- Home/
- United States/
- DEPT OF THE ARMY USA/
- Overview
DEPT OF THE ARMY USA Tender
DEPT OF THE ARMY USA Tender
Costs
Description
2/12/2025 the Government Is Extending The Solicitation Closing Time Only From 12am Est To 6pm Est. The Government Will Not Be Accepting Any Quotes Beyond 6pm Est On February 12, 2025. ----------------------------------------------------------------------------------------------------------------------------- amendment 0005to Sam Notice Id “w15qkn-25-r-0028” changes To Attachment 0005 – Quote Template clin 0002 Travel Not To Exceed (nte) Amount Has Been Increased/updated. uploaded Attachment 0005 – Quote Template 11feb2025 (with Revised Changes Above) ----------------------------------------------------------------------------------------------------------------------------- 11 February 2025 questions And Answers For 2/7/2025 1. Pursuant To Q&a: “20. The Dd 254 Block 1.b Indicates Safeguarding At The Secret Level? Is this Correct? Answer. Yes, Because Some Of The Training Material May Be Classified Up To secret Levels.” Does The Government Require Proof Of Safeguarding Capability Such As A Letter From Dcsa In The Technical Volume? answer: No, The Safeguarding Will Be On Site. The Fcl Will Be Required To Validate The Clearance Of The Contractor. 2. A Follow-up To The Safeguarding Question: According To Chapter 5 Section1 Of The Nispom, Safeguarding Is Required When A Company Has To Hold The Material In Their Own Possession In A Safe. Is This The Case With The Training Materials Or Will The Government Customer Be Handing Out And Collecting The Training Material Each Day? Would The Government Consider Removing The Requirement For Safeguarding From The Dd254 For The Contractor? answer: We Will Collect The Training Material Each Day. However, The Contractor Is Required To Have The Fcl To Validate Their Employee’s Security Clearance. 3. A Follow-up To Previous Question. The Dd 254 Block 1.b Indicates Safeguarding At The Secret Level? Is This Correct? Answer. Yes, Because Some Of The Training Material May Be Classified Up To Secret Levels. We Believe Strongly That The Dd254 Box Section 1b Is Not Marked Correctly And Should Be Left Blank Or Marked None. The Justification Provided In The Q&a Below Does Not Apply Because 1b Is Relevant Only To Classified Material At The Contractor’s Facility. The Justification Mentioned Is What Supports Section 1a Being Classified As Secret. please Clarify If Training Will Occur At The Contractor’s Facility, And If So, What Is The Mileage Limit From Camp Atterbury That A Contractor’s Facility May Be To Support This Valex, As Well As Specific Facility Requirements, Dimensions, Occupancy, And Access Considerations. Because The Dd254 Is The Third Item Listed For Technical Capability Assessment, If Training Is Not Going To Occur At The Contractor’s Facility, We Believe It Would Negatively Impact Offerors Who Do Not Address This Item Or Correct It In Their Submissions. answer: The Box Shall Remain Checked And The Training Will Occur At Camp Atterbury. 4. I See That You Did Add A Common Travel Plug For All Vendors To Use. This Will Be Very Valuable To Ensuring The Highest Quality Of Support For This Contract. Can You Please Clarify That All Vendors Should Be Including This Travel Plug In Their Proposals, Which Will Be Cost Reimbursable For The Applicable Travel Related Costs. I.e. Travel To/from, Lodging, Per Diem, As Need Rental Car To From Airports And Atterbury, Etc. i Wanted To Make Sure That Vendors Should Not Be Including Less That This Amount In Clin 2, As This Should Be A Common Plug Used/available To Everyone, Otherwise It Would Eliminate The Benefits Of Having This Plug. answer: An Amendment With Instructions To Offerors Was Issued To Clarify The Travel Plug And Add A Technical Factor. ----------------------------------------------------------------------------------------------------------------------------- 10 February 2025 amendment 0004to Sam Notice Id “w15qkn-25-r-0028” the Purpose Of Amendment 0004 Is To Incorporates Q&as And To State The Following: - Attachment 0001– Pws – 7feb2025, Uploaded To Sam On 2/7/2025 Is The Final Version. - Attachment 0007- Instruction To Offerors And Evaluation Criteria, Uploaded To Sam On 2/7/2025 Is The Final Version. questions And Answers From 2/5/2025 And 2/6/2025 1. The Period Of Performance Is Listed As 9-20 March, But The First Meeting With The Contractors Occurs On 19 March During The Coordinationphase. Could You Clarify Whether Contractors Are Required To Be Present For The Full9–20 March Period Or If They Must Report No Later Than (nlt) March 18, 2025? answer: The Pop Is 9-20 March 2025. The Pws Has Been Correct Via Amendment 001. 2. Additionally,doesthe Company Need To Hold An Fcl Or Is It Sufficient To Verify That The Contractors Possess An Active Secret Clearance? answer: Yes, So They Can Validate The Secret Security Clearance And Manage The Security Clearance. 3. The Period Of Performance (pop) Shows 9-20 March 2025; However, Paragraph 2.1.1 Shows The Beginning Date For The Coordination Phase As 19 March 2025. Should We Prepare For Only Two (2) Days Of Coordination And Roleplaying At Camp Atterbury? answer: The Pop Is 9-20 March 2025. The Pws Has Been Correct Via Amendment 001. 4. The Solicitation Only Provides For A Quote For Services. If Submitted, Will A Capabilities Statement Be Reviewed To Support The Technical Evaluation? answer: An Amendment Was Issued 2/7/2025, To Include Instructions To Offerors And Incorporate A Capabilities Statement For Evaluation Purposes. 5. What Is The Required Date For Submitting A Roster Of Candidates To Fill The Role Player Positions In Advance Of The March 9 Rotation? answer: The Required Date To Support The Training Is 9 March 2024. 6. Are There Specific Requirements Or Qualifications For Spanish Language Proficiency? answer: A Dlpt Score Of 3/3 7. Is A Technical Narrative Required As Part Of The Proposal? If So, Are There Any Guidelines Regarding Format (e.g., Page Limits, Font Size)? answer: An Amendment Was Issued 2/7/2025, To Include Instructions To Offerors And Incorporate A Capabilities Statement For Evaluation Purposes. 8. Will A Technical Volume And Past Performance Be Evaluated By The Governmentif Submitted? answer: Only The Technical Volume Will Be Evaluated. clarification Required: Based On The Evaluation Criteria I Understand That The Due Out To The Government Is The Quote Template (provided), Dd254 (provided) And A Downloaded Copy Of Reps And Certs For The Offeror. Are We Understanding That Correctly? Those Documents Meet The Requirement For The Technical. The Qasp Is Due Post Award? answer: An Amendment Was Issued 2/7/2025, To Include Instructions To Offerors And Incorporate A Capabilities Statement For Evaluation Purposes. 9. The Dd254 Block 1.b Indicates Safeguarding At The Secret Level? Is This Correct? answer. Yes, Because Some Of The Training Material May Be Classified Up To Secret Levels. clarification Required: Dd254 Block 1.b Is Understood By Our Industry Facility Security Officer (fso) That If Safeguarding Is Required Then The Government Is Asking The Contractor To Maintain Classified Documents At The Contractor's Facility. As I Understand The Requirement The Work Is Being Performed At Camp Atterbury. There Is Not A Contractor Owned And Maintained Facility In This Requirement At Camp Atterbury. How Is The Contractor Required To Secure, And Safeguard Classified Information In Commercial Lodging? Or, Will The Potentially Classified Documents Be Secured On Camp Atterbury By The Government And Then Accessed By The Contractor On A Daily Basis? If The Government Is Maintaining The Classified Material, Then The Safeguarding Requirement At The Contractor's Facilityshould Be "none". answer: The Fcl Is Required For The Company To Ensure That They Can Hold Or Manage The Employee Clearance. Fcl Isn’t Just For The Actual Facility. It Is Required. 10. We Are Bidding The Above Contract And Have Run Into A Dilemma. The Nte Travel Is $40,377.00. Just Gsa Lodging And M&i For The Area For 14 People For 14 Days Is: $38,059. This Does Not Include Airfare Or Any Other Things The Jtr Identifies As Reimbursable. No Rental Cars Are Currently In My Estimate. An Nte This Low Would Either: Require All Role Players To Come From The Camp Atterbury Area Which I Believe Would Be Not Possible, Or You Guys Are Providing Government Lodging Which I Did Not See In The Pws. answer: The Government Evaluated The Travel Cost And Has Increased The Nte Amount To $43,349.90. Lodging From March 8-21 Is For 13 Nights Only. Gsa States That M&ie For The First And Last Day Of Travel Will Be At A Lower Rate (2 Days). The Current Loging Rate For That Area Is $110 And M&ie Is $68, The First And Last Day Of Travel For M&ie Is $51. 11. Setting Clin 0002 (travel) To $0.00 Is Acceptable, Or If The Government Requires A Proposed Cost Under The Nte Threshold? answer: An Amendment Was Issued 2/7/2025, To Include Instructions To Offerors Regarding The Nte Amount. 12. If Setting Travel To $0.00 Is Not Permissible, Is There A Recommended Alternative Pricing Structure We Should Use? answer: An Amendment Was Issued 2/7/2025, To Include Instructions To Offerors Regarding The Nte Amount. ----------------------------------------------------------------------------------------------------------------------------- 07 February 2025 amendment 0003 To Sam Notice Id “w15qkn-25-r-0028” the Purpose Of Amendment 0003 Is To Incorporates The Following: -updated Attachment 0001 – Pws – 7feb2025 To Include The Following Changes: (a) 1.6.2 Iwatch Army Training (b) 1.6.3 Opsec Training (c) 1.6.4 Threat Awareness Reporting Program -add Attachment 0007 - Instruction To Offerors And Evaluation Criteria both Attachments Are Draft Versions To Allow Vendors Enough Time To Update Their Quotes/proposals. The Government Does Not Anticipate Any Changes To Attachment 0001 And 0007. The Final Versions Will Be Posted Early Next Week, If Any Changes Are Made To Either Attachment The Government Will Point Out Said Changes. fyi, Additional Q&as Will Also Be Posted Next Week, In The Event There Are Any Additional Questions Please Request And Extension As The Deadline To Submit Q&as Was 2/6/2025 At Noon Est. ----------------------------------------------------------------------------------------------------------------------------- 06 February 2025 amendment 0002 To Sam Notice Id “w15qkn-25-r-0028” the Purpose Of Amendment 0002 Is To Extend The Solicitation Closing Date To February 12, 2025 12pm Est. ----------------------------------------------------------------------------------------------------------------------------- questions And Answers From04 February 2025 1. Will The Role Players (rp) Be Afforded The Opportunity To Lodge On Camp Atterbury For Fee? Indiana National Guard: Lodging – Chargeable Transient Quarters answer: No, Because There Will Not Be Enough Time To Coordinate Prior To The Award Of The Contract. They Will Need To Do Commercial Lodging. 2. Is There Government Provided Lodging At No Cost On Camp Atterbury? answer: No. 3. Are The Rps Required To Work Independently Of Each Other On Different Schedules Or Will They Travel To And From The Government Work Site At The Same Schedules? answer: They Will All Be On The Same Schedule. 4. Is Camp Atterbury The Actual Work Site Or Will The Rps Be Required To Perform Duties In Urban City/town Environments Outside Of Camp Atterbury? answer: Camp Atterbury Is The Actual Work Site. 5. Are The Rps Required To Independently Arrive And Access Camp Atterbury Utilizing Separate Modes Of Transportation Or Will Mass Transit For The Rps Meet The Requirements? answer: No, They Can Use Mass Transportation. 6. Does The Government Have A Process For Gaining Entry To Camp Atterbury For Rps Who Do Not Carry Retired Military Id Cards? answer: Yes, They Will Be Provided The Base Access Form For Visitor Access. 7. Reference Pws 2.1.1: We Are Assuming 19 March Is A Typo And The Coordination Phase Is 9 March? With Time To Be Determined, Is It Safe To Assume The Rps Should Travel On 8 March, In Order To Be Present On 9 March As Early As The Government Desires? answer: The Rps Must Be Present On The 9th For The Start Of The Training. Travel Day Before Might Be Required If They Require To Travel Outside. 8. Reference Pws 1.4: Is 20 March Considered A Training/workday Or Is It Considered A Travel Day? answer: Training Day. 9. Does The Government Desire To Have A Program Manager Present On Site During The Entire Execution? answer: No, But There Needs To Be A Site Lead Designated For Coordination. 10. Can The Program Manager (pm) Or Alternate Program Manager (apm) Be One Of The Role players? Can Both Pm And Apm Be Role Players Or Will The Duties Detract From The Rp Requirements? answer: Yes. 11. Will Any Of The Training Be Conducted In Austere Environments Or Combat Simulated Environments Where Cold Weather Gear And Personal Protective Equipment Be Required? answer: No. The Training Will Take Place In An Improved Area. 12. Will The Rps Be Required To Ride In Military Vehicles Or Aircraft? answer: No. 13. Will Any Of The Rps Be Required To Access Any Government Unclassified Or Classified Information Networks? answer: No. 14. Will The Rps Be Required To Have Contractor Supplied Digital Training Aids Such As Exercise Phones Or Other Technical Devices? answer: Yes, But At No Cost At The Government. 15. Are All Scenario Documents, Scenario Scripts And Background Scenario Documents Complete; Or Will The Rp Be Responsible For Completing Those Documents? answer: All The Documents Will Be Provided To The Rps By The Training Team. 16. According To Attachment 0001 - Pws, Section 1.4, The Period Of Performance Is From 3/9/2025 To 3/20/2025. Will The Government Require Personnel On Every Day Within This Period, Or Only On Weekdays (monday Through Friday)? answer: The Rps Will Be Required Every Day. 17. Pws Paragraph 1.4 States That The Period Of Performance In 3/9 To 3/20. However, Pws Paragraph 2.1.1. States Synch Meetings Begin On 3/19. Please Clarify Which Datesthe 14 Role Players Are Required To Support Training? answer: The Date In 2.1.1 Is An Error The Pop Is 9-20 March. 18. The Sam Post States: "technical Capability Will Be Evaluated To Determine The Likelihood That The Government’s Requirements In The Pws Can Be Achieved." Since This Is An Rfq And Not An Rfp, How Will The Government Determine That Offeror Can Meet The Pws Requirements? answer: The Government Will Review The Rfq Or Rfp Based On The Proposal Provided By The Contractor To Identify Which Contractor Has The Best Technical Capability. 19. Will A Technical Volume And Past Performance Be Evaluated By The Governmentif Submitted? answer: Only The Technical Volume Will Be Evaluated. 20. The Dd 254 Block 1.b Indicates Safeguarding At The Secret Level? Is This Correct? answer. Yes, Because Some Of The Training Material May Be Classified Up To Secret Levels. ----------------------------------------------------------------------------------------------------------------------------- 05 February 2025 amendment 0001 To Sam Notice Id “w15qkn-25-r-0028” the Purpose Of Amendment 0001 Is To Incorporates The Following Changes: changes To Attachment 0001 - Pws change The Date On The Performance Work Statement (pws) add Section 1.7 Travel In The Pws change The Date In Section 2.1.1 Of The Pws update Language In Section 2.3.2 Of The Pws delete Section 2.3.4 From The Pws (duplicate Language) And Update The Numbering Following The Deletion Of 2.3.4 uploaded Attachment 0001 – Pws 4feb2025 (with Revised Changes Above) changes To Attachment 0005 – Quote Template added Clin 0002 Travel**** changed The Service Contract Reporting Clin To 0003 ****clin 0002 Travel Has A Not To Exceed (nte) Amount. All Vendors Who Submit Travel For Role Players Cannot Propose Over The Nte Amount. uploaded Attachment 0005 – Quote Template 4feb2025 (with Revised Changes Above) ----------------------------------------------------------------------------------------------------------------------------- questions And Answers From03 February 2025 1. In The Pws, Thepop Is Listed As 9-20 March 2025. Para 2.1 States There Will Be 3 Phases: Coordination, Scenario Rehearsal, And Scenario Execution. But Para 2.1.1 States That The Coordination Date Will Be On 19 March 2025. -can The Government Confirm That Exact Days Of Each Of These 3 Phases? -and Also, Are All Role Players Required To Be Present For The Coordination/synch Days/phase? -and Also The Total Days Each Role Player Will Be Required To Be On Site? answer: The Role Players Just Need To Be Available Starting For Training On The 9th. The Coordination And Scenario Rehearsal Will Take Place During The Pop. 2. Regarding Para 2.3 Tasks, Can The Government Confirm If The Role Players Will Be Performingas The Interrogators Conducting Interrogations? Or Will They Be The Subjects Of The Interrogations? answer: They Will Be The Subjects. That Is A Typo, It Should Be Performing As Interrogatees Being Interrogated. 3. Are The Role Players Required To Have An Active Dod Security Clearance? If So, At What Level? answer: This Is In The Pws And The Dd254. All Must Have A Secret Clearance. 4. If The Role Players Are Required To Have A Clearance, Can The Government Confirmthat The Awardee Will Be Required To Have The Commensurate Dod Corporate Facility Clearance? answer: Yes, This Is A Far Requirement And A Security Requirement. 5. Will The Government Require A Separaterole Player Coordinator/site Lead To Be Present? Or Can This Role Be Performed By One Of The 14 Role Players? answer: It Can Be Performed By One Of The Role Players. 6. Will The Role Players All Require A Separate Means Of Transportation To Get To Exercise Venues? Or Will They All Be Working At One Location Of General Area? answer: It Will Be The Responsibility Of The Role Player To Get To The Training Area. There Is Only One Training Area. 7. Will The Role Players Be Required To Have Special Clothing? Ie. U.s. Or Foreign Military Uniforms, Or Foreign National Clothing? answer: No 8. Will The Government Consider Adding/providing A Travel Plug That All Bidders Would Use For Covering Travel, Lodging, Per Diem, Etc For Role Players And Coordinator? This Would Create A Level Playing Field For All Bidders And Would Better Ensure The Highest Quality Intelligence Role Players From Around The Country For The Government, By Taking The Travel Costs Out Of The Award Competition. answer: The Contractor Shall Provide The Costs Estimated To Meet The Pws In The Way They View Best Meets The Technical Requirement. If That Means A Contractor Needs To Submit For Travel Then They Should Submit For Travel. 9. Is The Governmentsponsoringthe Initialsecret Fcl Per The Dd254 In The Attachments Or Is It Assumed That The Contractor Will Have A Pre Establishedsecret Fcl Prior To Submission Of Their Proposal? answer: No, The Contract Shall Have Pre Established Secret Fcl Prior To Submission Of Proposals. ------------------------------------------------------------------------------------------------------------------------------------------------------------------------------ i) Introduction this Is A Combined Synopsis/solicitation For Commercial Products Or Commercial Services Prepared In Accordance With The Format In Federal Acquisition Regulation (far) Subpart 12.6, As Supplemented With Additional Information Included In This Notice. This Announcement Constitutes The Only Solicitation; Quotes Are Being Requested And A Written Solicitation Will Not Be Issued. the United States Army Contracting Command – New Jersey (acc-nj) Has Issued Solicitation W15qkn-25-r-0028 As An Invitation For A Request For Quotation (rfq), In Support Of The Military Intelligence Readiness Command (mirc), To Procure Multiple Role Players To Participate In A Government Training Exercise At Camp Atterbury, In, In Accordance With The Performance Work Statement (pws) (attachment 0001), Quality Assurance Plan (qasp) (attachment 0002), Exhibit A, Contract Data Requirements List (cdrl) (attachment 0003) And Dd254 (attachment 0004). the Number Of Role Players Required And The Period Of Performance Is As Follows: 14 Role Players At Camp Atterbury, In: 09 March 2025- 20 March 2025 this Action Is A Small-business Set-aside Solicited Under North American Industry Classification System (naics) Code 541990 – All Other Professional, Scientific, And Technical Services; Size Standard $19.5m. in Accordance With Far 52.212-2, The Government Intends To Make An Award To The Contractor Who Submits The Lowest Price Technically Acceptable (lpta) Quote And Deemed Responsive And Responsible By The Contracting Officer. Offeror Shall Meet The Requirements As Specified In This Solicitation And The Attached Pws. The Anticipated Award Will Be A Firm-fixed Price Contract. The Contracting Officer Reserves The Right To Make No Award Under This Solicitation. note: An Offeror That Is Receiving An Award Resulting From This Solicitation Shall Be Registered In The System For Award Management (sam) Prior To Contract Award (no Later Than 18 February 2025). To Register, Offerors May Log Onto: Sam.gov. ii) Instructions To Offerors (far 52.212-1 Applies To This Acquisition) any/all Questions Shall Be Submitted Via Email To Both The Contract Specialist At Colleen.m.paglio.civ@army.mil And The Contracting Officer At Angelica.m.merino.civ@army.mil No Later Than 10am Eastern Standard Time On 6 February 2025. all Quotes Shall Be Submitted Via Email To Both The Contract Specialist At Colleen.m.paglio.civ@army.mil And The Contracting Officer At Angelica.m.merino.civ@army.mil No Later Than 12pm Eastern Standard Time On 7 February 2025. offeror Quotes Shall Include The Following Information: technical: Offerors Shall Submit The Following Three Items: a Completed Quote Using The Provided Quote Template (attachment 0005) a Completed Copy Of The Provision At Far 52.212-3, Offeror Representations And Certifications – Commercial Products And Commercial Services dd254 (attachment 0004): Complete Blocks 6(a), 6(b), And 6(c). Also, If Applicable, Complete Blocks 7(a), 7(b), And 7(c). price: Offerors Shall Submit Pricing For Contract Line Item Number (clin) 0001 On The Quote Template (attachment 0005). In The Event There Is A Difference In Price Between The Total Of Clin 0001 And The Total Proposed Price, The Total Of Clin 0001 Will Be Considered The Total Proposed Price Used For Evaluation. it Is The Government’s Intent To Award Without Discussions. iii) Evaluation (far 52.212-2) the Government Intends To Award A Single Contract To An Offeror Whose Quote Is Determined To Be The Lowest Priced Technically Acceptable Based On The Following Evaluation Factors: technical – Technical Capability Will Be Evaluated To Determine The Likelihood That The Government’s Requirements In The Pws Can Be Achieved. price – Price Will Be Evaluated To Determine If The Offerors’ Proposed Price Is Fair, Reasonable, And Balanced Using Price Analysis Techniques In Accordance With The Guidelines In Far 15.404-1(b). all Non-priced Factors Will Be Evaluated On An “acceptable” Or “unacceptable” Basis. An Offeror Must Receive An “acceptable” Rating For All Non-price Factors To Be Considered For Award. technical Acceptable/unacceptable Ratings acceptable quote Clearly Meets The Minimum Requirements Of The Solicitation. unacceptable quote Does Not Clearly Meet The Minimum Requirements Of The Solicitation. a Written Notice Of Award Or Acceptance Of An Offer, Mailed Or Otherwise Furnished To The Successful Offeror Within The Time For An Acceptance Specified In The Offer, Shall Result In A Binding Contract Without Further Action By Either Party. Before The Offer’s Specified Expiration Time, The Government May Accept An Offer (or Part Of An Offer), Whether Or Not There Are Negotiations After Its Receipt, Unless A Written Notice Of Withdrawal Is Received Before Award. v) Contract Provisions/clauses this Solicitation Document And Incorporated Provisions/clauses Are Those In Effect Through Federal Acquisition Circular 2025-03/ far 52.212-4 – Contract Terms And Conditions-commercial Products And Commercial Services, And Far 52.212-5 – Contract Terms And Conditions Required To Implement Statuses Or Executive Orders – Commercial Products And Commercial Services Apply To This Acquisition. see Attachment 0005 For The List Of Applicable Provisions/clauses vi) Attachments: attachment 0001: Pws, Dated 23 January 2025 attachment 0002: Qasp, Dated 23 January 2025 attachment 0003: Exhibit A Cdrl attachment 0004: Dd254 attachment 0005: Quote Template attachment 0006: Provisions/clauses
Contact
Tender Id
W15QKN-25-R-0028Tender No
W15QKN-25-R-0028Tender Authority
DEPT OF THE ARMY USA ViewPurchaser Address
-Website
beta.sam.gov