Electrical Tenders

Electrical Tenders

Establishments And Organizations Of Higher Education, Research And Innovation Tender

Electrical and Electronics...+1Electrical Works
Corrigendum : Closing Date Modified
France
Details: The purpose of this Single-Award Framework Agreement is the conclusion of subsequent contracts (ms) relating to the equipment of electrical sub-metering, the transmission and consolidation of their metering data by a Supervision
Closing Date10 Feb 2025
Tender AmountRefer Documents 

DEPT OF THE NAVY USA Tender

Others
Corrigendum : Closing Date Modified
United States
Description: Contact Information|4|n7m2.22|ee2|see Email|alexander.w.stimeling.civ@us.navy.mil| item Unique Identification And Valuation (jan 2023)|19|||||||||||||||||||| higher-level Contract Quality Requirement (navicp Review Feb 1991)(feb 1999)|1|iso9001| inspection Of Supplies--fixed-price (aug 1996)|2||| wide Area Workflow Payment Instructions (jan 2023)|16|combo||tbd|n00104|tbd|tbd|see Schedule|see Schedule|see Schedule||tbd|||||| navy Use Of Abilityone Support Contractor - Release Of Offeror Information (3-18))|1|wss| equal Opportunity (sep 2016)|2||| option For Increased Quantity (mar 1989)|1|365 Days| notice Of Total Small Business Set-aside (oct 2020)(deviation 2020-o0008)|1|| alternate A, Annual Representations And Certifications (nov 2023)|13|||||||||||||| buy American-balance Of Payments Program Certificate-basic (feb 2024)|1|| annual Representations And Certifications (may 2024)|13|334290|800 Employees|||||||||||| notice Of Priority Rating For National Defense, Emergency Perpardeness, And Enrgy Progam Use (april 2008))|2||x| this Amendment Extends The Solicitation Close Date To 1/10/2025. this Amendment Is To Extend The Solicitation Close To 13 Dec 2024. this Amendment Is To Remove The Small Business Set-aside Clause From The Solicitation As Well As Extend The Solicitation Close Date To 29 Nov 2024. the Purpose Of This Amendment Is To Extend The Solicitation Close Date To 17 Sep 2024 this Amendment Extedns The Solicitation Close Date To 11 Sep 2024. the Purpose Of This Amendment Is To Extend The Solicitation Closing Date To 29 Aug 2024. Accelerated Delivery Is Encouraged And Accepted Before The Delivery Date(s) Listed In The Schedule. ^^ all Freight Is Fob Origin. this Rfq Is For A Buy. The Resultant Award Of This Solicitation Will Be Issued Bilaterally, Requiring The Contractor's Written Acceptance Prior To Execution. Verify Nomenclature, Part Number, And Nsn Prior To Responding. government Source Inspection Is Required. o Unit Price:__________ Firm o Total Price:__________ Firm o Procurement Turnaround Time (ptat) :__________ o Awardee Cage: __________ o Inspection & Acceptance Cage, If Not At Source:__________ o Delivery Vehicle (if Delivery Order Requested) (if Your Company Has A Current Boa/idiq, For Example) :__________ important Traceability Notice: If You Are Not The Manufacturer Of The Material You Are Offering, You Must Provide A Letter/official Email From The Oem Confirming Your Company Is Authorized An Authorized Distributor Of Their Items. the Government Intends To Add An Option Quantity To The Resultant Contract. In Reference To The Option Quantity, The Government May Increase The Quantity Of Supplies Called For In The Schedule At The Unit Price Specified. The Contracting Officer May Exercise The option By Written Notice To The Contractor Within The Number Of Days In Far 52.217-6 Herein. Delivery Of The Added Items Shall Continue At The Same Rate As The Like Items Called For Under The Contract, Unless The Parties Otherwise Agree. \ 1. Scope 1.1 This Contract/purchase Order Contains The Requirements For Manufacture And The Contract Quality Requirements For The Transmitter,engine . 2. Applicable Documents 2.1 Applicable Documents - The Document(s) Listed Below Form A Part Of This Contract/purchase Order Including Modifications Or Exclusions. 2.1.1 "document References" Listed Below Must Be Obtained By The Contractor. Ordering Information Is Included As An Attachment To This Contract/purchase Order. 3. Requirements 3.1 Cage Code/reference Number Items - The Transmitter,engine Furnished Under This contract/purchase Order Shall Be The Design Represented By Cage Code(s) reference Number(s). Cage _______ Ref. No. ;0w588 10-1805 28199 10-1805 0njt4 10-1805; 3.2 Marking - This Item Shall Be Physically Identified In Accordance with ;mil-std-130, Rev N, 16 Nov 2012; . 3.3 Changes In Design, Material Servicing, Or Part Number - Except For A Code 1 Change, Which Shall Be Processed As Provided In The Code Statement Shown Below, No Substitution Of Items Shall Be Made Until The Navicp-mech Contracting Officer Has Notified And approval Has Been Given By Issuance Of A Written Change Order. When Any Change In Design, Material, Servicing Or Part Number Is Made To Replace Or Substitute Any Item To Be Furnished On This Contract/purchase Order, The Contractor Shall Furnish, For The substituting/replacement Item, A Drawing And An Explanation Of The Reason For The Change, Explaining The Reason Therefor. If Finished Detail Drawings Are Not Available, Shop Drawings In The Form Used By The Manufacturer Will Be Acceptable For Government evaluation. When Notifying The Procurement Contracting Officer Of The Reasons For Making Substitutions, The Type Of Change Shall Be Indicated By Code Number In Accordance With One Of The Following Statements: code 1: Part Number Change Only - If The Manufacturer's Part Number Indicated Thereon Has Changed, But The Parts Are Identical In All Respects, Supply The Item And Advise Navicp-mech Immediately Of The New Part Number. code 2: Assembly (or Set Or Kit) Not Furnished - Used Following Detail Parts. code 3: Part Not Furnished Separately - Use Assembly. code 4: Part Redesigned - Old And New Parts Are Completely Interchangeable. code 5: Part Redesigned - New Part Replaces Old. Old Part Cannot Replace New. code 6: Part Redesigned - Parts Not Interchangeable. 3.4 Soldering - The Requirements For Soldered Electrical And Electronic Assemblies Shall Conform To Ipc J-std-001, Class ;3; . 4. Quality Assurance 4.1 Responsibility For Inspection - Unless Otherwise Specified In The Contract/purchase Order, The Contractor Is Responsible For The Performance Of All Inspection Requirements As Specified Herein. Except As Otherwise Specified In The Contract/purchase Order, the Contractor May Use His Own Or Any Other Facilities Suitable For The Performance Of The Inspection Requirements Specified Herein, Unless Disapproved By The Government. The Government Reserves The Right To Perform Any Of The Inspections Set Forth In The specification Where Such Inspections Are Deemed Necessary To Assure Supplies And Services Conform To Prescribed Requirements. 4.2 Responsibility For Compliance - All Items Must Meet All Requirements Of This Contract/purchase Order. The Inspection Set Forth In This Specification Shall Become A Part Of The Contractor's Overall Inspection System Or Quality Program. The Absence Of Any inspection Requirements Shall Not Relieve The Contractor Of The Responsibility Of Assuring That All Products Or Supplies Submitted To The Government For Acceptance Comply With All Requirements Of The Contract/purchase Order. Sampling In Quality Conformance does Not Authorize Submission Of Known Defective Material, Either Indicated Or Actual, Not Does It Commit The Government To Acceptance Of Defective Material. 4.3 Records - Records Of All Inspection Work By The Contractor Shall Be Kept Complete And Available To The Government During The Performance Of Contract/purchase Order And For A Period Of 365 Calendar Days After Final Delivery Of Supplies. 5. Packaging 5.1 Preservation, Packaging, Packing And Marking - Preservation, Packaging, Packing And Marking Shall Be In Accordance With The Contract/purchase Order Schedule And As Specified Below. mil-std 2073 Packaging Applies As Found Elsewhere In The Schedule 6. Notes 6.1 Ordering Information For Document References - The Department Of Defense Single Stock Point (dodssp), Website Http://www.dsp.dla.mil/, Provides Product Information For The Department Of Defense Index Of Specifications And Standards (dodiss) (i.e.military/federal Specifications And Standards), Data Item Descriptions (dids), And Other Dodssp Products. Most Specifications Can Obtained Directly From Http://quicksearch.dla.mil/ a. Availability Of Cancelled Documents - The Dodssp Offers Cancelled Documentsthat Are Required By Private Industry In Fulfillment Of Contractual Obligationsin Paper Format. Documents Can Be Requested By Phoning The Subscription Services Desk. b. Commercial Specifications, Standards, And Descriptions - These Specifications, Standards And Descriptions Are Not Available From Government Sources. Theymay Be Obtained From The Publishers Of The Applicable Societies. c. Ordnance Standards (os), Weapons Specifications (ws), And Navord Ostd 600 Pages - These Type Publications May Be Obtained By Submitting A Request To: commander, Indian Head Division, Naval Surface Warfare Center code 8410p, 101 Strauss Avenue indian Head, Md 20640-5035 d. On Post-award Actions, Requests For "official Use Only" And "noforn" (not Releasable To Foreign Nationals) Documents Must Identify The Government Contractnumber, And Must Be Submitted Via The Cognizant Defense Contract Management Command (dcmc) For certification Of Need For The Document. On Pre-award Actions Such Requests Must Be Submitted To The Pco For Certification Of Need For The Document. e. Noforn Military Specifications And Standards (including Amendments, Change Notices And Supplements, But Not Interim Changes) To Be Ordered From: contracting Officer navsup-wss code 87321 5450 Carlisle Pike p.o. Box 2020 mechanicsburg, Pa. 17055-0788 f. Nuclear Reactor Publications Assigned Navsea Documents And Identification Numbers (i.e. Navsea Welding Standard, Navsea 250-1500-1) Are To Be Ordered Enue: commanding Officer navsup-wss code 009 5450 Carlisle Pike p.o. Box 2020 mechanicsburg, Pa. 17055-0788 g. Technical Manuals Assigned Navsea Identification Numbers (i.e. Navsea Welding And Brazing Procedure, Navsea S9074-aq-gib-010/248) Are To Be Ordered From: commanding Officer navsup-wss code 1 Support Branch 700 Robbins Avenue philadelphia, Pa. 19111-5094 h. Interim Changes And Classified Specifications Must Be Obtained By Submitting A Request On Dd Form 1425 To Navsup-wss. 6.2 Notice To Distributors/offerors - Consideration For Award Of Contract Shall Be Given Only To Authorized Distributors Of The Original Manufacturer's Item Represented In This Solicitation. If You Desire To Be Considered As A Potential Source For Award Of this Contract, Proof Of Being An Authorized Distributor Shall Be Provided On Company Letterhead Signed By A Responsible Company Official And Sent With Your Offer To The Procurement Contracting Officer. 6.3 In Accordance With Opnavinst 5510.1 All Documents And Drawings Provided By The U.s. Navy To Perspective Contractors Must Include A "distribution Statement" To Inform The Contractor Of The Limits Of Distribution, And The Safeguarding Of The Information contained On Those Documents And Drawings. There Are 7 (seven) Seperate Distribution Statement Codes Used For Non-classified Documents And Drawings. The Definition For Each Is As Follows: a... Approved For Public Release; Distribution Is Unlimited. b... Distribution Authorized To Us Governments Agencies Only. c... Distribution Authorized To Us Government Agencies And Their Contractors. d... Distribution Authorized To Dod And Dod Contractors Only. e... Distribution Authorized To Dod Components Only. f... Further Distribution Only As Directed By Commander, Naval Sea Systems Command, Code 09t. x... Distribution Is Authorized To Us Government Agencies And Private Individuals Or Enterprises Eligible To Obtain Export Controlled Technical Data In Accordance With Opnavinst 5510.161.
Closing Soon10 Jan 2025
Tender AmountRefer Documents 

DEPT OF THE NAVY USA Tender

Environmental Service
Corrigendum : Closing Date Modified
United States
Description: Contact Information|4|n7m2.7|bwk|7176052048|andrew.stader@navy.mil| item Unique Identification And Valuation (jan 2023)|19|||||||||||||||||||| higher-level Contract Quality Requirement (navicp Review Feb 1991)(feb 1999)|1|iso9001| inspection Of Supplies--fixed-price (aug 1996)|2||| time Of Delivery (june 1997)|20|0001aa|30|180|0001ab|1|180||||||||||||||| liquidated Damages--supplies, Services, Or Research And Development (sep 2000)|1|tbd| stop-work Order (aug 1989)|1|| wide Area Workflow Payment Instructions (jan 2023)|16|combo Invoice And Receiving||tbd|tbd|tbd|tbd|tbd|tbd|||tbd|||||| navy Use Of Abilityone Support Contractor - Release Of Offeror Information (3-18))|1|wss| value Engineering (jun 2020)|3|||| equal Opportunity (sep 2016)|2||| small Business Subcontracting Plan (dod Contracts)- Basic (dec 2019)|2||| integrity Of Unit Prices (nov 2021)|1|| equal Opportunity For Veterans (jun 2020)|4||||| small Business Subcontracting Plan (sep 2023)|4||||| equal Opportunity For Workers With Disabilities (jun 2020)|2||| transportation Of Supplies By Sea (jan 2023)|2||| critical Safety Item (aug 2011)|4|all Items In The Schedule|||| contractor Purchasing System Administration-basic (may 2014)|1|| limitation Of Liability--high-value Items ($100k)(feb 1997)|1|| authorized Deviations In Clauses (nov 2020)|2||| requirements For Certified Cost Or Pricing Data And Data Other Than Certified Cost Or Pricing Data-modifications (nov 2021))|7|||||||| list Of Award Attachments|5|||||| alternate A, Annual Representations And Certifications (nov 2023)|13|||||||||||||| small Business Program Representations (feb 2024)|4||||| royalty Information (apr 1984)|1|| certification Regarding Knowledge Of Child Labor For Listed End Products(feb 2021))|4||||| annual Representations And Certifications (feb 2024)|13|334515|750|||||||||||| requirements For Certified Cost Or Pricing Data And Data Other Than Certified Cost Or Pricing Data (nov 2021))|7|||||||| type Of Contract (apr 1984)|1|firm Fixed Price| alterations In Solicitation (apr 1984)|3|||| notice Of Priority Rating For National Defense, Emergency Perpardeness, And Enrgy Progam Use (april 2008))|2||x| requirements For Certified Cost Or Pricing Data And Data Other Than Certifiedcost Or Pricing Data--basic (feb 2024))|1|| this Amendment Is To Extend The Close Date To 02/28/2025 the Amendment Is To Increase The Qty From 32 To 34. the New Poc Is Heather Vanhoy:heather.a.vanhoy.civ@us.navy.mil 1. Scope 1.1 This Contract/purchase Order Contains The Requirements For Manufacture And The Contract Quality Requirements For The Wave Form Synthesiz . 2. Applicable Documents 2.1 Applicable Documents - The Document(s) Listed Below Form A Part Of This Contract/purchase Order Including Modifications Or Exclusions. 2.1.1 "document References" Listed Below Must Be Obtained By The Contractor. Ordering Information Is Included As An Attachment To This Contract/purchase Order. 3. Requirements 3.1 Cage Code/reference Number Items - The Wave Form Synthesiz Furnished Under This contract/purchase Order Shall Be The Design Represented By Cage Code(s) reference Number(s). Cage _______ Ref. No. ;z4937 G710386-2 15090 G710386-2 (auth Distrib For Z4937); 3.2 Marking - This Item Shall Be Physically Identified In Accordance with ;mil-std-130, Rev N, 16 Nov 2012; . 3.3 Changes In Design, Material Servicing, Or Part Number - Except For A Code 1 Change, Which Shall Be Processed As Provided In The Code Statement Shown Below, No Substitution Of Items Shall Be Made Until The Navicp-mech Contracting Officer Has Notified And approval Has Been Given By Issuance Of A Written Change Order. When Any Change In Design, Material, Servicing Or Part Number Is Made To Replace Or Substitute Any Item To Be Furnished On This Contract/purchase Order, The Contractor Shall Furnish, For The substituting/replacement Item, A Drawing And An Explanation Of The Reason For The Change, Explaining The Reason Therefor. If Finished Detail Drawings Are Not Available, Shop Drawings In The Form Used By The Manufacturer Will Be Acceptable For Government evaluation. When Notifying The Procurement Contracting Officer Of The Reasons For Making Substitutions, The Type Of Change Shall Be Indicated By Code Number In Accordance With One Of The Following Statements: code 1: Part Number Change Only - If The Manufacturer's Part Number Indicated Thereon Has Changed, But The Parts Are Identical In All Respects, Supply The Item And Advise Navicp-mech Immediately Of The New Part Number. code 2: Assembly (or Set Or Kit) Not Furnished - Used Following Detail Parts. code 3: Part Not Furnished Separately - Use Assembly. code 4: Part Redesigned - Old And New Parts Are Completely Interchangeable. code 5: Part Redesigned - New Part Replaces Old. Old Part Cannot Replace New. code 6: Part Redesigned - Parts Not Interchangeable. 3.4 Soldering - The Requirements For Soldered Electrical And Electronic Assemblies Shall Conform To Ipc J-std-001, Class ;3; . 4. Quality Assurance 4.1 Responsibility For Inspection - Unless Otherwise Specified In The Contract/purchase Order, The Contractor Is Responsible For The Performance Of All Inspection Requirements As Specified Herein. Except As Otherwise Specified In The Contract/purchase Order, the Contractor May Use His Own Or Any Other Facilities Suitable For The Performance Of The Inspection Requirements Specified Herein, Unless Disapproved By The Government. The Government Reserves The Right To Perform Any Of The Inspections Set Forth In The specification Where Such Inspections Are Deemed Necessary To Assure Supplies And Services Conform To Prescribed Requirements. 4.2 Responsibility For Compliance - All Items Must Meet All Requirements Of This Contract/purchase Order. The Inspection Set Forth In This Specification Shall Become A Part Of The Contractor's Overall Inspection System Or Quality Program. The Absence Of Any inspection Requirements Shall Not Relieve The Contractor Of The Responsibility Of Assuring That All Products Or Supplies Submitted To The Government For Acceptance Comply With All Requirements Of The Contract/purchase Order. Sampling In Quality Conformance does Not Authorize Submission Of Known Defective Material, Either Indicated Or Actual, Not Does It Commit The Government To Acceptance Of Defective Material. 4.3 Records - Records Of All Inspection Work By The Contractor Shall Be Kept Complete And Available To The Government During The Performance Of Contract/purchase Order And For A Period Of 365 Calendar Days After Final Delivery Of Supplies. 5. Packaging 5.1 Preservation, Packaging, Packing And Marking - Preservation, Packaging, Packing And Marking Shall Be In Accordance With The Contract/purchase Order Schedule And As Specified Below. mil-std 2073 Packaging Applies As Found Elsewhere In The Schedule 6. Notes 6.1 Ordering Information For Document References - The Department Of Defense Single Stock Point (dodssp), Website Http://www.dsp.dla.mil/, Provides Product Information For The Department Of Defense Index Of Specifications And Standards (dodiss) (i.e.military/federal Specifications And Standards), Data Item Descriptions (dids), And Other Dodssp Products. Most Specifications Can Obtained Directly From Http://quicksearch.dla.mil/ a. Availability Of Cancelled Documents - The Dodssp Offers Cancelled Documentsthat Are Required By Private Industry In Fulfillment Of Contractual Obligationsin Paper Format. Documents Can Be Requested By Phoning The Subscription Services Desk. b. Commercial Specifications, Standards, And Descriptions - These Specifications, Standards And Descriptions Are Not Available From Government Sources. Theymay Be Obtained From The Publishers Of The Applicable Societies. c. Ordnance Standards (os), Weapons Specifications (ws), And Navord Ostd 600 Pages - These Type Publications May Be Obtained By Submitting A Request To: commander, Indian Head Division, Naval Surface Warfare Center code 8410p, 101 Strauss Avenue indian Head, Md 20640-5035 d. On Post-award Actions, Requests For "official Use Only" And "noforn" (not Releasable To Foreign Nationals) Documents Must Identify The Government Contractnumber, And Must Be Submitted Via The Cognizant Defense Contract Management Command (dcmc) For certification Of Need For The Document. On Pre-award Actions Such Requests Must Be Submitted To The Pco For Certification Of Need For The Document. e. Noforn Military Specifications And Standards (including Amendments, Change Notices And Supplements, But Not Interim Changes) To Be Ordered From: contracting Officer navsup-wss code 87321 5450 Carlisle Pike p.o. Box 2020 mechanicsburg, Pa. 17055-0788 f. Nuclear Reactor Publications Assigned Navsea Documents And Identification Numbers (i.e. Navsea Welding Standard, Navsea 250-1500-1) Are To Be Ordered Enue: commanding Officer navsup-wss code 009 5450 Carlisle Pike p.o. Box 2020 mechanicsburg, Pa. 17055-0788 g. Technical Manuals Assigned Navsea Identification Numbers (i.e. Navsea Welding And Brazing Procedure, Navsea S9074-aq-gib-010/248) Are To Be Ordered From: commanding Officer navsup-wss code 1 Support Branch 700 Robbins Avenue philadelphia, Pa. 19111-5094 h. Interim Changes And Classified Specifications Must Be Obtained By Submitting A Request On Dd Form 1425 To Navsup-wss. 6.2 In Accordance With Opnavinst 5510.1 All Documents And Drawings Provided By The U.s. Navy To Perspective Contractors Must Include A "distribution Statement" To Inform The Contractor Of The Limits Of Distribution, And The Safeguarding Of The Information contained On Those Documents And Drawings. There Are 7 (seven) Seperate Distribution Statement Codes Used For Non-classified Documents And Drawings. The Definition For Each Is As Follows: a... Approved For Public Release; Distribution Is Unlimited. b... Distribution Authorized To Us Governments Agencies Only. c... Distribution Authorized To Us Government Agencies And Their Contractors. d... Distribution Authorized To Dod And Dod Contractors Only. e... Distribution Authorized To Dod Components Only. f... Further Distribution Only As Directed By Commander, Naval Sea Systems Command, Code 09t. x... Distribution Is Authorized To Us Government Agencies And Private Individuals Or Enterprises Eligible To Obtain Export Controlled Technical Data In Accordance With Opnavinst 5510.161. 6.3 Notice To Distributors/offerors - Consideration For Award Of Contract Shall Be Given Only To Authorized Distributors Of The Original Manufacturer's Item Represented In This Solicitation. If You Desire To Be Considered As A Potential Source For Award Of this Contract, Proof Of Being An Authorized Distributor Shall Be Provided On Company Letterhead Signed By A Responsible Company Official And Sent With Your Offer To The Procurement Contracting Officer.
Closing Date28 Feb 2025
Tender AmountRefer Documents 

DEFENSE LOGISTICS AGENCY USA Tender

Others
United States
Description: Amc/amsc: 1g 1 Suitable For Competitive Acquisition. (see Notes 1 And 2) g The Government Has Unlimited Rights To The Technical Rights To The Technical Data, And The Data Package Is Complete. Valid Amcs: 1 And 2. drawings – item Name: Circuit Card Assembly rp001: Dla Packaging Requirements For Procurement rd002, Covered Defense Information Applies ra001: This Document Incorporates Technical And/or Quality Requirements (identified By An 'r' Or An 'i' Number) Set Forth In Full Text In The dla Master List Of Technical And Quality Requirements Found On The Web at: http://www.dla.mil/hq/acquisition/offers/eprocurement.aspx for Simplified Acquisitions, The Revision Of The Master In Effect On The solicitation Issue Date Or The Award Date Controls. For Large acquisitions, The Revision Of The Master In Effect On The Rfp Issue Date applies Unless A Solicitation Amendment Incorporates A Follow-on revision, In Which Case The Amendment Date Controls. rq009: Inspection And Acceptance At Origin rq011: Removal Of Government Identification From Non-accepted Supplies rq032: Export Control Of Technical Data this Item Has Technical Data Some Or All Of Which Is Subject To export-control Of Either The International Traffic In Arms Regulations (itar) Or The Export Administration Regulations (ear), And Cannot Be exported Without Prior Authorization From Either The Department Of State or The Department Of Commerce. Export Includes Disclosure Of Technical data To Foreign Persons And Nationals Whether Located In The United states Or Abroad. This Requirement Applies Equally To Foreign National employees And U.s. Companies And Their Foreign Subsidiaries. Dfars 252.225-7048 Is Applicable To This Data. the Defense Logistics Agency (dla) Limits Distribution Of Export-control technical Data To Dla Contractors That Have An Approved Us/canada Joint certification Program (jcp) Certification, Have Completed The introduction To Proper Handling Of Dod Export-controlled Technical Data training And The Dla Export-controlled Technical Data Questionnaire (both Are Available At The Web Address Given Below), And Have Been approved By The Dla Controlling Authority To Access The export-controlled Data. Instructions For Obtaining Access To The export-controlled Data Can Be Found At: https://www.dla.mil/logistics-operations/enhanced-validation/ to Be Eligible For Award, Offerors And Any Sources Of Supply Proposed for Use Are Required To Have An Approved Jcp Certification And Have been Approved By The Dla Controlling Authority To Access export-controlled Data Managed By Dla. Dla Will Not Delay Award In order For An Offeror Or Its Supplier To Apply For And Receive Approval by The Dla Controlling Authority To Access The Export-controlled Data. rq039: Non-tailored Higher-level Quality Requirements (sae As9100) For manufacturers And Non-manufacturers rt001: Measuring And Test Equipment part Name Assigned By Controlling Agency: Circuit Card Assembly, Phase shifter Driver Electro-static Sensitive Device mil-std-130n(1) Dated 16 Nov 2012. identification Marking Of U.s. Military Property mercury Or Mercury Containing Compounds Shall not Be Intentionally Added To<(>,<)> Or Come In Direct contact With<(>,<)> Any Hardware Or Supplies Furnished under This Contract. Exception: Functional Mercury used In Batteries, Fluorescent Lights, Required instruments; Sensors Or Controls; Weapon Systems; and Chemical Analysis Reagents Specified By Navsea. portable Fluorescent Lamps And Portable Instruments containing Mercury Shall Be Shock Proof And Contain a Second Boundary Of Containment Of The Mercury Or mercury Compound. (iaw Navsea 5100-003d). reference Control Part Number 7624570 Cage 53711 sampling: the Sampling Method Shall Be In Accordance With Mil-std-1916 Or Asq h1331, Table 1 Or A Comparable Zero Based Sampling Plan Unless Otherwise specified By The Contract. If The Applicable Drawing, Specification, standard, Or Quality Assurance Provision (qap) Specifies Critical, Major and/or Minor Attributes, They Shall Be Assigned Verificaiton Levels Of vii, Iv And Ii Or Aqls Of 0.1, 1.0 And 4.0 Respectively. Unspecified attributes Shall Be Considered As Major Unless Sampling Plans Are specified In Applicable Documents. For Mil-std-1916, The Manufacturer may Use The Attribute Or Variable Inspection Method At Their Option Or per The Contract. Mil-std-105/asq Z1.4 May Be Used To Set Sample Lot size, But Acceptance Would Be Zero Non-conformances In The Sample Lot unless Otherwise Specified In The Contract. overall Length: 5.740 Inches Nominal Overall Width: 1.619 Inches Nominal major Components: Connector Assy, Electrical (7624566-2/53711) 1; printed Wiring Board, Phase Shifter Driver, 1; No Keying Pins Special features: No Keying Pin; Model With Keying Pin Is 7624570-1. End Item identification: As-4108/spy Phased Array Antenna critical Application Item iaw Basic Drawing Nr 53711 7624570 revision Nr D Dtd 06/21/2011 part Piece Number: iaw Reference Drawing Nr 53711 7624570 revision Nr F Dtd 02/06/2009 part Piece Number: iaw Reference Drawing Nr 10001 2900594 revision Nr Ae Dtd 12/01/2014 part Piece Number: iaw Reference Drawing Nr 10001 3256939 revision Nr P Dtd 02/28/2013 part Piece Number: iaw Reference Drawing Nr 53711 7624560 revision Nr A Dtd 06/19/2013 part Piece Number: iaw Reference Drawing Nr 53711 7624561 revision Nr B Dtd 01/30/2018 part Piece Number: iaw Reference Drawing Nr 53711 7624562 revision Nr C Dtd 05/08/2019 part Piece Number: iaw Reference Drawing Nr 53711 7624563 revision Nr L Dtd 03/10/2017 part Piece Number: iaw Reference Drawing Nr 53711 7624565 revision Nr Dtd 09/22/2005 part Piece Number: iaw Reference Drawing Nr 53711 7624566 revision Nr G Dtd 02/21/2020 part Piece Number: iaw Reference Drawing Nr 53711 7624567 revision Nr A Dtd 01/15/2007 part Piece Number: iaw Reference Drawing Nr 53711 7624569 revision Nr C Dtd 08/19/2009 part Piece Number: iaw Reference Drawing Nr 53711 7624573 revision Nr D Dtd 10/17/2023 part Piece Number: iaw Reference Drawing Nr 53711 7624574 revision Nr B Dtd 09/07/2011 part Piece Number: iaw Reference Drawing Nr 53711 7624575 revision Nr C Dtd 06/25/2020 part Piece Number: iaw Reference Drawing Nr 53711 7624576 revision Nr D Dtd 11/07/2018 part Piece Number: iaw Reference Drawing Nr 53711 7624578 revision Nr A Dtd 05/15/2013 part Piece Number: iaw Reference Drawing Nr 53711 7624581 revision Nr Dtd 05/13/2004 part Piece Number: iaw Reference Drawing Nr 53711 7624583 revision Nr A Dtd 07/11/2016 part Piece Number: iaw Reference Drawing Nr 53711 7624590 revision Nr A Dtd 02/13/2018 part Piece Number: iaw Reference Drawing Nr 53711 7624591 revision Nr B Dtd 05/23/2017 part Piece Number: iaw Reference Drawing Nr 53711 7624592 revision Nr A Dtd 06/30/2008 part Piece Number: iaw Reference Drawing Nr 53711 7624593 revision Nr C Dtd 05/10/2018 part Piece Number: iaw Reference Drawing Nr 53711 7624596 revision Nr B Dtd 06/28/2013 part Piece Number: iaw Reference Drawing Nr 53711 7624597 revision Nr A Dtd 06/13/2006 part Piece Number: iaw Reference Drawing Nr 53711 7624598 revision Nr C Dtd 05/14/2020 part Piece Number: iaw Reference Drawing Nr 53711 7624599 revision Nr B Dtd 09/07/2011 part Piece Number: iaw Reference Drawing Nr 53711 7624600 revision Nr C Dtd 01/10/2018 part Piece Number: iaw Reference Drawing Nr 53711 7624602 revision Nr C Dtd 01/10/2013 part Piece Number: iaw Reference Drawing Nr 53711 7624603 revision Nr C Dtd 07/01/2010 part Piece Number: iaw Reference Drawing Nr 53711 7624604 revision Nr A Dtd 01/10/2013 part Piece Number: iaw Reference Drawing Nr 53711 7624605 revision Nr Dtd 09/22/2005 part Piece Number: iaw Reference Drawing Nr 53711 8306492 revision Nr B Dtd 08/21/2020 part Piece Number: iaw Reference Drawing Nr 10001 Ws10288 revision Nr Ab Dtd 04/05/2001 part Piece Number: iaw Reference Drawing Nr 10001 Ws10298 revision Nr Dtd 06/29/1983 part Piece Number: please Review The Nsn Listed Above And Provide Any Sources That May Be Able To Manufacture These Items. The Approved Sources For This Nsn Are Currently Listed Above. All Information May Be Submitted Directly To The Contract Specialist Listed Above. This Information Must Be Provided By The Response Date Indicated Above. in Order To Be Considered An Interested Party, Vendors Must Complete And Return The Attached Market Survey To The Contract Specialist Listed Above By The Required Response Date. note: This Project Contains Drawings/specifications. You May Access The Tdp Directly From Cfolders And Searching For The Above Cited Solicitation Number. you May Access Them Only Through The Following Link: Https://pcf1.bsm.dla.mil/cfolders. the Drawings Cannot Be Accessed Through Dibbs. thank You In Advance For Your Assistance.
Closing Soon10 Jan 2025
Tender AmountRefer Documents 

Ministry Of Ecological Transition, Ministry Of Territorial Cohesion, Ministry Of The Sea Tender

France
Details: Implementation of 4 hydraulic power stations on the double-seal locks of the Pontoise and L'Isle-Adam sites to replace the single-stations and the geared motors and resumption of the electrical installations and the automation
Closing Date24 Feb 2025
Tender AmountRefer Documents 

Mechanical And Electrical Technician NIKOLI TESLI Tender

Poland
Purchaser Name: Mechanical And Electrical Technician NIKOLI TESLI | "Operation of the Dostawy Zakup I Dostawa Laptopów I Komputerów Na Potrzeby Realization Programs"
Closing DateNA
Tender AmountNA 

Professional Association Of Energy Textile Electrical Tender

Civil And Construction...+2Consultancy Services, Civil And Architectural Services
Germany
Purchaser Name: Professional Association Of Energy Textile Electrical | To the tender 'bg Etem Renewal of elevator systems, Cologne'
Closing Soon8 Jan 2025
Tender AmountRefer Documents 

Professional Association Of Energy Textile Electrical Tender

Others
Germany
Purchaser Name: Professional Association Of Energy Textile Electrical | To the tender 'renewal of passenger elevator system in Stuttgart'
Closing Date29 Jan 2025
Tender AmountRefer Documents 

DEPT OF THE NAVY USA Tender

Civil And Construction...+2Consultancy Services, Civil And Architectural Services
United States
Details: It Is Anticipated That A Formal Solicitation Will Be Issued Within 30 Days Of This Pre-solicitation Notice. No Response Is Required For This Notice. pre Solicitation Notice For N66604-23-rfpreq-npt-10-0243 Indefinite Delivery/indefinite Quantity (idiq) Contract For Multi‐ Discipline Architect‐engineer (a‐e) Services In Support Of Projects On Nuwc Facilities At Naval Undersea Warfare Center Newport Division (nuwcdivnpt), Newport, Ri. description: All Information Needed For Interested Parties To Submit A Standard Form Sf 330, Architect Engineer Qualifications Is Contained Herein. There Is No Separate Request For Proposals (rfp) Package To Download. background: the Naval Undersea Warfare Center Newport Division (nuwcdivnpt) Requires A-e Services In Support Of Various Projects At Nuwcdivnpt. This Procurement Will Result In One Single-award Idiq Contract For Multi‐discipline A‐e Services For Planning, Design, Construction, Evaluation Of New Construction, And Renovation Projects. These Services Will Be Procured In Accordance With 40 United States Code (usc) Chapter 11, Selection Of Architects And Engineers, As Implemented By Federal Acquisition Regulation (far) Subpart 36.6. The Idiq Contract Will Be For A Five-year Ordering Period. The Maximum Value For The Contract Term, Including All Awards, Shall Not Exceed $5,000,000. The Guaranteed Minimum For The Contract Ordering Period Is $500 And Will Be Satisfied By Simultaneous Award Of The Initial Task Order With The Basic Contract. Firm‐fixed Price Task Orders Will Be Negotiated At The Task Order Level. In Accordance With Far 15.404-4(c)(4)(i)(b), The Contract Price Or The Estimated Cost And Fee For Production And Delivery Of Designs, Plans, Drawings, And Specifications Shall Not Exceed 6 Percent Of The Estimated Of Construction Of The Public Work Or Construction, Excluding Fees. There Will Be No Minimum Dollar Limits Per Task Order. The Maximum Dollar Limit Per Task Order Is $3,000,000. this Proposed Contract Is Being Solicited As A Small Business Set-aside. The North American Industry Classification System (naics) Code Is 541310, Architectural Engineering Services, And The Small Business Size Standard Is $12,500,000. The Government Seeks The Most Highly Qualified Firm To Perform The Required Services, Based On The Demonstrated Competence And Qualifications, In Accordance With The Selection Criteria Included Herein. comprehensive A‐e Services Are Required For The New Construction, Repair, Replacement, Demolition, Alteration, And/or Improvement Of Facility Projects. Projects May Include Single Or Multiple Disciplines, Such As: Structural, Civil, Mechanical, Electrical, Architectural, Planning, Environmental, Fire Protection, Cost Estimating, And/or Geotechnical. The Types Of Projects May Include: Building Renovations; Building Additions; Site Work Required To Support New Work; New Construction; Parking Areas; Foundations; Retaining Walls; Failure Investigation Including Destructive And Non‐destructive Testing; Seismic Evaluation And Design; Progressive Collapse Analysis; Blast Resistant Design; Structural Engineering Investigations; Utility Systems Including Sanitary And Storm; Mechanical Services; Electrical Services; Water Systems; Storm Water Management; Surveying; Pavement Design; And Civil Engineering Studies. performance Location(s): newport, Ri requirements: for Complete Details On This Requirement See Attachment 1, “saes.” Specific Types Of A‐e Services That May Be Required Under This Contract Include: facility Planning And Project Development: Services May Include Work Such As The Following: Prepare Master Plans, Project/site Plans For Proposed Facility/infrastructure Projects. Facility Planning May Be Requested For Renovation, Addition, Repair And New Construction Projects. development Of Design‐bid‐ Build (dbb) Packages: Services May Include Preparation Of Drawings And Specifications For Renovation, Addition, Repair Or New Construction Projects. Design Meetings With The Government May Be Required In Order To Agree On Design Solution(s) That Meet The Government’s Project Requirements. development Of Design‐build (db) Request For Proposal (rfp) Packages: Services May Include Working With A Construction Manager As Part Of A Design-build Team To Prepare Drawings And Specifications For Renovation, Additions, Repair Or New Construction Projects. Design Meetings With The Government May Be Required In Order To Agree On Design-build Solution(s) That Meet The Government’s Project Requirements. preparation Of Cost Estimates Using Unit Guidance And Parametric Cost Estimating: Services May Include Preparing Cost Estimates For Renovation, Addition, Repair And/or New Construction Projects Based On Prepared Design Documents. development Of Alternatives And Economic Analysis: Service May Include Providing Alternate Design Solutions And Associated Economic Impacts For Renovation, Addition, Repair Or New Construction Projects. condition Assessment: Services May Include Performing Studies Of Existing Buildings And/or Components Of Buildings To Validate Existing Conditions That May Then Be Used To Inform Future Proposed Design Solutions. Site Visits May Be Required To Document Existing Facility/infrastructure Conditions. field Investigations (including Utility And Geotechnical): Services May Include Conducting Field Surveys/investigations Of Existing Sites, Buildings Or Specific Components Of A Building (i.e Hvac Or Electrical Systems) In Order To Document Current Status Of A Facility’s Infrastructure. The Results Of Any Field Investigations May Then Be Used To Assist With The Preparation Of Design Documents For A Particular Project. surveying And Mapping: Services May Include Surveying And/or Mapping Of Existing Or Proposed Sites For A New Construction Project Or Building Addition. Survey Work May Be Required In Order To Document Existing Site Conditions To Support Site/civil Design Solutions. preparation Of Engineering Evaluations: Services May Include Performing Engineering Calculations To Support Civil, Mechanical, Electrical, Plumbing Or Fire Protection Design Solutions. incorporation Of Sustainable Engineering Design Practices: Services May Include Incorporation Of Design Principles For Renovation, Addition, Repair And/or New Construction Projects To Support Sustainable Design Solutions. consultations: Services May Include Collaborating With Other Specialty Design Professionals To Offer And Propose Design Solutions Required To Respond To Unique Project Requirements. energy Computations; Services May Include Preparation Of Energy Calculations To Verify Proposed Design Solutions Comply With Required Building Codes, Federal, State And/or Local Energy Requirements. soil Borings: Services May Include Conducting Soil Boring Testing In Order To Identify Minimum Design Requirements For New Construction Projects Or Building Additions. obtaining Permits And Regulatory Approvals: Services May Include Submitting Design Documents To Local, State And/or Federal Jurisdictions For Review And Approval Prior To Proceeding With Renovation/construction Work. environmental Investigation And Consultation: Services May Include Providing Design Services Required To Meet Environmental/epa Regulations On Facility/infrastructure Projects And Providing Consultation(s)/collaboration With The Government To Discuss Acceptable Environmental Design Alternatives And Solutions. review Of Contractor Submittals: Services May Include Review Of Project Submittals (such As Product Data Or Product Samples) In Order To Validate Proposed Materials/products Comply With Design Drawings And/or Specifications. field Consultation And Inspection During Construction: Services May Include Responding To Contractor Rfi’s During Construction In Order To Address Design Questions That May Arise During Construction/renovation Projects. commissioning: Services May Include Supporting The Commissioning Process By Attending Commissioning Meetings In Order To Validate Engineered Design Solutions Are Incorporated Into The Project In Accordance With Design Specifications. operation And Maintenance Support Information (omsi): Services May Include Providing The Government With O&m Documentation And Training, Where Applicable, Based On The Final Design Solution And Construction. as‐built Drawing Preparation: Services May Include Updating Design Documents Including Drawings And Specifications To Accurately Reflect Construction Field Changes And Document Final As-built Construction/renovation Projects. functional Analysis Concept Development (facd)/design Charrette/other Design And Construction Related Workshops And Meetings: Services May Require Attendance At Design Meetings To Collaborate With Government Representatives To Consider Design Options And Build Consensus Regarding Preferred Design Solution(s). document Deliverable Requirements: cdrl Number title sub-title cdrl A001 contractor’s Personnel Roster contractor Personnel cdrl A002 hazardous Materials Management Program (hmmp) Plan facility Operations Inventory Hmmp Plan cdrl A003 monthly Status Report monthly Status Report cdrl A004 product Drawings/models And Associated Lists drawing Package cdrl A005 manhour Estimate, Technical Cost Proposal estimates And Proposal cdrl A001 – Contractor’s Personnel Roster within Ten Business Days Of Task Order Issue, The Contractor Shall Submit A List Of All Employees Working On The Project To The Contracting Officer. This List Shall Include Each Employee's Name, And Work Assignment. Changes To The Personnel List Shall Be Submitted At Least Ten Business Days In Advance. In Emergency Situations And Cases Of Adverse Actions Where Ten Business Days’ Notice Is Not Possible, The Contractor Shall Submit The Required Information Regarding The Change In Writing To The Contracting Officer Representative (cor) Not Later Than 24 Hours After The Replacement Employee Is On Board. cdrl A002 – Hazardous Materials Management Program (hmmp) Plan the Contractor Shall Submit A Hazardous Material Management Plan (hmmp) As Addressed In Paragraph 3.2 Of The Saes. cdrl A003 – Monthly Status Report contractor Shall Provide A Monthly Status Report For Each Project In Which The Support Was Provided. The Report Shall Discuss Major Impacts, Issues, And Steps For Remediation Of Issues, Proposals To Improve Operational Efficiencies, Effectiveness, Quality, Or The Customer Experience. cdrl A004 – Product Drawings/models And Associated Lists the Contractor Shall Develop And Deliver Drawings, Specifications, Architect / Engineering Reports, To The Technical Point Of Contact Upon Request. cdrl A005 – Manhour Estimate, Technical Cost Proposal Insert Title a‐e Firms Shall Prepare Cost Estimates Utilizing The Micro‐computer Aided Cost Estimating System (mcaces) Mii Estimating System. Specifications Shall Be Prepared In The Specifications‐kept‐intact (specsintact) Program. Design‐build Rfps Shall Be Prepared Utilizing Design‐build Masters, And Drawings Shall Be Prepared In Autocad (2016 Or Higher) Utilizing The National Computer‐aided Design And Drafting (cadd) Standards Format. Three‐dimension (3‐d) And Bim Modeling May Also Be Required. The Contractor Shall Provide Documents In Pdf Format. Final Documents Shall Be Electronically Signed By The Assigned Architect Or Engineer. All Projects Shall Be Designed In The Modern International Standard Version Of The Metric International System Of Units (si), Unless Specifically Exempted By The Statement Of Work At The Task Order Level. other Special Considerations: as Defined By Paragraph 1‐5 Of United Facilities Criteria (ufc) 3‐ 600‐01, Fire Protection Engineering For Facilities, This Contract Requires The Services Of A Licensed Fire Protection Engineer Or Consultant. asbestos And/or Lead‐based Paint Assessments May Be Required On This Contract To Determine The Presence Of Hazardous Material During Removals/demolition Or At Utility Points Of Connections. Work On And Around Waterfront Structures, Including Under Deck And Underwater, And Work In Confined Spaces May Be Required On This Contract. A‐e Firms Must Be Able To Accept Work That Involves Asbestos, Lead Paint, Poly‐chlorinated Biphenyls (pcb)s, And Other Hazardous Materials, Work On And Under Waterfront Structures, And In Confined Spaces. all Engineering And Design Services Shall Comply With The Most Current Edition Of Facilities Criteria (fc) 1‐300‐09n Design Procedures, And Other Requirements As Indicated On The Whole Building Design Guide (wbdg) Web Site (www.wbdg.org). The Selected A-e Contractor Shall Have Online Access To Web‐based Support Programs Capable Of Creating Auto-cad Documents For Government Review, And Email Via The Internet For Routine Exchange Of Correspondence. The Selected A-e Contractor Shall Submit And Maintain An A‐e Accident Prevention Plan (app) In Accordance With U.s.army Corp Of Engineers (usace) Em 385‐1‐1 For Each Project On This Contract And Activity Hazard Analysis (aha) For Each In‐field Action. Key Personnel, Including Consultants, Must Be U.s. Citizens. a‐e Firms Are Advised That The Selected Firm, Its Subsidiaries Or Affiliates, And Its Consultants Which Design, Prepare, Or Provide Engineering Services In Support Of Construction Contract Documents Cannot Provide Construction Services For The Same Contract. This Includes Concept Design, Preparation Of Project Programming Documents (dd Form 1391), Facility Siting Studies, Environmental Assessments, Geotechnical Services, Engineering Studies And Services, Design‐build Request For Proposals (rfps), Or Other Activities That Result In Identification Of Project Scope And Cost. The Awarded Contract Will Be Subject To Specific Provisions Addressing The Avoidance Of Organizational Conflicts Of Interest, Including Naval Facilities Acquisition Supplement (nfas) 5252.209‐9300, Organizational Conflicts Of Interest. The Prime Firm For This Contract Will Be Required To Perform Throughout The Contract Term. submission Requirements: a‐e Firms Desiring To Be Considered For This Contract Shall Submit A Completed Sf 330 Package By Email To The Contracting Officer And The Contract Specialist. The Sf 330 Shall Be Typed, At Least 11 Point Times New Roman Or Larger. Part I Shall Not Exceed 100 Single‐sided 8.5 By 11 Inch Pages (the Page Limit Does Not Include Individual Subcontracting Reports (isr)s, Certificates Licenses, Nor Does The Page Limit Include Cover Sheets Or Dividers, Provided That These Do Not Contain Any Substantive Information Submitted In Response To The Synopsis Or Intended To Demonstrate The Qualifications Of The Firm). Part I Pages Shall Be Numbered Sequentially. Introductions Shall Be Included In Sections E And F. A-e Firm Submissions Shall Include Its Dun & Bradstreet (duns), Commercial And Government Entity (cage), And Taxpayer Identification Number (tin) Numbers In Block 30 Of The Sf 330. all Contractors Are Advised That Registration In System For Award Management (sam) Database Is Required Prior To Award Of A Contract. Failure To Register In The Sam Database May Render Your Firm Ineligible For Award. For More Information, Check The Sam Web Site: Https://www.sam.gov. in Accordance With The Federal Acquisition Regulations (far) 36.601‐4(b), The A‐e Firm Must Be A Registered And Licensed Architectural And/or Engineering Firm In Rhode Island To Be Eligible For Award. A-e Firms Shall Provide Proof That The Firm Is Permitted By Law To Practice The Professions Of Architecture Or Engineering, (e.g., State Registration Number, Or A Brief Explanation Of The Firm’s Licensing In Jurisdictions That Do Not Register Firms, Etc.). Failure To Submit The Required Proof Will Result In A Firm’s Elimination From Consideration. firms Who Are Offering As A Joint Venture Should Include With Their Submission A Copy Of The Joint Venture Agreement. Failure To Include The Joint Venture Agreement Will Result In The Firm’s Elimination From Further Evaluation. if An Sf 254/sf 255 Is Submitted For This Solicitation, It Will Not Be Reviewed Or Considered. As Required Above, Provide Verifiable Evidence That Your Firm Is Permitted By Law To Practice The Professions Of Architecture Or Engineering (e.g., State Registration Number). interested Firms Shall Submit Proposals To Both The Contract Specialist And The Contracting Officer At The Email Addresses Listed Below. sf 330 Submissions Are Due No Later Than Xx Xxxxx 2023 At Xx:xx Pm (est). Late Responses Will Be Handled In Accordance With Federal Acquisition Regulations (far) 52.215‐1. The Points Of Contact For This Acquisition Are Contract Specialist, Xxxxx Xxxxxx, At Xxxxxxxxx@navy.mil And Xxxxx Xxxxxxx, Contracting Officer, At Xxxxxxx@navy.mil. (to Be Provided Within Formal Solicitation) the Total Maximum File Size For Email Proposal Submission Is Limited To 10mb. If The Submission Will Exceed 10mb, It Is Acceptable For The Submission To Be Broken Up Into Multiple Emails Or The Firm Should Coordinate With The Identified Government Poc's To Obtain A Dod Safe Request For Submission. Failure Of The Firm To Coordinate A Dod Safe Request For Submission In A Timely Manner, To Allow Sufficient Time For Submission Of The Required Documents Before The Required Response Date, Will Not Be Acceptable Justification For The Government Allowing Or Considering A Late Submission. A Timely Manner Is Defined As Requesting Such Dod Safe Information From The Identified Government Poc's No Later Than 10 Calendar Days In Advance Of The Response Date Of The Synopsis. if The Firm Chooses To Complete Multiple Email Submissions, Emails Shall Clearly Indicate The Number Of Email Submissions The Government Should Expect To Receive And Shall Be Numbered To Indicate Which Email Of The Submission Each Email Received Is (i.e.: Email 1 Of 3; Email 2 Of 3; Email 3 Of 3). inquiries Concerning This Procurement Should Reference The Solicitation Number And Title And Be Forwarded Via Email To The Points Of Contact Identified Above. Questions Pertaining To This Requirement Are Due No Later Than Fourteen (14) Days After Posting Of This Requirement On Sam.gov. list Of Attachments: scope Of Architect-engineer (a-e) Services (saes) (draft) cdrls (draft) selection Criteria: firms Responding To This Synopsis Will Be Evaluated To Determine The Most Highly Qualified Firms To Perform The Required Services In Accordance With The Published Selection Criteria. failure To Comply With Instructions, Or Provide Complete Information May Affect The Firm’s Evaluation Or Disqualify The Firm From Further Consideration. Evaluation Criteria (1) Through (4) Are Considered Most Important And Are Equal Among Themselves; Criteria (5) Through (6) Are Less Important And Are Equal Among Themselves; Criteria (7) Will Only Be Used As A Tie‐breaker Among Technically Equal Firms. Specific Selection Criteria Include: specialized Experience professional Qualifications And Technical Competence past Performance quality Control program Management And Capacity firm Location volume Of Work criterion 1 —specialized Experience (sf 330, Part I, Section F): firms Will Be Evaluated On Specialized Experience In Performance Of Services Similar To Those Anticipated Under This Contract Through Evaluation Of Experience In: infrastructure/facility Design Utilizing The Following Criteria, Including, But Not Limited To, Unified Facilities Criteria (ufc’s) And Military Standard (milstd); conducting On‐site Design Development Workshops, Charrettes, Functional Analysis, Schematic Design, Or Space Programming, Including Supporting Budgetary Or Parametric Cost Estimating; demonstrated Ability To Design To Project Budget And Schedule; experience Preparing Design‐bid‐build; experience Preparing Design‐build Rfp Packages; And designing Projects In Accordance With Dod, Navy, Or Other Government Agencies’, Or Private Industry Criteria. firms May Be Considered More Favorably Under Criterion 1 By Demonstrating The Following: experience In The Delivery Of Multiple Types Of A‐e Services Identified In The Requirements Above. experience On Multiple Facility Types, Such As Business, Educational, Industrial, Assembly, Health Care, Residential, Storage, Laboratory, And Mixed-use Occupancies, Identified In The Requirements Above. demonstrated Experience Using The Micro Computer Aided Cost Estimating System Second Generation (mii) Cost Estimating Software. demonstrated Experience On Navy Bases Within The Primary Geographic Area Of The Contract. demonstrated Experience Designing Modifications To Existing Structures And Developing Construction Phasing While Associated Facilities Are Required To Remain In Service. demonstrated Experience Specific To Navy Facility Projects, Illustrating The Capability Of The A‐e Firm And Individual Design Team Members (a‐e Staff, Key Personnel, Consultants) To Work Within The Navy Project Planning Process Including: dd Form 1391 Development In The Navy’s Electronic Procurement Generator (epg), dd Form 1391 Validation Procedures Including Cost Validation. demonstrated Understanding Of Procedures And Timely Submission Of Base Access Documents In Adherence With Security, Safety, Environmental, And Accident Prevention Regulations In Order To Support A‐e Activities And Maintain Project Schedules. experience Of A‐e Firm And Individual Design Team Members (a‐e Staff, Key Personnel, Sub‐ Consultants) With Facilities Located In Historic Areas That Will Require Consultation With State Historic Preservation Officer (shpo) Throughout The Design Process. criterion 1 Submission Requirements: provide Up To A Maximum Of Ten (10) Projects Completed (project Completion To Be Defined As Receiving Final Design Acceptance From Client) Within The Past Seven (7) Years Immediately Preceding The Date Of Issuance Of This Notice That Best Demonstrate Specialized Experience Of The Proposed Team In The Areas Outlined Above. Sufficient Information To Determine The Date Of Completion Of The Project Must Be Included In The Project Description Or The Project Will Not Be Considered. If More Than The Maximum Number Of Projects Is Submitted, The Government Will Only Evaluate Projects Up To The Maximum Number Authorized In The Order Submitted. all Projects Provided In The Sf 330 Must Be Completed By The Actual Office/branch/regional Office/ Individual Team Member Proposed To Manage And Perform Work Under This Contract. Projects Not Meeting This Requirement Will Be Excluded From Consideration In The Evaluation. To Enable Verification, Firms Should Include The Duns Number Along With Each Firm Name In The Sf 330 Part I, Section F, Block 25, “firm Name.” Include A Contract Number Or Project Identification Number In Block 21. Include An E‐ Mail Address And Phone Number For The Point Of Contact In Block 23(c). In Block 24, Include In The Project Description The Contract Period Of Performance, Award Contract Value, Current Contract Value, And A Summary Of The Work Performed That Demonstrates Relevance To Specialized Experience As Outlined Above. For Projects Performed As A Sub-contractor Or A Joint Venture Involving Different Partners, Specifically Indicate The Value Of The Work Performed As A Subcontractor Or By Those Firms Proposed For This Contract, And Identify The Specific Roles And Responsibilities Performed As A Sub-contractor Or By Those Firms On The Project Rather Than The Work Performed On The Project As A Whole. If The Project Description Does Not Clearly Delineate The Work Performed By The Entity/entities Offering/teaming On This Contract, The Firm Will Be Eliminated From Award Consideration. note: If The Firm Is A Joint Venture, Projects Performed By The Joint Venture Should Be Submitted; However, If There Are No Projects Performed By The Joint Venture, Projects Must Be Submitted For Each Joint Venture Partner, Not To Exceed A Total Of Ten (10) Projects. Firms Failing To Provide Projects From All Joint Venture Partners Will Be Considered To Have Not Met The Requirements Of The Criterion. projects Shall Be Submitted On The Sf 330 At Part I, Section F And Shall Be Completed Projects. Projects Not Completed Will Be Excluded From Evaluation Consideration. For Submittal Purposes, A Task Order On An Idiq Contract Is Considered A Project, As Is A Stand‐alone Contract Award. Do Not Submit An Idiq Contract As An Example Project. Instead, List Relevant Task Orders Or Stand‐alone Contract Awards That Fit Within The Definition Above. The Government Will Not Evaluate Information Provided For An Idiq Contract. Examples Of Project Work Submitted That Do Not Conform To This Requirement Will Not Be Evaluated. all Information For Criterion 1 Shall Be Submitted In The Sf 330, Part I, Section F. The Government Will Not Consider Information Submitted In Addition To Part I, Section F In The Evaluation Of Criterion 1. criterion 2—professional Qualifications And Technical Competence (sf 330, Part I, Sections E & G): firms Will Be Evaluated On Professional Qualifications, Competence, And Experience Of The Proposed Key Personnel In Providing Services To Accomplish The Tasks Required Under This Contract, Including Participation In Example Projects In The Sf 330, Part I, Section G. Key Personnel Are Individuals Who Will Have Major Contract Or Project Management Responsibilities And/or Will Provide Unusual Or Unique Expertise. Specific Disciplines That Must Be Included In Key Personnel Are: project Manager(s) senior Architect senior Civil Engineer senior Structural Engineer senior Mechanical Engineer senior Electrical Engineer senior Quality Control Manager senior Fire Protection Engineer (a Licensed Fire Protection Engineer Is Required) key Personnel, Including Consultants, Shall Be U.s. Citizens. submissions Must Demonstrate Key Personnel Relevant Experience, Formal Education (e.g. Bachelor’s Or Master’s Degrees), And Relevant Professional Development Or Professional Certifications. criteria 2 Submission Requirements: sf 330, Part I, Section E – Provide Resumes For All Proposed Key Personnel That Illustrate Experience In The Type Of Work Proposed Under This Contract. Resumes Are Limited To Three Pages And Should Indicate: Professional Registration, Certification, Licensure And/or Accreditation In Appropriate Disciplines; Cite Recent (within The Past 10 Years) Project‐specific Experience In Work Relevant To The Services Required Under This Contract; And Indicate Proposed Role In This Contract. Indicate Participation Of Key Personnel In Example Projects In The Sf 330, Part I, Section G. criterion 3—past Performance (sf 330, Part I, Section H): firms Will Be Evaluated On Past Performance With Government Agencies And Private Industry In Terms Of Work Quality, Compliance With Schedules, Cost Control, And Stakeholder/customer Satisfaction. evaluating Past Performance And Experience Will Include Information Provided In The Contract Performance Assessment Reporting System (cpars) / Architect-engineer Contract Administration Support System (acass) For Criterion 1 Projects And May Include Customer Inquiries, Government Databases, And Other Information Available To The Government Including Contacts With Points Of Contact In Other Criteria. Failure To Provide Requested Data, Accessible Points Of Contact, Or Valid Phone Numbers Could Result In A Firm Being Considered Less Qualified. criteria 3 Submission Requirements: submit A Completed Cpars/acass Evaluation For Each Project Under Criterion 1. If Cpars Or Acass Evaluations Are Not Available For The Projects Identified Under Criterion 1, Then The Firm Shall Provide A Point Of Contact Reference From The Requiring Organization Familiar With The Project Who Can Confirm The Quality Of The Offeror’s Work On The Project. Those References Shall Include Contract/task Order Number, Project Title, Point Of Contact Name, Telephone Numbers, And Email Addresses For The Reference. firms May Provide Any Information On Problems Encountered And The Corrective Actions Taken On Projects Submitted Under Criterion 1—specialized Experience. Firms May Also Address Any Adverse Past Performance Issues. Information Shall Not Exceed Two Double‐sided Pages (or Four Single‐sided Pages) In Total. awards, Letters Of Commendation, Certificates Of Appreciation, Etc. Shall Not Be Submitted And Will Not Be Considered In The Evaluation. criterion 4—quality Control Program (sf 330, Part I, Section H): firms Will Be Evaluated On The Strength Of The Quality Control Program Proposed By The Firm To Ensure Quality Products And Services Under This Contract, And Means Of Ensuring Quality Services From Their Consultants/subcontractors. criteria 4 Submission Requirements: describe The Quality Control Program That Will Be Utilized For All Deliverables Of This Contract And The Management Approach For Quality Control Processes And Procedures. The Description Shall: describe Specific Quality Control Processes And Procedures Proposed For This Contract To Achieve Technical Accuracy Of And Assurance Of Overall Coordination Of Plans And Specifications, And Engineering And Design Services. provide A Quality Control Process Chart Showing The Inter‐relationship Of The Management And Team Components. identify The Key Personnel (submitted Under Criterion 2—professional Qualifications And Technical Competence) Responsible For The Quality Control Program And A Description Of Their Roles And Responsibilities. describe How The Firm’s Quality Control Program Extends To Management Of Sub-contractors. explain The Quality Control Program Including An Example Of How The Plan Has Worked For One Of The Projects Submitted As Part Of Sf 330, Section F Or How The Plan Will Work If It Has Not Been Used Previously. criterion 5—program Management And Capacity (sf 330, Part I, Section H): firms Will Be Evaluated On The Firm’s Ability To Plan For And Manage Work Under The Contract And The Capacity To Accomplish The Work In The Required Time. criteria 5 Submission Requirements: provide An Organizational Chart For The Team And Discuss The Management Plan For This Contract And Personnel Roles In The Organization. Describe The Ability Of The Firm To Manage, Coordinate And Work Effectively With Team Members, Both Internal Staff, Sub-contractors And Consultants. Discuss The History Of Working Relationships With Team Members, Including Joint Venture Partners Where Applicable. describe The Firm’s Present Workload And The Availability Of The Project Team (including Consultants) For The Specified Contract Performance Period. Describe The Workload/availability Of The Key Personnel During The Anticipated Contract Performance Period And The Ability Of The Firm To Provide Qualified Backup Staffing For Key Personnel To Ensure Continuity Of Services. General Statements Of Availability/capacity May Be Considered Less Favorably. describe The Firm’s Ability To Sustain The Loss Of Key Personnel While Accomplishing Work Within Required Time Limits, To Ensure Continuity Of Services And Ability To Meet Surges In Unexpected Project Demands And Ability To Adhere To Schedules And Budgets. criterion 6—firm Location (sf 330, Part I, Section H) firms Will Be Evaluated On The Locations Of Their Office Or Offices That Will Be Performing The Work Under This Contract And Demonstrated Knowledge Of The General Geographic Areas In Which Projects Could Be Located. Evaluation Of Firms Will Include Consideration Of Their Location Within The General Geographic Area Of The Anticipated Projects (primarily At Naval Undersea Warfare Center Newport Division, Newport, Ri). criteria 6 Submission Requirements: indicate Location Of The Office(s) That Will Be Performing The Work, Including Main Offices, Branch Offices, And Offices Of Team Members. provide A Narrative Describing The Team’s Knowledge And Previous Experience Of The Primary Geographic Areas To Be Covered By This Contract. provide A Narrative To Describe The Team’s Ability To Provide Timely Response To Requests For On‐site Support. Provide Timelines And Examples Of The Team’s Success In Providing This Response. Include Both Primary And Sub‐contractor Support As Required. Teams With A Demonstrated History Of Providing Timely Support May Be Considered More Favorably. criterion 7—volume Of Work (sf 330, Part 1, Section H) (tie-breaker) in The Event Of A Tie Among Equally Rated Firms, Those Firms Will Be Evaluated In Accordance With Dod Federal Acquisition Regulation Supplement (dfars) Procedures, Guidance And Information (pgi) 236.602‐1, From Data Extracted From The Federal Procurement Data System (fpds). Firms Will Be Evaluated In Terms Of Work Previously Awarded To The Firm By Dod Within The Past Twelve (12) Months With The Objective Of Effecting An Equitable Distribution Of Contracts Among Qualified A‐e Firms Including Small, Disadvantaged Business Firms, And Firms That Have Not Had Prior Dod A‐e Contracts. criterion 7 Submission Requirements: firms Shall Not Submit Data For This Factor.
Closing Date31 Jan 2025
Tender AmountRefer Documents 

Offizielle Bezeichnung Tender

Others...+1Civil And Construction
Germany
Description: Contract notice – general guidelines, standard rules, open procedure (construction work) Replacement building for the Erich Kästner School in Marburg, scaffolding work for the new building The school complex of the Erich Kästner School in Marburg-Cappel currently consists of several buildings. The formal language of the individual buildings, some of which are interconnected by connecting corridors and buildings, is typical for the construction period. The overall picture is amorphous. An overall design concept cannot be recognized. The heterogeneous overall picture means that the school lacks an “address”, a clearly defined entrance. The space available no longer covers demand. Parts of the afternoon care had to be relocated to the community center. The implementation of contemporary educational concepts is not possible in the existing floor plan structures. In addition, the existing buildings B and K have significant deficiencies such as a lack of accessibility, functional and organizational deficits, static deficiencies, inadequate fire protection and the need for energy-related renovation. Based on the above points, it was decided to demolish buildings B and K and replace them with a new building, which would also include the additional rooms for care and the cafeteria. In addition to eliminating the above deficiencies, the new building will also give the school a recognizable "address" with a well-placed main entrance. Buildings A, G, F, H and I will remain. Building A houses the administration, the teachers' room and 3 therapy rooms. The rooms in building G are used as specialist classes for music and crafts. Buildings H and I are used by the special needs school. Building A will have a small extension with technical rooms and additional storage space. The existing building G will have an emergency staircase as a second escape route with access to the room on the ground floor that is currently used as a common room. Project description extension Building B, which is currently adjacent to building A, will be demolished. Part of the basement of building B will remain standing and will serve as the floor slab for a new single-storey extension to the existing building A. Static additions must be made to the shell at the demolition edges of the remaining basement. The new extension is planned to be built using timber construction, with timber frame walls (partially insulated) and a roof structure with roof beams, timber formwork and foil sealing. The outer walls will have a suspended, ventilated timber cladding. In the area where building B is to be demolished, the existing gable roof of building A must be supplemented with timber rafters and tile covering. The newly planned extension will include a technical room for the new house connection for the electrical supply to the Erich Kästner School area, as well as a technical room for the heating supply to building A. A storage room will also be created for the school's play equipment. Project description New building The new school building consists of two rectangular structures, slightly offset from one another, which are connected at the junction by a central entrance hall. Due to the topography, the southern structure is 3-storey, with a ground-level connection to the lower schoolyard, and the northern structure is 2-storey, with a connection to the upper schoolyard. The entrance hall is the central access element of the building. Access is via the entrances from the lower and upper schoolyard. The open, spacious staircase leads to the respective floors, and the elevator, which is also connected to the entrance hall, ensures barrier-free access to all floors. The clear concept of the open entrance hall offers good visual connections to all areas and thus enables good orientation in the building. The entrance hall is not just a circulation area, but a central communication zone or meeting point for students, and invites people to linger, especially with the staircase on the ground floor, which has been widened to form seating steps. The ground floor area extends only under the southern building. In this area, on the slope side, there is a central toilet core as well as storage and technical rooms. Facing the schoolyard is the large dining room with an attached kitchen and the necessary ancillary rooms. The kitchen has its own delivery from the south. The dining room has generous glazing facing the schoolyard and a large opening to the entrance hall. This opening can be closed using a mobile partition wall, or opened to the entrance hall if required, thus enabling this area to be used in a variety of ways. The dining room on the ground floor is to be made available to Cappel residents and clubs for parties or other external events outside of school hours. The classrooms are on the two upper floors. Each floor of each building contains a cluster, a so-called "learning house". The classrooms and differentiation rooms of the clusters are grouped around a central middle zone, which serves both as access and as an extended teaching area. This middle zone is structured and furnished in such a way that it can be used for teaching purposes for individual or group work, but also for supervision. Appropriate openings between the classrooms and the middle zone provide views and thus ensure that the children are well supervised. Each cluster also has a small teacher's base, so that the clusters are self-contained, "self-sufficient" learning houses with which the student community can identify and which strengthens the group feeling. On each floor, at the intersection between the two clusters, there are central toilets that can be reached in a short distance from the learning houses. Erich-Kästner-Schule replacement building, scaffolding work trade. The service includes all preparatory work - Approx. 250 sqm protection of the floor areas under the scaffolding - Approx. 2,200 sqm 1 scaffolding EN 12810, load class 4, W09 - Approx. 155,500 sqm/week. Use of scaffolding - Approx. 3 pcs. bridging L 500 cm - Approx. 1,000 m extension of scaffolding, scaffolding widening W 0.3 m - Approx. 3 pcs. staircase H up to 13 m - Approx. 3 pcs. staircase H up to 10 m
Closing Date16 Jan 2025
Tender AmountRefer Documents 
7291-7300 of 8002 active Tenders