design To Minimize Dust Dispersion Control System: On/off Switch With Overload Protection Adjustable Speed Control (optional For Certain Models) Operating Temperature: 5°c – 40°c Mobility: Equipped With Durable Wheels Or Skid Base For Easy Movement Accessories Included: Spare Blades/hammers Set Of Replacement Screens With Different Mesh Sizes Basic Toolkit For Maintenance Maintenance Requirements: Regular Lubrication And Periodic Blade Sharpening Or Replacement Power Cable Length: 5 Meters (with Waterproof Plug) Warranty: 1-year Warranty On Parts And Labor 2.) Charcoal Briquette Machine = 1 Pc Specifications: Power Supply: Single-phase (220v, 50hz) Motor Power: 2.2kw – 3kw (high-torque Electric Motor For Heavy-duty Operation) Briquetting Capacity: 150 – 300 Kg/h (depending On Feed Material And Moisture Content) Briquette Size: Diameter: 50mm – 70mm (customizable) Length: Adjustable (40mm – 100mm) Biomass Materials (optional) Feed Inlet Size: 300mm X 200mm Hopper Capacity: 50 – 100 Kg Binding Material: Optional Binder Feed System (for Starch Or Clay Binders) Moisture Content Requirement: 8% – 12% For Optimal Briquette Formation Heating System: Optional Pre-heating For Better Briquette Cohesion Output Shape: Cylindrical, Hexagonal, Or Square (based On Mold Type) Construction Material: Frame: Heavy-duty Steel Construction Compression Chamber: Hardened Steel For Durability Operating Pressure: 30 – 60 Mpa (adjustable For Different Materials) Cooling System: Air-cooled Motor With Thermal Overload Protection Discharge System: Manual Or Automatic Conveyor Discharge (optional) Lubrication: Manual Grease Lubrication For Bearings And Compression System Control System: On/off Switch With Overload Protection Emergency Stop Button Machine Dimensions: Approx. 1500mm (l) X 1000mm (w) X 1200mm (h) Safety Features: Protective Covers Over Moving Parts Emergency Stop Button Overload Protection Mobility: Equipped With Durable Wheels Or Skid Base For Ease Of Movement Dust Control: Optional Dust Collection System Or Enclosed Feed System Accessories Included: Set Of Molds For Different Briquette Shapes And Sizes Maintenance Toolkit Operating Manual Maintenance Requirements: Regular Lubrication And Periodic Mold Inspection And Replacement Power Cable Length: 5 Meters (with Waterproof Plug) Warranty: 1-year Warranty On Parts And Labor 3.) Charcoal Mixer = 1 Pc Specifications: Power Source: Diesel Engine Engine Power: 10 Hp Mixing Capacity: 200 – 500 Kg/h (depending On Material Type And Moisture Content) Mixing Type: Horizontal Or Vertical Ribbon Mixer Mixing Chamber Volume: 200 Liters Material Compatibility: Charcoal Powder Charcoal Dust Biomass Materials (e.g., Wood Shavings, Sawdust) Binder Additives (if Applicable) Feed Inlet Size: 150mm X 150mm (with Safety Cover) Discharge Outlet Size: 100mm X 100mm (manual Or Pneumatic Discharge Options) Mixing Speed: 30 – 50 Rpm (fixed Speed) Construction Material: Frame: Heavy-duty Carbon Steel Or Stainless Steel Mixing Blades: Hardened Steel For Long-lasting Durability Fuel Tank Capacity: 3.5 – 5 Liters (diesel Fuel) Fuel Consumption: 0.8 – 1.5 Liters Per Hour (depending On Load And Engine Type) Cooling System: Air-cooled Diesel Engine Safety Features: Emergency Stop Button Protective Guards Over Moving Parts Engine Overload Protection Machine Dimensions: Approx. 1400mm (l) X 900mm (w) X 1200mm (h) Mobility: Equipped With Heavy-duty Wheels Or Skid Base For Easy Movement Included Accessories: Basic Maintenance Toolkit Operating Manual Spare Mixing Blades (optional) Control System: On/off Switch For Engine Control Throttle Control For Engine Speed Adjustment Maintenance Requirements: Regular Lubrication And Cleaning Of Mixing Components Diesel Engine Maintenance (oil Change, Filter Cleaning) Operating Temperature: 5°c – 40°c Warranty: 1-year Warranty On Parts And Labor 4.) Fabricated Solar Dryer House = 1 Pc Specifications: Drying Area: 20 M² Can Be Customized Based On Available Space And Drying Capacity. Structure Frame: Material: Galvanized Steel Or Aluminum Alloy Frame Frame Dimensions: Approx. 3m (w) X 6m (l) X 2.5m (h) For A 20 M² House Corrosion-resistant Material For Outdoor Durability. Covering Material: Uv-stabilized Polyethylene Or Polycarbonate Plastic Sheeting Thickness: 200 Microns – 300 Microns Lifespan: 3 – 5 Years (depending On Maintenance) Light Transmittance: 80% – 90% (for Optimal Drying Efficiency) Ventilation System: Adjustable Air Vents Or Windows On Sidewalls And Roof For Airflow Control. Optional Exhaust Fans (solar-powered) For Better Air Circulation. Flooring: Raised Mesh Or Perforated Flooring For Air Circulation Underneath Drying Materials Material: Food-grade Stainless Steel Or Heavy-duty Plastic. Optional: Concrete Flooring With Drainage System. Shelving: Multi-layer Drying Racks (3 To 5 Layers, Adjustable) Frame: Stainless Steel Or Galvanized Metal Mesh: Uv-resistant Plastic Or Food-grade Stainless Steel Shelving Space Per Layer: 1.5m X 6m (adjustable). Entry/exit: Sliding Or Hinged Doors With Uv Plastic Covering Optional Lockable Doors For Security Temperature Control: Natural Solar Heating (temperature Up To 50°c – 70°c Inside The Dryer) Optional Thermostat For Monitoring Temperature Levels. Moisture Control: Adjustable Air Vents To Control Humidity Levels. Optional Hygrometer For Humidity Measurement. Rain Protection: Sloped Roof Design For Rainwater Runoff. Sealed Edges To Prevent Water Seepage. Wind Resistance: Windproof Design, Capable Of Withstanding Wind Speeds Up To 80 Km/h. Capacity: Suitable For Drying Fruits, Vegetables, Seaweed, Fish, Spices, And Herbs. Approx. 100 – 500 Kg Of Materials Per Batch (depending On House Size And Product Type). Installation: Modular Design For Easy Assembly And Disassembly. Includes Assembly Manual And Required Hardware. Maintenance: Uv Plastic Requires Periodic Cleaning To Remove Dust And Debris. Frame And Ventilation System Should Be Inspected Regularly. Accessories Included: Solar-powered Exhaust Fans (optional). Digital Thermometer And Hygrometer (optional). Extra Uv Plastic Sheeting For Future Replacements. Operating Temperature: 5°c – 45°c (ambient Temperature Range For Optimal Operation). Weight: Approx. 100 – 300 Kg (depending On Size And Materials Used). Lifespan: Uv Plastic Cover Expected To Last 3 – 5 Years; Frame Expected To Last 10 – 15 Years With Proper Maintenance. Warranty: 1-year Warranty On Structure And Uv Plastic Covering. ----------------nothing Follows------------------ Ben. #2 Supply, Delivery And Installation Of Processing Equipment Of Livestock Feeds Production Of Igabay Coconut Farmers Organization Place Of Delivery: Brgy. Igabay, Balabagan, Lanao Del Sur 1.) Heavy-duty Hammer Mill Machine = 1 Pc Specifications: Power Source: Diesel Engine Engine Power: 15hp – 20hp (diesel-powered, Air-cooled) Fuel Consumption: 1.5 – 2.5 Liters Per Hour (depending On Material And Load) Production Capacity: 400 – 500 Kg/h (depending On Material Type And Moisture Content) Rotor Speed: 1,800 – 2,500 Rpm Hammer Type: Grain (corn, Wheat, Sorghum, Etc.) Biomass (wood Chips, Agricultural Waste) Stalks And Straw Dry Grasses And Forage Various Other Materials For Processing Screen Size Options: Multiple Screen Sizes (2mm – 10mm) For Different Output Particle Sizes Feed Inlet Size: Approx. 300mm X 200mm (customizable Based On Material Size) Machine Dimensions: Approx. 1500mm (l) X 1000mm (w) X 1300mm (h) Material Of Construction: Frame: Stainless Steel Hammers: Hardened Steel Screens: Replaceable Mesh Screens Made Of Stainless Discharge System: Gravity-based Or Optional Conveyor Belt Discharge Safety Features: Emergency Stop Button Heavy-duty Guards For Moving Parts Vibration-dampening Mounts For Stable Operation Lubrication System: Manual Grease Points For Bearings And Other Moving Parts Mobility: Equipped With Durable Wheels Or Skid Base For Ease Of Transport Included Accessories: Set Of Replacement Hammers Set Of Screens (with Different Mesh Sizes) Basic Toolkit For Maintenance Warranty: 1-year Warranty On Parts And Labor 2.) Feeds Pellet Mill Machine = 1 Set Specifications: Power Source: Diesel Engine Engine Power: 15hp – 20hp (air-cooled Or Water-cooled) Fuel Consumption: 1.5 – 2.5 Liters Per Hour (depending On Load And Material) Production Capacity: 400 – 500 Kg/h (varies With Material Type And Pellet Size) Pellet Size: Adjustable From 2mm To 8mm (customizable Die Sizes) Die Type: Flat Die Or Ring Die (interchangeable Dies Available) Agricultural Waste Fish Meal And Other Feed Ingredients Hopper Capacity: 50 – 80 Kg Pelletizing Speed: 150 – 200 Rpm Feed Form: Dry Pellets Material Of Construction: Frame: Heavy-duty Steel Construction Rollers And Dies: Hardened Steel For Durability And Wear Resistance Discharge System: Gravity-based Or Optional Conveyor Pellet Length: Adjustable (via Cutting Knife At The Die) Machine Dimensions: Approx. 1600mm (l) X 900mm (w) X 1500mm (h) Cooling System: Air Or Water Cooling (to Prevent Overheating During Extended Use) Lubrication System: Manual Grease Lubrication For Bearings And Rollers Operating Temperature: 5°c – 40°c Safety Features: Emergency Stop Button Safety Guards On All Moving Parts Overload Protection Mobility: Mounted On Wheels Or Skid Base For Ease Of Transportation Included Accessories: Set Of Spare Dies (with Different Hole Sizes) Tool Kit For Basic Maintenance Operating Manual Fuel Tank Capacity: 10 – 15 Liters Pelletizing Efficiency: 90% – 95% Conversion Of Feedstock Into Pellets Warranty: 1-year Warranty On Parts And Labor 3.) Mixer Borrow Machine =1 Pc Specifications: Power Supply: Single-phase (220v, 50hz) Motor Power: 1.5kw – 2.2kw (high-torque Electric Motor) Mixing Capacity: 100 – 150 Liters (approximately 3 – 4 Bags Of Mortar Mix Per Batch) Drum Material: Heavy-duty Steel (rust-resistant Coating) Drum Capacity: 120 – 160 Liters (total Capacity, Including Mixing And Overspill) Drum Speed: 25 – 30 Rpm (optimal For Thorough Mortar Mixing) Concrete (light) Plaster Mixes Discharge System: Manual Tilting Mechanism For Easy Discharge Drum Tilt Range: 360° Tilting For Complete Emptying Machine Dimensions: Approx. 1200mm (l) X 800mm (w) X 1000mm (h) Weight: 80 – 120 Kg (depending On Model And Drum Size) Frame Construction: Heavy-duty Steel Frame For Durability Wheels: Pneumatic Or Solid Rubber Wheels For Easy Transport Across Job Sites Control System: On/off Switch With Thermal Overload Protection Emergency Stop Button Safety Features: Protective Cover For Motor And Moving Parts Safety Guards For Drum And Paddle Non-slip Base For Stability During Operation Lubrication: Sealed Bearings For Minimal Maintenance Operating Temperature: 5°c – 40°c Cable Length: 5 Meters (with Waterproof Plug) Mobility: Fitted With Handles For Manual Movement Included Accessories: Maintenance Toolkit Operating Manual Mixing Time: 3 – 5 Minutes Per Batch (depending On Material Consistency) Energy Efficiency: Low Power Consumption, Suitable For Continuous Operation Warranty: 1-year Warranty On Parts And Labor 4.) Siever Machine = 1 Pc Specifications: Power Supply: Single-phase (220v, 50hz) Motor Power: 0.75kw – 1.5kw (electric Motor With Variable Speed Control) Sieving Capacity: 300 – 500 Kg/h (depending On Material Type And Screen Size) Screen Type: Multiple-layer Vibrating Screens Stainless Steel Mesh (food-grade Or Standard Options Available) Fine Powders (flour, Starch, Etc.) Granular Materials (sand, Grains, Seeds) Dry Food Products Fertilizers Aggregates (cement, Construction Materials) Feeding System: Manual Or Automatic Feed Hopper With Adjustable Feed Rate Machine Dimensions: Approx. 1700mm (l) X 800mm (w) X 9000mm (h) Frame Construction: Heavy-duty Stainless Steel (rust-resistant, Suitable For Industrial Use) Control System: On/off Switch With Vibration Adjustment Thermal Overload Protection Vibration Mechanism: Eccentric Motor-driven Vibration System Operating Temperature: 5°c – 45°c Mobility: Fitted With Wheels Or Skid Base For Easy Movement Safety Features: Safety Guards On Moving Parts Emergency Stop Button Overload Protection Power Cable Length: 5 Meters (with Waterproof Plug) Included Accessories: Set Of Different Screen Meshes (with Various Sizes) Tool Kit For Maintenance And Screen Changes Warranty: 1-year Warranty On Parts And Labor ----------------nothing Follows------------------ Ben. #3 Supply, Delivery And Installation Of Processing Equipment Of Livestock Feeds Production Of Kauran Allience Farmers Marketing Cooperative Place Of Delivery Brgy. Kauran, Ampatuan, Maguindanao Del Sur 1.) Heavy-duty Hammer Mill Machine = 1 Pc Specifications: Power Source: Diesel Engine Engine Power: 15hp – 20hp (diesel-powered, Air-cooled) Fuel Consumption: 1.5 – 2.5 Liters Per Hour (depending On Material And Load) Production Capacity: 400 – 500 Kg/h (depending On Material Type And Moisture Content) Rotor Speed: 1,800 – 2,500 Rpm Hammer Type: Grain (corn, Wheat, Sorghum, Etc.) Biomass (wood Chips, Agricultural Waste) Stalks And Straw Dry Grasses And Forage Various Other Materials For Processing Screen Size Options: Multiple Screen Sizes (2mm – 10mm) For Different Output Particle Sizes Feed Inlet Size: Approx. 300mm X 200mm (customizable Based On Material Size) Machine Dimensions: Approx. 1500mm (l) X 1000mm (w) X 1300mm (h) Material Of Construction: Frame: Stainless Steel Hammers: Hardened Steel Screens: Replaceable Mesh Screens Made Of Stainless Discharge System: Gravity-based Or Optional Conveyor Belt Discharge Safety Features: Emergency Stop Button Heavy-duty Guards For Moving Parts Vibration-dampening Mounts For Stable Operation Lubrication System: Manual Grease Points For Bearings And Other Moving Parts Mobility: Equipped With Durable Wheels Or Skid Base For Ease Of Transport Included Accessories: Set Of Replacement Hammers Set Of Screens (with Different Mesh Sizes) Basic Toolkit For Maintenance Warranty: 1-year Warranty On Parts And Labor 2.) Feeds Pellet Mill Machine = 1 Set Specifications: Power Supply: Single-phase (220v, 50hz) Motor Power: 1.5kw – 2.2kw (high-torque Electric Motor) Mixing Capacity: 100 – 150 Liters (approximately 3 – 4 Bags Of Mortar Mix Per Batch) Drum Material: Heavy-duty Steel (rust-resistant Coating) Drum Capacity: 120 – 160 Liters (total Capacity, Including Mixing And Overspill) Drum Speed: 25 – 30 Rpm (optimal For Thorough Mortar Mixing) Concrete (light) Plaster Mixes Discharge System: Manual Tilting Mechanism For Easy Discharge Drum Tilt Range: 360° Tilting For Complete Emptying Machine Dimensions: Approx. 1200mm (l) X 800mm (w) X 1000mm (h) Weight: 80 – 120 Kg (depending On Model And Drum Size) Frame Construction: Heavy-duty Steel Frame For Durability Wheels: Pneumatic Or Solid Rubber Wheels For Easy Transport Across Job Sites Control System: On/off Switch With Thermal Overload Protection Emergency Stop Button Safety Features: Protective Cover For Motor And Moving Parts Safety Guards For Drum And Paddle Non-slip Base For Stability During Operation Lubrication: Sealed Bearings For Minimal Maintenance Operating Temperature: 5°c – 40°c Cable Length: 5 Meters (with Waterproof Plug) Mobility: Fitted With Handles For Manual Movement Included Accessories: Maintenance Toolkit Operating Manual Mixing Time: 3 – 5 Minutes Per Batch (depending On Material Consistency) Energy Efficiency: Low Power Consumption, Suitable For Continuous Operation Warranty: 1-year Warranty On Parts And Labor 3.) Mixer Borrow Machine = 1 Pc Specifications: Power Supply: Single-phase (220v, 50hz) Motor Power: 1.5kw – 2.2kw (high-torque Electric Motor) Mixing Capacity: 100 – 150 Liters (approximately 3 – 4 Bags Of Mortar Mix Per Batch) Drum Material: Heavy-duty Steel (rust-resistant Coating) Drum Capacity: 120 – 160 Liters (total Capacity, Including Mixing And Overspill) Drum Speed: 25 – 30 Rpm (optimal For Thorough Mortar Mixing) Concrete (light) Plaster Mixes Discharge System: Manual Tilting Mechanism For Easy Discharge Drum Tilt Range: 360° Tilting For Complete Emptying Machine Dimensions: Approx. 1200mm (l) X 800mm (w) X 1000mm (h) Weight: 80 – 120 Kg (depending On Model And Drum Size) Frame Construction: Heavy-duty Steel Frame For Durability Wheels: Pneumatic Or Solid Rubber Wheels For Easy Transport Across Job Sites Control System: On/off Switch With Thermal Overload Protection Emergency Stop Button Safety Features: Protective Cover For Motor And Moving Parts Safety Guards For Drum And Paddle Non-slip Base For Stability During Operation Lubrication: Sealed Bearings For Minimal Maintenance Operating Temperature: 5°c – 40°c Cable Length: 5 Meters (with Waterproof Plug) Mobility: Fitted With Handles For Manual Movement Included Accessories: Maintenance Toolkit Operating Manual Mixing Time: 3 – 5 Minutes Per Batch (depending On Material Consistency) Energy Efficiency: Low Power Consumption, Suitable For Continuous Operation Warranty: 1-year Warranty On Parts And Labor 4.) Siever Machine = 1 Pc Specifications: Power Supply: Single-phase (220v, 50hz) Motor Power: 0.75kw – 1.5kw (electric Motor With Variable Speed Control) Sieving Capacity: 300 – 500 Kg/h (depending On Material Type And Screen Size) Screen Type: Multiple-layer Vibrating Screens Stainless Steel Mesh (food-grade Or Standard Options Available) Fine Powders (flour, Starch, Etc.) Granular Materials (sand, Grains, Seeds) Dry Food Products Fertilizers Aggregates (cement, Construction Materials) Feeding System: Manual Or Automatic Feed Hopper With Adjustable Feed Rate Machine Dimensions: Approx. 1700mm (l) X 800mm (w) X 9000mm (h) Frame Construction: Heavy-duty Stainless Steel (rust-resistant, Suitable For Industrial Use) Control System: On/off Switch With Vibration Adjustment Thermal Overload Protection Vibration Mechanism: Eccentric Motor-driven Vibration System Operating Temperature: 5°c – 45°c Mobility: Fitted With Wheels Or Skid Base For Easy Movement Safety Features: Safety Guards On Moving Parts Emergency Stop Button Overload Protection Power Cable Length: 5 Meters (with Waterproof Plug) Included Accessories: Set Of Different Screen Meshes (with Various Sizes) Tool Kit For Maintenance And Screen Changes Warranty: 1-year Warranty On Parts And Labor ----------------nothing Follows------------------ Ben. #4 Supply, Delivery And Installation Processing Equipment Of Seaweeds Chips Of Abs-mhet Aquamarine Producer. Place Of Delivery Brgy. San Reymundo, Jolo, Sulu 1.) Electric Dough Sheeter Machine = 1 Pc Specifications: Power Supply: Single-phase (220v, 50hz) Motor Power: 1.5 Kw Rolling Width: 600 Mm Dough Thickness Adjustment: Adjustable From 0.5 Mm To 10 Mm Manual Or Automatic Thickness Adjustment System Frame: Heavy-duty Stainless Steel Or Painted Carbon Steel Rollers: Food-grade Stainless Steel For Easy Cleaning And Durability Dimensions: Approx. 1200 Mm (l) X 800 Mm (w) X 1100 Mm (h) Safety Features: Emergency Stop Button Safety Guards On Rollers Overload Protection Control System: On/off Switch With Overload Protection Variable Speed Control For Conveyor And Roller Speed Cleaning System: Easy Access For Cleaning Rollers And Conveyor Removable Parts For Thorough Cleaning Mobility: Equipped With Sturdy Wheels Or Skid Base For Easy Transport Power Cable Length: 5 Meters (with Waterproof Plug) Included Accessories: Maintenance Toolkit Operating Manual Operating Temperature: 5°c – 40°c Warranty: 1-year Warranty On Parts And Labor 2.) Seaweeds Grinder Machine = 1 Pc Specifications: Power Supply: Single-phase (220v, 50hz) Motor Power: 3 Kw (high-torque Electric Motor For Heavy-duty Operation) Grinding Capacity: 100 – 200 Kg/h (depending On Seaweed Type And Moisture Content) Grinding Mechanism: Hammer Mill Or Knife Mill Grinding System Adjustable Grinding Fineness (1 Mm To 5 Mm Particle Size) Other Plant Materials (optional) Screen Type: Removable Stainless Steel Screen For Varying Particle Sizes Cooling System: Air-cooled Motor With Thermal Overload Protection Discharge System: Gravity-based Discharge Or Optional Conveyor For Continuous Operation Construction Material: Frame: Heavy-duty Carbon Steel Or Stainless Steel Grinding Chamber: Corrosion-resistant Material Suitable For Marine Products Machine Dimensions: Approx. 1500 Mm (l) X 800 Mm (w) X 1200 Mm (h) Safety Features: Emergency Stop Button Protective Guards Over Moving Parts Overload Protection Control System: On/off Switch With Overload Protection Variable Speed Control (optional) Lubrication: Manual Grease Lubrication For Bearings And Grinding Components Mobility: Equipped With Sturdy Wheels For Easy Movement Power Cable Length: 5 Meters (with Waterproof Plug) Included Accessories: Spare Screens Of Different Mesh Sizes Maintenance Toolkit Operating Manual Cleaning System: Easy Access For Cleaning And Maintenance Dust Control: Optional Dust Extraction System Or Enclosed Design To Minimize Dust Dispersion Operating Temperature: 5°c – 40°c Warranty: 1-year Warranty On Parts And Labor 3.) Seaweeds Solar Dryer Machine = 1 Pc Specifications: Power Supply: 12v Dc (powered By Solar Panel And Battery System) Solar Panel: Type: Monocrystalline Or Polycrystalline Power Output: 100w – 200w Voltage: 12v Battery: Drying Method: Natural Convection Drying With Solar Heat Optional Fan-assisted Airflow For Improved Efficiency Drying Chamber Dimensions: Approx. 1200mm (l) X 800mm (w) X 800mm (h) Adjustable Shelving For Effective Drying 7 Layer Tray Rack Compatible To Drying Chamber Material Compatibility: Fresh Or Dried Seaweeds (e.g., Agar, Carrageenan) Other Plant Materials (optional) Construction Material: Frame: Heavy-duty Aluminum Or Stainless Steel Chamber: Uv-resistant Polycarbonate Or Insulated Metal Temperature Control: Thermostat With Temperature Gauge (up To 60°c) Adjustable Airflow Control For Optimal Drying Conditions Ventilation System: Adjustable Vents For Moisture Control Optional Exhaust Fan (12v Dc) For Enhanced Airflow Weight: Approx. 50 – 80 Kg (depending On Materials Used) Mobility: Equipped With Wheels Or A Skid Base For Easy Movement Included Accessories: Solar Panel Mounting Brackets Battery Charger And Controller Shelving Units For Drying Operating Manual Cleaning System: Easy Access For Cleaning The Drying Chamber Dust Control: Enclosed Design To Minimize Dust Ingress Warranty: 1-year Warranty On Parts And Labor ----------------nothing Follows------------------ Ben. #5 Supply, Delivery And Installation Of Processing Equipment Of Charcoal Briquetting Process Of Sabaken Maguyaga Fishermen Cooperative Place Of Delivery Brgy. Panosolen, Gen. Salipada K. Pendatun, Maguindanao Del Sur 1.) Charcoal Crusher Machine = 1 Pc Specifications: Power Supply: Single-phase (220v, 50hz) Motor Power: 2.2kw – 3.5kw (high-torque Electric Motor) Crushing Capacity: 300 – 500 Kg/h (depending On Charcoal Hardness And Moisture Content) Rotor Speed: 1,500 – 2,000 Rpm Feed Inlet Size: 300mm X 200mm Crushing Mechanism: Charcoal (lump Charcoal, Briquettes), Coal, And Biomass (optional) Hopper Capacity: 50 – 100 Kg Per Batch Machine Dimensions: Approx. 1200mm (l) X 800mm (w) X 1100mm (h) Construction Material: Frame: Heavy-duty Steel Frame Blades/hammers: Hardened Steel For Durability Screens: Replaceable Stainless Steel Or Carbon Steel Mesh Discharge System: Gravity-based Or Optional Conveyor For Continuous Discharge Cooling System: Air-cooled Motor With Thermal Protection Safety Features: Emergency Stop Button Protective Covers Over Moving Parts Safety Lock On The Hopper Lid Lubrication: Manual Grease Lubrication For Bearings And Other Moving Parts Dust Control: Optional Dust Collection System Or Enclosed Design To Minimize Dust Dispersion Control System: On/off Switch With Overload Protection Adjustable Speed Control (optional For Certain Models) Operating Temperature: 5°c – 40°c Mobility: Equipped With Durable Wheels Or Skid Base For Easy Movement Accessories Included: Spare Blades/hammers Set Of Replacement Screens With Different Mesh Sizes Basic Toolkit For Maintenance Maintenance Requirements: Regular Lubrication And Periodic Blade Sharpening Or Replacement Power Cable Length: 5 Meters (with Waterproof Plug) Warranty: 1-year Warranty On Parts And Labor 2.) Charcoal Briquette Machine = 1 Pc Specifications: Power Supply: Single-phase (220v, 50hz) Motor Power: 2.2kw – 3kw (high-torque Electric Motor For Heavy-duty Operation) Briquetting Capacity: 150 – 300 Kg/h (depending On Feed Material And Moisture Content) Briquette Size: Diameter: 50mm – 70mm (customizable) Length: Adjustable (40mm – 100mm) Biomass Materials (optional) Feed Inlet Size: 300mm X 200mm Hopper Capacity: 50 – 100 Kg Binding Material: Optional Binder Feed System (for Starch Or Clay Binders) Moisture Content Requirement: 8% – 12% For Optimal Briquette Formation Heating System: Optional Pre-heating For Better Briquette Cohesion Output Shape: Cylindrical, Hexagonal, Or Square (based On Mold Type) Construction Material: Frame: Heavy-duty Steel Construction Compression Chamber: Hardened Steel For Durability Operating Pressure: 30 – 60 Mpa (adjustable For Different Materials) Cooling System: Air-cooled Motor With Thermal Overload Protection Discharge System: Manual Or Automatic Conveyor Discharge (optional) Lubrication: Manual Grease Lubrication For Bearings And Compression System Control System: On/off Switch With Overload Protection Emergency Stop Button Machine Dimensions: Approx. 1500mm (l) X 1000mm (w) X 1200mm (h) Safety Features: Protective Covers Over Moving Parts Emergency Stop Button Overload Protection Mobility: Equipped With Durable Wheels Or Skid Base For Ease Of Movement Dust Control: Optional Dust Collection System Or Enclosed Feed System Accessories Included: Set Of Molds For Different Briquette Shapes And Sizes Maintenance Toolkit Operating Manual Maintenance Requirements: Regular Lubrication And Periodic Mold Inspection And Replacement Power Cable Length: 5 Meters (with Waterproof Plug) Warranty: 1-year Warranty On Parts And Labor 3.) Charcoal Mixer = 1 Pc Specifications: Power Source: Diesel Engine Engine Power: 10 Hp Mixing Capacity: 200 – 500 Kg/h (depending On Material Type And Moisture Content) Mixing Type: Horizontal Or Vertical Ribbon Mixer Mixing Chamber Volume: 200 Liters Material Compatibility: Charcoal Powder Charcoal Dust Biomass Materials (e.g., Wood Shavings, Sawdust) Binder Additives (if Applicable) Feed Inlet Size: 150mm X 150mm (with Safety Cover) Discharge Outlet Size: 100mm X 100mm (manual Or Pneumatic Discharge Options) Mixing Speed: 30 – 50 Rpm (fixed Speed) Construction Material: Frame: Heavy-duty Carbon Steel Or Stainless Steel Mixing Blades: Hardened Steel For Long-lasting Durability Fuel Tank Capacity: 3.5 – 5 Liters (diesel Fuel) Fuel Consumption: 0.8 – 1.5 Liters Per Hour (depending On Load And Engine Type) Cooling System: Air-cooled Diesel Engine Safety Features: Emergency Stop Button Protective Guards Over Moving Parts Engine Overload Protection Machine Dimensions: Approx. 1400mm (l) X 900mm (w) X 1200mm (h) Mobility: Equipped With Heavy-duty Wheels Or Skid Base For Easy Movement Included Accessories: Basic Maintenance Toolkit Operating Manual Spare Mixing Blades (optional) Control System: On/off Switch For Engine Control Throttle Control For Engine Speed Adjustment Maintenance Requirements: Regular Lubrication And Cleaning Of Mixing Components Diesel Engine Maintenance (oil Change, Filter Cleaning) Operating Temperature: 5°c – 40°c Warranty: 1-year Warranty On Parts And Labor 4.) Fabricated Solar Dryer House = 1 Pc Specifications: Drying Area: 20 M² Can Be Customized Based On Available Space And Drying Capacity. Structure Frame: Material: Galvanized Steel Or Aluminum Alloy Frame Frame Dimensions: Approx. 3m (w) X 6m (l) X 2.5m (h) For A 20 M² House Corrosion-resistant Material For Outdoor Durability. Covering Material: Uv-stabilized Polyethylene Or Polycarbonate Plastic Sheeting Thickness: 200 Microns – 300 Microns Lifespan: 3 – 5 Years (depending On Maintenance) Light Transmittance: 80% – 90% (for Optimal Drying Efficiency) Ventilation System: Adjustable Air Vents Or Windows On Sidewalls And Roof For Airflow Control. Optional Exhaust Fans (solar-powered) For Better Air Circulation. Flooring: Raised Mesh Or Perforated Flooring For Air Circulation Underneath Drying Materials Material: Food-grade Stainless Steel Or Heavy-duty Plastic. Optional: Concrete Flooring With Drainage System. Shelving: Multi-layer Drying Racks (3 To 5 Layers, Adjustable) Frame: Stainless Steel Or Galvanized Metal Mesh: Uv-resistant Plastic Or Food-grade Stainless Steel Shelving Space Per Layer: 1.5m X 6m (adjustable). Entry/exit: Sliding Or Hinged Doors With Uv Plastic Covering Optional Lockable Doors For Security Temperature Control: Natural Solar Heating (temperature Up To 50°c – 70°c Inside The Dryer) Optional Thermostat For Monitoring Temperature Levels. Moisture Control: Adjustable Air Vents To Control Humidity Levels. Optional Hygrometer For Humidity Measurement. Rain Protection: Sloped Roof Design For Rainwater Runoff. Sealed Edges To Prevent Water Seepage. Wind Resistance: Windproof Design, Capable Of Withstanding Wind Speeds Up To 80 Km/h. Capacity: Suitable For Drying Fruits, Vegetables, Seaweed, Fish, Spices, And Herbs. Approx. 100 – 500 Kg Of Materials Per Batch (depending On House Size And Product Type). Installation: Modular Design For Easy Assembly And Disassembly. Includes Assembly Manual And Required Hardware. Maintenance: Uv Plastic Requires Periodic Cleaning To Remove Dust And Debris. Frame And Ventilation System Should Be Inspected Regularly. Accessories Included: Solar-powered Exhaust Fans (optional). Digital Thermometer And Hygrometer (optional). Extra Uv Plastic Sheeting For Future Replacements. Operating Temperature: 5°c – 45°c (ambient Temperature Range For Optimal Operation). Weight: Approx. 100 – 300 Kg (depending On Size And Materials Used). Lifespan: Uv Plastic Cover Expected To Last 3 – 5 Years; Frame Expected To Last 10 – 15 Years With Proper Maintenance. Warranty: 1-year Warranty On Structure And Uv Plastic Covering. ----------------nothing Follows------------------ Ben. #6 Supply, Delivery And Installation Of Processing Equipment Of Fresh Water Fish Processing Of Bangsamoro Grassroot Anti-poverty Agriculture Cooperative Place Of Delivery Brgy. Lagunde Pikit, North Cotabato 1.) Production And Packaging Equipment = 1 Set Working Table = 1 Pc Table Dimensions: Length: 1500mm (1.5m) Width: 700mm (0.7m) Height: 850mm (standard Working Height) Material: Tabletop: Food-grade Stainless Steel (grade 304), Corrosion-resistant And Easy To Clean. Frame And Legs: Heavy-duty Stainless Steel Or Galvanized Steel For Durability And Stability. Undershelf: Optional Stainless Steel Shelf For Additional Storage. Surface Finish: Smooth, Non-porous, And Polished Surface To Prevent Bacteria Buildup And Ensure Easy Cleaning. Edge Corners Rounded For Safety And Cleanliness. Load Capacity: Capable Of Holding Up To 200 Kg Of Fish And Processing Tools. Stainless Steel Collander (double Ears) = 10 Pcs "material Type: High-quality Food-grade Stainless Steel (grade 304). Corrosion Resistance: Rust-proof And Corrosion-resistant, Suitable For Handling Fish And Other Seafood. Finish: Polished Or Brushed Stainless Steel For Easy Cleaning And Hygiene. Sizes: 2 Pcs Small: Diameter: 250mm (25cm), Depth: 120mm (12cm), Capacity: 4 Liters, Weight: 0.7 Kg 2 Pcs Medium: Diameter: 300mm (30cm), Depth: 150mm (15cm), Capacity: 7 Liters, Weight: 1 Kg 3 Pcs Large: Diameter: 350mm (35cm), Depth: 170mm (17cm), Capacity: 10 Liters, Weight: 1.3 Kg 3 Pcs Extra-large: Diameter: 400mm (40cm), Depth: 200mm (20cm), Capacity: 15 Liters, Weight: 1.8 Kg " Household Scales = 2 Pcs "capacity And Accuracy Maximum Capacity: 10 Kg (22 Lbs) Graduation/accuracy: 1 Gram (0.001 Kg) Weighing Units: Kg, G, Lb, Oz Type: Large Lcd Digital Display With Backlight For Clear Visibility. Screen Size: 50mm X 30mm (approximately) Display Features: Shows Weight, Low Battery, Overload Indicator, And Tare Function. Button Functions: Power, Tare, Unit Conversion. Power Source: 2 X Aaa Batteries Or Rechargeable Battery (depending On Model) And Ac Adapter Option For Continuous Use In Commercial Settings. Dimensions And Weight Overall Dimensions: 250mm (l) X 230mm (w) X 60mm (h) Weight: 1.2 Kg Compliance Food Safety: Compliant With Haccp Standards For Safe Use In Food Processing Environments. Calibration: Factory Calibrated And Can Be Re-calibrated As Needed " Measuring Cups And Spoon, Set = 2 Pcs "measuring Cups Specifications: Material: Food-grade Stainless Steel Or Bpa-free Plastic Sizes: 1 Cup, 1/2 Cup, 1/3 Cup, 1/4 Cup Measuring Spoons Specifications: Material: Food-grade Stainless Steel Or Bpa-free Plastic Sizes: 1 Tablespoon, 1/2 Tablespoon, 1 Teaspoon, 1/2 Teaspoon, 1/4 Teaspoon " Stainless Steel Knife Set = 2 Pcs Stainless Basin = 5 Pcs * Deep Stainless Steel Basin And Stainless Steel Basins Digital Weighing Scale = 2 Pcs "capacity: 10 Kg (22 Lbs) Accuracy: 1 Gram (0.001 Kg) Units: Kg, G, Lb, Oz Display: Large Lcd Digital Display With Backlight. Shows Weight, Low Battery, And Overload Indicators. Platform: Material: Food-grade Stainless Steel Size: 250mm X 250mm Power: Powered By 2 X Aaa Batteries Or Rechargeable Battery (optional Ac Adapter) Auto-off After 2 Minutes Of Inactivity " Utensils, Set (spatula, Paddle, Bowls,) = 3 Pcs Impluse Sealer = 2 Pcs "sealing Length: 300mm, Material: Durable Metal Housing, Corrosion-resistant And Heat-resistant Sealing Strip For Continuous Use Sealing Width: 2mm – 5mm (adjustable, Depending On Model) Heating Time: Adjustable (0.2 - 1.5 Seconds) For Various Bag Thicknesses Power Supply: Standard 220v, Single-phase Seal Types: Works With Pp, Pe, And Laminated Packaging Films Ideal For Sealing Plastic Bags Up To 0.2mm In Thickness Weight: Approximately 2–4 Kg, Depending On Model " Stainless Steel Knife = 4 Set "material: Blades: High-carbon Stainless Steel For Sharpness And Corrosion Resistance Handles: Ergonomic, Non-slip, And Easy-to-grip Polypropylene Or Stainless Steel Handles Knife Types (common In Fish Processing): Fillet Knife: Flexible Blade, 6-8 Inches, For Precise Filleting Boning Knife: 5-6 Inches, Stiff Blade For Deboning Chef’s Knife: 8 Inches, Multipurpose For Cutting, Slicing Utility Knife: 4-6 Inches, For Smaller Tasks And Trimming Cleaver: Heavy-duty, Ideal For Cutting Through Bones (optional In Some Sets)" Tray Rack,24 Trays Cap = 1 Pc "material: Stainless Steel Or Aluminum For Durability And Corrosion Resistance, Ideal For Food Processing Environments. Capacity: Holds Up To 24 Trays (compatible With Standard Trays Approximately 18"" X 26""). Dimensions: Overall Size: Approx. 180 Cm (h) X 60 Cm (w) X 50 Cm (d)" Soaking, S/s, 20l Cap, With Strainer = 10 Set "material: Stainless Steel (s/s) For Durability, Rust Resistance, And Easy Cleaning. Food-grade Material Safe For Direct Food Contact. Capacity: 20 Liters (suitable For Soaking Larger Batches Of Fish Or Other Food Items). Bowl Diameter: Approx. 35 Cm Height: Approx. 25 Cm" Stainless Mixing Bowl (different Sizes) = 10 Set "material: High-quality Stainless Steel For Durability, Rust Resistance, And Easy Maintenance. Food-grade, Safe For All Food Preparation Tasks. Sizes: Small: 1.5 Liters Medium: 3 Liters Large: 5 Liters Extra Large: 7 Liters" Stainless Steel Double Handle Frying Pan = 10 Set "material: Stainless Steel For Durability, Even Heat Distribution, And Rust Resistance. Food-grade, Suitable For High-heat Cooking. Size: Diameter: Available In Various Sizes, Commonly 30 Cm To 40 Cm. Depth: Approximately 5 Cm To 7 Cm, Ideal For Frying " Stainless Steel Colander = 10 Pcs "material: High-quality Stainless Steel, Rust-resistant And Durable. Food-grade, Suitable For Rinsing And Draining Food Items. Size: Available In Various Sizes, Typically 2 To 5 Liters Capacity. Diameter: 20 Cm To 30 Cm (varies By Model)." Measuring Cups And Spoons For Liquid = 10 Set "material: Food-grade Plastic Bpa-free If Plastic, For Safe Use With Liquids. Sizes: Measuring Cups: Commonly Includes 1 Cup (240 Ml), 1/2 Cup (120 Ml), 1/3 Cup (80 Ml), And 1/4 Cup (60 Ml). Measuring Spoons: Includes 1 Tablespoon (15 Ml), 1 Teaspoon (5 Ml), 1/2 Teaspoon (2.5 Ml), And 1/4 Teaspoon (1.25 Ml)." Cutting/chopping Board = 10 Pcs "material: Food-grade Plastic Non-porous And Stain-resistant To Prevent Bacterial Growth. Sizes: Small: 20 Cm X 15 Cm, Ideal For Small Tasks. Medium: 30 Cm X 20 Cm, Suitable For General Chopping. Large: 40 Cm X 30 Cm, Ideal For Cutting Larger Items." Kitchen Shears = 10 Set "material: Stainless Steel Blades For Durability, Rust Resistance, And Sharpness. Comfortable Handle Made Of Plastic Or Rubber, Often Ergonomic For Better Grip. Blade Length: Typically 8-10 Cm Cutting Length; Overall Length Around 20 Cm." Stainless Steel Knife = 2 Set "material: Stainless Steel Blades For Sharpness, Durability, And Corrosion Resistance. Handles Made From Plastic, Wood, Or Rubber For A Comfortable And Secure Grip. Set Includes (common Options): Chef's Knife (8 Inches): For Slicing, Dicing, And Chopping. Bread Knife (8 Inches): Serrated For Slicing Bread. Utility Knife (5 Inches): For Cutting Smaller Foods And Herbs. Paring Knife (3.5 Inches): For Peeling And Intricate Tasks." Casserole With Glass Lid = 3 Pcs "material: Stainless Steel Or Aluminum For Durability And Even Heat Distribution. Tempered Glass Lid With Steam Vent To Monitor Cooking Without Lifting The Lid. Capacity: Available In Various Sizes, Commonly 2 Liters To 6 Liters." Mixing Bowl Different Sizes (10l, 20l, 30l, 50l) = 10 Set "material: Food-grade Plastic (bpa-free) For Safety And Durability. Lightweight And Resistant To Staining And Odors. Sizes: 10 Liters: Suitable For Small To Medium Mixing Tasks. 20 Liters: Ideal For Larger Mixing Jobs Or Food Prep. 30 Liters: Great For Mixing Large Batches Of Ingredients. 50 Liters: Perfect For Heavy-duty Mixing In Commercial Kitchens." Plastic Food Grade Storage Boxes = 10 Pcs "material: Food-grade Polypropylene (pp) Or Polyethylene (pe), Safe For Food Storage. Sizes: 20 Kg Box (5pcs): Dimensions: Approximately 600mm (l) X 400mm (w) X 300mm (h) Capacity: Suitable For Storing Up To 20 Kg Of Food Items. 30 Kg Box(5 Pcs): Dimensions: Approximately 700mm (l) X 500mm (w) X 350mm (h)" 2.) Cooking Facility = 1 Set Gas Oven = 1 Pc "type: Gas Oven With Thermostat Capacity: Number Of Trays: 12 Trays Tray Size: Standard Size (approximately 40cm X 60cm Or Customizable Based On Design) Temperature Control: Thermostat: Adjustable Thermostat For Precise Temperature Control. Temperature Range: Typically Between 100°c To 300°c. Burners: Number Of Burners: 2 To 4 Gas Burners (depending On Model). Ignition Type: Manual Or Automatic Ignition System. Construction: Material: Heavy-duty Stainless Steel For Durability And Easy Cleaning. Insulation: Insulated Walls To Maintain Temperature And Reduce Heat Loss. Dimensions: Overall Size: Approximately 100cm (w) X 80cm (d) X 70cm (h) Fuel Type: Lpg " Complete Set Of Stove And Gas Tank = 2 Pcs Double Boiler Pot = 2 Pcs "capacity: 1.5 Liters To 4 Liters. " Stainless Steel Streamer = 1 Pc "material: High-quality Stainless Steel For Durability And Resistance To Rust And Corrosion. Size: 3 Liters To 10 Liters Capacity." Stainless Mixing Bowl = 5 Set "material: Made Of High-quality Stainless Steel For Durability, Corrosion Resistance, And Easy Cleaning. Sizes: Small: 1.5 Liters (1.6 Quarts) Medium: 3 Liters (3.2 Quarts) Large: 5 Liters (5.3 Quarts) Extra Large: 7 Liters (7.4 Quarts)" 3.) Upright Freezer = 1 Set Specifications: Power Supply: Single-phase (220v, 50hz) Capacity: 250 – 300 Liters (8.8 – 10.6 Cubic Feet) Temperature Range: -18°c To -25°c (adjustable Thermostat) Cooling System: Direct Cooling Or Fan-assisted Cooling (optional) Compressor Type: High-efficiency Inverter Compressor For Energy Savings Number Of Shelves: 4 – 6 Adjustable Wire Shelves Or Glass Shelves Door Type: Double Door, Swing Type Magnetic Door Seal For Air-tight Closure Defrosting: Manual Or Automatic Defrost (optional) Interior Lighting: Led Lighting For Energy Efficiency And Visibility Temperature Control: Digital Temperature Display With External Control Dimensions: Approx. 1210mm (w) X 730mm (d) X 1900mm (h) Weight: 45 – 60 Kg Safety Features: Overload And Overheat Protection Lockable Door For Security Mobility: Equipped With Caster Wheels For Easy Relocation Warranty: 2-year Warranty On Parts And Labor, 5-year Warranty On Compressor 4.) Food Dehydrator = 1 Pc Specifications: Power Supply: Single-phase (220v, 50hz) Power Consumption: 2.5kw Drying Capacity: 50 – 200 Kg Per Batch (depending On Machine Size And Type Of Fish) Drying Method: Hot Air Circulation System (electric Heating Elements With Fans) Temperature Range: 30°c – 90°c (adjustable) Drying Time: 4 – 12 Hours (depending On The Type Of Fish, Thickness, And Moisture Content) Tray Material: Stainless Steel Food-grade Trays (removable And Stackable) Number Of Trays: 10 Trays (upper And Lower Rack Gap: 34mm) Air Circulation System: Forced Air With Multiple Fans For Uniform Drying Construction Material: Exterior: Stainless Steel Or Powder-coated Mild Steel Interior: Stainless Steel (food-grade, Corrosion-resistant) Insulation: High-density Insulation Material To Minimize Heat Loss Humidity Control: Adjustable Humidity Control To Ensure Precise Drying Control System: Digital Temperature And Timer Control Overheat Protection Automatic Shut-off With Alarm Moisture Removal: 80% – 95% Moisture Reduction (depending On Drying Settings) Airflow: Horizontal Or Vertical Airflow (adjustable Based On Tray Configuration) Ventilation: Adjustable Vents For Moisture Release Mobility: Equipped With Caster Wheels For Easy Movement Included Accessories: Spare Heating Elements Tray Cleaning Kit User Manual And Maintenance Guide Warranty: 1-year Warranty On Parts And Labor ----------------nothing Follows------------------
Closing Date9 Dec 2024
Tender AmountPHP 1.7 Million (USD 30.2 K)
1581-1590 of 1591 active Tenders