Astm D Tenders

Astm D Tenders

DEPT OF THE NAVY USA Tender

Corrigendum : Closing Date Modified
United States
Description: Item Unique Identification And Valuation (jan 2023)|19|||||||||||||||||||| higher-level Contract Quality Requirement (navicp Review Feb 1991)(feb 1999)|1|see Specification Section C| inspection Of Supplies--fixed-price (aug 1996)|2||| inspection And Acceptance - Short Version|8|x||x|||||| wide Area Workflow Payment Instructions (jan 2023)|16|material - Invoice & Receiving Report (combo) Certifications - Stand-alone Receiving Report|material - Inspection & Acceptance At Source Certifications - Inspection At Destination & Acceptance At Other |tbd|n 00104|tbd|material-s4306a; Certifications-n39040|n50286|tbd|133.2|n/a|n/a|certifications - N39040|n/a|n/a|see Dd Form 1423|port_ptnh_wawf_notification@navy.mil| navy Use Of Abilityone Support Contractor - Release Of Offeror Information (3-18))|1|| warranty Of Supplies Of A Noncomplex Nature (june 2003)|6|one Year From The Date Of Delivery |one Year From The Date Of The Delivery ||||| warranty Of Data--basic (mar 2014)|2||| annual Representations And Certifications (mar 2023)|13|334220|1250|||||||||||| notice Of Priority Rating For National Defense, Emergency Perpardeness, And Enrgy Progam Use (april 2008))|2||x| closing Date Extended 1. The Resultant Award Of This Solicitation Will Be Issued Bilaterally, Requiring The Contractor's Written Acceptance Prior To Execution. 2. Any Contract/order Awarded As A Result Of This Solicitation Will Be A "do" Rated Order Certified For National Defense Use Under The Defense Priorities And Allocations System (dpas). See 52.211-14, Notice Of Priority Rating For National Defense, Emergency preparedness, And Energy Program Use. 3. Only Those Sources With An Acceptable Quality Assurance Manual Are Eligible For Award Under This Solicitation. The Navy Has Found From Past Experience That Quality Control Is Essential To Assure Personnel Safety In Critical Areas And To Provide For The Safe operation Of Submarines And Certain Systems On Surface Ships. See Wssterm Lz02. Vendors Submitting Quality Manuals Shall Submit Them To Jill.sabol@navy.mil. 4. All Contractual Documents (i.e. Contracts, Purchase Orders, Task Orders, Delivery Orders And Modifications) Related To The Instant Procurement Are Considered To Be "issued" By The Government When Copies Are Either Deposited In The Mail, Transmitted By facsimile, Or Sent By Other Electronic Commercemethods, Such As Email. The Government's Acceptance Of The Contractor's Proposal Constitutes Bilateral Agreement To "issue" Contractual Documents As Detailed Herein. 5. If Drawings Are Included In The Solicitation, Access Must Be Requested On The Individual Solicitation Page On Contract Opportunities Via The Government's Sam.gov Website. Include Your Cage Code In Your Request. 6. Unless Otherwise Stated On The Dd1423, Submission Of Dd1423 Certification Data (cdrls) Will Be On Or Before 20 Days Prior To The Material Delivery Date. Pnsy Review/acceptance Of Cdrls Shall Be 6 Working Days After Receipt Of Cdrls. Final Delivery Of Material will Be On Or Before Xxx Days After The Effective Date Of The Contract. \ 1. Scope 1.1 The Material Covered In This Contract/purchase Order Will Be Used In A Crucial Shipboard System. The Use Of Incorrect Or Defective Material Would Create A High Probability Of Failure Resulting In Serious Personnel Injury, Loss Of Life, Loss Of Vital shipboard Systems, Or Loss Of The Ship Itself. Therefore, The Material Has Been Designated As Special Emphasis Material (level I, Scope Of Certification, Or Quality Assured) And Special Control Procedures Are Invoked To Ensure Receipt Of Correct Material. 2. Applicable Documents 2.1 Order Of Precedence - In The Event Of A Conflict Between The Text Of This Contract/purchase Order And The References And/or Drawings Cited Herein, The Text Of This Contract/purchase Order Must Take Precedence. Nothing In This Contract/purchase Order, however, Must Supersede Applicable Laws And Regulations Unless A Specific Exemption Has Been Obtained. 2.2 Applicable Documents - The Document(s) Listed Below Form A Part Of This Contract/purchase Order Including Modifications Or Exclusions. 2.2.1 Specification Revisions - The Specification Revisions Listed Under "documents References" Below Are The Preferred Revision. Older And/or Newer R Evisions Are Acceptable When Listed Within Contract Support Library Reference Number Csd155 In Ecds (electric contractor Data Submission) At: Ht Tps://register.nslc.navy.mil/. This Is To Allow Contractors To Use Certain Acceptable Older Specification Revisions To Purge Their Existing Stock Of Material Certified To Those Older Revisions Or To Use Newer Specification revisions When Material Is Certified To Newly Released Revisions,without Requiring The Submittal Of Waiver/deviation Requests For Each Specification Revision On Every Contract. Revisions Of Specifications Reflecting Editorial And/or Re-approval (e.g. E2009, r2014, Etc.) Are Considered Inconsequential, But Are Acceptable When Their Revisions Are Listedwithin Csd155 Or Elsewhere Within This Contract. 2.2.2 Documents, Drawings, And Publications Supplied Are Listed Under "drawing Number". These Items Should Be Retained Until An Award Is Made. 2.2.3 "document References" Listed Below Must Be Obtained By The Contractor. Ordering Information Is Included As An Attachment To This Contract/purchase Order. drawing Data=7226178 |53711| D| |d|0001 | D|49998|0556734 document Ref Data=ansi/asq Z1.4 | | | |080101|a| | | document Ref Data=mil-std-792 | | |f |060519|a| | | document Ref Data=astm-d4976 | | |a |120801|a| | | document Ref Data=iso_9001 | | | |081115|a| | | document Ref Data=iso10012 | | | |030415|a| | | document Ref Data=iso/iec 17025 | | | |050515|a| | | document Ref Data=mil-i-45208 | | |a |810724|a| 1| | document Ref Data=mil-std-45662 | | |a |880801|a| | | document Ref Data=ansi/ncsl Z540.3 | | | |130326|a| | | 3. Requirements 3.1 ;the An/bps-15 Radar Mast Window Must Be In Accordance With Naval Sea Systems Command Drawing 7226178, Item 9, Except As Amplified Or Modified Herein.; 3.2 Material For Parts Requiring Certification - Quantitative Chemical And Mechanical Analysis Is Required For The Parts Listed Below Unless Specifically Stated Otherwise: part - ;window; material - ;(mechanicals Only) Hdpe, Group 2, Class 3 Or 4, Grades 1-5 Per Astm D4976 And Meeting The Mechanical Properties Cited In Note 12 On Drawing 7226178; 3.3 Navsea 0948-lp-045-7010 - Any Applicable Requirements Of Navships 4410.17,navsea 0948-lp-045-7010, Or 0948-045-7010 Which The Contractor Must Meet Are Included In This Contract/purchase Order. The Above Documents Are For Governmentuse Only. Further application Of The Above Documents Is Prohibited.prohibited. 3.3.1 Marking Of Material With A Material Designator Per The Drawing Is Also Prohibited, With The Exception Of Fasteners. Fasteners Must Be Marked With A Material Symbol/designator As Specified Elsewhere In This Contract. 3.4 Configuration Control - The Contractor Must Maintain The Total Equipment Baseline Configuration. For Items Of Proprietary Design, Contractor Drawings Showing The Latest Assembly Configuration Must Be Provided To The Government In Electronic (c4) Format. definitions Are Provided Elsewhere In The Contract/purchase Order. 3.4.1 Waivers/deviations - All Waivers And Deviations, Regardless Of Significance Or Classification Require Review And Approval By The Contracting Officer. Waivers And Deviations Must Be Designated As Critical, Major, Or Minor. The Contractor Must Provide A copy Of This Request To The Qar. Requests Must Include The Information Listed Below. A. A Complete Description Of The Contract Requirement Affected And The Nature Of The Waiver/deviation (non-conformance), Including A Classification Of Critical, Major, Or Minor. B. Number Of Units (and Serial/lot Numbers) To Be Delivered In This Configuration. C. Any Impacts To Logistics Support Elements (such As Software, Manuals, Spares, Tools, And Similar) Being Utilized By Government Personnel Or Impacts To The Operational Use Of The Product. D. Information About Remedial Action Being Taken To Prevent Reoccurrence Of The Non-conformance. 3.4.2 All Requests For Waivers/deviations On Navsup-wss Contracts Must Be Submitted Using The Ecds (electronic Contractor Data Submission) System At Https://register.nslc.navy.mil/ 3.4.3 Ecps - The Government Will Maintain Configuration Control And Change Authority For All Modifications Or Changes Affecting Form, Fit, Function, Or Interface Parameters Of The Equipment And Its Sub-assemblies. The Contractor Must Submit An Engineering change Proposal (ecp) For Any Class I Or Ii Changes That Impact The Equipment Covered By This Contract. Ecps Must Be Prepared In Contractor Format, And Must Include The Following Information: A. The Change Priority, Change Classification (class I Or Class Ii), And Change Justification. B. A Complete Description Of The Change To Be Made And The Need For That Change. C. A Complete Listing Of Other Configuration Items Impacted By The Proposed Change And A Description Of The Impact On Those Cis. D. Proposed Changes To Documents Controlled By The Government. E. Proposed Serial/lot Number Effectivities Of Units To Be Produced In, Or Retrofitted To, The Proposed Configuration. F. Recommendations About The Way A Retrofit Should Be Accomplished. G. Impacts To Any Logistics Support Elements (such As Software, Manuals, Spares, Tools, And Similar) Being Utilized By Government Personnel In Support Of The Product. H. Impacts To The Operational Use Of The Product. I. Complete Estimated Life-cycle Cost Impact Of The Proposed Change. J. Milestones Relating To The Processing And Implementation Of The Engineering Change. 3.5 Mercury Free - Mercury And Mercury Containing Compounds Must Not Be Intentionally Added Or Come In Direct Contact With Hardware Or Supplies Furnished Under This Contract. Mercury Contamination Of The Material Will Be Cause For Rejection. 3.6 Certificate Of Compliance - (special Emphasis Material) The Contractor Must Prepare And Submit A Certificate Of Compliance Certifying That The Items/components Furnished Under This Contract Comply With The Requirements Of The Procurement Document, including Any/all Invoked Specifications And Drawings. ^ Quality Assurance Requirements ^ 3.7 Quality System Requirements - The Contractor Furnishing Items Under This Contract/purchase Order Must Provide And Maintain A Quality System In Accordance With Iso-9001 As Amplified Or Modified Herein, With The Calibration System Requirements Of Iso-10012 or Ansi-z540.3 With Iso-17025. A Quality System In Accordance With Mil-i-45208, With The Calibration System Requirements Of Mil-std-4 3.7.1 The Contractor's Quality System And Products Supplied Under The System Are Subject To Evaluation, Verification Inspection, And Acceptance/nonacceptance By The Government Representative To Determine The System's Effectiveness In Meeting The Quality requirements Established In The Contract/purchase Order. 3.7.2 The Contractor's Quality System Must Be Documented And Must Be Available For Review By The Contracting Officer Or His Representative Prior To Initiation Of Production And Throughout The Life Of The Contract. The Prime Contractor Must, Upon notification, Make His Facilities Available For Audit By The Contracting Officer Or His Authorized Representative. 3.7.3 See Cdrl Di-qcic-81110 (inspection System Procedures) - All Suppliers Of Level I/subsafe (li/ss) Material Are Required To Submit A Copy Of Their Current Documented Quality System Procedures To The Procurement Contracting Officer (pco) Prior To Award Of any Contract/purchase Order. Suppliers That Have A Copy Of Their Current Quality System Procedures On File At The Procuring Activity May Request The Pco Waive This Requirement. 3.7.4 This Contract Provides For The Performance Of Government Quality Assurance At Source. The Place Or Places Of Performance May Not Be Changed Without The Authorization Of The Procurement Contracting Officer. Upon Receipt Of This Order, Promptly Notify the Government Representative Who Normally Services Your Plant So That Appropriate Planning For Government Inspection Can Be Accomplished. If You Do Not Have An Assigned Government Representative, Notify The Nearest Defense Contract Management Agency (dcma) office. In The Event That A Local Government Representative Or Dcma Office Cannot Be Located, Our Purchasing Agent Should Be Notified Immediately. 3.7.5 Any Changes Made By The Contractor To A Qualified Quality System Will Require Re-submittal To The Pco And Concurrence By The Government Quality Assurance Representative Prior To Adoption. 3.8 Contractor Inspection Requirements - The Contractor Must Maintain Adequate Records Of All Inspections And Tests. The Records Must Indicate The Nature And Number Of Observations Made, The Number And Type Of Deficiencies Found, The Quantities Approved And rejected And The Nature Of Corrective Action Taken As Appropriate. Inspection Records Must Be Traceable To The Material Inspected. 3.8.1 The Supplier's Gages, Measuring And Test Equipment Must Be Made Available For Use By The Government Representative When Required To Determine Conformance With Contract Requirements. When Conditions Warrant, The Supplier's Personnel Must Be Made available For Operations Of Such Devices And For Verification Of Their Accuracy And Condition. 3.8.2 All Documents And Reference Data Applicable To This Contract Must Be Available For Review By The Government Representative. Copies Of Documents Required For Government Inspection Purposes Must Be Furnished In Accordance With The Instructions Provided by The Government Representative. 3.9 Subcontractor Inspection Requirements - The Government Has The Right To Inspect At Source, Any Supplies Or Services That Were Not Manufactured Or Performed Within The Contractor's Facility. Such Inspection Can Only Be Requested By Or Under Authorization of The Government Representative. Any Purchasing Documents To A Subcontractor Must Cite The Applicable Portions Of The Contractually Invoked Quality System (e.g. Calibration Requirements), Plus Any Product Requirements That Apply To The Supplies Being purchased. When The Government Elects To Perform Source Inspection At The Subcontractor's Facility, Applicable Purchase Documents Must Be Annotated With The Following Statement: "a Government Inspection Is Required Prior To Shipment From Your Plant. Upon receipt Of This Order, Promptly Notify The Government Representative Who Normally Services Your Plant So That Appropriate Planning For Government Inspection Can Be Accomplished. If You Do Not Have An Assigned Government Representative, Notify The Nearest defense Contract Management Agency (dcma) Office. In The Event That A Local Government Representative Or Dcma Office Cannot Be Located, Our Purchasing Agent Should Be Notified Immediately." 3.9.1 The Prime Contractor's Program Must Include Procedures To Assess The Capability Of The Prospective Suppliers To Produce The Products Or Supply The Services In Accordance With The Contract, Prior To The Issuance Of Any Purchase Document. 3.9.2 Each Sub-tier Supplier Of Material Or Services For Items In Section 3 Of This Contract Must Be Subjected To A Periodic Review Or Audit By The Prime To Determine The Continued Capability Of The Supplier To Control The Quality Of The Products Or Services specified In The Purchase Order Or Contract. 3.9.3 The Prime Contractor Must Ensure That The Purchased Product Conformsto Specified Purchase Requirements And This Contract. The Type And Extent Of Control Applied To The Supplier And The Purchased Product Must Be Dependent Upon The Effect Of The purchased Product On The End Item Represented By This Contract. 3.9.4 The Prime Contractor Must Evaluate The Requirements Of The Contractand Select Suppliers Based On Their Ability To Supply The Product In Accordance With The Prime Contractor's Requirements And The Contract. Criteria For Selection And Evaluation Must Be established. Records Of This Effort Must Be Available For Review By The Government. 3.9.5 The Prime Contractor's Supplier Quality Assurance Program Must Provide For A Review Of Purchase Documents To Assure Applicable Quality Requirements Are Included Or Referenced In The Documentation For Compliance By The Supplier. 3.10 Government Furnished Material And/or Equipment (gfm/gfe) - When Material Or Equipment Is Furnished By The Government, The Contractor Must Develop Documented Control Procedures That Require At Least The Following: 3.10.1 Visual Examination Upon Receipt To Detect Damage During Transit. 3.10.2 Inspection For Completeness And Proper Type. 3.10.3 Verification Of Material Quality Received. 3.10.4 Periodic Inspection And Precautions To Assure Adequate Storage Conditions And To Guard Against Damage From Handling And Deterioration During Storage. 3.10.5 Functional Testing, Either Prior To Or After Installation, Or Both, As Required By The Contract To Determine Satisfactory Operation. 3.10.6 Identification And Protection From Improper Use Or Disposition. 3.10.7 Reporting To The Government, Any Gfm Or Gfe Property Found Damaged, Malfunctioning, Or Otherwise Unsuitable For Use. In The Event Of Damage Or Malfunction During Or After Installation, The Supplier Must Determine And Record Probable Cause And necessity For Withholding The Material From Use. 3.10.8 For Gfe Material, And As Required By The Terms Of The Bailment Agreement, The Supplier Must Establish Procedures For Adequate Storage, Maintenance, And Inspection Of Bailed Government Material. Records Of All Inspection And Maintenance Performed On bailed Property Must Be Maintained. 3.10.9 Material Returned To The Contractor Must Be Handled As Gfm. 3.11 Traceability And Certification Requirements - To Assure That Correct Materials Are Installed In Level I/subsafe Systems, It Is Imperative That Traceability Be Maintained From The Material To The Material Certification Test Report And Other Required objective Quality Evidence (oqe). The Material Certification Report Must Completely And Accurately Reflect That The Material Supplied Meets The Specified Requirements. Materials Requiring Traceability And Certification Data Are Identified Within Paragraph 3, section C Of This Contract/purchase Order. 3.11.1 The Following Provides The Minimum Requirements For Maintaining Material Traceability And Supplements The Requirements Specified In Di-misc-81020 And Elsewhere In The Contract/purchase Order. The Contractor Must Develop Written Procedures That implement The Material Control Requirements Stated Herein And Elsewhere In This Contract/purchase Order. 3.12 Material Traceability - The Certification Data Report Must Be Identified Through A Unique Traceability Number, Heat-lot Number, Or Heat-treat Number, As Applicable, Which Must Also Be Marked On The Material. This Traceability Marking On The Material Must provide Direct Traceability To The Material's Chemical Composition And Mechanical Properties Certification Data. For Material Produced By Batch, Continuous Cast, Or Continuous Pour Processes, Samples Must Be Taken No Less Than Once In Every Eight Hours Of operation For The Purpose Of Validating Proper Chemical Composition And Mechanical Properties. Traceability Must Be Maintained Through All Process Operations Including Any Subcontracted Operations, To The Finished Component. 3.12.1 Material Marking For Traceability And Identification - The Following Are The Minimum Marking Requirements. Additional/alternate Marking Requirements, If Applicable, Will Be Specified Elsewhere In The Contract/purchase Order. In Addition To The marking Requirements On Applicable Drawings And/or Specifications, Marking For Traceability Is Required. All Traceability Markings Must Be Permanently Applied In Accordance With Mil-std-792 (except As Specified Below). An Alternate Marking Method Is permissible Provided It Is An Available Option In The Contractually Invoked Specification Or Drawing, Except In Instances Where The Material Has Been Modified By This Contract/purchase Order And Differs From That Specified In The Specification Or Drawing. 3.12.2 Traceability Markings For Items With Precision Machined Or Plated Surfaces, Or Material With Suitable Marking Surface Areas Less Than 3/8 Inches Square (either 3/8" X 3/8" Or An Area Equal To 0.1406 Inches Square) Must Be Applied To A Durable Tag And the Tag Securely Affixed To The Material. 3.12.3 Marking Must Be Legible And Must Be Located So As To Not Affect The Form, Fit, And Function Of The Material. ; ; 3.13 See Cdrl Di-misc-81020 (chemical And Mechanical) - Material Certification - In Addition To The Certification Data Requirements Specified In Di-misc-81020, The Following Material Certification Requirements Apply: 3.13.1 Quantitative Chemical And Mechanical Analysis Of Material Traceable To Traceability Markings Is Required. Material Certification Test Reports Must Include The Class, Form, Condition, Grade, Type, Finish, And/or Composition, As Applicable, Of The material Supplied. 3.13.2 Re-identification And Re-certification Of Material Is Required When The Material Is Subjected To A Process Which Alters It's Properties. If The Starting Material Or Raw Stock Is Processed In A Manner That Will Not Affect Its Chemical Composition Or mechanical Properties, The Original Certifications For The Chemical Composition And Mechanical Properties, As Required By The Material Specification, Are Acceptable. Re-certification Of The Chemical Or Mechanical Properties Is Required If A Process Is Used during Fabrication That Alters The Original Properties Of The Material (e.g. Alloying, Heat Treating, Or Forming). In These Instances, The Properties Of The Material Must Be Re-determined And Documented To Reflect The Altered Condition. The Altered Material must Be Uniquely Re-identified. The Properties Thus Determined And Documented, Are Required For Final Certification And Must Conform To The Material Specification Or The Contract/purchase Order Requirements. When Only The Mechanical Properties Are Altered, The original Certification Forchemical Composition Must Be Overstamped And Annotated With The Unique Traceability Marking Used With The Altered Material And At A Minimum Contain The Information Below. traceability Marking ________________________________________________ (marking On Finished Item) is Fabricated From Raw Material Identified To heat/lot Number ______________ And Heat Treat Number ____________________ (when Applicable) _________________________________________ Date _____________________ (name And Signature Of Auth. Co. Rep.) 3.13.3 Material Certification Data Forwarded By The Manufacturer Must Contain A Signed Certification That The Report Results Represent The Actual Attributes Of The Material Furnished And Indicate Full Compliance With All Applicable Specification And contract Requirements. Transcription Of Certification Data Is Prohibited. 3.13.4 Statements On Material Certification Documents Must Be Positive And Unqualified. Disclaimers Such As "to The Best Of Our Knowledge" Or "we Believe The Information Contained Herein Is True" Are Not Acceptable. 3.13.5 If Material Is Received Without The Required Certification Papers Or With Incorrect/missing Data On The Certification Papers, The Material Will Be Rejected. 3.14 Material Handling - The Written Material Control Process Must Include The Following: 3.14.1 All Raw Materials Must Have Traceability Markings (except As Specified Below). 3.14.2 Stored Raw Materials Requiring Traceability Must Be Segregated To Preclude Intermingling With Materials Not Requiring Traceability. 3.14.3 When Traceability Markings Will Be Removed By A Manufacturing Or Fabrication Process, The Marking Must Be Recorded Prior To Removal And Be Immediately Restored Upon Completion Of The Process. If This Cannot Be Done Or Is Impractical, An Appropriate material Control Procedure (such As A Bag And Tag, Tagging, And/or Tote Box Control) Must Be Employed. The Material Control Procedure Must Provide A Method Of Positive Control To Preclude Commingling Of Heats/lots Or Loss Of Traceability. The Traceability marking Must Be Reapplied Upon Completion Of The Final Manufacturing Process. 3.14.4 Brazing Or Weld Filler Metals For Strength Welds Forming Or Integral With Pressure Containing Components Or Assemblies Requiring Traceability Must Be Verified To Be The Correct Material, And Type Or Grade, As Applicable, Prior To Consumption. At A minimum, Material Verification Must Consist Of Inspection Of Material Test Reports For Conformance To Specified Requirements. Control Of Welding And Brazing Filler Metals Must Be Maintained To The Point Of Consumption To Assure Use Of The Correct Type And grade. Markings And Traceability Requirements Do Not Apply To Brazing And Weld Filler Metals After Consumption. It Is The Responsibility Of The Prime Contractor To Ensure Conformance With The Above Requirements On Welds Performed By Their Subcontractors. 3.14.5 Purchase Orders For Raw Material Must Specify That The Material Be Traceable To Material Certification Test Reports By Traceability Markings On The Material And Identified On The Test Reports. The Certification Data Requirements Contained In di-misc-81020 Must Be Invoked By The Prime Contractor On All Subcontractors Supplying Level I Material. 3.14.6 The Material Control Process Must Include Requirements For The Maintenance Of Traceability For Items Sent Out For Subcontracted Operations. If Such Operations Would Remove Traceability Markings, Purchase Or Work Orders Must Specify A Method And Marking location For Remarking. The Contractor Must Also Ensure That Subcontractor Production Controls Are Adequate To Preclude Commingling Of Materials During Processing. 3.15 Receiving Inspection - 3.15.1 Products And Services Produced By Sub-tier Suppliers For Incorporation In The Contract End Item Must Be Subject To Inspection Or Audit At The Time Of Receipt By The Prime Prior To Further Processing Within The Prime Contractor's Plant Or Shipment To another Location. 3.15.2 Receiving Inspection Must Include As A Minimum - verification That The Traceability Marking On The Material Agrees With That On The Certification Test Reports. verification That Certification Test Reports Are Legible And Complete. verification That The Contents Of The Certification Test Reports Are In Compliance With The Contractually Invoked Specifications And Requirements. 3.16 Discrepancy Reporting - 3.16.1 Nonconforming Products From Sub-tier Suppliers Must Be Identified And Processed In Accordance With The Prime Contractor's Procedures For Controlling Nonconforming Products. The Prime Contractor Must Report The Receipt Of Any Nonconforming Products To the Responsible Sub-tier Supplier In Accordance With Established Procedures. Nonconforming Material Records Must Be Maintained And Available For Review By The Government Quality Assurance Representative (qar). 3.17 Final Inspection - The Following Inspections Must Be Performed Prior To Government Inspection And Acceptance. 3.17.1 Material Sampling - Material Must Be Inspected For Form, Fit, And Function. Lot Acceptance Must Be Based On Zero Defects And Lot Rejection Based On One Defect. The Sample Size Must Be In Accordance With The Sampling Plan(s) In The Applicable Military specification Or Standard, Federal Specification Or Standard, Or Drawing To Which The Material Was Manufactured. In The Absence Of Such Sampling Plans, Sampling Inspection Must Be Per Ansi/asq-z1.4, General Inspection Level Ii (for Sample Size Selection Code), table Iia (for Sample Size). small Lot Sizes - For Lot Sizes Of Fifty Or Less, The Minimum Sample Size Must Be Eight Units. For Lot Sizes Of Eight Or Less, The Sample Size Must Be One Hundred Percent Of The Lot. 3.17.2 The Manufacturer May Elect To Use Statistical Process Control (spc) To Assure Product Quality In Lieu Of The Above Attribute Sampling Plan, Provided That The Spc Methodology/system Used Provides Acceptable Products To The Government. However, The government/navy Receipt Inspection Activity May Perform Their Acceptance Inspection Of The Material Using The Attribute Sampling Plan Outlined Above. 3.17.3 All Data Concerning Material Verification (chemical, Mechanical Or Physical Properties), Traceability (material Certifications To Material Marking), And Nondestructive Test (ndt) Certifications For Material Must Be 100% Inspected. The Certification test Reports Must Also Be 100% Inspected For Completeness And Legibility. 3.17.4 All Material Requiring Traceability Must Be 100% Inspected For Traceability Marking And That The Marking Is Legible. 3.18 See Cdrl Di-misc-80678 (special Emphasis C Of C) - The Certificate Of Compliance Must Show Traceability To The Marking Applied On Each Individual Item, And Must Contain The Following Information: 1. Contractor's Name, Address And Date. 2. The Contract/purchase Order Number (for Example: N00104-11-p-fa12) 3. The National Stock Number (nsn). The 18 Character National Stock Number For Special Emphasis Material Includes The Two Digit Cog, The Four Digit Fsc, The 9 Digit Niin, And The Two Digit Smic (for Example: 1h 4820 012345678 L1) ("n/a" When Not Applicable). 4. Lubricants, Sealants, Anti-seize, And/or Thread Locking Compounds ("n/a" When Not Applicable). 5. Certification That O-rings, Packing, Gaskets, Or Other Elastomeric Products Were Installed In A Compressed State Within An Assembly Or Sub-assembly, Prior To Expiration Of The Shelf Life ("n/a" When Not Applicable). 6. Manufacturer's Compound Number ("n/a" When Not Applicable). 7. When Weld Procedure Submittal Is Required By The Contract, A Statement That The Approval Date Of The Qualification Data Precedes Any Production Or Repair Welding Performed On This Contract. ("n/a" When Not Applicable). 8. A Statement To The Effect That All Items Furnished On This Contract Are In Full Compliance With The Specifications And Requirements And List Each Contractually Invoked Conformance/compliance Test Performed By Name And That It Was Performed satisfactorily. 9. Contractor's Or Authorized Personnel's Signature. 4. Quality Assurance 4.1 Notes To Dcma Qar And The Contractor - 4.1.1 Dcma Qar And The Contractor For Proprietary Designs - Departures From Contractor Imposed Requirements, Not Specifically Covered By The Contract, Must Be Judged Individually On The Basis Of The Effect, If Any, On Contractual Requirements. When There Is A disagreement Between The Contractor And The Government Representative As To The Effect On Contractual Requirements, The Departure Must Be Considered A Nonconformance And Be Submitted To The Pco For Disposition. 4.1.2 Dcma Qar And The Contractor For Proprietary Designs - All Records Of Departures From Contractor Imposed Requirements Must Be Maintained And Available For Review At The Contractor's Facility. A Copy Must Be Given To The Local Government Representative. A record Of These Departures, Traceable To The Applicablepart Number And Contract Number Must Be Submitted To The Pco. 4.1.3 Dcma Qar And The Contractor For Proprietary Designs - For Proprietary Designs, The Contractor's Part Numbers Are Acceptable For Reference Only. The Delivered Material Must Conform To All Drawings, Specifications, And Other Contractual Requirements. 4.1.4 Dcma Qar - It Is The Responsibility Of Dcma Qar To Review Non-destructive Testing (ndt) Procedures For Navsup Contracts/purchase Orders. 4.1.5 Dcma Qar And The Contractor - The Ecds (electronic Contractor Data Submission) System Is Available For Certain Data Submissions And To Submit Questions And Clarifications, And Waiver Requests On Contracts And Solicitations. Ecds Can Be Found At: https://register.nslc.navy.mil/ 5. Packaging 5.1 Preservation, Packaging, Packing And Marking - Preservation, Packaging, Packing And Marking Must Be In Accordance With The Contract/purchase Order Schedule And As Specified Below. mil-std 2073 Packaging Applies As Found Elsewhere In The Schedule 6. Notes 6.1 Several Definitions Of Terms That Apply To Csi Items Are Listed Below. All Terms May Not Apply To Every Item. 6.1.1 The Ecds (electronic Contractor Data Submission) System Is At: Https://register.nslc.navy.mil/ This Application Will Require Advance Registration Using A Pki Digital Certificate On A Cac. A Vendor User Guide Is Available As Csd001 In The Csd (contract Support Document) Library Within Ecds. 6.1.2 Critical Safety Item (csi) - Any Ship Part, Assembly, Or Support Equipment Containing A Critical Characteristic Whose Failure, Malfunction, Or Absence Of Which Could Cause A Catastrophic Or Critical Failure Resulting In Loss Of, Or Serious Damage To The ship, Or Unacceptable Risk Of Personal Injury Or Loss Of Life. 6.1.3 Critical Process - As Determined By The Twh, Any Process, Operation Or Action Performed On A Ship Csi That Serves To Establish A Critical Characteristic (such As Welding, Soldering, Machining, Polishing, Cleaning, Or Assembling) Or Confirm That A critical Characteristic Is Within Drawing Or Specification Compliance (such As, Testing, Measurement, Or Non-destructive Evaluation). 6.1.4 First Article - Pre-production Models, Initial Product Samples, Test Samples Produced To Ensure A Manufacturer's Capability To Meet Full Specification Requirements. 6.1.5 First Article Test (fat) - Contractually Required Testing And Inspection Of A Supplier's Pre-production, Production, Or "production Representative" Specimens To Evaluate A Manufacturer's Ability To Produce Conforming Product Prior To The Government's commitment To Receive Subsequent Production Items. First Article Testing Is Product Specific And Does Not Assess Manufacturing Process Controls Nor Does It Assure The Effectiveness Of The Manufacturer's Quality Program. 6.1.6 Government Source Inspection (gsi) - Gsi Is Independent Oversight Performed By A Government Representative Usually A Dcma Quality Assurance Representative (qar)) To Assure That Those Unique Product Quality And System Elements, Identified By The contracting Agency As Important, Are Observed And Evaluated. 6.1.7 Quality Assurance Letter Of Instruction (qali) - A Qali Is A Formal Document Initiated By A Contracting Activity That Provides Essential Requirements And Instructions For Contracted Materials To Be Independently Verified And Accepted By A Government representative Prior To Shipment. 6.1.8 Objective Quality Evidence (oqe) - The Quantitative And Qualitative Data Of All Mechanical, Chemical, And Performance Tests Performed (as Required By The Applicable Specification, Drawing, Or Purchase Document) To Prove That The Material Supplied conforms To The Specified Requirements. 6.1.9 Surface Discontinuity - Any Surface Irregularity, Marking, Or Localized Change In Physical Character Of The Surface, Other Than Dimensional, That Exists Infrequently At One Or Several Places. (examples: Burrs, Dents, Nicks, Scratches, Gouges, Pits, center-punches, Scribes, And Tool Marks) Surface Discontinuities Less Than 0.005-inch In Depth Are Acceptable Provided They Do Not Violate Any Other Design Requirements Specified In This Contract/purchase Order. 6.1.10 Traceability Code - A Code Or Number Providing Traceability To The Actual Chemical And Mechanical Properties Of The Specified Heat, Batch, Or Form From Which The Material Originated. 6.1.11 Verification - An Examination Performed To Determine Compliance With A Specific Requirement. 6.1.12 Nonconformance - A Nonconformance Is Defined As Affecting Or Violating The Following: - The Requirements Of This Contract/purchase Order. - Contractually Invoked Drawings (i.e. Envelope Dimensions, Interface Dimensions With Mating Parts/equipment, Center Of Gravity, Weights, Piece Part Identification, Material, Etc.). - Contractually Invoked Federal, Military, Or Commercial Specifications And/or Standards. - Form, Fit, Function, Performance To Contract Requirements, Reliability, Maintainability, Interchangeability, Safety Of Personnel Or Equipment, Or Additional Cost To The Government. 6.1.13 Waiver - A Written Authorization To Accept An Item, Which During Manufacture, Or After Having Been Submitted For Government Inspection Or Acceptance, Is Found To Depart From Specified Requirements, But Nevertheless Is Considered Suitable For Use As Is or After Repair By An Approved Method. 6.1.14 Deviation - A Specific Written Authorization (granted Prior To The Manufacture Of An Item) To Depart From A Particular Requirement(s) Of An Item's Current Approved Configuration Documentation For A Specific Number Of Units Or A Specified Period Of time, And To Accept An Item Which Is Found To Depart From Specified Requirements, But Nevertheless Is Considered Suitable For Use "as Is" Or After Repair By An Approved Method. 6.1.15 Critical Waiver/deviation - This Waiver/deviation Consists Of A Departure Involving Safety. 6.1.16 Major Waiver/deviation - This Waiver/deviation Consists Of A Departure Involving: - Performance - Interchangeability, Reliability, Survivability, Maintainability, Or Durability Of The Item Or Its Repair Parts - Health Or Safety - Effective Use Or Operation - Weight, Stability, Or Structural Integrity - System Design Parameters As Schematics, Flows, Pressures Or Temperatures - Compartment Arrangements Or Assigned Function 6.1.17 Minor Waiver/deviation - This Waiver/deviation Consists Of A Departure Which Does Not Involve Any Of The Factors Listed As Critical Or Major. 6.1.18 Engineering Change (ec) - A Change To The Current Approved Configuration Documentation Of A Configuration Item At Any Point In The Life Cycle Of The Item. 6.1.19 Engineering Change Proposal (ecp) - A Proposed Engineering Change And The Documentation By Which The Change Is Described, Justified, And Submitted To The Government For Approval Or Disapproval. 6.1.20 Class I Ecp - A Class I Ecp Is Approved By The Government's Configuration Control Board And Authorized With A Contract Modification. 6.1.21 Class Ii Ecp - A Class Ii Change Is Typically Reviewed For Concurrence In Classification By The Local Government Representative, Unless Otherwise Specified Elsewhere In The Contract/purchase Order. 6.2 In Accordance With Opnavinst 5510.1 All Documents And Drawings Provided By The U.s. Navy To Perspective Contractors Must Include A "distribution Statement" To Inform The Contractor Of The Limits Of Distribution, And The Safeguarding Of The Information contained On Those Documents And Drawings. 6.2.1 There Are 7 (seven) Separate Distribution Statement Codes Used For Non-classified Documents And Drawings. The Definition For Each Is As Follows: a... Approved For Public Release; Distribution Is Unlimited. b... Distribution Authorized To Us Governments Agencies Only. c... Distribution Authorized To Us Government Agencies And Their Contractors. d... Distribution Authorized To Dod And Dod Contractors Only. e... Distribution Authorized To Dod Components Only. f... Further Distribution Only As Directed By Commander, Naval Sea Systems Command, Code 09t. x... Distribution Is Authorized To Us Government Agencies And Private Individuals Or Enterprises Eligible To Obtain Export Controlled Technical Data In Accordance With Opnavinst 5510.161. 6.3 Ordering Information For Document References - The Department Of Defense Single Stock Point (dodssp), Website Http://www.dsp.dla.mil/, Provides Product Information For The Department Of Defense Index Of Specifications And Standards (dodiss) (i.e.military/federal Specifications And Standards), Data Item Descriptions (dids), And Other Dodssp Products. Most Specifications Can Obtained Directly From Http://quicksearch.dla.mil/ a. Availability Of Cancelled Documents - The Dodssp Offers Cancelled Documentsthat Are Required By Private Industry In Fulfillment Of Contractual Obligationsin Paper Format. Documents Can Be Requested By Phoning The Subscription Services Desk. b. Commercial Specifications, Standards, And Descriptions - These Specifications, Standards And Descriptions Are Not Available From Government Sources. Theymay Be Obtained From The Publishers Of The Applicable Societies. c. Ordnance Standards (os), Weapons Specifications (ws), And Navord Ostd 600 Pages - These Type Publications May Be Obtained By Submitting A Request To: commander, Indian Head Division, Naval Surface Warfare Center code 8410p, 101 Strauss Avenue indian Head, Md 20640-5035 d. On Post-award Actions, Requests For "official Use Only" And "noforn" (not Releasable To Foreign Nationals) Documents Must Identify The Government Contractnumber, And Must Be Submitted Via The Cognizant Defense Contract Management Command (dcmc) For certification Of Need For The Document. On Pre-award Actions Such Requests Must Be Submitted To The Pco For Certification Of Need For The Document. e. Noforn Military Specifications And Standards (including Amendments, Change Notices And Supplements, But Not Interim Changes) To Be Ordered From: contracting Officer navsup-wss code 87321 5450 Carlisle Pike p.o. Box 2020 mechanicsburg, Pa. 17055-0788 f. Nuclear Reactor Publications Assigned Navsea Documents And Identification Numbers (i.e. Navsea Welding Standard, Navsea 250-1500-1) Are To Be Ordered Enue: commanding Officer navsup-wss code 009 5450 Carlisle Pike p.o. Box 2020 mechanicsburg, Pa. 17055-0788 g. Technical Manuals Assigned Navsea Identification Numbers (i.e. Navsea Welding And Brazing Procedure, Navsea S9074-aq-gib-010/248) Are To Be Ordered From: commanding Officer navsup-wss code 1 Support Branch 700 Robbins Avenue philadelphia, Pa. 19111-5094 h. Interim Changes And Classified Specifications Must Be Obtained By Submitting A Request On Dd Form 1425 To Navsup-wss. 6.4 Recent Updates - A Short Description Of Recent Updates To The Technical Requirements Of This Item Are Listed Below, Along With An Implementation Date For Each Issue. The Notes Below Are Only A Generic Quick Reference And Are Provided For Convenience only, Detailed Requirements Will Be Defined Elsewhere In The Technical Sections Of This Contract/purchase Order. ;10/20/2016 - Updated Ecds Url - Dec 17 2011 - Began Using Ecds For Submissions - Jan 05 2012 - Added Wawf To Forward Approved Waivers/deviations With Final Oqe - Dec 17 2011 - Moved Quality Assurance Text Location For Readability - Apr 15 2009 - Clarified The Sample Size For Large And Small Lot Sizes - Jan 19 2011 - Added Notification Of Dcma Upon Contract Award - May 02 2009 - Added Lubricants And Sealants To The C Of C - Aug 27 2014 - Took Out Contractor's Phone Number Requirement - Dec 01 2011 - Moved "notes To Dcma Qar" To Qa Section - Jan 5 2017 - Ecds/csd Info Was Added To Definitions In The Notes Section.; date Of First Submission=asreq paragraph 10.4 Of Di-qcic-81110 Does Not Apply. date Of First Submission=asreq block 12 - Certification Data Must Be Submitted To Portsmouth Naval Shipyard For Review And Acceptance Prior To Each Shipment Of Material. Certification Documentation Must Be Submitted Via Wawf (wide Area Work Flow). enter In Wawf As Follows: "ship To" N50286 "inspect By" N39040 "accept By" N39040 and Email Notification Field: Port_ptnh_wawf_notification@navy.mil no Material Is To Be Shipped Prior To The Receipt Of Acceptance. date Of First Submission=asreq block 4 - Paragraphs 10.2.1, 10.2.2, 10.2.3, 10.3, And 10.4 Of Di-misc-80678 Do Not Apply. block 12 - Certification Data Must Be Submitted To Portsmouth Naval Shipyard For Review And Acceptance Prior To Each Shipment Of Material. Certification Documentation Must Be Submitted Via Wawf (wide Area Work Flow). enter In Wawf As Follows: "ship To" N50286 "inspect By" N39040 "accept By" N39040 and Email Notification Field: Port_ptnh_wawf_notification@navy.mil no Material Is To Be Shipped Prior To The Receipt Of Acceptance.
Closing Date12 Feb 2024
Tender AmountRefer Documents 

DEPT OF THE NAVY USA Tender

Chemical Products
United States
Description: Contact Information|4|n743.5|tbd|7176053229|joel.j.curtis.civ@us.navy.mil| item Unique Identification And Valuation (jan 2023)|19|||||||||||||||||||| higher-level Contract Quality Requirement (navicp Review Feb 1991)(feb 1999)|1|see Specification Sections C And E.| inspection Of Supplies--fixed-price (aug 1996)|2||| general Information-fob-destination|1|b| wide Area Workflow Payment Instructions (jan 2023)|16|stand-alone Receiving Report - Certifications Combo - Receiving Report & Invoice - Material |na|tbd|n00104|tbd|n39040 - Certifications, S4306a - Material |n50286|tbd|133.2|na|na|n39040 - Certifications|na|na|s ee Dd 1423|port_ptnh_wawf_notification@navy.mil| navy Use Of Abilityone Support Contractor - Release Of Offeror Information (3-18))|1|| equal Opportunity (sep 2016)|2||| warranty Of Supplies Of A Noncomplex Nature (june 2003)|6|one Year From Date Of Delivery.|one Year From Date Of Delivery.||||| warranty Of Data--basic (mar 2014)|2||| buy American --free Trade Agreements--balance Of Payments Program - Basic (feb2024))|11|||||||||||| alternate A, Annual Representations And Certifications (nov 2023)|13|||||||||||||| buy American-free Trade Agreements-balance Of Payments Program Certificate-basic (feb 2024))|5|||||| buy American-balance Of Payments Program Certificate-basic (feb 2024)|1|| annual Representations And Certifications (feb 2024)|13|332919|750 Employees|||||||||||| notice Of Priority Rating For National Defense, Emergency Perpardeness, And Enrgy Progam Use (april 2008))|2||x| 1.data Item A001 (inspection And Test Plan) May Be Waived If Already On File Atnavsup Wss Mech. 2. This Is A Rated Order Certified For National Defense Use, And The Contractor Will Follow All The Requirements Of The Defense Priorities And Allocations System Regulation (15 Cfr 700). 3.this Is A Request For A Not To Exceed Quote Subject To Downward Negotiations For The Complete Repair To Include Evaluation To Completed Repair. After Award Upon Receiving A Detailed Repair Proposal For Each Individual Item (including Recommended Components For repair Along With A Delivery Schedule And Informal Costbreakdown), Order Will Be Definitized. 4. This Solicitation Is And Resulting Award Will Be Issued Iaw Eaf. 5. This Contract Utilizes Commercial Asset Visibility (cav). See Clause Navsupwssfa25 For Further Details. \ 1. Scope 1.1 The Material Covered In This Contract/purchase Order Will Be Used In A Crucial Shipboard System. The Use Of Incorrect Or Defective Material Would Create A High Probability Of Failure Resulting In Serious Personnel Injury, Loss Of Life, Loss Of Vital shipboard Systems, Or Loss Of The Ship Itself. Therefore, The Material Has Been Designated As Special Emphasis Material (level I, Scope Of Certification, Or Quality Assured) And Special Control Procedures Are Invoked To Ensure Receipt Of Correct Material. 2. Applicable Documents 2.1 Order Of Precedence - In The Event Of A Conflict Between The Text Of This Contract/purchase Order And The References And/or Drawings Cited Herein, The Text Of This Contract/purchase Order Must Take Precedence. Nothing In This Contract/purchase Order, however, Must Supersede Applicable Laws And Regulations Unless A Specific Exemption Has Been Obtained. 2.2 Applicable Documents - The Document(s) Listed Below Form A Part Of This Contract/purchase Order Including Modifications Or Exclusions. 2.2.1 "document References" Listed Below Must Be Obtained By The Contractor. Ordering Information Is Included As An Attachment To This Contract/purchase Order. 2.2.2 Specification Revisions - The Specification Revisions Listed Under "documents References" Below Are The Preferred Revision. Older And/or Newer R Evisions Are Acceptable When Listed Within Contract Support Library Reference Number Csd155 In Ecds (electric contractor Data Submission) At: Ht Tps://register.nslc.navy.mil/. This Is To Allow Contractors To Use Certain Acceptable Older Specification Revisions To Purge Their Existing Stock Of Material Certified To Those Older Revisions Or To Use Newer Specification revisions When Material Is Certified To Newly Released Revisions,without Requiring The Submittal Of Waiver/deviation Requests For Each Specification Revision On Every Contract. Revisions Of Specifications Reflecting Editorial And/or Re-approval (e.g. E2009, r2014, Etc.) Are Considered Inconsequential, But Are Acceptable When Their Revisions Are Listedwithin Csd155 Or Elsewhere Within This Contract. 2.2.3 The Documents And Drawings Listed Below Under Drawing No. Are Not Provided With This Contract/purchase Order. drawing No Cage Rev Distr Cd ;300057 27826 H B 299943 27826 C B 300010 27826 B B 300012 27826 B B 300015 27826 C B 300014 27826 C B 300035 27826 B B; document Ref Data=fed-std-h28 | | |b |190424|a| | | document Ref Data=fed-std-h28 |0020| |b |941221|a| |01| document Ref Data=ff-s-86 | | |g |210127|a| | | document Ref Data=ansi/asq Z1.4 | | | |080101|a| | | document Ref Data=qq-n-281 | | |d |851023|a| 2| | document Ref Data=qq-n-286 | | |g |001207|a| | | document Ref Data=astm-a574 | | | |211201|a| | | document Ref Data=astm-f606 | | | |191115|a| | | document Ref Data=mil-std-792 | | |f |060519|a| | | document Ref Data=mil-dtl-1222 | | |j |001208|a| | | document Ref Data=astm-e1417 | | | |160615|a| | | document Ref Data=astm-e1444 | | | |160601|a| | | document Ref Data=mil-std-2035 | | |a |950515|a| | | document Ref Data=mil-std-2132 | | |d |080310|f| |01| document Ref Data=astm-d4066 | | | |130701|a| | | document Ref Data=iso_9001 | | | |081115|a| | | document Ref Data=iso10012 | | | |030415|a| | | document Ref Data=mil-dtl-15024 | | |g |180303|a| | | document Ref Data=mil-c-15726 | | |f |911008|a| 1| | document Ref Data=mil-t-16420 | | |k |880916|a| 1| | document Ref Data=iso/iec 17025 | | | |050515|a| | | document Ref Data=mil-dtl-18240 | | |f |000313|a| 1| | document Ref Data=qpl 18240 | | |qpd|170619|a| | | document Ref Data=mil-dtl-24202 | | |a |171017|a| | | document Ref Data=mil-c-24679 | | | |880506|a| | | document Ref Data=qpl 25027 | | |17 |000207|a| | | document Ref Data=mil-i-45208 | | |a |810724|a| 1| | document Ref Data=mil-std-45662 | | |a |880801|a| | | document Ref Data=a-a-50433 | | | |890815|a| | | document Ref Data=a-a-59004 | | |b |081118|a| | | document Ref Data=ansi/ncsl Z540.3 | | | |130326|a| | | document Ref Data=0900-lp-001-7000 | | | |810101|c| |01| document Ref Data=0900-lp-003-8000 | | | |740701|a| |02| document Ref Data=aia/nas Nasm 17828 | | |1 |130430|a| | | document Ref Data=aia/nas Nasm 25027 | | |1 |121221|a| | | document Ref Data=s9074-aq-gib-010/248 | | |1 |191112|a| | | document Ref Data=t9074-as-gib-010/271 | | |1 |140911|a| | | document Ref Data=s9074-ar-gib-010a/278 (chg A) | | | |130214|a| | | 3. Requirements 3.1 Refurbished Material Statement Of Work (repair Sow) - 3.1.1 Inspection - Clean And Determine If Refurbishment Is Possible. At Disassembly, The Contractor Must Record All Identifying Markings Found On The Parts Of Each Assembly. The Contractor Must Maintain Traceability Of These Markings To Each Unit Throughout refurbishment. 3.1.2 Identifying Markings - Part Must Have A Mic (material Identification A And Control) Code, Heat/heat Lot Code, Or Unique Contractor Traceability Number/code That Is Visible On The Part. See Material Traceability In Paragraph 3 (quality Assurance provisions) Of This Contract For Traceability Requirements. The Mic Code Can Consist Of A 2, 3, Or 4 Letter Material Identifier, 4 Or 5 Digit Julian Date, 3 Digit Lot Serial Number, And Certifying Activity Designator (cad) Which Will Be 1 Or 2 Letters; The 4 parts Are Normally Separated By Hyphens; Examples: Tia-3089-30-qq And St-06262-506-a. 3.1.3 Re-useable Parts - - Any Parts Of The Original Assembly That Are Useable (replacement Is Not Necessary), That Are Properly Marked As Identified Above, And That Have Material Certifications Available May Be Utilized As Initially Supplied. Certifications Are Not Required To Be resubmitted By The Contractor. - Any Parts Of The Original Assembly That Are Useable (replacement Is Not Necessary), Are Properly Marked As Identified Above, But Material Certifications Are Not Available At The Contractor's Facility, A Waiver Must Be Submitted In Accordance With waiver/deviation (configuration Control) Requirements Specified Elsewhere In The Contract. 3.1.4 Non-useable Parts - -any Parts Of The Original Assembly That Are Not Properly Marked As Identified Above Must Be Replaced And The Required Certifications Must Be Submitted. - Any Parts Of The Original Assembly That Are Not Usable (replacement Is Necessary) Must Be Replaced And The Required Certifications Must Be Submitted. 3.1.5 Refurbishment - Upon Completion Of Inspection, This Item Must Be Refurbished To Be In Accordance With ;murdock Drawing 299943, Assembly 299943-200; , Except As Amplified Or Modified Herein. This Applies To All "parts Requiring Certification" As identified Elsewhere In This Contract/purchase Order. 3.1.6 Additional Sow Requirements - ;n/a; 3.2 Material For Parts Requiring Certification - Quantitative Chemical And Mechanical Analysis Is Required For The Parts Listed Below Unless Specifically Stated Otherwise: part - ;body, Item 1 And Attach Flange, Item 6 On Murdock Drawing 299943; Back Flange, Item 14 On Murdock Drawing 300035; Thread End, Item 4 And Flare End, Item 10 On Murdock Drawing 300015; material - ;mil-c-15726, Alloy C71500 Or Mil-c-24679, Alloy C71500; part - ;stud, Item 8 On Murdock Drawing 299943; material - ;qq-n-281, Class A; part - ;self-locking Nut, Item 9 On Murdock Drawing 299943; material - ;qq-n-281, Class B, Cold Drawn self-locking Element- Astm-d4066, Group 01, Class 1, Grade 1; part - ;socket Head Cap Screw, Item 7 On Murdock Drawing 299943; material - ;ff-s-86, Qq-n-286, Form 2, Annealed And Age Hardened, Self-locking Element In Accordance With Mil-dtl-18240; part - ;elbow, Item 8 On Murdock Drawing 300015; material - ;mil-t-16420, Type I, Composition 70/30 And In Accordance With Murdock Drawing 300057 And Mil-dtl-24202; 3.3 Testing Certification - Certifications Are Required For The Following Tests On The Items Listed Below. Additional Testing On Other Piece Parts (if Any) Per Applicable Drawings And Specifications Is Still Required, But Certifications Are Only Required As listed Below. test - ;dye Penetrant Inspection; item - ;body, Item 1 And Attach Flange, Item 6 On Murdock Drawing 299943; Back Flange, Item 14 On Murdock Drawing 300035; Thread End, Item 4 And Flare End, Item 10 On Murdock Drawing 300015; performance - ;t9074-as-gib-010/271; acceptance - ;for Mil-c-15726 Material Use Mil-std-2035 Or 0900-lp-003-8000 For Mil-c-24679 Forgings Use Mil-c-24679; test - ;liquid Penetrant Inspection; item - ;socket Head Cap Screw, Item 7 And Stud, Item 8 On Murdock Drawing 299943; performance - T9074-as-gib-010/271; Sampling Must Be Per Mil-dtl-1222 acceptance - Mil-dtl-1222 test - ;dye Penetrant Inspection For Non-magnetic Grades; item - ;self-locking Nut, Item 9 On Murdock Drawing 299943; performance - T9074-as-gib-010/271 Or Astm-e1417/astm-e1444 (method C Solvent Removal Techniques Must Not Be Used On Thread) acceptance - ;nasm25027; test - ;dye Penetrant Inspection; item - ;elbow, Item 8 On Murdock Drawing 300015; performance - ;t9074-as-gib-010/271; acceptance - ;mil-std-2035 Or 0900-lp-003-8000; test - ;visual And Dye Penetrant Inspection (final Layer); item - ;weldments; performance - ;t9074-as-gib-010/271; acceptance - ;mil-std-2035 Or 0900-lp-003-8000; test - Non-destructive Tests item - ;weld Repair (as Applicable); performance - Per Applicable Fabrication Specification acceptance - Per Applicable Fabrication Specification test - ;hydrostatic Pressure Test; item - ;each Assembly; performance - ;the Test Pressure Of Murdock Drawing 299943 Note 6 +50/-0 Psig For 5 Minutes Minimum; acceptance - ;no Leakage Or Permanent Deformation; attribute - Certificate Of Compliance item - Self-locking Nuts performance - This Certificate Must State That Self-locking Nuts Were Manufactured By An Approved Source. Approved Sources Are Those Listed On Qpl-25027 For The Appropriate Fastener. This Qpl May Also Be Considered As Approved Sources For Heavy Hex self-locking Nuts. attribute - Certificate Of Completion item - Self-locking Nut Nonmetallic Insert performance - ;astm-d4066, Group 01, Class 1, Grade 1; test - Quality Conformance Tests item - Self-locking Nuts performance - ;nasm25027; acceptance - ;nasm25027; attribute - Annealing And Age Hardening item - ;socket Head Cap Screw, Item 7 On Murdock Drawing 299943; performance - Qq-n-286 test - Ultrasonic Inspection On Starting Material item - ;all Items Requiring Certification Made From Qq-n-286 With A Diameter Or Minimum Distance Between Parallel Surfaces Of 4 Inches Or Greater Of The Starting Material, Or When Required By A Drawing Or Specification Invoked Elsewhere In This Contract; performance - T9074-as-gib-010/271 Or Mil-std-2132, And Qq-n-286 acceptance - Qq-n-286 attribute - Certificate Of Compliance For Seamless Tubing/pipe item - ;elbow, Item 8 On Murdock Drawing 300015; performance - Material Supplied Must Be In The Seamless Condition. 3.4 The Pressure Tolerance Must Be As Specified In The Assembly Drawing, Detail Drawing, Design Specification Or Elsewhere In This Contract. Where Pressure Tolerances Are Not Provided By Drawings, Specifications Or Specified Elsewhere In This Contract, The following Must Be Used: For Pressure Tests Below 100 Psig, The Pressure Tolerance Must Be +1 Psig / -0 Psig. For Pressure Tests At Or Above 100 Psig Up To And Including 2500 Psig, The Pressure Tolerance Must Be +2% / -0 Psig Rounded Off To The Nearest Multiple Of The Smallest Graduation On An Analog Test Pressure Gauge, Not To Exceed 50 Psig. For Pressure Tests Above 2500 Psig, The Pressure Tolerance Must Be +2% / -0 Psig, Rounded Off To The Nearest Multiple Of The Smallest Graduation On An Analog Test Pressure Gauge, Not To Exceed 200 Psig. the Pressure Test Time Tolerance Must Be As Specified In The Assembly Drawing, Detail Drawing, Design Specification Or Elsewhere In This Contract. Where Pressure Test Time Tolerances Are Not Provided By Drawings, Specifications Or Specified Elsewhere In This contract, The Following Must Be Used: For A Test Duration Up To And Including 1 Hour, The Tolerance Must Be +5 Minutes / - 0 Minutes. For A Test Duration Of More Than 1 Hour Up To And Including 24 Hours, The Tolerance Must Be +30 Minutes / - 0 Minutes. For A Test Duration Of More Than 24 Hours, The Tolerance Must Be +60 Minutes / - 0 Minutes. 3.5 O-ring Grooves And Mating Sealing Surfaces Must Be Inspected Per The Contractually Invoked Drawings Or Specifications. When The Drawings Or Specifications Do Not Provide Specific Defect Criteria Or State That No Defects Are Allowed, The General Acceptance criteria (gac) Standard Must Be Used For Inspecting O-ring Grooves And Mating Sealing Surfaces Only. Repairs To Sealing Surfaces And O-ring Grooves With Unacceptable Defects May Be Accomplished Within The Limits Of The Size And Tolerances Provided In The applicable Drawing. Repairs Thatwould Exceed These Limits Require Approval (including Final Dimensions). The Data That Is Red Lined (crossed Out) Is Excluded From The Gac For This Contract And Is Not To Be Used For Acceptance Or Rejection Criteria. The Gac document Is Identified As Contract Support Library Reference Number Csd008 At Https://register.nslc.navy.mil/ 3.6 Slow Strain Rate Tensile Test Laboratories - The Slow Strain Rate Tensile Test Of Qq-n-286 Must Be Performed By One Of The Following Laboratories: huntington Alloys, A Special Metals Company attn: Bill Bolenr 3200 Riverside Drive huntington, Wv 257059 phone: (304) 526-5889 fax: (304) 526-5973 metallurgical Consultants, Inc. attn: W. M. Buehler 4820 Caroline po Box 88046 houston, Tx 77288-0046 phone: (713) 526-6351 fax: (713) 526-2964 naval Surface Warfare Center, Carderock Division attn: Eric Focht Code 614 9500 Macarthur Blvd west Bethesda, Md 20817-5700 phone: (301) 227-5032 fax: (301) 227-5576 teledyne Allvac attn: Dr. W. D. Cao 2020 Ashcraft Ave. monroe, Nc 28110 phone: (704) 289-4511 fax: (704) 289-4269 westmoreland Mechanical Testing And Research Inc. attn: Andrew Wisniewski p.o. Box 388 youngstown, Pa 15696-0388 mannesmann Rohrenwerke mannesmann Forschungsinstitut (mfi) attn: Dr. Weiss postfach 251160 47251 Duisburg germany phone: 011-49-0203-9993194 fax: 011-49-0203-9994415 thyssenkrupp Vdm Usa, Inc. attn: D. C. Agarwal 11210 Steeplecrest Drive, Suite 120 houston, Tx 77065-4939 phone: (281) 955-6683 3.7 Recorded Dimensions - A Certification Of Recorded Dimensions As Depicted In Note 6 Of Murdock Machine And Engineering Company Drawing 300057 Is Required. Certification Must Include The Actual Measured Dimensions. At The Time Of Receipt Inspection, rejection Of Any Single Piece Must Be Cause For Rejection Of The Entire Lot. 3.8 Radiography Is Required On ;weldments Per Note 2 On Murdock Drawing 300015 And Must Be Identified To The Weld Joint; . 3.9 K-monel Fasteners - Material Must Be Heat Treated Per Qq-n-286. 3.9.1 Fasteners That Have Been Hot Or Cold Headed Or Roll Threaded Must Be Solution Annealed Followed By Age Hardening Subsequent To All Heading And Thread Rolling Operations. The Mechanical Properties On Certifications Must Be Actual Properties Of The annealed And Age Hardened Material And Must Meet The Requirements Of Qq-n-286. 3.9.2 Qq-n-286 Fasteners That Have Been Headed And/or Roll Threaded Must Not Beage Hardened Unless The Material Has Been Solution Annealed Subsequent To The Heading And Threading Operations. Threads Formed After The Final Age Hardening Heat Treatment Must Be cut Or Ground Only. 3.10 Specification Change - For Qq-n-281, Class B Material: 1 - Footnote 9 To Table Ii Of Qq-n-281 Does Not Apply. 2 - When Starting Material Is Round Bar Greater Than 3" Dia, The Mechanical Properties Of Hex Bar Apply. 3.11 Ff-s-86 Mechanical Property And Metallographic Testing Sample Sizes Must Use Asq Z1.4 Inspection Level S-1 With Aql = 1.0.note: The Sample Size Values Must Conform To Ff-s-86e And Earlier Revisions. 3.12 Wedge Tensile Test Specimens (headed Fasteners) - A Wedge Tensile Test Must Be Conducted On A Full Size Fastener For Each Production Lot And Reported Aspart Of The Mechanical Properties. The Required Specimens For The Wedge Tensile Test Must Be Separate fasteners From Those Required For The Yield Test. 3.12.1 Testing For Socket Head Cap Screws Must Be In Accordance Mil-dtl-1222, Paragraphs 4.5.2.3 And 4.5.2.3.1. 3.12.2 Testing For All Other Headed Fasteners With A Nominal Diameter Greater Than 1/4-inch Must Be In Accordance With Astm-f606 For Grades 5, 8, B7, And B16.for All Other Grades, The Following Wedge Angles Must Be Used. a. Except As Specified In Item C Below, Fasteners With A Nominal Diameter Of 1/4-inch Through 1-inch (inclusive) Must Be Tested With A Ten Degree Wedge. b. Except As Specified In Item C Below, Fasteners With A Nominal Diameter Over 1-inch Must Be Tested With A Six Degree Wedge. c. Fasteners That Are Of Grades 8, B7, B16, 410, 416, 416se, 431, And 630 And Are Threaded Within One Diameter To The Underside Of The Head Must Be Tested As Follows: sizes 1/4 Inch Through 3/4 Inch (inclusive) Use A Six Degree Wedgesizes Over 3/4 Inch Use A Four Degree Wedge d. Fasteners Which Have Passed Testing With Wedge Angles Greater Than Those Specified Should Be Considered Acceptable. 3.12.3 For Fasteners Having A Length Less Than The Minimum Specified In Table 1 Of Astm-f606, One "test Specimen Fastener" Must Be Manufactured From Each Lot Of Fasteners And Tested To Represent That Lot. The Length Of These Test Specimen Fasteners Must Meet the Minimum Specified In Table 1 Of Astm-f606 But Must Not Exceed It By More Than 1/4 Inch. Test Specimen Fasteners Must Be The Same Type, Style, And Diameter As The Production Lot And Must Be Manufactured From The Same Starting Material, Using The Same manufacturing Techniques As The Production Lot, And Must Be Heat Treated (if Required) Along With The Production Lot. 3.13 ;lubricate O-rings With Grease Per Cid A-a-50433 (termalene No. 2). lubricate Threads With Lubricant Per Cid A-a-59004 (molykote P-37 Paste).; 3.14 Change To Table Vii Of Mil-t-16420: the Column Headed "longer Lengths (max)" In All Classes Of Table Vii Must Be Changed To Read "longer Lengths (min)". All Rows In Aforementioned Column Reading "25" Must Be Changed To Read "20". The Maximum Length Must Be 25 Feet Per Paragraph 3.8.5.2 Of mil-t-16420. example: Class 700 Tube Having O.d. Of .540 And Wall Thickness Of .065 Must Be Supplied With A Minimum Length Of 12 Feet, With 80% (by Weight) In Lengths Of 20 To 25 Feet. 3.15 Change Paragraph 3.2.5 Of Mil-f-24202 To Read: 3.2.5 All Finished Fittings Must Be Furnished In The Fully Annealed Condition. 3.2.5.1 After Annealing, Fittings Produced From Tubular Stock Must Not Exceed A Maximum Hardness Of 51 Rockwell 30t Determined In The Area Of Maximum Bending Or Forming When Manufactured In Accordance With Paragraph 3.2.3. 3.2.5.2 Fittings Produced From Bar, Plate, Or Forgings In Accordance With 3.2.4 Must Meet The Hardness Required By 3.2.5.1, Except That The Location For Hardness Tests May Be Any Area Of The Finished Fitting. 3.16 Changes To Mil-t-16420 Mechanical Properties (table Ii): copper Alloy Outside Tensile Yield Strength Elongation In and Temper Diameter Strength (.5% Under Load) 2" Or 4x Dia. 715 (70/30)...all.......50,000....18,000............30.0% (min) fully Sizes annealed 3.17 Mil-t-16420 Ut Changes - Delete Paragraph 3.4.3.4 And Substitute: "3.4.3.4 Laminations. Tube Required To Meet The Ultrasonic Requirements Specified In 3.4.3 Must Be Examined For Laminar Discontinuities That Present Indications Exceeding Exploration threshold Levels (20 Percent For The Contact Method At +6 Db; 30 Percent For The Immersion Method At Calibration) Must Be Rejected." 3.17.1 In The Second Sentence Of Paragraph 4.4.7; Delete "18 Inch" And Substitute "1 Inch". In The Last Sentence, Insert "3.4.3.4 And" Before "3.8.2". 3.18 Internal Threads - All Internal Threads Must Be Formed By Cutting. Cold Forming Of Internal Threads Is Not Acceptable. 3.19 Thread Inspection Requirements - All Threads On Threaded Parts Must Be Inspected Using Appropriate Inspection Methods, Inspection Systems, And Inspection Gages/instruments In Accordance With Fed-std-h28 Series. Substitution Of Thecommercial Equivalent inspection In Accordance With Asme B1 Series Is Acceptable. 3.19.1 System 21 Of Fed-std-h28/20 Must Be Used As A Minimum Inspection Requirement For Threads When The Design Drawing Or Design Specification Does Not Specify An Inspection Requirement. 3.19.2 For Navy And Shipyard Drawings, System 21 Of Fed-std-h28/20 May Be Substituted For System 22 Without Further Navy Approval When The Design Drawing Invokes System 22 And Does Not Cite Governing Specifications That Specifically Require System 22. System 22 Of Fed-std-h28/20 Must Be Used When The Drawing References Other Governing Specifications That Specifically Require System 22, Such As Certain Thread Types Of Mil-dtl-1222. 3.19.3 A Written Request For Concurrence Must Be Submitted When Utilizing Alternative Measuring Equipment Or Measuring Systems Not Applicable To The Specified Inspection System. 3.20 Component Identification Description (cid) - When Applicable Drawing(s) And/or Specification(s) Specify That A Nameplate Or Identification Plate Is Required, The Cid Number ( ;cid 990997156; ) Must Be Added. When No Plate Is Specified, An Identification plate In Accordance With Mil-dtl-15024, Type "c" On Brass Or Type "h" On Aluminum Must Be Securely Attached To Each Assembly Showing The Above Cid Number. No Assembly Must Be Shipped Without The Cid Number Attached. 3.21 Welding Or Brazing - When Welding, Brazing, And Allied Processes Are Required, As Invoked By Section C Paragraph 3 Requirements, They Must Be In Accordance With S9074-ar-gib-010a/278, 0900-lp-001-7000 For Brazing Of Piping And Pressure Vessel applications, Or S9074-aq-gib-010/248 For Brazing Of Other Applications. For All Production And Repair Welding And Brazing, Personnel And Procedures Must Be Qualified Under S9074-aq-gib-010/248 Or 0900-lp-001-7000, As Applicable. Repair Welding Is Not permitted On ;qq-n-286 Material; . Procedures And Qualification Data Must Be Submitted For Review And Approval Prior To Performing Any Welding Or Brazing. 3.22 Configuration Control - The Contractor Must Maintain The Total Equipment Baseline Configuration. For Items Of Proprietary Design, Contractor Drawings Showing The Latest Assembly Configuration Must Be Provided To The Government In Electronic (c4) Format. definitions Are Provided Elsewhere In The Contract/purchase Order. 3.22.1 Waivers/deviations - All Waivers And Deviations, Regardless Of Significance Or Classification Require Review And Approval By The Contracting Officer. Waivers And Deviations Must Be Designated As Critical, Major, Or Minor. The Contractor Must Provide a Copy Of This Request To The Qar. Requests Must Include The Information Listed Below. A. A Complete Description Of The Contract Requirement Affected And The Nature Of The Waiver/deviation (non-conformance), Including A Classification Of Critical, Major, Or Minor. B. Number Of Units (and Serial/lot Numbers) To Be Delivered In This Configuration. C. Any Impacts To Logistics Support Elements (such As Software, Manuals, Spares, Tools, And Similar) Being Utilized By Government Personnel Or Impacts To The Operational Use Of The Product. D. Information About Remedial Action Being Taken To Prevent Reoccurrence Of The Non-conformance. 3.22.2 All Requests For Waivers/deviations On Navsup-wss Contracts Must Be Submitted To The Navsup Wss Contracting Specialist Via Email. 3.22.3 Ecps - The Government Will Maintain Configuration Control And Change Authority For All Modifications Or Changes Affecting Form, Fit, Function, Or Interface Parameters Of The Equipment And Its Sub-assemblies. The Contractor Must Submit An Engineering change Proposal (ecp) For Any Class I Or Ii Changes That Impact The Equipment Covered By This Contract. Ecps Must Be Prepared In Contractor Format, And Must Include The Following Information: A. The Change Priority, Change Classification (class I Or Class Ii), And Change Justification. B. A Complete Description Of The Change To Be Made And The Need For That Change. C. A Complete Listing Of Other Configuration Items Impacted By The Proposed Change And A Description Of The Impact On Those Cis. D. Proposed Changes To Documents Controlled By The Government. E. Proposed Serial/lot Number Effectivities Of Units To Be Produced In, Or Retrofitted To, The Proposed Configuration. F. Recommendations About The Way A Retrofit Should Be Accomplished. G. Impacts To Any Logistics Support Elements (such As Software, Manuals, Spares, Tools, And Similar) Being Utilized By Government Personnel In Support Of The Product. H. Impacts To The Operational Use Of The Product. I. Complete Estimated Life-cycle Cost Impact Of The Proposed Change. J. Milestones Relating To The Processing And Implementation Of The Engineering Change. 3.23 Mercury Free - Mercury And Mercury Containing Compounds Must Not Be Intentionally Added Or Come In Direct Contact With Hardware Or Supplies Furnished Under This Contract. Mercury Contamination Of The Material Will Be Cause For Rejection. 3.24 Navsea 0948-lp-045-7010 - Any Applicable Requirements Of Navships 4410.17,navsea 0948-lp-045-7010, Or 0948-045-7010 Which The Contractor Must Meet Are Included In This Contract/purchase Order. The Above Documents Are For Governmentuse Only. Further application Of The Above Documents Is Prohibited.prohibited. 3.24.1 Marking Of Material With A Material Designator Per The Drawing Is Also Prohibited, With The Exception Of Fasteners. Fasteners Must Be Marked With A Material Symbol/designator As Specified Elsewhere In This Contract. 3.25 Certificate Of Compliance - (special Emphasis Material) The Contractor Must Prepare And Submit A Certificate Of Compliance Certifying That The Items/components Furnished Under This Contract Comply With The Requirements Of The Procurement Document, including Any/all Invoked Specifications And Drawings. ^ Quality Assurance Requirements ^ 3.26 See Cdrl Di-misc-80678 (test Certification) - A Statement Of Tests Performed, Listing The Pieces Tested Must Be Furnished Along With A Copy Of The Test Results. Certification Must Include The Contractor's Name, Address And Date, Quantity Inspected, identified To The Contract/purchase Order And Item Number, And The Contractor's Or Authorized Personnel's Signature. Test Certifications Must Reference The Standard/specification, Including The Revision, To Which The Testing Was Performed And The Acceptance criteria Used. Test Procedure Numbers May Also Be Referenced On Test Reports. Test Reports On Weldments Must Be Identified To Weld Joint And Layer. 3.27 See Cdrls Di-misc-80875 (welding Procedures) And Di-misc-80876 (weld Procedure Qualification Data) - When Production Or Repair Welding Is Required, The Applicable Welding Procedure(s) And Qualification Data Must Be Submitted For Review And Approval. In addition, The Consumed Weld Metal C Of C As Defined Below Must Be Submitted As Part Of The Certification Oqe Package Submitted By The Contractor. note: These Requirements Do Not Apply To Tack/spot Welds. 3.27.1 Approval Of The Contractor's Qualification Data Must Be Obtained Prior To Performing Any Welding (production Or Repair). 3.27.2 If The Contractors Qualification Data Has Previously Been Approved By The Navy For Other Contracts, A Copy Of The Original Approval Letter May Be Submitted Along With The Procedures And Qualification Data Report To Expedite The Approval Process. The approval Letter Must Reference The Applicable Welding Procedure And Qualification Data Report Identification/number. Prior Approval Does Not Guarantee Acceptance For This Or Any Future Contracts. As Far As Practical, All Procedures For The Contract Must Be submitted At The Same Time. Welding Procedures And Qualification Data Must Be Submitted In A Commercially Available Electronic Format Such As Adobe Acrobat Pdf. The Contractor Must State The Applicability Of Each Weld Procedure And Qualification Data Submitted, citing The Drawing Number And Pieces To Be Welded. (i.e. "wp-123 And Qd-123 Are Submitted For The Weld Joint Between Pieces 1 And 2 On Drawing Abc." Wp-456 And Qd-456 Are Submitted For The Hardfacing Of Piece 3 On Drawing Xyz.") 3.27.3 The Pco's Authorization For The Use Of Weld Procedure(s) And Qualification Data For The Specific Application As Submitted Does Not Mitigate The Vendors Responsibility To Comply With The Requirements Of S9074-aq-gib-010/248, S9074-ar-gib-010a/278, And the Contract. 3.27.4 Authority For The Repair Of Special Repairs In Castings, The Repair Of Wrought Material, Or The Repair Of Forged Material Must Be Obtained Via Request For Waiver From The Procurement Contracting Officer. This Request Must Describe The Defect; Including size, Depth, Location, And A Description Of The Proposed Repair. Repairs Deemed Minor Or Nominal In Accordance With S9074-ar-gib-010/278 Can Be Made At Contractor Discretion In Accordance With S9074-ar-gib-010/278 Requirements; However, Weld Procedure specification (wps) And Procedure Qualification Record (pqr) Submittals Are Still Required. This Request For Navsup-wss Contracts Must Be Submitted Via The Electronic Contractor Data Submission (ecds) Application. 3.27.5 Any New Procedure Qualification Performed Under This Contract Will Require The Vendor To Provide A Minimum 72 Hour Notification To Dcma With An Offer To Observe The Welding Of The Test Assemblies. The 72 Hour Time Limit May Be Modified Upon Mutual agreement Between The Vendor And Dcma. 3.27.6 When Drawings Require Hardfacing Surface Iron Or Nickel Content Not To Exceed 5%, The Contractor Must Verify Surface Iron Or Nickel Content By Performing Chemical Testing As Defined By The Applicable Drawing. The Chemical Test Results Must Be Submitted as Part Of The Qualification Data. 3.27.7 Additional Qualification Requirements For Production Hardfacing Thickness Less Than 1/8-inch: Macro-etch (or Legible Photomacrographs Clearly Showing The Fusion Area) Must Be Submitted For Review And Show Consistent, Minimized Dilution. All Essential elements And Any Elements Not Listed In S9074-aq-gib-010/248 That Influence Dilution Must Be In The Qualification Data And Weld Procedure, With Strict Limits Placed On Each Essential Element. 3.27.8 Preparation And Retention Of Weld Records Is Required, As Specified By Paragraph 4.1.3 Of S9074-ar-gib-010a/278. 3.27.9 When Production Or Repair Welding Is Required On Titanium Materials, The Applicable Fabrication Plan, Facilities Procedure, Training Plan, And Active Welder Qualification Must Also Be Submitted For Review And Approval. 3.27.10 If The Contractor's Fabrication Plan, Facilities Procedure, Training Plan, Or Active Welder Qualification Has Previously Been Approved By The Navy For Other Contracts, A Copy Of The Original Approval Letter May Be Submitted Along With The Applicable documentation To Expedite The Approval Process. The Approval Letter Must Reference The Applicable Documentation. Prior Approval Does Not Guarantee Acceptance For This Or Any Future Contracts. The Contractor's Fabrication Plan, Facilities Procedure, Training plan, And Active Welder Qualification Must Be Submitted At The Same Time As The Applicable Welding Procedure(s) And Weld Procedure Qualification Data. All Documentation Must Be Submitted In A Commercially Available Electronic Format, Such As Adobe Acrobat Pdf. 3.27.11 See Cdrl Di-misc-80678 (consumed Weld Metal) - A Certificate Of Compliance Is Required For All Weld Filler Metals Used For Production Or Repair Welding, And Must Include The Following: a) Filler Metal Lot Number(s) b) Specification And Type c) A Positive Statement That The Vendor Has Obtained Oqe And Verified That Each Lot Of Weld Filler Material Conforms To Specification Requirements. d) A Positive Statement Verifying That The Weld Filler Metals Were The Correct Material Type Or Grade Prior To Consumption. 3.27.12 When Production Welds Or Repair Welds Are Performed By A Subcontractor, The Requirement For Submission Of All Certification Documentation Required Herein Must Be Passed Down To The Subcontractor. 3.28 Radiography (rt) - Radiography Must Be Performed In Accordance With T9074-as-gib-010/271. Rt Acceptance Criteria For Weldments To Be Per The Applicabletable Of S9074-ar-gib-010a/278 (p-1 Piping) Or Mil-std-2035, Class 1, As Applicable. 3.28.1 Submission Of Radiographic Shooting Sketches For Approval Is Not Requiredfor Weldments. 3.28.2 All Pieces Radiographed Must Be Permanently Marked With "rt" And A Unique Traceability Number. (unique Traceability Number Must Be Directly Traceable To The Rt Film.) 3.28.3 See Cdrl Di-misc-80678 (production Radiography) - Production Radiographyrequires Final Acceptance By The Navy. The Items Listed Below Must Be Submitted For Final Acceptance, Cataloging, File, And Retention. They Must Be Submitted And Approved By The navy Prior To Shipment Of The Applicable Hardware. However, When The Source Certification Clause Is Invoked, They Must Be Submitted A Minimum Of Forty-five (45) Working Days Prior To The Date Of Source Certification Inspection. (a) Film (b) Rss/rsss (c) Rs (d) Dd250 (with Heat Numbers Corresponding To Rt Numbers Referenced In Block 16) 3.29 Quality System Requirements - The Contractor Furnishing Items Under This Contract/purchase Order Must Provide And Maintain A Quality System In Accordance With Iso-9001 As Amplified Or Modified Herein, With The Calibration System Requirements Of Iso-10012 or Ansi-z540.3 With Iso-17025. A Quality System In Accordance With Mil-i-45208, With The Calibration System Requirements Of Mil-std-45662, Is Acceptable As An Alternate. 3.29.1 The Contractor's Quality System And Products Supplied Under The System Are Subject To Evaluation, Verification Inspection, And Acceptance/nonacceptance By The Government Representative To Determine The System's Effectiveness In Meeting The Quality requirements Established In The Contract/purchase Order. 3.29.2 The Contractor's Quality System Must Be Documented And Must Be Available For Review By The Contracting Officer Or His Representative Prior To Initiation Of Production And Throughout The Life Of The Contract. The Prime Contractor Must, Upon notification, Make His Facilities Available For Audit By The Contracting Officer Or His Authorized Representative. 3.29.3 See Cdrl Di-qcic-81110 (inspection System Procedures) - All Suppliers Of Level I/subsafe (li/ss) Material Are Required To Submit A Copy Of Their Current Documented Quality System Procedures To The Procurement Contracting Officer (pco) Prior To Award Of any Contract/purchase Order. Suppliers That Have A Copy Of Their Current Quality System Procedures On File At The Procuring Activity May Request The Pco Waive This Requirement. 3.29.4 This Contract Provides For The Performance Of Government Quality Assurance At Source. The Place Or Places Of Performance May Not Be Changed Without The Authorization Of The Procurement Contracting Officer. Upon Receipt Of This Order, Promptly notify The Government Representative Who Normally Services Your Plant So That Appropriate Planning For Government Inspection Can Be Accomplished. If You Do Not Have An Assigned Government Representative, Notify The Nearest Defense Contract Management Agency (dcma) Office. In The Event That A Local Government Representative Or Dcma Office Cannot Be Located, Our Purchasing Agent Should Be Notified Immediately. 3.29.5 Any Changes Made By The Contractor To A Qualified Quality System Will Require Re-submittal To The Pco And Concurrence By The Government Quality Assurance Representative Prior To Adoption. 3.30 Contractor Inspection Requirements - The Contractor Must Maintain Adequate Records Of All Inspections And Tests. The Records Must Indicate The Nature And Number Of Observations Made, The Number And Type Of Deficiencies Found, The Quantities Approved And rejected And The Nature Of Corrective Action Taken As Appropriate. Inspection Records Must Be Traceable To The Material Inspected. 3.30.1 The Supplier's Gages, Measuring And Test Equipment Must Be Made Available For Use By The Government Representative When Required To Determine Conformance With Contract Requirements. When Conditions Warrant, The Supplier's Personnel Must Be Made available For Operations Of Such Devices And For Verification Of Their Accuracy And Condition. 3.30.2 All Documents And Reference Data Applicable To This Contract Must Be Available For Review By The Government Representative. Copies Of Documents Required For Government Inspection Purposes Must Be Furnished In Accordance With The Instructions Provided by The Government Representative. 3.31 Subcontractor Inspection Requirements - The Government Has The Right To Inspect At Source, Any Supplies Or Services That Were Not Manufactured Or Performed Within The Contractor's Facility. Such Inspection Can Only Be Requested By Or Under Authorization of The Government Representative. Any Purchasing Documents To A Subcontractor Must Cite The Applicable Portions Of The Contractually Invoked Quality System (e.g. Calibration Requirements), Plus Any Product Requirements That Apply To The Supplies Being purchased. When The Government Elects To Perform Source Inspection At The Subcontractor's Facility, Applicable Purchase Documents Must Be Annotated With The Following Statement: "a Government Inspection Is Required Prior To Shipment From Your Plant. Upon receipt Of This Order, Promptly Notify The Government Representative Who Normally Services Your Plant So That Appropriate Planning For Government Inspection Can Be Accomplished. If You Do Not Have An Assigned Government Representative, Notify The Nearest defense Contract Management Agency (dcma) Office. In The Event That A Local Government Representative Or Dcma Office Cannot Be Located, Our Purchasing Agent Should Be Notified Immediately." 3.31.1 The Prime Contractor's Program Must Include Procedures To Assess The Capability Of The Prospective Suppliers To Produce The Products Or Supply The Services In Accordance With The Contract, Prior To The Issuance Of Any Purchase Document. 3.31.2 Each Sub-tier Supplier Of Material Or Services For Items In Section 3 Of This Contract Must Be Subjected To A Periodic Review Or Audit By The Prime To Determine The Continued Capability Of The Supplier To Control The Quality Of The Products Or Services specified In The Purchase Order Or Contract. 3.31.3 The Prime Contractor Must Ensure That The Purchased Product Conformsto Specified Purchase Requirements And This Contract. The Type And Extent Of Control Applied To The Supplier And The Purchased Product Must Be Dependent Upon The Effect Of The purchased Product On The End Item Represented By This Contract. 3.31.4 The Prime Contractor Must Evaluate The Requirements Of The Contractand Select Suppliers Based On Their Ability To Supply The Product In Accordance With The Prime Contractor's Requirements And The Contract. Criteria For Selection And Evaluation Must Be established. Records Of This Effort Must Be Available For Review By The Government. 3.31.5 The Prime Contractor's Supplier Quality Assurance Program Must Provide For A Review Of Purchase Documents To Assure Applicable Quality Requirements Are Included Or Referenced In The Documentation For Compliance By The Supplier. 3.32 Government Furnished Material And/or Equipment (gfm/gfe) - When Material Or Equipment Is Furnished By The Government, The Contractor Must Develop Documented Control Procedures That Require At Least The Following: 3.32.1 Visual Examination Upon Receipt To Detect Damage During Transit. 3.32.2 Inspection For Completeness And Proper Type. 3.32.3 Verification Of Material Quality Received. 3.32.4 Periodic Inspection And Precautions To Assure Adequate Storage Conditions And To Guard Against Damage From Handling And Deterioration During Storage. 3.32.5 Functional Testing, Either Prior To Or After Installation, Or Both, As Required By The Contract To Determine Satisfactory Operation. 3.32.6 Identification And Protection From Improper Use Or Disposition. 3.32.7 Reporting To The Government, Any Gfm Or Gfe Property Found Damaged, Malfunctioning, Or Otherwise Unsuitable For Use. In The Event Of Damage Or Malfunction During Or After Installation, The Supplier Must Determine And Record Probable Cause And necessity For Withholding The Material From Use. 3.32.8 For Gfe Material, And As Required By The Terms Of The Bailment Agreement, The Supplier Must Establish Procedures For Adequate Storage, Maintenance, And Inspection Of Bailed Government Material. Records Of All Inspection And Maintenance Performed On bailed Property Must Be Maintained. 3.32.9 Material Returned To The Contractor Must Be Handled As Gfm. 3.33 Traceability And Certification Requirements - To Assure That Correct Materials Are Installed In Level I/subsafe Systems, It Is Imperative That Traceability Be Maintained From The Material To The Material Certification Test Report And Other Required objective Quality Evidence (oqe). The Material Certification Report Must Completely And Accurately Reflect That The Material Supplied Meets The Specified Requirements. Materials Requiring Traceability And Certification Data Are Identified Within Paragraph 3, section C Of This Contract/purchase Order. 3.33.1 The Following Provides The Minimum Requirements For Maintaining Material Traceability And Supplements The Requirements Specified In Di-misc-81020 And Elsewhere In The Contract/purchase Order. The Contractor Must Develop Written Procedures That implement The Material Control Requirements Stated Herein And Elsewhere In This Contract/purchase Order. 3.34 Material Traceability - The Certification Data Report Must Be Identified Through A Unique Traceability Number, Heat-lot Number, Or Heat-treat Number, As Applicable, Which Must Also Be Marked On The Material. This Traceability Marking On The Material Must provide Direct Traceability To The Material's Chemical Composition And Mechanical Properties Certification Data. For Material Produced By Batch, Continuous Cast, Or Continuous Pour Processes, Samples Must Be Taken No Less Than Once In Every Eight Hours Of operation For The Purpose Of Validating Proper Chemical Composition And Mechanical Properties. Traceability Must Be Maintained Through All Process Operations Including Any Subcontracted Operations, To The Finished Component. 3.34.1 Material Marking For Traceability And Identification - The Following Are The Minimum Marking Requirements. Additional/alternate Marking Requirements, If Applicable, Will Be Specified Elsewhere In The Contract/purchase Order. In Addition To The marking Requirements On Applicable Drawings And/or Specifications, Marking For Traceability Is Required. All Traceability Markings Must Be Permanently Applied In Accordance With Mil-std-792 (except As Specified Below). An Alternate Marking Method Is permissible Provided It Is An Available Option In The Contractually Invoked Specification Or Drawing, Except In Instances Where The Material Has Been Modified By This Contract/purchase Order And Differs From That Specified In The Specification Or Drawing. 3.34.2 Traceability Markings For Items With Precision Machined Or Plated Surfaces, Or Material With Suitable Marking Surface Areas Less Than 3/8 Inches Square (either 3/8" X 3/8" Or An Area Equal To 0.1406 Inches Square) Must Be Applied To A Durable Tag And the Tag Securely Affixed To The Material. 3.34.3 Traceability Markings Must Be Maintained Through Assembly, And Whenever Possible Must Be Visible After Assembly. For Items Where The Marking Is Not Visible After Assembly, A Durable Tag Must Be Securely Attached To The Assembly Identifying The Part number, Piece Number, Traceability Number, And The Location Of The Permanent Mark. 3.34.4 Marking Must Be Legible And Must Be Located So As To Not Affect The Form, Fit, And Function Of The Material. ; ; 3.35 See Cdrl Di-misc-81020 (chemical And Mechanical) - Material Certification - In Addition To The Certification Data Requirements Specified In Di-misc-81020, The Following Material Certification Requirements Apply: 3.35.1 Quantitative Chemical And Mechanical Analysis Of Material Traceable To Traceability Markings Is Required. Material Certification Test Reports Must Include The Class, Form, Condition, Grade, Type, Finish, And/or Composition, As Applicable, Of The material Supplied. 3.35.2 Re-identification And Re-certification Of Material Is Required When The Material Is Subjected To A Process Which Alters It's Properties. If The Starting Material Or Raw Stock Is Processed In A Manner That Will Not Affect Its Chemical Composition Or mechanical Properties, The Original Certifications For The Chemical Composition And Mechanical Properties, As Required By The Material Specification, Are Acceptable. Re-certification Of The Chemical Or Mechanical Properties Is Required If A Process Is Used during Fabrication That Alters The Original Properties Of The Material (e.g. Alloying, Heat Treating, Or Forming). In These Instances, The Properties Of The Material Must Be Re-determined And Documented To Reflect The Altered Condition. The Altered Material must Be Uniquely Re-identified. The Properties Thus Determined And Documented, Are Required For Final Certification And Must Conform To The Material Specification Or The Contract/purchase Order Requirements. When Only The Mechanical Properties Are Altered, the Original Certification Forchemical Composition Must Be Overstamped And Annotated With The Unique Traceability Material And At A Minimum Contain The Information Below. traceability Marking ________________________________________________ (marking On Finished Item) is Fabricated From Raw Material Identified To heat/lot Number ______________ And Heat Treat Number _____________________ (when Applicable) _________________________________________ Date _____________________ (name And Signature Of Auth. Co. Rep.) 3.35.3 Material Certification Data Forwarded By The Manufacturer Must Contain A Signed Certification That The Report Results Represent The Actual Attributes Of The Material Furnished And Indicate Full Compliance With All Applicable Specification And Contract requirements. Transcription Of Certification Data Is Prohibited. 3.35.4 Statements On Material Certification Documents Must Be Positive And Unqualified. Disclaimers Such As "to The Best Of Our Knowledge" Or "we Believe The Information Contained Herein Is True" Are Not Acceptable. 3.35.5 If Material Is Received Without The Required Certification Papers Or With Incorrect/missing Data On The Certification Papers, The Material Will Be Rejected. 3.36 Material Handling - The Written Material Control Process Must Include The Following: 3.36.1 All Raw Materials Must Have Traceability Markings (except As Specified Below). 3.36.2 Stored Raw Materials Requiring Traceability Must Be Segregated To Preclude Intermingling With Materials Not Requiring Traceability. 3.36.3 When Traceability Markings Will Be Removed By A Manufacturing Or Fabrication Process, The Marking Must Be Recorded Prior To Removal And Be Immediately Restored Upon Completion Of The Process. If This Cannot Be Done Or Is Impractical, An Appropriate material Control Procedure (such As A Bag And Tag, Tagging, And/or Tote Box Control) Must Be Employed. The Material Control Procedure Must Provide A Method Of Positive Control To Preclude Commingling Of Heats/lots Or Loss Of Traceability. The Traceability marking Must Be Reapplied Upon Completion Of The Final Manufacturing Process. 3.36.4 Brazing Or Weld Filler Metals For Strength Welds Forming Or Integral With Pressure Containing Components Or Assemblies Requiring Traceability Must Be Verified To Be The Correct Material, And Type Or Grade, As Applicable, Prior To Consumption. At A minimum, Material Verification Must Consist Of Inspection Of Material Test Reports For Conformance To Specified Requirements. Control Of Welding And Brazing Filler Metals Must Be Maintained To The Point Of Consumption To Assure Use Of The Correct Type And grade. Markings And Traceability Requirements Do Not Apply To Brazing And Weld Filler Metals After Consumption. It Is The Responsibility Of The Prime Contractor To Ensure Conformance With The Above Requirements On Welds Performed By Their Subcontractors. 3.36.5 Purchase Orders For Raw Material Must Specify That The Material Be Traceable To Material Certification Test Reports By Traceability Markings On The Material And Identified On The Test Reports. The Certification Data Requirements Contained In di-misc-81020 Must Be Invoked By The Prime Contractor On All Subcontractors Supplying Level I Material. 3.36.6 The Material Control Process Must Include Requirements For The Maintenance Of Traceability For Items Sent Out For Subcontracted Operations. If Such Operations Would Remove Traceability Markings, Purchase Or Work Orders Must Specify A Method And Marking location For Remarking. The Contractor Must Also Ensure That Subcontractor Production Controls Are Adequate To Preclude Commingling Of Materials During Processing. 3.37 Receiving Inspection - 3.37.1 Products And Services Produced By Sub-tier Suppliers For Incorporation In The Contract End Item Must Be Subject To Inspection Or Audit At The Time Of Receipt By The Prime Prior To Further Processing Within The Prime Contractor's Plant Or Shipment To another Location. 3.37.2 Receiving Inspection Must Include As A Minimum - verification That The Traceability Marking On The Material Agrees With That On The Certification Test Reports. verification That Certification Test Reports Are Legible And Complete. verification That The Contents Of The Certification Test Reports Are In Compliance With The Contractually Invoked Specifications And Requirements. 3.38 Discrepancy Reporting - 3.38.1 Nonconforming Products From Sub-tier Suppliers Must Be Identified And Processed In Accordance With The Prime Contractor's Procedures For Controlling Nonconforming Products. The Prime Contractor Must Report The Receipt Of Any Nonconforming Products To the Responsible Sub-tier Supplier In Accordance With Established Procedures. Nonconforming Material Records Must Be Maintained And Available For Review By The Government Quality Assurance Representative (qar). 3.39 Final Inspection - The Following Inspections Must Be Performed Prior To Government Inspection And Acceptance. 3.39.1 Material Sampling - Material Must Be Inspected For Form, Fit, And Function. Lot Acceptance Must Be Based On Zero Defects And Lot Rejection Based On One Defect. The Sample Size Must Be In Accordance With The Sampling Plan(s) In The Applicable Military specification Or Standard, Federal Specification Or Standard, Or Drawing To Which The Material Was Manufactured. In The Absence Of Such Sampling Plans, Sampling Inspection Must Be Per Ansi/asq-z1.4, General Inspection Level Ii (for Sample Size Selection Code), table Iia (for Sample Size). small Lot Sizes - For Lot Sizes Of Fifty Or Less, The Minimum Sample Size Must Be Eight Units. For Lot Sizes Of Eight Or Less, The Sample Size Must Be One Hundred Percent Of The Lot. 3.39.2 The Manufacturer May Elect To Use Statistical Process Control (spc) To Assure Product Quality In Lieu Of The Above Attribute Sampling Plan, Provided That The Spc Methodology/system Used Provides Acceptable Products To The Government. However, The government/navy Receipt Inspection Activity May Perform Their Acceptance Inspection Of The Material Using The Attribute Sampling Plan Outlined Above. 3.39.3 All Data Concerning Material Verification (chemical, Mechanical Or Physical Properties), Traceability (material Certifications To Material Marking), And Nondestructive Test (ndt) Certifications For Material Must Be 100% Inspected. The Certification test Reports Must Also Be 100% Inspected For Completeness And Legibility. 3.39.4 All Material Requiring Traceability Must Be 100% Inspected For Traceability Marking And That The Marking Is Legible. 3.40 Additional Marking For Fasteners - Fasteners Must Be Marked In Accordance With ;mil-dtl-1222, Except The Self-locking Hex Nuts Must Be Marked In Accordance With Nasm 17828. Nasm 17828 Nuts Must Be Marked On The Wrenching Surface With The Manufacturer's identification Symbol, Material Symbol And Heat/lot Traceability Code; . The Method Of Marking Must Be Types I, Ii, Iii, V, Viii Or Ix Of Mil-std-792 Except For Grades 410, 416 And 431 In The H Condition And Grades 8, 630, A574, And 4340 Which Must Be Marked by Method Ii When Marking Is Applied After The Final Heat Treatment. Markings On Fasteners That Are To Be Coated Must Be Marked Prior To Coating And Have A Minimum Depth Of 4 Mils. Traceability Marking Must Be Legible After The Application Of Protective compounds. 3.40.1 Marking Is Required For All Fasteners Regardless Of Size And Must Include The Material Symbol, The Manufacturer's Identification Symbol, And The Traceability Marking. Marking Must Be Applied On The Head Of Headed Fastener (top Preferred, Side location If Necessary). Self-locking Screws Must Also Be Marked With Six Dots. Where No Contract Invoked Specification Requirement Exists For This Marking, Self-locking Fasteners Must Be Marked With Six Dots Approximately .032" Diameter, Raised Or Depressed by Approximately .010" Located On The Top Perimeter Of The Head Of The Fastener In An Arc Or Circular Pattern. The Six Dots Must Be Distinguishable From All Other Required Markings. 3.40.2 In Addition To All Other Marking, The Cure Date Of The Molded Seal Must Be Marked On The Outside Of Each Unit Package. 3.41 See Cdrl Di-misc-80678 (special Emphasis C Of C) - The Certificate Of Compliance Must Show Traceability To The Marking Applied On Each Individual Item, And Must Contain The Following Information: 1. Contractor's Name, Address And Date. 2. The Contract/purchase Order Number (for Example: N00104-11-p-fa12) 3. The National Stock Number (nsn). The 18 Character National Stock Number For Special Emphasis Material Includes The Two Digit Cog, The Four Digit Fsc, The 9 Digit Niin, And The Two Digit Smic (for Example: 1h 4820 012345678 L1) ("n/a" When Not Applicable). 4. Lubricants, Sealants, Anti-seize, And/or Thread Locking Compounds ("n/a" When Not Applicable). 5. Certification That O-rings, Packing, Gaskets, Or Other Elastomeric Products Were Installed In A Compressed State Within An Assembly Or Sub-assembly, Prior To Expiration Of The Shelf Life ("n/a" When Not Applicable). 6. Manufacturer's Compound Number ("n/a" When Not Applicable). 7. When Weld Procedure Submittal Is Required By The Contract, A Statement That The Approval Date Of The Qualification Data Precedes Any Production Or Repair Welding Performed On This Contract. ("n/a" When Not Applicable). 8. A Statement To The Effect That All Items Furnished On This Contract Are In Full Compliance With The Specifications And Requirements And List Each Contractually Invoked Conformance/compliance Test Performed By Name And That It Was Performed satisfactorily. 9. Contractor's Or Authorized Personnel's Signature. 4. Quality Assurance 4.1 Notes To Dcma Qar And The Contractor - 4.1.1 Dcma Qar And The Contractor For Proprietary Designs - Departures From Contractor Imposed Requirements, Not Specifically Covered By The Contract, Must Be Judged Individually On The Basis Of The Effect, If Any, On Contractual Requirements. When There Is A disagreement Between The Contractor And The Government Representative As To The Effect On Contractual Requirements, The Departure Must Be Considered A Nonconformance And Be Submitted To The Pco For Disposition. 4.1.2 Dcma Qar And The Contractor For Proprietary Designs - All Records Of Departures From Contractor Imposed Requirements Must Be Maintained And Available For Review At The Contractor's Facility. A Copy Must Be Given To The Local Government Representative. A record Of These Departures, Traceable To The Applicablepart Number And Contract Number Must Be Submitted To The Pco. 4.1.3 Dcma Qar And The Contractor For Proprietary Designs - For Proprietary Designs, The Contractor's Part Numbers Are Acceptable For Reference Only. The Delivered Material Must Conform To All Drawings, Specifications, And Other Contractual Requirements. 4.1.4 Dcma Qar - It Is The Responsibility Of Dcma Qar To Review Non-destructive Testing (ndt) Procedures For Navsup Contracts/purchase Orders. 4.1.5 Dcma Qar And The Contractor - The Ecds (electronic Contractor Data Submission) System Is Available For Certain Data Submissions And To Submit Questions And Clarifications, And Waiver Requests On Contracts And Solicitations. Ecds Can Be Found At: https://register.nslc.navy.mil/ 5. Packaging 5.1 Preservation, Packaging, Packing And Marking - Preservation, Packaging, Packing And Marking Must Be In Accordance With The Contract/purchase Order Schedule And As Specified Below. mil-std 2073 Packaging Applies As Found Elsewhere In The Schedule 6. Notes 6.1 Several Definitions Of Terms That Apply To Csi Items Are Listed Below. All Terms May Not Apply To Every Item. 6.1.1 The Ecds (electronic Contractor Data Submission) System Is At: Https://register.nslc.navy.mil/ This Application Will Require Advance Registration Using A Pki Digital Certificate On A Cac. A Vendor User Guide Is Available As Csd001 In The Csd (contract Support Document) Library Within Ecds. 6.1.2 Critical Safety Item (csi) - Any Ship Part, Assembly, Or Support Equipment Containing A Critical Characteristic Whose Failure, Malfunction, Or Absence Of Which Could Cause A Catastrophic Or Critical Failure Resulting In Loss Of, Or Serious Damage To The ship, Or Unacceptable Risk Of Personal Injury Or Loss Of Life. 6.1.3 Critical Process - As Determined By The Twh, Any Process, Operation Or Action Performed On A Ship Csi That Serves To Establish A Critical Characteristic (such As Welding, Soldering, Machining, Polishing, Cleaning, Or Assembling) Or Confirm That A critical Characteristic Is Within Drawing Or Specification Compliance (such As, Testing, Measurement, Or Non-destructive Evaluation). 6.1.4 First Article - Pre-production Models, Initial Product Samples, Test Samples Produced To Ensure A Manufacturer's Capability To Meet Full Specification Requirements. 6.1.5 First Article Test (fat) - Contractually Required Testing And Inspection Of A Supplier's Pre-production, Production, Or "production Representative" Specimens To Evaluate A Manufacturer's Ability To Produce Conforming Product Prior To The Government's commitment To Receive Subsequent Production Items. First Article Testing Is Product Specific And Does Not Assess Manufacturing Process Controls Nor Does It Assure The Effectiveness Of The Manufacturer's Quality Program. 6.1.6 Government Source Inspection (gsi) - Gsi Is Independent Oversight Performed By A Government Representative Usually A Dcma Quality Assurance Representative (qar)) To Assure That Those Unique Product Quality And System Elements, Identified By The contracting Agency As Important, Are Observed And Evaluated. 6.1.7 Quality Assurance Letter Of Instruction (qali) - A Qali Is A Formal Document Initiated By A Contracting Activity That Provides Essential Requirements And Instructions For Contracted Materials To Be Independently Verified And Accepted By A Government representative Prior To Shipment. 6.1.8 Objective Quality Evidence (oqe) - The Quantitative And Qualitative Data Of All Mechanical, Chemical, And Performance Tests Performed (as Required By The Applicable Specification, Drawing, Or Purchase Document) To Prove That The Material Supplied conforms To The Specified Requirements. 6.1.9 Surface Discontinuity - Any Surface Irregularity, Marking, Or Localized Change In Physical Character Of The Surface, Other Than Dimensional, That Exists Infrequently At One Or Several Places. (examples: Burrs, Dents, Nicks, Scratches, Gouges, Pits, center-punches, Scribes, And Tool Marks) Surface Discontinuities Less Than 0.005-inch In Depth Are Acceptable Provided They Do Not Violate Any Other Design Requirements Specified In This Contract/purchase Order. 6.1.10 Traceability Code - A Code Or Number Providing Traceability To The Actual Chemical And Mechanical Properties Of The Specified Heat, Batch, Or Form From Which The Material Originated. 6.1.11 Verification - An Examination Performed To Determine Compliance With A Specific Requirement. 6.1.12 Nonconformance - A Nonconformance Is Defined As Affecting Or Violating The Following: - The Requirements Of This Contract/purchase Order. - Contractually Invoked Drawings (i.e. Envelope Dimensions, Interface Dimensions With Mating Parts/equipment, Center Of Gravity, Weights, Piece Part Identification, Material, Etc.). - Contractually Invoked Federal, Military, Or Commercial Specifications And/or Standards. - Form, Fit, Function, Performance To Contract Requirements, Reliability, Maintainability, Interchangeability, Safety Of Personnel
Closing Date18 Apr 2024
Tender AmountRefer Documents 

DEPT OF THE NAVY USA Tender

United States
Description: Contact Information|4|n743.5|tbd|7176053229|joel.j.curtis.civ@us.navy.mil| item Unique Identification And Valuation (jan 2023)|19|||||||||||||||||||| higher-level Contract Quality Requirement (navicp Review Feb 1991)(feb 1999)|1|see Specification Sections C And E.| inspection Of Supplies--fixed-price (aug 1996)|2||| wide Area Workflow Payment Instructions (jan 2023)|16|stand-alone Receiving Report-certifications Combo-receiving Report & Invoice-material |na|tbd|n00104|tbd|n39040 - Certifications, S4306a - Material |n50285|tbd|133.2|na|na|n39040 - Certifications|na|na|see Dd 14523|port_ptnh_wawf_notification@navy.mil| navy Use Of Abilityone Support Contractor - Release Of Offeror Information (3-18))|1|| equal Opportunity (sep 2016)|2||| warranty Of Supplies Of A Noncomplex Nature (june 2003)|6|one Year From Date Of Delivery.|one Year From Date Of Delivery.||||| warranty Of Data--basic (mar 2014)|2||| buy American-free Trade Agreements-balance Of Payments Program-basic (feb 2024)|11|||||||||||| alternate A, Annual Representations And Certifications (nov 2023)|13|||||||||||||| buy American-free Trade Agreements-balance Of Payments Program Certificate-basic (feb 2024))|5|||||| buy American-balance Of Payments Program Certificate-basic (feb 2024)|1|| annual Representations And Certifications (may 2024)|13|332919|750 Employees|||||||||||| notice Of Priority Rating For National Defense, Emergency Perpardeness, And Enrgy Progam Use (april 2008))|2||x| 1. Data Item A001 (inspection And Test Plan) May Be Waived If Already On File At Navsup Wss Mech. 2. This Is A Rated Order Certified For National Defense Use,and The Contractor Will Follow All The Requirements Ofthe Defense Priorities And Allocations Systemregulation (15 Cfr 700). 3. This Solicitation Is And Resulting Award Will Be Issued Iaw Eaf. 1. Scope 1.1 The Material Covered In This Contract/purchase Order Will Be Used In A Crucial Shipboard System. The Use Of Incorrect Or Defective Material Would Create A High Probability Of Failure Resulting In Serious Personnel Injury, Loss Of Life, Loss Of Vital shipboard Systems, Or Loss Of The Ship Itself. Therefore, The Material Has Been Designated As Special Emphasis Material (level I, Scope Of Certification, Or Quality Assured) And Special Control Procedures Are Invoked To Ensure Receipt Of Correct Material. 2. Applicable Documents 2.1 Order Of Precedence - In The Event Of A Conflict Between The Text Of This Contract/purchase Order And The References And/or Drawings Cited Herein, The Text Of This Contract/purchase Order Must Take Precedence. Nothing In This Contract/purchase Order, however, Must Supersede Applicable Laws And Regulations Unless A Specific Exemption Has Been Obtained. 2.2 Applicable Documents - The Document(s) Listed Below Form A Part Of This Contract/purchase Order Including Modifications Or Exclusions. 2.2.1 Specification Revisions - The Specification Revisions Listed Under "documents References" Below Are The Preferred Revision. Older And/or Newer R Evisions Are Acceptable When Listed Within Contract Support Library Reference Number Csd155 In Ecds (electric contractor Data Submission) At: Ht Tps://register.nslc.navy.mil/. This Is To Allow Contractors To Use Certain Acceptable Older Specification Revisions To Purge Their Existing Stock Of Material Certified To Those Older Revisions Or To Use Newer Specification revisions When Material Is Certified To Newly Released Revisions,without Requiring The Submittal Of Waiver/deviation Requests For Each Specification Revision On Every Contract. Revisions Of Specifications Reflecting Editorial And/or Re-approval (e.g. E2009, r2014, Etc.) Are Considered Inconsequential, But Are Acceptable When Their Revisions Are Listedwithin Csd155 Or Elsewhere Within This Contract. 2.2.2 "document References" Listed Below Must Be Obtained By The Contractor. Ordering Information Is Included As An Attachment To This Contract/purchase Order. 2.2.3 The Documents And Drawings Listed Below Under Drawing No. Are Not Provided With This Contract/purchase Order. drawing No Cage Rev Distr Cd ;300057 27826 H B 299931 27826 C B 299956 27826 A B 300028 27826 A B 299958 27826 A B 299960 27826 D B 299961 27826 B B; document Ref Data=fed-std-h28 | | |b |190424|a| | | document Ref Data=fed-std-h28 |0020| |b |941221|a| |01| document Ref Data=ff-s-86 | | |g |210127|a| | | document Ref Data=ansi/asq Z1.4 | | | |080101|a| | | document Ref Data=qq-n-281 | | |d |851023|a| 2| | document Ref Data=qq-n-286 | | |g |001207|a| | | document Ref Data=astm-a574 | | | |211201|a| | | document Ref Data=astm-f606 | | | |191115|a| | | document Ref Data=mil-std-792 | | |f |060519|a| | | document Ref Data=mil-dtl-1222 | | |j |001208|a| | | document Ref Data=astm-e1417 | | | |160615|a| | | document Ref Data=astm-e1444 | | | |160601|a| | | document Ref Data=mil-std-2035 | | |a |950515|a| | | document Ref Data=mil-std-2132 | | |d |080310|f| |01| document Ref Data=astm-d4066 | | | |130701|a| | | document Ref Data=iso_9001 | | | |081115|a| | | document Ref Data=iso10012 | | | |030415|a| | | document Ref Data=mil-dtl-15024 | | |g |180303|a| | | document Ref Data=mil-c-15726 | | |f |911008|a| 1| | document Ref Data=mil-t-16420 | | |k |880916|a| 1| | document Ref Data=iso/iec 17025 | | | |050515|a| | | document Ref Data=mil-dtl-18240 | | |f |000313|a| 1| | document Ref Data=qpl 18240 | | |qpd|120521|a| | | document Ref Data=mil-dtl-24202 | | |a |171017|a| | | document Ref Data=mil-c-24679 | | | |880506|a| | | document Ref Data=qpl 25027 | | |17 |000207|a| | | document Ref Data=mil-i-45208 | | |a |810724|a| 1| | document Ref Data=mil-std-45662 | | |a |880801|a| | | document Ref Data=a-a-50433 | | | |890815|a| | | document Ref Data=ansi/ncsl Z540.3 | | | |130326|a| | | document Ref Data=0900-lp-001-7000 | | | |810101|c| |01| document Ref Data=0900-lp-003-8000 | | | |740701|a| |02| document Ref Data=aia/nas Nasm 17828 | | |1 |130430|a| | | document Ref Data=aia/nas Nasm 25027 | | |1 |121221|a| | | document Ref Data=s9074-aq-gib-010/248 | | |1 |191112|a| | | document Ref Data=t9074-as-gib-010/271 | | |1 |140911|a| | | document Ref Data=s9074-ar-gib-010a/278 (chg A) | | | |130214|a| | | 3. Requirements 3.1 ;the 1/2 Inch, 700 Psi, Flanged, Seawater Sound Isolation Coupling Must Be In Accordance With Murdock Drawing 299931, Assembly 299931-100, Except As Amplified Or Modified Herein.; 3.2 Material For Parts Requiring Certification - Quantitative Chemical And Mechanical Analysis Is Required For The Parts Listed Below Unless Specifically Stated Otherwise: part - ;body, Item 1 And Attach Flange, Item 3 On Murdock Drawing 299931; Back Flange, Item 1 On Murdock Drawing 300028; Thread End, Item 3 And Flare End, Item 2 On Murdock Drawing 299961; material - ;mil-c-15726, Alloy C71500 Or Mil-c-24679, Alloy C71500; part - ;stud, Item 5 On Murdock Drawing 299931; material - ;qq-n-281, Class A; part - ;socket Head Cap Screw, Item 4 On Murdock Drawing 299931; material - ;ff-s-86, Qq-n-286, Form 2, Annealed And Age Hardened With Self-locking Element In Accordance With Mil-dtl-18240; part - ;self-locking Nut, Item 6 On Murdock Drawing 299931; material - ;qq-n-281, Class B, Cold Drawn self-locking Element- Astm-d4066, Group 01, Class 1, Grade 1; part - ;elbow, Item 1 On Murdock Drawing 299961; material - ;mil-t-16420, Type I, Composition 70/30 And In Accordance With Murdock Drawing 300057 And Mil-dtl-24202; 3.3 Testing Certification - Certifications Are Required For The Following Tests On The Items Listed Below. Additional Testing On Other Piece Parts (if Any) Per Applicable Drawings And Specifications Is Still Required, But Certifications Are Only Required As listed Below. test - Non-destructive Tests item - ;weld Repair (as Applicable); performance - Per Applicable Fabrication Specification acceptance - Per Applicable Fabrication Specification test - ;dye Penetrant Inspection; item - ;body, Item 1 And Attach Flange, Item 3 On Murdock Drawing 299931; Back Flange, Item 1 On Murdock Drawing 300028; Thread End, Item 3 And Flare End, Item 2 On Murdock Drawing 299961; performance - ;t9074-as-gib-010/271; acceptance - ;for Mil-c-15726 Material: Mil-std-2035 Or 0900-lp-003-8000; For Mil-c-24679 Forgings: Mil-c-24679; test - ;liquid Penetrant Inspection; item - ;socket Head Cap Screw, Item 4 And Stud, Item 5 On Murdock Drawing 299931; performance - T9074-as-gib-010/271; Sampling Must Be Per Mil-dtl-1222 acceptance - Mil-dtl-1222 test - ;dye Penetrant Inspection For Non-magnetic Grades; item - ;self-locking Nut, Item 6 On Murdock Drawing 299931; performance - T9074-as-gib-010/271 Or Astm-e1417/astm-e1444 (method C Solvent Removal Techniques Must Not Be Used On Thread) acceptance - ;nasm25027; test - ;dye Penetrant Inspection; item - ;elbow, Item 1 On Murdock Drawing 299961; performance - ;t9074-as-gib-010/271; acceptance - ;mil-std-2035 Or 0900-lp-003-8000; test - ;5x Visual Magnification Or Dye Penetrant Inspection (root Layer); item - ;weldments; performance - ;t9074-as-gib-010/271; acceptance - ;mil-std-2035 Or 0900-lp-003-8000; test - ;visual And Dye Penetrant Inspection (final Layer); item - ;weldments; performance - ;t9074-as-gib-010/271; acceptance - ;mil-std-2035 Or 0900-lp-003-8000; test - ;hydrostatic Pressure Test; item - ;each Assembly; performance - ;murdock Drawing 299931 Note 6 +50/-0 Psig For 5 Minutes Minimum; acceptance - ;no Leakage Or Permanent Deformation; attribute - Certificate Of Completion item - Self-locking Nut Nonmetallic Insert performance - ;astm-d4066, Group 01, Class 1, Grade 1; test - Quality Conformance Tests item - Self-locking Nuts performance - ;nasm25027; acceptance - ;nasm25027; attribute - Certificate Of Compliance item - Self-locking Nuts performance - This Certificate Must State That Self-locking Nuts Were Manufactured By An Approved Source. Approved Sources Are Those Listed On Qpl-25027 For The Appropriate Fastener. This Qpl May Also Be Considered As Approved Sources For Heavy Hex self-locking Nuts. attribute - Annealing And Age Hardening item - ;socket Head Cap Screw, Item 4 On Murdock Drawing 299931; performance - Qq-n-286 test - Ultrasonic Inspection On Starting Material item - ;all Items Requiring Certification Made From Qq-n-286 With A Diameter Or Minimum Distance Between Parallel Surfaces Of 4 Inches Or Greater Of The Starting Material, Or When Required By A Drawing Or Specification Invoked Elsewhere In This Contract; performance - T9074-as-gib-010/271 Or Mil-std-2132, And Qq-n-286 acceptance - Qq-n-286 attribute - Certificate Of Compliance For Seamless Tubing/pipe item - ;elbow, Item 1 On Murdock Drawing 299961; performance - Material Supplied Must Be In The Seamless Condition. 3.4 The Pressure Tolerance Must Be As Specified In The Assembly Drawing, Detail Drawing, Design Specification Or Elsewhere In This Contract. Where Pressure Tolerances Are Not Provided By Drawings, Specifications Or Specified Elsewhere In This Contract, The following Must Be Used: For Pressure Tests Below 100 Psig, The Pressure Tolerance Must Be +1 Psig / -0 Psig. For Pressure Tests At Or Above 100 Psig Up To And Including 2500 Psig, The Pressure Tolerance Must Be +2% / -0 Psig Rounded Off To The Nearest Multiple Of The Smallest Graduation On An Analog Test Pressure Gauge, Not To Exceed 50 Psig. For Pressure Tests Above 2500 Psig, The Pressure Tolerance Must Be +2% / -0 Psig, Rounded Off To The Nearest Multiple Of The Smallest Graduation On An Analog Test Pressure Gauge, Not To Exceed 200 Psig. the Pressure Test Time Tolerance Must Be As Specified In The Assembly Drawing, Detail Drawing, Design Specification Or Elsewhere In This Contract. Where Pressure Test Time Tolerances Are Not Provided By Drawings, Specifications Or Specified Elsewhere In This contract, The Following Must Be Used: For A Test Duration Up To And Including 1 Hour, The Tolerance Must Be +5 Minutes / - 0 Minutes. For A Test Duration Of More Than 1 Hour Up To And Including 24 Hours, The Tolerance Must Be +30 Minutes / - 0 Minutes. For A Test Duration Of More Than 24 Hours, The Tolerance Must Be +60 Minutes / - 0 Minutes. 3.5 Recorded Dimensions - A Certification Of Recorded Dimensions As Depicted In Note 6 Of Murdock Machine And Engineering Company Drawing 300057 Is Required. Certification Must Include The Actual Measured Dimensions. At The Time Of Receipt Inspection, rejection Of Any Single Piece Must Be Cause For Rejection Of The Entire Lot. 3.6 Radiography Is Required On ;weldments Per Note 2 On Murdock Drawing 299961 And Must Be Identified To The Weld Joint; . 3.7 K-monel Fasteners - Material Must Be Heat Treated Per Qq-n-286. 3.7.1 Fasteners That Have Been Hot Or Cold Headed Or Roll Threaded Must Be Solution Annealed Followed By Age Hardening Subsequent To All Heading And Thread Rolling Operations. The Mechanical Properties On Certifications Must Be Actual Properties Of The annealed And Age Hardened Material And Must Meet The Requirements Of Qq-n-286. 3.7.2 Qq-n-286 Fasteners That Have Been Headed And/or Roll Threaded Must Not Beage Hardened Unless The Material Has Been Solution Annealed Subsequent To The Heading And Threading Operations. Threads Formed After The Final Age Hardening Heat Treatment Must Be cut Or Ground Only. 3.8 Ff-s-86 Mechanical Property And Metallographic Testing Sample Sizes Must Use Asq Z1.4 Inspection Level S-1 With Aql = 1.0.note: The Sample Size Values Must Conform To Ff-s-86e And Earlier Revisions. 3.9 Wedge Tensile Test Specimens (headed Fasteners) - A Wedge Tensile Test Must Be Conducted On A Full Size Fastener For Each Production Lot And Reported Aspart Of The Mechanical Properties. The Required Specimens For The Wedge Tensile Test Must Be Separate fasteners From Those Required For The Yield Test. 3.9.1 Testing For Socket Head Cap Screws Must Be In Accordance Mil-dtl-1222, Paragraphs 4.5.2.3 And 4.5.2.3.1. 3.9.2 Testing For All Other Headed Fasteners With A Nominal Diameter Greater Than 1/4-inch Must Be In Accordance With Astm-f606 For Grades 5, 8, B7, And B16.for All Other Grades, The Following Wedge Angles Must Be Used. a. Except As Specified In Item C Below, Fasteners With A Nominal Diameter Of 1/4-inch Through 1-inch (inclusive) Must Be Tested With A Ten Degree Wedge. b. Except As Specified In Item C Below, Fasteners With A Nominal Diameter Over 1-inch Must Be Tested With A Six Degree Wedge. c. Fasteners That Are Of Grades 8, B7, B16, 410, 416, 416se, 431, And 630 And Are Threaded Within One Diameter To The Underside Of The Head Must Be Tested As Follows: sizes 1/4 Inch Through 3/4 Inch (inclusive) Use A Six Degree Wedgesizes Over 3/4 Inch Use A Four Degree Wedge d. Fasteners Which Have Passed Testing With Wedge Angles Greater Than Those Specified Should Be Considered Acceptable. 3.9.3 For Fasteners Having A Length Less Than The Minimum Specified In Table 1 Of Astm-f606, One "test Specimen Fastener" Must Be Manufactured From Each Lot Of Fasteners And Tested To Represent That Lot. The Length Of These Test Specimen Fasteners Must Meet the Minimum Specified In Table 1 Of Astm-f606 But Must Not Exceed It By More Than 1/4 Inch. Test Specimen Fasteners Must Be The Same Type, Style, And Diameter As The Production Lot And Must Be Manufactured From The Same Starting Material, Using The Same manufacturing Techniques As The Production Lot, And Must Be Heat Treated (if Required) Along With The Production Lot. 3.10 Slow Strain Rate Tensile Test Laboratories - The Slow Strain Rate Tensile Test Of Qq-n-286 Must Be Performed By One Of The Following Laboratories: huntington Alloys, A Special Metals Company attn: Bill Bolenr 3200 Riverside Drive huntington, Wv 257059 phone: (304) 526-5889 fax: (304) 526-5973 metallurgical Consultants, Inc. attn: W. M. Buehler 4820 Caroline po Box 88046 houston, Tx 77288-0046 phone: (713) 526-6351 fax: (713) 526-2964 naval Surface Warfare Center, Carderock Division attn: Eric Focht Code 614 9500 Macarthur Blvd west Bethesda, Md 20817-5700 phone: (301) 227-5032 fax: (301) 227-5576 teledyne Allvac attn: Dr. W. D. Cao 2020 Ashcraft Ave. monroe, Nc 28110 phone: (704) 289-4511 fax: (704) 289-4269 westmoreland Mechanical Testing And Research Inc. attn: Andrew Wisniewski p.o. Box 388 youngstown, Pa 15696-0388 mannesmann Rohrenwerke mannesmann Forschungsinstitut (mfi) attn: Dr. Weiss postfach 251160 47251 Duisburg germany phone: 011-49-0203-9993194 fax: 011-49-0203-9994415 thyssenkrupp Vdm Usa, Inc. attn: D. C. Agarwal 11210 Steeplecrest Drive, Suite 120 houston, Tx 77065-4939 phone: (281) 955-6683 3.11 Specification Change - For Qq-n-281, Class B Material: 1 - Footnote 9 To Table Ii Of Qq-n-281 Does Not Apply. 2 - When Starting Material Is Round Bar Greater Than 3" Dia, The Mechanical Properties Of Hex Bar Apply. 3.12 Change Paragraph 3.2.5 Of Mil-f-24202 To Read: 3.2.5 All Finished Fittings Must Be Furnished In The Fully Annealed Condition. 3.2.5.1 After Annealing, Fittings Produced From Tubular Stock Must Not Exceed A Maximum Hardness Of 51 Rockwell 30t Determined In The Area Of Maximum Bending Or Forming When Manufactured In Accordance With Paragraph 3.2.3. 3.2.5.2 Fittings Produced From Bar, Plate, Or Forgings In Accordance With 3.2.4 Must Meet The Hardness Required By 3.2.5.1, Except That The Location For Hardness Tests May Be Any Area Of The Finished Fitting. 3.13 Changes To Mil-t-16420 Mechanical Properties (table Ii): copper Alloy Outside Tensile Yield Strength Elongation In and Temper Diameter Strength (.5% Under Load) 2" Or 4x Dia. 715 (70/30)...all.......50,000....18,000............30.0% (min) fully Sizes annealed 3.14 Mil-t-16420 Ut Changes - Delete Paragraph 3.4.3.4 And Substitute: "3.4.3.4 Laminations. Tube Required To Meet The Ultrasonic Requirements Specified In 3.4.3 Must Be Examined For Laminar Discontinuities That Present Indications Exceeding Exploration threshold Levels (20 Percent For The Contact Method At +6 Db; 30 Percent For The Immersion Method At Calibration) Must Be Rejected." 3.14.1 In The Second Sentence Of Paragraph 4.4.7; Delete "18 Inch" And Substitute "1 Inch". In The Last Sentence, Insert "3.4.3.4 And" Before "3.8.2". 3.15 Component Identification Description (cid) - When Applicable Drawing(s) And/or Specification(s) Specify That A Nameplate Or Identification Plate Is Required, The Cid Number ( ;cid 990997065; ) Must Be Added. When No Plate Is Specified, An Identification plate In Accordance With Mil-dtl-15024, Type "c" On Brass Or Type "h" On Aluminum Must Be Securely Attached To Each Assembly Showing The Above Cid Number. No Assembly Must Be Shipped Without The Cid Number Attached. 3.16 O-ring Grooves And Mating Sealing Surfaces Must Be Inspected Per The Contractually Invoked Drawings Or Specifications. When The Drawings Or Specifications Do Not Provide Specific Defect Criteria Or State That No Defects Are Allowed, The General acceptance Criteria (gac) Standard Must Be Used For Inspecting O-ring Grooves And Mating Sealing Surfaces Only. Repairs To Sealing Surfaces And O-ring Grooves With Unacceptable Defects May Be Accomplished Within The Limits Of The Size And Tolerances Provided in The Applicable Drawing. Repairs Thatwould Exceed These Limits Require Approval (including Final Dimensions). The Data That Is Red Lined (crossed Out) Is Excluded From The Gac For This Contract And Is Not To Be Used For Acceptance Or Rejection Criteria. the Gac Document Is Identified As Contract Support Library Reference Number Csd008 At Https://register.nslc.navy.mil/ 3.17 ;lubricant Per Cid A-a-50433 Must Be Used In Lieu Of Dod-g-24508.; 3.18 Internal Threads - All Internal Threads Must Be Formed By Cutting. Cold Forming Of Internal Threads Is Not Acceptable. 3.19 Thread Inspection Requirements - All Threads On Threaded Parts Must Be Inspected Using Appropriate Inspection Methods, Inspection Systems, And Inspection Gages/instruments In Accordance With Fed-std-h28 Series. Substitution Of Thecommercial Equivalent inspection In Accordance With Asme B1 Series Is Acceptable. 3.19.1 System 21 Of Fed-std-h28/20 Must Be Used As A Minimum Inspection Requirement For Threads When The Design Drawing Or Design Specification Does Not Specify An Inspection Requirement. 3.19.2 For Navy And Shipyard Drawings, System 21 Of Fed-std-h28/20 May Be Substituted For System 22 Without Further Navy Approval When The Design Drawing Invokes System 22 And Does Not Cite Governing Specifications That Specifically Require System 22. System 22 Of Fed-std-h28/20 Must Be Used When The Drawing References Other Governing Specifications That Specifically Require System 22, Such As Certain Thread Types Of Mil-dtl-1222. 3.19.3 A Written Request For Concurrence Must Be Submitted When Utilizing Alternative Measuring Equipment Or Measuring Systems Not Applicable To The Specified Inspection System. 3.20 Welding Or Brazing - When Welding, Brazing, And Allied Processes Are Required, As Invoked By Section C Paragraph 3 Requirements, They Must Be In Accordance With S9074-ar-gib-010a/278, 0900-lp-001-7000 For Brazing Of Piping And Pressure Vessel applications, Or S9074-aq-gib-010/248 For Brazing Of Other Applications. For All Production And Repair Welding And Brazing, Personnel And Procedures Must Be Qualified Under S9074-aq-gib-010/248 Or 0900-lp-001-7000, As Applicable. Repair Welding Is Not permitted On ;qq-n-286 Material; . Procedures And Qualification Data Must Be Submitted For Review And Approval Prior To Performing Any Welding Or Brazing. 3.21 Configuration Control - The Contractor Must Maintain The Total Equipment Baseline Configuration. For Items Of Proprietary Design, Contractor Drawings Showing The Latest Assembly Configuration Must Be Provided To The Government In Electronic (c4) Format. definitions Are Provided Elsewhere In The Contract/purchase Order. 3.21.1 Waivers/deviations - All Waivers And Deviations, Regardless Of Significance Or Classification Require Review And Approval By The Contracting Officer. Waivers And Deviations Must Be Designated As Critical, Major, Or Minor. The Contractor Must Provide a Copy Of This Request To The Qar. Requests Must Include The Information Listed Below. A. A Complete Description Of The Contract Requirement Affected And The Nature Of The Waiver/deviation (non-conformance), Including A Classification Of Critical, Major, Or Minor. B. Number Of Units (and Serial/lot Numbers) To Be Delivered In This Configuration. C. Any Impacts To Logistics Support Elements (such As Software, Manuals, Spares, Tools, And Similar) Being Utilized By Government Personnel Or Impacts To The Operational Use Of The Product. D. Information About Remedial Action Being Taken To Prevent Reoccurrence Of The Non-conformance. 3.21.2 All Requests For Waivers/deviations On Navsup-wss Contracts Must Be Submitted To The Navsup Wss Contracting Specialist Via Email. 3.21.3 Ecps - The Government Will Maintain Configuration Control And Change Authority For All Modifications Or Changes Affecting Form, Fit, Function, Or Interface Parameters Of The Equipment And Its Sub-assemblies. The Contractor Must Submit An Engineering change Proposal (ecp) For Any Class I Or Ii Changes That Impact The Equipment Covered By This Contract. Ecps Must Be Prepared In Contractor Format, And Must Include The Following Information: A. The Change Priority, Change Classification (class I Or Class Ii), And Change Justification. B. A Complete Description Of The Change To Be Made And The Need For That Change. C. A Complete Listing Of Other Configuration Items Impacted By The Proposed Change And A Description Of The Impact On Those Cis. D. Proposed Changes To Documents Controlled By The Government. E. Proposed Serial/lot Number Effectivities Of Units To Be Produced In, Or Retrofitted To, The Proposed Configuration. F. Recommendations About The Way A Retrofit Should Be Accomplished. G. Impacts To Any Logistics Support Elements (such As Software, Manuals, Spares, Tools, And Similar) Being Utilized By Government Personnel In Support Of The Product. H. Impacts To The Operational Use Of The Product. I. Complete Estimated Life-cycle Cost Impact Of The Proposed Change. J. Milestones Relating To The Processing And Implementation Of The Engineering Change. 3.22 Mercury Free - Mercury And Mercury Containing Compounds Must Not Be Intentionally Added Or Come In Direct Contact With Hardware Or Supplies Furnished Under This Contract. Mercury Contamination Of The Material Will Be Cause For Rejection. 3.23 Navsea 0948-lp-045-7010 - Any Applicable Requirements Of Navships 4410.17,navsea 0948-lp-045-7010, Or 0948-045-7010 Which The Contractor Must Meet Are Included In This Contract/purchase Order. The Above Documents Are For Governmentuse Only. Further application Of The Above Documents Is Prohibited.prohibited. 3.23.1 Marking Of Material With A Material Designator Per The Drawing Is Also Prohibited, With The Exception Of Fasteners. Fasteners Must Be Marked With A Material Symbol/designator As Specified Elsewhere In This Contract. 3.24 Certificate Of Compliance - (special Emphasis Material) The Contractor Must Prepare And Submit A Certificate Of Compliance Certifying That The Items/components Furnished Under This Contract Comply With The Requirements Of The Procurement Document, including Any/all Invoked Specifications And Drawings. ^ Quality Assurance Requirements ^ 3.25 See Cdrl Di-misc-80678 (test Certification) - A Statement Of Tests Performed, Listing The Pieces Tested Must Be Furnished Along With A Copy Of The Test Results. Certification Must Include The Contractor's Name, Address And Date, Quantity Inspected, identified To The Contract/purchase Order And Item Number, And The Contractor's Or Authorized Personnel's Signature. Test Certifications Must Reference The Standard/specification, Including The Revision, To Which The Testing Was Performed And The Acceptance criteria Used. Test Procedure Numbers May Also Be Referenced On Test Reports. Test Reports On Weldments Must Be Identified To Weld Joint And Layer. 3.26 See Cdrls Di-misc-80875 (welding Procedures) And Di-misc-80876 (weld Procedure Qualification Data) - When Production Or Repair Welding Is Required, The Applicable Welding Procedure(s) And Qualification Data Must Be Submitted For Review And Approval. In addition, The Consumed Weld Metal C Of C As Defined Below Must Be Submitted As Part Of The Certification Oqe Package Submitted By The Contractor. note: These Requirements Do Not Apply To Tack/spot Welds When The Conditions Of Section 4.2.1.1 Of S9074-ar-gib-010a/278 Are Met. 3.26.1 Approval Of The Contractor's Qualification Data Must Be Obtained Prior To Performing Any Welding (production Or Repair). 3.26.2 If The Contractors Qualification Data Has Previously Been Approved By The Navy For Other Contracts, A Copy Of The Original Approval Letter May Be Submitted Along With The Procedures And Qualification Data Report To Expedite The Approval Process. The approval Letter Must Reference The Applicable Welding Procedure And Qualification Data Report Identification/number. Prior Approval Does Not Guarantee Acceptance For This Or Any Future Contracts. As Far As Practical, All Procedures For The Contract Must Be submitted At The Same Time. Welding Procedures And Qualification Data Must Be Submitted In A Commercially Available Electronic Format Such As Adobe Acrobat Pdf. The Contractor Must State The Applicability Of Each Weld Procedure And Qualification Data Submitted, citing The Drawing Number And Pieces To Be Welded. (i.e. "wp-123 And Qd-123 Are Submitted For The Weld Joint Between Pieces 1 And 2 On Drawing Abc." Wp-456 And Qd-456 Are Submitted For The Hardfacing Of Piece 3 On Drawing Xyz.") 3.26.3 The Pco's Authorization For The Use Of Weld Procedure(s) And Qualification Data For The Specific Application As Submitted Does Not Mitigate The Vendors Responsibility To Comply With The Requirements Of S9074-aq-gib-010/248, S9074-ar-gib-010a/278, And the Contract. 3.26.4 Authority For The Repair Of Special Repairs In Castings, The Repair Of Wrought Material, Or The Repair Of Forged Material Must Be Obtained Via Request For Waiver From The Procurement Contracting Officer. This Request Must Describe The Defect; Including size, Depth, Location, And A Description Of The Proposed Repair. Repairs Deemed Minor Or Nominal In Accordance With S9074-ar-gib-010/278 Can Be Made At Contractor Discretion In Accordance With S9074-ar-gib-010/278 Requirements; However, Weld Procedure specification (wps) And Procedure Qualification Record (pqr) Submittals Are Still Required. This Request For Navsup-wss Contracts Must Be Submitted Via The Electronic Contractor Data Submission (ecds) Application. 3.26.5 Any New Procedure Qualification Performed Under This Contract Will Require The Vendor To Provide A Minimum 72 Hour Notification To Dcma With An Offer To Observe The Welding Of The Test Assemblies. The 72 Hour Time Limit May Be Modified Upon Mutual agreement Between The Vendor And Dcma. 3.26.6 When Drawings Require Hardfacing Surface Iron Or Nickel Content Not To Exceed 5%, The Contractor Must Verify Surface Iron Or Nickel Content By Performing Chemical Testing As Defined By The Applicable Drawing. The Chemical Test Results Must Be Submitted as Part Of The Qualification Data. 3.26.7 Additional Qualification Requirements For Production Hardfacing Thickness Less Than 1/8-inch: Macro-etch (or Legible Photomacrographs Clearly Showing The Fusion Area) Must Be Submitted For Review And Show Consistent, Minimized Dilution. All Essential elements And Any Elements Not Listed In S9074-aq-gib-010/248 That Influence Dilution Must Be In The Qualification Data And Weld Procedure, With Strict Limits Placed On Each Essential Element. 3.26.8 Preparation And Retention Of Weld Records Is Required, As Specified By Paragraph 4.1.3 Of S9074-ar-gib-010a/278. 3.26.9 When Production Or Repair Welding Is Required On Titanium Materials, The Applicable Fabrication Plan, Facilities Procedure, Training Plan, And Active Welder Qualification Must Also Be Submitted For Review And Approval. 3.26.10 If The Contractor's Fabrication Plan, Facilities Procedure, Training Plan, Or Active Welder Qualification Has Previously Been Approved By The Navy For Other Contracts, A Copy Of The Original Approval Letter May Be Submitted Along With The Applicable documentation To Expedite The Approval Process. The Approval Letter Must Reference The Applicable Documentation. Prior Approval Does Not Guarantee Acceptance For This Or Any Future Contracts. The Contractor's Fabrication Plan, Facilities Procedure, Training plan, And Active Welder Qualification Must Be Submitted At The Same Time As The Applicable Welding Procedure(s) And Weld Procedure Qualification Data. All Documentation Must Be Submitted In A Commercially Available Electronic Format, Such As Adobe Acrobat Pdf. 3.26.11 See Cdrl Di-misc-80678 (consumed Weld Metal) - A Certificate Of Compliance Is Required For All Weld Filler Metals Used For Production Or Repair Welding, And Must Include The Following: a) Filler Metal Lot Number(s) b) Specification And Type c) A Positive Statement That The Vendor Has Obtained Oqe And Verified That Each Lot Of Weld Filler Material Conforms To Specification Requirements. d) A Positive Statement Verifying That The Weld Filler Metals Were The Correct Material Type Or Grade Prior To Consumption. 3.26.12 When Production Welds Or Repair Welds Are Performed By A Subcontractor,the Requirement For Submission Of All Certification Documentation Required Herein Must Be Passed Down To The Subcontractor. 3.27 Radiography (rt) - Radiography Must Be Performed In Accordance With T9074-as-gib-010/271. Rt Acceptance Criteria For Weldments To Be Per The Applicabletable Of S9074-ar-gib-010a/278 (p-1 Piping) Or Mil-std-2035, Class 1, As Applicable. 3.27.1 Submission Of Radiographic Shooting Sketches For Approval Is Not Requiredfor Weldments. 3.27.2 All Pieces Radiographed Must Be Permanently Marked With "rt" And A Unique Traceability Number. (unique Traceability Number Must Be Directly Traceable To The Rt Film.) 3.27.3 See Cdrl Di-misc-80678 (production Radiography) - Production Radiographyrequires Final Acceptance By The Navy. The Items Listed Below Must Be Submitted For Final Acceptance, Cataloging, File, And Retention. They Must Be Submitted And Approved By The navy Prior To Shipment Of The Applicable Hardware. However, When The Source Certification Clause Is Invoked, They Must Be Submitted A Minimum Of Forty-five (45) Working Days Prior To The Date Of Source Certification Inspection. (a) Film (b) Rss/rsss (c) Rs (d) Dd250 (with Heat Numbers Corresponding To Rt Numbers Referenced In Block 16) 3.28 Quality System Requirements - The Contractor Furnishing Items Under This Contract/purchase Order Must Provide And Maintain A Quality System In Accordance With Iso-9001 As Amplified Or Modified Herein, With The Calibration System Requirements Of Iso-10012 or Ansi-z540.3 With Iso-17025. A Quality System In Accordance With Mil-i-45208, With The Calibration System Requirements Of Mil-std-45662, Is Acceptable As An Alternate. 3.28.1 The Contractor's Quality System And Products Supplied Under The System Are Subject To Evaluation, Verification Inspection, And Acceptance/nonacceptance By The Government Representative To Determine The System's Effectiveness In Meeting The Quality requirements Established In The Contract/purchase Order. 3.28.2 The Contractor's Quality System Must Be Documented And Must Be Available For Review By The Contracting Officer Or His Representative Prior To Initiation Of Production And Throughout The Life Of The Contract. The Prime Contractor Must, Upon notification, Make His Facilities Available For Audit By The Contracting Officer Or His Authorized Representative. 3.28.3 See Cdrl Di-qcic-81110 (inspection System Procedures) - All Suppliers Of Level I/subsafe (li/ss) Material Are Required To Submit A Copy Of Their Current Documented Quality System Procedures To The Procurement Contracting Officer (pco) Prior To Award Of any Contract/purchase Order. Suppliers That Have A Copy Of Their Current Quality System Procedures On File At The Procuring Activity May Request The Pco Waive This Requirement. 3.28.4 This Contract Provides For The Performance Of Government Quality Assurance At Source. The Place Or Places Of Performance May Not Be Changed Without The Authorization Of The Procurement Contracting Officer. Upon Receipt Of This Order, Promptly notify The Government Representative Who Normally Services Your Plant So That Appropriate Planning For Government Inspection Can Be Accomplished. If You Do Not Have An Assigned Government Representative, Notify The Nearest Defense Contract Management Agency (dcma) Office. In The Event That A Local Government Representative Or Dcma Office Cannot Be Located, Our Purchasing Agent Should Be Notified Immediately. 3.28.5 Any Changes Made By The Contractor To A Qualified Quality System Will Require Re-submittal To The Pco And Concurrence By The Government Quality Assurance Representative Prior To Adoption. 3.29 Contractor Inspection Requirements - The Contractor Must Maintain Adequate Records Of All Inspections And Tests. The Records Must Indicate The Nature And Number Of Observations Made, The Number And Type Of Deficiencies Found, The Quantities Approved And rejected And The Nature Of Corrective Action Taken As Appropriate. Inspection Records Must Be Traceable To The Material Inspected. 3.29.1 The Supplier's Gages, Measuring And Test Equipment Must Be Made Available For Use By The Government Representative When Required To Determine Conformance With Contract Requirements. When Conditions Warrant, The Supplier's Personnel Must Be Made available For Operations Of Such Devices And For Verification Of Their Accuracy And Condition. 3.29.2 All Documents And Reference Data Applicable To This Contract Must Be Available For Review By The Government Representative. Copies Of Documents Required For Government Inspection Purposes Must Be Furnished In Accordance With The Instructions Provided by The Government Representative. 3.30 Subcontractor Inspection Requirements - The Government Has The Right To Inspect At Source, Any Supplies Or Services That Were Not Manufactured Or Performed Within The Contractor's Facility. Such Inspection Can Only Be Requested By Or Under Authorization of The Government Representative. Any Purchasing Documents To A Subcontractor Must Cite The Applicable Portions Of The Contractually Invoked Quality System (e.g. Calibration Requirements), Plus Any Product Requirements That Apply To The Supplies Being purchased. When The Government Elects To Perform Source Inspection At The Subcontractor's Facility, Applicable Purchase Documents Must Be Annotated With The Following Statement: "a Government Inspection Is Required Prior To Shipment From Your Plant. Upon receipt Of This Order, Promptly Notify The Government Representative Who Normally Services Your Plant So That Appropriate Planning For Government Inspection Can Be Accomplished. If You Do Not Have An Assigned Government Representative, Notify The Nearest defense Contract Management Agency (dcma) Office. In The Event That A Local Government Representative Or Dcma Office Cannot Be Located, Our Purchasing Agent Should Be Notified Immediately." 3.30.1 The Prime Contractor's Program Must Include Procedures To Assess The Capability Of The Prospective Suppliers To Produce The Products Or Supply The Services In Accordance With The Contract, Prior To The Issuance Of Any Purchase Document. 3.30.2 Each Sub-tier Supplier Of Material Or Services For Items In Section 3 Of This Contract Must Be Subjected To A Periodic Review Or Audit By The Prime To Determine The Continued Capability Of The Supplier To Control The Quality Of The Products Or Services specified In The Purchase Order Or Contract. 3.30.3 The Prime Contractor Must Ensure That The Purchased Product Conformsto Specified Purchase Requirements And This Contract. The Type And Extent Of Control Applied To The Supplier And The Purchased Product Must Be Dependent Upon The Effect Of The purchased Product On The End Item Represented By This Contract. 3.30.4 The Prime Contractor Must Evaluate The Requirements Of The Contractand Select Suppliers Based On Their Ability To Supply The Product In Accordance With The Prime Contractor's Requirements And The Contract. Criteria For Selection And Evaluation Must Be established. Records Of This Effort Must Be Available For Review By The Government. 3.30.5 The Prime Contractor's Supplier Quality Assurance Program Must Provide For A Review Of Purchase Documents To Assure Applicable Quality Requirements Are Included Or Referenced In The Documentation For Compliance By The Supplier. 3.31 Government Furnished Material And/or Equipment (gfm/gfe) - When Material Or Equipment Is Furnished By The Government, The Contractor Must Develop Documented Control Procedures That Require At Least The Following: 3.31.1 Visual Examination Upon Receipt To Detect Damage During Transit. 3.31.2 Inspection For Completeness And Proper Type. 3.31.3 Verification Of Material Quality Received. 3.31.4 Periodic Inspection And Precautions To Assure Adequate Storage Conditions And To Guard Against Damage From Handling And Deterioration During Storage. 3.31.5 Functional Testing, Either Prior To Or After Installation, Or Both, As Required By The Contract To Determine Satisfactory Operation. 3.31.6 Identification And Protection From Improper Use Or Disposition. 3.31.7 Reporting To The Government, Any Gfm Or Gfe Property Found Damaged, Malfunctioning, Or Otherwise Unsuitable For Use. In The Event Of Damage Or Malfunction During Or After Installation, The Supplier Must Determine And Record Probable Cause And necessity For Withholding The Material From Use. 3.31.8 For Gfe Material, And As Required By The Terms Of The Bailment Agreement, The Supplier Must Establish Procedures For Adequate Storage, Maintenance, And Inspection Of Bailed Government Material. Records Of All Inspection And Maintenance Performed On bailed Property Must Be Maintained. 3.31.9 Material Returned To The Contractor Must Be Handled As Gfm. 3.32 Traceability And Certification Requirements - To Assure That Correct Materials Are Installed In Level I/subsafe Systems, It Is Imperative That Traceability Be Maintained From The Material To The Material Certification Test Report And Other Required objective Quality Evidence (oqe). The Material Certification Report Must Completely And Accurately Reflect That The Material Supplied Meets The Specified Requirements. Materials Requiring Traceability And Certification Data Are Identified Within Paragraph 3, section C Of This Contract/purchase Order. 3.32.1 The Following Provides The Minimum Requirements For Maintaining Material Traceability And Supplements The Requirements Specified In Di-misc-81020 And Elsewhere In The Contract/purchase Order. The Contractor Must Develop Written Procedures That implement The Material Control Requirements Stated Herein And Elsewhere In This Contract/purchase Order. 3.33 Material Traceability - The Certification Data Report Must Be Identified Through A Unique Traceability Number, Heat-lot Number, Or Heat-treat Number, As Applicable, Which Must Also Be Marked On The Material. This Traceability Marking On The Material Must provide Direct Traceability To The Material's Chemical Composition And Mechanical Properties Certification Data. For Material Produced By Batch, Continuous Cast, Or Continuous Pour Processes, Samples Must Be Taken No Less Than Once In Every Eight Hours Of operation For The Purpose Of Validating Proper Chemical Composition And Mechanical Properties. Traceability Must Be Maintained Through All Process Operations Including Any Subcontracted Operations, To The Finished Component. 3.33.1 Material Marking For Traceability And Identification - The Following Are The Minimum Marking Requirements. Additional/alternate Marking Requirements, If Applicable, Will Be Specified Elsewhere In The Contract/purchase Order. In Addition To The marking Requirements On Applicable Drawings And/or Specifications, Marking For Traceability Is Required. All Traceability Markings Must Be Permanently Applied In Accordance With Mil-std-792 (except As Specified Below). An Alternate Marking Method Is permissible Provided It Is An Available Option In The Contractually Invoked Specification Or Drawing, Except In Instances Where The Material Has Been Modified By This Contract/purchase Order And Differs From That Specified In The Specification Or Drawing. 3.33.2 Traceability Markings For Items With Precision Machined Or Plated Surfaces, Or Material With Suitable Marking Surface Areas Less Than 3/8 Inches Square (either 3/8" X 3/8" Or An Area Equal To 0.1406 Inches Square) Must Be Applied To A Durable Tag And the Tag Securely Affixed To The Material. 3.33.3 Traceability Markings Must Be Maintained Through Assembly, And Whenever Possible Must Be Visible After Assembly. For Items Where The Marking Is Not Visible After Assembly, A Durable Tag Must Be Securely Attached To The Assembly Identifying The Part number, Piece Number, Traceability Number, And The Location Of The Permanent Mark. 3.33.4 Marking Must Be Legible And Must Be Located So As To Not Affect The Form, Fit, And Function Of The Material. ;marking Area To Be As Shown On Drawing.; 3.34 See Cdrl Di-misc-81020 (chemical And Mechanical) - Material Certification - In Addition To The Certification Data Requirements Specified In Di-misc-81020, The Following Material Certification Requirements Apply: 3.34.1 Quantitative Chemical And Mechanical Analysis Of Material Traceable To Traceability Markings Is Required. Material Certification Test Reports Must Include The Class, Form, Condition, Grade, Type, Finish, And/or Composition, As Applicable, Of The material Supplied. 3.34.2 Re-identification And Re-certification Of Material Is Required When The Material Is Subjected To A Process Which Alters It's Properties. If The Starting Material Or Raw Stock Is Processed In A Manner That Will Not Affect Its Chemical Composition Or mechanical Properties, The Original Certifications For The Chemical Composition And Mechanical Properties, As Required By The Material Specification, Are Acceptable. Re-certification Of The Chemical Or Mechanical Properties Is Required If A Process Is Used during Fabrication That Alters The Original Properties Of The Material (e.g. Alloying, Heat Treating, Or Forming). In These Instances, The Properties Of The Material Must Be Re-determined And Documented To Reflect The Altered Condition. The Altered Material must Be Uniquely Re-identified. The Properties Thus Determined And Documented, Are Required For Final Certification And Must Conform To The Material Specification Or The Contract/purchase Order Requirements. When Only The Mechanical Properties Are Altered, the Original Certification Forchemical Composition Must Be Overstamped And Annotated With The Unique Traceability Material And At A Minimum Contain The Information Below. traceability Marking ________________________________________________ (marking On Finished Item) is Fabricated From Raw Material Identified To heat/lot Number ______________ And Heat Treat Number _____________________ (when Applicable) _________________________________________ Date _____________________ (name And Signature Of Auth. Co. Rep.) 3.34.3 Material Certification Data Forwarded By The Manufacturer Must Contain A Signed Certification That The Report Results Represent The Actual Attributes Of The Material Furnished And Indicate Full Compliance With All Applicable Specification And Contract requirements. Transcription Of Certification Data Is Prohibited. 3.34.4 Statements On Material Certification Documents Must Be Positive And Unqualified. Disclaimers Such As "to The Best Of Our Knowledge" Or "we Believe The Information Contained Herein Is True" Are Not Acceptable. 3.34.5 If Material Is Received Without The Required Certification Papers Or With Incorrect/missing Data On The Certification Papers, The Material Will Be Rejected. 3.35 Material Handling - The Written Material Control Process Must Include The Following: 3.35.1 All Raw Materials Must Have Traceability Markings (except As Specified Below). 3.35.2 Stored Raw Materials Requiring Traceability Must Be Segregated To Preclude Intermingling With Materials Not Requiring Traceability. 3.35.3 When Traceability Markings Will Be Removed By A Manufacturing Or Fabrication Process, The Marking Must Be Recorded Prior To Removal And Be Immediately Restored Upon Completion Of The Process. If This Cannot Be Done Or Is Impractical, An Appropriate material Control Procedure (such As A Bag And Tag, Tagging, And/or Tote Box Control) Must Be Employed. The Material Control Procedure Must Provide A Method Of Positive Control To Preclude Commingling Of Heats/lots Or Loss Of Traceability. The Traceability marking Must Be Reapplied Upon Completion Of The Final Manufacturing Process. 3.35.4 Brazing Or Weld Filler Metals For Strength Welds Forming Or Integral With Pressure Containing Components Or Assemblies Requiring Traceability Must Be Verified To Be The Correct Material, And Type Or Grade, As Applicable, Prior To Consumption. At A minimum, Material Verification Must Consist Of Inspection Of Material Test Reports For Conformance To Specified Requirements. Control Of Welding And Brazing Filler Metals Must Be Maintained To The Point Of Consumption To Assure Use Of The Correct Type And grade. Markings And Traceability Requirements Do Not Apply To Brazing And Weld Filler Metals After Consumption. It Is The Responsibility Of The Prime Contractor To Ensure Conformance With The Above Requirements On Welds Performed By Their Subcontractors. 3.35.5 Purchase Orders For Raw Material Must Specify That The Material Be Traceable To Material Certification Test Reports By Traceability Markings On The Material And Identified On The Test Reports. The Certification Data Requirements Contained In di-misc-81020 Must Be Invoked By The Prime Contractor On All Subcontractors Supplying Level I Material. 3.35.6 The Material Control Process Must Include Requirements For The Maintenance Of Traceability For Items Sent Out For Subcontracted Operations. If Such Operations Would Remove Traceability Markings, Purchase Or Work Orders Must Specify A Method And Marking location For Remarking. The Contractor Must Also Ensure That Subcontractor Production Controls Are Adequate To Preclude Commingling Of Materials During Processing. 3.36 Receiving Inspection - 3.36.1 Products And Services Produced By Sub-tier Suppliers For Incorporation In The Contract End Item Must Be Subject To Inspection Or Audit At The Time Of Receipt By The Prime Prior To Further Processing Within The Prime Contractor's Plant Or Shipment To another Location. 3.36.2 Receiving Inspection Must Include As A Minimum - verification That The Traceability Marking On The Material Agrees With That On The Certification Test Reports. verification That Certification Test Reports Are Legible And Complete. verification That The Contents Of The Certification Test Reports Are In Compliance With The Contractually Invoked Specifications And Requirements. 3.37 Discrepancy Reporting - 3.37.1 Nonconforming Products From Sub-tier Suppliers Must Be Identified And Processed In Accordance With The Prime Contractor's Procedures For Controlling Nonconforming Products. The Prime Contractor Must Report The Receipt Of Any Nonconforming Products To the Responsible Sub-tier Supplier In Accordance With Established Procedures. Nonconforming Material Records Must Be Maintained And Available For Review By The Government Quality Assurance Representative (qar). 3.38 Final Inspection - The Following Inspections Must Be Performed Prior To Government Inspection And Acceptance. 3.38.1 Material Sampling - Material Must Be Inspected For Form, Fit, And Function. Lot Acceptance Must Be Based On Zero Defects And Lot Rejection Based On One Defect. The Sample Size Must Be In Accordance With The Sampling Plan(s) In The Applicable Military specification Or Standard, Federal Specification Or Standard, Or Drawing To Which The Material Was Manufactured. In The Absence Of Such Sampling Plans, Sampling Inspection Must Be Per Ansi/asq-z1.4, General Inspection Level Ii (for Sample Size Selection Code), table Iia (for Sample Size). small Lot Sizes - For Lot Sizes Of Fifty Or Less, The Minimum Sample Size Must Be Eight Units. For Lot Sizes Of Eight Or Less, The Sample Size Must Be One Hundred Percent Of The Lot. 3.38.2 The Manufacturer May Elect To Use Statistical Process Control (spc) To Assure Product Quality In Lieu Of The Above Attribute Sampling Plan, Provided That The Spc Methodology/system Used Provides Acceptable Products To The Government. However, The government/navy Receipt Inspection Activity May Perform Their Acceptance Inspection Of The Material Using The Attribute Sampling Plan Outlined Above. 3.38.3 All Data Concerning Material Verification (chemical, Mechanical Or Physical Properties), Traceability (material Certifications To Material Marking), And Nondestructive Test (ndt) Certifications For Material Must Be 100% Inspected. The Certification test Reports Must Also Be 100% Inspected For Completeness And Legibility. 3.38.4 All Material Requiring Traceability Must Be 100% Inspected For Traceability Marking And That The Marking Is Legible. 3.39 Additional Marking For Fasteners - Fasteners Must Be Marked In Accordance With ;mil-dtl-1222, Except The Self-locking Hex Nuts Must Be Marked In Accordance With Nasm 17828; . The Method Of Marking Must Be Types I, Ii, Iii, V, Viii Or Ix Of Mil-std-792 except For Grades 410, 416 And 431 In The H Condition And Grades 8, 630, A574, And 4340 Which Must Be Marked By Method Ii When Marking Is Applied After The Final Heat Treatment. Markings On Fasteners That Are To Be Coated Must Be Marked Prior To Coating And have A Minimum Depth Of 4 Mils. Traceability Marking Must Be Legible After The Application Of Protective Compounds. 3.39.1 Marking Is Required For All Fasteners Regardless Of Size And Must Include The Material Symbol, The Manufacturer's Identification Symbol, And The Traceability Marking. Marking Must Be Applied On The Head Of Headed Fastener (top Preferred, Side location If Necessary). Self-locking Screws Must Also Be Marked With Six Dots. Where No Contract Invoked Specification Requirement Exists For This Marking, Self-locking Fasteners Must Be Marked With Six Dots Approximately .032" Diameter, Raised Or Depressed by Approximately .010" Located On The Top Perimeter Of The Head Of The Fastener In An Arc Or Circular Pattern. The Six Dots Must Be Distinguishable From All Other Required Markings. 3.39.2 In Addition To All Other Marking, The Cure Date Of The Molded Seal Must Be Marked On The Outside Of Each Unit Package. 3.40 See Cdrl Di-misc-80678 (special Emphasis C Of C) - The Certificate Of Compliance Must Show Traceability To The Marking Applied On Each Individual Item, And Must Contain The Following Information: 1. Contractor's Name, Address And Date. 2. The Contract/purchase Order Number (for Example: N00104-11-p-fa12) 3. The National Stock Number (nsn). The 18 Character National Stock Number For Special Emphasis Material Includes The Two Digit Cog, The Four Digit Fsc, The 9 Digit Niin, And The Two Digit Smic (for Example: 1h 4820 012345678 L1) ("n/a" When Not Applicable). 4. Lubricants, Sealants, Anti-seize, And/or Thread Locking Compounds ("n/a" When Not Applicable). 5. Certification That O-rings, Packing, Gaskets, Or Other Elastomeric Products Were Installed In A Compressed State Within An Assembly Or Sub-assembly, Prior To Expiration Of The Shelf Life ("n/a" When Not Applicable). 6. Manufacturer's Compound Number ("n/a" When Not Applicable). 7. When Weld Procedure Submittal Is Required By The Contract, A Statement That The Approval Date Of The Qualification Data Precedes Any Production Or Repair Welding Performed On This Contract. ("n/a" When Not Applicable). 8. A Statement To The Effect That All Items Furnished On This Contract Are In Full Compliance With The Specifications And Requirements And List Each Contractually Invoked Conformance/compliance Test Performed By Name And That It Was Performed satisfactorily. 9. Contractor's Or Authorized Personnel's Signature. 4. Quality Assurance 4.1 Notes To Dcma Qar And The Contractor - 4.1.1 Dcma Qar And The Contractor For Proprietary Designs - Departures From Contractor Imposed Requirements, Not Specifically Covered By The Contract, Must Be Judged Individually On The Basis Of The Effect, If Any, On Contractual Requirements. When There Is A disagreement Between The Contractor And The Government Representative As To The Effect On Contractual Requirements, The Departure Must Be Considered A Nonconformance And Be Submitted To The Pco For Disposition. 4.1.2 Dcma Qar And The Contractor For Proprietary Designs - All Records Of Departures From Contractor Imposed Requirements Must Be Maintained And Available For Review At The Contractor's Facility. A Copy Must Be Given To The Local Government Representative. A record Of These Departures, Traceable To The Applicablepart Number And Contract Number Must Be Submitted To The Pco. 4.1.3 Dcma Qar And The Contractor For Proprietary Designs - For Proprietary Designs, The Contractor's Part Numbers Are Acceptable For Reference Only. The Delivered Material Must Conform To All Drawings, Specifications, And Other Contractual Requirements. 4.1.4 Dcma Qar - It Is The Responsibility Of Dcma Qar To Review Non-destructive Testing (ndt) Procedures For Navsup Contracts/purchase Orders. 4.1.5 Dcma Qar And The Contractor - The Ecds (electronic Contractor Data Submission) System Is Available For Certain Data Submissions And To Submit Questions And Clarifications, And Waiver Requests On Contracts And Solicitations. Ecds Can Be Found At: https://register.nslc.navy.mil/ 5. Packaging 5.1 Preservation, Packaging, Packing And Marking - Preservation, Packaging, Packing And Marking Must Be In Accordance With The Contract/purchase Order Schedule And As Specified Below. mil-std 2073 Packaging Applies As Found Elsewhere In The Schedule 6. Notes 6.1 Several Definitions Of Terms That Apply To Csi Items Are Listed Below. All Terms May Not Apply To Every Item. 6.1.1 The Ecds (electronic Contractor Data Submission) System Is At: Https://register.nslc.navy.mil/ This Application Will Require Advance Registration Using A Pki Digital Certificate On A Cac. A Vendor User Guide Is Available As Csd001 In The Csd (contract Support Document) Library Within Ecds. 6.1.2 Critical Safety Item (csi) - Any Ship Part, Assembly, Or Support Equipment Containing A Critical Characteristic Whose Failure, Malfunction, Or Absence Of Which Could Cause A Catastrophic Or Critical Failure Resulting In Loss Of, Or Serious Damage To The ship, Or Unacceptable Risk Of Personal Injury Or Loss Of Life. 6.1.3 Critical Process - As Determined By The Twh, Any Process, Operation Or Action Performed On A Ship Csi That Serves To Establish A Critical Characteristic (such As Welding, Soldering, Machining, Polishing, Cleaning, Or Assembling) Or Confirm That A critical Characteristic Is Within Drawing Or Specification Compliance (such As, Testing, Measurement, Or Non-destructive Evaluation). 6.1.4 First Article - Pre-production Models, Initial Product Samples, Test Samples Produced To Ensure A Manufacturer's Capability To Meet Full Specification Requirements. 6.1.5 First Article Test (fat) - Contractually Required Testing And Inspection Of A Supplier's Pre-production, Production, Or "production Representative" Specimens To Evaluate A Manufacturer's Ability To Produce Conforming Product Prior To The Government's commitment To Receive Subsequent Production Items. First Article Testing Is Product Specific And Does Not Assess Manufacturing Process Controls Nor Does It Assure The Effectiveness Of The Manufacturer's Quality Program. 6.1.6 Government Source Inspection (gsi) - Gsi Is Independent Oversight Performed By A Government Representative Usually A Dcma Quality Assurance Representative (qar)) To Assure That Those Unique Product Quality And System Elements, Identified By The contracting Agency As Important, Are Observed And Evaluated. 6.1.7 Quality Assurance Letter Of Instruction (qali) - A Qali Is A Formal Document Initiated By A Contracting Activity That Provides Essential Requirements And Instructions For Contracted Materials To Be Independently Verified And Accepted By A Government representative Prior To Shipment. 6.1.8 Objective Quality Evidence (oqe) - The Quantitative And Qualitative Data Of All Mechanical, Chemical, And Performance Tests Performed (as Required By The Applicable Specification, Drawing, Or Purchase Document) To Prove That The Material Supplied conforms To The Specified Requirements. 6.1.9 Surface Discontinuity - Any Surface Irregularity, Marking, Or Localized Change In Physical Character Of The Surface, Other Than Dimensional, That Exists Infrequently At One Or Several Places. (examples: Burrs, Dents, Nicks, Scratches, Gouges, Pits, center-punches, Scribes, And Tool Marks) Surface Discontinuities Less Than 0.005-inch In Depth Are Acceptable Provided They Do Not Violate Any Other Design Requirements Specified In This Contract/purchase Order. 6.1.10 Traceability Code - A Code Or Number Providing Traceability To The Actual Chemical And Mechanical Properties Of The Specified Heat, Batch, Or Form From Which The Material Originated. 6.1.11 Verification - An Examination Performed To Determine Compliance With A Specific Requirement. 6.1.12 Nonconformance - A Nonconformance Is Defined As Affecting Or Violating The Following: - The Requirements Of This Contract/purchase Order. - Contractually Invoked Drawings (i.e. Envelope Dimensions, Interface Dimensions With Mating Parts/equipment, Center Of Gravity, Weights, Piece Part Identification, Material, Etc.). - Contractually Invoked Federal, Military, Or Commercial Specifications And/or Standards. - Form, Fit, Function, Performance To Contract Requirements, Reliability, Maintainability, Interchangeability, Safety Of Personnel Or Equipment, Or Additional Cost To The Government. 6.1.13 Waiver - A Written Authorization To Accept An Item, Which During Manufacture, Or After Having Been Submitted For Government Inspection Or Acceptance, Is Found To Depart From Specified Requirements, But Nevertheless Is Considered Suitable For Use As Is or After Repair By An Approved Method. 6.1.14 Deviation - A Specific Written Authorization (granted Prior To The Manufacture Of An Item) To Depart From A Particular Requirement(s) Of An Item's Current Approved Configuration Documentation For A Specific Number Of Units Or A Specified Period Of time, And To Accept An Item Which Is Found To Depart From Specified Requirements, But Nevertheless Is Considered Suitable For Use "as Is" Or After Repair By An Approved Method. 6.1.15 Critical Waiver/deviation - This Waiver/deviation Consists Of A Departure Involving Safety. 6.1.16 Major Waiver/deviation - This Waiver/deviation Consists Of A Departure Involving: - Performance - Interchangeability, Reliability, Survivability, Maintainability, Or Durability Of The Item Or Its Repair Parts - Health Or Safety - Effective Use Or Operation - Weight, Stability, Or Structural Integrity - System Design Parameters As Schematics, Flows, Pressures Or Temperatures - Compartment Arrangements Or Assigned Function 6.1.17 Minor Waiver/deviation - This Waiver/deviation Consists Of A Departure Which Does Not Involve Any Of The Factors Listed As Critical Or Major. 6.1.18 Engineering Change (ec) - A Change To The Current Approved Configuration Documentation Of A Configuration Item At Any Point In The Life Cycle Of The Item. 6.1.19 Engineering Change Proposal (ecp) - A Proposed Engineering Change And The Documentation By Which The Change Is Described, Justified, And Submitted To The Government For Approval Or Disapproval. 6.1.20 Class I Ecp - A Class I Ecp Is Approved By The Government's Configuration Control Board And Authorized With A Contract Modification. 6.1.21 Class Ii Ecp - A Class Ii Change Is Typically Reviewed For Concurrence In Classification By The Local Government Representative, Unless Otherwise Specified Elsewhere In The Contract/purchase Order. 6.2 In Accordance With Opnavinst 5510.1 All Documents And Drawings Provided By The U.s. Navy To Perspective Contractors Must Include A "distribution Statement" To Inform The Contractor Of The Limits Of Distribution, And The Safeguarding Of The Information contained On Those Documents And Drawings. 6.2.1 There Are 7 (seven) Separate Distribution Statement Codes Used For Non-classified Documents And Drawings. The Definition For Each Is As Follows: a... Approved For Public Release; Distribution Is Unlimited. b... Distribution Authorized To Us Governments Agencies Only. c... Distribution Authorized To Us Government Agencies And Their Contractors. d... Distribution Authorized To Dod And Dod Contractors Only. e... Distribution Authorized To Dod Components Only. f... Further Distribution Only As Directed By Commander, Naval Sea Systems Command, Code 09t.
Closing Date11 Sep 2024
Tender AmountUSD 549.8 K 
This is an estimated amount, exact amount may vary.

DEPT OF THE NAVY USA Tender

Corrigendum : Closing Date Modified
United States
Description: Contact Information|4|n743.49|wvg|7176052147|benjamin.t.spangler.civ@us.navy.mil| item Unique Identification And Valuation (jan 2023)|19|||||||||||||||||||| higher-level Contract Quality Requirement (navicp Review Feb 1991)(feb 1999)|1|see Specification Sections C And E.| inspection Of Supplies--fixed-price (aug 1996)|2||| general Information-fob-destination|1|b| wide Area Workflow Payment Instructions (jan 2023)|16|stand-alone Receiving Report - Certifications Combo - Receiving Report & Invoice - Material |n/a|tbd|n00104|tbd|n39040 - Certifications, S4306a - Material |n50286|tbd|133.2|n/a|n/a|n39040 - Certifications |n/a |n/a|see Dd Form 1423 |port_ptnh_wawf_notification@navy.mil Benjamin.t.spangler.civ@us.navy.mil| navy Use Of Abilityone Support Contractor - Release Of Offeror Information (3-18))|1|| equal Opportunity (sep 2016)|2||| warranty Of Supplies Of A Noncomplex Nature (june 2003)|6|one Year From Date Of Delivery.|one Year From Date Of Delivery.||||| warranty Of Data--basic (mar 2014)|2||| buy American --free Trade Agreements--balance Of Payments Program - Basic (jan2023))|3|||| notice Of Total Small Business Set-aside (oct 2020)(deviation 2020-o0008)|1|| alternate A, Annual Representations And Certifications (nov 2020)|13|||||||||||||| buy American-free Trade Agreements-balance Of Payments Program Certificate-basic (dec 2022))|3|||| buy American-balance Of Payments Program Certificate-basic (nov 2014)|1|| annual Representations And Certifications (mar 2023)|13|333613|750|||||||||||| notice Of Priority Rating For National Defense, Emergency Perpardeness, And Enrgy Progam Use (april 2008))|2||x| this Amendment Is Issued To Extend Closing To 06sep2024. small Business Set-aside Is Hereby Dissolved. \ this Amendment Is Issued To Extend The Closing Date To 28jun2024. \ this Amendment Is Issued To Extend The Closing Date To 01mar2024. \ this Amendment Is Issued To Extend The Closing Date To 17nov23. \ 1.dd1423 Data Item A001 (inspection And Test Plan) May Be Waived If Already On File At Navsup Wss Mechanicsburg. 2. Portsmouth Nsy's Dodaac Has Changed From N00102 To N50286. Any Reference Ton00102 Within This Order Should Be Updated To N50286. 3. All Contractual Documents (i.e. Contracts, Purchase Orders, Task Orders, Delivery Orders, And Modifications) Related To The Instant Procurement Are Considered To Be "issued" By The Government When Copies Are Either Deposited In The Mail, Transmitted By facsimile, Or Sent By Other Electronic Commerce Methods, Such As Email. The Government's Acceptance Of The Contractor's Proposal Constitutes Bilateral Agreement To "issue" Contractual Documents As Detailed Here In. 4.the Following Proposed Delivery Schedule Applies: submission Of All Certification Data Cdrls 20 Days Prior To Delivery. pnsy Review/acceptance Of Certification Cdrls 6 Working Days After Receipt production Radiography (pr) 135 Days After Approval Of Rss Sd approval Of Pr 30 Days After Receipt weld Procedure And Qual Data 120 Days Adc Lt approval Of Weld Procedures And Qual Data 60 Days After Receipt final Delivery Of Material (365 Days) 5.navsup Wss Mech Will Be Considering Past Performance In The Evaluation Of Offers. See Clause 252.213-7000. 6. Drawings Can Be Accessed Thru: Sam.gov 7. This Order Is Issued Pursuant To Emergency Acquisition Flexibilities (eaf). \ 1. Scope 1.1 The Material Covered In This Contract/purchase Order Will Be Used In A Crucial Shipboard System. The Use Of Incorrect Or Defective Material Would Create A High Probability Of Failure Resulting In Serious Personnel Injury, Loss Of Life, Loss Of Vital shipboard Systems, Or Loss Of The Ship Itself. Therefore, The Material Has Been Designated As Special Emphasis Material (level I, Scope Of Certification, Or Quality Assured) And Special Control Procedures Are Invoked To Ensure Receipt Of Correct Material. 2. Applicable Documents 2.1 Order Of Precedence - In The Event Of A Conflict Between The Text Of This Contract/purchase Order And The References And/or Drawings Cited Herein, The Text Of This Contract/purchase Order Must Take Precedence. Nothing In This Contract/purchase Order, however, Must Supersede Applicable Laws And Regulations Unless A Specific Exemption Has Been Obtained. 2.2 Identification Of Classified Documents - This Contract/purchase Order Requires The Contractor To Have Authorized Access To Classified Documents In Accordance With The Attached Contract Security Classification Specification (dd Form 254). The Classified Documents And Security Level Are: ;830-6404016 - Confidential; 2.3 Applicable Documents - The Document(s) Listed Below Form A Part Of This Contract/purchase Order Including Modifications Or Exclusions. 2.3.1 Specification Revisions - The Specification Revisions Listed Under "documents References" Below Are The Preferred Revision. Older And/or Newer R Evisions Are Acceptable When Listed Within Contract Support Library Reference Number Csd155 In Ecds (electric contractor Data Submission) At: Ht Tps://register.nslc.navy.mil/. This Is To Allow Contractors To Use Certain Acceptable Older Specification Revisions To Purge Their Existing Stock Of Material Certified To Those Older Revisions Or To Use Newer Specification revisions When Material Is Certified To Newly Released Revisions,without Requiring The Submittal Of Waiver/deviation Requests For Each Specification Revision On Every Contract. Revisions Of Specifications Reflecting Editorial And/or Re-approval (e.g. E2009, r2014, Etc.) Are Considered Inconsequential, But Are Acceptable When Their Revisions Are Listedwithin Csd155 Or Elsewhere Within This Contract. 2.3.2 Documents, Drawings, And Publications Supplied Are Listed Under "drawing Number". These Items Should Be Retained Until An Award Is Made. 2.3.3 "document References" Listed Below Must Be Obtained By The Contractor. Ordering Information Is Included As An Attachment To This Contract/purchase Order. drawing Data=erb553-1003-mf03450 |96169| A| |d|0001 | A|49998|0032647 drawing Data=erb553-1003-mf03450 |96169| A| |d|0001.a | A|49998|0041250 drawing Data=erb553-1003-mf03450 |96169| A| |d|0002 | A|49998|0018549 drawing Data=erb553-1003-mf03450 |96169| A| |d|0003 | A|49998|0020330 drawing Data=erb553-1003-mf03450 |96169| A| |d|0004 | A|49998|0034988 drawing Data=erb553-1003-mf03450 |96169| A| |d|0004.a | A|49998|0014187 drawing Data=erb553-1003-mf03450 |96169| A| |d|0005 | A|49998|0053007 drawing Data=erb553-1003-mf03450 |96169| A| |d|0006 | A|49998|0042477 drawing Data=erb553-1003-mf03450 |96169| A| |d|0007 | A|49998|0036752 drawing Data=erb553-1003-mf03450 |96169| A| |d|0008 | A|49998|0052601 drawing Data=erb553-1003-mf03450 |96169| A| |d|0009 | A|49998|0038926 drawing Data=erb553-1003-mf03450 |96169| A| |d|0010 | A|49998|0038916 drawing Data=erb553-1003-mf03450 |96169| A| |d|0011 | A|49998|0049740 drawing Data=erb553-1003-mf03450 |96169| A| |d|0012 | A|49998|0032950 drawing Data=erb553-1003-mf03450 |96169| A| |d|0013 | A|49998|0027549 drawing Data=erb553-1003-mf03450 |96169| A| |d|0014 | A|49998|0044189 drawing Data=erb553-1003-mf03450 |96169| A| |d|0015 | A|49998|0005209 drawing Data=erb553-1003-mf03450 |96169| A| |d|0016 | A|49998|0011895 drawing Data=erb553-1003-mf03450 |96169| A| |d|0017 | A|49998|0008180 drawing Data=erb553-1003-mf03450 |96169| A| |d|0018 | A|49998|0018601 drawing Data=erb553-2200-mf00140 |96169| A| |d|0001 | A|49998|0056831 drawing Data=erb553-2200-mf00140 |96169| A| |d|0002 | A|49998|0036178 drawing Data=erb553-2200-mf00140 |96169| A| |d|0003 | A|49998|0067084 drawing Data=erb553-2200-mf00140 |96169| A| |d|0004 | A|49998|0020551 drawing Data=erb553-2200-mf00140 |96169| A| |d|0005 | A|49998|0041619 drawing Data=erb553-2200-mf00140 |96169| A| |d|0006 | A|49998|0036523 drawing Data=erb553-2200-mf00140 |96169| A| |d|0007 | A|49998|0039219 drawing Data=erb553-2200-mf00140 |96169| A| |d|0008 | A|49998|0037181 drawing Data=erb553-2200-mf00140 |96169| A| |d|0009 | A|49998|0017405 drawing Data=erb553-2200-mf00181 |96169| A| |d|0001 | A|49998|0050954 drawing Data=erb553-2200-mf00181 |96169| A| |d|0002 | A|49998|0026818 drawing Data=erb553-2200-mf00181 |96169| A| |d|0003 | A|49998|0070451 drawing Data=erb553-2200-mf00181 |96169| A| |d|0004 | A|49998|0037409 drawing Data=erb553-2200-mf00181 |96169| A| |d|0005 | A|49998|0024070 drawing Data=erb553-2200-mf00181 |96169| A| |d|0006 | A|49998|0027789 drawing Data=erb553-2200-mf00181 |96169| A| |d|0007 | A|49998|0055237 drawing Data=erb553-2200-mf00181 |96169| A| |d|0008 | A|49998|0040651 drawing Data=erb553-2200-mf00181 |96169| A| |d|0009 | A|49998|0041691 drawing Data=erb553-2200-mf00181 |96169| A| |d|0010 | A|49998|0039731 drawing Data=erb553-2200-mf00181 |96169| A| |d|0011 | A|49998|0039657 drawing Data=erb553-2200-mf00181 |96169| A| |d|0012 | A|49998|0033413 drawing Data=erb553-2200-mf00181 |96169| A| |d|0013 | A|49998|0007370 drawing Data=erb553-2200-mf00181 |96169| A| |d|0014 | A|49998|0019031 drawing Data=erb553-2200-mf00181 |96169| A| |d|0015 | A|49998|0014926 drawing Data=erb553-2200-mf01530 |96169| A| |d|0001 | A|49998|0033997 drawing Data=erb553-2200-mf01530 |96169| A| |d|0001.a | A|49998|0045157 drawing Data=erb553-2200-mf01530 |96169| A| |d|0002 | A|49998|0021918 drawing Data=erb553-2200-mf01530 |96169| A| |d|0003 | A|49998|0023584 drawing Data=erb553-2200-mf01530 |96169| A| |d|0004 | A|49998|0020593 drawing Data=erb553-2200-mf01530 |96169| A| |d|0005 | A|49998|0045293 drawing Data=erb553-2200-mf01530 |96169| A| |d|0006 | A|49998|0042351 drawing Data=erb553-2200-mf01530 |96169| A| |d|0007 | A|49998|0035542 drawing Data=erb553-2200-mf01530 |96169| A| |d|0008 | A|49998|0016157 drawing Data=erb553-2200-mf03425 |96169| A| |d|0001 | A|49998|0031704 drawing Data=erb553-2200-mf03425 |96169| A| |d|0001.a | A|49998|0043765 drawing Data=erb553-2200-mf03425 |96169| A| |d|0002 | A|49998|0016566 drawing Data=erb553-2200-mf03425 |96169| A| |d|0003 | A|49998|0020977 drawing Data=erb553-2200-mf03425 |96169| A| |d|0004 | A|49998|0015831 drawing Data=erb553-2200-mf03425 |96169| A| |d|0004.a | A|49998|0011033 drawing Data=erb553-2200-mf03425 |96169| A| |d|0005 | A|49998|0069238 drawing Data=erb553-2200-mf03425 |96169| A| |d|0006 | A|49998|0015814 drawing Data=erb553-2200-3g00008 |96169| A| |d|0001 | A|49998|0029799 drawing Data=erb553-2200-3g00008 |96169| A| |d|0002 | A|49998|0030924 drawing Data=erb553-2200-3g00008 |96169| A| |d|0003 | A|49998|0007940 drawing Data=erb553-2200-3g00008 |96169| A| |d|0004 | A|49998|0015367 drawing Data=erb553-2200-3g00008 |96169| A| |d|0005 | A|49998|0013292 drawing Data=1385861 |53711| H| |d|0001 | H|49998|0762439 drawing Data=6404016 |53711| B| |f|0001 | B|00026|0000000 drawing Data=7409397 |53711| A| |d|0000.a | A|49998|0033695 drawing Data=7409397 |53711| A| |d|0001 | A|49998|0064297 drawing Data=7409397 |53711| A| |d|0002 | A|49998|0030482 drawing Data=7409397 |53711| A| |d|0003 | A|49998|0012305 drawing Data=7409397 |53711| A| |d|0004 | A|49998|0013958 drawing Data=7409397 |53711| A| |d|0005 | A|49998|0028080 drawing Data=7409397 |53711| A| |d|0006.1 | A|49998|0063000 drawing Data=7409397 |53711| A| |d|0006.2 | A|49998|0065929 drawing Data=7409397 |53711| A| |d|0006.3 | A|49998|0063879 drawing Data=7409397 |53711| A| |d|0006.4 | A|49998|0063933 drawing Data=7409397 |53711| A| |d|0006.5 | A|49998|0017595 drawing Data=7409397 |53711| A| |d|0006.6 | A|49998|0041814 drawing Data=7409397 |53711| A| |d|0007.1 | A|49998|0033641 drawing Data=7409397 |53711| A| |d|0007.2 | A|49998|0037140 drawing Data=7409397 |53711| A| |d|0007.3 | A|49998|0033499 drawing Data=7409397 |53711| A| |d|0007.4 | A|49998|0035238 drawing Data=7409397 |53711| A| |d|0008 | A|49998|0013266 drawing Data=7409397 |53711| A| |d|0009 | A|49998|0050808 drawing Data=7409397 |53711| A| |d|0010 | A|49998|0072086 drawing Data=7409397 |53711| A| |d|0011 | A|49998|0155498 drawing Data=7409397 |53711| A| |d|0012 | A|49998|0110719 drawing Data=7409397 |53711| A| |d|0013 | A|49998|0107679 drawing Data=7409397 |53711| A| |d|0014 | A|49998|0121411 document Ref Data=fed-std-h28 | | |b |190424|a| | | document Ref Data=fed-std-h28 |0020| |b |941221|a| |01| document Ref Data=ansi/asq Z1.4 | | | |080101|a| | | document Ref Data=qq-n-281 | | |d |851023|a|2 | | document Ref Data=qq-n-286 | | |g |001207|a| | | document Ref Data=mil-std-792 | | |f |060519|a| | | document Ref Data=mil-dtl-1222 | | |j |001208|a| | | document Ref Data=astm-e1417 | | | |160615|a| | | document Ref Data=astm-e1444 | | | |160601|a| | | document Ref Data=mil-std-2035 | | |a |950515|a| | | document Ref Data=mil-std-2132 | | |d |080310|f| |01| document Ref Data=astm-d4066 | | | |130701|a| | | document Ref Data=iso_9001 | | | |081115|a| | | document Ref Data=iso10012 | | | |030415|a| | | document Ref Data=mil-dtl-15024 | | |g |180303|a| | | document Ref Data=iso/iec 17025 | | | |050515|a| | | document Ref Data=qpl 25027 | | |17 |000207|a| | | document Ref Data=mil-i-45208 | | |a |810724|a|1 | | document Ref Data=mil-std-45662 | | |a |880801|a| | | document Ref Data=a-a-59004 | | |b |181118|a| | | document Ref Data=ansi/ncsl Z540.3 | | | |130326|a| | | document Ref Data=0900-lp-001-7000 | | | |810101|c| |01| document Ref Data=aia/nas Nasm 17828 | | |1 |130430|a| | | document Ref Data=aia/nas Nasm 25027 | | |1 |121221|a| | | document Ref Data=s9074-aq-gib-010/248 | | |1 |191112|a| | | document Ref Data=t9074-as-gib-010/271 | | |1 |140911|a| | | document Ref Data=s9074-ar-gib-010a/278 (chg A) | | | |130214|a| | | 3. Requirements 3.1 ;the Ball Joint Must Be In Accordance With Navsea Drawing 596-7409397 Assembly A Along With All Engineering Reports Provided, Except As Amplified Or Modified Herein.; 3.2 ;note: Reference To Note 47 On Drawing 7409397 Must Be Disregarded For Stud, Part Number 20.; 3.3 Material For Parts Requiring Certification - Quantitative Chemical And Mechanical Analysis Is Required For The Parts Listed Below Unless Specifically Stated Otherwise: part - ;lower Body, Part Number 1; Retainer, Part Number 2; Ball, Part Number 5; And Flange, Part Number 6 Of Drawing 7409397; material - ;qq-n-281, Class A, Form 2, Condition Forged, High Tensile And Stress Relieved; part - ;stud, Continuous Thread, Part Number 20 Of Drawing 7409397; material - ;mil-dtl-1222, Qq-n-286, Hot Finished Or Cold Drawn, Annealed And Age Hardened; part - ;self-locking Nut, Part Number 21 Of Drawing 7409397; material - Qq-n-281, Class A Annealed (hot Finished Or Cold Drawn) Or Class B Cold Drawn. all Material Must Be From The Same Class. self-locking Element- Astm-d4066, Group 01, Class 1, Grade 1 3.4 Testing Certification - Certifications Are Required For The Following Tests On The Items Listed Below. Additional Testing On Other Piece Parts (if Any) Per Applicable Drawings Is Still Required, But Certifications Are Only Required As Listed Below. test - ;visual And Dye Penetrant Inspection (final Layer); item - ;joint Number J2031; performance - ;t9074-as-gib-010/271; acceptance - ;mil-std-2035; test - ;hydrostatic Testing; item - ;each Assembly; performance - ;note 7018 Of Drawing 7409397; acceptance - ;note 7018 Of Drawing 7409397; attribute - Annealing And Age Hardening item - ;stud, Continuous Thread, Part Number 20 Of Drawing 7409397; performance - Qq-n-286 test - ;liquid Penetrant Inspection; item - ;stud, Continuous Thread, Part Number 20 Of Drawing 7409397; performance - T9074-as-gib-010/271; Sampling Must Be Per Mil-dtl-1222 acceptance - Mil-dtl-1222 test - ;dye Penetrant Inspection For Non-magnetic Grades; item - ;self-locking Nut, Part Number 21 Of Drawing 7409397; performance - T9074-as-gib-010/271 Or Astm-e1417/astm-e1444 (method C Solvent Removal Techniques Must Not Be Used On Thread) acceptance - ;nasm25027; test - Quality Conformance Tests item - Self-locking Nuts performance - ;nasm25027; acceptance - ;nasm25027; attribute - Certificate Of Completion item - Self-locking Nut Nonmetallic Insert performance - ;astm-d4066, Group 01, Class 1, Grade 1; attribute - Certificate Of Compliance item - Self-locking Nuts performance - This Certificate Must State That Self-locking Nuts Were Manufactured By An Approved Source. Approved Sources Are Those Listed On Qpl-25027 For The Appropriate Fastener. This Qpl May Also Be Considered As Approved Sources For Heavy Hex self-locking Nuts. test - Ultrasonic Inspection On Starting Material item - ;all Items Requiring Certification Made From Qq-n-286 With A Diameter Or Minimum Distance Between Parallel Surfaces Of 4 Inches Or Greater Of The Starting Material, Or When Required By A Drawing Or Specification Invoked Elsewhere In This Contract; performance - T9074-as-gib-010/271 Or Mil-std-2132, And Qq-n-286 acceptance - Qq-n-286 test - Non-destructive Tests item - ;weld Repair (as Applicable); performance - Per Applicable Fabrication Specification acceptance - Per Applicable Fabrication Specification 3.5 Radiography Is Required On ;joint Number J2031 And Must Be Identified To The Weld Joint; . 3.6 The Pressure Tolerance Must Be As Specified In The Assembly Drawing, Detail Drawing, Design Specification Or Elsewhere In This Contract. Where Pressure Tolerances Are Not Provided By Drawings, Specifications Or Specified Elsewhere In This Contract, The following Must Be Used: For Pressure Tests Below 100 Psig, The Pressure Tolerance Must Be +1 Psig / -0 Psig. For Pressure Tests At Or Above 100 Psig Up To And Including 2500 Psig, The Pressure Tolerance Must Be +2% / -0 Psig Rounded Off To The Nearest Multiple Of The Smallest Graduation On An Analog Test Pressure Gauge, Not To Exceed 50 Psig. For Pressure Tests Above 2500 Psig, The Pressure Tolerance Must Be +2% / -0 Psig, Rounded Off To The Nearest Multiple Of The Smallest Graduation On An Analog Test Pressure Gauge, Not To Exceed 200 Psig. the Pressure Test Time Tolerance Must Be As Specified In The Assembly Drawing, Detail Drawing, Design Specification Or Elsewhere In This Contract. Where Pressure Test Time Tolerances Are Not Provided By Drawings, Specifications Or Specified Elsewhere In This contract, The Following Must Be Used: For A Test Duration Up To And Including 1 Hour, The Tolerance Must Be +5 Minutes / - 0 Minutes. For A Test Duration Of More Than 1 Hour Up To And Including 24 Hours, The Tolerance Must Be +30 Minutes / - 0 Minutes. For A Test Duration Of More Than 24 Hours, The Tolerance Must Be +60 Minutes / - 0 Minutes. 3.7 Confidential Hydrostatic Test Pressures - When Test Pressures Are Confidential, Certification Must Reference ;830-6404016, Rev B; And The Item Number To Which The Item Was Tested In Lieu Of The Actual Pressures. Any Drawing Requirement To Mark The working Pressure On The Item Does Not Apply And Is Strictly Prohibited. 3.8 Chemours Company (formerly Dupont) Teflon Coating 850g-204 And 852g-201. Use Of Chemours Company (formerly Dupont) Teflon Coating 851n-204 And 852n-201 Is Acceptable Until Exhausted - Teflon Coating Of Ball(s) Must Be In Accordance With General Note ;7002 and 7003; Of Drawing ;7409397; . 3.8.1 Naval Ordnance Systems Command Od 10362 First Revision Dated 15 Aug 1961 Is Provided By Contract Support Library Reference Number Csd018 In Ecds At Https://register.nslc.navy.mil/ 3.8.2 Csd099 Provides Guidance For Acceptance/rejection Of Teflon-coated Valve Balls After Valve Assembly Production Testing. 3.9 Ball Spherical Surface Waviness - Unless Otherwise Specified On Drawing, All Sealing Area Surfaces Must Have A Spherical Surface Waviness Which Does Not Exceed 0.0005 Inches Of Height Per Inch Of Spherical Surface. Roughness And Waviness Ratings Must apply In A Direction Which Yields The Maximum Rating, Normally Perpendicular To The Lay. 3.10 ;surface Waviness Must Be Verified Prior To Teflon Coating.; 3.11 K-monel Fasteners - Material Must Be Heat Treated Per Qq-n-286. 3.11.1 Fasteners That Have Been Hot Or Cold Headed Or Roll Threaded Must Be Solution Annealed Followed By Age Hardening Subsequent To All Heading And Thread Rolling Operations. The Mechanical Properties On Certifications Must Be Actual Properties Of The annealed And Age Hardened Material And Must Meet The Requirements Of Qq-n-286. 3.11.2 Qq-n-286 Fasteners That Have Been Headed And/or Roll Threaded Must Not Beage Hardened Unless The Material Has Been Solution Annealed Subsequent To The Heading And Threading Operations. Threads Formed After The Final Age Hardening Heat Treatment Must Be cut Or Ground Only. 3.12 K-monel Fasteners - K-monel Externally Threaded Fasteners Must Have Mechanical Properties Determined In Accordance With Mil-dtl-1222. Test Results Must Include Tensile, Yield, Elongation And Hardness As Required By Mil-dtl-1222. (the Hardness Tests Must be Performed On A Full Size Fastener.) 3.12.1 Studs Require An Axial Tensile Test In Accordance With Mil-dtl-1222. 3.12.2 Headed Fasteners Require A Wedge Tensile Test As Specified Elsewhere In This Contract/purchase Order. 3.13 Internal Threads - All Internal Threads Must Be Formed By Cutting. Cold Forming Of Internal Threads Is Not Acceptable. 3.14 Thread Inspection Requirements - All Threads On Threaded Parts Must Be Inspected Using Appropriate Inspection Methods, Inspection Systems, And Inspection Gages/instruments In Accordance With Fed-std-h28 Series. Substitution Of Thecommercial Equivalent inspection In Accordance With Asme B1 Series Is Acceptable. 3.14.1 System 21 Of Fed-std-h28/20 Must Be Used As A Minimum Inspection Requirement For Threads When The Design Drawing Or Design Specification Does Not Specify An Inspection Requirement. 3.14.2 For Navy And Shipyard Drawings, System 21 Of Fed-std-h28/20 May Be Substituted For System 22 Without Further Navy Approval When The Design Drawing Invokes System 22 And Does Not Cite Governing Specifications That Specifically Require System 22. System 22 Of Fed-std-h28/20 Must Be Used When The Drawing References Other Governing Specifications That Specifically Require System 22, Such As Certain Thread Types Of Mil-dtl-1222. 3.14.3 A Written Request For Concurrence Must Be Submitted When Utilizing Alternative Measuring Equipment Or Measuring Systems Not Applicable To The Specified Inspection System. 3.15 Thread Lubricant - Thread Lubricants Containing Molybdenum Disulfide Must Not Be Used On This Material. Bacteria In Water, Especially Seawater, Causes Molybdenum Disulfide To Break Down. The By-products Of The Breakdown Form Compounds Which Attack The fasteners. Anti-galling Compound A-a-59004 Must Be Used As A Replacement When Thread Lubricant Is Required For Assembly. 3.16 O-ring Grooves And Mating Sealing Surfaces Must Be Inspected Per The Contractually Invoked Drawings Or Specifications. When The Drawings Or Specifications Do Not Provide Specific Defect Criteria Or State That No Defects Are Allowed, The General acceptance Criteria (gac) Standard Must Be Used For Inspecting O-ring Grooves And Mating Sealing Surfaces Only. Repairs To Sealing Surfaces And O-ring Grooves With Unacceptable Defects May Be Accomplished Within The Limits Of The Size And Tolerances Provided in The Applicable Drawing. Repairs Thatwould Exceed These Limits Require Approval (including Final Dimensions). The Data That Is Red Lined (crossed Out) Is Excluded From The Gac For This Contract And Is Not To Be Used For Acceptance Or Rejection Criteria. the Gac Document Is Identified As Contract Support Library Reference Number Csd008 At Https://register.nslc.navy.mil/ 3.17 Slow Strain Rate Tensile Test Laboratories - The Slow Strain Rate Tensile Test Of Qq-n-286 Must Be Performed By One Of The Following Laboratories: huntington Alloys, A Special Metals Company attn: Bill Bolenr 3200 Riverside Drive huntington, Wv 257059 phone: (304) 526-5889 fax: (304) 526-5973 metallurgical Consultants, Inc. attn: W. M. Buehler 4820 Caroline po Box 88046 houston, Tx 77288-0046 phone: (713) 526-6351 fax: (713) 526-2964 naval Surface Warfare Center, Carderock Division attn: Eric Focht Code 614 9500 Macarthur Blvd west Bethesda, Md 20817-5700 phone: (301) 227-5032 fax: (301) 227-5576 teledyne Allvac attn: Dr. W. D. Cao 2020 Ashcraft Ave. monroe, Nc 28110 phone: (704) 289-4511 fax: (704) 289-4269 westmoreland Mechanical Testing And Research Inc. attn: Andrew Wisniewski p.o. Box 388 youngstown, Pa 15696-0388 mannesmann Rohrenwerke mannesmann Forschungsinstitut (mfi) attn: Dr. Weiss postfach 251160 47251 Duisburg germany phone: 011-49-0203-9993194 fax: 011-49-0203-9994415 thyssenkrupp Vdm Usa, Inc. attn: D. C. Agarwal 11210 Steeplecrest Drive, Suite 120 houston, Tx 77065-4939 phone: (281) 955-6683 3.18 Thread Forming - The Following Provides The Official Interpretation Of Paragraph 4.5.2.7 Of Mil-dtl-1222. 3.18.1 In Order To Qualify For "alternate Mechanical Testing" Found In Mil-dtl-1222j Paragraph 4.5.2.7 And Utilize The Mechanical Properties For The Starting Bar Stock In Lieu Of Performing Yield Strength Or Proof Stress Testing On Finished Fasteners, All Of the Subsequent Provisions Found In Mil-dtl-1222j Paragraphs 4.5.2.7 A Through E Must Be Met. If Any Single Provision Is Not Met, All Required Mechanical Testing Must Be Performed On The Finished Full Sized Fasteners. These Provisions Are Explained As Follows: a. Proper Product Lot Control And Traceability Must Be In Place. b. No Heat Treatment (including Hot Heading And Hot Forming), Cold Forming, Drawing, Rolling And Thread Rolling May Be Performed On The Starting Bar, Fastener Blanks Or Finished Fasteners After The Completion Of The Mechanical Testing On The Starting Bar. c. And D. The Proper Size Starting Bar Must Be Selected To Ensure Mechanical Properties Of Finished Fasteners Are Represented By The Mechanical Properties Of The Starting Bar. e. The Mandatory Testing, Axial Tensile (studs) And Wedge Tensile (screws And Bolts) Must Be Performed On Full Sized Fasteners. Note That There Is A Typographical Error In Paragraph 4.5.2.7 And That The Axial Load Test Is A Mandatory Test That Must Be performed On Studs As Required In Paragraph 4.5.2.7.e. 3.18.2 Thread Rolling Is A Cold Working Process And Is Not Considered To Be A Machining Or Grinding Operation. Therefore, Fasteners Which Have Rolled Threads Do Not Satisfy The Provisions Of Mil-dtl-1222j Paragraph 4.5.2.7.b And Are Not Eligible For The "alternate Mechanical Testing" Provision. 3.18.3 Thread Rolling Alone Is Not A Sufficient Cold Working Process To Qualify A Fastener To Be In The Cold Worked (cw) Condition. This Condition Is Only Applicable To Some 300 Series Stainless Steel Studs, Screws And Nuts. These Cw Condition Fasteners must Be Manufactured From Cold Worked Bar Stock Or Be Cold Headed In Order To Qualify. The Threads May Subsequently Be Rolled, Machined Or Ground. Testing Of The Finished Fasteners And/or Reporting Of The Starting Bar Stock Material Properties Is Subject To the Same Provisions Found In Mil-dtl-1222j Paragraph 4.5.2.7 And Discussed Above. 3.19 Specification Change - For Qq-n-281, Class B Material: 1 - Footnote 9 To Table Ii Of Qq-n-281 Does Not Apply. 2 - When Starting Material Is Round Bar Greater Than 3" Dia, The Mechanical Properties Of Hex Bar Apply. 3.20 Component Identification Description (cid) - When Applicable Drawing(s) And/or Specification(s) Specify That A Nameplate Or Identification Plate Is Required, The Cid Number ( ;cid 990997177; ) Must Be Added. When No Plate Is Specified, An Identification plate In Accordance With Mil-dtl-15024, Type "c" On Brass Or Type "h" On Aluminum Must Be Securely Attached To Each Assembly Showing The Above Cid Number. No Assembly Must Be Shipped Without The Cid Number Attached. 3.21 Welding Or Brazing - When Welding, Brazing, And Allied Processes Are Required, As Invoked By Section C Paragraph 3 Requirements, They Must Be In Accordance With S9074-ar-gib-010a/278, 0900-lp-001-7000 For Brazing Of Piping And Pressure Vessel applications, Or S9074-aq-gib-010/248 For Brazing Of Other Applications. For All Production And Repair Welding And Brazing, Personnel And Procedures Must Be Qualified Under S9074-aq-gib-010/248 Or 0900-lp-001-7000, As Applicable. Repair Welding Is Not permitted On ;qq-n-286; . Procedures And Qualification Data Must Be Submitted For Review And Approval Prior To Performing Any Welding Or Brazing. 3.22 Certificate Of Compliance - (special Emphasis Material) The Contractor Must Prepare And Submit A Certificate Of Compliance Certifying That The Items/components Furnished Under This Contract Comply With The Requirements Of The Procurement Document, including Any/all Invoked Specifications And Drawings. 3.23 Configuration Control - The Contractor Must Maintain The Total Equipment Baseline Configuration. For Items Of Proprietary Design, Contractor Drawings Showing The Latest Assembly Configuration Must Be Provided To The Government In Electronic (c4) Format. definitions Are Provided Elsewhere In The Contract/purchase Order. 3.23.1 Waivers/deviations - All Waivers And Deviations, Regardless Of Significance Or Classification Require Review And Approval By The Contracting Officer. Waivers And Deviations Must Be Designated As Critical, Major, Or Minor. The Contractor Must Provide a Copy Of This Request To The Qar. Requests Must Include The Information Listed Below. A. A Complete Description Of The Contract Requirement Affected And The Nature Of The Waiver/deviation (non-conformance), Including A Classification Of Critical, Major, Or Minor. B. Number Of Units (and Serial/lot Numbers) To Be Delivered In This Configuration. C. Any Impacts To Logistics Support Elements (such As Software, Manuals, Spares, Tools, And Similar) Being Utilized By Government Personnel Or Impacts To The Operational Use Of The Product. D. Information About Remedial Action Being Taken To Prevent Reoccurrence Of The Non-conformance. 3.23.2 All Requests For Waivers/deviations On Navsup-wss Contracts Must Be Submitted To The Navsup Wss Contracting Specialist Via Email. 3.23.3 Ecps - The Government Will Maintain Configuration Control And Change Authority For All Modifications Or Changes Affecting Form, Fit, Function, Or Interface Parameters Of The Equipment And Its Sub-assemblies. The Contractor Must Submit An Engineering change Proposal (ecp) For Any Class I Or Ii Changes That Impact The Equipment Covered By This Contract. Ecps Must Be Prepared In Contractor Format, And Must Include The Following Information: A. The Change Priority, Change Classification (class I Or Class Ii), And Change Justification. B. A Complete Description Of The Change To Be Made And The Need For That Change. C. A Complete Listing Of Other Configuration Items Impacted By The Proposed Change And A Description Of The Impact On Those Cis. D. Proposed Changes To Documents Controlled By The Government. E. Proposed Serial/lot Number Effectivities Of Units To Be Produced In, Or Retrofitted To, The Proposed Configuration. F. Recommendations About The Way A Retrofit Should Be Accomplished. G. Impacts To Any Logistics Support Elements (such As Software, Manuals, Spares, Tools, And Similar) Being Utilized By Government Personnel In Support Of The Product. H. Impacts To The Operational Use Of The Product. I. Complete Estimated Life-cycle Cost Impact Of The Proposed Change. J. Milestones Relating To The Processing And Implementation Of The Engineering Change. 3.24 Mercury Free - Mercury And Mercury Containing Compounds Must Not Be Intentionally Added Or Come In Direct Contact With Hardware Or Supplies Furnished Under This Contract. Mercury Contamination Of The Material Will Be Cause For Rejection. 3.25 Navsea 0948-lp-045-7010 - Any Applicable Requirements Of Navships 4410.17,navsea 0948-lp-045-7010, Or 0948-045-7010 Which The Contractor Must Meet Are Included In This Contract/purchase Order. The Above Documents Are For Governmentuse Only. Further application Of The Above Documents Is Prohibited.prohibited. 3.25.1 Marking Of Material With A Material Designator Per The Drawing Is Also Prohibited, With The Exception Of Fasteners. Fasteners Must Be Marked With A Material Symbol/designator As Specified Elsewhere In This Contract. ^ Quality Assurance Requirements ^ 3.26 See Cdrl Di-misc-80678 (test Certification) - A Statement Of Tests Performed, Listing The Pieces Tested Must Be Furnished Along With A Copy Of The Test Results. Certification Must Include The Contractor's Name, Address And Date, Quantity Inspected, identified To The Contract/purchase Order And Item Number, And The Contractor's Or Authorized Personnel's Signature. Test Certifications Must Reference The Standard/specification, Including The Revision, To Which The Testing Was Performed And The Acceptance criteria Used. Test Procedure Numbers May Also Be Referenced On Test Reports. Test Reports On Weldments Must Be Identified To Weld Joint And Layer. 3.27 Quality System Requirements - The Contractor Furnishing Items Under This Contract/purchase Order Must Provide And Maintain A Quality System In Accordance With Iso-9001 As Amplified Or Modified Herein, With The Calibration System Requirements Of Iso-10012 or Ansi-z540.3 With Iso-17025. A Quality System In Accordance With Mil-i-45208, With The Calibration System Requirements Of Mil-std-45662, Is Acceptable As An Alternate. 3.27.1 The Contractor's Quality System And Products Supplied Under The System Are Subject To Evaluation, Verification Inspection, And Acceptance/nonacceptance By The Government Representative To Determine The System's Effectiveness In Meeting The Quality requirements Established In The Contract/purchase Order. 3.27.2 The Contractor's Quality System Must Be Documented And Must Be Available For Review By The Contracting Officer Or His Representative Prior To Initiation Of Production And Throughout The Life Of The Contract. The Prime Contractor Must, Upon notification, Make His Facilities Available For Audit By The Contracting Officer Or His Authorized Representative. 3.27.3 See Cdrl Di-qcic-81110 (inspection System Procedures) - All Suppliers Of Level I/subsafe (li/ss) Material Are Required To Submit A Copy Of Their Current Documented Quality System Procedures To The Procurement Contracting Officer (pco) Prior To Award Of any Contract/purchase Order. Suppliers That Have A Copy Of Their Current Quality System Procedures On File At The Procuring Activity May Request The Pco Waive This Requirement. 3.27.4 This Contract Provides For The Performance Of Government Quality Assurance At Source. The Place Or Places Of Performance May Not Be Changed Without The Authorization Of The Procurement Contracting Officer. Upon Receipt Of This Order, Promptly notify The Government Representative Who Normally Services Your Plant So That Appropriate Planning For Government Inspection Can Be Accomplished. If You Do Not Have An Assigned Government Representative, Notify The Nearest Defense Contract Management Agency (dcma) Office. In The Event That A Local Government Representative Or Dcma Office Cannot Be Located, Our Purchasing Agent Should Be Notified Immediately. 3.27.5 Any Changes Made By The Contractor To A Qualified Quality System Will Require Re-submittal To The Pco And Concurrence By The Government Quality Assurance Representative Prior To Adoption. 3.28 Contractor Inspection Requirements - The Contractor Must Maintain Adequate Records Of All Inspections And Tests. The Records Must Indicate The Nature And Number Of Observations Made, The Number And Type Of Deficiencies Found, The Quantities Approved And rejected And The Nature Of Corrective Action Taken As Appropriate. Inspection Records Must Be Traceable To The Material Inspected. 3.28.1 The Supplier's Gages, Measuring And Test Equipment Must Be Made Available For Use By The Government Representative When Required To Determine Conformance With Contract Requirements. When Conditions Warrant, The Supplier's Personnel Must Be Made available For Operations Of Such Devices And For Verification Of Their Accuracy And Condition. 3.28.2 All Documents And Reference Data Applicable To This Contract Must Be Available For Review By The Government Representative. Copies Of Documents Required For Government Inspection Purposes Must Be Furnished In Accordance With The Instructions Provided by The Government Representative. 3.29 Subcontractor Inspection Requirements - The Government Has The Right To Inspect At Source, Any Supplies Or Services That Were Not Manufactured Or Performed Within The Contractor's Facility. Such Inspection Can Only Be Requested By Or Under Authorization of The Government Representative. Any Purchasing Documents To A Subcontractor Must Cite The Applicable Portions Of The Contractually Invoked Quality System (e.g. Calibration Requirements), Plus Any Product Requirements That Apply To The Supplies Being purchased. When The Government Elects To Perform Source Inspection At The Subcontractor's Facility, Applicable Purchase Documents Must Be Annotated With The Following Statement: "a Government Inspection Is Required Prior To Shipment From Your Plant. Upon receipt Of This Order, Promptly Notify The Government Representative Who Normally Services Your Plant So That Appropriate Planning For Government Inspection Can Be Accomplished. If You Do Not Have An Assigned Government Representative, Notify The Nearest defense Contract Management Agency (dcma) Office. In The Event That A Local Government Representative Or Dcma Office Cannot Be Located, Our Purchasing Agent Should Be Notified Immediately." 3.29.1 The Prime Contractor's Program Must Include Procedures To Assess The Capability Of The Prospective Suppliers To Produce The Products Or Supply The Services In Accordance With The Contract, Prior To The Issuance Of Any Purchase Document. 3.29.2 Each Sub-tier Supplier Of Material Or Services For Items In Section 3 Of This Contract Must Be Subjected To A Periodic Review Or Audit By The Prime To Determine The Continued Capability Of The Supplier To Control The Quality Of The Products Or Services specified In The Purchase Order Or Contract. 3.29.3 The Prime Contractor Must Ensure That The Purchased Product Conformsto Specified Purchase Requirements And This Contract. The Type And Extent Of Control Applied To The Supplier And The Purchased Product Must Be Dependent Upon The Effect Of The purchased Product On The End Item Represented By This Contract. 3.29.4 The Prime Contractor Must Evaluate The Requirements Of The Contractand Select Suppliers Based On Their Ability To Supply The Product In Accordance With The Prime Contractor's Requirements And The Contract. Criteria For Selection And Evaluation Must Be established. Records Of This Effort Must Be Available For Review By The Government. 3.29.5 The Prime Contractor's Supplier Quality Assurance Program Must Provide For A Review Of Purchase Documents To Assure Applicable Quality Requirements Are Included Or Referenced In The Documentation For Compliance By The Supplier. 3.30 Government Furnished Material And/or Equipment (gfm/gfe) - When Material Or Equipment Is Furnished By The Government, The Contractor Must Develop Documented Control Procedures That Require At Least The Following: 3.30.1 Visual Examination Upon Receipt To Detect Damage During Transit. 3.30.2 Inspection For Completeness And Proper Type. 3.30.3 Verification Of Material Quality Received. 3.30.4 Periodic Inspection And Precautions To Assure Adequate Storage Conditions And To Guard Against Damage From Handling And Deterioration During Storage. 3.30.5 Functional Testing, Either Prior To Or After Installation, Or Both, As Required By The Contract To Determine Satisfactory Operation. 3.30.6 Identification And Protection From Improper Use Or Disposition. 3.30.7 Reporting To The Government, Any Gfm Or Gfe Property Found Damaged, Malfunctioning, Or Otherwise Unsuitable For Use. In The Event Of Damage Or Malfunction During Or After Installation, The Supplier Must Determine And Record Probable Cause And necessity For Withholding The Material From Use. 3.30.8 For Gfe Material, And As Required By The Terms Of The Bailment Agreement, The Supplier Must Establish Procedures For Adequate Storage, Maintenance, And Inspection Of Bailed Government Material. Records Of All Inspection And Maintenance Performed On bailed Property Must Be Maintained. 3.30.9 Material Returned To The Contractor Must Be Handled As Gfm. 3.31 Traceability And Certification Requirements - To Assure That Correct Materials Are Installed In Level I/subsafe Systems, It Is Imperative That Traceability Be Maintained From The Material To The Material Certification Test Report And Other Required objective Quality Evidence (oqe). The Material Certification Report Must Completely And Accurately Reflect That The Material Supplied Meets The Specified Requirements. Materials Requiring Traceability And Certification Data Are Identified Within Paragraph 3, section C Of This Contract/purchase Order. 3.31.1 The Following Provides The Minimum Requirements For Maintaining Material Traceability And Supplements The Requirements Specified In Di-misc-81020 And Elsewhere In The Contract/purchase Order. The Contractor Must Develop Written Procedures That implement The Material Control Requirements Stated Herein And Elsewhere In This Contract/purchase Order. 3.32 Material Traceability - The Certification Data Report Must Be Identified Through A Unique Traceability Number, Heat-lot Number, Or Heat-treat Number, As Applicable, Which Must Also Be Marked On The Material. This Traceability Marking On The Material Must provide Direct Traceability To The Material's Chemical Composition And Mechanical Properties Certification Data. For Material Produced By Batch, Continuous Cast, Or Continuous Pour Processes, Samples Must Be Taken No Less Than Once In Every Eight Hours Of operation For The Purpose Of Validating Proper Chemical Composition And Mechanical Properties. Traceability Must Be Maintained Through All Process Operations Including Any Subcontracted Operations, To The Finished Component. 3.32.1 Material Marking For Traceability And Identification - The Following Are The Minimum Marking Requirements. Additional/alternate Marking Requirements, If Applicable, Will Be Specified Elsewhere In The Contract/purchase Order. In Addition To The marking Requirements On Applicable Drawings And/or Specifications, Marking For Traceability Is Required. All Traceability Markings Must Be Permanently Applied In Accordance With Mil-std-792 (except As Specified Below). An Alternate Marking Method Is permissible Provided It Is An Available Option In The Contractually Invoked Specification Or Drawing, Except In Instances Where The Material Has Been Modified By This Contract/purchase Order And Differs From That Specified In The Specification Or Drawing. 3.32.2 Traceability Markings For Items With Precision Machined Or Plated Surfaces, Or Material With Suitable Marking Surface Areas Less Than 3/8 Inches Square (either 3/8" X 3/8" Or An Area Equal To 0.1406 Inches Square) Must Be Applied To A Durable Tag And the Tag Securely Affixed To The Material. 3.32.3 Traceability Markings Must Be Maintained Through Assembly, And Whenever Possible Must Be Visible After Assembly. For Items Where The Marking Is Not Visible After Assembly, A Durable Tag Must Be Securely Attached To The Assembly Identifying The Part number, Piece Number, Traceability Number, And The Location Of The Permanent Mark. 3.32.4 Marking Must Be Legible And Must Be Located So As To Not Affect The Form, Fit, And Function Of The Material. ; ; 3.33 See Cdrl Di-misc-81020 (chemical And Mechanical) - Material Certification - In Addition To The Certification Data Requirements Specified In Di-misc-81020, The Following Material Certification Requirements Apply: 3.33.1 Quantitative Chemical And Mechanical Analysis Of Material Traceable To Traceability Markings Is Required. Material Certification Test Reports Must Include The Class, Form, Condition, Grade, Type, Finish, And/or Composition, As Applicable, Of The material Supplied. 3.33.2 Re-identification And Re-certification Of Material Is Required When The Material Is Subjected To A Process Which Alters It's Properties. If The Starting Material Or Raw Stock Is Processed In A Manner That Will Not Affect Its Chemical Composition Or mechanical Properties, The Original Certifications For The Chemical Composition And Mechanical Properties, As Required By The Material Specification, Are Acceptable. Re-certification Of The Chemical Or Mechanical Properties Is Required If A Process Is Used during Fabrication That Alters The Original Properties Of The Material (e.g. Alloying, Heat Treating, Or Forming). In These Instances, The Properties Of The Material Must Be Re-determined And Documented To Reflect The Altered Condition. The Altered Material must Be Uniquely Re-identified. The Properties Thus Determined And Documented, Are Required For Final Certification And Must Conform To The Material Specification Or The Contract/purchase Order Requirements. When Only The Mechanical Properties Are Altered, the Original Certification Forchemical Composition Must Be Overstamped And Annotated With The Unique Traceability Material And At A Minimum Contain The Information Below. traceability Marking ________________________________________________ (marking On Finished Item) is Fabricated From Raw Material Identified To heat/lot Number ______________ And Heat Treat Number _____________________ (when Applicable) _________________________________________ Date _____________________ (name And Signature Of Auth. Co. Rep.) 3.33.3 Material Certification Data Forwarded By The Manufacturer Must Contain A Signed Certification That The Report Results Represent The Actual Attributes Of The Material Furnished And Indicate Full Compliance With All Applicable Specification And Contract requirements. Transcription Of Certification Data Is Prohibited. 3.33.4 Statements On Material Certification Documents Must Be Positive And Unqualified. Disclaimers Such As "to The Best Of Our Knowledge" Or "we Believe The Information Contained Herein Is True" Are Not Acceptable. 3.33.5 If Material Is Received Without The Required Certification Papers Or With Incorrect/missing Data On The Certification Papers, The Material Will Be Rejected. 3.34 Material Handling - The Written Material Control Process Must Include The Following: 3.34.1 All Raw Materials Must Have Traceability Markings (except As Specified Below). 3.34.2 Stored Raw Materials Requiring Traceability Must Be Segregated To Preclude Intermingling With Materials Not Requiring Traceability. 3.34.3 When Traceability Markings Will Be Removed By A Manufacturing Or Fabrication Process, The Marking Must Be Recorded Prior To Removal And Be Immediately Restored Upon Completion Of The Process. If This Cannot Be Done Or Is Impractical, An Appropriate material Control Procedure (such As A Bag And Tag, Tagging, And/or Tote Box Control) Must Be Employed. The Material Control Procedure Must Provide A Method Of Positive Control To Preclude Commingling Of Heats/lots Or Loss Of Traceability. The Traceability marking Must Be Reapplied Upon Completion Of The Final Manufacturing Process. 3.34.4 Brazing Or Weld Filler Metals For Strength Welds Forming Or Integral With Pressure Containing Components Or Assemblies Requiring Traceability Must Be Verified To Be The Correct Material, And Type Or Grade, As Applicable, Prior To Consumption. At A minimum, Material Verification Must Consist Of Inspection Of Material Test Reports For Conformance To Specified Requirements. Control Of Welding And Brazing Filler Metals Must Be Maintained To The Point Of Consumption To Assure Use Of The Correct Type And grade. Markings And Traceability Requirements Do Not Apply To Brazing And Weld Filler Metals After Consumption. It Is The Responsibility Of The Prime Contractor To Ensure Conformance With The Above Requirements On Welds Performed By Their Subcontractors. 3.34.5 Purchase Orders For Raw Material Must Specify That The Material Be Traceable To Material Certification Test Reports By Traceability Markings On The Material And Identified On The Test Reports. The Certification Data Requirements Contained In di-misc-81020 Must Be Invoked By The Prime Contractor On All Subcontractors Supplying Level I Material. 3.34.6 The Material Control Process Must Include Requirements For The Maintenance Of Traceability For Items Sent Out For Subcontracted Operations. If Such Operations Would Remove Traceability Markings, Purchase Or Work Orders Must Specify A Method And Marking location For Remarking. The Contractor Must Also Ensure That Subcontractor Production Controls Are Adequate To Preclude Commingling Of Materials During Processing. 3.35 Receiving Inspection - 3.35.1 Products And Services Produced By Sub-tier Suppliers For Incorporation In The Contract End Item Must Be Subject To Inspection Or Audit At The Time Of Receipt By The Prime Prior To Further Processing Within The Prime Contractor's Plant Or Shipment To another Location. 3.35.2 Receiving Inspection Must Include As A Minimum - verification That The Traceability Marking On The Material Agrees With That On The Certification Test Reports. verification That Certification Test Reports Are Legible And Complete. verification That The Contents Of The Certification Test Reports Are In Compliance With The Contractually Invoked Specifications And Requirements. 3.36 Discrepancy Reporting - 3.36.1 Nonconforming Products From Sub-tier Suppliers Must Be Identified And Processed In Accordance With The Prime Contractor's Procedures For Controlling Nonconforming Products. The Prime Contractor Must Report The Receipt Of Any Nonconforming Products To the Responsible Sub-tier Supplier In Accordance With Established Procedures. Nonconforming Material Records Must Be Maintained And Available For Review By The Government Quality Assurance Representative (qar). 3.37 Final Inspection - The Following Inspections Must Be Performed Prior To Government Inspection And Acceptance. 3.37.1 Material Sampling - Material Must Be Inspected For Form, Fit, And Function. Lot Acceptance Must Be Based On Zero Defects And Lot Rejection Based On One Defect. The Sample Size Must Be In Accordance With The Sampling Plan(s) In The Applicable Military specification Or Standard, Federal Specification Or Standard, Or Drawing To Which The Material Was Manufactured. In The Absence Of Such Sampling Plans, Sampling Inspection Must Be Per Ansi/asq-z1.4, General Inspection Level Ii (for Sample Size Selection Code), table Iia (for Sample Size). small Lot Sizes - For Lot Sizes Of Fifty Or Less, The Minimum Sample Size Must Be Eight Units. For Lot Sizes Of Eight Or Less, The Sample Size Must Be One Hundred Percent Of The Lot. 3.37.2 The Manufacturer May Elect To Use Statistical Process Control (spc) To Assure Product Quality In Lieu Of The Above Attribute Sampling Plan, Provided That The Spc Methodology/system Used Provides Acceptable Products To The Government. However, The government/navy Receipt Inspection Activity May Perform Their Acceptance Inspection Of The Material Using The Attribute Sampling Plan Outlined Above. 3.37.3 All Data Concerning Material Verification (chemical, Mechanical Or Physical Properties), Traceability (material Certifications To Material Marking), And Nondestructive Test (ndt) Certifications For Material Must Be 100% Inspected. The Certification test Reports Must Also Be 100% Inspected For Completeness And Legibility. 3.37.4 All Material Requiring Traceability Must Be 100% Inspected For Traceability Marking And That The Marking Is Legible. 3.38 See Cdrls Di-misc-80875 (welding Procedures) And Di-misc-80876 (weld Procedure Qualification Data) - When Production Or Repair Welding Is Required, The Applicable Welding Procedure(s) And Qualification Data Must Be Submitted For Review And Approval. In addition, The Consumed Weld Metal C Of C As Defined Below Must Be Submitted As Part Of The Certification Oqe Package Submitted By The Contractor. note: These Requirements Do Not Apply To Tack/spot Welds. 3.38.1 Approval Of The Contractor's Qualification Data Must Be Obtained Prior To Performing Any Welding (production Or Repair). 3.38.2 If The Contractors Qualification Data Has Previously Been Approved By The Navy For Other Contracts, A Copy Of The Original Approval Letter May Be Submitted Along With The Procedures And Qualification Data Report To Expedite The Approval Process. The approval Letter Must Reference The Applicable Welding Procedure And Qualification Data Report Identification/number. Prior Approval Does Not Guarantee Acceptance For This Or Any Future Contracts. As Far As Practical, All Procedures For The Contract Must Be submitted At The Same Time. Welding Procedures And Qualification Data Must Be Submitted In A Commercially Available Electronic Format Such As Adobe Acrobat Pdf. The Contractor Must State The Applicability Of Each Weld Procedure And Qualification Data Submitted, citing The Drawing Number And Pieces To Be Welded. (i.e. "wp-123 And Qd-123 Are Submitted For The Weld Joint Between Pieces 1 And 2 On Drawing Abc." Wp-456 And Qd-456 Are Submitted For The Hardfacing Of Piece 3 On Drawing Xyz.") 3.38.3 The Pco's Authorization For The Use Of Weld Procedure(s) And Qualification Data For The Specific Application As Submitted Does Not Mitigate The Vendors Responsibility To Comply With The Requirements Of S9074-aq-gib-010/248, S9074-ar-gib-010a/278, And the Contract. 3.38.4 Authority For The Repair Of Special Repairs In Castings, The Repair Of Wrought Material, Or The Repair Of Forged Material Must Be Obtained Via Request For Waiver From The Procurement Contracting Officer. This Request Must Describe The Defect; Including size, Depth, Location, And A Description Of The Proposed Repair. Repairs Deemed Minor Or Nominal In Accordance With S9074-ar-gib-010/278 Can Be Made At Contractor Discretion In Accordance With S9074-ar-gib-010/278 Requirements; However, Weld Procedure specification (wps) And Procedure Qualification Record (pqr) Submittals Are Still Required. This Request For Navsup-wss Contracts Must Be Submitted Via The Electronic Contractor Data Submission (ecds) Application. 3.38.5 Any New Procedure Qualification Performed Under This Contract Will Require The Vendor To Provide A Minimum 72 Hour Notification To Dcma With An Offer To Observe The Welding Of The Test Assemblies. The 72 Hour Time Limit May Be Modified Upon Mutual agreement Between The Vendor And Dcma. 3.38.6 When Drawings Require Hardfacing Surface Iron Or Nickel Content Not To Exceed 5%, The Contractor Must Verify Surface Iron Or Nickel Content By Performing Chemical Testing As Defined By The Applicable Drawing. The Chemical Test Results Must Be Submitted as Part Of The Qualification Data. 3.38.7 Additional Qualification Requirements For Production Hardfacing Thickness Less Than 1/8-inch: Macro-etch (or Legible Photomacrographs Clearly Showing The Fusion Area) Must Be Submitted For Review And Show Consistent, Minimized Dilution. All Essential elements And Any Elements Not Listed In S9074-aq-gib-010/248 That Influence Dilution Must Be In The Qualification Data And Weld Procedure, With Strict Limits Placed On Each Essential Element. 3.38.8 Preparation And Retention Of Weld Records Is Required, As Specified By Paragraph 4.1.3 Of S9074-ar-gib-010a/278. 3.38.9 When Production Or Repair Welding Is Required On Titanium Materials, The Applicable Fabrication Plan, Facilities Procedure, Training Plan, And Active Welder Qualification Must Also Be Submitted For Review And Approval. 3.38.10 If The Contractor's Fabrication Plan, Facilities Procedure, Training Plan, Or Active Welder Qualification Has Previously Been Approved By The Navy For Other Contracts, A Copy Of The Original Approval Letter May Be Submitted Along With The Applicable documentation To Expedite The Approval Process. The Approval Letter Must Reference The Applicable Documentation. Prior Approval Does Not Guarantee Acceptance For This Or Any Future Contracts. The Contractor's Fabrication Plan, Facilities Procedure, Training plan, And Active Welder Qualification Must Be Submitted At The Same Time As The Applicable Welding Procedure(s) And Weld Procedure Qualification Data. All Documentation Must Be Submitted In A Commercially Available Electronic Format, Such As Adobe Acrobat Pdf. 3.38.11 See Cdrl Di-misc-80678 (consumed Weld Metal) - A Certificate Of Compliance Is Required For All Weld Filler Metals Used For Production Or Repair Welding, And Must Include The Following: a) Filler Metal Lot Number(s) b) Specification And Type c) A Positive Statement That The Vendor Has Obtained Oqe And Verified That Each Lot Of Weld Filler Material Conforms To Specification Requirements. d) A Positive Statement Verifying That The Weld Filler Metals Were The Correct Material Type Or Grade Prior To Consumption. 3.38.12 When Production Welds Or Repair Welds Are Performed By A Subcontractor, The Requirement For Submission Of All Certification Documentation Required Herein Must Be Passed Down To The Subcontractor. 3.39 Radiography (rt) - Radiography Must Be Performed In Accordance With T9074-as-gib-010/271. Rt Acceptance Criteria For Weldments To Be Per The Applicabletable Of S9074-ar-gib-010a/278 (p-1 Piping) Or Mil-std-2035, Class 1, As Applicable. 3.39.1 Submission Of Radiographic Shooting Sketches For Approval Is Not Requiredfor Weldments. 3.39.2 All Pieces Radiographed Must Be Permanently Marked With "rt" And A Unique Traceability Number. (unique Traceability Number Must Be Directly Traceable To The Rt Film.) 3.39.3 See Cdrl Di-misc-80678 (production Radiography) - Production Radiographyrequires Final Acceptance By The Navy. The Items Listed Below Must Be Submitted For Final Acceptance, Cataloging, File, And Retention. They Must Be Submitted And Approved By The navy Prior To Shipment Of The Applicable Hardware. However, When The Source Certification Clause Is Invoked, They Must Be Submitted A Minimum Of Forty-five (45) Working Days Prior To The Date Of Source Certification Inspection. (a) Film (b) Rss/rsss (c) Rs (d) Dd250 (with Heat Numbers Corresponding To Rt Numbers Referenced In Block 16) 3.40 Additional Marking For Fasteners - Fasteners Must Be Marked In Accordance With ;mil-dtl-1222, Except Self-locking Hex Nuts Must Be Marked In Accordance With Nasm 17828. Nasm 17828 Nuts Must Be Marked On The Wrenching Surface With The Manufacturer's identification Symbol, Material Symbol And Heat/lot Traceability Code; . The Method Of Marking Must Be Types I, Ii, Iii, V, Viii Or Ix Of Mil-std-792 Except For Grades 410, 416 And 431 In The H Condition And Grades 8, 630, A574, And 4340 Which Must Be Marked by Method Ii When Marking Is Applied After The Final Heat Treatment. Markings On Fasteners That Are To Be Coated Must Be Marked Prior To Coating And Have A Minimum Depth Of 4 Mils. Traceability Marking Must Be Legible After The Application Of Protective compounds. 3.40.1 Marking Is Required For All Fasteners Regardless Of Size And Must Include The Material Symbol, The Manufacturer's Identification Symbol, And The Traceability Marking. Marking Must Be Applied On The Head Of Headed Fastener (top Preferred, Side location If Necessary). Self-locking Screws Must Also Be Marked With Six Dots. Where No Contract Invoked Specification Requirement Exists For This Marking, Self-locking Fasteners Must Be Marked With Six Dots Approximately .032" Diameter, Raised Or Depressed by Approximately .010" Located On The Top Perimeter Of The Head Of The Fastener In An Arc Or Circular Pattern. The Six Dots Must Be Distinguishable From All Other Required Markings. 3.41 See Cdrl Di-misc-80678 (special Emphasis C Of C) - The Certificate Of Compliance Must Show Traceability To The Marking Applied On Each Individual Item, And Must Contain The Following Information: 1. Contractor's Name, Address And Date. 2. The Contract/purchase Order Number (for Example: N00104-11-p-fa12) 3. The National Stock Number (nsn). The 18 Character National Stock Number For Special Emphasis Material Includes The Two Digit Cog, The Four Digit Fsc, The 9 Digit Niin, And The Two Digit Smic (for Example: 1h 4820 012345678 L1) ("n/a" When Not Applicable). 4. Lubricants, Sealants, Anti-seize, And/or Thread Locking Compounds ("n/a" When Not Applicable). 5. Certification That O-rings, Packing, Gaskets, Or Other Elastomeric Products Were Installed In A Compressed State Within An Assembly Or Sub-assembly, Prior To Expiration Of The Shelf Life ("n/a" When Not Applicable). 6. Manufacturer's Compound Number ("n/a" When Not Applicable). 7. When Weld Procedure Submittal Is Required By The Contract, A Statement That The Approval Date Of The Qualification Data Precedes Any Production Or Repair Welding Performed On This Contract. ("n/a" When Not Applicable). 8. A Statement To The Effect That All Items Furnished On This Contract Are In Full Compliance With The Specifications And Requirements And List Each Contractually Invoked Conformance/compliance Test Performed By Name And That It Was Performed satisfactorily. 9. Contractor's Or Authorized Personnel's Signature. 4. Quality Assurance 4.1 Notes To Dcma Qar And The Contractor - 4.1.1 Dcma Qar And The Contractor For Proprietary Designs - Departures From Contractor Imposed Requirements, Not Specifically Covered By
Closing Date6 Sep 2024
Tender AmountRefer Documents 

DEPT OF THE NAVY USA Tender

United States
Description: Contact Information|4|n743.5|tbd|7176053229|joel.j.curtis.civ@us.navy.mil| item Unique Identification And Valuation (jan 2023)|19|||||||||||||||||||| higher-level Contract Quality Requirement (navicp Review Feb 1991)(feb 1999)|1|see Specification Sections C And E.| inspection Of Supplies--fixed-price (aug 1996)|2||| wide Area Workflow Payment Instructions (jan 2023)|16|stand-alone Receiving Report-certifications Combo-receiving Report & Invoice-material |na|tbd|n00104|tbd|n39040 - Certifications, S4306a - Material |n50286|tbd|133.2|na|na|n39040 - Certifications|na|na|see Dd 1423|port_ptnh_wawf_notification@navy.mil| navy Use Of Abilityone Support Contractor - Release Of Offeror Information (3-18))|1|| equal Opportunity (sep 2016)|2||| warranty Of Supplies Of A Noncomplex Nature (june 2003)|6|one Year From Date Of Delivery.|one Year From Date Of Delivery.||||| warranty Of Data--basic (mar 2014)|2||| buy American-free Trade Agreements-balance Of Payments Program-basic (feb 2024)|11|||||||||||| alternate A, Annual Representations And Certifications (nov 2023)|13|||||||||||||| buy American-free Trade Agreements-balance Of Payments Program Certificate-basic (feb 2024))|5|||||| buy American-balance Of Payments Program Certificate-basic (feb 2024)|1|| annual Representations And Certifications (may 2024)|13|332919|750 Employees|||||||||||| notice Of Priority Rating For National Defense, Emergency Perpardeness, And Enrgy Progam Use (april 2008))|2||x| 1.data Item A001 (inspection And Test Plan) May Be Waived If Already On File At Navsup Wss Mech. 2. This Is A Rated Order Certified For National Defense Use, And The Contractor Will Follow All The Requirements Of The Defense Priorities And Allocations System Regulation (15 Cfr 700). 3. This Solicitation Is And Resulting Award Will Be Issued Iaw Eaf. 1. Scope 1.1 The Material Covered In This Contract/purchase Order Will Be Used In A Crucial Shipboard System. The Use Of Incorrect Or Defective Material Would Create A High Probability Of Failure Resulting In Serious Personnel Injury, Loss Of Life, Loss Of Vital shipboard Systems, Or Loss Of The Ship Itself. Therefore, The Material Has Been Designated As Special Emphasis Material (level I, Scope Of Certification, Or Quality Assured) And Special Control Procedures Are Invoked To Ensure Receipt Of Correct Material. 2. Applicable Documents 2.1 Order Of Precedence - In The Event Of A Conflict Between The Text Of This Contract/purchase Order And The References And/or Drawings Cited Herein, The Text Of This Contract/purchase Order Must Take Precedence. Nothing In This Contract/purchase Order, however, Must Supersede Applicable Laws And Regulations Unless A Specific Exemption Has Been Obtained. 2.2 Applicable Documents - The Document(s) Listed Below Form A Part Of This Contract/purchase Order Including Modifications Or Exclusions. 2.2.1 Specification Revisions - The Specification Revisions Listed Under "documents References" Below Are The Preferred Revision. Older And/or Newer R Evisions Are Acceptable When Listed Within Contract Support Library Reference Number Csd155 In Ecds (electric contractor Data Submission) At: Ht Tps://register.nslc.navy.mil/. This Is To Allow Contractors To Use Certain Acceptable Older Specification Revisions To Purge Their Existing Stock Of Material Certified To Those Older Revisions Or To Use Newer Specification revisions When Material Is Certified To Newly Released Revisions,without Requiring The Submittal Of Waiver/deviation Requests For Each Specification Revision On Every Contract. Revisions Of Specifications Reflecting Editorial And/or Re-approval (e.g. E2009, r2014, Etc.) Are Considered Inconsequential, But Are Acceptable When Their Revisions Are Listedwithin Csd155 Or Elsewhere Within This Contract. 2.2.2 "document References" Listed Below Must Be Obtained By The Contractor. Ordering Information Is Included As An Attachment To This Contract/purchase Order. 2.2.3 The Documents And Drawings Listed Below Under Drawing No. Are Not Provided With This Contract/purchase Order. drawing No Cage Rev Distr Cd ;300057 27826 H B 299943 27826 C B 300010 27826 B B 300012 27826 B B 300015 27826 C B 300014 27826 C B 300035 27826 B B; document Ref Data=fed-std-h28 | | |b |190424|a| | | document Ref Data=fed-std-h28 |0020| |b |941221|a| |01| document Ref Data=ff-s-86 | | |g |210127|a| | | document Ref Data=ansi/asq Z1.4 | | | |080101|a| | | document Ref Data=qq-n-281 | | |d |851023|a| 2| | document Ref Data=qq-n-286 | | |g |001207|a| | | document Ref Data=astm-a574 | | | |211201|a| | | document Ref Data=astm-f606 | | | |191115|a| | | document Ref Data=mil-std-792 | | |f |060519|a| | | document Ref Data=mil-dtl-1222 | | |j |001208|a| | | document Ref Data=astm-e1417 | | | |160615|a| | | document Ref Data=astm-e1444 | | | |160601|a| | | document Ref Data=mil-std-2035 | | |a |950515|a| | | document Ref Data=mil-std-2132 | | |d |080310|f| |01| document Ref Data=astm-d4066 | | | |130701|a| | | document Ref Data=iso_9001 | | | |081115|a| | | document Ref Data=iso10012 | | | |030415|a| | | document Ref Data=mil-dtl-15024 | | |g |180303|a| | | document Ref Data=mil-c-15726 | | |f |911008|a| 1| | document Ref Data=mil-t-16420 | | |k |880916|a| 1| | document Ref Data=iso/iec 17025 | | | |050515|a| | | document Ref Data=mil-dtl-18240 | | |f |000313|a| 1| | document Ref Data=qpl 18240 | | |qpd|170619|a| | | document Ref Data=mil-dtl-24202 | | |a |171017|a| | | document Ref Data=mil-c-24679 | | | |880506|a| | | document Ref Data=qpl 25027 | | |17 |000207|a| | | document Ref Data=mil-i-45208 | | |a |810724|a| 1| | document Ref Data=mil-std-45662 | | |a |880801|a| | | document Ref Data=a-a-50433 | | | |890815|a| | | document Ref Data=a-a-59004 | | |b |081118|a| | | document Ref Data=ansi/ncsl Z540.3 | | | |130326|a| | | document Ref Data=0900-lp-001-7000 | | | |810101|c| |01| document Ref Data=0900-lp-003-8000 | | | |740701|a| |02| document Ref Data=aia/nas Nasm 17828 | | |1 |130430|a| | | document Ref Data=aia/nas Nasm 25027 | | |1 |121221|a| | | document Ref Data=s9074-aq-gib-010/248 | | |1 |191112|a| | | document Ref Data=t9074-as-gib-010/271 | | |1 |140911|a| | | document Ref Data=s9074-ar-gib-010a/278 (chg A) | | | |130214|a| | | 3. Requirements 3.1 ;the 6 Inch, 700 Psi, Flanged, Seawater Sound Isolation Coupling Must Be In Accordance With Murdock Drawing 299943, Assembly 299943-400, Except As Amplified Or Modified Herein.; 3.2 Material For Parts Requiring Certification - Quantitative Chemical And Mechanical Analysis Is Required For The Parts Listed Below Unless Specifically Stated Otherwise: part - ;body, Item 1 And Attach Flange, Item 6 On Murdock Drawing 299943; Back Flange, Item 14 On Murdock Drawing 300035; Thread End, Item 7 And Flare End, Item 10 On Murdock Drawing 300015; material - ;mil-c-15726, Alloy C71500 Or Mil-c-24679, Alloy C71500; part - ;stud, Item 8 On Murdock Drawing 299943; material - ;qq-n-281, Class A; part - ;self-locking Nut, Item 9 On Murdock Drawing 299943 In Accordance With Nasm 17828; material - ;qq-n-281, B Cold Drawn. self-locking Element- Astm-d4066, Group 01, Class 1, Grade 1; part - ;socket Head Cap Screw, Item 7 On Murdock Drawing 299943; material - ;ff-s-86, Qq-n-286, Form 2, Annealed And Age Hardened With Self-locking Element In Accordance With Mil-dtl-18240; part - ;elbow, Item 8 On Murdock Drawing 300015; material - ;mil-t-16420, Type I, Composition 70/30 And In Accordance With Murdock Drawing 300057 And Mildtl-24202; 3.3 Testing Certification - Certifications Are Required For The Following Tests On The Items Listed Below. Additional Testing On Other Piece Parts (if Any) Per Applicable Drawings And Specifications Is Still Required, But Certifications Are Only Required As listed Below. test - Non-destructive Tests item - ;weld Repair (as Applicable); performance - Per Applicable Fabrication Specification acceptance - Per Applicable Fabrication Specification test - ;dye Penetrant Inspection; item - ;body, Item 1 And Attach Flange, Item 6 On Murdock Drawing 299943; Back Flange, Item 14 On Murdock Drawing 300035; Thread End, Item 7 And Flare End, Item 10 On Murdock Drawing 300015; performance - ;t9074-as-gib-010/271; acceptance - ;for Mil-c-15726 Material Use Mil-std-2035 Or 0900-lp-003-8000, For Mil-c-24679 Forgings Use Mil-c-24679; test - ;liquid Penetrant Inspection; item - ;socket Head Cap Screw, Item 7 And Stud, Item 8 On Murdock Drawing 299943; performance - T9074-as-gib-010/271; Sampling Must Be Per Mil-dtl-1222 acceptance - Mil-dtl-1222 test - ;dye Penetrant Inspection For Non-magnetic Grades; item - ;self-locking Nut Item 9 On Murdock Drawing 299943; performance - T9074-as-gib-010/271 Or Astm-e1417/astm-e1444 (method C Solvent Removal Techniques Must Not Be Used On Thread) acceptance - ;nasm25027; test - ;dye Penetrant Inspection; item - ;elbow, Item 8 On Murdock Drawing 300015; performance - ;t9074-as-gib-010/271; acceptance - ;mil-std-2035 Or 0900-lp-003-8000; test - ;visual And Dye Penetrant Inspection (final Layer); item - ;weldments; performance - ;t9074-as-gib-010/271; acceptance - ;mil-std-2035 Or 0900-lp-003-8000; test - ;hydrostatic Pressure Test; item - ;each Assembly; performance - ;the Test Pressure Of Drawing 299943 Note 6 +50/-0 Psig For 5 Minutes Minimum; acceptance - ;no Leakage Or Permanent Deformation Is Allowed; attribute - Certificate Of Compliance item - Self-locking Nuts performance - This Certificate Must State That Self-locking Nuts Were Manufactured By An Approved Source. Approved Sources Are Those Listed On Qpl-25027 For The Appropriate Fastener. This Qpl May Also Be Considered As Approved Sources For Heavy Hex self-locking Nuts. attribute - Certificate Of Completion item - Self-locking Nut Nonmetallic Insert performance - ;astm-d4066, Group 01, Class 1, Grade 1; test - Quality Conformance Tests item - Self-locking Nuts performance - ;nasm25027; acceptance - ;nasm25027; test - Ultrasonic Inspection On Starting Material item - ;all Items Requiring Certification Made From Qq-n-286 With A Diameter Or Minimum Distance Between Parallel Surfaces Of 4 Inches Or Greater Of The Starting Material, Or When Required By A Drawing Or Specification Invoked Elsewhere In This Contract; performance - T9074-as-gib-010/271 Or Mil-std-2132, And Qq-n-286 acceptance - Qq-n-286 attribute - Annealing And Age Hardening item - ;socket Head Cap Screw, Item 7 On Murdock Drawing 299943; performance - Qq-n-286 attribute - Certificate Of Compliance For Seamless Tubing/pipe item - ;elbow, Item 8 On Murdock Drawing 300015; performance - Material Supplied Must Be In The Seamless Condition. 3.4 The Pressure Tolerance Must Be As Specified In The Assembly Drawing, Detail Drawing, Design Specification Or Elsewhere In This Contract. Where Pressure Tolerances Are Not Provided By Drawings, Specifications Or Specified Elsewhere In This Contract, The following Must Be Used: For Pressure Tests Below 100 Psig, The Pressure Tolerance Must Be +1 Psig / -0 Psig. For Pressure Tests At Or Above 100 Psig Up To And Including 2500 Psig, The Pressure Tolerance Must Be +2% / -0 Psig Rounded Off To The Nearest Multiple Of The Smallest Graduation On An Analog Test Pressure Gauge, Not To Exceed 50 Psig. For Pressure Tests Above 2500 Psig, The Pressure Tolerance Must Be +2% / -0 Psig, Rounded Off To The Nearest Multiple Of The Smallest Graduation On An Analog Test Pressure Gauge, Not To Exceed 200 Psig. the Pressure Test Time Tolerance Must Be As Specified In The Assembly Drawing, Detail Drawing, Design Specification Or Elsewhere In This Contract. Where Pressure Test Time Tolerances Are Not Provided By Drawings, Specifications Or Specified Elsewhere In This contract, The Following Must Be Used: For A Test Duration Up To And Including 1 Hour, The Tolerance Must Be +5 Minutes / - 0 Minutes. For A Test Duration Of More Than 1 Hour Up To And Including 24 Hours, The Tolerance Must Be +30 Minutes / - 0 Minutes. For A Test Duration Of More Than 24 Hours, The Tolerance Must Be +60 Minutes / - 0 Minutes. 3.5 Radiography Is Required On ;weldments Per Note 2 On Murdock Drawing 300015 And Must Be Identified To The Weld Joint; . 3.6 Wedge Tensile Test Specimens (headed Fasteners) - A Wedge Tensile Test Must Be Conducted On A Full Size Fastener For Each Production Lot And Reported Aspart Of The Mechanical Properties. The Required Specimens For The Wedge Tensile Test Must Be Separate fasteners From Those Required For The Yield Test. 3.6.1 Testing For Socket Head Cap Screws Must Be In Accordance Mil-dtl-1222, Paragraphs 4.5.2.3 And 4.5.2.3.1. 3.6.2 Testing For All Other Headed Fasteners With A Nominal Diameter Greater Than 1/4-inch Must Be In Accordance With Astm-f606 For Grades 5, 8, B7, And B16.for All Other Grades, The Following Wedge Angles Must Be Used. a. Except As Specified In Item C Below, Fasteners With A Nominal Diameter Of 1/4-inch Through 1-inch (inclusive) Must Be Tested With A Ten Degree Wedge. b. Except As Specified In Item C Below, Fasteners With A Nominal Diameter Over 1-inch Must Be Tested With A Six Degree Wedge. c. Fasteners That Are Of Grades 8, B7, B16, 410, 416, 416se, 431, And 630 And Are Threaded Within One Diameter To The Underside Of The Head Must Be Tested As Follows: sizes 1/4 Inch Through 3/4 Inch (inclusive) Use A Six Degree Wedgesizes Over 3/4 Inch Use A Four Degree Wedge d. Fasteners Which Have Passed Testing With Wedge Angles Greater Than Those Specified Should Be Considered Acceptable. 3.6.3 For Fasteners Having A Length Less Than The Minimum Specified In Table 1 Of Astm-f606, One "test Specimen Fastener" Must Be Manufactured From Each Lot Of Fasteners And Tested To Represent That Lot. The Length Of These Test Specimen Fasteners Must Meet the Minimum Specified In Table 1 Of Astm-f606 But Must Not Exceed It By More Than 1/4 Inch. Test Specimen Fasteners Must Be The Same Type, Style, And Diameter As The Production Lot And Must Be Manufactured From The Same Starting Material, Using The Same manufacturing Techniques As The Production Lot, And Must Be Heat Treated (if Required) Along With The Production Lot. 3.7 Thread Inspection Requirements - All Threads On Threaded Parts Must Be Inspected Using Appropriate Inspection Methods, Inspection Systems, And Inspection Gages/instruments In Accordance With Fed-std-h28 Series. Substitution Of Thecommercial Equivalent inspection In Accordance With Asme B1 Series Is Acceptable. 3.7.1 System 21 Of Fed-std-h28/20 Must Be Used As A Minimum Inspection Requirement For Threads When The Design Drawing Or Design Specification Does Not Specify An Inspection Requirement. 3.7.2 For Navy And Shipyard Drawings, System 21 Of Fed-std-h28/20 May Be Substituted For System 22 Without Further Navy Approval When The Design Drawing Invokes System 22 And Does Not Cite Governing Specifications That Specifically Require System 22. System 22 of Fed-std-h28/20 Must Be Used When The Drawing References Other Governing Specifications That Specifically Require System 22, Such As Certain Thread Types Of Mil-dtl-1222. 3.7.3 A Written Request For Concurrence Must Be Submitted When Utilizing Alternative Measuring Equipment Or Measuring Systems Not Applicable To The Specified Inspection System. 3.8 O-ring Grooves And Mating Sealing Surfaces Must Be Inspected Per The Contractually Invoked Drawings Or Specifications. When The Drawings Or Specifications Do Not Provide Specific Defect Criteria Or State That No Defects Are Allowed, The General Acceptance criteria (gac) Standard Must Be Used For Inspecting O-ring Grooves And Mating Sealing Surfaces Only. Repairs To Sealing Surfaces And O-ring Grooves With Unacceptable Defects May Be Accomplished Within The Limits Of The Size And Tolerances Provided In The applicable Drawing. Repairs Thatwould Exceed These Limits Require Approval (including Final Dimensions). The Data That Is Red Lined (crossed Out) Is Excluded From The Gac For This Contract And Is Not To Be Used For Acceptance Or Rejection Criteria. The Gac document Is Identified As Contract Support Library Reference Number Csd008 At Https://register.nslc.navy.mil/ 3.9 Recorded Dimensions - A Certification Of Recorded Dimensions As Depicted In Note 6 Of Murdock Machine And Engineering Company Drawing 300057 Is Required. Certification Must Include The Actual Measured Dimensions. At The Time Of Receipt Inspection, rejection Of Any Single Piece Must Be Cause For Rejection Of The Entire Lot. 3.10 Slow Strain Rate Tensile Test Laboratories - The Slow Strain Rate Tensile Test Of Qq-n-286 Must Be Performed By One Of The Following Laboratories: huntington Alloys, A Special Metals Company attn: Bill Bolenr 3200 Riverside Drive huntington, Wv 257059 phone: (304) 526-5889 fax: (304) 526-5973 metallurgical Consultants, Inc. attn: W. M. Buehler 4820 Caroline po Box 88046 houston, Tx 77288-0046 phone: (713) 526-6351 fax: (713) 526-2964 naval Surface Warfare Center, Carderock Division attn: Eric Focht Code 614 9500 Macarthur Blvd west Bethesda, Md 20817-5700 phone: (301) 227-5032 fax: (301) 227-5576 teledyne Allvac attn: Dr. W. D. Cao 2020 Ashcraft Ave. monroe, Nc 28110 phone: (704) 289-4511 fax: (704) 289-4269 westmoreland Mechanical Testing And Research Inc. attn: Andrew Wisniewski p.o. Box 388 youngstown, Pa 15696-0388 mannesmann Rohrenwerke mannesmann Forschungsinstitut (mfi) attn: Dr. Weiss postfach 251160 47251 Duisburg germany phone: 011-49-0203-9993194 fax: 011-49-0203-9994415 thyssenkrupp Vdm Usa, Inc. attn: D. C. Agarwal 11210 Steeplecrest Drive, Suite 120 houston, Tx 77065-4939 phone: (281) 955-6683 3.11 K-monel Fasteners - Material Must Be Heat Treated Per Qq-n-286. 3.11.1 Fasteners That Have Been Hot Or Cold Headed Or Roll Threaded Must Be Solution Annealed Followed By Age Hardening Subsequent To All Heading And Thread Rolling Operations. The Mechanical Properties On Certifications Must Be Actual Properties Of The annealed And Age Hardened Material And Must Meet The Requirements Of Qq-n-286. 3.11.2 Qq-n-286 Fasteners That Have Been Headed And/or Roll Threaded Must Not Beage Hardened Unless The Material Has Been Solution Annealed Subsequent To The Heading And Threading Operations. Threads Formed After The Final Age Hardening Heat Treatment Must Be cut Or Ground Only. 3.12 Ff-s-86 Mechanical Property And Metallographic Testing Sample Sizes Must Use Asq Z1.4 Inspection Level S-1 With Aql = 1.0.note: The Sample Size Values Must Conform To Ff-s-86e And Earlier Revisions. 3.13 Specification Change - For Qq-n-281, Class B Material: 1 - Footnote 9 To Table Ii Of Qq-n-281 Does Not Apply. 2 - When Starting Material Is Round Bar Greater Than 3" Dia, The Mechanical Properties Of Hex Bar Apply. 3.14 Change To Table Vii Of Mil-t-16420: the Column Headed "longer Lengths (max)" In All Classes Of Table Vii Must Be Changed To Read "longer Lengths (min)". All Rows In Aforementioned Column Reading "25" Must Be Changed To Read "20". The Maximum Length Must Be 25 Feet Per Paragraph 3.8.5.2 Of mil-t-16420. example: Class 700 Tube Having O.d. Of .540 And Wall Thickness Of .065 Must Be Supplied With A Minimum Length Of 12 Feet, With 80% (by Weight) In Lengths Of 20 To 25 Feet. 3.15 Change Paragraph 3.2.5 Of Mil-f-24202 To Read: 3.2.5 All Finished Fittings Must Be Furnished In The Fully Annealed Condition. 3.2.5.1 After Annealing, Fittings Produced From Tubular Stock Must Not Exceed A Maximum Hardness Of 51 Rockwell 30t Determined In The Area Of Maximum Bending Or Forming When Manufactured In Accordance With Paragraph 3.2.3. 3.2.5.2 Fittings Produced From Bar, Plate, Or Forgings In Accordance With 3.2.4 Must Meet The Hardness Required By 3.2.5.1, Except That The Location For Hardness Tests May Be Any Area Of The Finished Fitting. 3.16 ;lubricate O-rings With Grease Per Cid A-a-50433 (termalene No. 2). lubricate Threads With Lubricant Per Cid A-a-59004 (molykote P-37 Paste).; 3.17 Changes To Mil-t-16420 Mechanical Properties (table Ii): copper Alloy Outside Tensile Yield Strength Elongation In and Temper Diameter Strength (.5% Under Load) 2" Or 4x Dia. 715 (70/30)...all.......50,000....18,000............30.0% (min) fully Sizes annealed 3.18 Mil-t-16420 Ut Changes - Delete Paragraph 3.4.3.4 And Substitute: "3.4.3.4 Laminations. Tube Required To Meet The Ultrasonic Requirements Specified In 3.4.3 Must Be Examined For Laminar Discontinuities That Present Indications Exceeding Exploration threshold Levels (20 Percent For The Contact Method At +6 Db; 30 Percent For The Immersion Method At Calibration) Must Be Rejected." 3.18.1 In The Second Sentence Of Paragraph 4.4.7; Delete "18 Inch" And Substitute "1 Inch". In The Last Sentence, Insert "3.4.3.4 And" Before "3.8.2". 3.19 Component Identification Description (cid) - When Applicable Drawing(s) And/or Specification(s) Specify That A Nameplate Or Identification Plate Is Required, The Cid Number ( ;cid 990997159; ) Must Be Added. When No Plate Is Specified, An Identification plate In Accordance With Mil-dtl-15024, Type "c" On Brass Or Type "h" On Aluminum Must Be Securely Attached To Each Assembly Showing The Above Cid Number. No Assembly Must Be Shipped Without The Cid Number Attached. 3.20 Internal Threads - All Internal Threads Must Be Formed By Cutting. Cold Forming Of Internal Threads Is Not Acceptable. 3.21 Welding Or Brazing - When Welding, Brazing, And Allied Processes Are Required, As Invoked By Section C Paragraph 3 Requirements, They Must Be In Accordance With S9074-ar-gib-010a/278, 0900-lp-001-7000 For Brazing Of Piping And Pressure Vessel applications, Or S9074-aq-gib-010/248 For Brazing Of Other Applications. For All Production And Repair Welding And Brazing, Personnel And Procedures Must Be Qualified Under S9074-aq-gib-010/248 Or 0900-lp-001-7000, As Applicable. Repair Welding Is Not permitted On ;qq-n-286 Material; . Procedures And Qualification Data Must Be Submitted For Review And Approval Prior To Performing Any Welding Or Brazing. 3.22 Configuration Control - The Contractor Must Maintain The Total Equipment Baseline Configuration. For Items Of Proprietary Design, Contractor Drawings Showing The Latest Assembly Configuration Must Be Provided To The Government In Electronic (c4) Format. definitions Are Provided Elsewhere In The Contract/purchase Order. 3.22.1 Waivers/deviations - All Waivers And Deviations, Regardless Of Significance Or Classification Require Review And Approval By The Contracting Officer. Waivers And Deviations Must Be Designated As Critical, Major, Or Minor. The Contractor Must Provide a Copy Of This Request To The Qar. Requests Must Include The Information Listed Below. A. A Complete Description Of The Contract Requirement Affected And The Nature Of The Waiver/deviation (non-conformance), Including A Classification Of Critical, Major, Or Minor. B. Number Of Units (and Serial/lot Numbers) To Be Delivered In This Configuration. C. Any Impacts To Logistics Support Elements (such As Software, Manuals, Spares, Tools, And Similar) Being Utilized By Government Personnel Or Impacts To The Operational Use Of The Product. D. Information About Remedial Action Being Taken To Prevent Reoccurrence Of The Non-conformance. 3.22.2 All Requests For Waivers/deviations On Navsup-wss Contracts Must Be Submitted To The Navsup Wss Contracting Specialist Via Email. 3.22.3 Ecps - The Government Will Maintain Configuration Control And Change Authority For All Modifications Or Changes Affecting Form, Fit, Function, Or Interface Parameters Of The Equipment And Its Sub-assemblies. The Contractor Must Submit An Engineering change Proposal (ecp) For Any Class I Or Ii Changes That Impact The Equipment Covered By This Contract. Ecps Must Be Prepared In Contractor Format, And Must Include The Following Information: A. The Change Priority, Change Classification (class I Or Class Ii), And Change Justification. B. A Complete Description Of The Change To Be Made And The Need For That Change. C. A Complete Listing Of Other Configuration Items Impacted By The Proposed Change And A Description Of The Impact On Those Cis. D. Proposed Changes To Documents Controlled By The Government. E. Proposed Serial/lot Number Effectivities Of Units To Be Produced In, Or Retrofitted To, The Proposed Configuration. F. Recommendations About The Way A Retrofit Should Be Accomplished. G. Impacts To Any Logistics Support Elements (such As Software, Manuals, Spares, Tools, And Similar) Being Utilized By Government Personnel In Support Of The Product. H. Impacts To The Operational Use Of The Product. I. Complete Estimated Life-cycle Cost Impact Of The Proposed Change. J. Milestones Relating To The Processing And Implementation Of The Engineering Change. 3.23 Mercury Free - Mercury And Mercury Containing Compounds Must Not Be Intentionally Added Or Come In Direct Contact With Hardware Or Supplies Furnished Under This Contract. Mercury Contamination Of The Material Will Be Cause For Rejection. 3.24 Navsea 0948-lp-045-7010 - Any Applicable Requirements Of Navships 4410.17,navsea 0948-lp-045-7010, Or 0948-045-7010 Which The Contractor Must Meet Are Included In This Contract/purchase Order. The Above Documents Are For Governmentuse Only. Further application Of The Above Documents Is Prohibited.prohibited. 3.24.1 Marking Of Material With A Material Designator Per The Drawing Is Also Prohibited, With The Exception Of Fasteners. Fasteners Must Be Marked With A Material Symbol/designator As Specified Elsewhere In This Contract. 3.25 Certificate Of Compliance - (special Emphasis Material) The Contractor Must Prepare And Submit A Certificate Of Compliance Certifying That The Items/components Furnished Under This Contract Comply With The Requirements Of The Procurement Document, including Any/all Invoked Specifications And Drawings. ^ Quality Assurance Requirements ^ 3.26 See Cdrl Di-misc-80678 (test Certification) - A Statement Of Tests Performed, Listing The Pieces Tested Must Be Furnished Along With A Copy Of The Test Results. Certification Must Include The Contractor's Name, Address And Date, Quantity Inspected, identified To The Contract/purchase Order And Item Number, And The Contractor's Or Authorized Personnel's Signature. Test Certifications Must Reference The Standard/specification, Including The Revision, To Which The Testing Was Performed And The Acceptance criteria Used. Test Procedure Numbers May Also Be Referenced On Test Reports. Test Reports On Weldments Must Be Identified To Weld Joint And Layer. 3.27 See Cdrls Di-misc-80875 (welding Procedures) And Di-misc-80876 (weld Procedure Qualification Data) - When Production Or Repair Welding Is Required, The Applicable Welding Procedure(s) And Qualification Data Must Be Submitted For Review And Approval. In addition, The Consumed Weld Metal C Of C As Defined Below Must Be Submitted As Part Of The Certification Oqe Package Submitted By The Contractor. note: These Requirements Do Not Apply To Tack/spot Welds When The Conditions Of Section 4.2.1.1 Of S9074-ar-gib-010a/278 Are Met. 3.27.1 Approval Of The Contractor's Qualification Data Must Be Obtained Prior To Performing Any Welding (production Or Repair). 3.27.2 If The Contractors Qualification Data Has Previously Been Approved By The Navy For Other Contracts, A Copy Of The Original Approval Letter May Be Submitted Along With The Procedures And Qualification Data Report To Expedite The Approval Process. The approval Letter Must Reference The Applicable Welding Procedure And Qualification Data Report Identification/number. Prior Approval Does Not Guarantee Acceptance For This Or Any Future Contracts. As Far As Practical, All Procedures For The Contract Must Be submitted At The Same Time. Welding Procedures And Qualification Data Must Be Submitted In A Commercially Available Electronic Format Such As Adobe Acrobat Pdf. The Contractor Must State The Applicability Of Each Weld Procedure And Qualification Data Submitted, citing The Drawing Number And Pieces To Be Welded. (i.e. "wp-123 And Qd-123 Are Submitted For The Weld Joint Between Pieces 1 And 2 On Drawing Abc." Wp-456 And Qd-456 Are Submitted For The Hardfacing Of Piece 3 On Drawing Xyz.") 3.27.3 The Pco's Authorization For The Use Of Weld Procedure(s) And Qualification Data For The Specific Application As Submitted Does Not Mitigate The Vendors Responsibility To Comply With The Requirements Of S9074-aq-gib-010/248, S9074-ar-gib-010a/278, And the Contract. 3.27.4 Authority For The Repair Of Special Repairs In Castings, The Repair Of Wrought Material, Or The Repair Of Forged Material Must Be Obtained Via Request For Waiver From The Procurement Contracting Officer. This Request Must Describe The Defect; Including size, Depth, Location, And A Description Of The Proposed Repair. Repairs Deemed Minor Or Nominal In Accordance With S9074-ar-gib-010/278 Can Be Made At Contractor Discretion In Accordance With S9074-ar-gib-010/278 Requirements; However, Weld Procedure specification (wps) And Procedure Qualification Record (pqr) Submittals Are Still Required. This Request For Navsup-wss Contracts Must Be Submitted Via The Electronic Contractor Data Submission (ecds) Application. 3.27.5 Any New Procedure Qualification Performed Under This Contract Will Require The Vendor To Provide A Minimum 72 Hour Notification To Dcma With An Offer To Observe The Welding Of The Test Assemblies. The 72 Hour Time Limit May Be Modified Upon Mutual agreement Between The Vendor And Dcma. 3.27.6 When Drawings Require Hardfacing Surface Iron Or Nickel Content Not To Exceed 5%, The Contractor Must Verify Surface Iron Or Nickel Content By Performing Chemical Testing As Defined By The Applicable Drawing. The Chemical Test Results Must Be Submitted as Part Of The Qualification Data. 3.27.7 Additional Qualification Requirements For Production Hardfacing Thickness Less Than 1/8-inch: Macro-etch (or Legible Photomacrographs Clearly Showing The Fusion Area) Must Be Submitted For Review And Show Consistent, Minimized Dilution. All Essential elements And Any Elements Not Listed In S9074-aq-gib-010/248 That Influence Dilution Must Be In The Qualification Data And Weld Procedure, With Strict Limits Placed On Each Essential Element. 3.27.8 Preparation And Retention Of Weld Records Is Required, As Specified By Paragraph 4.1.3 Of S9074-ar-gib-010a/278. 3.27.9 When Production Or Repair Welding Is Required On Titanium Materials, The Applicable Fabrication Plan, Facilities Procedure, Training Plan, And Active Welder Qualification Must Also Be Submitted For Review And Approval. 3.27.10 If The Contractor's Fabrication Plan, Facilities Procedure, Training Plan, Or Active Welder Qualification Has Previously Been Approved By The Navy For Other Contracts, A Copy Of The Original Approval Letter May Be Submitted Along With The Applicable documentation To Expedite The Approval Process. The Approval Letter Must Reference The Applicable Documentation. Prior Approval Does Not Guarantee Acceptance For This Or Any Future Contracts. The Contractor's Fabrication Plan, Facilities Procedure, Training plan, And Active Welder Qualification Must Be Submitted At The Same Time As The Applicable Welding Procedure(s) And Weld Procedure Qualification Data. All Documentation Must Be Submitted In A Commercially Available Electronic Format, Such As Adobe Acrobat Pdf. 3.27.11 See Cdrl Di-misc-80678 (consumed Weld Metal) - A Certificate Of Compliance Is Required For All Weld Filler Metals Used For Production Or Repair Welding, And Must Include The Following: a) Filler Metal Lot Number(s) b) Specification And Type c) A Positive Statement That The Vendor Has Obtained Oqe And Verified That Each Lot Of Weld Filler Material Conforms To Specification Requirements. d) A Positive Statement Verifying That The Weld Filler Metals Were The Correct Material Type Or Grade Prior To Consumption. 3.27.12 When Production Welds Or Repair Welds Are Performed By A Subcontractor,the Requirement For Submission Of All Certification Documentation Required Herein Must Be Passed Down To The Subcontractor. 3.28 Radiography (rt) - Radiography Must Be Performed In Accordance With T9074-as-gib-010/271. Rt Acceptance Criteria For Weldments To Be Per The Applicabletable Of S9074-ar-gib-010a/278 (p-1 Piping) Or Mil-std-2035, Class 1, As Applicable. 3.28.1 Submission Of Radiographic Shooting Sketches For Approval Is Not Requiredfor Weldments. 3.28.2 All Pieces Radiographed Must Be Permanently Marked With "rt" And A Unique Traceability Number. (unique Traceability Number Must Be Directly Traceable To The Rt Film.) 3.28.3 See Cdrl Di-misc-80678 (production Radiography) - Production Radiographyrequires Final Acceptance By The Navy. The Items Listed Below Must Be Submitted For Final Acceptance, Cataloging, File, And Retention. They Must Be Submitted And Approved By The navy Prior To Shipment Of The Applicable Hardware. However, When The Source Certification Clause Is Invoked, They Must Be Submitted A Minimum Of Forty-five (45) Working Days Prior To The Date Of Source Certification Inspection. (a) Film (b) Rss/rsss (c) Rs (d) Dd250 (with Heat Numbers Corresponding To Rt Numbers Referenced In Block 16) 3.29 Quality System Requirements - The Contractor Furnishing Items Under This Contract/purchase Order Must Provide And Maintain A Quality System In Accordance With Iso-9001 As Amplified Or Modified Herein, With The Calibration System Requirements Of Iso-10012 or Ansi-z540.3 With Iso-17025. A Quality System In Accordance With Mil-i-45208, With The Calibration System Requirements Of Mil-std-45662, Is Acceptable As An Alternate. 3.29.1 The Contractor's Quality System And Products Supplied Under The System Are Subject To Evaluation, Verification Inspection, And Acceptance/nonacceptance By The Government Representative To Determine The System's Effectiveness In Meeting The Quality requirements Established In The Contract/purchase Order. 3.29.2 The Contractor's Quality System Must Be Documented And Must Be Available For Review By The Contracting Officer Or His Representative Prior To Initiation Of Production And Throughout The Life Of The Contract. The Prime Contractor Must, Upon notification, Make His Facilities Available For Audit By The Contracting Officer Or His Authorized Representative. 3.29.3 See Cdrl Di-qcic-81110 (inspection System Procedures) - All Suppliers Of Level I/subsafe (li/ss) Material Are Required To Submit A Copy Of Their Current Documented Quality System Procedures To The Procurement Contracting Officer (pco) Prior To Award Of any Contract/purchase Order. Suppliers That Have A Copy Of Their Current Quality System Procedures On File At The Procuring Activity May Request The Pco Waive This Requirement. 3.29.4 This Contract Provides For The Performance Of Government Quality Assurance At Source. The Place Or Places Of Performance May Not Be Changed Without The Authorization Of The Procurement Contracting Officer. Upon Receipt Of This Order, Promptly notify The Government Representative Who Normally Services Your Plant So That Appropriate Planning For Government Inspection Can Be Accomplished. If You Do Not Have An Assigned Government Representative, Notify The Nearest Defense Contract Management Agency (dcma) Office. In The Event That A Local Government Representative Or Dcma Office Cannot Be Located, Our Purchasing Agent Should Be Notified Immediately. 3.29.5 Any Changes Made By The Contractor To A Qualified Quality System Will Require Re-submittal To The Pco And Concurrence By The Government Quality Assurance Representative Prior To Adoption. 3.30 Contractor Inspection Requirements - The Contractor Must Maintain Adequate Records Of All Inspections And Tests. The Records Must Indicate The Nature And Number Of Observations Made, The Number And Type Of Deficiencies Found, The Quantities Approved And rejected And The Nature Of Corrective Action Taken As Appropriate. Inspection Records Must Be Traceable To The Material Inspected. 3.30.1 The Supplier's Gages, Measuring And Test Equipment Must Be Made Available For Use By The Government Representative When Required To Determine Conformance With Contract Requirements. When Conditions Warrant, The Supplier's Personnel Must Be Made available For Operations Of Such Devices And For Verification Of Their Accuracy And Condition. 3.30.2 All Documents And Reference Data Applicable To This Contract Must Be Available For Review By The Government Representative. Copies Of Documents Required For Government Inspection Purposes Must Be Furnished In Accordance With The Instructions Provided by The Government Representative. 3.31 Subcontractor Inspection Requirements - The Government Has The Right To Inspect At Source, Any Supplies Or Services That Were Not Manufactured Or Performed Within The Contractor's Facility. Such Inspection Can Only Be Requested By Or Under Authorization of The Government Representative. Any Purchasing Documents To A Subcontractor Must Cite The Applicable Portions Of The Contractually Invoked Quality System (e.g. Calibration Requirements), Plus Any Product Requirements That Apply To The Supplies Being purchased. When The Government Elects To Perform Source Inspection At The Subcontractor's Facility, Applicable Purchase Documents Must Be Annotated With The Following Statement: "a Government Inspection Is Required Prior To Shipment From Your Plant. Upon receipt Of This Order, Promptly Notify The Government Representative Who Normally Services Your Plant So That Appropriate Planning For Government Inspection Can Be Accomplished. If You Do Not Have An Assigned Government Representative, Notify The Nearest defense Contract Management Agency (dcma) Office. In The Event That A Local Government Representative Or Dcma Office Cannot Be Located, Our Purchasing Agent Should Be Notified Immediately." 3.31.1 The Prime Contractor's Program Must Include Procedures To Assess The Capability Of The Prospective Suppliers To Produce The Products Or Supply The Services In Accordance With The Contract, Prior To The Issuance Of Any Purchase Document. 3.31.2 Each Sub-tier Supplier Of Material Or Services For Items In Section 3 Of This Contract Must Be Subjected To A Periodic Review Or Audit By The Prime To Determine The Continued Capability Of The Supplier To Control The Quality Of The Products Or Services specified In The Purchase Order Or Contract. 3.31.3 The Prime Contractor Must Ensure That The Purchased Product Conformsto Specified Purchase Requirements And This Contract. The Type And Extent Of Control Applied To The Supplier And The Purchased Product Must Be Dependent Upon The Effect Of The purchased Product On The End Item Represented By This Contract. 3.31.4 The Prime Contractor Must Evaluate The Requirements Of The Contractand Select Suppliers Based On Their Ability To Supply The Product In Accordance With The Prime Contractor's Requirements And The Contract. Criteria For Selection And Evaluation Must Be established. Records Of This Effort Must Be Available For Review By The Government. 3.31.5 The Prime Contractor's Supplier Quality Assurance Program Must Provide For A Review Of Purchase Documents To Assure Applicable Quality Requirements Are Included Or Referenced In The Documentation For Compliance By The Supplier. 3.32 Government Furnished Material And/or Equipment (gfm/gfe) - When Material Or Equipment Is Furnished By The Government, The Contractor Must Develop Documented Control Procedures That Require At Least The Following: 3.32.1 Visual Examination Upon Receipt To Detect Damage During Transit. 3.32.2 Inspection For Completeness And Proper Type. 3.32.3 Verification Of Material Quality Received. 3.32.4 Periodic Inspection And Precautions To Assure Adequate Storage Conditions And To Guard Against Damage From Handling And Deterioration During Storage. 3.32.5 Functional Testing, Either Prior To Or After Installation, Or Both, As Required By The Contract To Determine Satisfactory Operation. 3.32.6 Identification And Protection From Improper Use Or Disposition. 3.32.7 Reporting To The Government, Any Gfm Or Gfe Property Found Damaged, Malfunctioning, Or Otherwise Unsuitable For Use. In The Event Of Damage Or Malfunction During Or After Installation, The Supplier Must Determine And Record Probable Cause And necessity For Withholding The Material From Use. 3.32.8 For Gfe Material, And As Required By The Terms Of The Bailment Agreement, The Supplier Must Establish Procedures For Adequate Storage, Maintenance, And Inspection Of Bailed Government Material. Records Of All Inspection And Maintenance Performed On bailed Property Must Be Maintained. 3.32.9 Material Returned To The Contractor Must Be Handled As Gfm. 3.33 Traceability And Certification Requirements - To Assure That Correct Materials Are Installed In Level I/subsafe Systems, It Is Imperative That Traceability Be Maintained From The Material To The Material Certification Test Report And Other Required objective Quality Evidence (oqe). The Material Certification Report Must Completely And Accurately Reflect That The Material Supplied Meets The Specified Requirements. Materials Requiring Traceability And Certification Data Are Identified Within Paragraph 3, section C Of This Contract/purchase Order. 3.33.1 The Following Provides The Minimum Requirements For Maintaining Material Traceability And Supplements The Requirements Specified In Di-misc-81020 And Elsewhere In The Contract/purchase Order. The Contractor Must Develop Written Procedures That implement The Material Control Requirements Stated Herein And Elsewhere In This Contract/purchase Order. 3.34 Material Traceability - The Certification Data Report Must Be Identified Through A Unique Traceability Number, Heat-lot Number, Or Heat-treat Number, As Applicable, Which Must Also Be Marked On The Material. This Traceability Marking On The Material Must provide Direct Traceability To The Material's Chemical Composition And Mechanical Properties Certification Data. For Material Produced By Batch, Continuous Cast, Or Continuous Pour Processes, Samples Must Be Taken No Less Than Once In Every Eight Hours Of operation For The Purpose Of Validating Proper Chemical Composition And Mechanical Properties. Traceability Must Be Maintained Through All Process Operations Including Any Subcontracted Operations, To The Finished Component. 3.34.1 Material Marking For Traceability And Identification - The Following Are The Minimum Marking Requirements. Additional/alternate Marking Requirements, If Applicable, Will Be Specified Elsewhere In The Contract/purchase Order. In Addition To The marking Requirements On Applicable Drawings And/or Specifications, Marking For Traceability Is Required. All Traceability Markings Must Be Permanently Applied In Accordance With Mil-std-792 (except As Specified Below). An Alternate Marking Method Is permissible Provided It Is An Available Option In The Contractually Invoked Specification Or Drawing, Except In Instances Where The Material Has Been Modified By This Contract/purchase Order And Differs From That Specified In The Specification Or Drawing. 3.34.2 Traceability Markings For Items With Precision Machined Or Plated Surfaces, Or Material With Suitable Marking Surface Areas Less Than 3/8 Inches Square (either 3/8" X 3/8" Or An Area Equal To 0.1406 Inches Square) Must Be Applied To A Durable Tag And the Tag Securely Affixed To The Material. 3.34.3 Traceability Markings Must Be Maintained Through Assembly, And Whenever Possible Must Be Visible After Assembly. For Items Where The Marking Is Not Visible After Assembly, A Durable Tag Must Be Securely Attached To The Assembly Identifying The Part number, Piece Number, Traceability Number, And The Location Of The Permanent Mark. 3.34.4 Marking Must Be Legible And Must Be Located So As To Not Affect The Form, Fit, And Function Of The Material. ;marking Area To Be As Shown On Drawing.; 3.35 See Cdrl Di-misc-81020 (chemical And Mechanical) - Material Certification - In Addition To The Certification Data Requirements Specified In Di-misc-81020, The Following Material Certification Requirements Apply: 3.35.1 Quantitative Chemical And Mechanical Analysis Of Material Traceable To Traceability Markings Is Required. Material Certification Test Reports Must Include The Class, Form, Condition, Grade, Type, Finish, And/or Composition, As Applicable, Of The material Supplied. 3.35.2 Re-identification And Re-certification Of Material Is Required When The Material Is Subjected To A Process Which Alters It's Properties. If The Starting Material Or Raw Stock Is Processed In A Manner That Will Not Affect Its Chemical Composition Or mechanical Properties, The Original Certifications For The Chemical Composition And Mechanical Properties, As Required By The Material Specification, Are Acceptable. Re-certification Of The Chemical Or Mechanical Properties Is Required If A Process Is Used during Fabrication That Alters The Original Properties Of The Material (e.g. Alloying, Heat Treating, Or Forming). In These Instances, The Properties Of The Material Must Be Re-determined And Documented To Reflect The Altered Condition. The Altered Material must Be Uniquely Re-identified. The Properties Thus Determined And Documented, Are Required For Final Certification And Must Conform To The Material Specification Or The Contract/purchase Order Requirements. When Only The Mechanical Properties Are Altered, the Original Certification Forchemical Composition Must Be Overstamped And Annotated With The Unique Traceability Material And At A Minimum Contain The Information Below. traceability Marking ________________________________________________ (marking On Finished Item) is Fabricated From Raw Material Identified To heat/lot Number ______________ And Heat Treat Number _____________________ (when Applicable) _________________________________________ Date _____________________ (name And Signature Of Auth. Co. Rep.) 3.35.3 Material Certification Data Forwarded By The Manufacturer Must Contain A Signed Certification That The Report Results Represent The Actual Attributes Of The Material Furnished And Indicate Full Compliance With All Applicable Specification And Contract requirements. Transcription Of Certification Data Is Prohibited. 3.35.4 Statements On Material Certification Documents Must Be Positive And Unqualified. Disclaimers Such As "to The Best Of Our Knowledge" Or "we Believe The Information Contained Herein Is True" Are Not Acceptable. 3.35.5 If Material Is Received Without The Required Certification Papers Or With Incorrect/missing Data On The Certification Papers, The Material Will Be Rejected. 3.36 Material Handling - The Written Material Control Process Must Include The Following: 3.36.1 All Raw Materials Must Have Traceability Markings (except As Specified Below). 3.36.2 Stored Raw Materials Requiring Traceability Must Be Segregated To Preclude Intermingling With Materials Not Requiring Traceability. 3.36.3 When Traceability Markings Will Be Removed By A Manufacturing Or Fabrication Process, The Marking Must Be Recorded Prior To Removal And Be Immediately Restored Upon Completion Of The Process. If This Cannot Be Done Or Is Impractical, An Appropriate material Control Procedure (such As A Bag And Tag, Tagging, And/or Tote Box Control) Must Be Employed. The Material Control Procedure Must Provide A Method Of Positive Control To Preclude Commingling Of Heats/lots Or Loss Of Traceability. The Traceability marking Must Be Reapplied Upon Completion Of The Final Manufacturing Process. 3.36.4 Brazing Or Weld Filler Metals For Strength Welds Forming Or Integral With Pressure Containing Components Or Assemblies Requiring Traceability Must Be Verified To Be The Correct Material, And Type Or Grade, As Applicable, Prior To Consumption. At A minimum, Material Verification Must Consist Of Inspection Of Material Test Reports For Conformance To Specified Requirements. Control Of Welding And Brazing Filler Metals Must Be Maintained To The Point Of Consumption To Assure Use Of The Correct Type And grade. Markings And Traceability Requirements Do Not Apply To Brazing And Weld Filler Metals After Consumption. It Is The Responsibility Of The Prime Contractor To Ensure Conformance With The Above Requirements On Welds Performed By Their Subcontractors. 3.36.5 Purchase Orders For Raw Material Must Specify That The Material Be Traceable To Material Certification Test Reports By Traceability Markings On The Material And Identified On The Test Reports. The Certification Data Requirements Contained In di-misc-81020 Must Be Invoked By The Prime Contractor On All Subcontractors Supplying Level I Material. 3.36.6 The Material Control Process Must Include Requirements For The Maintenance Of Traceability For Items Sent Out For Subcontracted Operations. If Such Operations Would Remove Traceability Markings, Purchase Or Work Orders Must Specify A Method And Marking location For Remarking. The Contractor Must Also Ensure That Subcontractor Production Controls Are Adequate To Preclude Commingling Of Materials During Processing. 3.37 Receiving Inspection - 3.37.1 Products And Services Produced By Sub-tier Suppliers For Incorporation In The Contract End Item Must Be Subject To Inspection Or Audit At The Time Of Receipt By The Prime Prior To Further Processing Within The Prime Contractor's Plant Or Shipment To another Location. 3.37.2 Receiving Inspection Must Include As A Minimum - verification That The Traceability Marking On The Material Agrees With That On The Certification Test Reports. verification That Certification Test Reports Are Legible And Complete. verification That The Contents Of The Certification Test Reports Are In Compliance With The Contractually Invoked Specifications And Requirements. 3.38 Discrepancy Reporting - 3.38.1 Nonconforming Products From Sub-tier Suppliers Must Be Identified And Processed In Accordance With The Prime Contractor's Procedures For Controlling Nonconforming Products. The Prime Contractor Must Report The Receipt Of Any Nonconforming Products To the Responsible Sub-tier Supplier In Accordance With Established Procedures. Nonconforming Material Records Must Be Maintained And Available For Review By The Government Quality Assurance Representative (qar). 3.39 Final Inspection - The Following Inspections Must Be Performed Prior To Government Inspection And Acceptance. 3.39.1 Material Sampling - Material Must Be Inspected For Form, Fit, And Function. Lot Acceptance Must Be Based On Zero Defects And Lot Rejection Based On One Defect. The Sample Size Must Be In Accordance With The Sampling Plan(s) In The Applicable Military specification Or Standard, Federal Specification Or Standard, Or Drawing To Which The Material Was Manufactured. In The Absence Of Such Sampling Plans, Sampling Inspection Must Be Per Ansi/asq-z1.4, General Inspection Level Ii (for Sample Size Selection Code), table Iia (for Sample Size). small Lot Sizes - For Lot Sizes Of Fifty Or Less, The Minimum Sample Size Must Be Eight Units. For Lot Sizes Of Eight Or Less, The Sample Size Must Be One Hundred Percent Of The Lot. 3.39.2 The Manufacturer May Elect To Use Statistical Process Control (spc) To Assure Product Quality In Lieu Of The Above Attribute Sampling Plan, Provided That The Spc Methodology/system Used Provides Acceptable Products To The Government. However, The government/navy Receipt Inspection Activity May Perform Their Acceptance Inspection Of The Material Using The Attribute Sampling Plan Outlined Above. 3.39.3 All Data Concerning Material Verification (chemical, Mechanical Or Physical Properties), Traceability (material Certifications To Material Marking), And Nondestructive Test (ndt) Certifications For Material Must Be 100% Inspected. The Certification test Reports Must Also Be 100% Inspected For Completeness And Legibility. 3.39.4 All Material Requiring Traceability Must Be 100% Inspected For Traceability Marking And That The Marking Is Legible. 3.40 Additional Marking For Fasteners - Fasteners Must Be Marked In Accordance With ;mil-dtl-1222, Except The Self-locking Hex Nuts Must Be Marked In Accordance With Nasm 17828. Nasm 17828 Nuts Must Be Marked On The Wrenching Surface With The Manufacturer's identification Symbol, Material Symbol And Heat/lot Traceability Code; . The Method Of Marking Must Be Types I, Ii, Iii, V, Viii Or Ix Of Mil-std-792 Except For Grades 410, 416 And 431 In The H Condition And Grades 8, 630, A574, And 4340 Which Must Be Marked by Method Ii When Marking Is Applied After The Final Heat Treatment. Markings On Fasteners That Are To Be Coated Must Be Marked Prior To Coating And Have A Minimum Depth Of 4 Mils. Traceability Marking Must Be Legible After The Application Of Protective compounds. 3.40.1 Marking Is Required For All Fasteners Regardless Of Size And Must Include The Material Symbol, The Manufacturer's Identification Symbol, And The Traceability Marking. Marking Must Be Applied On The Head Of Headed Fastener (top Preferred, Side location If Necessary). Self-locking Screws Must Also Be Marked With Six Dots. Where No Contract Invoked Specification Requirement Exists For This Marking, Self-locking Fasteners Must Be Marked With Six Dots Approximately .032" Diameter, Raised Or Depressed by Approximately .010" Located On The Top Perimeter Of The Head Of The Fastener In An Arc Or Circular Pattern. The Six Dots Must Be Distinguishable From All Other Required Markings. 3.40.2 In Addition To All Other Marking, The Cure Date Of The Molded Seal Must Be Marked On The Outside Of Each Unit Package. 3.41 See Cdrl Di-misc-80678 (special Emphasis C Of C) - The Certificate Of Compliance Must Show Traceability To The Marking Applied On Each Individual Item, And Must Contain The Following Information: 1. Contractor's Name, Address And Date. 2. The Contract/purchase Order Number (for Example: N00104-11-p-fa12) 3. The National Stock Number (nsn). The 18 Character National Stock Number For Special Emphasis Material Includes The Two Digit Cog, The Four Digit Fsc, The 9 Digit Niin, And The Two Digit Smic (for Example: 1h 4820 012345678 L1) ("n/a" When Not Applicable). 4. Lubricants, Sealants, Anti-seize, And/or Thread Locking Compounds ("n/a" When Not Applicable). 5. Certification That O-rings, Packing, Gaskets, Or Other Elastomeric Products Were Installed In A Compressed State Within An Assembly Or Sub-assembly, Prior To Expiration Of The Shelf Life ("n/a" When Not Applicable). 6. Manufacturer's Compound Number ("n/a" When Not Applicable). 7. When Weld Procedure Submittal Is Required By The Contract, A Statement That The Approval Date Of The Qualification Data Precedes Any Production Or Repair Welding Performed On This Contract. ("n/a" When Not Applicable). 8. A Statement To The Effect That All Items Furnished On This Contract Are In Full Compliance With The Specifications And Requirements And List Each Contractually Invoked Conformance/compliance Test Performed By Name And That It Was Performed satisfactorily. 9. Contractor's Or Authorized Personnel's Signature. 4. Quality Assurance 4.1 Notes To Dcma Qar And The Contractor - 4.1.1 Dcma Qar And The Contractor For Proprietary Designs - Departures From Contractor Imposed Requirements, Not Specifically Covered By The Contract, Must Be Judged Individually On The Basis Of The Effect, If Any, On Contractual Requirements. When There Is A disagreement Between The Contractor And The Government Representative As To The Effect On Contractual Requirements, The Departure Must Be Considered A Nonconformance And Be Submitted To The Pco For Disposition. 4.1.2 Dcma Qar And The Contractor For Proprietary Designs - All Records Of Departures From Contractor Imposed Requirements Must Be Maintained And Available For Review At The Contractor's Facility. A Copy Must Be Given To The Local Government Representative. A record Of These Departures, Traceable To The Applicablepart Number And Contract Number Must Be Submitted To The Pco. 4.1.3 Dcma Qar And The Contractor For Proprietary Designs - For Proprietary Designs, The Contractor's Part Numbers Are Acceptable For Reference Only. The Delivered Material Must Conform To All Drawings, Specifications, And Other Contractual Requirements. 4.1.4 Dcma Qar - It Is The Responsibility Of Dcma Qar To Review Non-destructive Testing (ndt) Procedures For Navsup Contracts/purchase Orders. 4.1.5 Dcma Qar And The Contractor - The Ecds (electronic Contractor Data Submission) System Is Available For Certain Data Submissions And To Submit Questions And Clarifications, And Waiver Requests On Contracts And Solicitations. Ecds Can Be Found At: https://register.nslc.navy.mil/ 5. Packaging 5.1 Preservation, Packaging, Packing And Marking - Preservation, Packaging, Packing And Marking Must Be In Accordance With The Contract/purchase Order Schedule And As Specified Below. mil-std 2073 Packaging Applies As Found Elsewhere In The Schedule 6. Notes 6.1 Several Definitions Of Terms That Apply To Csi Items Are Listed Below. All Terms May Not Apply To Every Item. 6.1.1 The Ecds (electronic Contractor Data Submission) System Is At: Https://register.nslc.navy.mil/ This Application Will Require Advance Registration Using A Pki Digital Certificate On A Cac. A Vendor User Guide Is Available As Csd001 In The Csd (contract Support Document) Library Within Ecds. 6.1.2 Critical Safety Item (csi) - Any Ship Part, Assembly, Or Support Equipment Containing A Critical Characteristic Whose Failure, Malfunction, Or Absence Of Which Could Cause A Catastrophic Or Critical Failure Resulting In Loss Of, Or Serious Damage To The ship, Or Unacceptable Risk Of Personal Injury Or Loss Of Life. 6.1.3 Critical Process - As Determined By The Twh, Any Process, Operation Or Action Performed On A Ship Csi That Serves To Establish A Critical Characteristic (such As Welding, Soldering, Machining, Polishing, Cleaning, Or Assembling) Or Confirm That A critical Characteristic Is Within Drawing Or Specification Compliance (such As, Testing, Measurement, Or Non-destructive Evaluation). 6.1.4 First Article - Pre-production Models, Initial Product Samples, Test Samples Produced To Ensure A Manufacturer's Capability To Meet Full Specification Requirements. 6.1.5 First Article Test (fat) - Contractually Required Testing And Inspection Of A Supplier's Pre-production, Production, Or "production Representative" Specimens To Evaluate A Manufacturer's Ability To Produce Conforming Product Prior To The Government's commitment To Receive Subsequent Production Items. First Article Testing Is Product Specific And Does Not Assess Manufacturing Process Controls Nor Does It Assure The Effectiveness Of The Manufacturer's Quality Program. 6.1.6 Government Source Inspection (gsi) - Gsi Is Independent Oversight Performed By A Government Representative Usually A Dcma Quality Assurance Representative (qar)) To Assure That Those Unique Product Quality And System Elements, Identified By The contracting Agency As Important, Are Observed And Evaluated. 6.1.7 Quality Assurance Letter Of Instruction (qali) - A Qali Is A Formal Document Initiated By A Contracting Activity That Provides Essential Requirements And Instructions For Contracted Materials To Be Independently Verified And Accepted By A Government representative Prior To Shipment. 6.1.8 Objective Quality Evidence (oqe) - The Quantitative And Qualitative Data Of All Mechanical, Chemical, And Performance Tests Performed (as Required By The Applicable Specification, Drawing, Or Purchase Document) To Prove That The Material Supplied conforms To The Specified Requirements. 6.1.9 Surface Discontinuity - Any Surface Irregularity, Marking, Or Localized Change In Physical Character Of The Surface, Other Than Dimensional, That Exists Infrequently At One Or Several Places. (examples: Burrs, Dents, Nicks, Scratches, Gouges, Pits, center-punches, Scribes, And Tool Marks) Surface Discontinuities Less Than 0.005-inch In Depth Are Acceptable Provided They Do Not Violate Any Other Design Requirements Specified In This Contract/purchase Order. 6.1.10 Traceability Code - A Code Or Number Providing Traceability To The Actual Chemical And Mechanical Properties Of The Specified Heat, Batch, Or Form From Which The Material Originated. 6.1.11 Verification - An Examination Performed To Determine Compliance With A Specific Requirement. 6.1.12 Nonconformance - A Nonconformance Is Defined As Affecting Or Violating The Following: - The Requirements Of This Contract/purchase Order. - Contractually Invoked Drawings (i.e. Envelope Dimensions, Interface Dimensions With Mating Parts/equipment, Center Of Gravity, Weights, Piece Part Identification, Material, Etc.). - Contractually Invoked Federal, Military, Or Commercial Specifications And/or Standards. - Form, Fit, Function, Performance To Contract Requirements, Reliability, Maintainability, Interchangeability, Safety Of Personnel Or Equipment, Or Additional Cost To The Government. 6.1.13 Waiver - A Written Authorization To Accept An Item, Which During Manufacture, Or After Having Been Submitted For Government Inspection Or Acceptance, Is Found To Depart From Specified Requirements, But Nevertheless Is Considered Suitable For Use As Is or After Repair By An Approved Method. 6.1.14 Deviation - A Specific Written Authorization (granted Prior To The Manufacture Of An Item) To Depart From A Particular Requirement(s) Of An Item's Current Approved Configuration Documentation For A Specific Number Of Units Or A Specified Period Of time, And To Accept An Item Which Is Found To Depart From Specified Requirements, But Nevertheless Is Considered Suitable For Use "as Is" Or After Repair By An Approved Method. 6.1.15 Critical Waiver/deviation - This Waiver/deviation Consists Of A Departure Involving Safety. 6.1.16 Major Waiver/deviation - This Waiver/deviation Consists Of A Departure Involving: - Performance - Interchangeability, Reliability, Survivability, Maintainability, Or Durability Of The Item Or Its Repair Parts - Health Or Safety - Effective Use Or Operation - Weight, Stability, Or Structural Integrity - System Design Parameters As Schematics, Flows, Pressures Or Temperatures - Compartment Arrangements Or Assigned Function 6.1.17 Minor Waiver/deviation - This Waiver/deviation Consists Of A Departure Which Does Not Involve Any Of The Factors Listed As Critical Or Major. 6.1.18 Engineering Change (ec) - A Change To The Current Approved Configuration Documentation Of A Configuration Item At Any Point In The Life Cycle Of The Item. 6.1.19 Engineering Change Proposal (ecp) - A Proposed Engineering Change And The Documentation By Which The Change Is Described, Justified, And Submitted To The Government For Approval Or Disapproval. 6.1.20 Class I Ecp - A Class I Ecp Is Approved By The Government's Configuration Control Board And Authorized With A Contract Modification. 6.1.21 Class Ii Ecp - A Class Ii Change Is Typically Reviewed For Concurrence In Classification By The Local Government Representative, Unless Otherwise Specified Elsewhere In The Contract/purchase Order. 6.2 In Accordance With Opnavinst 5510.1 All Documents And Drawings Provided By The U.s. Navy To Perspective Contractors Must Include A "distribution Statement" To Inform The Contractor Of The Limits Of Distributi
Closing Date19 Aug 2024
Tender AmountRefer Documents 

DEPT OF THE NAVY USA Tender

United States
Description: Contact Information|4|n743.45|n/a|717-605-2227|sylvia.sentz@navy.mil| item Unique Identification And Valuation (jan 2023)|19|||||||||||||||||||| higher-level Contract Quality Requirement (navicp Review Feb 1991)(feb 1999)|1|see Specification Sections C And E| inspection Of Supplies--fixed-price (aug 1996)|2||| inspection And Acceptance - Short Version|8|x||x|||||| time Of Delivery (june 1997)|20|0001|7|365 Days|0002|23|365 Days||||||||||||||| general Information-fob-destination|1|b| wide Area Workflow Payment Instructions (jan 2023)|16|stand-alone Receiving Report - Certifications Combo-receiving Report & Invoice - Material |n/a|tbd|n00104|tbd|n39040 - Certifications, S4306a - Material|n50286|tbd|133.2|n/a|n/a|s4306a - Material|n/a|n/a|see Dd 1423|port_ptnh_wawf_notification@navy.mil| navy Use Of Abilityone Support Contractor - Release Of Offeror Information (3-18))|1|| equal Opportunity (sep 2016)|2||| warranty Of Supplies Of A Noncomplex Nature (june 2003)|6|one Year From Date Of Delivery|one Year From Date Of Delivery||||| warranty Of Data--basic (mar 2014)|2||| buy American-free Trade Agreements-balance Of Payments Program-basic (feb 2024)|11|||||||||||| notice Of Total Small Business Set-aside (oct 2020)(deviation 2020-o0008)|1|| alternate A, Annual Representations And Certifications (nov 2023)|13|||||||||||||| small Business Program Representations (feb 2024)|4||||| buy American-free Trade Agreements-balance Of Payments Program Certificate-basic (feb 2024))|5|||||| buy American-balance Of Payments Program Certificate-basic (feb 2024)|1|| annual Representations And Certifications (may 2024)|13|332919|750|||||||||||| notice Of Priority Rating For National Defense, Emergency Perpardeness, And Enrgy Progam Use (april 2008))|2||x| 1. Data Item A001 And B001 (inspection And Test Plan) May Be Waived If Already On File At Navsup Wss Mech. 2. Drawings Associated With This Solicitation Will Be Made Available On The Sam.gov Website But Will Be Restricted Access, Which Needs To Be Approved.once Access Has Been Requested, Interested Vendors Should Email The Poc Listed On The Solicitation To Inform Them Of The Request. 3. Navsup Wss Mech Will Be Considering Past Performance In The Evaluation Ofoffers. See Clause 252.213-7000. 4. The Following Proposed Delivery Schedule Applies: submission Of All Certification Data Cdrls 20 Days Prior To Delivery. pnsy Review/acceptance Of Certification Cdrls After Receipt final Delivery Of Material (365 Days) please Quote Actual Delivery Days early And Incremental Delivery Is Acceptable At No Additional Cost To The Government. 5. This Procurement Is Issued Pursuant To Emergency Acquisition Flexibilities. \ 1. Scope 1.1 The Material Covered In This Contract/purchase Order Will Be Used In A Crucial Shipboard System. The Use Of Incorrect Or Defective Material Would Create A High Probability Of Failure Resulting In Serious Personnel Injury, Loss Of Life, Loss Of Vital shipboard Systems, Or Loss Of The Ship Itself. Therefore, The Material Has Been Designated As Special Emphasis Material (level I, Scope Of Certification, Or Quality Assured) And Special Control Procedures Are Invoked To Ensure Receipt Of Correct Material. 2. Applicable Documents 2.1 Order Of Precedence - In The Event Of A Conflict Between The Text Of This Contract/purchase Order And The References And/or Drawings Cited Herein, The Text Of This Contract/purchase Order Must Take Precedence. Nothing In This Contract/purchase Order, however, Must Supersede Applicable Laws And Regulations Unless A Specific Exemption Has Been Obtained. 2.2 Applicable Documents - The Document(s) Listed Below Form A Part Of This Contract/purchase Order Including Modifications Or Exclusions. 2.2.1 Specification Revisions - The Specification Revisions Listed Under "documents References" Below Are The Preferred Revision. Older And/or Newer R Evisions Are Acceptable When Listed Within Contract Support Library Reference Number Csd155 In Ecds (electric contractor Data Submission) At: Ht Tps://register.nslc.navy.mil/. This Is To Allow Contractors To Use Certain Acceptable Older Specification Revisions To Purge Their Existing Stock Of Material Certified To Those Older Revisions Or To Use Newer Specification revisions When Material Is Certified To Newly Released Revisions,without Requiring The Submittal Of Waiver/deviation Requests For Each Specification Revision On Every Contract. Revisions Of Specifications Reflecting Editorial And/or Re-approval (e.g. E2009, r2014, Etc.) Are Considered Inconsequential, But Are Acceptable When Their Revisions Are Listedwithin Csd155 Or Elsewhere Within This Contract. 2.2.2 Documents, Drawings, And Publications Supplied Are Listed Under "drawing Number". These Items Should Be Retained Until An Award Is Made. 2.2.3 "document References" Listed Below Must Be Obtained By The Contractor. Ordering Information Is Included As An Attachment To This Contract/purchase Order. drawing Data=2640-801x1 |96169| D| |d| | | | drawing Data=2640-808x1 |96169| H| |d| | | | drawing Data=2641-744 |96169| A| |d| | | | drawing Data=845-4558731 |80064| E| |d| | | | document Ref Data=fed-std-h28 | | |b |190424|a| | | document Ref Data=fed-std-h28 |0020| |b |941221|a| |01| document Ref Data=ansi/asq Z1.4 | | | |080101|a| | | document Ref Data=astm-b150 | | | |190401|a| | | document Ref Data=qq-n-281 | | |d |851023|a| 2| | document Ref Data=qq-n-286 | | |g |001207|a| | | document Ref Data=astm-b367 | | | |220401|a| | | document Ref Data=astm-b369 | | | |200401|a| | | document Ref Data=mil-std-792 | | |f |060519|a| | | document Ref Data=mil-dtl-1222 | | |j |001208|a| | | document Ref Data=astm-e1417 | | | |160615|a| | | document Ref Data=astm-e1444 | | | |160601|a| | | document Ref Data=mil-std-2132 | | |d |080310|f| |01| document Ref Data=astm-d4066 | | | |130701|a| | | document Ref Data=sae Ams 6931 | | |d |171201|a| | | document Ref Data=iso_9001 | | | |081115|a| | | document Ref Data=mil-prf-9954 | | |d |090416|a| | | document Ref Data=iso10012 | | | |030415|a| | | document Ref Data=mil-dtl-15024 | | |g |180303|a| | | document Ref Data=mil-c-15726 | | |f |911008|a| 1| | document Ref Data=iso/iec 17025 | | | |050515|a| | | document Ref Data=qpl 25027 | | |17 |000207|a| | | document Ref Data=mil-i-45208 | | |a |810724|a|1 | | document Ref Data=mil-std-45662 | | |a |880801|a| | | document Ref Data=a-a-50433 | | | |890815|a| | | document Ref Data=a-a-59004 | | |b |181118|a| | | document Ref Data=ansi/ncsl Z540.3 | | | |130326|a| | | document Ref Data=0900-lp-001-7000 | | | |810101|c| |01| document Ref Data=aia/nas Nasm 17828 | | |1 |130430|a| | | document Ref Data=aia/nas Nasm 25027 | | |1 |121221|a| | | document Ref Data=s9074-aq-gib-010/248 | | |1 |191112|a| | | document Ref Data=t9074-as-gib-010/271 | | |1 |140911|a| | | document Ref Data=s9074-ar-gib-010a/278 (chg A) | | | |130214|a| | | 3. Requirements 3.1 ;the 1 1/2 Inch Ball Valve Must Be In Accordance With Naval Ship Systems Command Drawing 845-4558731, Assembly "ia" Along With Liabilities Dm117384, Er2640-801x1e1, And Er2640-808x1j1, Except As Amplified Or Modified Herein.; 3.1.1 ;bolt Holes On Mounting Flange(s) Must Not Be Drilled; 3.2 Material For Parts Requiring Certification - Quantitative Chemical And Mechanical Analysis Is Required For The Parts Listed Below Unless Specifically Stated Otherwise: part - ;body, Item 1 Of Drawing 4558731; material - ;astm-b369, Alloy Uns C96400; part - ;tailpiece, Item 5 Of Drawing 4558731; material - ;mil-c-15726, Alloy Uns C71500 And Meeting The Mechanical Properties Per General Note 25 On Drawing 4558731; part - ;stem, Item 19 Of Drawing 2641-744; material - ;astm-b150, Alloy C63200, Temper Tq50; part - ;studs, Item 24 Of Drawing 4558731; material - ;qq-n-286, Alloy Uns N05500, Annealed And Age Hardened Iaw Mil-dtl-1222, Type Iv; part - ;self-locking Hex Nuts, Item 26 Of Drawing 4558731; material - Qq-n-281, Class A Annealed (hot Finished Or Cold Drawn) Or Class B Cold Drawn. all Material Must Be From The Same Class. self-locking Element- Astm-d4066, Group 01, Class 1, Grade 1 part - ;ball, Item 21 Of Drawing 4558731; material - Sae-ams-6931 or centrifugally Cast 6al-4v, Astm-b367, Grade C-5, With Mechanical Properties As Listed In Supplementary Requirement S6. note: Mechanical Properties For Bars, Forgings And Forging Stock Over 10" Must Be As Specified In The Applicable Drawing. If The Mechanical Properties Are Not Provided In The Drawing, The Mechanical Properties Specified In Sae-ams-6931 Table 2 For Material 6" to 10", Must Be Applied. part - ;seats (q3), Item 22 Of Drawing 7285297; material - Delrin: Dupont Af De588 (teflon Filled Acetal) (properties Specified Below Only) item Property Astm Test Method Value (a) Specific Gravity D792 (note 1) 1.50 - 1.57 (b) Melting Point D2133 Or D3418 172 - 184 Deg C (342 - 363 Deg F) (c) Tensile Strength (min) D638 (notes 1 & 5) 6100 Psi (d) Tensile Impact (min) D1822 Type S (notes 1 & 5) 5 Ft-lb/sq In (e) Compressive Stress D695 2100 @ 1% Def. (min - Psi) (notes 1 & 5) 11,000 @ 10% Def. (f) Water Absorption D570 .30% Max 24 Hours (g) Rockwell Hardness (r) D785 (note 1) 115 +/- 15 (h) Teflon Fiber Content (note 2) 18 - 23% (i) Dimensional Change (note 4) .7% Max notes: 1. Material Conditioning Prior To Test Is At The Vendor's Option. 2. Teflon Fiber Content - As Certified By Dupont (raw Material). 3. Visual And Dimensional Inspection Of Product (final Machined Condition) - White Teflon String Inclusions Must Not Exceed The Following: A. Diameter 1/32" B. Length 1/8" C. Density 6 Indications Per 100 Sq In 4. The Test Method To Determine Dimensional Stability Must Be Performed As Follows: The Test Specimens (finished Pieces) Tested Must Be Measured At 23 +/- 3 Deg C (73 +/- 5f) And Placed In A Mineral Oil Bath Maintained At 160 +/- 3 Deg C (320 +/- 5f) The specimens Must Remain In The Bath For Six (6) Hours At Temperature And Allowed To Slow Cool In The Bath At A Rate Not To Exceed 23 +/- 3 Deg C (73 +/- 5f) Per Hour. When The Bath Reaches 23 +/- 3 Deg C (73 +/- 5f), The Test Specimens Must Be Removed And measured. The Percent Change In Each Dimension, Outside Diameter, Inside Diameter And Thickness Must Not Be Greater Than The Value Specified. ^mineral Oil Meets The Specification As Listed Below: description.......................passes U.s.p. Test (usp Xx, P.1143) solubility........................passes U.s.p. Test (usp Xx, P.1143) neutrality........................passes U.s.p. Test (usp Xx, P.532) readily Carbonizable Substances...passes U.s.p. Test (usp Xx, P.532) limit Of Polynuclear Compounds....passes U.s.p. Test (usp Xx, P.532) solid Paraffin....................passes U.s.p. Test (usp Xx, P.532) specific Gravity @ 25 Deg C (77 Deg F).0.8600 To 0.8900 viscosity @ 37.8 Deg C (100f).....73.6 To 84.4 Centistokes (340-390 Sus) flash Point Cleveland Open Cup....420 Deg F (216c) (typical) refractive Index @ 20c (68f)......1.480 (typical) 5. Values Are Minimum Mean Values. Individual Specimen Values May Not Vary More Than 25% Below The Specified Minimum Mean Value. Should One Specimen Exceed The 25% Criteria, Retest Is Required. Failure To Meet The Above Criteria A Second Time Is Cause For rejection. 3.3 Testing Certification - Certifications Are Required For The Following Tests On The Items Listed Below. Additional Testing On Other Piece Parts (if Any) Per Applicable Drawings Is Still Required, But Certifications Are Only Required As Listed Below. test - ;liquid Penetrant Inspection; item - ;studs, Item 24 Of Drawing 4558731; performance - T9074-as-gib-010/271; Sampling Must Be Per Mil-dtl-1222 acceptance - Mil-dtl-1222 test - ;dye Penetrant Inspection For Non-magnetic Grades; item - ;self-locking Hex Nuts, Item 26 Of Drawing 4558731; performance - T9074-as-gib-010/271 Or Astm-e1417/astm-e1444 (method C Solvent Removal Techniques Must Not Be Used On Thread) acceptance - ;nasm25027; attribute - Annealing And Age Hardening item - ;studs, Item 24 Of Drawing 4558731; performance - Qq-n-286 test - Ultrasonic Inspection On Starting Material item - ;all Items Requiring Certification Made From Qq-n-286 With A Diameter Or Minimum Distance Between Parallel Surfaces Of 4 Inches Or Greater Of The Starting Material, Or When Required By A Drawing Or Specification Invoked Elsewhere In This Contract; performance - T9074-as-gib-010/271 Or Mil-std-2132, And Qq-n-286 acceptance - Qq-n-286 test - Weldability Test Of Astm-b369 Material item - ;body, Item 1 Of Drawing 4558731; performance - Astm-b369 acceptance - Astm-b369 test - Pressure Tests item - Each Assembly performance - ;general Note 7 On Drawing 4558731; acceptance - ;general Note 7 On Drawing 4558731; test - Quality Conformance Tests item - Self-locking Nuts performance - ;nasm25027; acceptance - ;nasm25027; attribute - Certificate Of Completion item - Self-locking Nut Nonmetallic Insert performance - ;astm-d4066, Group 01, Class 1, Grade 1; attribute - Certificate Of Compliance item - Self-locking Nuts performance - This Certificate Must State That Self-locking Nuts Were Manufactured By An Approved Source. Approved Sources Are Those Listed On Qpl-25027 For The Appropriate Fastener. This Qpl May Also Be Considered As Approved Sources For Heavy Hex self-locking Nuts. test - Non-destructive Tests item - ;weld Repair And/or Production Weld (as Applicable); performance - Per Applicable Fabrication Specification acceptance - Per Applicable Fabrication Specification 3.4 Slow Strain Rate Tensile Test Laboratories - The Slow Strain Rate Tensile Test Of Qq-n-286 Must Be Performed By One Of The Following Laboratories: huntington Alloys, A Special Metals Company attn: Bill Bolenr 3200 Riverside Drive huntington, Wv 257059 phone: (304) 526-5889 fax: (304) 526-5973 metallurgical Consultants, Inc. attn: W. M. Buehler 4820 Caroline po Box 88046 houston, Tx 77288-0046 phone: (713) 526-6351 fax: (713) 526-2964 naval Surface Warfare Center, Carderock Division attn: Eric Focht Code 614 9500 Macarthur Blvd west Bethesda, Md 20817-5700 phone: (301) 227-5032 fax: (301) 227-5576 teledyne Allvac attn: Dr. W. D. Cao 2020 Ashcraft Ave. monroe, Nc 28110 phone: (704) 289-4511 fax: (704) 289-4269 westmoreland Mechanical Testing And Research Inc. attn: Andrew Wisniewski p.o. Box 388 youngstown, Pa 15696-0388 mannesmann Rohrenwerke mannesmann Forschungsinstitut (mfi) attn: Dr. Weiss postfach 251160 47251 Duisburg germany phone: 011-49-0203-9993194 fax: 011-49-0203-9994415 thyssenkrupp Vdm Usa, Inc. attn: D. C. Agarwal 11210 Steeplecrest Drive, Suite 120 houston, Tx 77065-4939 phone: (281) 955-6683 3.5 The Pressure Tolerance Must Be As Specified In The Assembly Drawing, Detail Drawing, Design Specification Or Elsewhere In This Contract. Where Pressure Tolerances Are Not Provided By Drawings, Specifications Or Specified Elsewhere In This Contract, The following Must Be Used: For Pressure Tests Below 100 Psig, The Pressure Tolerance Must Be +1 Psig / -0 Psig. For Pressure Tests At Or Above 100 Psig Up To And Including 2500 Psig, The Pressure Tolerance Must Be +2% / -0 Psig Rounded Off To The Nearest Multiple Of The Smallest Graduation On An Analog Test Pressure Gauge, Not To Exceed 50 Psig. For Pressure Tests Above 2500 Psig, The Pressure Tolerance Must Be +2% / -0 Psig, Rounded Off To The Nearest Multiple Of The Smallest Graduation On An Analog Test Pressure Gauge, Not To Exceed 200 Psig. the Pressure Test Time Tolerance Must Be As Specified In The Assembly Drawing, Detail Drawing, Design Specification Or Elsewhere In This Contract. Where Pressure Test Time Tolerances Are Not Provided By Drawings, Specifications Or Specified Elsewhere In This contract, The Following Must Be Used: For A Test Duration Up To And Including 1 Hour, The Tolerance Must Be +5 Minutes / - 0 Minutes. For A Test Duration Of More Than 1 Hour Up To And Including 24 Hours, The Tolerance Must Be +30 Minutes / - 0 Minutes. For A Test Duration Of More Than 24 Hours, The Tolerance Must Be +60 Minutes / - 0 Minutes. 3.6 O-ring Grooves And Mating Sealing Surfaces Must Be Inspected Per The Contractually Invoked Drawings Or Specifications. When The Drawings Or Specifications Do Not Provide Specific Defect Criteria Or State That No Defects Are Allowed, The General Acceptance criteria (gac) Standard Must Be Used For Inspecting O-ring Grooves And Mating Sealing Surfaces Only. Repairs To Sealing Surfaces And O-ring Grooves With Unacceptable Defects May Be Accomplished Within The Limits Of The Size And Tolerances Provided In The applicable Drawing. Repairs Thatwould Exceed These Limits Require Approval (including Final Dimensions). The Data That Is Red Lined (crossed Out) Is Excluded From The Gac For This Contract And Is Not To Be Used For Acceptance Or Rejection Criteria. The Gac document Is Identified As Contract Support Library Reference Number Csd008 At Https://register.nslc.navy.mil/ 3.7 Installation Of Titanium Shims Must Be Performed Using Section 6.1.3 Of The Procedure Provided In Csd158 In The Ecds (electronic Contractor Data Submission) System At: Https://register.nslc.navy.mil/. Paragraph 6.1.3.9 Is Not Applicable. 3.7.1 Use Of Alternative Epoxies, Other Than The Epoxies Listed In Equipment/material Section Of Csd158, Must Be Requested As Stated Elsewhere In The Contract/purchase Order. 3.8 Seat Stack Height Measurement - To Ensure That Each Seat Is Within Tolerance, Check Each Seat Singularly By Measuring The Seat Height Over The Ball. This Measurement Is Calculated By Adding One-half Ball Diameter To The Half Stack Height Dimension On The drawing. Limits Are Determined By The Ball Diameter Tolerance And The Half Stack Height Tolerance. Check Dimensions By Measuring From The Seat Back Face To Top Of Ball. Manufacturers Of Seats That Do Not Have A Ball Of The Required Size Available Will Be required To Manufacture A Dummy Ball Or Segment Of A Ball With Sufficient Spherical Surface To Check The Above Dimension. 3.9 Ball Spherical Surface Finish - Spherical Surfaces Of Valve Balls Must Be Finished As Follows: machine Finish Spherical Surfaces Of The Valve Ball To Between 30 And 35 Rhr; Use Lubricant. Grind, Hone, Or Cup Polish To 16 Rhr Maximum; Use Lubricant (light Oil Or Soap Solution). Grit Blast With Glass Bead Media (mil-prf-9954-mil 10); Use A 3/16 Inch Id blasting Nozzle (not Supersonic Type) 4 Inches From Ball At 75 Psi Air Pressure. The Resulting Surface Finish Should Be Less Than 25 Rhr.perform Final Polish With Supfina Polishing Paste (pink Polishing Paste, Item Code 10100244, Supfina Machine Company, North kingstown, Ri). Apply The Supfinapolishing Paste That Is Initially Light Pink In Color Over The Entire Surface Of The Ball With A Brush And Perform A Low Speed Finishing Process With Both Theball And A .250" Thick Wool Pad (style 22110, Aetna Felt Corporation, allentown, Pa^) Turning At The Same Time With Light Pressure For Approximately 30 Seconds^^ (3 Revolutions) Of The Entire Surface Of The Ball. Once The Light Pink Supfina Polishing Paste That Was Applied To The Surface Of The Ball Turns A Grey Color, The Final finishing Process Is Complete. After The Final Finishingprocess Is Complete, The Surface Of The Ball Should Have A Matte Dull Appearance With A Surface Finish Between Rhr 12 And Rhr 16. clean Ball With A Warm, Alkaline Solution Or A Liquid Nonionic Detergent To Remove Supfina Polishing Paste. ^ Reference Customer Number Pli00499 When Ordering Wool Pad. ^^ Caution: Excessive Time Will Cause The Ball To Be Polished In Violation Of The Process." 3.10 Ball Spherical Surface Waviness - Unless Otherwise Specified On Drawing, All Sealing Area Surfaces Must Have A Spherical Surface Waviness Which Does Not Exceed 0.0005 Inches Of Height Per Inch Of Spherical Surface. Roughness And Waviness Ratings Must apply In A Direction Which Yields The Maximum Rating, Normally Perpendicular To The Lay. 3.11 A Visual Inspection Shall Be Performed On The Finished Seat With Acceptance Criteria On Critical Surfaces Per Csd167 In The Ecds (electronic Contractor Data Submission) System At: Https://register.nslc.navy.mil/. 3.12 Thread Inspection Requirements - All Threads On Threaded Parts Must Be Inspected Using Appropriate Inspection Methods, Inspection Systems, And Inspection Gages/instruments In Accordance With Fed-std-h28 Series. Substitution Of Thecommercial Equivalent inspection In Accordance With Asme B1 Series Is Acceptable. 3.12.1 System 21 Of Fed-std-h28/20 Must Be Used As A Minimum Inspection Requirement For Threads When The Design Drawing Or Design Specification Does Not Specify An Inspection Requirement. 3.12.2 For Navy And Shipyard Drawings, System 21 Of Fed-std-h28/20 May Be Substituted For System 22 Without Further Navy Approval When The Design Drawing Invokes System 22 And Does Not Cite Governing Specifications That Specifically Require System 22. System 22 Of Fed-std-h28/20 Must Be Used When The Drawing References Other Governing Specifications That Specifically Require System 22, Such As Certain Thread Types Of Mil-dtl-1222. 3.12.3 A Written Request For Concurrence Must Be Submitted When Utilizing Alternative Measuring Equipment Or Measuring Systems Not Applicable To The Specified Inspection System. 3.13 Thread Forming - The Following Provides The Official Interpretation Of Paragraph 4.5.2.7 Of Mil-dtl-1222. 3.13.1 In Order To Qualify For "alternate Mechanical Testing" Found In Mil-dtl-1222j Paragraph 4.5.2.7 And Utilize The Mechanical Properties For The Starting Bar Stock In Lieu Of Performing Yield Strength Or Proof Stress Testing On Finished Fasteners, All Of the Subsequent Provisions Found In Mil-dtl-1222j Paragraphs 4.5.2.7 A Through E Must Be Met. If Any Single Provision Is Not Met, All Required Mechanical Testing Must Be Performed On The Finished Full Sized Fasteners. These Provisions Are Explained As Follows: a. Proper Product Lot Control And Traceability Must Be In Place. b. No Heat Treatment (including Hot Heading And Hot Forming), Cold Forming, Drawing, Rolling And Thread Rolling May Be Performed On The Starting Bar, Fastener Blanks Or Finished Fasteners After The Completion Of The Mechanical Testing On The Starting Bar. c. And D. The Proper Size Starting Bar Must Be Selected To Ensure Mechanical Properties Of Finished Fasteners Are Represented By The Mechanical Properties Of The Starting Bar. e. The Mandatory Testing, Axial Tensile (studs) And Wedge Tensile (screws And Bolts) Must Be Performed On Full Sized Fasteners. Note That There Is A Typographical Error In Paragraph 4.5.2.7 And That The Axial Load Test Is A Mandatory Test That Must Be performed On Studs As Required In Paragraph 4.5.2.7.e. 3.13.2 Thread Rolling Is A Cold Working Process And Is Not Considered To Be A Machining Or Grinding Operation. Therefore, Fasteners Which Have Rolled Threads Do Not Satisfy The Provisions Of Mil-dtl-1222j Paragraph 4.5.2.7.b And Are Not Eligible For The "alternate Mechanical Testing" Provision. 3.13.3 Thread Rolling Alone Is Not A Sufficient Cold Working Process To Qualify A Fastener To Be In The Cold Worked (cw) Condition. This Condition Is Only Applicable To Some 300 Series Stainless Steel Studs, Screws And Nuts. These Cw Condition Fasteners must Be Manufactured From Cold Worked Bar Stock Or Be Cold Headed In Order To Qualify. The Threads May Subsequently Be Rolled, Machined Or Ground. Testing Of The Finished Fasteners And/or Reporting Of The Starting Bar Stock Material Properties Is Subject To the Same Provisions Found In Mil-dtl-1222j Paragraph 4.5.2.7 And Discussed Above. 3.14 K-monel Fasteners - Material Must Be Heat Treated Per Qq-n-286. 3.14.1 Fasteners That Have Been Hot Or Cold Headed Or Roll Threaded Must Be Solution Annealed Followed By Age Hardening Subsequent To All Heading And Thread Rolling Operations. The Mechanical Properties On Certifications Must Be Actual Properties Of The annealed And Age Hardened Material And Must Meet The Requirements Of Qq-n-286. 3.14.2 Qq-n-286 Fasteners That Have Been Headed And/or Roll Threaded Must Not Beage Hardened Unless The Material Has Been Solution Annealed Subsequent To The Heading And Threading Operations. Threads Formed After The Final Age Hardening Heat Treatment Must Be cut Or Ground Only. 3.15 K-monel Fasteners - K-monel Externally Threaded Fasteners Must Have Mechanical Properties Determined In Accordance With Mil-dtl-1222. Test Results Must Include Tensile, Yield, Elongation And Hardness As Required By Mil-dtl-1222. (the Hardness Tests Must be Performed On A Full Size Fastener.) 3.15.1 Studs Require An Axial Tensile Test In Accordance With Mil-dtl-1222. 3.15.2 Headed Fasteners Require A Wedge Tensile Test As Specified Elsewhere In This Contract/purchase Order. 3.16 Internal Threads - All Internal Threads Must Be Formed By Cutting. Cold Forming Of Internal Threads Is Not Acceptable. 3.17 Specification Change - For Qq-n-281, Class B Material: 1 - Footnote 9 To Table Ii Of Qq-n-281 Does Not Apply. 2 - When Starting Material Is Round Bar Greater Than 3" Dia, The Mechanical Properties Of Hex Bar Apply. 3.18 Thread Lubricant - Thread Lubricants Containing Molybdenum Disulfide Must Not Be Used On This Material. Bacteria In Water, Especially Seawater, Causes Molybdenum Disulfide To Break Down. The By-products Of The Breakdown Form Compounds Which Attack The fasteners. Anti-galling Compound A-a-59004 Must Be Used As A Replacement When Thread Lubricant Is Required For Assembly. 3.19 ;grease Per Cid A-a-50433 Must Be Used In Lieu Of Mil-g-24139.; 3.20 Component Identification Description (cid) - When Applicable Drawing(s) And/or Specification(s) Specify That A Nameplate Or Identification Plate Is Required, The Cid Number ( ;cid T887305851; ) Must Be Added. When No Plate Is Specified, An identification Plate In Accordance With Mil-dtl-15024, Type "c" On Brass Or Type "h" On Aluminum Must Be Securely Attached To Each Assembly Showing The Above Cid Number. No Assembly Must Be Shipped Without The Cid Number Attached. 3.21 Welding Or Brazing - When Welding, Brazing, And Allied Processes Are Required, As Invoked By Section C Paragraph 3 Requirements, They Must Be In Accordance With S9074-ar-gib-010a/278, 0900-lp-001-7000 For Brazing Of Piping And Pressure Vessel applications, Or S9074-aq-gib-010/248 For Brazing Of Other Applications. For All Production And Repair Welding And Brazing, Personnel And Procedures Must Be Qualified Under S9074-aq-gib-010/248 Or 0900-lp-001-7000, As Applicable. Repair Welding Is Not permitted On ;qq-n-286 Material; . Procedures And Qualification Data Must Be Submitted For Review And Approval Prior To Performing Any Welding Or Brazing. 3.22 Configuration Control - The Contractor Must Maintain The Total Equipment Baseline Configuration. For Items Of Proprietary Design, Contractor Drawings Showing The Latest Assembly Configuration Must Be Provided To The Government In Electronic (c4) Format. definitions Are Provided Elsewhere In The Contract/purchase Order. 3.22.1 Waivers/deviations - All Waivers And Deviations, Regardless Of Significance Or Classification Require Review And Approval By The Contracting Officer. Waivers And Deviations Must Be Designated As Critical, Major, Or Minor. The Contractor Must Provide a Copy Of This Request To The Qar. Requests Must Include The Information Listed Below. A. A Complete Description Of The Contract Requirement Affected And The Nature Of The Waiver/deviation (non-conformance), Including A Classification Of Critical, Major, Or Minor. B. Number Of Units (and Serial/lot Numbers) To Be Delivered In This Configuration. C. Any Impacts To Logistics Support Elements (such As Software, Manuals, Spares, Tools, And Similar) Being Utilized By Government Personnel Or Impacts To The Operational Use Of The Product. D. Information About Remedial Action Being Taken To Prevent Reoccurrence Of The Non-conformance. 3.22.2 All Requests For Waivers/deviations On Navsup-wss Contracts Must Be Submitted To The Navsup Wss Contracting Specialist Via Email. 3.22.3 Ecps - The Government Will Maintain Configuration Control And Change Authority For All Modifications Or Changes Affecting Form, Fit, Function, Or Interface Parameters Of The Equipment And Its Sub-assemblies. The Contractor Must Submit An Engineering change Proposal (ecp) For Any Class I Or Ii Changes That Impact The Equipment Covered By This Contract. Ecps Must Be Prepared In Contractor Format, And Must Include The Following Information: A. The Change Priority, Change Classification (class I Or Class Ii), And Change Justification. B. A Complete Description Of The Change To Be Made And The Need For That Change. C. A Complete Listing Of Other Configuration Items Impacted By The Proposed Change And A Description Of The Impact On Those Cis. D. Proposed Changes To Documents Controlled By The Government. E. Proposed Serial/lot Number Effectivities Of Units To Be Produced In, Or Retrofitted To, The Proposed Configuration. F. Recommendations About The Way A Retrofit Should Be Accomplished. G. Impacts To Any Logistics Support Elements (such As Software, Manuals, Spares, Tools, And Similar) Being Utilized By Government Personnel In Support Of The Product. H. Impacts To The Operational Use Of The Product. I. Complete Estimated Life-cycle Cost Impact Of The Proposed Change. J. Milestones Relating To The Processing And Implementation Of The Engineering Change. 3.23 Mercury Free - Mercury And Mercury Containing Compounds Must Not Be Intentionally Added Or Come In Direct Contact With Hardware Or Supplies Furnished Under This Contract. Mercury Contamination Of The Material Will Be Cause For Rejection. 3.24 Navsea 0948-lp-045-7010 - Any Applicable Requirements Of Navships 4410.17,navsea 0948-lp-045-7010, Or 0948-045-7010 Which The Contractor Must Meet Are Included In This Contract/purchase Order. The Above Documents Are For Governmentuse Only. Further application Of The Above Documents Is Prohibited.prohibited. 3.24.1 Marking Of Material With A Material Designator Per The Drawing Is Also Prohibited, With The Exception Of Fasteners. Fasteners Must Be Marked With A Material Symbol/designator As Specified Elsewhere In This Contract. 3.25 Certificate Of Compliance - (special Emphasis Material) The Contractor Must Prepare And Submit A Certificate Of Compliance Certifying That The Items/components Furnished Under This Contract Comply With The Requirements Of The Procurement Document, including Any/all Invoked Specifications And Drawings. ^ Quality Assurance Requirements ^ 3.26 See Cdrl Di-misc-80678 (test Certification) - A Statement Of Tests Performed, Listing The Pieces Tested Must Be Furnished Along With A Copy Of The Test Results. Certification Must Include The Contractor's Name, Address And Date, Quantity Inspected, identified To The Contract/purchase Order And Item Number, And The Contractor's Or Authorized Personnel's Signature. Test Certifications Must Reference The Standard/specification, Including The Revision, To Which The Testing Was Performed And The Acceptance criteria Used. Test Procedure Numbers May Also Be Referenced On Test Reports. Test Reports On Weldments Must Be Identified To Weld Joint And Layer. 3.27 Welding Requirements - When Production Or Repair Welding Is Required, The Applicable Welding Procedure(s) And Qualification Data Must Be Submitted For Review And Approval. In Addition, The Consumed Weld Metal C Of C As Defined Below Must Be Submitted As part Of The Certification Oqe Package Submitted By The Contractor. note: These Requirements Do Not Apply To Tack/spot Welds. 3.27.1 Approval Of The Contractor's Qualification Data Must Be Obtained Prior To Performing Any Welding (production Or Repair). 3.27.2 If The Contractors Qualification Data Has Previously Been Approved By The Navy For Other Contracts, A Copy Of The Original Approval Letter May Be Submitted Along With The Procedures And Qualification Data Report To Expedite The Approval Process. The approval Letter Must Reference The Applicable Welding Procedure And Qualification Data Report Identification/number. Prior Approval Does Not Guarantee Acceptance For This Or Any Future Contracts. As Far As Practical, All Procedures For The Contract Must Be submitted At The Same Time. Welding Procedures And Qualification Data Must Be Submitted In A Commercially Available Electronic Format Such As Adobe Acrobat Pdf. The Contractor Must State The Applicability Of Each Weld Procedure And Qualification Data Submitted, citing The Drawing Number And Pieces To Be Welded. (i.e. ''wp-123 And Qd-123 Are Submitted For The Weld Joint Between Pieces 1 And 2 On Drawing Abc'.' Wp-456 And Qd-456 Are Submitted For The Hardfacing Of Piece 3 On Drawing Xyz'') 3.27.3 The Pco's Authorization For The Use Of Weld Procedure(s) And Qualification Data For The Specific Application As Submitted Does Not Mitigate The Vendors Responsibility To Comply With The Requirements Of S9074-aq-gib-010, S9074-ar-gib-010a/278,248d The contract. 3.27.4 Authority For The Repair Of Special Repairs In Castings, The Repair Of Wrought Material, Or The Repair Of Forged Material Must Be Obtained Via Request For Waiver From The Procurement Contracting Officer. This Request Must Describe The Defect; Including size, Depth, Location, And A Description Of The Proposed Repair. Repairs Deemed Minor Or Nominal In Accordance With S9074-ar-gib-010/278 Can Be Made At Contractor Discretion In Accordance With S9074-ar-gib-010/278 Requirements; However, Weld Procedure specification (wps) And Procedure Qualification Record (pqr) Submittals Are Still Required. This Request For Navsup-wss Contracts Must Be Submitted Via The Electronic Contractor Data Submission (ecds) Application. 3.27.5 Any New Procedure Qualification Performed Under This Contract Will Require The Vendor To Provide A Minimum 72 Hour Notification To Dcma With An Offer To Observe The Welding Of The Test Assemblies. The 72 Hour Time Limit May Be Modified Upon Mutual agreement Between The Vendor And Dcma. 3.27.6 When Drawings Require Hardfacing Surface Iron Or Nickel Content Not To Exceed 5%, The Contractor Must Verify Surface Iron Or Nickel Content By Performing Chemical Testing As Defined By The Applicable Drawing. The Chemical Test Results Must Be Submitted as Part Of The Qualification Data. 3.27.7 Additional Qualification Requirements For Production Hardfacing Thickness Less Than 1/8-inch: Macro-etch (or Legible Photomacrographs Clearly Showing The Fusion Area) Must Be Submitted For Review And Show Consistent, Minimized Dilution. All Essential elements And Any Elements Not Listed In S9074-aq-gib-010/248 That Influence Dilution Must Be In The Qualification Data And Weld Procedure, With Strict Limits Placed On Each Essential Element. 3.27.8 Preparation And Retention Of Weld Records Is Required, As Specified By Paragraph 4.1.3 Of S9074-ar-gib-010a/278. 3.27.9 When Production Or Repair Welding Is Required On Titanium Materials, Theapplicable Fabrication Plan, Facilities Procedure, Training Plan, And Active Welder Qualification Must Also Be Submitted For Review And Approval. 3.27.10 If The Contractor's Fabrication Plan, Facilities Procedure, Training Plan, Or Active Welder Qualification Has Previously Been Approved By The Navy For Other Contracts, A Copy Of The Original Approval Letter May Be Submitted Along With The Applicable documentation To Expedite The Approval Process. The Approval Letter Must Reference The Applicable Documentation. Prior Approval Does Not Guarantee Acceptance For This Or Any Future Contracts. The Contractor's Fabrication Plan, Facilities Procedure, Training plan, And Active Welder Qualification Must Be Submitted At The Same Time As The Applicable Welding Procedure(s) And Weld Procedure Qualification Data. All Documentation Must Be Submitted In A Commercially Available Electronic Format, Such As Adobe Acrobat Pdf. 3.27.11 A Certificate Of Compliance Is Required For All Weld Filler Metals Used For Production Or Repair Welding, And Must Include The Following: a) Filler Metal Lot Number(s) b) Specification And Type c) A Positive Statement That The Vendor Has Obtained Oqe And Verified That Each Lot Of Weld Filler Material Conforms To Specification Requirements. d) A Positive Statement Verifying That The Weld Filler Metals Were The Correct Material Type Or Grade Prior To Consumption. 3.27.12 When Production Welds Or Repair Welds Are Performed By A Subcontractor, The Requirement For Submission Of All Certification Documentation Required Herein Must Be Passed Down To The Subcontractor. 3.28 Quality System Requirements - The Contractor Furnishing Items Under This Contract/purchase Order Must Provide And Maintain A Quality System In Accordance With Iso-9001 As Amplified Or Modified Herein, With The Calibration System Requirements Of Iso-10012 or Ansi-z540.3 With Iso-17025. A Quality System In Accordance With Mil-i-45208, With The Calibration System Requirements Of Mil-std-45662, Is Acceptable As An Alternate. 3.28.1 The Contractor's Quality System And Products Supplied Under The System Are Subject To Evaluation, Verification Inspection, And Acceptance/non-acceptance By The Government Representative To Determine The System's Effectiveness In Meeting The Quality requirements Established In The Contract/purchase Order. 3.28.2 The Contractor's Quality System Must Be Documented And Must Be Available For Review By The Contracting Officer Or His Representative Prior To Initiation Of Production And Throughout The Life Of The Contract. The Prime Contractor Must, Upon notification, Make His Facilities Available For Audit By The Contracting Officer Or His Authorized Representative. 3.28.3 See Cdrl Di-qcic-81110 (inspection System Procedures) - All Suppliers Of Level I/subsafe (li/ss) Material Are Required To Submit A Copy Of Their Current Documented Quality System Procedures To The Procurement Contracting Officer (pco) Prior To Award Of any Contract/purchase Order. Suppliers That Have A Copy Of Their Current Quality System Procedures On File At The Procuring Activity May Request The Pco Waive This Requirement. 3.28.4 This Contract Provides For The Performance Of Government Quality Assurance At Source. The Place Or Places Of Performance May Not Be Changed Without The Authorization Of The Procurement Contracting Officer. Upon Receipt Of This Order, Promptly notify The Government Representative Who Normally Services Your Plant So That Appropriate Planning For Government Inspection Can Be Accomplished. If You Do Not Have An Assigned Government Representative, Notify The Nearest Defense Contract Management Agency (dcma) Office. In The Event That A Local Government Representative Or Dcma Office Cannot Be Located, Our Purchasing Agent Should Be Notified Immediately. 3.28.5 Any Changes Made By The Contractor To A Qualified Quality System Will Require Re-submittal To The Pco And Concurrence By The Government Quality Assurance Representative Prior To Adoption. 3.29 Contractor Inspection Requirements - The Contractor Must Maintain Adequate Records Of All Inspections And Tests. The Records Must Indicate The Nature And Number Of Observations Made, The Number And Type Of Deficiencies Found, The Quantities Approved And rejected And The Nature Of Corrective Action Taken As Appropriate. Inspection Records Must Be Traceable To The Material Inspected. 3.29.1 The Supplier's Gages, Measuring And Test Equipment Must Be Made Available For Use By The Government Representative When Required To Determine Conformance With Contract Requirements. When Conditions Warrant, The Supplier's Personnel Must Be Made available For Operations Of Such Devices and For Verification Of Their Accuracy And Condition. 3.29.2 All Documents And Reference Data Applicable To This Contract Must Be Available For Review By The Government Representative. Copies Of Documents Required For Government Inspection Purposes Must Be Furnished In Accordance With The Instructions Provided by The Government Representative. 3.30 Subcontractor Inspection Requirements - The Government Has The Right To Inspect At Source, Any Supplies Or Services That Were Not Manufactured Or Performed Within The Contractor's Facility. Such Inspection Can Only Be Requested By Or Under Authorization of The Government Representative. Any Purchasing Documents To A Subcontractor Must Cite The Applicable Portions Of The Contractually Invoked Quality System (e.g. Calibration Requirements), Plus Any Product Requirements That Apply To The Supplies Being purchased. When The Government Elects To Perform Source Inspection At The Subcontractor's Facility, Applicable Purchase Documents Must Be Annotated With The Following Statement: "a Government Inspection Is Required Prior To Shipment From Your Plant. Upon receipt Of This Order, Promptly Notify The Government Representative Who Normally Services Your Plant So That Appropriate Planning For Government Inspection Can Be Accomplished. If You Do Not Have An Assigned Government Representative, Notify The Nearest defense Contract Management Agency (dcma) Office. In The Event That A Local Government Representative Or Dcma Office Cannot Be Located, Our Purchasing Agent Should Be Notified Immediately." 3.31 The Prime Contractor's Program Must Include Procedures To Assess The Capability Of The Prospective Suppliers To Produce The Products Or Supply The Services In Accordance With The Contract, Prior To The Issuance Of Any Purchase Document. 3.31.1 Each Sub-tier Supplier Of Material Or Services For Items In Section 3 Of This Contract Must Be Subjected To A Periodic Review Or Audit By The Prime To Determine The Continued Capability Of The Supplier To Control The Quality Of The Products Or Services specified In The Purchase Order Or Contract. 3.31.2 The Prime Contractor Must Ensure That The Purchased Product Conforms To Specified Purchase Requirements And This Contract. The Type And Extent Of Control Applied To The Supplier And The Purchased Product Must Be Dependent Upon The Effect Of The purchased Product On The End Item Represented By This Contract. 3.31.3 The Prime Contractor Must Evaluate The Requirements Of The Contract And Select Suppliers Based On Their Ability To Supply The Product In Accordance With The Prime Contractor's Requirements And The Contract. Criteria For Selection And Evaluation Must be Established. Records Of This Effort Must Be Available For Review By The Government. 3.31.4 The Prime Contractor's Supplier Quality Assurance Program Must Provide For A Review Of Purchase Documents To Assure Applicable Quality Requirements Are Included Or Referenced In The Documentation For Compliance By The Supplier. 3.32 Government Furnished Material And/or Equipment (gfm/gfe) - When Material Or Equipment Is Furnished By The Government, The Contractor Must Develop Documented Control Procedures That Require At Least The Following: 3.32.1 Visual Examination Upon Receipt To Detect Damage During Transit. 3.32.2 Inspection For Completeness And Proper Type. 3.32.3 Verification Of Material Quality Received. 3.32.4 Periodic Inspection And Precautions To Assure Adequate Storage Conditions And To Guard Against Damage From Handling And Deterioration During Storage. 3.32.5 Functional Testing, Either Prior To Or After Installation, Or Both, As Required By The Contract To Determine Satisfactory Operation. 3.32.6 Identification And Protection From Improper Use Or Disposition. 3.32.7 Reporting To The Government, Any Gfm Or Gfe Property Found Damaged, Malfunctioning, Or Otherwise Unsuitable For Use. In The Event Of Damage Or Malfunction During Or After Installation, The Supplier Must Determine And Record Probable Cause And necessity For Withholding The Material From Use. 3.32.8 For Gfe Material, And As Required By The Terms Of The Bailment Agreement, The Supplier Must Establish Procedures For Adequate Storage, Maintenance, And Inspection Of Bailed Government Material. Records Of All Inspection And Maintenance Performed On bailed Property Must Be Maintained. 3.32.9 Material Returned To The Contractor Must Be Handled As Gfm. 3.33 Traceability And Certification Requirements - To Assure That Correct Materials Are Installed In Level I/subsafe Systems, It Is Imperative That Traceability Be Maintained From The Material To The Material Certification Test Report And Other Required objective Quality Evidence (oqe). The Material Certification Report Must Completely And Accurately Reflect That The Material Supplied Meets The Specified Requirements. Materials Requiring Traceability And Certification Data Are Identified Within Paragraph 3, section C Of This Contract/purchase Order. 3.33.1 The Following Provides The Minimum Requirements For Maintaining Material Traceability And Supplements The Requirements Specified In Di-misc-81020 And Elsewhere In The Contract/purchase Order. The Contractor Must Develop Written Procedures That implement The Material Control Requirements Stated Herein. 3.34 Material Traceability - The Certification Data Report Must Be Identified Through A Unique Traceability Number, Heat-lot Number, Or Heat-treat Number For Metallic Material Or Batch Of Non-metallic Material, As Applicable, Which Must Also Be Marked On The material. This Traceability Marking On The Material Must Provide Direct Traceability To The Material's Chemical Composition And Mechanical Properties Certification Data. For Material Produced By Batch, Continuous Cast, Or Continuous Pour Processes, Samples must Be Taken No Less Than Once In Every Eight Hours Of Operation For The Purpose Of Validating Proper Chemical Composition And Mechanical Properties. Traceability Must Be Maintained Through All Process Operations Including Any Subcontracted Operations, To The finished Component. 3.34.1 Material Marking For Traceability And Identification - The Following Are The Minimum Marking Requirements. Additional/alternate Marking Requirements, If Applicable, Will Be Specified Elsewhere In The Contract/purchase Order. In Addition To The marking Requirements On Applicable Drawings And/or Specifications, Marking For Traceability Is Required. All Traceability Markings Must Be Permanently Applied In Accordance With Mil-std-792 (except As Specified Below). An Alternate Marking Method Is permissible Provided It Is An Available Option In The Contractually Invoked Specification Or Drawing, Except In Instances Where The Material Has Been Modified By This Contract/purchase Order And Differs From That Specified In The Specification Or Drawing. 3.34.2 Traceability Markings For Items With Precision Machined Or Plated Surfaces, Or Material With Suitable Marking Surface Areas Less Than 3/8 Inches Square (either 3/8" X 3/8" Or An Area Equal To 0.1406 Inches Square) Must Be Applied To A Durable Tag And the Tag Securely Affixed To The Material. 3.34.3 Permanent Marking Must Be Legible And Must Be Located So As To Not Affect The Form, Fit, And Function Of The Material. ;marking Area To Be As Shown On Drawing. Ball Is To Be Marked In The Waterway And Seats To Be Marked On The Outer Cylindrical surface. Self-locking Hex Nuts To Be Marked On The Hex Flats.; 3.34.4 Seat Marking - Each Seat Must Be Permanently Marked In Accordance With Mil-std-792, Type I And As Stated Below, Except For Teflon Seats, Which Must Only Be Tagged. Type Ix Marking May Be Substituted For Type I, Provided The Minimum Character Size scribed By The Marking Tool Must Be Approximately 3/32 Inch High To Insure Legibility. Permanent Marking Is Not Permitted On Teflon Seats. seat Marking Requirements Must Maintain Complete Traceability To Certification Oqe. Seat Marking Must Be Either Heat/lot Or Batch Number, A Vendor Traceability Number/code, Or A Combination Thereof And Must Be Unique To The Material Certification. 3.34.5 Traceability Markings Must Be Maintained Through Assembly, And Whenever Possible Must Be Visible After Assembly. For Items Where The Marking Is Not Visible After Assembly, A Durable Tag Must Be Securely Attached To The Item Identifying The Part number, Piece Number, Traceability Number, And The Location Of The Permanent Mark. 3.35 See Cdrl-di-misc-81020 (chemical And Mechanical) And Cdrl Di-misc-80678 (seat Material) - Material Certifications - The Following Material Certification Requirements Apply: 3.35.1 Metallic Material - Quantitative Chemical And Mechanical Analysis Of Material Traceable To Traceability Markings Is Required. Material Certification Test Reports Must Include The Class, Form, Condition, Grade, Type, Finish, And/or Composition, As applicable, Of The Material Supplied. 3.35.2 Non-metallic Material - The Contractor Must Furnish The Applicable Test Reports For Each Heat/lot/batch Of Seat Material. Material Certification Test Reports Must Include, In Addition To The Specification, The Class, Form, Grade, Type, Process, And/or composition, As Applicable, Of The Material Supplied. 3.35.3 Re-identification And Re-certification Of Metallic Material Is Required When The Material Is Subjected To A Process Which Alters Its Properties. If The Starting Material Or Raw Stock Is Processed In A Manner That Will Not Affect Its Chemical composition Or Mechanical Properties, The Original Certifications For The Chemical Composition And Mechanical Properties, As Required By The Material Specification, Are Acceptable. Re-certification Of The Chemical Or Mechanical Properties Is Required If A process Is Used During Fabrication That Alters The Original Properties Of The Material (e.g. Alloying, Heat Treating, Or Forming). In These Instances, The Properties Of The Material Must Be Re-determined And Documented To Reflect The Altered Condition. The altered Material Must Be Uniquely Re-identified. The Properties Thus Determined And Documented, Are Required For Final Certification And Must Conform To The Material Specification Or The Contract/purchase Order Requirements. When Only The Mechanical Properties are Altered, The Original Certification Forchemical Composition Must Be Overstamped And Annotated With The Unique Traceability Marking Used With The Altered Material And At A Minimum Contain The Information Below. traceability Marking________________________________________________ (marking On Finished Item) is Fabricated From Raw Material Identified To heat/lot Number _______________ And Heat Treat Number ______________________ (when Applicable) _________________________________________ Date _____________________ (name And Signature Of Auth. Co. Rep.) 3.35.4 Material Certification Data Forwarded By The Manufacturer Must Contain A Signed Certification That The Report Results Represent The Actual Attributes Of The Material Furnished And Indicate Full Compliance With All Applicable Specification And Contract requirements. Transcription Of Certification Data Is Prohibited. 3.35.5 Statements On Material Certification Documents Must Be Positive And Unqualified. Disclaimers Such As "to The Best Of Our Knowledge" Or "we Believe The Information Contained Herein Is True" Are Not Acceptable. 3.35.6 If Material Is Received Without The Required Certification Papers Or With Incorrect/missing Data On The Certification Papers, The Material Will Be Rejected. 3.36 Material Handling - The Written Material Control Process Must Include The Following: 3.36.1 All Raw Materials Must Have Traceability Markings (except As Specified Below). 3.36.2 Stored Raw Materials Requiring Traceability Must Be Segregated To Preclude Intermingling With Materials Not Requiring Traceability. 3.36.3 When Traceability Markings Will Be Removed By A Manufacturing Or Fabrication Process, The Marking Must Be Recorded Prior To Removal And Be Immediately Restored Upon Completion Of The Process. If This Cannot Be Done Or Is Impractical, An Appropriate material Control Procedure (such As A Bag And Tag, Tagging, And/or Tote Box Control) Must Be Employed. The Material Control Procedure Must Provide A Method Of Positive Control To Preclude Commingling Of Heats/lots Or Loss Of Traceability. The Traceability marking Must Be Reapplied Upon Completion Of The Final Manufacturing Process. 3.36.4 Brazing Or Weld Filler Metals For Strength Welds Forming Or Integral With Pressure Containing Components Or Assemblies Requiring Traceability Must Be Verified To Be The Correct Material, And Type Or Grade, As Applicable, Prior To Consumption. At A minimum, Material Verification Must Consist Of Inspection Of Material Test Reports For Conformance To Specified Requirements. Control Of Welding And Brazing Filler Metals Must Be Maintained To The Point Of Consumption To Assure Use Of The Correct Type And grade. Markings And Traceability Requirements Do Not Apply To Brazing And Weld Filler Metals After Consumption. It Is The Responsibility Of The Prime Contractor To Ensure Conformance With The Above Requirements On Welds Performed By Their Subcontractors. 3.36.5 Purchase Orders For Raw Material Must Specify That The Material Be Traceable To Material Certification Test Reports By Traceability Markings On The Material And Identified On The Test Reports. The Certification Data Requirements Contained In di-misc-81020 Must Be Invoked By The Prime Contractor On All Subcontractors Supplying Level I Material. 3.36.6 The Material Control Process Must Include Requirements For The Maintenance Of Traceability For Items Sent Out For Subcontracted Operations. If Such Operations Would Remove Traceability Markings, Purchase Or Work Orders Must Specify A Method And marking Location For Remarking. The Contractor Must Also Ensure That Subcontractor Production Controls Are Adequate To Preclude Commingling Of Materials During Processing. 3.37 Receiving Inspection 3.37.1 Products And Services Produced By Sub-tier Suppliers For Incorporation In The Contract End Item Must Be Subject To Inspection Or Audit At The Time Of Receipt By The Prime Prior To Further Processing Within The Prime Contractor's Plant Or Shipment To another Location. 3.37.2 Receiving Inspection Must Include As A Minimum - verification That The Traceability Marking On The Material Agrees With That On The Certification Test Reports. verification That Certification Test Reports Are Legible And Complete. verification That The Contents Of The Certification Test Reports Are In Compliance With The Contractually Invoked Specifications And Requirements. 3.38 Discrepancy Reporting 3.38.1 Nonconforming Products Must Be Identified And Processed In Accordance With The Prime Contractor's Procedures For Controlling Nonconforming Products. The Prime Contractor Must Report The Receipt Of Any Nonconforming Products To The Responsible Sub-tier supplier In Accordance With Established Procedures. Nonconforming Material Records Will Be Maintained And Available For Review By The Government Quality Assurance Representative (qar). 3.39 Final Inspection - The Following Inspections Must Be Performed Prior To Government Inspection And Acceptance. 3.39.1 Material Sampling - Material Must Be Inspected For Form, Fit, And Function. Lot Acceptance Must Be Based On Zero Defects And Lot Rejection Based On One Defect. The Sample Size Must Be In Accordance With The Sampling Plan(s) In The Applicable Military specification Or Standard, Federal Specification Or Standard, Or Drawing To Which The Material Was Manufactured. In The Absence Of Such Sampling Plans, Sampling Inspection Must Be Per Ansi/asq-z1.4, General Inspection Level Ii (for Sample Size Selection Code), table Iia (for Sample Size). small Lot Sizes - For Lot Sizes Of Fifty Or Less, The Minimum Sample Size Must Be Eight Units. For Lot Sizes Of Eight Or Less, The Sample Size Must Be One Hundred Percent Of The Lot. 3.39.2 The Manufacturer May Elect To Use Statistical Process Control (spc) To Assure Product Quality In Lieu Of The Above Attribute Sampling Plan, Provided That The Spc Methodology/system Used Provides Acceptable Products To The Government. However, The government/navy Receipt Inspection Activity May Perform Their Acceptance Inspection Of The Material Using The Attribute Sampling Plan Outlined Above. 3.39.3 All Data Concerning Material Verification (chemical, Mechanical Or Physical Properties), Traceability (material Certifications To Material Marking), And Nondestructive Test (ndt) Certifications For Material Must Be 100% Inspected. The Certification test Reports Must Also Be 100% Inspected For Completeness And Legibility. 3.39.4 All Material Requiring Traceability Must Be 100% Inspected For Traceability Marking And That The Marking Is Legible. 3.39.5 Sampling For Certification Of Non-metallic Material Must Be On The Basis Of One Set Of Test Specimens From Each Heat/lot Or Batch. 3.40 Additional Marking For Fasteners - Fasteners Must Be Marked In Accordance With ;mil-dtl-1222, Except Self-locking Hex Nuts Must Be Marked In Accordance With Nasm 17828; . The Method Of Marking Must Be Types I, Ii, Iii, V, Viii Or Ix Of Mil-std-792 except For Grades 410, 416 And 431 In The H Condition And Grades 8, 630, A574, And 4340 Which Must Be Marked By Method Ii When Marking Is Applied After The Final Heat Treatment. Markings On Fasteners That Are To Be Coated Must Be Marked Prior To Coating And have A Minimum Depth Of 4 Mils. Traceability Marking Must Be Legible After The Application Of Protective Compounds. 3.40.1 Marking Is Required For All Fasteners Regardless Of Size And Must Include The Material Symbol, The Manufacturer's Identification Symbol, And The Traceability Marking. Marking Must Be Applied On The Head Of Headed Fastener (top Preferred, Side location If Necessary). Self-locking Screws Must Also Be Marked With Six Dots. Where No Contract Invoked Specification Requirement Exists For This Marking, Self-locking Fasteners Must Be Marked With Six Dots Approximately .032" Diameter, Raised Or Depressed by Approximately .010" Located On The Top Perimeter Of The Head Of The Fastener In An Arc Or Circular Pattern. The Six Dots Must Be Distinguishable From All Other Required Markings. 3.41 See Cdrl Di-misc-80678 (special Emphasis C Of C) - The Certificate Of Compliance Must Show Traceability To The Marking Applied On Each Individual Item, And Must Contain The Following Information: 1. Contractor's Name, Address And Date. 2. The Contract/purchase Order Number (for Example: N00104-11-p-fa12) 3. The National Stock Number (nsn). The 18 Character National Stock Number For Special Emphasis Material Includes The Two Digit Cog, The Four Digit Fsc, The 9 Digit Niin, And The Two Digit Smic (for Example: 1h 4820 012345678 L1) ("n/a" When Not Applicable). 4. Lubricants, Sealants, Anti-seize, And/or Thread Locking Compounds ("n/a" When Not Applicable). 5. Certification That O-rings, Packing, Gaskets, Or Other Elastomeric Products Were Installed In A Compressed State Within An Assembly Or Sub-assembly, Prior To Expiration Of The Shelf Life ("n/a" When Not Applicable). 6. Manufacturer's Compound Number ("n/a" When Not Applicable). 7. When Weld Procedure Submittal Is Required By The Contract, A Statement That The Approval Date Of The Qualification Data Precedes Any Production Or Repair Welding Performed On This Contract. ("n/a" When Not Applicable). 8. A Statement To The Effect That All Items Furnished On This Contract Are In Full Compliance With The Specifications And Requirements And List Each Contractually Invoked Conformance/compliance Test Performed By Name And That It Was Performed satisfactorily. 9. Contractor's Or Authorized Personnel's Signature. 4. Quality Assurance 4.1 Notes To Dcma Qar And The Contractor - 4.1.1 Dcma Qar And The Contractor For Proprietary Designs - Departures From Contractor Imposed Requirements, Not Specifically Covered By The Contract, Must Be Judged Individually On The Basis Of The Effect, If Any, On Contractual Requirements. When There Is A disagreement Between The Contractor And The Government Representative As To The Effect On Contractual Requirements, The Departure Must Be Considered A Nonconformance And Be Submitted To The Pco For Disposition. 4.1.2 Dcma Qar And The Contractor For Proprietary Designs - All Records Of Departures From Contractor Imposed Requirements Must Be Maintained And Available For Review At The Contractor's Facility. A Copy Must Be Given To The Local Government Representative. A record Of These Departures, Traceable To The Applicablepart Number And Contract Number Must Be Submitted To The Pco. 4.1.3 Dcma Qar And The Contractor For Proprietary Designs - For Proprietary Designs, The Contractor's Part Numbers Are Acceptable For Reference Only. The Delivered Material Must Conform To All Drawings, Specifications, And Other Contractual Requirements. 4.1.4 Dcma Qar - It Is The Responsibility Of Dcma Qar To Review Non-destructive Testing (ndt) Procedures For Navsup Contracts/purchase Orders. 4.1.5 Dcma Qar And The Contractor - The Ecds (electronic Contractor Data Submission) System Is Available For Certain Data Submissions And To Submit Questions And Clarifications, And Waiver Requests On Contracts And Solicitations. Ecds Can Be Found At: https://register.nslc.navy.mil/ 5. Packaging 5.1 Preservation, Packaging, Packing And Marking - Preservation, Packaging, Packing And Marking Must Be In Accordance With The Contract/purchase Order Schedule And As Specified Below. mil-std 2073 Packaging Applies As Found Elsewhere In The Schedule 6. Notes 6.1 Several Definitions Of Terms That Apply To Csi Items Are Listed Below. All Terms May Not Apply To Every Item. 6.1.1 The Ecds (electronic Contractor Data Submission) System Is At: Https://register.nslc.navy.mil/ This Application Will Require Advance Registration Using A Pki Digital Certificate On A Cac. A Vendor User Guide Is Available As Csd001 In The Csd (contract Support Document) Library Within Ecds. 6.1.2 Critical Safety Item (csi) - Any Ship Part, Assembly, Or Support Equipment Containing A Critical Characteristic Whose Failure, Malfunction, Or Absence Of Which Could Cause A Catastrophic Or Critical Failure Resulting In Loss Of, Or Serious Damage To The ship, Or Unacceptable Risk Of Personal Injury Or Loss Of Life. 6.1.3 Critical Process - As Determined By The Twh, Any Process, Operation Or Action Performed On A Ship Csi That Serves To Establish A Critical Characteristic (such As Welding, Soldering, Machining, Polishing, Cleaning, Or Assembling) Or Confirm That A critical Characteristic Is Within Drawing Or Specification Compliance (such As, Testing, Measurement, Or Non-destructive Evaluation). 6.1.4 First Article - Pre-production Models, Initial Product Samples, Test Samples Produced To Ensure A Manufacturer's Capability To Meet Full Specification Requirements. 6.1.5 First Article Test (fat) - Contractually Required Testing And Inspection Of A Supplier's Pre-production, Production, Or "production Representative" Specimens To Evaluate A Manufacturer's Ability To Produce Conforming Product Prior To The Government's commitment To Receive Subsequent Production Items. First Article Testing Is Product Specific And Does Not Assess Manufacturing Process Controls Nor Does It Assure The Effectiveness Of The Manufacturer's Quality Program. 6.1.6 Government Source Inspection (gsi) - Gsi Is Independent Oversight Performed By A Government Representative Usually A Dcma Quality Assurance Representative (qar)) To Assure That Those Unique Product Quality And System Elements, Identified By The contracting Agency As Important, Are Observed And Evaluated. 6.1.7 Quality Assurance Letter Of Instruction (qali) - A Qali Is A Formal Docume
Closing Date16 Aug 2024
Tender AmountRefer Documents 

DEPT OF THE NAVY USA Tender

United States
Description: Contact Information|4|n743.4|wvn|717-605-3354|amanda.l.bailey50.civ@us.navy.mil| item Unique Identification And Valuation (jan 2023)|19|||||||||||||||||||| higher-level Contract Quality Requirement (navicp Review Feb 1991)(feb 1999)|1|see Specification Sections C And E. | inspection Of Supplies--fixed-price (aug 1996)|2||| general Information-fob-destination|1|a| wide Area Workflow Payment Instructions (jan 2023)|16|stand-alone Receiving Report- Certifications Combo- Receiving Report & Invoice- Material |n/a|tbd|n00104 |tbd|n39040 |n50286 |tbd|133.2|n/a|n/a|n39040 |n/a|n/a|see Dd F orm 1423 |port_ptnh_wawf_notification@navy.mil | navy Use Of Abilityone Support Contractor - Release Of Offeror Information (3-18))|1|| equal Opportunity (sep 2016)|2||| warranty Of Supplies Of A Noncomplex Nature (june 2003)|6|365 Days After Acceptances Of Material|365 Days After Acceptances Of Material||||| warranty Of Data--basic (mar 2014)|2||| buy American-free Trade Agreements-balance Of Payments Program-basic (feb 2024)|11|||||||||||| notice Of Total Small Business Set-aside (oct 2020)(deviation 2020-o0008)|1|| alternate A, Annual Representations And Certifications (nov 2023)|13|||||||||||||| buy American-free Trade Agreements-balance Of Payments Program Certificate-basic (feb 2024))|5|||||| buy American-balance Of Payments Program Certificate-basic (feb 2024)|1|| annual Representations And Certifications (may 2024)|13|332919|750|||||||||||| notice Of Priority Rating For National Defense, Emergency Perpardeness, And Enrgy Progam Use (april 2008))|2||x| dd1423 Data Item A001 May Be Waived If Already On File At Navsup Wss Mechanicsburg. any Contract Awarded As A Result Of This Solicitation Will Be "do" Rated Order Certified For National Defense Use Under The Defense Priorities And Allocations System (dpas). navsup Wss Mechanicsburg Will Be Considering Past Performance In The Evaluation Of Offers In Accordance With Far 13.106(a)(2) And Dfars 252.213-7000. if Drawings Are Included In The Solicitation, Access Needs To Be Requested On The Individual Solicitation Page On Contracts Opportunities On The Government's Sam Website. After Requesting Access, Send An Email To The Primary Poc Listed On The Solicitation. \ 1. Scope 1.1 The Material Covered In This Contract/purchase Order Will Be Used In A Crucial Shipboard System. The Use Of Incorrect Or Defective Material Would Create A High Probability Of Failure Resulting In Serious Personnel Injury, Loss Of Life, Loss Of Vital shipboard Systems, Or Loss Of The Ship Itself. Therefore, The Material Has Been Designated As Special Emphasis Material (level I, Scope Of Certification, Or Quality Assured) And Special Control Procedures Are Invoked To Ensure Receipt Of Correct Material. 2. Applicable Documents 2.1 Order Of Precedence - In The Event Of A Conflict Between The Text Of This Contract/purchase Order And The References And/or Drawings Cited Herein, The Text Of This Contract/purchase Order Must Take Precedence. Nothing In This Contract/purchase Order, however, Must Supersede Applicable Laws And Regulations Unless A Specific Exemption Has Been Obtained. 2.2 Identification Of Classified Documents - This Contract/purchase Order Requires The Contractor To Have Authorized Access To Classified Documents In Accordance With The Attached Contract Security Classification Specification (dd Form 254). The Classified Documents And Security Level Are: ;6404016 - Confidential; 2.3 Applicable Documents - The Document(s) Listed Below Form A Part Of This Contract/purchase Order Including Modifications Or Exclusions. 2.3.1 Specification Revisions - The Specification Revisions Listed Under "documents References" Below Are The Preferred Revision. Older And/or Newer R Evisions Are Acceptable When Listed Within Contract Support Library Reference Number Csd155 In Ecds (electric contractor Data Submission) At: Ht Tps://register.nslc.navy.mil/. This Is To Allow Contractors To Use Certain Acceptable Older Specification Revisions To Purge Their Existing Stock Of Material Certified To Those Older Revisions Or To Use Newer Specification revisions When Material Is Certified To Newly Released Revisions,without Requiring The Submittal Of Waiver/deviation Requests For Each Specification Revision On Every Contract. Revisions Of Specifications Reflecting Editorial And/or Re-approval (e.g. E2009, r2014, Etc.) Are Considered Inconsequential, But Are Acceptable When Their Revisions Are Listedwithin Csd155 Or Elsewhere Within This Contract. 2.3.2 Documents, Drawings, And Publications Supplied Are Listed Under "drawing Number". These Items Should Be Retained Until An Award Is Made. 2.3.3 "document References" Listed Below Must Be Obtained By The Contractor. Ordering Information Is Included As An Attachment To This Contract/purchase Order. drawing Data=df330644-mk00630 |53711| G|er |d|0001 | G|49998|0087063 drawing Data=4384678 |80064| C| |d|0001 | C|49998|1136401 drawing Data=6404016 |53711| B| |f|0001 | B|00026|0000000 drawing Data=6408784 |53711| G| |d|0001 | G|49998|0485147 drawing Data=6408784 |53711| G| |d|0001.a | F|49998|0287643 drawing Data=6408784 |53711| G| |d|0001.b | G|49998|0472234 drawing Data=6408784 |53711| G| |d|0001.c | G|49998|0558855 drawing Data=6408784 |53711| G| |d|0001.d | G|49998|0550305 drawing Data=6408784 |53711| G| |d|0001.e | G|49998|0571760 drawing Data=6408784 |53711| G| |d|0001.f | G|49998|0394198 drawing Data=6408784 |53711| G| |d|0001.g | F|49998|0365994 drawing Data=6408784 |53711| G| |d|0001.h | F|49998|0416942 drawing Data=6408784 |53711| G| |d|0001.j | G|49998|0479318 drawing Data=6408784 |53711| G| |d|0001.k | C|49998|0225968 drawing Data=6408784 |53711| G| |d|0001.l | E|49998|0295546 drawing Data=6408784 |53711| G| |d|0001.m | C|49998|0238215 drawing Data=6408784 |53711| G| |d|0001.n | D|49998|0225359 drawing Data=6408784 |53711| G| |d|0001.p | E|49998|0245921 drawing Data=6408784 |53711| G| |d|0001.r | E|49998|0141705 drawing Data=6408784 |53711| G| |d|0002 | G|49998|0314749 drawing Data=6408784 |53711| G| |d|0002.a | G|49998|0295580 drawing Data=6408784 |53711| G| |d|0002.b | G|49998|0309802 drawing Data=6408784 |53711| G| |d|0002.c | G|49998|0297839 drawing Data=6408784 |53711| G| |d|0002.d | G|49998|0306373 drawing Data=6408784 |53711| G| |d|0002.e | G|49998|0291975 drawing Data=6408784 |53711| G| |d|0002.f | G|49998|0300432 drawing Data=6408784 |53711| G| |d|0002.g | G|49998|0249846 drawing Data=6408784 |53711| G| |d|0002.h | G|49998|0315473 drawing Data=6408784 |53711| G| |d|0002.j | G|49998|0290477 drawing Data=6408784 |53711| G| |d|0002.k | G|49998|0306289 drawing Data=6408784 |53711| G| |d|0002.l | G|49998|0304890 drawing Data=6408784 |53711| G| |d|0002.m | G|49998|0335217 drawing Data=6408784 |53711| G| |d|0002.n | G|49998|0272254 drawing Data=6408784 |53711| G| |d|0003 | F|49998|0220529 drawing Data=6408784 |53711| G| |d|0003.a | F|49998|0157992 drawing Data=6408784 |53711| G| |d|0003.b | G|49998|0240006 drawing Data=6408784 |53711| G| |d|0003.c | F|49998|0147720 drawing Data=6408784 |53711| G| |d|0003.d | F|49998|0149083 drawing Data=6408784 |53711| G| |d|0003.e | F|49998|0188053 drawing Data=6408784 |53711| G| |d|0003.f | F|49998|0250438 drawing Data=6408784 |53711| G| |d|0003.g | F|49998|0208998 drawing Data=6408784 |53711| G| |d|0003.h | G|49998|0284381 drawing Data=6408784 |53711| G| |d|0003.j | G|49998|0314647 drawing Data=6408784 |53711| G| |d|0003.k | F|49998|0258080 drawing Data=6408784 |53711| G| |d|0003.l | F|49998|0245590 drawing Data=6408784 |53711| G| |d|0003.m | F|49998|0143929 drawing Data=6408784 |53711| G| |d|0003.n | F|49998|0140630 drawing Data=6408784 |53711| G| |d|0003.p | F|49998|0149944 drawing Data=6408784 |53711| G| |d|0003.r | F|49998|0192941 drawing Data=6408784 |53711| G| |d|0003.t | G|49998|0257600 drawing Data=6408784 |53711| G| |d|0003.u | F|49998|0143214 drawing Data=6408784 |53711| G| |d|0003.v | F|49998|0150759 drawing Data=6408784 |53711| G| |d|0003.w | F|49998|0199783 drawing Data=6408784 |53711| G| |d|0003.y | F|49998|0150738 drawing Data=6408784 |53711| G| |d|0004 | F|49998|0152567 drawing Data=6408784 |53711| G| |d|0004.a | F|49998|0153261 drawing Data=6408784 |53711| G| |d|0004.b | F|49998|0153232 drawing Data=6408784 |53711| G| |d|0004.c | G|49998|0286081 drawing Data=6408784 |53711| G| |d|0004.d | G|49998|0297409 drawing Data=6408784 |53711| G| |d|0004.e | F|49998|0194149 drawing Data=6408784 |53711| G| |d|0004.f | F|49998|0199753 drawing Data=6408784 |53711| G| |d|0005 | F|49998|0191745 drawing Data=6408784 |53711| G| |d|0006 | F|49998|0249711 drawing Data=6408784 |53711| G| |d|0007 | F|49998|0216570 drawing Data=6408784 |53711| G| |d|0008 | F|49998|0211254 drawing Data=6408784 |53711| G| |d|0009 | F|49998|0218828 drawing Data=6408784 |53711| G| |d|0010 | F|49998|0127037 drawing Data=6408784 |53711| G| |d|0011 | G|49998|0278990 drawing Data=6408784 |53711| G| |d|0012 | G|49998|0239278 drawing Data=6408784 |53711| G| |d|0013 | G|49998|0310649 drawing Data=6408784 |53711| G| |d|0014 | G|49998|0237699 drawing Data=6408784 |53711| G| |d|0015 | F|49998|0108453 drawing Data=6408784 |53711| G| |d|0016 | F|49998|0108785 drawing Data=6408784 |53711| G| |d|0017 | F|49998|0111575 drawing Data=6408784 |53711| G| |d|0018 | F|49998|0119999 drawing Data=6408784 |53711| G| |d|0019 | F|49998|0148631 drawing Data=6408784 |53711| G| |d|0020 | F|49998|0152166 drawing Data=6408784 |53711| G| |d|0021 | F|49998|0130943 drawing Data=6408784 |53711| G| |d|0022 | G|49998|0223526 drawing Data=6408784 |53711| G| |d|0023 | F|49998|0115733 drawing Data=6408784 |53711| G| |d|0024 | F|49998|0115543 drawing Data=6408784 |53711| G| |d|0025 | F|49998|0100554 drawing Data=6408784 |53711| G| |d|0026 | F|49998|0160953 drawing Data=6408784 |53711| G| |d|0027 | F|49998|0198229 drawing Data=6408784 |53711| G| |d|0028 | F|49998|0151387 drawing Data=6408784 |53711| G| |d|0029 | F|49998|0233249 drawing Data=6408784 |53711| G| |d|0030 | F|49998|0126688 drawing Data=6408784 |53711| G| |d|0031 | G|49998|0165644 drawing Data=6408784g01 |53711| A|dn |d|0001 | A|49998|0294106 document Ref Data=fed-std-h28 | | |b |190424|a| | | document Ref Data=fed-std-h28 |0020| |b |941221|a| |01| document Ref Data=ansi/asq Z1.4 | | | |080101|a| | | document Ref Data=astm-b139 | | | |121001|a| | | document Ref Data=qq-n-281 | | |d |851023|a| 2| | document Ref Data=qq-n-286 | | |g |001207|a| | | document Ref Data=astm-b367 | | | |220401|a| | | document Ref Data=astm-b369 | | | |200401|a| | | document Ref Data=mil-std-792 | | |f |060519|a| | | document Ref Data=mil-dtl-1222 | | |j |001208|a| | | document Ref Data=astm-e1417 | | | |160615|a| | | document Ref Data=astm-e1444 | | | |160601|a| | | document Ref Data=mil-std-2035 | | |a |950515|a| | | document Ref Data=mil-std-2132 | | |d |080310|f| |01| document Ref Data=sae Ams 2631 | | |e |170701|a| | | document Ref Data=astm-d4066 | | | |130701|a| | | document Ref Data=sae Ams 6931 | | |d |171201|a| | | document Ref Data=iso_9001 | | | |081115|a| | | document Ref Data=iso10012 | | | |030415|a| | | document Ref Data=mil-dtl-15024 | | |g |180303|a| | | document Ref Data=iso/iec 17025 | | | |050515|a| | | document Ref Data=qpl 25027 | | |17 |000207|a| | | document Ref Data=mil-i-45208 | | |a |810727|a| 1| | document Ref Data=mil-std-45662 | | |a |880801|a| | | document Ref Data=a-a-59004 | | |b |081118|a| | | document Ref Data=ansi/ncsl Z540.3 | | | |130326|a| | | document Ref Data=0900-lp-001-7000 | | | |810101|c| |01| document Ref Data=aia/nas Nasm 17828 | | |1 |130430|a| | | document Ref Data=aia/nas Nasm 25027 | | |1 |121221|a| | | document Ref Data=s9074-aq-gib-010/248 | | |1 |191112|a| | | document Ref Data=t9074-as-gib-010/271 | | |1 |140911|a| | | document Ref Data=s9074-ar-gib-010a/278 (chg A) | | | |130214|a| | | 3. Requirements 3.1 ;the 1 1/2 Inch Ball Valve Must Be In Accordance With Naval Sea Systems Command Drawing 801-6408784, Assembly 99, Design Notice 6408784g01 And Engineering Report Df330644-mk00630, Except As Amplified Or Modified Herein.; 3.1.1 ;plastisol Coating Of The Handwheel Is Not Required.; 3.2 Material For Parts Requiring Certification - Quantitative Chemical And Mechanical Analysis Is Required For The Parts Listed Below Unless Specifically Stated Otherwise: part - ;body - Find No. 12; material - ;astm-b369, Alloy Uns C96400; part - ;bonnet - Find No. 4; material - ;qq-n-281, Class A, Form 1, Hot Finished, Stress Relieved; part - ;stem - Find No. 20; material - ;qq-n-286, Alloy Uns N05500, Form 2, Annealed And Age Hardened; part - ;stem Retainer Nut - Find No. 15; material - ;astm-b139, Alloy C51000, Temper H04; part - ;stud, Continuous Thread - Find No. 17; material - ;mil-dtl-1222, Type Iv, Qq-n-281, Class A; part - ;self-locking Hex Nut - Find No. 16; material - Qq-n-281, Class A Annealed (hot Finished Or Cold Drawn) Or Class B Cold Drawn. all Material Must Be From The Same Class. self-locking Element- Astm-d4066, Group 01, Class 1, Grade 1 part - ;ball (q3) - Find No. 150; material - Sae-ams-6931 or centrifugally Cast 6al-4v, Astm-b367, Grade C-5, With Mechanical Properties As Listed In Supplementary Requirement S6. note: Mechanical Properties For Bars, Forgings And Forging Stock Over 10" Must Be As Specified In The Applicable Drawing. If The Mechanical Properties Are Not Provided In The Drawing, The Mechanical Properties Specified In Sae-ams-6931 Table 2 For Material 6" to 10", Must Be Applied. part - ;seats (q3) - Find No. 8; material - Delrin: Dupont Af De588 (teflon Filled Acetal) (properties Specified Below Only) item Property Astm Test Method Value (a) Specific Gravity D792 (note 1) 1.50 - 1.57 (b) Melting Point D2133 Or D3418 172 - 184 Deg C (342 - 363 Deg F) (c) Tensile Strength (min) D638 (notes 1 & 5) 6100 Psi (d) Tensile Impact (min) D1822 Type S (notes 1 & 5) 5 Ft-lb/sq In (e) Compressive Stress D695 2100 @ 1% Def. (min - Psi) (notes 1 & 5) 11,000 @ 10% Def. (f) Water Absorption D570 .30% Max 24 Hours (g) Rockwell Hardness (r) D785 (note 1) 115 +/- 15 (h) Teflon Fiber Content (note 2) 18 - 23% (i) Dimensional Change (note 4) .7% Max notes: 1. Material Conditioning Prior To Test Is At The Vendor's Option. 2. Teflon Fiber Content - As Certified By Dupont (raw Material). 3. Visual And Dimensional Inspection Of Product (final Machined Condition) - White Teflon String Inclusions Must Not Exceed The Following: A. Diameter 1/32" B. Length 1/8" C. Density 6 Indications Per 100 Sq In 4. The Test Method To Determine Dimensional Stability Must Be Performed As Follows: The Test Specimens (finished Pieces) Tested Must Be Measured At 23 +/- 3 Deg C (73 +/- 5f) And Placed In A Mineral Oil Bath Maintained At 160 +/- 3 Deg C (320 +/- 5f) The specimens Must Remain In The Bath For Six (6) Hours At Temperature And Allowed To Slow Cool In The Bath At A Rate Not To Exceed 23 +/- 3 Deg C (73 +/- 5f) Per Hour. When The Bath Reaches 23 +/- 3 Deg C (73 +/- 5f), The Test Specimens Must Be Removed And measured. The Percent Change In Each Dimension, Outside Diameter, Inside Diameter And Thickness Must Not Be Greater Than The Value Specified. ^mineral Oil Meets The Specification As Listed Below: description.......................passes U.s.p. Test (usp Xx, P.1143) solubility........................passes U.s.p. Test (usp Xx, P.1143) neutrality........................passes U.s.p. Test (usp Xx, P.532) readily Carbonizable Substances...passes U.s.p. Test (usp Xx, P.532) limit Of Polynuclear Compounds....passes U.s.p. Test (usp Xx, P.532) solid Paraffin....................passes U.s.p. Test (usp Xx, P.532) specific Gravity @ 25 Deg C (77 Deg F).0.8600 To 0.8900 viscosity @ 37.8 Deg C (100f).....73.6 To 84.4 Centistokes (340-390 Sus) flash Point Cleveland Open Cup....420 Deg F (216c) (typical) refractive Index @ 20c (68f)......1.480 (typical) 5. Values Are Minimum Mean Values. Individual Specimen Values May Not Vary More Than 25% Below The Specified Minimum Mean Value. Should One Specimen Exceed The 25% Criteria, Retest Is Required. Failure To Meet The Above Criteria A Second Time Is Cause For rejection. 3.3 Testing Certification - Certifications Are Required For The Following Tests On The Items Listed Below. Additional Testing On Other Piece Parts (if Any) Per Applicable Drawings And Specifications Is Still Required, But Certifications Are Only Required As listed Below. attribute - Annealing And Age Hardening item - ;stem - Find No. 20; performance - Qq-n-286 test - Ultrasonic Inspection On Starting Material item - ;all Items Requiring Certification Made From Qq-n-286 With A Diameter Or Minimum Distance Between Parallel Surfaces Of 4 Inches Or Greater Of The Starting Material, Or When Required By A Drawing Or Specification Invoked Elsewhere In This Contract; performance - T9074-as-gib-010/271 Or Mil-std-2132, And Qq-n-286 acceptance - Qq-n-286 test - ;liquid Penetrant Inspection; item - ;stud, Continuous Thread - Find No. 17; performance - T9074-as-gib-010/271; Sampling Must Be Per Mil-dtl-1222 acceptance - Mil-dtl-1222 test - Weldability Test Of Astm-b369 Material item - ;body - Find No. 12; performance - Astm-b369 acceptance - Astm-b369 test - Dye Penetrant Inspection part - Body Weld Ends In Final Machined Condition Including 1/2" Of Base Material performance - T9074-as-gib-010/271 acceptance - S9074-ar-gib-010a/278 test - ;dye Penetrant Inspection For Non-magnetic Grades; item - ;self-locking Hex Nut - Find No. 16; performance - T9074-as-gib-010/271 Or Astm-e1417/astm-e1444 (method C Solvent Removal Techniques Must Not Be Used On Thread) acceptance - ;nasm25027; test - Pressure Tests item - Each Assembly performance - ;general Note 17 On Drawing 801-6408784; acceptance - ;general Note 17 On Drawing 801-6408784; test - ;ultrasonic Testing Is Required For Sae Ams 6931 Starting Material Per Note 16. D. On Drawing 801-6408784; item - ;ball - Find No. 150; performance - ;in Accordance With Sae Ams 6931 And Sae Ams 2631; acceptance - ;in Accordance With Sae-ams-2631; test - ;visual Inspection; item - ;weldments; performance - T9074-as-gib-010/271 acceptance - Mil-std-2035 test - Non-destructive Tests item - ;weld Repair (as Applicable); performance - Per Applicable Fabrication Specification acceptance - Per Applicable Fabrication Specification test - Quality Conformance Tests item - Self-locking Nuts performance - ;nasm25027; acceptance - ;nasm25027; attribute - Certificate Of Completion item - Self-locking Nut Nonmetallic Insert performance - ;astm-d4066, Group 01, Class 1, Grade 1; attribute - Certificate Of Compliance item - Self-locking Nuts performance - This Certificate Must State That Self-locking Nuts Were Manufactured By An Approved Source. Approved Sources Are Those Listed On Qpl-25027 For The Appropriate Fastener. This Qpl May Also Be Considered As Approved Sources For Heavy Hex self-locking Nuts. 3.4 Specification Change - For Qq-n-281, Class B Material: 1 - Footnote 9 To Table Ii Of Qq-n-281 Does Not Apply. 2 - When Starting Material Is Round Bar Greater Than 3" Dia, The Mechanical Properties Of Hex Bar Apply. 3.5 Confidential Hydrostatic Test Pressures - When Test Pressures Are Confidential, Certification Must Reference ;drawing 830-6404016 Rev B; And The Item Number To Which The Item Was Tested In Lieu Of The Actual Pressures. Any Drawing Requirement To Mark the Working Pressure On The Item Does Not Apply And Is Strictly Prohibited. 3.6 The Pressure Tolerance Must Be As Specified In The Assembly Drawing, Detail Drawing, Design Specification Or Elsewhere In This Contract. Where Pressure Tolerances Are Not Provided By Drawings, Specifications Or Specified Elsewhere In This Contract, The following Must Be Used: For Pressure Tests Below 100 Psig, The Pressure Tolerance Must Be +1 Psig / -0 Psig. For Pressure Tests At Or Above 100 Psig Up To And Including 2500 Psig, The Pressure Tolerance Must Be +2% / -0 Psig Rounded Off To The Nearest Multiple Of The Smallest Graduation On An Analog Test Pressure Gauge, Not To Exceed 50 Psig. For Pressure Tests Above 2500 Psig, The Pressure Tolerance Must Be +2% / -0 Psig, Rounded Off To The Nearest Multiple Of The Smallest Graduation On An Analog Test Pressure Gauge, Not To Exceed 200 Psig. the Pressure Test Time Tolerance Must Be As Specified In The Assembly Drawing, Detail Drawing, Design Specification Or Elsewhere In This Contract. Where Pressure Test Time Tolerances Are Not Provided By Drawings, Specifications Or Specified Elsewhere In This contract, The Following Must Be Used: For A Test Duration Up To And Including 1 Hour, The Tolerance Must Be +5 Minutes / - 0 Minutes. For A Test Duration Of More Than 1 Hour Up To And Including 24 Hours, The Tolerance Must Be +30 Minutes / - 0 Minutes. For A Test Duration Of More Than 24 Hours, The Tolerance Must Be +60 Minutes / - 0 Minutes. 3.7 Slow Strain Rate Tensile Test Laboratories - The Slow Strain Rate Tensile Test Of Qq-n-286 Must Be Performed By One Of The Following Laboratories: huntington Alloys, A Special Metals Company attn: Bill Bolenr 3200 Riverside Drive huntington, Wv 257059 phone: (304) 526-5889 fax: (304) 526-5973 metallurgical Consultants, Inc. attn: W. M. Buehler 4820 Caroline po Box 88046 houston, Tx 77288-0046 phone: (713) 526-6351 fax: (713) 526-2964 naval Surface Warfare Center, Carderock Division attn: Eric Focht Code 614 9500 Macarthur Blvd west Bethesda, Md 20817-5700 phone: (301) 227-5032 fax: (301) 227-5576 teledyne Allvac attn: Dr. W. D. Cao 2020 Ashcraft Ave. monroe, Nc 28110 phone: (704) 289-4511 fax: (704) 289-4269 westmoreland Mechanical Testing And Research Inc. attn: Andrew Wisniewski p.o. Box 388 youngstown, Pa 15696-0388 mannesmann Rohrenwerke mannesmann Forschungsinstitut (mfi) attn: Dr. Weiss postfach 251160 47251 Duisburg germany phone: 011-49-0203-9993194 fax: 011-49-0203-9994415 thyssenkrupp Vdm Usa, Inc. attn: D. C. Agarwal 11210 Steeplecrest Drive, Suite 120 houston, Tx 77065-4939 phone: (281) 955-6683 3.8 Internal Threads - All Internal Threads Must Be Formed By Cutting. Cold Forming Of Internal Threads Is Not Acceptable. 3.9 Thread Forming - The Following Provides The Official Interpretation Of Paragraph 4.5.2.7 Of Mil-dtl-1222. 3.9.1 In Order To Qualify For "alternate Mechanical Testing" Found In Mil-dtl-1222j Paragraph 4.5.2.7 And Utilize The Mechanical Properties For The Starting Bar Stock In Lieu Of Performing Yield Strength Or Proof Stress Testing On Finished Fasteners, All Of the Subsequent Provisions Found In Mil-dtl-1222j Paragraphs 4.5.2.7 A Through E Must Be Met. If Any Single Provision Is Not Met, All Required Mechanical Testing Must Be Performed On The Finished Full Sized Fasteners. These Provisions Are Explained As Follows: a. Proper Product Lot Control And Traceability Must Be In Place. b. No Heat Treatment (including Hot Heading And Hot Forming), Cold Forming, Drawing, Rolling And Thread Rolling May Be Performed On The Starting Bar, Fastener Blanks Or Finished Fasteners After The Completion Of The Mechanical Testing On The Starting Bar. c. And D. The Proper Size Starting Bar Must Be Selected To Ensure Mechanical Properties Of Finished Fasteners Are Represented By The Mechanical Properties Of The Starting Bar. e. The Mandatory Testing, Axial Tensile (studs) And Wedge Tensile (screws And Bolts) Must Be Performed On Full Sized Fasteners. Note That There Is A Typographical Error In Paragraph 4.5.2.7 And That The Axial Load Test Is A Mandatory Test That Must Be performed On Studs As Required In Paragraph 4.5.2.7.e. 3.9.2 Thread Rolling Is A Cold Working Process And Is Not Considered To Be A Machining Or Grinding Operation. Therefore, Fasteners Which Have Rolled Threads Do Not Satisfy The Provisions Of Mil-dtl-1222j Paragraph 4.5.2.7.b And Are Not Eligible For The "alternate Mechanical Testing" Provision. 3.9.3 Thread Rolling Alone Is Not A Sufficient Cold Working Process To Qualify A Fastener To Be In The Cold Worked (cw) Condition. This Condition Is Only Applicable To Some 300 Series Stainless Steel Studs, Screws And Nuts. These Cw Condition Fasteners Must be Manufactured From Cold Worked Bar Stock Or Be Cold Headed In Order To Qualify. The Threads May Subsequently Be Rolled, Machined Or Ground. Testing Of The Finished Fasteners And/or Reporting Of The Starting Bar Stock Material Properties Is Subject To The same Provisions Found In Mil-dtl-1222j Paragraph 4.5.2.7 And Discussed Above. 3.10 Thread Inspection Requirements - All Threads On Threaded Parts Must Be Inspected Using Appropriate Inspection Methods, Inspection Systems, And Inspection Gages/instruments In Accordance With Fed-std-h28 Series. Substitution Of Thecommercial Equivalent inspection In Accordance With Asme B1 Series Is Acceptable. 3.10.1 System 21 Of Fed-std-h28/20 Must Be Used As A Minimum Inspection Requirement For Threads When The Design Drawing Or Design Specification Does Not Specify An Inspection Requirement. 3.10.2 For Navy And Shipyard Drawings, System 21 Of Fed-std-h28/20 May Be Substituted For System 22 Without Further Navy Approval When The Design Drawing Invokes System 22 And Does Not Cite Governing Specifications That Specifically Require System 22. System 22 Of Fed-std-h28/20 Must Be Used When The Drawing References Other Governing Specifications That Specifically Require System 22, Such As Certain Thread Types Of Mil-dtl-1222. 3.10.3 A Written Request For Concurrence Must Be Submitted When Utilizing Alternative Measuring Equipment Or Measuring Systems Not Applicable To The Specified Inspection System. 3.11 Thread Lubricant - Thread Lubricants Containing Molybdenum Disulfide Must Not Be Used On This Material. Bacteria In Water, Especially Seawater, Causes Molybdenum Disulfide To Break Down. The By-products Of The Breakdown Form Compounds Which Attack The fasteners. Anti-galling Compound A-a-59004 Must Be Used As A Replacement When Thread Lubricant Is Required For Assembly. 3.12 A Visual Inspection Shall Be Performed On The Finished Seat With Acceptance Criteria On Critical Surfaces Per Csd167 In The Ecds (electronic Contractor Data Submission) System At: Https://register.nslc.navy.mil/. 3.13 Seat Stack Height Measurement - To Ensure That Each Seat Is Within Tolerance, Check Each Seat Singularly By Measuring The Seat Height Over The Ball. This Measurement Is Calculated By Adding One-half Ball Diameter To The Half Stack Height Dimension On the Drawing. Limits Are Determined By The Ball Diameter Tolerance And The Half Stack Height Tolerance. Check Dimensions By Measuring From The Seat Back Face To Top Of Ball. Manufacturers Of Seats That Do Not Have A Ball Of The Required Size Available Will Be required To Manufacture A Dummy Ball Or Segment Of A Ball With Sufficient Spherical Surface To Check The Above Dimension. 3.14 Ball Spherical Surface Waviness - Unless Otherwise Specified On Drawing, All Sealing Area Surfaces Must Have A Spherical Surface Waviness Which Does Not Exceed 0.0005 Inches Of Height Per Inch Of Spherical Surface. Roughness And Waviness Ratings Must apply In A Direction Which Yields The Maximum Rating, Normally Perpendicular To The Lay. 3.15 ;surface Waviness Must Be Verified Prior To Teflon Coating.; 3.16 Chemours Company (formerly Dupont) Teflon Coating 850g-204 And 852g-201. Use Of Chemours Company (formerly Dupont) Teflon Coating 851n-204 And 852n-201 Is Acceptable Until Exhausted - Teflon Coating Of Ball(s) Must Be In Accordance With General Note ;4. f.; Of Drawing ;803-4384678; . 3.16.1 Naval Ordnance Systems Command Od 10362 First Revision Dated 15 Aug 1961 Is Provided By Contract Support Library Reference Number Csd018 In Ecds At Https://register.nslc.navy.mil/ 3.16.2 Csd099 Provides Guidance For Acceptance/rejection Of Teflon-coated Valve Balls After Valve Assembly Production Testing. 3.17 Contract Support Library - Additional Requirements For This Item Are Identified As Contract Support Library Reference Number ;csd099; In Ecds At Https://register.nslc.navy.mil/ 3.18 Component Identification Description (cid) - When Applicable Drawing(s) And/or Specification(s) Specify That A Nameplate Or Identification Plate Is Required, The Cid Number ( ;cid 887306327; ) Must Be Added. When No Plate Is Specified, An Identification plate In Accordance With Mil-dtl-15024, Type "c" On Brass Or Type "h" On Aluminum Must Be Securely Attached To Each Assembly Showing The Above Cid Number. No Assembly Must Be Shipped Without The Cid Number Attached. 3.19 Welding Or Brazing - When Welding, Brazing, And Allied Processes Are Required, As Invoked By Section C Paragraph 3 Requirements, They Must Be In Accordance With S9074-ar-gib-010a/278, 0900-lp-001-7000 For Brazing Of Piping And Pressure Vessel applications, Or S9074-aq-gib-010/248 For Brazing Of Other Applications. For All Production And Repair Welding And Brazing, Personnel And Procedures Must Be Qualified Under S9074-aq-gib-010/248 Or 0900-lp-001-7000, As Applicable. Repair Welding Is Not permitted On ;qq-n-286 Material; . Procedures And Qualification Data Must Be Submitted For Review And Approval Prior To Performing Any Welding Or Brazing. 3.20 Configuration Control - The Contractor Must Maintain The Total Equipment Baseline Configuration. For Items Of Proprietary Design, Contractor Drawings Showing The Latest Assembly Configuration Must Be Provided To The Government In Electronic (c4) Format. definitions Are Provided Elsewhere In The Contract/purchase Order. 3.20.1 Waivers/deviations - All Waivers And Deviations, Regardless Of Significance Or Classification Require Review And Approval By The Contracting Officer. Waivers And Deviations Must Be Designated As Critical, Major, Or Minor. The Contractor Must Provide a Copy Of This Request To The Qar. Requests Must Include The Information Listed Below. A. A Complete Description Of The Contract Requirement Affected And The Nature Of The Waiver/deviation (non-conformance), Including A Classification Of Critical, Major, Or Minor. B. Number Of Units (and Serial/lot Numbers) To Be Delivered In This Configuration. C. Any Impacts To Logistics Support Elements (such As Software, Manuals, Spares, Tools, And Similar) Being Utilized By Government Personnel Or Impacts To The Operational Use Of The Product. D. Information About Remedial Action Being Taken To Prevent Reoccurrence Of The Non-conformance. 3.20.2 All Requests For Waivers/deviations On Navsup-wss Contracts Must Be Submitted To The Navsup Wss Contracting Specialist Via Email. 3.20.3 Ecps - The Government Will Maintain Configuration Control And Change Authority For All Modifications Or Changes Affecting Form, Fit, Function, Or Interface Parameters Of The Equipment And Its Sub-assemblies. The Contractor Must Submit An Engineering change Proposal (ecp) For Any Class I Or Ii Changes That Impact The Equipment Covered By This Contract. Ecps Must Be Prepared In Contractor Format, And Must Include The Following Information: A. The Change Priority, Change Classification (class I Or Class Ii), And Change Justification. B. A Complete Description Of The Change To Be Made And The Need For That Change. C. A Complete Listing Of Other Configuration Items Impacted By The Proposed Change And A Description Of The Impact On Those Cis. D. Proposed Changes To Documents Controlled By The Government. E. Proposed Serial/lot Number Effectivities Of Units To Be Produced In, Or Retrofitted To, The Proposed Configuration. F. Recommendations About The Way A Retrofit Should Be Accomplished. G. Impacts To Any Logistics Support Elements (such As Software, Manuals, Spares, Tools, And Similar) Being Utilized By Government Personnel In Support Of The Product. H. Impacts To The Operational Use Of The Product. I. Complete Estimated Life-cycle Cost Impact Of The Proposed Change. J. Milestones Relating To The Processing And Implementation Of The Engineering Change. 3.21 Certificate Of Compliance - (special Emphasis Material) The Contractor Must Prepare And Submit A Certificate Of Compliance Certifying That The Items/components Furnished Under This Contract Comply With The Requirements Of The Procurement Document, including Any/all Invoked Specifications And Drawings. 3.22 Mercury Free - Mercury And Mercury Containing Compounds Must Not Be Intentionally Added Or Come In Direct Contact With Hardware Or Supplies Furnished Under This Contract. Mercury Contamination Of The Material Will Be Cause For Rejection. 3.23 Navsea 0948-lp-045-7010 - Any Applicable Requirements Of Navships 4410.17,navsea 0948-lp-045-7010, Or 0948-045-7010 Which The Contractor Must Meet Are Included In This Contract/purchase Order. The Above Documents Are For Governmentuse Only. Further application Of The Above Documents Is Prohibited.prohibited. 3.23.1 Marking Of Material With A Material Designator Per The Drawing Is Also Prohibited, With The Exception Of Fasteners. Fasteners Must Be Marked With A Material Symbol/designator As Specified Elsewhere In This Contract. ^ Quality Assurance Requirements ^ 3.24 See Cdrl Di-misc-80678 (test Certification) - A Statement Of Tests Performed, Listing The Pieces Tested Must Be Furnished Along With A Copy Of The Test Results. Certification Must Include The Contractor's Name, Address And Date, Quantity Inspected, identified To The Contract/purchase Order And Item Number, And The Contractor's Or Authorized Personnel's Signature. Test Certifications Must Reference The Standard/specification, Including The Revision, To Which The Testing Was Performed And The Acceptance criteria Used. Test Procedure Numbers May Also Be Referenced On Test Reports. Test Reports On Weldments Must Be Identified To Weld Joint And Layer. 3.25 See Cdrls Di-misc-80875 (welding Procedures) And Di-misc-80876 (weld Procedure Qualification Data) - When Production Or Repair Welding Is Required, The Applicable Welding Procedure(s) And Qualification Data Must Be Submitted For Review And Approval. In addition, The Consumed Weld Metal C Of C As Defined Below Must Be Submitted As Part Of The Certification Oqe Package Submitted By The Contractor. note: These Requirements Do Not Apply To Tack/spot Welds When The Conditions Of Section 4.2.1.1 Of S9074-ar-gib-010a/278 Are Met. 3.25.1 Approval Of The Contractor's Qualification Data Must Be Obtained Prior To Performing Any Welding (production Or Repair). 3.25.2 If The Contractors Qualification Data Has Previously Been Approved By The Navy For Other Contracts, A Copy Of The Original Approval Letter May Be Submitted Along With The Procedures And Qualification Data Report To Expedite The Approval Process. The approval Letter Must Reference The Applicable Welding Procedure And Qualification Data Report Identification/number. Prior Approval Does Not Guarantee Acceptance For This Or Any Future Contracts. As Far As Practical, All Procedures For The Contract Must Be submitted At The Same Time. Welding Procedures And Qualification Data Must Be Submitted In A Commercially Available Electronic Format Such As Adobe Acrobat Pdf. The Contractor Must State The Applicability Of Each Weld Procedure And Qualification Data Submitted, citing The Drawing Number And Pieces To Be Welded. (i.e. "wp-123 And Qd-123 Are Submitted For The Weld Joint Between Pieces 1 And 2 On Drawing Abc." Wp-456 And Qd-456 Are Submitted For The Hardfacing Of Piece 3 On Drawing Xyz.") 3.25.3 The Pco's Authorization For The Use Of Weld Procedure(s) And Qualification Data For The Specific Application As Submitted Does Not Mitigate The Vendors Responsibility To Comply With The Requirements Of S9074-aq-gib-010/248, S9074-ar-gib-010a/278, And the Contract. 3.25.4 Authority For The Repair Of Special Repairs In Castings, The Repair Of Wrought Material, Or The Repair Of Forged Material Must Be Obtained Via Request For Waiver From The Procurement Contracting Officer. This Request Must Describe The Defect; Including size, Depth, Location, And A Description Of The Proposed Repair. Repairs Deemed Minor Or Nominal In Accordance With S9074-ar-gib-010/278 Can Be Made At Contractor Discretion In Accordance With S9074-ar-gib-010/278 Requirements; However, Weld Procedure specification (wps) And Procedure Qualification Record (pqr) Submittals Are Still Required. This Request For Navsup-wss Contracts Must Be Submitted Via The Electronic Contractor Data Submission (ecds) Application. 3.25.5 Any New Procedure Qualification Performed Under This Contract Will Require The Vendor To Provide A Minimum 72 Hour Notification To Dcma With An Offer To Observe The Welding Of The Test Assemblies. The 72 Hour Time Limit May Be Modified Upon Mutual agreement Between The Vendor And Dcma. 3.25.6 When Drawings Require Hardfacing Surface Iron Or Nickel Content Not To Exceed 5%, The Contractor Must Verify Surface Iron Or Nickel Content By Performing Chemical Testing As Defined By The Applicable Drawing. The Chemical Test Results Must Be Submitted as Part Of The Qualification Data. 3.25.7 Additional Qualification Requirements For Production Hardfacing Thickness Less Than 1/8-inch: Macro-etch (or Legible Photomacrographs Clearly Showing The Fusion Area) Must Be Submitted For Review And Show Consistent, Minimized Dilution. All Essential elements And Any Elements Not Listed In S9074-aq-gib-010/248 That Influence Dilution Must Be In The Qualification Data And Weld Procedure, With Strict Limits Placed On Each Essential Element. 3.25.8 Preparation And Retention Of Weld Records Is Required, As Specified By Paragraph 4.1.3 Of S9074-ar-gib-010a/278. 3.25.9 When Production Or Repair Welding Is Required On Titanium Materials, The Applicable Fabrication Plan, Facilities Procedure, Training Plan, And Active Welder Qualification Must Also Be Submitted For Review And Approval. 3.25.10 If The Contractor's Fabrication Plan, Facilities Procedure, Training Plan, Or Active Welder Qualification Has Previously Been Approved By The Navy For Other Contracts, A Copy Of The Original Approval Letter May Be Submitted Along With The Applicable documentation To Expedite The Approval Process. The Approval Letter Must Reference The Applicable Documentation. Prior Approval Does Not Guarantee Acceptance For This Or Any Future Contracts. The Contractor's Fabrication Plan, Facilities Procedure, Training plan, And Active Welder Qualification Must Be Submitted At The Same Time As The Applicable Welding Procedure(s) And Weld Procedure Qualification Data. All Documentation Must Be Submitted In A Commercially Available Electronic Format, Such As Adobe Acrobat Pdf. 3.25.11 See Cdrl Di-misc-80678 (consumed Weld Metal) - A Certificate Of Compliance Is Required For All Weld Filler Metals Used For Production Or Repair Welding, And Must Include The Following: a) Filler Metal Lot Number(s) b) Specification And Type c) A Positive Statement That The Vendor Has Obtained Oqe And Verified That Each Lot Of Weld Filler Material Conforms To Specification Requirements. d) A Positive Statement Verifying That The Weld Filler Metals Were The Correct Material Type Or Grade Prior To Consumption. 3.25.12 When Production Welds Or Repair Welds Are Performed By A Subcontractor,the Requirement For Submission Of All Certification Documentation Required Herein Must Be Passed Down To The Subcontractor. 3.26 Quality System Requirements - The Contractor Furnishing Items Under This Contract/purchase Order Must Provide And Maintain A Quality System In Accordance With Iso-9001 As Amplified Or Modified Herein, With The Calibration System Requirements Of Iso-10012 or Ansi-z540.3 With Iso-17025. A Quality System In Accordance With Mil-i-45208, With The Calibration System Requirements Of Mil-std-45662, Is Acceptable As An Alternate. 3.26.1 The Contractor's Quality System And Products Supplied Under The System Are Subject To Evaluation, Verification Inspection, And Acceptance/non-acceptance By The Government Representative To Determine The System's Effectiveness In Meeting The Quality requirements Established In The Contract/purchase Order. 3.26.2 The Contractor's Quality System Must Be Documented And Must Be Available For Review By The Contracting Officer Or His Representative Prior To Initiation Of Production And Throughout The Life Of The Contract. The Prime Contractor Must, Upon notification, Make His Facilities Available For Audit By The Contracting Officer Or His Authorized Representative. 3.26.3 See Cdrl Di-qcic-81110 (inspection System Procedures) - All Suppliers Of Level I/subsafe (li/ss) Material Are Required To Submit A Copy Of Their Current Documented Quality System Procedures To The Procurement Contracting Officer (pco) Prior To Award Of any Contract/purchase Order. Suppliers That Have A Copy Of Their Current Quality System Procedures On File At The Procuring Activity May Request The Pco Waive This Requirement. 3.26.4 This Contract Provides For The Performance Of Government Quality Assurance At Source. The Place Or Places Of Performance May Not Be Changed Without The Authorization Of The Procurement Contracting Officer. Upon Receipt Of This Order, Promptly notify The Government Representative Who Normally Services Your Plant So That Appropriate Planning For Government Inspection Can Be Accomplished. If You Do Not Have An Assigned Government Representative, Notify The Nearest Defense Contract Management Agency (dcma) Office. In The Event That A Local Government Representative Or Dcma Office Cannot Be Located, Our Purchasing Agent Should Be Notified Immediately. 3.26.5 Any Changes Made By The Contractor To A Qualified Quality System Will Require Re-submittal To The Pco And Concurrence By The Government Quality Assurance Representative Prior To Adoption. 3.27 Contractor Inspection Requirements - The Contractor Must Maintain Adequate Records Of All Inspections And Tests. The Records Must Indicate The Nature And Number Of Observations Made, The Number And Type Of Deficiencies Found, The Quantities Approved And rejected And The Nature Of Corrective Action Taken As Appropriate. Inspection Records Must Be Traceable To The Material Inspected. 3.27.1 The Supplier's Gages, Measuring And Test Equipment Must Be Made Available For Use By The Government Representative When Required To Determine Conformance With Contract Requirements. When Conditions Warrant, The Supplier's Personnel Must Be Made available For Operations Of Such Devices and For Verification Of Their Accuracy And Condition. 3.27.2 All Documents And Reference Data Applicable To This Contract Must Be Available For Review By The Government Representative. Copies Of Documents Required For Government Inspection Purposes Must Be Furnished In Accordance With The Instructions Provided by The Government Representative. 3.28 Subcontractor Inspection Requirements - The Government Has The Right To Inspect At Source, Any Supplies Or Services That Were Not Manufactured Or Performed Within The Contractor's Facility. Such Inspection Can Only Be Requested By Or Under Authorization of The Government Representative. Any Purchasing Documents To A Subcontractor Must Cite The Applicable Portions Of The Contractually Invoked Quality System (e.g. Calibration Requirements), Plus Any Product Requirements That Apply To The Supplies Being purchased. When The Government Elects To Perform Source Inspection At The Subcontractor's Facility, Applicable Purchase Documents Must Be Annotated With The Following Statement: "a Government Inspection Is Required Prior To Shipment From Your Plant. Upon receipt Of This Order, Promptly Notify The Government Representative Who Normally Services Your Plant So That Appropriate Planning For Government Inspection Can Be Accomplished. If You Do Not Have An Assigned Government Representative, Notify The Nearest defense Contract Management Agency (dcma) Office. In The Event That A Local Government Representative Or Dcma Office Cannot Be Located, Our Purchasing Agent Should Be Notified Immediately." 3.29 The Prime Contractor's Program Must Include Procedures To Assess The Capability Of The Prospective Suppliers To Produce The Products Or Supply The Services In Accordance With The Contract, Prior To The Issuance Of Any Purchase Document. 3.29.1 Each Sub-tier Supplier Of Material Or Services For Items In Section 3 Of This Contract Must Be Subjected To A Periodic Review Or Audit By The Prime To Determine The Continued Capability Of The Supplier To Control The Quality Of The Products Or Services specified In The Purchase Order Or Contract. 3.29.2 The Prime Contractor Must Ensure That The Purchased Product Conforms To Specified Purchase Requirements And This Contract. The Type And Extent Of Control Applied To The Supplier And The Purchased Product Must Be Dependent Upon The Effect Of The purchased Product On The End Item Represented By This Contract. 3.29.3 The Prime Contractor Must Evaluate The Requirements Of The Contract And Select Suppliers Based On Their Ability To Supply The Product In Accordance With The Prime Contractor's Requirements And The Contract. Criteria For Selection And Evaluation Must be Established. Records Of This Effort Must Be Available For Review By The Government. 3.29.4 The Prime Contractor's Supplier Quality Assurance Program Must Provide For A Review Of Purchase Documents To Assure Applicable Quality Requirements Are Included Or Referenced In The Documentation For Compliance By The Supplier. 3.30 Government Furnished Material And/or Equipment (gfm/gfe) - When Material Or Equipment Is Furnished By The Government, The Contractor Must Develop Documented Control Procedures That Require At Least The Following: 3.30.1 Visual Examination Upon Receipt To Detect Damage During Transit. 3.30.2 Inspection For Completeness And Proper Type. 3.30.3 Verification Of Material Quality Received. 3.30.4 Periodic Inspection And Precautions To Assure Adequate Storage Conditions And To Guard Against Damage From Handling And Deterioration During Storage. 3.30.5 Functional Testing, Either Prior To Or After Installation, Or Both, As Required By The Contract To Determine Satisfactory Operation. 3.30.6 Identification And Protection From Improper Use Or Disposition. 3.30.7 Reporting To The Government, Any Gfm Or Gfe Property Found Damaged, Malfunctioning, Or Otherwise Unsuitable For Use. In The Event Of Damage Or Malfunction During Or After Installation, The Supplier Must Determine And Record Probable Cause And necessity For Withholding The Material From Use. 3.30.8 For Gfe Material, And As Required By The Terms Of The Bailment Agreement, The Supplier Must Establish Procedures For Adequate Storage, Maintenance, And Inspection Of Bailed Government Material. Records Of All Inspection And Maintenance Performed On bailed Property Must Be Maintained. 3.30.9 Material Returned To The Contractor Must Be Handled As Gfm. 3.31 Traceability And Certification Requirements - To Assure That Correct Materials Are Installed In Level I/subsafe Systems, It Is Imperative That Traceability Be Maintained From The Material To The Material Certification Test Report And Other Required objective Quality Evidence (oqe). The Material Certification Report Must Completely And Accurately Reflect That The Material Supplied Meets The Specified Requirements. Materials Requiring Traceability And Certification Data Are Identified Within Paragraph 3, section C Of This Contract/purchase Order. 3.31.1 The Following Provides The Minimum Requirements For Maintaining Material Traceability And Supplements The Requirements Specified In Di-misc-81020 And Elsewhere In The Contract/purchase Order. The Contractor Must Develop Written Procedures That implement The Material Control Requirements Stated Herein. 3.32 Material Traceability - The Certification Data Report Must Be Identified Through A Unique Traceability Number, Heat-lot Number, Or Heat-treat Number For Metallic Material Or Batch Of Non-metallic Material, As Applicable, Which Must Also Be Marked On The material. This Traceability Marking On The Material Must Provide Direct Traceability To The Material's Chemical Composition And Mechanical Properties Certification Data. For Material Produced By Batch, Continuous Cast, Or Continuous Pour Processes, Samples must Be Taken No Less Than Once In Every Eight Hours Of Operation For The Purpose Of Validating Proper Chemical Composition And Mechanical Properties. Traceability Must Be Maintained Through All Process Operations Including Any Subcontracted Operations, To The finished Component. 3.32.1 Material Marking For Traceability And Identification - The Following Are The Minimum Marking Requirements. Additional/alternate Marking Requirements, If Applicable, Will Be Specified Elsewhere In The Contract/purchase Order. In Addition To The marking Requirements On Applicable Drawings And/or Specifications, Marking For Traceability Is Required. All Traceability Markings Must Be Permanently Applied In Accordance With Mil-std-792 (except As Specified Below). An Alternate Marking Method Is permissible Provided It Is An Available Option In The Contractually Invoked Specification Or Drawing, Except In Instances Where The Material Has Been Modified By This Contract/purchase Order And Differs From That Specified In The Specification Or Drawing. 3.32.2 Traceability Markings For Items With Precision Machined Or Plated Surfaces, Or Material With Suitable Marking Surface Areas Less Than 3/8 Inches Square (either 3/8" X 3/8" Or An Area Equal To 0.1406 Inches Square) Must Be Applied To A Durable Tag And the Tag Securely Affixed To The Material. 3.32.3 Permanent Marking Must Be Legible And Must Be Located So As To Not Affect The Form, Fit, And Function Of The Material. ;marking Area To Be As Shown On The Drawing. Ball Is To Be Marked In The Waterway And Seats Are To Be Marked On The Outer cylindrical Surface.; 3.32.4 Seat Marking - Each Seat Must Be Permanently Marked In Accordance With Mil-std-792, Type I And As Stated Below, Except For Teflon Seats, Which Must Only Be Tagged. Type Ix Marking May Be Substituted For Type I, Provided The Minimum Character Size scribed By The Marking Tool Must Be Approximately 3/32 Inch High To Insure Legibility. Permanent Marking Is Not Permitted On Teflon Seats. seat Marking Requirements Must Maintain Complete Traceability To Certification Oqe. Seat Marking Must Be Either Heat/lot Or Batch Number, A Vendor Traceability Number/code, Or A Combination Thereof And Must Be Unique To The Material Certification. 3.32.5 Traceability Markings Must Be Maintained Through Assembly, And Whenever Possible Must Be Visible After Assembly. For Items Where The Marking Is Not Visible After Assembly, A Durable Tag Must Be Securely Attached To The Item Identifying The Part number, Piece Number, Traceability Number, And The Location Of The Permanent Mark. 3.33 See Cdrl-di-misc-81020 (chemical And Mechanical) And Cdrl Di-misc-80678 (seat Material) - Material Certifications - The Following Material Certification Requirements Apply: 3.33.1 Metallic Material - Quantitative Chemical And Mechanical Analysis Of Material Traceable To Traceability Markings Is Required. Material Certification Test Reports Must Include The Class, Form, Condition, Grade, Type, Finish, And/or Composition, As applicable, Of The Material Supplied. 3.33.2 Non-metallic Material - The Contractor Must Furnish The Applicable Test Reports For Each Heat/lot/batch Of Seat Material. Material Certification Test Reports Must Include, In Addition To The Specification, The Class, Form, Grade, Type, Process, And/or composition, As Applicable, Of The Material Supplied. 3.33.3 Re-identification And Re-certification Of Metallic Material Is Required When The Material Is Subjected To A Process Which Alters Its Properties. If The Starting Material Or Raw Stock Is Processed In A Manner That Will Not Affect Its Chemical composition Or Mechanical Properties, The Original Certifications For The Chemical Composition And Mechanical Properties, As Required By The Material Specification, Are Acceptable. Re-certification Of The Chemical Or Mechanical Properties Is Required If A process Is Used During Fabrication That Alters The Original Properties Of The Material (e.g. Alloying, Heat Treating, Or Forming). In These Instances, The Properties Of The Material Must Be Re-determined And Documented To Reflect The Altered Condition. The altered Material Must Be Uniquely Re-identified. The Properties Thus Determined And Documented, Are Required For Final Certification And Must Conform To The Material Specification Or The Contract/purchase Order Requirements. When Only The Mechanical Properties are Altered, The Original Certification Forchemical Composition Must Be Overstamped And Annotated With The Unique Traceability Marking Used With The Altered Material And At A Minimum Contain The Information Below. traceability Marking________________________________________________ (marking On Finished Item) is Fabricated From Raw Material Identified To heat/lot Number _______________ And Heat Treat Number ______________________ (when Applicable) _________________________________________ Date _____________________ (name And Signature Of Auth. Co. Rep.) 3.33.4 Material Certification Data Forwarded By The Manufacturer Must Contain A Signed Certification That The Report Results Represent The Actual Attributes Of The Material Furnished And Indicate Full Compliance With All Applicable Specification And Contract requirements. Transcription Of Certification Data Is Prohibited. 3.33.5 Statements On Material Certification Documents Must Be Positive And Unqualified. Disclaimers Such As "to The Best Of Our Knowledge" Or "we Believe The Information Contained Herein Is True" Are Not Acceptable. 3.33.6 If Material Is Received Without The Required Certification Papers Or With Incorrect/missing Data On The Certification Papers, The Material Will Be Rejected. 3.34 Material Handling - The Written Material Control Process Must Include The Following: 3.34.1 All Raw Materials Must Have Traceability Markings (except As Specified Below). 3.34.2 Stored Raw Materials Requiring Traceability Must Be Segregated To Preclude Intermingling With Materials Not Requiring Traceability. 3.34.3 When Traceability Markings Will Be Removed By A Manufacturing Or Fabrication Process, The Marking Must Be Recorded Prior To Removal And Be Immediately Restored Upon Completion Of The Process. If This Cannot Be Done Or Is Impractical, An Appropriate material Control Procedure (such As A Bag And Tag, Tagging, And/or Tote Box Control) Must Be Employed. The Material Control Procedure Must Provide A Method Of Positive Control To Preclude Commingling Of Heats/lots Or Loss Of Traceability. The Traceability marking Must Be Reapplied Upon Completion Of The Final Manufacturing Process. 3.34.4 Brazing Or Weld Filler Metals For Strength Welds Forming Or Integral With Pressure Containing Components Or Assemblies Requiring Traceability Must Be Verified To Be The Correct Material, And Type Or Grade, As Applicable, Prior To Consumption. At A minimum, Material Verification Must Consist Of Inspection Of Material Test Reports For Conformance To Specified Requirements. Control Of Welding And Brazing Filler Metals Must Be Maintained To The Point Of Consumption To Assure Use Of The Correct Type And grade. Markings And Traceability Requirements Do Not Apply To Brazing And Weld Filler Metals After Consumption. It Is The Responsibility Of The Prime Contractor To Ensure Conformance With The Above Requirements On Welds Performed By Their Subcontractors. 3.34.5 Purchase Orders For Raw Material Must Specify That The Material Be Traceable To Material Certification Test Reports By Traceability Markings On The Material And Identified On The Test Reports. The Certification Data Requirements Contained In di-misc-81020 Must Be Invoked By The Prime Contractor On All Subcontractors Supplying Level I Material. 3.34.6 The Material Control Process Must Include Requirements For The Maintenance Of Traceability For Items Sent Out For Subcontracted Operations. If Such Operations Would Remove Traceability Markings, Purchase Or Work Orders Must Specify A Method And marking Location For Remarking. The Contractor Must Also Ensure That Subcontractor Production Controls Are Adequate To Preclude Commingling Of Materials During Processing. 3.35 Receiving Inspection 3.35.1 Products And Services Produced By Sub-tier Suppliers For Incorporation In The Contract End Item Must Be Subject To Inspection Or Audit At The Time Of Receipt By The Prime Prior To Further Processing Within The Prime Contractor's Plant Or Shipment To another Location. 3.35.2 Receiving Inspection Must Include As A Minimum - verification That The Traceability Marking On The Material Agrees With That On The Certification Test Reports. verification That Certification Test Reports Are Legible And Complete. verification That The Contents Of The Certification Test Reports Are In Compliance With The Contractually Invoked Specifications And Requirements. 3.36 Discrepancy Reporting 3.36.1 Nonconforming Products Must Be Identified And Processed In Accordance With The Prime Contractor's Procedures For Controlling Nonconforming Products. The Prime Contractor Must Report The Receipt Of Any Nonconforming Products To The Responsible Sub-tier supplier In Accordance With Established Procedures. Nonconforming Material Records Will Be Maintained And Available For Review By The Government Quality Assurance Representative (qar). 3.37 Final Inspection - The Following Inspections Must Be Performed Prior To Government Inspection And Acceptance. 3.37.1 Material Sampling - Material Must Be Inspected For Form, Fit, And Function. Lot Acceptance Must Be Based On Zero Defects And Lot Rejection Based On One Defect. The Sample Size Must Be In Accordance With The Sampling Plan(s) In The Applicable Military specification Or Standard, Federal Specification Or Standard, Or Drawing To Which The Material Was Manufactured. In The Absence Of Such Sampling Plans, Sampling Inspection Must Be Per Ansi/asq-z1.4, General Inspection Level Ii (for Sample Size Selection Code), table Iia (for Sample Size). small Lot Sizes - For Lot Sizes Of Fifty Or Less, The Minimum Sample Size Must Be Eight Units. For Lot Sizes Of Eight Or Less, The Sample Size Must Be One Hundred Percent Of The Lot. 3.37.2 The Manufacturer May Elect To Use Statistical Process Control (spc) To Assure Product Quality In Lieu Of The Above Attribute Sampling Plan, Provided That The Spc Methodology/system Used Provides Acceptable Products To The Government. However, The government/navy Receipt Inspection Activity May Perform Their Acceptance Inspection Of The Material Using The Attribute Sampling Plan Outlined Above. 3.37.3 All Data Concerning Material Verification (chemical, Mechanical Or Physical Properties), Traceability (material Certifications To Material Marking), And Nondestructive Test (ndt) Certifications For Material Must Be 100% Inspected. The Certification test Reports Must Also Be 100% Inspected For Completeness And Legibility. 3.37.4 All Material Requiring Traceability Must Be 100% Inspected For Traceability Marking And That The Marking Is Legible. 3.37.5 Sampling For Certification Of Non-metallic Material Must Be On The Basis Of One Set Of Test Specimens From Each Heat/lot Or Batch. 3.38 Additional Marking For Fasteners - Fasteners Must Be Marked In Accordance With ;mil-dtl-1222, Except The Self-locking Hex Nuts Must Be Marked In Accordance With Nasm 17828. Nasm 17828 Nuts Must Be Marked On The Wrenching Surface With The Manufacturer's identification Symbol, Material Symbol And Heat/lot Traceability Code; . The Method Of Marking Must Be Types I, Ii, Iii, V, Viii Or Ix Of Mil-std-792 Except For Grades 410, 416 And 431 In The H Condition And Grades 8, 630, A574, And 4340 Which Must Be Marked by Method Ii When Marking Is Applied After The Final Heat Treatment. Markings On Fasteners That Are To Be Coated Must Be Marked Prior To Coating And Have A Minimum Depth Of 4 Mils. Traceability Marking Must Be Legible After The Application Of Protective compounds. 3.38.1 Marking Is Required For All Fasteners Regardless Of Size And Must Include The Material Symbol, The Manufacturer's I
Closing Date23 Sep 2024
Tender AmountRefer Documents 

DEPT OF THE NAVY USA Tender

Machinery and Tools
United States
Description: Contact Information|4|n743.49|wvg|7176052147|benjamin.t.spangler.civ@us.navy.mil| item Unique Identification And Valuation (jan 2023)|19|||||||||||||||||||| higher-level Contract Quality Requirement (navicp Review Feb 1991)(feb 1999)|1|see Specification Sections C And E.| inspection Of Supplies--fixed-price (aug 1996)|2||| general Information-fob-destination|1|b| wide Area Workflow Payment Instructions (jan 2023)|16|stand-alone Receiving Report - Certifications Combo - Receiving Report & Invoice - Material |n/a|tbd|n00104|tbd|n39040 - Certifications, S4306a - Material |n50286|tbd|133.2|n/a|n/a|n39040 - Certifications|n/a| n/a |see Dd Form 1423 |port_ptnh_wawf_notification@navy.mil Benjamin.t.spangler.civ@us.navy.mil| navy Use Of Abilityone Support Contractor - Release Of Offeror Information (3-18))|1|| equal Opportunity (sep 2016)|2||| warranty Of Supplies Of A Noncomplex Nature (june 2003)|6|one Year From Date Of Delivery.|one Year From Date Of Delivery.||||| warranty Of Data--basic (mar 2014)|2||| buy American-free Trade Agreements-balance Of Payments Program-basic (feb 2024)|11|||||||||||| notice Of Total Small Business Set-aside (oct 2020)(deviation 2020-o0008)|1|| alternate A, Annual Representations And Certifications (nov 2023)|13|||||||||||||| buy American-free Trade Agreements-balance Of Payments Program Certificate-basic (feb 2024))|5|||||| buy American-balance Of Payments Program Certificate-basic (feb 2024)|1|| annual Representations And Certifications (may 2024)|13|333613|750|||||||||||| notice Of Priority Rating For National Defense, Emergency Perpardeness, And Enrgy Progam Use (april 2008))|2||x| 1.dd1423 Data Item A001 (inspection And Test Plan) May Be Waived If Already On File At Navsup Wss Mechanicsburg. 2. Portsmouth Nsy's Dodaac Has Changed From N00102 To N50286. Any Reference Ton00102 Within This Order Should Be Updated To N50286. 3. The Following Proposed Delivery Schedule Applies: submission Of Certification Data Cdrls Will Be On Or Before 20 Days Prior To Scheduled Delivery. production Radiography (pr) 135 Days After Approval Of Rss Approval Of Pr30 Days After Receipt weld Procedure And Qual Data 120 Days Adc Approval Of Weld Procedures And Qual Data 60 Days After Receipt Pnsy Review/acceptance Of Certification Cdrls 6 Working Days After Receipt Of Certification Dd 1423 Cdrls. Final Delivery Of Material Will Be On Or Before 638 Days After Effective Date Of The Resulting Contract. 4. Any Contract Awarded As A Result Of This Solicitation Will Be "do" Rated Order; "do" Rated Order Certified For National Defense Use Under The Defense Priorities And Allocations System (dpas). 5. Navsup Wss Mechanicsburg Will Be Considering Past Performance In The Evaluation Of Offers In Accordance With Far 13.106(a)(2) And Dfars 252.213-7000. 6. If Drawings Are Included In The Solicitation, Access Needs To Be Requested On The Individual Solicitation Page On Contracts Opportunities On The Government's Beta.sam Website. After Requesting Access, Send An Email To The Primary Poc Listed On The Solicitation. 7. This Order Is Issued Pursuant To Emergency Acquisition Flexibilities (eaf). 8. This Requirement Requires Access To Classified Drawings. These Drawings Are Not Required To Submit A Quote, However, In The Event Of An Award, A Facility Clearance May Be Required In Accordance With Far 52.204-2. \ 1. Scope 1.1 The Material Covered In This Contract/purchase Order Will Be Used In A Crucial Shipboard System. The Use Of Incorrect Or Defective Material Would Create A High Probability Of Failure Resulting In Serious Personnel Injury, Loss Of Life, Loss Of Vital shipboard Systems, Or Loss Of The Ship Itself. Therefore, The Material Has Been Designated As Special Emphasis Material (level I, Scope Of Certification, Or Quality Assured) And Special Control Procedures Are Invoked To Ensure Receipt Of Correct Material. 2. Applicable Documents 2.1 Order Of Precedence - In The Event Of A Conflict Between The Text Of This Contract/purchase Order And The References And/or Drawings Cited Herein, The Text Of This Contract/purchase Order Must Take Precedence. Nothing In This Contract/purchase Order, however, Must Supersede Applicable Laws And Regulations Unless A Specific Exemption Has Been Obtained. 2.2 Identification Of Classified Documents - This Contract/purchase Order Requires The Contractor To Have Authorized Access To Classified Documents In Accordance With The Attached Contract Security Classification Specification (dd Form 254). The Classified Documents And Security Level Are: ;803-6404016 Confidential; 2.3 Applicable Documents - The Document(s) Listed Below Form A Part Of This Contract/purchase Order Including Modifications Or Exclusions. 2.3.1 Specification Revisions - The Specification Revisions Listed Under "documents References" Below Are The Preferred Revision. Older And/or Newer R Evisions Are Acceptable When Listed Within Contract Support Library Reference Number Csd155 In Ecds (electric contractor Data Submission) At: Ht Tps://register.nslc.navy.mil/. This Is To Allow Contractors To Use Certain Acceptable Older Specification Revisions To Purge Their Existing Stock Of Material Certified To Those Older Revisions Or To Use Newer Specification revisions When Material Is Certified To Newly Released Revisions,without Requiring The Submittal Of Waiver/deviation Requests For Each Specification Revision On Every Contract. Revisions Of Specifications Reflecting Editorial And/or Re-approval (e.g. E2009, r2014, Etc.) Are Considered Inconsequential, But Are Acceptable When Their Revisions Are Listedwithin Csd155 Or Elsewhere Within This Contract. 2.3.2 Documents, Drawings, And Publications Supplied Are Listed Under "drawing Number". These Items Should Be Retained Until An Award Is Made. 2.3.3 "document References" Listed Below Must Be Obtained By The Contractor. Ordering Information Is Included As An Attachment To This Contract/purchase Order. drawing Data=erb553-1003-mf03450 |96169| A| |d|0001 | A|49998|0032647 drawing Data=erb553-1003-mf03450 |96169| A| |d|0001.a | A|49998|0041250 drawing Data=erb553-1003-mf03450 |96169| A| |d|0002 | A|49998|0018549 drawing Data=erb553-1003-mf03450 |96169| A| |d|0003 | A|49998|0020330 drawing Data=erb553-1003-mf03450 |96169| A| |d|0004 | A|49998|0034988 drawing Data=erb553-1003-mf03450 |96169| A| |d|0004.a | A|49998|0014187 drawing Data=erb553-1003-mf03450 |96169| A| |d|0005 | A|49998|0053007 drawing Data=erb553-1003-mf03450 |96169| A| |d|0006 | A|49998|0042477 drawing Data=erb553-1003-mf03450 |96169| A| |d|0007 | A|49998|0036752 drawing Data=erb553-1003-mf03450 |96169| A| |d|0008 | A|49998|0052601 drawing Data=erb553-1003-mf03450 |96169| A| |d|0009 | A|49998|0038926 drawing Data=erb553-1003-mf03450 |96169| A| |d|0010 | A|49998|0038916 drawing Data=erb553-1003-mf03450 |96169| A| |d|0011 | A|49998|0049740 drawing Data=erb553-1003-mf03450 |96169| A| |d|0012 | A|49998|0032950 drawing Data=erb553-1003-mf03450 |96169| A| |d|0013 | A|49998|0027549 drawing Data=erb553-1003-mf03450 |96169| A| |d|0014 | A|49998|0044189 drawing Data=erb553-1003-mf03450 |96169| A| |d|0015 | A|49998|0005209 drawing Data=erb553-1003-mf03450 |96169| A| |d|0016 | A|49998|0011895 drawing Data=erb553-1003-mf03450 |96169| A| |d|0017 | A|49998|0008180 drawing Data=erb553-1003-mf03450 |96169| A| |d|0018 | A|49998|0018601 drawing Data=erb553-2200-mf00140 |96169| A| |d|0001 | A|49998|0056831 drawing Data=erb553-2200-mf00140 |96169| A| |d|0002 | A|49998|0036178 drawing Data=erb553-2200-mf00140 |96169| A| |d|0003 | A|49998|0067084 drawing Data=erb553-2200-mf00140 |96169| A| |d|0004 | A|49998|0020551 drawing Data=erb553-2200-mf00140 |96169| A| |d|0005 | A|49998|0041619 drawing Data=erb553-2200-mf00140 |96169| A| |d|0006 | A|49998|0036523 drawing Data=erb553-2200-mf00140 |96169| A| |d|0007 | A|49998|0039219 drawing Data=erb553-2200-mf00140 |96169| A| |d|0008 | A|49998|0037181 drawing Data=erb553-2200-mf00140 |96169| A| |d|0009 | A|49998|0017405 drawing Data=erb553-2200-mf00181 |96169| A| |d|0001 | A|49998|0050954 drawing Data=erb553-2200-mf00181 |96169| A| |d|0002 | A|49998|0026818 drawing Data=erb553-2200-mf00181 |96169| A| |d|0003 | A|49998|0070451 drawing Data=erb553-2200-mf00181 |96169| A| |d|0004 | A|49998|0037409 drawing Data=erb553-2200-mf00181 |96169| A| |d|0005 | A|49998|0024070 drawing Data=erb553-2200-mf00181 |96169| A| |d|0006 | A|49998|0027789 drawing Data=erb553-2200-mf00181 |96169| A| |d|0007 | A|49998|0055237 drawing Data=erb553-2200-mf00181 |96169| A| |d|0008 | A|49998|0040651 drawing Data=erb553-2200-mf00181 |96169| A| |d|0009 | A|49998|0041691 drawing Data=erb553-2200-mf00181 |96169| A| |d|0010 | A|49998|0039731 drawing Data=erb553-2200-mf00181 |96169| A| |d|0011 | A|49998|0039657 drawing Data=erb553-2200-mf00181 |96169| A| |d|0012 | A|49998|0033413 drawing Data=erb553-2200-mf00181 |96169| A| |d|0013 | A|49998|0007370 drawing Data=erb553-2200-mf00181 |96169| A| |d|0014 | A|49998|0019031 drawing Data=erb553-2200-mf00181 |96169| A| |d|0015 | A|49998|0014926 drawing Data=erb553-2200-mf01530 |96169| A| |d|0001 | A|49998|0033997 drawing Data=erb553-2200-mf01530 |96169| A| |d|0001.a | A|49998|0045157 drawing Data=erb553-2200-mf01530 |96169| A| |d|0002 | A|49998|0021918 drawing Data=erb553-2200-mf01530 |96169| A| |d|0003 | A|49998|0023584 drawing Data=erb553-2200-mf01530 |96169| A| |d|0004 | A|49998|0020593 drawing Data=erb553-2200-mf01530 |96169| A| |d|0005 | A|49998|0045293 drawing Data=erb553-2200-mf01530 |96169| A| |d|0006 | A|49998|0042351 drawing Data=erb553-2200-mf01530 |96169| A| |d|0007 | A|49998|0035542 drawing Data=erb553-2200-mf01530 |96169| A| |d|0008 | A|49998|0016157 drawing Data=erb553-2200-mf03425 |96169| A| |d|0001 | A|49998|0031704 drawing Data=erb553-2200-mf03425 |96169| A| |d|0001.a | A|49998|0043765 drawing Data=erb553-2200-mf03425 |96169| A| |d|0002 | A|49998|0016566 drawing Data=erb553-2200-mf03425 |96169| A| |d|0003 | A|49998|0020977 drawing Data=erb553-2200-mf03425 |96169| A| |d|0004 | A|49998|0015831 drawing Data=erb553-2200-mf03425 |96169| A| |d|0004.a | A|49998|0011033 drawing Data=erb553-2200-mf03425 |96169| A| |d|0005 | A|49998|0069238 drawing Data=erb553-2200-mf03425 |96169| A| |d|0006 | A|49998|0015814 drawing Data=erb553-2200-3g00008 |96169| A| |d|0001 | A|49998|0029799 drawing Data=erb553-2200-3g00008 |96169| A| |d|0002 | A|49998|0030924 drawing Data=erb553-2200-3g00008 |96169| A| |d|0003 | A|49998|0007940 drawing Data=erb553-2200-3g00008 |96169| A| |d|0004 | A|49998|0015367 drawing Data=erb553-2200-3g00008 |96169| A| |d|0005 | A|49998|0013292 drawing Data=mf04590 |53711| A|er |d|0001 | A|49998|0329046 drawing Data=5959311 |53711| C| |d|0001 | C|00026|0000000 drawing Data=5959311c5 |53711| A|er |d|0001 | A|49998|0674623 drawing Data=6404016 |53711| B| |f|0001 | B|00026|0000000 drawing Data=6405227 |53711| B| |d|0001 | B|49998|0157242 drawing Data=6405227 |53711| B| |d|0002 | B|49998|0082937 drawing Data=6405227 |53711| B| |d|0002.a | B|49998|0065719 drawing Data=6405227 |53711| B| |d|0003 | B|49998|0091771 drawing Data=6405227 |53711| B| |d|0004 | B|49998|0096949 drawing Data=6405227 |53711| B| |d|0005 | B|49998|0089577 drawing Data=7409397 |03538| C| |d|0001 | C|49998|0062373 document Ref Data=ansi/asq Z1.4 | | | |080101|a| | | document Ref Data=astm-b150 | | | |190401|a| | | document Ref Data=qq-n-281 | | |d |851023|a|2 | | document Ref Data=qq-n-286 | | |g |001207|a| | | document Ref Data=mil-std-792 | | |f |060519|a| | | document Ref Data=mil-dtl-1222 | | |j |001208|a| | | document Ref Data=mil-t-1368 | | |c |001212|a|4 | | document Ref Data=astm-e1417 | | | |160615|a| | | document Ref Data=astm-e1444 | | | |160601|a| | | document Ref Data=mil-std-2035 | | |a |950515|a| | | document Ref Data=mil-std-2132 | | |d |080310|f| |01| document Ref Data=astm-d4066 | | | |130701|a| | | document Ref Data=iso_9001 | | | |081115|a| | | document Ref Data=iso10012 | | | |030415|a| | | document Ref Data=mil-t-16420 | | |k |880916|a|1 | | document Ref Data=iso/iec 17025 | | | |050515|a| | | document Ref Data=qpl 25027 | | |17 |000207|a| | | document Ref Data=mil-i-45208 | | |a |810724|a|1 | | document Ref Data=mil-std-45662 | | |a |880801|a| | | document Ref Data=ansi/ncsl Z540.3 | | | |130326|a| | | document Ref Data=0900-lp-001-7000 | | | |810101|c| |01| document Ref Data=aia/nas Nasm 25027 | | |1 |121221|a| | | document Ref Data=s9074-aq-gib-010/248 | | |1 |191112|a| | | document Ref Data=t9074-as-gib-010/271 | | |1 |140911|a| | | document Ref Data=s9074-ar-gib-010a/278 (chg A) | | | |130214|a| | | 3. Requirements 3.1 ;the Ball Joint Must Be In Accordance With Navsea Drawing 596-7409397 Assembly B And Navsea Drawing 801-6405227 Assembly 91 Less Find Nos. 16, 19, And 31, Along With All Engineering Reports Provided, Except As Amplified Or Modified Herein.; 3.2 Material For Parts Requiring Certification - Quantitative Chemical And Mechanical Analysis Is Required For The Parts Listed Below Unless Specifically Stated Otherwise: part - ;retainer, Part Number 2; Ball, Part Number 3; Flange, Part Number 6; And Upper Body, Part Number 9 Of Drawing 7409397; material - ;qq-n-281 Class A Form 2 Condition Forged Htnsl (sr); part - ;grease Valve Body, Part Number 4 Of Drawing 7409397; material - ;qq-n-281 Class A Form 1 Cold Drawn (sr); part - ;flange, Part Number 11 Of Drawing 7409397; material - ;qq-n-281 Class A; part - ;tube, Part Number 10 Of Drawing 7409397; material - ;mil-t-1368 Class A; part - ;stud, Part Number 20 Of Drawing 7409397; material - ;qq-n-286 Cold Drawn, Annealed, And Age Hardened Or Hot Finished, Annealed And Age Hardened.; ;note: Reference To Note 47 On Drawing Must Be Disregarded For Stud, Part Number 20.; part - ;self-locking Hex Nut, Part Number 21 Of Drawing 7409397; material - Qq-n-281, Class A Annealed (hot Finished Or Cold Drawn) Or Class B Cold Drawn. all Material Must Be From The Same Class. self-locking Element- Astm-d4066, Group 01, Class 1, Grade 1 part - ;tubing, Part Number 7 Of Drawing 7409397; material - ;mil-t-16420 Comp 70/30 Cl-1650 Ty-i Gr-2; part - ;needle Valve, Find No. 30 Of Drawing 6405227; material - ;astm-b150 Alloy C63200; 3.3 Testing Certification - Certifications Are Required For The Following Tests On The Items Listed Below. Additional Testing On Other Piece Parts (if Any) Per Applicable Drawings Is Still Required, But Certifications Are Only Required As Listed Below. attribute - Certificate Of Compliance For Seamless Tubing/pipe item - ;tubing, Part Number 7 And Tube, Part Number 10 Of Drawing 7409397; performance - Material Supplied Must Be In The Seamless Condition. test - ;5x Visual Magnification Inspection (root Layer); item - ;joint Numbers J2033, J2034, J2035, And J2038; performance - ;t9074-as-gib-010/271; acceptance - ;mil-std-2035; test - ;visual And Dye Penetrant Inspection (final Layer); item - ;joint Numbers J2032, J2033, J2034, J2035, And J2038; performance - ;t9074-as-gib-010/271; acceptance - ;mil-std-2035; test - Non-destructive Tests item - ;weld Repair (as Applicable); performance - Per Applicable Fabrication Specification acceptance - Per Applicable Fabrication Specification test - ;hydrostatic Testing; item - ;each Assembly; performance - ;note 7018 Of Drawing 7409397; acceptance - ;note 7018 Of Drawing 7409397; test - ;dye Penetrant Inspection For Non-magnetic Grades; item - ;self-locking Hex Nut; performance - T9074-as-gib-010/271 Or Astm-e1417/astm-e1444 (method C Solvent Removal Techniques Must Not Be Used On Thread) acceptance - ;nasm25027; test - Quality Conformance Tests item - Self-locking Nuts performance - ;nasm25027; acceptance - ;nasm25027; attribute - Certificate Of Completion item - Self-locking Nut Nonmetallic Insert performance - ;astm-d4066, Group 01, Class 1, Grade 1; attribute - Certificate Of Compliance item - Self-locking Nuts performance - This Certificate Must State That Self-locking Nuts Were Manufactured By An Approved Source. Approved Sources Are Those Listed On Qpl-25027 For The Appropriate Fastener. This Qpl May Also Be Considered As Approved Sources For Heavy Hex self-locking Nuts. attribute - Annealing And Age Hardening item - ;stud; performance - Qq-n-286 test - Ultrasonic Inspection On Starting Material item - ;all Items Requiring Certification Made From Qq-n-286 With A Diameter Or Minimum Distance Between Parallel Surfaces Of 4 Inches Or Greater Of The Starting Material, Or When Required By A Drawing Or Specification Invoked Elsewhere In This Contract; performance - T9074-as-gib-010/271 Or Mil-std-2132, And Qq-n-286 acceptance - Qq-n-286 3.4 The Pressure Tolerance Must Be As Specified In The Assembly Drawing, Detail Drawing, Design Specification Or Elsewhere In This Contract. Where Pressure Tolerances Are Not Provided By Drawings, Specifications Or Specified Elsewhere In This Contract, The following Must Be Used: For Pressure Tests Below 100 Psig, The Pressure Tolerance Must Be +1 Psig / -0 Psig. For Pressure Tests At Or Above 100 Psig Up To And Including 2500 Psig, The Pressure Tolerance Must Be +2% / -0 Psig Rounded Off To The Nearest Multiple Of The Smallest Graduation On An Analog Test Pressure Gauge, Not To Exceed 50 Psig. For Pressure Tests Above 2500 Psig, The Pressure Tolerance Must Be +2% / -0 Psig, Rounded Off To The Nearest Multiple Of The Smallest Graduation On An Analog Test Pressure Gauge, Not To Exceed 200 Psig. the Pressure Test Time Tolerance Must Be As Specified In The Assembly Drawing, Detail Drawing, Design Specification Or Elsewhere In This Contract. Where Pressure Test Time Tolerances Are Not Provided By Drawings, Specifications Or Specified Elsewhere In This contract, The Following Must Be Used: For A Test Duration Up To And Including 1 Hour, The Tolerance Must Be +5 Minutes / - 0 Minutes. For A Test Duration Of More Than 1 Hour Up To And Including 24 Hours, The Tolerance Must Be +30 Minutes / - 0 Minutes. For A Test Duration Of More Than 24 Hours, The Tolerance Must Be +60 Minutes / - 0 Minutes. 3.5 Confidential Hydrostatic Test Pressures - When Test Pressures Are Confidential, Certification Must Reference ;803-6404016 Rev. B; And The Item Number To Which The Item Was Tested In Lieu Of The Actual Pressures. Any Drawing Requirement To Mark The working Pressure On The Item Does Not Apply And Is Strictly Prohibited. 3.6 Chemours Company (formerly Dupont) Teflon Coating 850g-204 And 852g-201. Use Of Chemours Company (formerly Dupont) Teflon Coating 851n-204 And 852n-201 Is Acceptable Until Exhausted - Teflon Coating Of Ball(s) Must Be In Accordance With General Note ;2. C.; of Drawing ;803-5959311; . 3.6.1 Naval Ordnance Systems Command Od 10362 First Revision Dated 15 Aug 1961 Is Provided By Contract Support Library Reference Number Csd018 In Ecds At Https://register.nslc.navy.mil/ 3.6.2 Csd099 Provides Guidance For Acceptance/rejection Of Teflon-coated Valve Balls After Valve Assembly Production Testing. 3.7 Ball Spherical Surface Waviness - Unless Otherwise Specified On Drawing, All Sealing Area Surfaces Must Have A Spherical Surface Waviness Which Does Not Exceed 0.0005 Inches Of Height Per Inch Of Spherical Surface. Roughness And Waviness Ratings Must apply In A Direction Which Yields The Maximum Rating, Normally Perpendicular To The Lay. 3.8 ;surface Waviness Must Be Verified Prior To Teflon Coating.; 3.9 Radiography Is Required On ;joint Number J2032 And Must Be Identified To The Weld Joint; . 3.10 Slow Strain Rate Tensile Test Laboratories - The Slow Strain Rate Tensile Test Of Qq-n-286 Must Be Performed By One Of The Following Laboratories: huntington Alloys, A Special Metals Company attn: Bill Bolenr 3200 Riverside Drive huntington, Wv 257059 phone: (304) 526-5889 fax: (304) 526-5973 metallurgical Consultants, Inc. attn: W. M. Buehler 4820 Caroline po Box 88046 houston, Tx 77288-0046 phone: (713) 526-6351 fax: (713) 526-2964 naval Surface Warfare Center, Carderock Division attn: Eric Focht Code 614 9500 Macarthur Blvd west Bethesda, Md 20817-5700 phone: (301) 227-5032 fax: (301) 227-5576 teledyne Allvac attn: Dr. W. D. Cao 2020 Ashcraft Ave. monroe, Nc 28110 phone: (704) 289-4511 fax: (704) 289-4269 westmoreland Mechanical Testing And Research Inc. attn: Andrew Wisniewski p.o. Box 388 youngstown, Pa 15696-0388 mannesmann Rohrenwerke mannesmann Forschungsinstitut (mfi) attn: Dr. Weiss postfach 251160 47251 Duisburg germany phone: 011-49-0203-9993194 fax: 011-49-0203-9994415 thyssenkrupp Vdm Usa, Inc. attn: D. C. Agarwal 11210 Steeplecrest Drive, Suite 120 houston, Tx 77065-4939 phone: (281) 955-6683 3.11 O-ring Grooves And Mating Sealing Surfaces Must Be Inspected Per The Contractually Invoked Drawings Or Specifications. When The Drawings Or Specifications Do Not Provide Specific Defect Criteria Or State That No Defects Are Allowed, The General acceptance Criteria (gac) Standard Must Be Used For Inspecting O-ring Grooves And Mating Sealing Surfaces Only. Repairs To Sealing Surfaces And O-ring Grooves With Unacceptable Defects May Be Accomplished Within The Limits Of The Size And Tolerances Provided in The Applicable Drawing. Repairs Thatwould Exceed These Limits Require Approval (including Final Dimensions). The Data That Is Red Lined (crossed Out) Is Excluded From The Gac For This Contract And Is Not To Be Used For Acceptance Or Rejection Criteria. the Gac Document Is Identified As Contract Support Library Reference Number Csd008 At Https://register.nslc.navy.mil/ 3.12 Welding Or Brazing - When Welding, Brazing, And Allied Processes Are Required, As Invoked By Section C Paragraph 3 Requirements, They Must Be In Accordance With S9074-ar-gib-010a/278, 0900-lp-001-7000 For Brazing Of Piping And Pressure Vessel applications, Or S9074-aq-gib-010/248 For Brazing Of Other Applications. For All Production And Repair Welding And Brazing, Personnel And Procedures Must Be Qualified Under S9074-aq-gib-010/248 Or 0900-lp-001-7000, As Applicable. Repair Welding Is Not permitted On ;qq-n-286; . Procedures And Qualification Data Must Be Submitted For Review And Approval Prior To Performing Any Welding Or Brazing. 3.13 Certificate Of Compliance - (special Emphasis Material) The Contractor Must Prepare And Submit A Certificate Of Compliance Certifying That The Items/components Furnished Under This Contract Comply With The Requirements Of The Procurement Document, including Any/all Invoked Specifications And Drawings. 3.14 Configuration Control - The Contractor Must Maintain The Total Equipment Baseline Configuration. For Items Of Proprietary Design, Contractor Drawings Showing The Latest Assembly Configuration Must Be Provided To The Government In Electronic (c4) Format. definitions Are Provided Elsewhere In The Contract/purchase Order. 3.14.1 Waivers/deviations - All Waivers And Deviations, Regardless Of Significance Or Classification Require Review And Approval By The Contracting Officer. Waivers And Deviations Must Be Designated As Critical, Major, Or Minor. The Contractor Must Provide a Copy Of This Request To The Qar. Requests Must Include The Information Listed Below. A. A Complete Description Of The Contract Requirement Affected And The Nature Of The Waiver/deviation (non-conformance), Including A Classification Of Critical, Major, Or Minor. B. Number Of Units (and Serial/lot Numbers) To Be Delivered In This Configuration. C. Any Impacts To Logistics Support Elements (such As Software, Manuals, Spares, Tools, And Similar) Being Utilized By Government Personnel Or Impacts To The Operational Use Of The Product. D. Information About Remedial Action Being Taken To Prevent Reoccurrence Of The Non-conformance. 3.14.2 All Requests For Waivers/deviations On Navsup-wss Contracts Must Be Submitted To The Navsup Wss Contracting Specialist Via Email. 3.14.3 Ecps - The Government Will Maintain Configuration Control And Change Authority For All Modifications Or Changes Affecting Form, Fit, Function, Or Interface Parameters Of The Equipment And Its Sub-assemblies. The Contractor Must Submit An Engineering change Proposal (ecp) For Any Class I Or Ii Changes That Impact The Equipment Covered By This Contract. Ecps Must Be Prepared In Contractor Format, And Must Include The Following Information: A. The Change Priority, Change Classification (class I Or Class Ii), And Change Justification. B. A Complete Description Of The Change To Be Made And The Need For That Change. C. A Complete Listing Of Other Configuration Items Impacted By The Proposed Change And A Description Of The Impact On Those Cis. D. Proposed Changes To Documents Controlled By The Government. E. Proposed Serial/lot Number Effectivities Of Units To Be Produced In, Or Retrofitted To, The Proposed Configuration. F. Recommendations About The Way A Retrofit Should Be Accomplished. G. Impacts To Any Logistics Support Elements (such As Software, Manuals, Spares, Tools, And Similar) Being Utilized By Government Personnel In Support Of The Product. H. Impacts To The Operational Use Of The Product. I. Complete Estimated Life-cycle Cost Impact Of The Proposed Change. J. Milestones Relating To The Processing And Implementation Of The Engineering Change. 3.15 Mercury Free - Mercury And Mercury Containing Compounds Must Not Be Intentionally Added Or Come In Direct Contact With Hardware Or Supplies Furnished Under This Contract. Mercury Contamination Of The Material Will Be Cause For Rejection. 3.16 Navsea 0948-lp-045-7010 - Any Applicable Requirements Of Navships 4410.17,navsea 0948-lp-045-7010, Or 0948-045-7010 Which The Contractor Must Meet Are Included In This Contract/purchase Order. The Above Documents Are For Governmentuse Only. Further application Of The Above Documents Is Prohibited.prohibited. 3.16.1 Marking Of Material With A Material Designator Per The Drawing Is Also Prohibited, With The Exception Of Fasteners. Fasteners Must Be Marked With A Material Symbol/designator As Specified Elsewhere In This Contract. ^ Quality Assurance Requirements ^ 3.17 See Cdrl Di-misc-80678 (test Certification) - A Statement Of Tests Performed, Listing The Pieces Tested Must Be Furnished Along With A Copy Of The Test Results. Certification Must Include The Contractor's Name, Address And Date, Quantity Inspected, identified To The Contract/purchase Order And Item Number, And The Contractor's Or Authorized Personnel's Signature. Test Certifications Must Reference The Standard/specification, Including The Revision, To Which The Testing Was Performed And The Acceptance criteria Used. Test Procedure Numbers May Also Be Referenced On Test Reports. Test Reports On Weldments Must Be Identified To Weld Joint And Layer. 3.18 Quality System Requirements - The Contractor Furnishing Items Under This Contract/purchase Order Must Provide And Maintain A Quality System In Accordance With Iso-9001 As Amplified Or Modified Herein, With The Calibration System Requirements Of Iso-10012 or Ansi-z540.3 With Iso-17025. A Quality System In Accordance With Mil-i-45208, With The Calibration System Requirements Of Mil-std-45662, Is Acceptable As An Alternate. 3.18.1 The Contractor's Quality System And Products Supplied Under The System Are Subject To Evaluation, Verification Inspection, And Acceptance/nonacceptance By The Government Representative To Determine The System's Effectiveness In Meeting The Quality requirements Established In The Contract/purchase Order. 3.18.2 The Contractor's Quality System Must Be Documented And Must Be Available For Review By The Contracting Officer Or His Representative Prior To Initiation Of Production And Throughout The Life Of The Contract. The Prime Contractor Must, Upon notification, Make His Facilities Available For Audit By The Contracting Officer Or His Authorized Representative. 3.18.3 See Cdrl Di-qcic-81110 (inspection System Procedures) - All Suppliers Of Level I/subsafe (li/ss) Material Are Required To Submit A Copy Of Their Current Documented Quality System Procedures To The Procurement Contracting Officer (pco) Prior To Award Of any Contract/purchase Order. Suppliers That Have A Copy Of Their Current Quality System Procedures On File At The Procuring Activity May Request The Pco Waive This Requirement. 3.18.4 This Contract Provides For The Performance Of Government Quality Assurance At Source. The Place Or Places Of Performance May Not Be Changed Without The Authorization Of The Procurement Contracting Officer. Upon Receipt Of This Order, Promptly notify The Government Representative Who Normally Services Your Plant So That Appropriate Planning For Government Inspection Can Be Accomplished. If You Do Not Have An Assigned Government Representative, Notify The Nearest Defense Contract Management Agency (dcma) Office. In The Event That A Local Government Representative Or Dcma Office Cannot Be Located, Our Purchasing Agent Should Be Notified Immediately. 3.18.5 Any Changes Made By The Contractor To A Qualified Quality System Will Require Re-submittal To The Pco And Concurrence By The Government Quality Assurance Representative Prior To Adoption. 3.19 Contractor Inspection Requirements - The Contractor Must Maintain Adequate Records Of All Inspections And Tests. The Records Must Indicate The Nature And Number Of Observations Made, The Number And Type Of Deficiencies Found, The Quantities Approved And rejected And The Nature Of Corrective Action Taken As Appropriate. Inspection Records Must Be Traceable To The Material Inspected. 3.19.1 The Supplier's Gages, Measuring And Test Equipment Must Be Made Available For Use By The Government Representative When Required To Determine Conformance With Contract Requirements. When Conditions Warrant, The Supplier's Personnel Must Be Made available For Operations Of Such Devices And For Verification Of Their Accuracy And Condition. 3.19.2 All Documents And Reference Data Applicable To This Contract Must Be Available For Review By The Government Representative. Copies Of Documents Required For Government Inspection Purposes Must Be Furnished In Accordance With The Instructions Provided by The Government Representative. 3.20 Subcontractor Inspection Requirements - The Government Has The Right To Inspect At Source, Any Supplies Or Services That Were Not Manufactured Or Performed Within The Contractor's Facility. Such Inspection Can Only Be Requested By Or Under Authorization of The Government Representative. Any Purchasing Documents To A Subcontractor Must Cite The Applicable Portions Of The Contractually Invoked Quality System (e.g. Calibration Requirements), Plus Any Product Requirements That Apply To The Supplies Being purchased. When The Government Elects To Perform Source Inspection At The Subcontractor's Facility, Applicable Purchase Documents Must Be Annotated With The Following Statement: "a Government Inspection Is Required Prior To Shipment From Your Plant. Upon receipt Of This Order, Promptly Notify The Government Representative Who Normally Services Your Plant So That Appropriate Planning For Government Inspection Can Be Accomplished. If You Do Not Have An Assigned Government Representative, Notify The Nearest defense Contract Management Agency (dcma) Office. In The Event That A Local Government Representative Or Dcma Office Cannot Be Located, Our Purchasing Agent Should Be Notified Immediately." 3.20.1 The Prime Contractor's Program Must Include Procedures To Assess The Capability Of The Prospective Suppliers To Produce The Products Or Supply The Services In Accordance With The Contract, Prior To The Issuance Of Any Purchase Document. 3.20.2 Each Sub-tier Supplier Of Material Or Services For Items In Section 3 Of This Contract Must Be Subjected To A Periodic Review Or Audit By The Prime To Determine The Continued Capability Of The Supplier To Control The Quality Of The Products Or Services specified In The Purchase Order Or Contract. 3.20.3 The Prime Contractor Must Ensure That The Purchased Product Conformsto Specified Purchase Requirements And This Contract. The Type And Extent Of Control Applied To The Supplier And The Purchased Product Must Be Dependent Upon The Effect Of The purchased Product On The End Item Represented By This Contract. 3.20.4 The Prime Contractor Must Evaluate The Requirements Of The Contractand Select Suppliers Based On Their Ability To Supply The Product In Accordance With The Prime Contractor's Requirements And The Contract. Criteria For Selection And Evaluation Must Be established. Records Of This Effort Must Be Available For Review By The Government. 3.20.5 The Prime Contractor's Supplier Quality Assurance Program Must Provide For A Review Of Purchase Documents To Assure Applicable Quality Requirements Are Included Or Referenced In The Documentation For Compliance By The Supplier. 3.21 Government Furnished Material And/or Equipment (gfm/gfe) - When Material Or Equipment Is Furnished By The Government, The Contractor Must Develop Documented Control Procedures That Require At Least The Following: 3.21.1 Visual Examination Upon Receipt To Detect Damage During Transit. 3.21.2 Inspection For Completeness And Proper Type. 3.21.3 Verification Of Material Quality Received. 3.21.4 Periodic Inspection And Precautions To Assure Adequate Storage Conditions And To Guard Against Damage From Handling And Deterioration During Storage. 3.21.5 Functional Testing, Either Prior To Or After Installation, Or Both, As Required By The Contract To Determine Satisfactory Operation. 3.21.6 Identification And Protection From Improper Use Or Disposition. 3.21.7 Reporting To The Government, Any Gfm Or Gfe Property Found Damaged, Malfunctioning, Or Otherwise Unsuitable For Use. In The Event Of Damage Or Malfunction During Or After Installation, The Supplier Must Determine And Record Probable Cause And necessity For Withholding The Material From Use. 3.21.8 For Gfe Material, And As Required By The Terms Of The Bailment Agreement, The Supplier Must Establish Procedures For Adequate Storage, Maintenance, And Inspection Of Bailed Government Material. Records Of All Inspection And Maintenance Performed On bailed Property Must Be Maintained. 3.21.9 Material Returned To The Contractor Must Be Handled As Gfm. 3.22 Traceability And Certification Requirements - To Assure That Correct Materials Are Installed In Level I/subsafe Systems, It Is Imperative That Traceability Be Maintained From The Material To The Material Certification Test Report And Other Required objective Quality Evidence (oqe). The Material Certification Report Must Completely And Accurately Reflect That The Material Supplied Meets The Specified Requirements. Materials Requiring Traceability And Certification Data Are Identified Within Paragraph 3, section C Of This Contract/purchase Order. 3.22.1 The Following Provides The Minimum Requirements For Maintaining Material Traceability And Supplements The Requirements Specified In Di-misc-81020 And Elsewhere In The Contract/purchase Order. The Contractor Must Develop Written Procedures That implement The Material Control Requirements Stated Herein And Elsewhere In This Contract/purchase Order. 3.23 Material Traceability - The Certification Data Report Must Be Identified Through A Unique Traceability Number, Heat-lot Number, Or Heat-treat Number, As Applicable, Which Must Also Be Marked On The Material. This Traceability Marking On The Material Must provide Direct Traceability To The Material's Chemical Composition And Mechanical Properties Certification Data. For Material Produced By Batch, Continuous Cast, Or Continuous Pour Processes, Samples Must Be Taken No Less Than Once In Every Eight Hours Of operation For The Purpose Of Validating Proper Chemical Composition And Mechanical Properties. Traceability Must Be Maintained Through All Process Operations Including Any Subcontracted Operations, To The Finished Component. 3.23.1 Material Marking For Traceability And Identification - The Following Are The Minimum Marking Requirements. Additional/alternate Marking Requirements, If Applicable, Will Be Specified Elsewhere In The Contract/purchase Order. In Addition To The marking Requirements On Applicable Drawings And/or Specifications, Marking For Traceability Is Required. All Traceability Markings Must Be Permanently Applied In Accordance With Mil-std-792 (except As Specified Below). An Alternate Marking Method Is permissible Provided It Is An Available Option In The Contractually Invoked Specification Or Drawing, Except In Instances Where The Material Has Been Modified By This Contract/purchase Order And Differs From That Specified In The Specification Or Drawing. 3.23.2 Traceability Markings For Items With Precision Machined Or Plated Surfaces, Or Material With Suitable Marking Surface Areas Less Than 3/8 Inches Square (either 3/8" X 3/8" Or An Area Equal To 0.1406 Inches Square) Must Be Applied To A Durable Tag And the Tag Securely Affixed To The Material. 3.23.3 Traceability Markings Must Be Maintained Through Assembly, And Whenever Possible Must Be Visible After Assembly. For Items Where The Marking Is Not Visible After Assembly, A Durable Tag Must Be Securely Attached To The Assembly Identifying The Part number, Piece Number, Traceability Number, And The Location Of The Permanent Mark. 3.23.4 Marking Must Be Legible And Must Be Located So As To Not Affect The Form, Fit, And Function Of The Material. ; ; 3.24 See Cdrl Di-misc-81020 (chemical And Mechanical) - Material Certification - In Addition To The Certification Data Requirements Specified In Di-misc-81020, The Following Material Certification Requirements Apply: 3.24.1 Quantitative Chemical And Mechanical Analysis Of Material Traceable To Traceability Markings Is Required. Material Certification Test Reports Must Include The Class, Form, Condition, Grade, Type, Finish, And/or Composition, As Applicable, Of The material Supplied. 3.24.2 Re-identification And Re-certification Of Material Is Required When The Material Is Subjected To A Process Which Alters It's Properties. If The Starting Material Or Raw Stock Is Processed In A Manner That Will Not Affect Its Chemical Composition Or mechanical Properties, The Original Certifications For The Chemical Composition And Mechanical Properties, As Required By The Material Specification, Are Acceptable. Re-certification Of The Chemical Or Mechanical Properties Is Required If A Process Is Used during Fabrication That Alters The Original Properties Of The Material (e.g. Alloying, Heat Treating, Or Forming). In These Instances, The Properties Of The Material Must Be Re-determined And Documented To Reflect The Altered Condition. The Altered Material must Be Uniquely Re-identified. The Properties Thus Determined And Documented, Are Required For Final Certification And Must Conform To The Material Specification Or The Contract/purchase Order Requirements. When Only The Mechanical Properties Are Altered, the Original Certification Forchemical Composition Must Be Overstamped And Annotated With The Unique Traceability Material And At A Minimum Contain The Information Below. traceability Marking ________________________________________________ (marking On Finished Item) is Fabricated From Raw Material Identified To heat/lot Number ______________ And Heat Treat Number _____________________ (when Applicable) _________________________________________ Date _____________________ (name And Signature Of Auth. Co. Rep.) 3.24.3 Material Certification Data Forwarded By The Manufacturer Must Contain A Signed Certification That The Report Results Represent The Actual Attributes Of The Material Furnished And Indicate Full Compliance With All Applicable Specification And Contract requirements. Transcription Of Certification Data Is Prohibited. 3.24.4 Statements On Material Certification Documents Must Be Positive And Unqualified. Disclaimers Such As "to The Best Of Our Knowledge" Or "we Believe The Information Contained Herein Is True" Are Not Acceptable. 3.24.5 If Material Is Received Without The Required Certification Papers Or With Incorrect/missing Data On The Certification Papers, The Material Will Be Rejected. 3.25 Material Handling - The Written Material Control Process Must Include The Following: 3.25.1 All Raw Materials Must Have Traceability Markings (except As Specified Below). 3.25.2 Stored Raw Materials Requiring Traceability Must Be Segregated To Preclude Intermingling With Materials Not Requiring Traceability. 3.25.3 When Traceability Markings Will Be Removed By A Manufacturing Or Fabrication Process, The Marking Must Be Recorded Prior To Removal And Be Immediately Restored Upon Completion Of The Process. If This Cannot Be Done Or Is Impractical, An Appropriate material Control Procedure (such As A Bag And Tag, Tagging, And/or Tote Box Control) Must Be Employed. The Material Control Procedure Must Provide A Method Of Positive Control To Preclude Commingling Of Heats/lots Or Loss Of Traceability. The Traceability marking Must Be Reapplied Upon Completion Of The Final Manufacturing Process. 3.25.4 Brazing Or Weld Filler Metals For Strength Welds Forming Or Integral With Pressure Containing Components Or Assemblies Requiring Traceability Must Be Verified To Be The Correct Material, And Type Or Grade, As Applicable, Prior To Consumption. At A minimum, Material Verification Must Consist Of Inspection Of Material Test Reports For Conformance To Specified Requirements. Control Of Welding And Brazing Filler Metals Must Be Maintained To The Point Of Consumption To Assure Use Of The Correct Type And grade. Markings And Traceability Requirements Do Not Apply To Brazing And Weld Filler Metals After Consumption. It Is The Responsibility Of The Prime Contractor To Ensure Conformance With The Above Requirements On Welds Performed By Their Subcontractors. 3.25.5 Purchase Orders For Raw Material Must Specify That The Material Be Traceable To Material Certification Test Reports By Traceability Markings On The Material And Identified On The Test Reports. The Certification Data Requirements Contained In di-misc-81020 Must Be Invoked By The Prime Contractor On All Subcontractors Supplying Level I Material. 3.25.6 The Material Control Process Must Include Requirements For The Maintenance Of Traceability For Items Sent Out For Subcontracted Operations. If Such Operations Would Remove Traceability Markings, Purchase Or Work Orders Must Specify A Method And Marking location For Remarking. The Contractor Must Also Ensure That Subcontractor Production Controls Are Adequate To Preclude Commingling Of Materials During Processing. 3.26 Receiving Inspection - 3.26.1 Products And Services Produced By Sub-tier Suppliers For Incorporation In The Contract End Item Must Be Subject To Inspection Or Audit At The Time Of Receipt By The Prime Prior To Further Processing Within The Prime Contractor's Plant Or Shipment To another Location. 3.26.2 Receiving Inspection Must Include As A Minimum - verification That The Traceability Marking On The Material Agrees With That On The Certification Test Reports. verification That Certification Test Reports Are Legible And Complete. verification That The Contents Of The Certification Test Reports Are In Compliance With The Contractually Invoked Specifications And Requirements. 3.27 Discrepancy Reporting - 3.27.1 Nonconforming Products From Sub-tier Suppliers Must Be Identified And Processed In Accordance With The Prime Contractor's Procedures For Controlling Nonconforming Products. The Prime Contractor Must Report The Receipt Of Any Nonconforming Products To the Responsible Sub-tier Supplier In Accordance With Established Procedures. Nonconforming Material Records Must Be Maintained And Available For Review By The Government Quality Assurance Representative (qar). 3.28 Final Inspection - The Following Inspections Must Be Performed Prior To Government Inspection And Acceptance. 3.28.1 Material Sampling - Material Must Be Inspected For Form, Fit, And Function. Lot Acceptance Must Be Based On Zero Defects And Lot Rejection Based On One Defect. The Sample Size Must Be In Accordance With The Sampling Plan(s) In The Applicable Military specification Or Standard, Federal Specification Or Standard, Or Drawing To Which The Material Was Manufactured. In The Absence Of Such Sampling Plans, Sampling Inspection Must Be Per Ansi/asq-z1.4, General Inspection Level Ii (for Sample Size Selection Code), table Iia (for Sample Size). small Lot Sizes - For Lot Sizes Of Fifty Or Less, The Minimum Sample Size Must Be Eight Units. For Lot Sizes Of Eight Or Less, The Sample Size Must Be One Hundred Percent Of The Lot. 3.28.2 The Manufacturer May Elect To Use Statistical Process Control (spc) To Assure Product Quality In Lieu Of The Above Attribute Sampling Plan, Provided That The Spc Methodology/system Used Provides Acceptable Products To The Government. However, The government/navy Receipt Inspection Activity May Perform Their Acceptance Inspection Of The Material Using The Attribute Sampling Plan Outlined Above. 3.28.3 All Data Concerning Material Verification (chemical, Mechanical Or Physical Properties), Traceability (material Certifications To Material Marking), And Nondestructive Test (ndt) Certifications For Material Must Be 100% Inspected. The Certification test Reports Must Also Be 100% Inspected For Completeness And Legibility. 3.28.4 All Material Requiring Traceability Must Be 100% Inspected For Traceability Marking And That The Marking Is Legible. 3.29 See Cdrls Di-misc-80875 (welding Procedures) And Di-misc-80876 (weld Procedure Qualification Data) - When Production Or Repair Welding Is Required, The Applicable Welding Procedure(s) And Qualification Data Must Be Submitted For Review And Approval. In addition, The Consumed Weld Metal C Of C As Defined Below Must Be Submitted As Part Of The Certification Oqe Package Submitted By The Contractor. note: These Requirements Do Not Apply To Tack/spot Welds. 3.29.1 Approval Of The Contractor's Qualification Data Must Be Obtained Prior To Performing Any Welding (production Or Repair). 3.29.2 If The Contractors Qualification Data Has Previously Been Approved By The Navy For Other Contracts, A Copy Of The Original Approval Letter May Be Submitted Along With The Procedures And Qualification Data Report To Expedite The Approval Process. The approval Letter Must Reference The Applicable Welding Procedure And Qualification Data Report Identification/number. Prior Approval Does Not Guarantee Acceptance For This Or Any Future Contracts. As Far As Practical, All Procedures For The Contract Must Be submitted At The Same Time. Welding Procedures And Qualification Data Must Be Submitted In A Commercially Available Electronic Format Such As Adobe Acrobat Pdf. The Contractor Must State The Applicability Of Each Weld Procedure And Qualification Data Submitted, citing The Drawing Number And Pieces To Be Welded. (i.e. "wp-123 And Qd-123 Are Submitted For The Weld Joint Between Pieces 1 And 2 On Drawing Abc." Wp-456 And Qd-456 Are Submitted For The Hardfacing Of Piece 3 On Drawing Xyz.") 3.29.3 The Pco's Authorization For The Use Of Weld Procedure(s) And Qualification Data For The Specific Application As Submitted Does Not Mitigate The Vendors Responsibility To Comply With The Requirements Of S9074-aq-gib-010/248, S9074-ar-gib-010a/278, And the Contract. 3.29.4 Authority For The Repair Of Special Repairs In Castings, The Repair Of Wrought Material, Or The Repair Of Forged Material Must Be Obtained Via Request For Waiver From The Procurement Contracting Officer. This Request Must Describe The Defect; Including size, Depth, Location, And A Description Of The Proposed Repair. Repairs Deemed Minor Or Nominal In Accordance With S9074-ar-gib-010/278 Can Be Made At Contractor Discretion In Accordance With S9074-ar-gib-010/278 Requirements; However, Weld Procedure specification (wps) And Procedure Qualification Record (pqr) Submittals Are Still Required. This Request For Navsup-wss Contracts Must Be Submitted Via The Electronic Contractor Data Submission (ecds) Application. 3.29.5 Any New Procedure Qualification Performed Under This Contract Will Require The Vendor To Provide A Minimum 72 Hour Notification To Dcma With An Offer To Observe The Welding Of The Test Assemblies. The 72 Hour Time Limit May Be Modified Upon Mutual agreement Between The Vendor And Dcma. 3.29.6 When Drawings Require Hardfacing Surface Iron Or Nickel Content Not To Exceed 5%, The Contractor Must Verify Surface Iron Or Nickel Content By Performing Chemical Testing As Defined By The Applicable Drawing. The Chemical Test Results Must Be Submitted as Part Of The Qualification Data. 3.29.7 Additional Qualification Requirements For Production Hardfacing Thickness Less Than 1/8-inch: Macro-etch (or Legible Photomacrographs Clearly Showing The Fusion Area) Must Be Submitted For Review And Show Consistent, Minimized Dilution. All Essential elements And Any Elements Not Listed In S9074-aq-gib-010/248 That Influence Dilution Must Be In The Qualification Data And Weld Procedure, With Strict Limits Placed On Each Essential Element. 3.29.8 Preparation And Retention Of Weld Records Is Required, As Specified By Paragraph 4.1.3 Of S9074-ar-gib-010a/278. 3.29.9 When Production Or Repair Welding Is Required On Titanium Materials, The Applicable Fabrication Plan, Facilities Procedure, Training Plan, And Active Welder Qualification Must Also Be Submitted For Review And Approval. 3.29.10 If The Contractor's Fabrication Plan, Facilities Procedure, Training Plan, Or Active Welder Qualification Has Previously Been Approved By The Navy For Other Contracts, A Copy Of The Original Approval Letter May Be Submitted Along With The Applicable documentation To Expedite The Approval Process. The Approval Letter Must Reference The Applicable Documentation. Prior Approval Does Not Guarantee Acceptance For This Or Any Future Contracts. The Contractor's Fabrication Plan, Facilities Procedure, Training plan, And Active Welder Qualification Must Be Submitted At The Same Time As The Applicable Welding Procedure(s) And Weld Procedure Qualification Data. All Documentation Must Be Submitted In A Commercially Available Electronic Format, Such As Adobe Acrobat Pdf. 3.29.11 See Cdrl Di-misc-80678 (consumed Weld Metal) - A Certificate Of Compliance Is Required For All Weld Filler Metals Used For Production Or Repair Welding, And Must Include The Following: a) Filler Metal Lot Number(s) b) Specification And Type c) A Positive Statement That The Vendor Has Obtained Oqe And Verified That Each Lot Of Weld Filler Material Conforms To Specification Requirements. d) A Positive Statement Verifying That The Weld Filler Metals Were The Correct Material Type Or Grade Prior To Consumption. 3.29.12 When Production Welds Or Repair Welds Are Performed By A Subcontractor, The Requirement For Submission Of All Certification Documentation Required Herein Must Be Passed Down To The Subcontractor. 3.30 Radiography (rt) - Radiography Must Be Performed In Accordance With T9074-as-gib-010/271. Rt Acceptance Criteria For Weldments To Be Per The Applicabletable Of S9074-ar-gib-010a/278 (p-1 Piping) Or Mil-std-2035, Class 1, As Applicable. 3.30.1 Submission Of Radiographic Shooting Sketches For Approval Is Not Requiredfor Weldments. 3.30.2 All Pieces Radiographed Must Be Permanently Marked With "rt" And A Unique Traceability Number. (unique Traceability Number Must Be Directly Traceable To The Rt Film.) 3.30.3 See Cdrl Di-misc-80678 (production Radiography) - Production Radiographyrequires Final Acceptance By The Navy. The Items Listed Below Must Be Submitted For Final Acceptance, Cataloging, File, And Retention. They Must Be Submitted And Approved By The navy Prior To Shipment Of The Applicable Hardware. However, When The Source Certification Clause Is Invoked, They Must Be Submitted A Minimum Of Forty-five (45) Working Days Prior To The Date Of Source Certification Inspection. (a) Film (b) Rss/rsss (c) Rs (d) Dd250 (with Heat Numbers Corresponding To Rt Numbers Referenced In Block 16) 3.31 Additional Marking For Fasteners - Fasteners Must Be Marked In Accordance With ;mil-dtl-1222; . The Method Of Marking Must Be Types I, Ii, Iii, V, Viii Or Ix Of Mil-std-792 Except For Grades 410, 416 And 431 In The H Condition And Grades 8, 630, A574, and 4340 Which Must Be Marked By Method Ii When Marking Is Applied After The Final Heat Treatment. Markings On Fasteners That Are To Be Coated Must Be Marked Prior To Coating And Have A Minimum Depth Of 4 Mils. Traceability Marking Must Be Legible After The application Of Protective Compounds. 3.31.1 Marking Is Required For All Fasteners Regardless Of Size And Must Include The Material Symbol, The Manufacturer's Identification Symbol, And The Traceability Marking. Marking Must Be Applied On The Head Of Headed Fastener (top Preferred, Side location If Necessary). Self-locking Screws Must Also Be Marked With Six Dots. Where No Contract Invoked Specification Requirement Exists For This Marking, Self-locking Fasteners Must Be Marked With Six Dots Approximately .032" Diameter, Raised Or Depressed by Approximately .010" Located On The Top Perimeter Of The Head Of The Fastener In An Arc Or Circular Pattern. The Six Dots Must Be Distinguishable From All Other Required Markings. 3.32 See Cdrl Di-misc-80678 (special Emphasis C Of C) - The Certificate Of Compliance Must Show Traceability To The Marking Applied On Each Individual Item, And Must Contain The Following Information: 1. Contractor's Name, Address And Date. 2. The Contract/purchase Order Number (for Example: N00104-11-p-fa12) 3. The National Stock Number (nsn). The 18 Character National Stock Number For Special Emphasis Material Includes The Two Digit Cog, The Four Digit Fsc, The 9 Digit Niin, And The Two Digit Smic (for Example: 1h 4820 012345678 L1) ("n/a" When Not Applicable). 4. Lubricants, Sealants, Anti-seize, And/or Thread Locking Compounds ("n/a" When Not Applicable). 5. Certification That O-rings, Packing, Gaskets, Or Other Elastomeric Products Were Installed In A Compressed State Within An Assembly Or Sub-assembly, Prior To Expiration Of The Shelf Life ("n/a" When Not Applicable). 6. Manufacturer's Compound Number ("n/a" When Not Applicable). 7. When Weld Procedure Submittal Is Required By The Contract, A Statement That The Approval Date Of The Qualification Data Precedes Any Production Or Repair Welding Performed On This Contract. ("n/a" When Not Applicable). 8. A Statement To The Effect That All Items Furnished On This Contract Are In Full Compliance With The Specifications And Requirements And List Each Contractually Invoked Conformance/compliance Test Performed By Name And That It Was Performed satisfactorily. 9. Contractor's Or Authorized Personnel's Signature. 4. Quality Assurance 4.1 Notes To Dcma Qar And The Contractor - 4.1.1 Dcma Qar And The Contractor For Proprietary Designs - Departures From Contractor Imposed Requirements, Not Specifically Covered By The Contract, Must Be Judged Individually On The Basis Of The Effect, If Any, On Contractual Requirements. When There Is A disagreement Between The Contractor And The Government Representative As To The Effect On Contractual Requirements, The Departure Must Be Considered A Nonconformance And Be Submitted To The Pco For Disposition. 4.1.2 Dcma Qar And The Contractor For Proprietary Designs - All Records Of Departures From Contractor Imposed Requirements Must Be Maintained And Available For Review At The Contractor's Facility. A Copy Must Be Given To The Local Government Representative. A record Of These Departures, Traceable To The Applicablepart Number And Contract Number Must Be Submitted To The Pco. 4.1.3 Dcma Qar And The Contractor For Proprietary Designs - For Proprietary Designs, The Contractor's Part Numbers Are Acceptable For Reference Only. The Delivered Material Must Conform To All Drawings, Specifications, And Other Contractual Requirements. 4.1.4 Dcma Qar - It Is The Responsibility Of Dcma Qar To Review Non-destructive Testing (ndt) Procedures For Navsup Contracts/purchase Orders. 4.1.5 Dcma Qar And The Contractor - The Ecds (electronic Contractor Data Submission) System Is Available For Certain Data Submissions And To Submit Questions And Clarifications, And Waiver Requests On Contracts And Solicitations. Ecds Can Be Found At: https://register.nslc.navy.mil/ 5. Packaging 5.1 Preservation, Packaging, Packing And Marking - Preservation, Packaging, Packing And Marking Must Be In Accordance With The Contract/purchase Order Schedule And As Specified Below. mil-std 2073 Packaging Applies As Found Elsewhere In The Schedule 6. Notes 6.1 Several Definitions Of Terms That Apply To Csi Items Are Listed Below. All Terms May Not Apply To Every Item. 6.1.1 The Ecds (electronic Contractor Data Submission) System Is At: Https://register.nslc.navy.mil/ This Application Will Require Advance Registration Using A Pki Digital Certificate On A Cac. A Vendor User Guide Is Available As Csd001 In The Csd (contract Support Document) Library Within Ecds. 6.1.2 Critical Safety Item (csi) - Any Ship Part, Assembly, Or Support Equipment Containing A Critical Characteristic Whose Failure, Malfunction, Or Absence Of Which Could Cause A Catastrophic Or Critical Failure Resulting In Loss Of, Or Serious Damage To The ship, Or Unacceptable Risk Of Personal Injury Or Loss Of Life. 6.1.3 Critical Process - As Determined By The Twh, Any Process, Operation Or Action Performed On A Ship Csi That Serves To Establish A Critical Characteristic (such As Welding, Soldering, Machining, Polishing, Cleaning, Or Assembling) Or Confirm That A critical Characteristic Is Within Drawing Or Specification Compliance (such As, Testing, Measurement, Or Non-destructive Evaluation). 6.1.4 First Article - Pre-production Models, Initial Product Samples, Test Samples Produced To Ensure A Manufacturer's Capability To Meet Full Specification Requirements. 6.1.5 First Article Test (fat) - Contractually Required Testing And Inspection Of A Supplier's Pre-production, Production, Or "production Representative" Specimens To Evaluate A Manufacturer's Ability To Produce Conforming Product Prior To The Government's commitment To Receive Subsequent Production Items. First Article Testing Is Product Specific And Does Not Assess Manufacturing Process Controls Nor Does It Assure The Effectiveness Of The Manufacturer's Quality Program. 6.1.6 Government Source Inspection (gsi) - Gsi Is Independent Oversight Performed By A Government Representative Usually A Dcma Quality Assurance Representative (qar)) To Assure That Those Unique Product Quality And System Elements, Identified By The contracting Agency As Important, Are Observed And Evaluated. 6.1.7 Quality Assurance Letter Of Instruction (qali) - A Qali Is A Formal Document Initiated By A Contracting Activity That Provides Essential Requirements And Instructions For Contracted Materials To Be Independently Verified And Accepted By A Government representative Prior To Shipment. 6.1.8 Objective Quality Evidence (oqe) - The Quantitative And Qualitative Data Of All Mechanical, Chemical, And Performance Tests Performed (as Required By The Applicable Specification, Drawing, Or Purchase Document) To Prove That The Material Supplied conforms To The Specified Requirements. 6.1.9 Surface Discontinuity - Any Surface Irregularity, Marking, Or Localized Change In Physical Character Of The Surface, Other Than Dimensional, That Exists Infrequently At One Or Several Places. (examples: Burrs, Dents, Nicks, Scratches, Gouges, Pits, center-punches, Scribes, And Tool Marks) Surface Discontinuities Less Than 0.005-inch In Depth Are Acceptable Provided They Do Not Violate Any Other Design Requirements Specified In This Contract/purchase Order. 6.1.10 Traceability Code - A Code Or Number Providing Traceability To The Actual Chemical And Mechanical Properties Of The Specified Heat, Batch, Or Form From Which The Material Originated. 6.1.11 Verification - An Examination Performed To Determine Compliance With A Specific Requirement. 6.1.12 Nonconformance - A Nonconformance Is Defined As Affecting Or Violating The Following: - The Requirements Of This Contract/purchase Order. - Contractually Invoked Drawings (i.e. Envelope Dimensions, Interface Dimensions With Mating Parts/equipment, Center Of Gravity, Weights, Piece Part Identification, Material, Etc.). - Contractually Invoked Federal, Military, Or Commercial Specifications And/or Standards. - Form, Fit, Function, Performance To Contract Requirements, Reliability, Maintainability, Interchangeability, Safety Of Personnel Or Equipment, Or Additional Cost To The Government. 6.1.13 Waiver - A Written Authorization To Accept An Item, Which During Manufacture, Or After Having Been Submitted For Government Inspection Or Acceptance, Is Found To Depart From Specified Requirements, But Nevertheless Is Considered Suitable For Use As Is or After Repair By An Approved Method. 6.1.14 Deviation - A Specific Written Authorization (granted Prior To The Manufacture Of An Item) To Depart From A Particular Requirement(s) Of An Item's Current Approved Configuration Documentation For A Specific Number Of Units Or A Specified Period Of time, And To Accept An Item Which Is Found To Depart From Specified Requirements, But Nevertheless Is Considered Suitable For Use "as Is" Or After Repair By An Approved Method. 6.1.15 Critical Waiver/deviation - This Waiver/deviation Consists Of A Departure Involving Safety. 6.1.16 Major Waiver/deviation - This Waiver/deviation Consists Of A Departure Involving: - Performance - Interchangeability, Reliability, Survivability, Maintainability, Or Durability Of The Item Or Its Repair Parts - Health Or Safety - Effective Use Or Operation
Closing Date19 Jul 2024
Tender AmountRefer Documents 

DEPT OF THE NAVY USA Tender

United States
Description: Contact Information|4|n743.5|tbd|7176053229|joel.j.curtis.civ@us.navy.mil| item Unique Identification And Valuation (jan 2023)|19|||||||||||||||||||| higher-level Contract Quality Requirement (navicp Review Feb 1991)(feb 1999)|1|see Specification Sections C And E.| inspection Of Supplies--fixed-price (aug 1996)|2||| general Information-fob-destination|1|b| repair Delivery (firm Fixed Price)|1|365| wide Area Workflow Payment Instructions (jan 2023)|16|stand-alone Receiving Report-certifications Combo-receiving Report & Invoice-material |na|tbd|n00104|tbd|n39040-certifications, S4306a-material |n50286|tbd|133.2|na|na|nan39040-certifications|na|na|see Dd 1423 |port_ptnh_wawf_notification@navy.mil| navy Use Of Abilityone Support Contractor - Release Of Offeror Information (3-18))|1|| firm Fixed Price Repair Purchase Orders|1|| equal Opportunity (sep 2016)|2||| warranty Of Supplies Of A Noncomplex Nature (june 2003)|6|one Year From Date Of Delivery.|one Year From Date Of Delivery.||||| warranty Of Data--basic (mar 2014)|2||| buy American-free Trade Agreements-balance Of Payments Program-basic (feb 2024)|11|||||||||||| notice Of Total Small Business Set-aside (oct 2020)(deviation 2020-o0008)|1|| alternate A, Annual Representations And Certifications (nov 2023)|13|||||||||||||| buy American-free Trade Agreements-balance Of Payments Program Certificate-basic (feb 2024))|5|||||| buy American-balance Of Payments Program Certificate-basic (feb 2024)|1|| annual Representations And Certifications (may 2024)|13|332919|750 Employees|||||||||||| notice Of Priority Rating For National Defense, Emergency Perpardeness, And Enrgy Progam Use (april 2008))|2||b| 1. Data Item A001 (inspection And Test Plan) May Be Waived If Already On File At Navsup Wss Mech. 2.drawings Associated With This Solicitation Will Be Made Available On The New Beta.sam Website, But Will Be Restricted Access Which Needs To Be Approved. Once Access Has Been Requested, Interested Vendors Should Email The Poc Listed On The Solicitation To Inform them Of The Request. 3. Navsup Wss Mech Will Be Considering Past Performance In The Evaluation Of Offers. See Clause 252.213-7000. 4. This Is A Rated Order Certified For National Defense Use,and The Contractor Will Follow All The Requirements Ofthe Defense Priorities And Allocations Systemregulation (15 Cfr 700). 5. This Solicitation Is And Resulting Award Will Be Issued Iaw Eaf. 6. Quote To Be A Firm Fixed Price For The Full Repair Of The Item. This Includes The Teardown, Evaluation, Inspection And Full Repair Of The Item To "like New" Or "a" Condition. See Statement Of Work In Solicitation.a Beyond Repair (br)/ Beyond Economic Repair (ber) Price Shall Also Be Provided In Addition To The Repair Price At Time Submission Of Quote. do Not Include The Cost For Shipping Material As The Government Implemented Shipping System Or Atac Will Be Shipping/delivering Material. 1. Scope 1.1 The Material Covered In This Contract/purchase Order Will Be Used In A Crucial Shipboard System. The Use Of Incorrect Or Defective Material Would Create A High Probability Of Failure Resulting In Serious Personnel Injury, Loss Of Life, Loss Of Vital shipboard Systems, Or Loss Of The Ship Itself. Therefore, The Material Has Been Designated As Special Emphasis Material (level I, Scope Of Certification, Or Quality Assured) And Special Control Procedures Are Invoked To Ensure Receipt Of Correct Material. 2. Applicable Documents 2.1 Order Of Precedence - In The Event Of A Conflict Between The Text Of This Contract/purchase Order And The References And/or Drawings Cited Herein, The Text Of This Contract/purchase Order Must Take Precedence. Nothing In This Contract/purchase Order, however, Must Supersede Applicable Laws And Regulations Unless A Specific Exemption Has Been Obtained. 2.2 Identification Of Classified Documents - This Contract/purchase Order Requires The Contractor To Have Authorized Access To Classified Documents In Accordance With The Attached Contract Security Classification Specification (dd Form 254). The Classified Documents And Security Level Are: ;4640418 - Confidential; 2.3 Applicable Documents - The Document(s) Listed Below Form A Part Of This Contract/purchase Order Including Modifications Or Exclusions. 2.3.1 Specification Revisions - The Specification Revisions Listed Under "documents References" Below Are The Preferred Revision. Older And/or Newer R Evisions Are Acceptable When Listed Within Contract Support Library Reference Number Csd155 In Ecds (electric contractor Data Submission) At: Ht Tps://register.nslc.navy.mil/. This Is To Allow Contractors To Use Certain Acceptable Older Specification Revisions To Purge Their Existing Stock Of Material Certified To Those Older Revisions Or To Use Newer Specification revisions When Material Is Certified To Newly Released Revisions,without Requiring The Submittal Of Waiver/deviation Requests For Each Specification Revision On Every Contract. Revisions Of Specifications Reflecting Editorial And/or Re-approval (e.g. E2009, r2014, Etc.) Are Considered Inconsequential, But Are Acceptable When Their Revisions Are Listedwithin Csd155 Or Elsewhere Within This Contract. 2.3.2 Documents, Drawings, And Publications Supplied Are Listed Under "drawing Number". These Items Should Be Retained Until An Award Is Made. 2.3.3 "document References" Listed Below Must Be Obtained By The Contractor. Ordering Information Is Included As An Attachment To This Contract/purchase Order. drawing Data=dm117384 |96169| A| |d|0001 | A|49998|0055082 drawing Data=dm117384 |96169| A| |d|0001.a | A|49998|0042263 drawing Data=dm117384 |96169| A| |d|0002 | A|49998|0053468 drawing Data=dm117384 |96169| A| |d|0003 | A|49998|0059744 drawing Data=dm117384 |96169| A| |d|0004 | A|49998|0012659 drawing Data=dm117384 |96169| A| |d|0005 | A|49998|0028276 drawing Data=dm117384 |96169| A| |d|0006 | A|49998|0025657 drawing Data=dm117384 |96169| A| |d|0007 | A|49998|0028768 drawing Data=dm117384 |96169| A| |d|0008 | A|49998|0029722 drawing Data=dm117384 |96169| A| |d|0009 | A|49998|0251337 drawing Data=dm117384 |96169| A| |d|0010 | A|49998|0024477 drawing Data=dm117384 |96169| A| |d|0011 | A|49998|0023361 drawing Data=dm117384 |96169| A| |d|0012 | A|49998|0023810 drawing Data=dm117384 |96169| A| |d|0013 | A|49998|0018527 drawing Data=2640-808x1j1 |53711| A|er |d|0001 | A|49998|0487192 drawing Data=4558709 |80064| E| |d|0001 | E|49998|2026998 drawing Data=4558761 |80064| E| |d|0001 | E|49998|4552240 drawing Data=4558766 |80064| E| |d|0001 | E|49998|0124267 drawing Data=4558766 |80064| E| |d|0002 | E|49998|0118211 drawing Data=4558766 |80064| E| |d|0003 | E|49998|0098547 drawing Data=4558766 |80064| E| |d|0004 | E|49998|0074376 drawing Data=4558766 |80064| E| |d|0005 | E|49998|0079537 drawing Data=4558766 |80064| E| |d|0006 | E|49998|0082494 drawing Data=4558766 |80064| E| |d|0007 | E|49998|0092812 drawing Data=4558766 |80064| E| |d|0008 | E|49998|0077701 drawing Data=4558766 |80064| E| |d|0009 | E|49998|0089388 drawing Data=4558766 |80064| E| |d|0010 | E|49998|0081709 drawing Data=4558766 |80064| E| |d|0011 | E|49998|0087864 drawing Data=4558766 |80064| E| |d|0012 | E|49998|0070378 drawing Data=4558769 |53711| D| |d|0001 | D|49998|2875470 drawing Data=4558772 |80064| D| |d|0001 | D|49998|0346240 drawing Data=4558791 |80064| F| |d|0001 | F|49998|0339870 drawing Data=4558792 |80064| C| |d|0001 | C|49998|0332761 drawing Data=4640418 |80064| E| |d|0001 | E|00026|0000000 drawing Data=4687720 |80064| E| |d|0001 | E|49998|1531397 drawing Data=7285198 |53711| M| |d|0001 | M|49998|1247552 drawing Data=7285245 |53711| E| |d|0001 | E|49998|0766442 drawing Data=7285297 |53711| E| |d|0001 | E|49998|0862180 drawing Data=7285297 |53711| E| |d|0002 | E|49998|0392982 drawing Data=7285297 |53711| E| |d|0003 | E|49998|0280881 drawing Data=7285297 |53711| E| |d|0004 | E|49998|0204692 drawing Data=7286168 |53711| H| |d|0001 | H|49998|2932540 drawing Data=7286250 |53711| J| |d|0001 | J|49998|0350803 drawing Data=8617511 |53711| N| |d|0001 | N|49998|3447332 drawing Data=8753270 |53711| H| |d|0001 | H|49998|1045373 document Ref Data=fed-std-h28 | | |b |190424|a| | | document Ref Data=fed-std-h28 |0020| |b |941221|a| |01| document Ref Data=ansi/asq Z1.4 | | | |080101|a| | | document Ref Data=qq-n-281 | | |d |851023|a|2 | | document Ref Data=qq-n-286 | | |g |001207|a| | | document Ref Data=astm-b367 | | | |220401|a| | | document Ref Data=astm-b369 | | | |200401|a| | | document Ref Data=astm-b505 | | | |180301|a| | | document Ref Data=mil-std-792 | | |f |060519|a| | | document Ref Data=mil-dtl-1222 | | |j |001208|a| | | document Ref Data=astm-e1417 | | | |160615|a| | | document Ref Data=astm-e1444 | | | |160601|a| | | document Ref Data=mil-std-2035 | | |a |950515|a| | | document Ref Data=mil-std-2132 | | |d |080310|f| |01| document Ref Data=astm-d4066 | | | |130701|a| | | document Ref Data=sae Ams 6931 | | |d |171201|a| | | document Ref Data=iso_9001 | | | |081115|a| | | document Ref Data=iso10012 | | | |030415|a| | | document Ref Data=mil-dtl-15024 | | |g |180303|a| | | document Ref Data=iso/iec 17025 | | | |050515|a| | | document Ref Data=qpl 25027 | | |17 |000207|a| | | document Ref Data=mil-i-45208 | | |a |810724|a|1 | | document Ref Data=mil-std-45662 | | |a |880801|a| | | document Ref Data=ansi/ncsl Z540.3 | | | |130326|a| | | document Ref Data=0900-lp-001-7000 | | | |810101|c| |01| document Ref Data=aia/nas Nasm 17828 | | |1 |130430|a| | | document Ref Data=aia/nas Nasm 25027 | | |1 |121221|a| | | document Ref Data=s9074-aq-gib-010/248 | | |1 |191112|a| | | document Ref Data=t9074-as-gib-010/271 | | |1 |140911|a| | | document Ref Data=s9074-ar-gib-010a/278 (chg A) | | | |130214|a| | | 3. Requirements 3.1 Refurbished Material Statement Of Work (repair Sow) - 3.1.1 Inspection - Clean And Determine If Refurbishment Is Possible. At Disassembly, The Contractor Must Record All Identifying Markings Found On The Parts Of Each Assembly. The Contractor Must Maintain Traceability Of These Markingsto Each Unit Throughout refurbishment. 3.1.2 Re-useable Parts - Any Parts Of The Original Assembly That Are Useable (replacement Is Not Necessary), May Be Utilized As Initially Supplied. 3.1.3 Non-useable Parts - Any Parts Of The Original Assembly That Are Not Usable (replacement Is Necessary) Must Be In Accordance With This Tdp (technical Data Package). 3.1.4 Refurbishment - Upon Completion Of Inspection, This Item Must Be Refurbished To Be In Accordance With ; Naval Ship Systems Command Drawing 845-4558791, Assembly Irj-3 (less Hydraulic Actuator, Item 60), Liability Dm117384, Engineering Report er2640-808x1j1, Maintenance Standard (ms) 7250-081-011 Rev E Chg-10 (csd441); , Except As Amplified Or Modified Herein. This Applies To All "parts Requiring Certification" As Identified Elsewhere In This Contract/purchase Order. 3.1.5 Additional Sow Requirements - ;n/a; 3.2 Material For Parts Requiring Certification - Quantitative Chemical And Mechanical Analysis Is Required For The Parts Listed Below Unless Specifically Stated Otherwise: part - ;item 3a, Sub Mk 1 - Body On Drawing 4558792 And Item 1a, Sub Mk 1 - Tailpiece On Drawing 4558761; material - ;astm-b369, Alloy Uns C96400; part - ;item 18a - Stem On Drawing 4558766 And Item 19a - Stem On Drawing 4558766; material - ;qq-n-286, Form 2, Cold Drawn, Annealed And Age Hardened; part - ;item 5a - Stem Retaining Nut On Drawing 7286168 And Item 19a - Stem Retaining Nut On Drawing 4558769; material - ;astm-b505, Alloy Uns C90300; part - ;item 32 - Continuous Thread Stud On Drawing 4558791; material - ;mil-dtl-1222, Type Iv, Qq-n-286, Annealed And Age Hardened; part - ;item 71 - Self-locking Hex Nut On Drawing 4558791; material - Qq-n-281, Class A Annealed (hot Finished Or Cold Drawn) Or Class B Cold Drawn. all Material Must Be From The Same Class. self-locking Element- Astm-d4066, Group 01, Class 1, Grade 1 part - ;item 2a - Insert (q3) On Drawing 4558772; material - Sae-ams-6931 note: Mechanical Properties For Bars, Forgings And Forging Stock Over 10" Must Be As Specified In The Applicable Drawing. If The Mechanical Properties Are Not Provided In The Drawing, The Mechanical Properties Specified In Sae-ams-6931 Table 2 For Material 6" to 10", Must Be Applied. part - ;piece 18l1 - Ball On Drawing 8617511 And Piece 51l1 - Ball On Drawing 7285198; material - Sae-ams-6931 or centrifugally Cast 6al-4v, Astm-b367, Grade C-5, With Mechanical Properties As Listed In Supplementary Requirement S6. note: Mechanical Properties For Bars, Forgings And Forging Stock Over 10" Must Be As Specified In The Applicable Drawing. If The Mechanical Properties Are Not Provided In The Drawing, The Mechanical Properties Specified In Sae-ams-6931 Table 2 For Material 6" to 10", Must Be Applied. part - ;piece 17 - Seats (q3) On Drawing 7285297; material - Md71-gg Mearthane (graphite Filled Urethane). Material Must Be Manufactured By Mearthane Products Inc. Cranston, Ri. (properties Specified Below Only) item Property Astm Test Method Value (a) Hardness D2240 70 +/- 5 Shore D (b) Specific Gravity D792 1.18 +/- 0.02 (c) Tensile Strength D412 (diec) 5000 Psi Min (d) Compression-defl D575 700 Psi Min @ 2% Def. (e) Tensile Impact D1822 300 Ft-lb/sq In (note 1) (type L Specimen) (f) Water Absorption D570 1.5% Max (1 Week At R.t.) note 1: These Values Are Minimum Averages. Separate Specimen Values May Not Vary More Than 25% Under The Specified Minimum. 3.3 Testing Certification - Certifications Are Required For The Following Tests On The Items Listed Below. Additional Testing On Other Piece Parts (if Any) Per Applicable Drawings And Specifications Is Still Required, But Certifications Are Only Required As listed Below. test - ;liquid Penetrant Inspection; item - ;item 32 - Continuous Thread Stud On Drawing 4558791; performance - T9074-as-gib-010/271; Sampling Must Be Per Mil-dtl-1222 acceptance - Mil-dtl-1222 test - ;dye Penetrant Inspection For Non-magnetic Grades; item - ;item 71 - Self-locking Hex Nut On Drawing 4558791; performance - T9074-as-gib-010/271 Or Astm-e1417/astm-e1444 (method C Solvent Removal Techniques Must Not Be Used On Thread) acceptance - ;nasm25027; test - Weldability Test Of Astm-b369 Material item - ;item 3a, Sub Mk 1 - Body On Drawing 4558792 And Item 1a, Sub Mk 1 - Tailpiece On Drawing 4558761; performance - Astm-b369 acceptance - Astm-b369 test - Dye Penetrant Inspection part - Body Weld Ends In Final Machined Condition Including 1/2" Of Base Material performance - T9074-as-gib-010/271 acceptance - S9074-ar-gib-010a/278 test - Ultrasonic Inspection On Starting Material item - ;all Items Requiring Certification Made From Qq-n-286 With A Diameter Or Minimum Distance Between Parallel Surfaces Of 4 Inches Or Greater Of The Starting Material, Or When Required By A Drawing Or Specification Invoked Elsewhere In This Contract; performance - T9074-as-gib-010/271 Or Mil-std-2132, And Qq-n-286 acceptance - Qq-n-286 attribute - Annealing And Age Hardening item - ;item 18a - Stem On Drawing 4558766, Item 19a - Stem On Drawing 4558766, And Item 32 - Continuous Thread Stud On Drawing 4558791; performance - Qq-n-286 test - Pressure Tests item - Each Assembly performance - ;ms 7250-081-011 (csd441) Step 1.z; acceptance - ;ms 7250-081-011 (csd441) Step 1.z; test - Quality Conformance Tests item - Self-locking Nuts performance - ;nasm25027; acceptance - ;nasm25027; attribute - Certificate Of Completion item - Self-locking Nut Nonmetallic Insert performance - ;astm-d4066, Group 01, Class 1, Grade 1; attribute - Certificate Of Compliance item - Self-locking Nuts performance - This Certificate Must State That Self-locking Nuts Were Manufactured By An Approved Source. Approved Sources Are Those Listed On Qpl-25027 For The Appropriate Fastener. This Qpl May Also Be Considered As Approved Sources For Heavy Hex self-locking Nuts. test - Non-destructive Tests item - ;weld Repair And/or Production Weld (as Applicable); performance - Per Applicable Fabrication Specification acceptance - Per Applicable Fabrication Specification 3.4 Radiography Is Required On ;item 3a, Sub Mk 1 - Body On Drawing 4558792 And Item 1a, Sub Mk 1 - Tailpiece On Drawing 4558761; . 3.5 The Pressure Tolerance Must Be As Specified In The Assembly Drawing, Detail Drawing, Design Specification Or Elsewhere In This Contract. Where Pressure Tolerances Are Not Provided By Drawings, Specifications Or Specified Elsewhere In This Contract, The following Must Be Used: For Pressure Tests Below 100 Psig, The Pressure Tolerance Must Be +1 Psig / -0 Psig. For Pressure Tests At Or Above 100 Psig Up To And Including 2500 Psig, The Pressure Tolerance Must Be +2% / -0 Psig Rounded Off To The Nearest Multiple Of The Smallest Graduation On An Analog Test Pressure Gauge, Not To Exceed 50 Psig. For Pressure Tests Above 2500 Psig, The Pressure Tolerance Must Be +2% / -0 Psig, Rounded Off To The Nearest Multiple Of The Smallest Graduation On An Analog Test Pressure Gauge, Not To Exceed 200 Psig. the Pressure Test Time Tolerance Must Be As Specified In The Assembly Drawing, Detail Drawing, Design Specification Or Elsewhere In This Contract. Where Pressure Test Time Tolerances Are Not Provided By Drawings, Specifications Or Specified Elsewhere In This contract, The Following Must Be Used: For A Test Duration Up To And Including 1 Hour, The Tolerance Must Be +5 Minutes / - 0 Minutes. For A Test Duration Of More Than 1 Hour Up To And Including 24 Hours, The Tolerance Must Be +30 Minutes / - 0 Minutes. For A Test Duration Of More Than 24 Hours, The Tolerance Must Be +60 Minutes / - 0 Minutes. 3.6 Confidential Hydrostatic Test Pressures - When Test Pressures Are Confidential, Certification Must Reference ;4640418, Rev E; And The Item Number To Which The Item Was Tested In Lieu Of The Actual Pressures. Any Drawing Requirement To Mark The Working pressure On The Item Does Not Apply And Is Strictly Prohibited. 3.7 Installation Of Titanium Shims Must Be Performed Using Section 6.1.3 Of The Procedure Provided In Csd158 In The Ecds (electronic Contractor Data Submission) System At: Https://register.nslc.navy.mil/. Paragraph 6.1.3.9 Is Not Applicable. 3.7.1 Use Of Alternative Epoxies, Other Than The Epoxies Listed In Equipment/material Section Of Csd158, Must Be Requested As Stated Elsewhere In The Contract/purchase Order. 3.8 A Visual Inspection Shall Be Performed On The Finished Seat With Acceptance Criteria On Critical Surfaces Per Csd167 In The Ecds (electronic Contractor Data Submission) System At: Https://register.nslc.navy.mil/. 3.9 Seat Stack Height Measurement - To Ensure That Each Seat Is Within Tolerance, Check Each Seat Singularly By Measuring The Seat Height Over The Ball. This Measurement Is Calculated By Adding One-half Ball Diameter To The Half Stack Height Dimension On The drawing. Limits Are Determined By The Ball Diameter Tolerance And The Half Stack Height Tolerance. Check Dimensions By Measuring From The Seat Back Face To Top Of Ball. Manufacturers Of Seats That Do Not Have A Ball Of The Required Size Available Will Be required To Manufacture A Dummy Ball Or Segment Of A Ball With Sufficient Spherical Surface To Check The Above Dimension. 3.10 Ball Spherical Surface Waviness - Unless Otherwise Specified On Drawing, All Sealing Area Surfaces Must Have A Spherical Surface Waviness Which Does Not Exceed 0.0005 Inches Of Height Per Inch Of Spherical Surface. Roughness And Waviness Ratings Must apply In A Direction Which Yields The Maximum Rating, Normally Perpendicular To The Lay. 3.11 ;surface Waviness Must Be Verified Prior To Teflon Coating.; 3.12 Chemours Company (formerly Dupont) Teflon Coating 850g-204 And 852g-201. Use Of Chemours Company (formerly Dupont) Teflon Coating 851n-204 And 852n-201 Is Acceptable Until Exhausted - Teflon Coating Of Ball(s) Must Be In Accordance With General Note ;8; of Drawing ;8617511; . 3.12.1 Naval Ordnance Systems Command Od 10362 First Revision Dated 15 Aug 1961 Is Provided By Contract Support Library Reference Number Csd018 In Ecds At Https://register.nslc.navy.mil/ 3.12.2 ;this Teflon Coating Procedure Is Applicable To Item 18l1 - Ball On Drawing 8617511; 3.12.3 Csd099 Provides Guidance For Acceptance/rejection Of Teflon-coated Valve Balls After Valve Assembly Production Testing. 3.13 Chemours Company (formerly Dupont) Teflon Coating 850g-204 And 852g-201. Use Of Chemours Company (formerly Dupont) Teflon Coating 851n-204 And 852n-201 Is Acceptable Until Exhausted - Teflon Coating Of Ball(s) Must Be In Accordance With General Note ;5; of Drawing ;7285198; . 3.13.1 Naval Ordnance Systems Command Od 10362 First Revision Dated 15 Aug 1961 Is Provided By Contract Support Library Reference Number Csd018 In Ecds At Https://register.nslc.navy.mil/ 3.13.2 ;this Teflon Coating Procedure Is Applicable To Item 51l1 - Ball On Drawing 7285198; 3.13.3 Csd099 Provides Guidance For Acceptance/rejection Of Teflon-coated Valve Balls After Valve Assembly Production Testing. 3.14 Contract Support Library - Additional Requirements For This Item Are Identified As Contract Support Library Reference Number ;csd099 And Csd441; In Ecds At Https://register.nslc.navy.mil/ 3.15 O-ring Grooves And Mating Sealing Surfaces Must Be Inspected Per The Contractually Invoked Drawings Or Specifications. When The Drawings Or Specifications Do Not Provide Specific Defect Criteria Or State That No Defects Are Allowed, The General acceptance Criteria (gac) Standard Must Be Used For Inspecting O-ring Grooves And Mating Sealing Surfaces Only. Repairs To Sealing Surfaces And O-ring Grooves With Unacceptable Defects May Be Accomplished Within The Limits Of The Size And Tolerances Provided in The Applicable Drawing. Repairs Thatwould Exceed These Limits Require Approval (including Final Dimensions). The Data That Is Red Lined (crossed Out) Is Excluded From The Gac For This Contract And Is Not To Be Used For Acceptance Or Rejection Criteria. the Gac Document Is Identified As Contract Support Library Reference Number Csd008 At Https://register.nslc.navy.mil/ 3.16 Thread Forming - The Following Provides The Official Interpretation Of Paragraph 4.5.2.7 Of Mil-dtl-1222. 3.16.1 In Order To Qualify For "alternate Mechanical Testing" Found In Mil-dtl-1222j Paragraph 4.5.2.7 And Utilize The Mechanical Properties For The Starting Bar Stock In Lieu Of Performing Yield Strength Or Proof Stress Testing On Finished Fasteners, All Of the Subsequent Provisions Found In Mil-dtl-1222j Paragraphs 4.5.2.7 A Through E Must Be Met. If Any Single Provision Is Not Met, All Required Mechanical Testing Must Be Performed On The Finished Full Sized Fasteners. These Provisions Are Explained As Follows: a. Proper Product Lot Control And Traceability Must Be In Place. b. No Heat Treatment (including Hot Heading And Hot Forming), Cold Forming, Drawing, Rolling And Thread Rolling May Be Performed On The Starting Bar, Fastener Blanks Or Finished Fasteners After The Completion Of The Mechanical Testing On The Starting Bar. c. And D. The Proper Size Starting Bar Must Be Selected To Ensure Mechanical Properties Of Finished Fasteners Are Represented By The Mechanical Properties Of The Starting Bar. e. The Mandatory Testing, Axial Tensile (studs) And Wedge Tensile (screws And Bolts) Must Be Performed On Full Sized Fasteners. Note That There Is A Typographical Error In Paragraph 4.5.2.7 And That The Axial Load Test Is A Mandatory Test That Must Be performed On Studs As Required In Paragraph 4.5.2.7.e. 3.16.2 Thread Rolling Is A Cold Working Process And Is Not Considered To Be A Machining Or Grinding Operation. Therefore, Fasteners Which Have Rolled Threads Do Not Satisfy The Provisions Of Mil-dtl-1222j Paragraph 4.5.2.7.b And Are Not Eligible For The "alternate Mechanical Testing" Provision. 3.16.3 Thread Rolling Alone Is Not A Sufficient Cold Working Process To Qualify A Fastener To Be In The Cold Worked (cw) Condition. This Condition Is Only Applicable To Some 300 Series Stainless Steel Studs, Screws And Nuts. These Cw Condition Fasteners must Be Manufactured From Cold Worked Bar Stock Or Be Cold Headed In Order To Qualify. The Threads May Subsequently Be Rolled, Machined Or Ground. Testing Of The Finished Fasteners And/or Reporting Of The Starting Bar Stock Material Properties Is Subject To the Same Provisions Found In Mil-dtl-1222j Paragraph 4.5.2.7 And Discussed Above. 3.17 Thread Inspection Requirements - All Threads On Threaded Parts Must Be Inspected Using Appropriate Inspection Methods, Inspection Systems, And Inspection Gages/instruments In Accordance With Fed-std-h28 Series. Substitution Of Thecommercial Equivalent inspection In Accordance With Asme B1 Series Is Acceptable. 3.17.1 System 21 Of Fed-std-h28/20 Must Be Used As A Minimum Inspection Requirement For Threads When The Design Drawing Or Design Specification Does Not Specify An Inspection Requirement. 3.17.2 For Navy And Shipyard Drawings, System 21 Of Fed-std-h28/20 May Be Substituted For System 22 Without Further Navy Approval When The Design Drawing Invokes System 22 And Does Not Cite Governing Specifications That Specifically Require System 22. System 22 Of Fed-std-h28/20 Must Be Used When The Drawing References Other Governing Specifications That Specifically Require System 22, Such As Certain Thread Types Of Mil-dtl-1222. 3.17.3 A Written Request For Concurrence Must Be Submitted When Utilizing Alternative Measuring Equipment Or Measuring Systems Not Applicable To The Specified Inspection System. 3.18 Slow Strain Rate Tensile Test Laboratories - The Slow Strain Rate Tensile Test Of Qq-n-286 Must Be Performed By One Of The Following Laboratories: huntington Alloys, A Special Metals Company attn: Bill Bolenr 3200 Riverside Drive huntington, Wv 257059 phone: (304) 526-5889 fax: (304) 526-5973 metallurgical Consultants, Inc. attn: W. M. Buehler 4820 Caroline po Box 88046 houston, Tx 77288-0046 phone: (713) 526-6351 fax: (713) 526-2964 naval Surface Warfare Center, Carderock Division attn: Eric Focht Code 614 9500 Macarthur Blvd west Bethesda, Md 20817-5700 phone: (301) 227-5032 fax: (301) 227-5576 teledyne Allvac attn: Dr. W. D. Cao 2020 Ashcraft Ave. monroe, Nc 28110 phone: (704) 289-4511 fax: (704) 289-4269 westmoreland Mechanical Testing And Research Inc. attn: Andrew Wisniewski p.o. Box 388 youngstown, Pa 15696-0388 mannesmann Rohrenwerke mannesmann Forschungsinstitut (mfi) attn: Dr. Weiss postfach 251160 47251 Duisburg germany phone: 011-49-0203-9993194 fax: 011-49-0203-9994415 thyssenkrupp Vdm Usa, Inc. attn: D. C. Agarwal 11210 Steeplecrest Drive, Suite 120 houston, Tx 77065-4939 phone: (281) 955-6683 3.19 K-monel Fasteners - Material Must Be Heat Treated Per Qq-n-286. 3.19.1 Fasteners That Have Been Hot Or Cold Headed Or Roll Threaded Must Be Solution Annealed Followed By Age Hardening Subsequent To All Heading And Thread Rolling Operations. The Mechanical Properties On Certifications Must Be Actual Properties Of The annealed And Age Hardened Material And Must Meet The Requirements Of Qq-n-286. 3.19.2 Qq-n-286 Fasteners That Have Been Headed And/or Roll Threaded Must Not Beage Hardened Unless The Material Has Been Solution Annealed Subsequent To The Heading And Threading Operations. Threads Formed After The Final Age Hardening Heat Treatment Must Be cut Or Ground Only. 3.20 K-monel Fasteners - K-monel Externally Threaded Fasteners Must Have Mechanical Properties Determined In Accordance With Mil-dtl-1222. Test Results Must Include Tensile, Yield, Elongation And Hardness As Required By Mil-dtl-1222. (the Hardness Tests Must be Performed On A Full Size Fastener.) 3.20.1 Studs Require An Axial Tensile Test In Accordance With Mil-dtl-1222. 3.20.2 Headed Fasteners Require A Wedge Tensile Test As Specified Elsewhere In This Contract/purchase Order. 3.21 Internal Threads - All Internal Threads Must Be Formed By Cutting. Cold Forming Of Internal Threads Is Not Acceptable. 3.22 Specification Change - For Qq-n-281, Class B Material: 1 - Footnote 9 To Table Ii Of Qq-n-281 Does Not Apply. 2 - When Starting Material Is Round Bar Greater Than 3" Dia, The Mechanical Properties Of Hex Bar Apply. 3.23 Welding Or Brazing - When Welding, Brazing, And Allied Processes Are Required, As Invoked By Section C Paragraph 3 Requirements, They Must Be In Accordance With S9074-ar-gib-010a/278, 0900-lp-001-7000 For Brazing Of Piping And Pressure Vessel applications, Or S9074-aq-gib-010/248 For Brazing Of Other Applications. For All Production And Repair Welding And Brazing, Personnel And Procedures Must Be Qualified Under S9074-aq-gib-010/248 Or 0900-lp-001-7000, As Applicable. Repair Welding Is Not permitted On ;alloy C90300 Or Qq-n-286 Material; . Procedures And Qualification Data Must Be Submitted For Review And Approval Prior To Performing Any Welding Or Brazing. 3.24 Component Identification Description (cid) - When Applicable Drawing(s) And/or Specification(s) Specify That A Nameplate Or Identification Plate Is Required, The Cid Number ( ;cid T884245580; ) Must Be Added. When No Plate Is Specified, An identification Plate In Accordance With Mil-dtl-15024, Type "c" On Brass Or Type "h" On Aluminum Must Be Securely Attached To Each Assembly Showing The Above Cid Number. No Assembly Must Be Shipped Without The Cid Number Attached. 3.25 Configuration Control - The Contractor Must Maintain The Total Equipment Baseline Configuration. For Items Of Proprietary Design, Contractor Drawings Showing The Latest Assembly Configuration Must Be Provided To The Government In Electronic (c4) Format. definitions Are Provided Elsewhere In The Contract/purchase Order. 3.25.1 Waivers/deviations - All Waivers And Deviations, Regardless Of Significance Or Classification Require Review And Approval By The Contracting Officer. Waivers And Deviations Must Be Designated As Critical, Major, Or Minor. The Contractor Must Provide a Copy Of This Request To The Qar. Requests Must Include The Information Listed Below. A. A Complete Description Of The Contract Requirement Affected And The Nature Of The Waiver/deviation (non-conformance), Including A Classification Of Critical, Major, Or Minor. B. Number Of Units (and Serial/lot Numbers) To Be Delivered In This Configuration. C. Any Impacts To Logistics Support Elements (such As Software, Manuals, Spares, Tools, And Similar) Being Utilized By Government Personnel Or Impacts To The Operational Use Of The Product. D. Information About Remedial Action Being Taken To Prevent Reoccurrence Of The Non-conformance. 3.25.2 All Requests For Waivers/deviations On Navsup-wss Contracts Must Be Submitted To The Navsup Wss Contracting Specialist Via Email. 3.25.3 Ecps - The Government Will Maintain Configuration Control And Change Authority For All Modifications Or Changes Affecting Form, Fit, Function, Or Interface Parameters Of The Equipment And Its Sub-assemblies. The Contractor Must Submit An Engineering change Proposal (ecp) For Any Class I Or Ii Changes That Impact The Equipment Covered By This Contract. Ecps Must Be Prepared In Contractor Format, And Must Include The Following Information: A. The Change Priority, Change Classification (class I Or Class Ii), And Change Justification. B. A Complete Description Of The Change To Be Made And The Need For That Change. C. A Complete Listing Of Other Configuration Items Impacted By The Proposed Change And A Description Of The Impact On Those Cis. D. Proposed Changes To Documents Controlled By The Government. E. Proposed Serial/lot Number Effectivities Of Units To Be Produced In, Or Retrofitted To, The Proposed Configuration. F. Recommendations About The Way A Retrofit Should Be Accomplished. G. Impacts To Any Logistics Support Elements (such As Software, Manuals, Spares, Tools, And Similar) Being Utilized By Government Personnel In Support Of The Product. H. Impacts To The Operational Use Of The Product. I. Complete Estimated Life-cycle Cost Impact Of The Proposed Change. J. Milestones Relating To The Processing And Implementation Of The Engineering Change. 3.26 Certificate Of Compliance - (special Emphasis Material) The Contractor Must Prepare And Submit A Certificate Of Compliance Certifying That The Items/components Furnished Under This Contract Comply With The Requirements Of The Procurement Document, including Any/all Invoked Specifications And Drawings. 3.27 Mercury Free - Mercury And Mercury Containing Compounds Must Not Be Intentionally Added Or Come In Direct Contact With Hardware Or Supplies Furnished Under This Contract. Mercury Contamination Of The Material Will Be Cause For Rejection. 3.28 Navsea 0948-lp-045-7010 - Any Applicable Requirements Of Navships 4410.17,navsea 0948-lp-045-7010, Or 0948-045-7010 Which The Contractor Must Meet Are Included In This Contract/purchase Order. The Above Documents Are For Governmentuse Only. Further application Of The Above Documents Is Prohibited.prohibited. 3.28.1 Marking Of Material With A Material Designator Per The Drawing Is Also Prohibited, With The Exception Of Fasteners. Fasteners Must Be Marked With A Material Symbol/designator As Specified Elsewhere In This Contract. ^ Quality Assurance Requirements ^ 3.29 See Cdrl Di-misc-80678 (test Certification) - A Statement Of Tests Performed, Listing The Pieces Tested Must Be Furnished Along With A Copy Of The Test Results. Certification Must Include The Contractor's Name, Address And Date, Quantity Inspected, identified To The Contract/purchase Order And Item Number, And The Contractor's Or Authorized Personnel's Signature. Test Certifications Must Reference The Standard/specification, Including The Revision, To Which The Testing Was Performed And The Acceptance criteria Used. Test Procedure Numbers May Also Be Referenced On Test Reports. Test Reports On Weldments Must Be Identified To Weld Joint And Layer. 3.30 Welding Requirements - When Production Or Repair Welding Is Required, The Applicable Welding Procedure(s) And Qualification Data Must Be Submitted For Review And Approval. In Addition, The Consumed Weld Metal C Of C As Defined Below Must Be Submitted As part Of The Certification Oqe Package Submitted By The Contractor. note: These Requirements Do Not Apply To Tack/spot Welds. 3.30.1 Approval Of The Contractor's Qualification Data Must Be Obtained Prior To Performing Any Welding (production Or Repair). 3.30.2 If The Contractors Qualification Data Has Previously Been Approved By The Navy For Other Contracts, A Copy Of The Original Approval Letter May Be Submitted Along With The Procedures And Qualification Data Report To Expedite The Approval Process. The approval Letter Must Reference The Applicable Welding Procedure And Qualification Data Report Identification/number. Prior Approval Does Not Guarantee Acceptance For This Or Any Future Contracts. As Far As Practical, All Procedures For The Contract Must Be submitted At The Same Time. Welding Procedures And Qualification Data Must Be Submitted In A Commercially Available Electronic Format Such As Adobe Acrobat Pdf. The Contractor Must State The Applicability Of Each Weld Procedure And Qualification Data Submitted, citing The Drawing Number And Pieces To Be Welded. (i.e. ''wp-123 And Qd-123 Are Submitted For The Weld Joint Between Pieces 1 And 2 On Drawing Abc'.' Wp-456 And Qd-456 Are Submitted For The Hardfacing Of Piece 3 On Drawing Xyz'') 3.30.3 The Pco's Authorization For The Use Of Weld Procedure(s) And Qualification Data For The Specific Application As Submitted Does Not Mitigate The Vendors Responsibility To Comply With The Requirements Of S9074-aq-gib-010, S9074-ar-gib-010a/278,248d The contract. 3.30.4 Authority For The Repair Of Special Repairs In Castings, The Repair Of Wrought Material, Or The Repair Of Forged Material Must Be Obtained Via Request For Waiver From The Procurement Contracting Officer. This Request Must Describe The Defect; Including size, Depth, Location, And A Description Of The Proposed Repair. Repairs Deemed Minor Or Nominal In Accordance With S9074-ar-gib-010/278 Can Be Made At Contractor Discretion In Accordance With S9074-ar-gib-010/278 Requirements; However, Weld Procedure specification (wps) And Procedure Qualification Record (pqr) Submittals Are Still Required. This Request For Navsup-wss Contracts Must Be Submitted Via The Electronic Contractor Data Submission (ecds) Application. 3.30.5 Any New Procedure Qualification Performed Under This Contract Will Require The Vendor To Provide A Minimum 72 Hour Notification To Dcma With An Offer To Observe The Welding Of The Test Assemblies. The 72 Hour Time Limit May Be Modified Upon Mutual agreement Between The Vendor And Dcma. 3.30.6 When Drawings Require Hardfacing Surface Iron Or Nickel Content Not To Exceed 5%, The Contractor Must Verify Surface Iron Or Nickel Content By Performing Chemical Testing As Defined By The Applicable Drawing. The Chemical Test Results Must Be Submitted as Part Of The Qualification Data. 3.30.7 Additional Qualification Requirements For Production Hardfacing Thickness Less Than 1/8-inch: Macro-etch (or Legible Photomacrographs Clearly Showing The Fusion Area) Must Be Submitted For Review And Show Consistent, Minimized Dilution. All Essential elements And Any Elements Not Listed In S9074-aq-gib-010/248 That Influence Dilution Must Be In The Qualification Data And Weld Procedure, With Strict Limits Placed On Each Essential Element. 3.30.8 Preparation And Retention Of Weld Records Is Required, As Specified By Paragraph 4.1.3 Of S9074-ar-gib-010a/278. 3.30.9 When Production Or Repair Welding Is Required On Titanium Materials, Theapplicable Fabrication Plan, Facilities Procedure, Training Plan, And Active Welder Qualification Must Also Be Submitted For Review And Approval. 3.30.10 If The Contractor's Fabrication Plan, Facilities Procedure, Training Plan, Or Active Welder Qualification Has Previously Been Approved By The Navy For Other Contracts, A Copy Of The Original Approval Letter May Be Submitted Along With The Applicable documentation To Expedite The Approval Process. The Approval Letter Must Reference The Applicable Documentation. Prior Approval Does Not Guarantee Acceptance For This Or Any Future Contracts. The Contractor's Fabrication Plan, Facilities Procedure, Training plan, And Active Welder Qualification Must Be Submitted At The Same Time As The Applicable Welding Procedure(s) And Weld Procedure Qualification Data. All Documentation Must Be Submitted In A Commercially Available Electronic Format, Such As Adobe Acrobat Pdf. 3.30.11 A Certificate Of Compliance Is Required For All Weld Filler Metals Used For Production Or Repair Welding, And Must Include The Following: a) Filler Metal Lot Number(s) b) Specification And Type c) A Positive Statement That The Vendor Has Obtained Oqe And Verified That Each Lot Of Weld Filler Material Conforms To Specification Requirements. d) A Positive Statement Verifying That The Weld Filler Metals Were The Correct Material Type Or Grade Prior To Consumption. 3.30.12 When Production Welds Or Repair Welds Are Performed By A Subcontractor, The Requirement For Submission Of All Certification Documentation Required Herein Must Be Passed Down To The Subcontractor. 3.31 Radiography (rt) - Radiography Must Be Performed In Accordance With T9074-as-gib-010/271. Rt Acceptable Criteria For Castings To Be Criticality Level I Per The Applicable Table Of S9074-ar-gib-010a/278. Rt Acceptance Criteria For Weldments To Be Per The applicable Table Of S9074-ar-gib-010a/278 (p-1 Piping) Or Mil-std-2035, Class 1, As Applicable. 3.31.1 See Cdrl Di-misc-80678 (rss) - The Contractor Or Activity Performing The Radiography Must Be Responsible For Preparing The Radiographic Shooting Sketches (rss) In Accordance With T9074-as-gib-010/271. Shooting Sketch Approval Is Not Required For radiography Of Weldments. The Radiographic Standard Shooting Sketches (rsss) Referenced On The Applicable Drawing May Be Used, However, Since T9074-as-gib-010/271 Permits A Variety Of Processes, The Rsss May Not Be Applicable As They Will Not Necessarily Depend only On The Coverage Requirements, But Also On The Equipment And Procedures Of The Particular Radiographic Facility. Approval Of These Shooting Sketches Or Radiographic Standard Shooting Sketches Is Required Per S9074-ar-gib-010a/278. If This Data Has Been previously Approved By A Navy Activity, The Original Approval Letter Must Be Submitted At The Same Time As Rt Film And Reader Sheet Submittal. 3.31.2 All Pieces Radiographed Must Be Permanently Marked With "rt" And A Unique Rt Serial Number. (the Unique Rt Serial Number Must Be Directly Traceable To The Rt Film.) 3.31.3 See Cdrl Di-misc-80678 (production Radiography) - Production Radiography Requires Final Acceptance By The Navy. The Items Listed Below Must Be Submitted For Final Acceptance, Cataloging, File, And Retention. They Must Be Submitted And Approved Prior To shipment Of The Applicable Hardware. However, When The Source Certification Clause Is Invoked, They Must Be Submitted A Minimum Of Forty-five (45) Working Days Prior To The Date Of Source Certification Inspection. (a) Film (b) Rss/rsss (c) Rs (reader Sheets) (d) Documentation Record Listing The Part Number, Heat/lot Traceability, And Theunique Rt Serial Number (which Is Traceable To The Rt Film And Reader Sheet) 3.32 Quality System Requirements - The Contractor Furnishing Items Under This Contract/purchase Order Must Provide And Maintain A Quality System In Accordance With Iso-9001 As Amplified Or Modified Herein, With The Calibration System Requirements Of Iso-10012 or Ansi-z540.3 With Iso-17025. A Quality System In Accordance With Mil-i-45208, With The Calibration System Requirements Of Mil-std-45662, Is Acceptable As An Alternate. 3.32.1 The Contractor's Quality System And Products Supplied Under The System Are Subject To Evaluation, Verification Inspection, And Acceptance/non-acceptance By The Government Representative To Determine The System's Effectiveness In Meeting The Quality requirements Established In The Contract/purchase Order. 3.32.2 The Contractor's Quality System Must Be Documented And Must Be Available For Review By The Contracting Officer Or His Representative Prior To Initiation Of Production And Throughout The Life Of The Contract. The Prime Contractor Must, Upon notification, Make His Facilities Available For Audit By The Contracting Officer Or His Authorized Representative. 3.32.3 See Cdrl Di-qcic-81110 (inspection System Procedures) - All Suppliers Of Level I/subsafe (li/ss) Material Are Required To Submit A Copy Of Their Current Documented Quality System Procedures To The Procurement Contracting Officer (pco) Prior To Award Of any Contract/purchase Order. Suppliers That Have A Copy Of Their Current Quality System Procedures On File At The Procuring Activity May Request The Pco Waive This Requirement. 3.32.4 This Contract Provides For The Performance Of Government Quality Assurance At Source. The Place Or Places Of Performance May Not Be Changed Without The Authorization Of The Procurement Contracting Officer. Upon Receipt Of This Order, Promptly notify The Government Representative Who Normally Services Your Plant So That Appropriate Planning For Government Inspection Can Be Accomplished. If You Do Not Have An Assigned Government Representative, Notify The Nearest Defense Contract Management Agency (dcma) Office. In The Event That A Local Government Representative Or Dcma Office Cannot Be Located, Our Purchasing Agent Should Be Notified Immediately. 3.32.5 Any Changes Made By The Contractor To A Qualified Quality System Will Require Re-submittal To The Pco And Concurrence By The Government Quality Assurance Representative Prior To Adoption. 3.33 Contractor Inspection Requirements - The Contractor Must Maintain Adequate Records Of All Inspections And Tests. The Records Must Indicate The Nature And Number Of Observations Made, The Number And Type Of Deficiencies Found, The Quantities Approved And rejected And The Nature Of Corrective Action Taken As Appropriate. Inspection Records Must Be Traceable To The Material Inspected. 3.33.1 The Supplier's Gages, Measuring And Test Equipment Must Be Made Available For Use By The Government Representative When Required To Determine Conformance With Contract Requirements. When Conditions Warrant, The Supplier's Personnel Must Be Made available For Operations Of Such Devices and For Verification Of Their Accuracy And Condition. 3.33.2 All Documents And Reference Data Applicable To This Contract Must Be Available For Review By The Government Representative. Copies Of Documents Required For Government Inspection Purposes Must Be Furnished In Accordance With The Instructions Provided by The Government Representative. 3.34 Subcontractor Inspection Requirements - The Government Has The Right To Inspect At Source, Any Supplies Or Services That Were Not Manufactured Or Performed Within The Contractor's Facility. Such Inspection Can Only Be Requested By Or Under Authorization of The Government Representative. Any Purchasing Documents To A Subcontractor Must Cite The Applicable Portions Of The Contractually Invoked Quality System (e.g. Calibration Requirements), Plus Any Product Requirements That Apply To The Supplies Being purchased. When The Government Elects To Perform Source Inspection At The Subcontractor's Facility, Applicable Purchase Documents Must Be Annotated With The Following Statement: "a Government Inspection Is Required Prior To Shipment From Your Plant. Upon receipt Of This Order, Promptly Notify The Government Representative Who Normally Services Your Plant So That Appropriate Planning For Government Inspection Can Be Accomplished. If You Do Not Have An Assigned Government Representative, Notify The Nearest defense Contract Management Agency (dcma) Office. In The Event That A Local Government Representative Or Dcma Office Cannot Be Located, Our Purchasing Agent Should Be Notified Immediately." 3.35 The Prime Contractor's Program Must Include Procedures To Assess The Capability Of The Prospective Suppliers To Produce The Products Or Supply The Services In Accordance With The Contract, Prior To The Issuance Of Any Purchase Document. 3.35.1 Each Sub-tier Supplier Of Material Or Services For Items In Section 3 Of This Contract Must Be Subjected To A Periodic Review Or Audit By The Prime To Determine The Continued Capability Of The Supplier To Control The Quality Of The Products Or Services specified In The Purchase Order Or Contract. 3.35.2 The Prime Contractor Must Ensure That The Purchased Product Conforms To Specified Purchase Requirements And This Contract. The Type And Extent Of Control Applied To The Supplier And The Purchased Product Must Be Dependent Upon The Effect Of The purchased Product On The End Item Represented By This Contract. 3.35.3 The Prime Contractor Must Evaluate The Requirements Of The Contract And Select Suppliers Based On Their Ability To Supply The Product In Accordance With The Prime Contractor's Requirements And The Contract. Criteria For Selection And Evaluation Must be Established. Records Of This Effort Must Be Available For Review By The Government. 3.35.4 The Prime Contractor's Supplier Quality Assurance Program Must Provide For A Review Of Purchase Documents To Assure Applicable Quality Requirements Are Included Or Referenced In The Documentation For Compliance By The Supplier. 3.36 Government Furnished Material And/or Equipment (gfm/gfe) - When Material Or Equipment Is Furnished By The Government, The Contractor Must Develop Documented Control Procedures That Require At Least The Following: 3.36.1 Visual Examination Upon Receipt To Detect Damage During Transit. 3.36.2 Inspection For Completeness And Proper Type. 3.36.3 Verification Of Material Quality Received. 3.36.4 Periodic Inspection And Precautions To Assure Adequate Storage Conditions And To Guard Against Damage From Handling And Deterioration During Storage. 3.36.5 Functional Testing, Either Prior To Or After Installation, Or Both, As Required By The Contract To Determine Satisfactory Operation. 3.36.6 Identification And Protection From Improper Use Or Disposition. 3.36.7 Reporting To The Government, Any Gfm Or Gfe Property Found Damaged, Malfunctioning, Or Otherwise Unsuitable For Use. In The Event Of Damage Or Malfunction During Or After Installation, The Supplier Must Determine And Record Probable Cause And necessity For Withholding The Material From Use. 3.36.8 For Gfe Material, And As Required By The Terms Of The Bailment Agreement, The Supplier Must Establish Procedures For Adequate Storage, Maintenance, And Inspection Of Bailed Government Material. Records Of All Inspection And Maintenance Performed On bailed Property Must Be Maintained. 3.36.9 Material Returned To The Contractor Must Be Handled As Gfm. 3.37 Traceability And Certification Requirements - To Assure That Correct Materials Are Installed In Level I/subsafe Systems, It Is Imperative That Traceability Be Maintained From The Material To The Material Certification Test Report And Other Required objective Quality Evidence (oqe). The Material Certification Report Must Completely And Accurately Reflect That The Material Supplied Meets The Specified Requirements. Materials Requiring Traceability And Certification Data Are Identified Within Paragraph 3, section C Of This Contract/purchase Order. 3.37.1 The Following Provides The Minimum Requirements For Maintaining Material Traceability And Supplements The Requirements Specified In Di-misc-81020 And Elsewhere In The Contract/purchase Order. The Contractor Must Develop Written Procedures That implement The Material Control Requirements Stated Herein. 3.38 Material Traceability - The Certification Data Report Must Be Identified Through A Unique Traceability Number, Heat-lot Number, Or Heat-treat Number For Metallic Material Or Batch Of Non-metallic Material, As Applicable, Which Must Also Be Marked On The material. This Traceability Marking On The Material Must Provide Direct Traceability To The Material's Chemical Composition And Mechanical Properties Certification Data. For Material Produced By Batch, Continuous Cast, Or Continuous Pour Processes, Samples must Be Taken No Less Than Once In Every Eight Hours Of Operation For The Purpose Of Validating Proper Chemical Composition And Mechanical Properties. Traceability Must Be Maintained Through All Process Operations Including Any Subcontracted Operations, To The finished Component. 3.38.1 Material Marking For Traceability And Identification - The Following Are The Minimum Marking Requirements. Additional/alternate Marking Requirements, If Applicable, Will Be Specified Elsewhere In The Contract/purchase Order. In Addition To The marking Requirements On Applicable Drawings And/or Specifications, Marking For Traceability Is Required. All Traceability Markings Must Be Permanently Applied In Accordance With Mil-std-792 (except As Specified Below). An Alternate Marking Method Is permissible Provided It Is An Available Option In The Contractually Invoked Specification Or Drawing, Except In Instances Where The Material Has Been Modified By This Contract/purchase Order And Differs From That Specified In The Specification Or Drawing. 3.38.2 Traceability Markings For Items With Precision Machined Or Plated Surfaces, Or Material With Suitable Marking Surface Areas Less Than 3/8 Inches Square (either 3/8" X 3/8" Or An Area Equal To 0.1406 Inches Square) Must Be Applied To A Durable Tag And the Tag Securely Affixed To The Material. 3.38.3 Permanent Marking Must Be Legible And Must Be Located So As To Not Affect The Form, Fit, And Function Of The Material. ;marking Area To Be As Shown On Drawing. Self-locking Nuts To Be Marked On The Hex Flats. Balls Must Be Marked In The Waterway And seats To Be Marked On The Outer Cylindrical Surface.; 3.38.4 Seat Marking - Each Seat Must Be Permanently Marked In Accordance With Mil-std-792, Type I And As Stated Below, Except For Teflon Seats, Which Must Only Be Tagged. Type Ix Marking May Be Substituted For Type I, Provided The Minimum Character Size scribed By The Marking Tool Must Be Approximately 3/32 Inch High To Insure Legibility. Permanent Marking Is Not Permitted On Teflon Seats. seat Marking Requirements Must Maintain Complete Traceability To Certification Oqe. Seat Marking Must Be Either Heat/lot Or Batch Number, A Vendor Traceability Number/code, Or A Combination Thereof And Must Be Unique To The Material Certification. 3.38.5 Traceability Markings Must Be Maintained Through Assembly, And Whenever Possible Must Be Visible After Assembly. For Items Where The Marking Is Not Visible After Assembly, A Durable Tag Must Be Securely Attached To The Item Identifying The Part number, Piece Number, Traceability Number, And The Location Of The Permanent Mark. 3.39 See Cdrl-di-misc-81020 (chemical And Mechanical) And Cdrl Di-misc-80678 (seat Material) - Material Certifications - The Following Material Certification Requirements Apply: 3.39.1 Metallic Material - Quantitative Chemical And Mechanical Analysis Of Material Traceable To Traceability Markings Is Required. Material Certification Test Reports Must Include The Class, Form, Condition, Grade, Type, Finish, And/or Composition, As applicable, Of The Material Supplied. 3.39.2 Non-metallic Material - The Contractor Must Furnish The Applicable Test Reports For Each Heat/lot/batch Of Seat Material. Material Certification Test Reports Must Include, In Addition To The Specification, The Class, Form, Grade, Type, Process, And/or composition, As Applicable, Of The Material Supplied. 3.39.3 Re-identification And Re-certification Of Metallic Material Is Required When The Material Is Subjected To A Process Which Alters Its Properties. If The Starting Material Or Raw Stock Is Processed In A Manner That Will Not Affect Its Chemical composition Or Mechanical Properties, The Original Certifications For The Chemical Composition And Mechanical Properties, As Required By The Material Specification, Are Acceptable. Re-certification Of The Chemical Or Mechanical Properties Is Required If A process Is Used During Fabrication That Alters The Original Properties Of The Material (e.g. Alloying, Heat Treating, Or Forming). In These Instances, The Properties Of The Material Must Be Re-determined And Documented To Reflect The Altered Condition. The altered Material Must Be Uniquely Re-identified. The Properties Thus Determined And Documented, Are Required For Final Certification And Must Conform To The Material Specification Or The Contract/purchase Order Requirements. When Only The Mechanical Properties are Altered, The Original Certification Forchemical Composition Must Be Overstamped And Annotated With The Unique Traceability Marking Used With The Altered Material And At A Minimum Contain The Information Below. traceability Marking________________________________________________ (marking On Finished Item) is Fabricated From Raw Material Identified To heat/lot Number _______________ And Heat Treat Number ______________________ (when Applicable) _________________________________________ Date _____________________ (name And Signature Of Auth. Co. Rep.) 3.39.4 Material Certification Data Forwarded By The Manufacturer Must Contain A Signed Certification That The Report Results Represent The Actual Attributes Of The Material Furnished And Indicate Full Compliance With All Applicable Specification And Contract requirements. Transcription Of Certification Data Is Prohibited. 3.39.5 Statements On Material Certification Documents Must Be Positive And Unqualified. Disclaimers Such As "to The Best Of Our Knowledge" Or "we Believe The Information Contained Herein Is True" Are Not Acceptable. 3.39.6 If Material Is Received Without The Required Certification Papers Or With Incorrect/missing Data On The Certification Papers, The Material Will Be Rejected. 3.40 Material Handling - The Written Material Control Process Must Include The Following: 3.40.1 All Raw Materials Must Have Traceability Markings (except As Specified Below). 3.40.2 Stored Raw Materials Requiring Traceability Must Be Segregated To Preclude Intermingling With Materials Not Requiring Traceability. 3.40.3 When Traceability Markings Will Be Removed By A Manufacturing Or Fabrication Process, The Marking Must Be Recorded Prior To Removal And Be Immediately Restored Upon Completion Of The Process. If This Cannot Be Done Or Is Impractical, An Appropriate material Control Procedure (such As A Bag And Tag, Tagging, And/or Tote Box Control) Must Be Employed. The Material Control Procedure Must Provide A Method Of Positive Control To Preclude Commingling Of Heats/lots Or Loss Of Traceability. The Traceability marking Must Be Reapplied Upon Completion Of The Final Manufacturing Process. 3.40.4 Brazing Or Weld Filler Metals For Strength Welds Forming Or Integral With Pressure Containing Components Or Assemblies Requiring Traceability Must Be Verified To Be The Correct Material, And Type Or Grade, As Applicable, Prior To Consumption. At A minimum, Material Verification Must Consist Of Inspection Of Material Test Reports For Conformance To Specified Requirements. Control Of Welding And Brazing Filler Metals Must Be Maintained To The Point Of Consumption To Assure Use Of The Correct Type And grade. Markings And Traceability Requirements Do Not Apply To Brazing And Weld Filler Metals After Consumption. It Is The Responsibility Of The Prime Contractor To Ensure Conformance With The Above Requirements On Welds Performed By Their Subcontractors. 3.40.5 Purchase Orders For Raw Material Must Specify That The Material Be Traceable To Material Certification Test Reports By Traceability Markings On The Material And Identified On The Test Reports. The Certification Data Requirements Contained In di-misc-81020 Must Be Invoked By The Prime Contractor On All Subcontractors Supplying Level I Material. 3.40.6 The Material Control Process Must Include Requirements For The Maintenance Of Traceability For Items Sent Out For Subcontracted Operations. If Such Operations Would Remove Traceability Markings, Purchase Or Work Orders Must Specify A Method And marking Location For Remarking. The Contractor Must Also Ensure That Subcontractor Production Controls Are Adequate To Preclude Commingling Of Materials During Processing. 3.41 Receiving Inspection 3.41.1 Products And Services Produced By Sub-tier Suppliers For Incorporation In The Contract End Item Must Be Subject To Inspection Or Audit At The Time Of Receipt By The Prime Prior To Further Processing Within The Prime Contractor's Plant Or Shipment To another Location. 3.41.2 Receiving Inspection Must Include As A Minimum - verification That The Traceability Marking On The Material Agrees With That On The Certification Test Reports. verification That Certification Test Reports Are Legible And Complete. verification That The Contents Of The Certification Test Reports Are In Compliance With The Contractually Invoked Specifications And Requirements. 3.42 Discrepancy Reporting 3.42.1 Nonconforming Products Must Be Identified And Processed In Accordance With The Prime Contractor's Procedures For Controlling Nonconforming Products. The Prime Contractor Must Report The Receipt Of Any Nonconforming Products To The Responsible Sub-tier supplier In Accordance With Established Procedures. Nonconforming Material Records Will Be Maintained And Available For Review By The Government Quality Assurance Representative (qar). 3.43 Final Inspection - The Following Inspections Must Be Performed Prior To Government Inspection And Acceptance. 3.43.1 Material Sampling - Material Must Be Inspected For Form, Fit, And Function. Lot Acceptance Must Be Based On Zero Defects And Lot Rejection Based On One Defect. The Sample Size Must Be In Accordance With The Sampling Plan(s) In The Applicable Military specification Or Standard, Federal Specification Or Standard, Or Drawing To Which The Material Was Manufactured. In The Absence Of Such Sampling Plans, Sampling Inspection Must Be Per Ansi/asq-z1.4, General Inspection Level Ii (for Sample Size Selection Code), table Iia (for Sample Size). small Lot Sizes - For Lot Sizes Of Fifty Or Less, The Minimum Sample Size Must Be Eight Units. For Lot Sizes Of Eight Or Less, The Sample Size Must Be One Hundred Percent Of The Lot. 3.43.2 The Manufacturer May Elect To Use Statistical Process Control (spc) To Assure Product Quality In Lieu Of The Above Attribute Sampling Plan, Provided That The Spc Methodology/system Used Provides Acceptable Products To The Government. However, The government/navy Receipt Inspection Activity May Perform Their Acceptance Inspection Of The Material Using The Attribute Sampling Plan Outlined Above. 3.43.3 All Data Concerning Material Verification (chemical, Mechanical Or Physical Properties), Traceability (material Certifications To Material Marking), And Nondestructive Test (ndt) Certifications For Material Must Be 100% Inspected. The Certification test Reports Must Also Be 100% Inspected For Completeness And Legibility. 3.43.4 All Material Requiring Traceability Must Be 100% Inspected For Traceability Marking And That The Marking Is Legible. 3.43.5 Sampling For Certification Of Non-metallic Material Must Be On The Basis Of One Set Of Test Specimens From Each Heat/lot Or Batch. 3.44 Additional Marking For Fasteners - Fasteners Must Be Marked In Accordance With ;mil-dtl-1222, Except The Self-locking Hex Nuts Must Be Marked In Accordance With Nasm 17828; . The Method Of Marking Must Be Types I, Ii, Iii, V, Viii Or Ix Of Mil-std-792 except For Grades 410, 416 And 431 In The H Condition And Grades 8, 630, A574, And 4340 Which Must Be Marked By Method Ii When Marking Is Applied After The Final Heat Treatment. Markings On Fasteners That Are To Be Coated Must Be Marked Prior To Coating And have A Minimum Depth Of 4 Mils. Traceability Marki
Closing Date22 Aug 2024
Tender AmountRefer Documents 

DEPT OF THE NAVY USA Tender

Others
Corrigendum : Closing Date Modified
United States
Description: Contact Information|4|n742.10|wv2|n/a|madison.m.gray4.civ@us.navy.mil| item Unique Identification And Valuation (jan 2023)|19|||||||||||||||||||| higher-level Contract Quality Requirement (navicp Review Feb 1991)(feb 1999)|1|iso9001| inspection Of Supplies--fixed-price (aug 1996)|2||| inspection/acceptance Point|6||||||| desired And Required Time Of Delivery (june 1997)|29|clin 0001|ten (10)|365||||||||||||||||||||||||||| stop-work Order (aug 1989)|1|| wide Area Workflow Payment Instructions (jan 2023)|16|material - Invoice And Receiving Report (combo) Certifications - Stand-alone Receiving Report|n/a|tbd|n00104|tbd|material - S4306a; Certifications - N39040|n50286|tbd|133.2|n/a|n/a|certifications - N39040|n/a|n /a|see Dd Form 1423|port_ptnh_wawf_notification@navy.mil| navy Use Of Abilityone Support Contractor - Release Of Offeror Information (3-18))|1|wss| equal Opportunity (sep 2016)|2||| integrity Of Unit Prices (nov 2021)|1|| warranty Of Supplies Of A Noncomplex Nature (june 2003)|6|one Year From Date Of Delivery|one Year From Date Of Delivery||||| warranty Of Data--basic (mar 2014)|2||| equal Opportunity For Workers With Disabilities (jun 2020)|2||| transportation Of Supplies By Sea (jan 2023)|2||| progress Payments (nov 2021)|4||||| notice Of Total Small Business Set-aside (oct 2020)(deviation 2020-o0008)|1|| alternate A, Annual Representations And Certifications (nov 2023)|13|||||||||||||| buy American-balance Of Payments Program Certificate-basic (feb 2024)|1|| annual Representations And Certifications (may 2024)|13|332911|750 (# Of Employees)|||||||||||| type Of Contract (apr 1984)|1|firm-fixed Price| notice Of Priority Rating For National Defense, Emergency Perpardeness, And Enrgy Progam Use (april 2008))|2||x| the Hour And Date Specified For Receipt Of Offers Has Been Extended To 4:30pm Est On 25 October 2024 Due To Issues With Required Drawings. form Dd254 Is Not Required, As There Is No Confidential Drawing Needed For This Requirement. the Tdp Has Been Updated From Version 002 To Version 003. all Other Terms And Conditions Remain The Same. \ the Hour And Date Specified For Receipt Of Offers Has Been Extended To 4:30 Pm Est On 2 October 2024. \ 1. The Hour And Date Specified For Receipt Of Offers Has Been Extended To 4:30pm Est On 09 September 2024. 2. The Clauses And Provisions On The Following Pages Have Been Incorporated Into The Solicitation. \ 1. All Contractual Documents (i.e., Contracts, Purchase Orders, Task Orders, Delivery Orders, And Modifications) Related To The Instant Procurement Are Considered To Be "issued" By The Government When Copies Are Either In The Mail, Transmitted By Facsimile, Or sent By Other Electronic Methods, Such As Email. The Government's Acceptance Of The Contract Proposal Constitutes Bilateral Agreement To "issue" Contractual Documents As Detailed Herein. 2. The Following Proposed Delivery Schedule Applies: radiographic Shooting Sketches (rss) 45 Days Adc Dd approval Of Radio Rss 30 Days After Receipt production Radiography (pr) 135 Days After Approval Of Rss Dd approval Of Pr weld Procedures 120 Days After Contract Award approval Must Be Obtained Prior To Performing Welding submission Of Certification Data Cdrls Shall Be On Or Before 20 Days Prior To Scheduled Delivery. Pnsy Review/acceptance Of Certification Cdrls 6 Working Days After Receipt Of Certification Dd 1423 Cdrls. final Delivery Of Material Shall Be On Or Before 365 Days After The Effective Date Of The Contract. 3. Drawings Associated With This Solicitation Will Be Made Available On The Individual Solicitation Page On Contract Opportunities On The Sam.gov Website. 4. Any Contract/order Awarded As A Result Of This Solicitation Will Be A "do" Rated Order Certified For National Defense Use Under The Defense Prioritiesand Allocations System (dpas). See Far Clause 52.211-14, Notice Of Priority Rating For National Defense, emergency Preparedness, And Energy Program Use. 5. The Resultant Award Of This Solicitation Will Be Issued Bilaterally, Requiring The Contractor's Written Acceptance Prior To Execution. 6. Data Item A001 (inspection And Test Plan) May Be Waived If Already On File At Navsup Wss Mech. \ 1. Scope 1.1 The Material Covered In This Contract/purchase Order Will Be Used In A Crucial Shipboard System. The Use Of Incorrect Or Defective Material Would Create A High Probability Of Failure Resulting In Serious Personnel Injury, Loss Of Life, Loss Of Vital shipboard Systems, Or Loss Of The Ship Itself. Therefore, The Material Has Been Designated As Special Emphasis Material (level I, Scope Of Certification, Or Quality Assured) And Special Control Procedures Are Invoked To Ensure Receipt Of Correct Material. 2. Applicable Documents 2.1 Order Of Precedence - In The Event Of A Conflict Between The Text Of This Contract/purchase Order And The References And/or Drawings Cited Herein, The Text Of This Contract/purchase Order Must Take Precedence. Nothing In This Contract/purchase Order, however, Must Supersede Applicable Laws And Regulations Unless A Specific Exemption Has Been Obtained. 2.2 Applicable Documents - The Document(s) Listed Below Form A Part Of This Contract/purchase Order Including Modifications Or Exclusions. 2.2.1 Specification Revisions - The Specification Revisions Listed Under "documents References" Below Are The Preferred Revision. Older And/or Newer R Evisions Are Acceptable When Listed Within Contract Support Library Reference Number Csd155 In Ecds (electric contractor Data Submission) At: Ht Tps://register.nslc.navy.mil/. This Is To Allow Contractors To Use Certain Acceptable Older Specification Revisions To Purge Their Existing Stock Of Material Certified To Those Older Revisions Or To Use Newer Specification revisions When Material Is Certified To Newly Released Revisions,without Requiring The Submittal Of Waiver/deviation Requests For Each Specification Revision On Every Contract. Revisions Of Specifications Reflecting Editorial And/or Re-approval (e.g. E2009, r2014, Etc.) Are Considered Inconsequential, But Are Acceptable When Their Revisions Are Listedwithin Csd155 Or Elsewhere Within This Contract. 2.2.2 Documents, Drawings, And Publications Supplied Are Listed Under "drawing Number". These Items Should Be Retained Until An Award Is Made. 2.2.3 "document References" Listed Below Must Be Obtained By The Contractor. Ordering Information Is Included As An Attachment To This Contract/purchase Order. drawing Data=2640-808x1j1 |53711| A|er |d|0001 | A|49998|0487192 drawing Data=4558709 |80064| E| |d|0001 | E|49998|2026998 drawing Data=4558761 |80064| E| |d|0001 | E|49998|4552240 drawing Data=4558766 |80064| E| |d|0001 | E|49998|0124267 drawing Data=4558766 |80064| E| |d|0002 | E|49998|0118211 drawing Data=4558766 |80064| E| |d|0003 | E|49998|0098547 drawing Data=4558766 |80064| E| |d|0004 | E|49998|0074376 drawing Data=4558766 |80064| E| |d|0005 | E|49998|0079537 drawing Data=4558766 |80064| E| |d|0006 | E|49998|0082494 drawing Data=4558766 |80064| E| |d|0007 | E|49998|0092812 drawing Data=4558766 |80064| E| |d|0008 | E|49998|0077701 drawing Data=4558766 |80064| E| |d|0009 | E|49998|0089388 drawing Data=4558766 |80064| E| |d|0010 | E|49998|0081709 drawing Data=4558766 |80064| E| |d|0011 | E|49998|0087864 drawing Data=4558766 |80064| E| |d|0012 | E|49998|0070378 drawing Data=4558769 |53711| D| |d|0001 | D|49998|2875470 drawing Data=4558772 |80064| D| |d|0001 | D|49998|0346240 drawing Data=4687720 |80064| E| |d|0001 | E|49998|1531397 drawing Data=5510-081-268 |53711| -|st |d|0001 | -|49998|1959589 drawing Data=7285195 |53711| D| |d|0001 | D|49998|0690343 drawing Data=7285245 |53711| E| |d|0001 | E|49998|0766442 drawing Data=7285297 |53711| E| |d|0001 | E|49998|0862180 drawing Data=7285297 |53711| E| |d|0002 | E|49998|0392982 drawing Data=7285297 |53711| E| |d|0003 | E|49998|0280881 drawing Data=7285297 |53711| E| |d|0004 | E|49998|0204692 drawing Data=7286168 |53711| H| |d|0001 | H|49998|2932540 drawing Data=7286250 |53711| J| |d|0001 | J|49998|0350803 drawing Data=7286652 |53711| E| |d|0001 | E|49998|5491711 drawing Data=7650-081-005 |53711| D|st |d|0001 | D|49998|9999999 drawing Data=8617511 |53711| N| |d|0001 | N|49998|3447332 document Ref Data=fed-std-h28 | | |b |190424|a| | | document Ref Data=fed-std-h28 |0020| |b |941221|a| |01| document Ref Data=ansi/asq Z1.4 | | | |080101|a| | | document Ref Data=qq-n-281 | | |d |851023|a|2 | | document Ref Data=qq-n-286 | | |g |001207|a| | | document Ref Data=astm-b367 | | | |220401|a| | | document Ref Data=astm-b369 | | | |200401|a| | | document Ref Data=astm-b505 | | | |180301|a| | | document Ref Data=mil-std-792 | | |f |060516|a| | | document Ref Data=mil-dtl-1222 | | |j |001208|a| | | document Ref Data=astm-e1417 | | | |160615|a| | | document Ref Data=astm-e1444 | | | |160601|a| | | document Ref Data=mil-std-2035 | | |a |950515|a| | | document Ref Data=mil-std-2132 | | |d |080310|f| |01| document Ref Data=astm-d4066 | | | |130701|a| | | document Ref Data=sae Ams 6931 | | |d |171201|a| | | document Ref Data=iso_9001 | | | |081115|a| | | document Ref Data=iso10012 | | | |030415|a| | | document Ref Data=mil-dtl-15024 | | |g |180303|a| | | document Ref Data=iso/iec 17025 | | | |050515|a| | | document Ref Data=qpl 25027 | | |17 |000207|a| | | document Ref Data=mil-i-45208 | | |a |810724|a|1 | | document Ref Data=mil-std-45662 | | |a |880801|a| | | document Ref Data=a-a-59004 | | |b |181118|a| | | document Ref Data=ansi/ncsl Z540.3 | | | |130326|a| | | document Ref Data=0900-lp-001-7000 | | | |810101|c| |01| document Ref Data=aia/nas Nasm 17828 | | |1 |130430|a| | | document Ref Data=aia/nas Nasm 25027 | | |1 |121221|a| | | document Ref Data=s9074-aq-gib-010/248 | | |1 |191112|a| | | document Ref Data=t9074-as-gib-010/271 | | |1 |140911|a| | | document Ref Data=s9074-ar-gib-010a/278 (chg A) | | | |130214|a| | | 3. Requirements 3.1 ;the Complete 1 Inch Combination Hull And Backup Ball Valve Must Be In Accordance With Naval Sea Systems Command Drawing 7286652, Assembly Ira-1, And Provided Engineering Report 2640-808x1j1, Except As Amplified Or Modified Herein.; 3.1.1 ;bolt Holes On Mounting Flanges Must Not Be Drilled.; 3.2 Material For Parts Requiring Certification - Quantitative Chemical And Mechanical Analysis Is Required For The Parts Listed Below Unless Specifically Stated Otherwise: part - ;body, Item 1-1 Of Drawing 72866552; material - ;qq-n-281, Class A, Forged; part - ;blow Connection Weldment, Item 1-2 Of Drawing 7286652; material - ;qq-n-281, Class A; part - ;tailpiece, Item 3a Of Drawing 4558761; material - ;astm-b369, Alloy C96400; part - ;stems, Item 9a And Item 3a On Drawing 4558766; material - ;qq-n-286, Alloy Uns N05500, Form 2, Cold Drawn, Annealed And Age Hardened; part - ;continuous Threaded Studs, Item 48 Of Drawing 7286652; material - ;qq-n-286, Alloy Uns N05500, Annealed And Age Hardened Iaw Mil-dtl-1222, Type Iv; part - ;self-locking Hex Nuts, Item 57 Of Drawing 7286652; material - Qq-n-281, Class A Annealed (hot Finished Or Cold Drawn) Or Class B Cold Drawn. all Material Must Be From The Same Class. self-locking Element- Astm-d4066, Group 01, Class 1, Grade 1 part - ;stem Retaining Nuts, Item 5a Of Drawing 7286168 And Item 19a Of Drawing 4558769; material - ;astm-b505, Alloy C90300; part - ;insert (q3), Item 2a Of Drawing 4558772; material - Sae-ams-6931 note: Mechanical Properties For Bars, Forgings And Forging Stock Over 10" Must Be As Specified In The Applicable Drawing. If The Mechanical Properties Are Not Provided In The Drawing, The Mechanical Properties Specified In Sae-ams-6931 Table 2 For Material 6" to 10", Must Be Applied. part - ;straight Ball, Piece 18l1 Of Drawing 8617511 And Angle Ball, Piece 51l1 Of Drawing 7285198; material - Sae-ams-6931 or centrifugally Cast 6al-4v, Astm-b367, Grade C-5, With Mechanical Properties As Listed In Supplementary Requirement S6. note: Mechanical Properties For Bars, Forgings And Forging Stock Over 10" Must Be As Specified In The Applicable Drawing. If The Mechanical Properties Are Not Provided In The Drawing, The Mechanical Properties Specified In Sae-ams-6931 Table 2 For Material 6" to 10", Must Be Applied. part - ;seats (q3), Item 17 Of Drawing 7285297; material - Md71-gg Mearthane (graphite Filled Urethane). Material Must Be Manufactured By Mearthane Products Inc. Cranston, Ri. (properties Specified Below Only) item Property Astm Test Method Value (a) Hardness D2240 70 +/- 5 Shore D (b) Specific Gravity D792 1.18 +/- 0.02 (c) Tensile Strength D412 (diec) 5000 Psi Min (d) Compression-defl D575 700 Psi Min @ 2% Def. (e) Tensile Impact D1822 300 Ft-lb/sq In (note 1) (type L Specimen) (f) Water Absorption D570 1.5% Max (1 Week At R.t.) note 1: These Values Are Minimum Averages. Separate Specimen Values May Not Vary More Than 25% Under The Specified Minimum. 3.3 Testing Certification - Certifications Are Required For The Following Tests On The Items Listed Below. Additional Testing On Other Piece Parts (if Any) Per Applicable Drawings And Specifications Is Still Required, But Certifications Are Only Required As listed Below. test - Non-destructive Tests item - ;weld Repair (as Applicable); performance - Per Applicable Fabrication Specification acceptance - Per Applicable Fabrication Specification test - ;5x Visual Inspection; item - ;joint J0002; performance - ;t9074-as-gib-010/271; acceptance - ;mil-std-2035; test - ;5x Visual Magnification Or Dye Penetrant Inspection (root Layer); item - ;joint J0001; performance - ;t9074-as-gib-010/271; acceptance - ;mil-std-2035; test - ;visual And Dye Penetrant Inspection (final Layer); item - ;joint J0001; performance - ;t9074-as-gib-010/271; acceptance - ;mil-std-2035; test - Weldability Test Of Astm-b369 Material item - ;tailpiece, Item 3a Of Drawing 4558761; performance - Astm-b369 acceptance - Astm-b369 test - ;liquid Penetrant Inspection; item - ;continuous Threaded Studs, Item 48 Of Drawing 7286652; performance - T9074-as-gib-010/271; Sampling Must Be Per Mil-dtl-1222 acceptance - Mil-dtl-1222 test - ;dye Penetrant Inspection For Non-magnetic Grades; item - ;self-locking Hex Nuts, Item 57 Of Drawing 7286652; performance - T9074-as-gib-010/271 Or Astm-e1417/astm-e1444 (method C Solvent Removal Techniques Must Not Be Used On Thread) acceptance - ;nasm25027; attribute - Annealing And Age Hardening item - ;stems, Item 9a And Item 3a On Drawing 4558766 And Continuous Threaded Studs, Item 48 Of Drawing 7286652; performance - Qq-n-286 test - Quality Conformance Tests item - Self-locking Nuts performance - ;nasm25027; acceptance - ;nasm25027; attribute - Certificate Of Completion item - Self-locking Nut Nonmetallic Insert performance - ;astm-d4066, Group 01, Class 1, Grade 1; attribute - Certificate Of Compliance item - Self-locking Nuts performance - This Certificate Must State That Self-locking Nuts Were Manufactured By An Approved Source. Approved Sources Are Those Listed On Qpl-25027 For The Appropriate Fastener. This Qpl May Also Be Considered As Approved Sources For Heavy Hex self-locking Nuts. test - Pressure Tests item - Each Assembly performance - ;general Note 7001 Of Drawing 7286652; acceptance - ;general Note 7001 Of Drawing 7286652; test - Ultrasonic Inspection On Starting Material item - ;all Items Requiring Certification Made From Qq-n-286 With A Diameter Or Minimum Distance Between Parallel Surfaces Of 4 Inches Or Greater Of The Starting Material, Or When Required By A Drawing Or Specification Invoked Elsewhere In This Contract; performance - T9074-as-gib-010/271 Or Mil-std-2132, And Qq-n-286 acceptance - Qq-n-286 3.4 Radiography Is Required On ;tailpiece, Item 3a Of Drawing 4558761; . 3.5 The Pressure Tolerance Must Be As Specified In The Assembly Drawing, Detail Drawing, Design Specification Or Elsewhere In This Contract. Where Pressure Tolerances Are Not Provided By Drawings, Specifications Or Specified Elsewhere In This Contract, The following Must Be Used: For Pressure Tests Below 100 Psig, The Pressure Tolerance Must Be +1 Psig / -0 Psig. For Pressure Tests At Or Above 100 Psig Up To And Including 2500 Psig, The Pressure Tolerance Must Be +2% / -0 Psig Rounded Off To The Nearest Multiple Of The Smallest Graduation On An Analog Test Pressure Gauge, Not To Exceed 50 Psig. For Pressure Tests Above 2500 Psig, The Pressure Tolerance Must Be +2% / -0 Psig, Rounded Off To The Nearest Multiple Of The Smallest Graduation On An Analog Test Pressure Gauge, Not To Exceed 200 Psig. the Pressure Test Time Tolerance Must Be As Specified In The Assembly Drawing, Detail Drawing, Design Specification Or Elsewhere In This Contract. Where Pressure Test Time Tolerances Are Not Provided By Drawings, Specifications Or Specified Elsewhere In This contract, The Following Must Be Used: For A Test Duration Up To And Including 1 Hour, The Tolerance Must Be +5 Minutes / - 0 Minutes. For A Test Duration Of More Than 1 Hour Up To And Including 24 Hours, The Tolerance Must Be +30 Minutes / - 0 Minutes. For A Test Duration Of More Than 24 Hours, The Tolerance Must Be +60 Minutes / - 0 Minutes. 3.6 Thread Forming - The Following Provides The Official Interpretation Of Paragraph 4.5.2.7 Of Mil-dtl-1222. 3.6.1 In Order To Qualify For "alternate Mechanical Testing" Found In Mil-dtl-1222j Paragraph 4.5.2.7 And Utilize The Mechanical Properties For The Starting Bar Stock In Lieu Of Performing Yield Strength Or Proof Stress Testing On Finished Fasteners, All Of the Subsequent Provisions Found In Mil-dtl-1222j Paragraphs 4.5.2.7 A Through E Must Be Met. If Any Single Provision Is Not Met, All Required Mechanical Testing Must Be Performed On The Finished Full Sized Fasteners. These Provisions Are Explained As Follows: a. Proper Product Lot Control And Traceability Must Be In Place. b. No Heat Treatment (including Hot Heading And Hot Forming), Cold Forming, Drawing, Rolling And Thread Rolling May Be Performed On The Starting Bar, Fastener Blanks Or Finished Fasteners After The Completion Of The Mechanical Testing On The Starting Bar. c. And D. The Proper Size Starting Bar Must Be Selected To Ensure Mechanical Properties Of Finished Fasteners Are Represented By The Mechanical Properties Of The Starting Bar. e. The Mandatory Testing, Axial Tensile (studs) And Wedge Tensile (screws And Bolts) Must Be Performed On Full Sized Fasteners. Note That There Is A Typographical Error In Paragraph 4.5.2.7 And That The Axial Load Test Is A Mandatory Test That Must Be performed On Studs As Required In Paragraph 4.5.2.7.e. 3.6.2 Thread Rolling Is A Cold Working Process And Is Not Considered To Be A Machining Or Grinding Operation. Therefore, Fasteners Which Have Rolled Threads Do Not Satisfy The Provisions Of Mil-dtl-1222j Paragraph 4.5.2.7.b And Are Not Eligible For The "alternate Mechanical Testing" Provision. 3.6.3 Thread Rolling Alone Is Not A Sufficient Cold Working Process To Qualify A Fastener To Be In The Cold Worked (cw) Condition. This Condition Is Only Applicable To Some 300 Series Stainless Steel Studs, Screws And Nuts. These Cw Condition Fasteners Must be Manufactured From Cold Worked Bar Stock Or Be Cold Headed In Order To Qualify. The Threads May Subsequently Be Rolled, Machined Or Ground. Testing Of The Finished Fasteners And/or Reporting Of The Starting Bar Stock Material Properties Is Subject To The same Provisions Found In Mil-dtl-1222j Paragraph 4.5.2.7 And Discussed Above. 3.7 Installation Of Titanium Shims Must Be Performed Using Section 6.1.3 Of The Procedure Provided In Csd158 In The Ecds (electronic Contractor Data Submission) System At: Https://register.nslc.navy.mil/. Paragraph 6.1.3.9 Is Not Applicable. 3.7.1 Use Of Alternative Epoxies, Other Than The Epoxies Listed In Equipment/material Section Of Csd158, Must Be Requested As Stated Elsewhere In The Contract/purchase Order. 3.8 Ball Spherical Surface Waviness - Unless Otherwise Specified On Drawing, All Sealing Area Surfaces Must Have A Spherical Surface Waviness Which Does Not Exceed 0.0005 Inches Of Height Per Inch Of Spherical Surface. Roughness And Waviness Ratings Must apply In A Direction Which Yields The Maximum Rating, Normally Perpendicular To The Lay. 3.9 ;surface Waviness Must Be Verified Prior To Teflon Coating.; 3.10 Seat Stack Height Measurement - To Ensure That Each Seat Is Within Tolerance, Check Each Seat Singularly By Measuring The Seat Height Over The Ball. This Measurement Is Calculated By Adding One-half Ball Diameter To The Half Stack Height Dimension On the Drawing. Limits Are Determined By The Ball Diameter Tolerance And The Half Stack Height Tolerance. Check Dimensions By Measuring From The Seat Back Face To Top Of Ball. Manufacturers Of Seats That Do Not Have A Ball Of The Required Size Available Will Be required To Manufacture A Dummy Ball Or Segment Of A Ball With Sufficient Spherical Surface To Check The Above Dimension. 3.11 Chemours Company (formerly Dupont) Teflon Coating 850g-204 And 852g-201. Use Of Chemours Company (formerly Dupont) Teflon Coating 851n-204 And 852n-201 Is Acceptable Until Exhausted - Teflon Coating Of Ball(s) Must Be In Accordance With General Note ;8; of Drawing ;8617511; . 3.11.1 Naval Ordnance Systems Command Od 10362 First Revision Dated 15 Aug 1961 Is Provided By Contract Support Library Reference Number Csd018 In Ecds At Https://register.nslc.navy.mil/ 3.11.2 ;this Teflon Coating Procedure Is Applicable To The Straight Ball, Piece 18l1; 3.11.3 Csd099 Provides Guidance For Acceptance/rejection Of Teflon-coated Valve Balls After Valve Assembly Production Testing. 3.12 Chemours Company (formerly Dupont) Teflon Coating 850g-204 And 852g-201. Use Of Chemours Company (formerly Dupont) Teflon Coating 851n-204 And 852n-201 Is Acceptable Until Exhausted - Teflon Coating Of Ball(s) Must Be In Accordance With General Note ;5; of Drawing ;7285198; . 3.12.1 Naval Ordnance Systems Command Od 10362 First Revision Dated 15 Aug 1961 Is Provided By Contract Support Library Reference Number Csd018 In Ecds At Https://register.nslc.navy.mil/ 3.12.2 ;this Teflon Coating Procedure Is Applicable To The Angle Ball, Piece 51l1; 3.12.3 Csd099 Provides Guidance For Acceptance/rejection Of Teflon-coated Valve Balls After Valve Assembly Production Testing. 3.13 Contract Support Library - Additional Requirements For This Item Are Identified As Contract Support Library Reference Number ;csd099; In Ecds At Https://register.nslc.navy.mil/ 3.14 K-monel Fasteners - K-monel Externally Threaded Fasteners Must Have Mechanical Properties Determined In Accordance With Mil-dtl-1222. Test Results Must Include Tensile, Yield, Elongation And Hardness As Required By Mil-dtl-1222. (the Hardness Tests Must be Performed On A Full Size Fastener.) 3.14.1 Studs Require An Axial Tensile Test In Accordance With Mil-dtl-1222. 3.14.2 Headed Fasteners Require A Wedge Tensile Test As Specified Elsewhere In This Contract/purchase Order. 3.15 K-monel Fasteners - Material Must Be Heat Treated Per Qq-n-286. 3.15.1 Fasteners That Have Been Hot Or Cold Headed Or Roll Threaded Must Be Solution Annealed Followed By Age Hardening Subsequent To All Heading And Thread Rolling Operations. The Mechanical Properties On Certifications Must Be Actual Properties Of The annealed And Age Hardened Material And Must Meet The Requirements Of Qq-n-286. 3.15.2 Qq-n-286 Fasteners That Have Been Headed And/or Roll Threaded Must Not Beage Hardened Unless The Material Has Been Solution Annealed Subsequent To The Heading And Threading Operations. Threads Formed After The Final Age Hardening Heat Treatment Must Be cut Or Ground Only. 3.16 Specification Change - For Qq-n-281, Class B Material: 1 - Footnote 9 To Table Ii Of Qq-n-281 Does Not Apply. 2 - When Starting Material Is Round Bar Greater Than 3" Dia, The Mechanical Properties Of Hex Bar Apply. 3.17 A Visual Inspection Shall Be Performed On The Finished Seat With Acceptance Criteria On Critical Surfaces Per Csd167 In The Ecds (electronic Contractor Data Submission) System At: Https://register.nslc.navy.mil/. 3.18 Component Identification Description (cid) - When Applicable Drawing(s) And/or Specification(s) Specify That A Nameplate Or Identification Plate Is Required, The Cid Number ( ;cid 887306349; ) Must Be Added. When No Plate Is Specified, An Identification plate In Accordance With Mil-dtl-15024, Type "c" On Brass Or Type "h" On Aluminum Must Be Securely Attached To Each Assembly Showing The Above Cid Number. No Assembly Must Be Shipped Without The Cid Number Attached. 3.19 Slow Strain Rate Tensile Test Laboratories - The Slow Strain Rate Tensile Test Of Qq-n-286 Must Be Performed By One Of The Following Laboratories: huntington Alloys, A Special Metals Company attn: Bill Bolenr 3200 Riverside Drive huntington, Wv 257059 phone: (304) 526-5889 fax: (304) 526-5973 metallurgical Consultants, Inc. attn: W. M. Buehler 4820 Caroline po Box 88046 houston, Tx 77288-0046 phone: (713) 526-6351 fax: (713) 526-2964 naval Surface Warfare Center, Carderock Division attn: Eric Focht Code 614 9500 Macarthur Blvd west Bethesda, Md 20817-5700 phone: (301) 227-5032 fax: (301) 227-5576 teledyne Allvac attn: Dr. W. D. Cao 2020 Ashcraft Ave. monroe, Nc 28110 phone: (704) 289-4511 fax: (704) 289-4269 westmoreland Mechanical Testing And Research Inc. attn: Andrew Wisniewski p.o. Box 388 youngstown, Pa 15696-0388 mannesmann Rohrenwerke mannesmann Forschungsinstitut (mfi) attn: Dr. Weiss postfach 251160 47251 Duisburg germany phone: 011-49-0203-9993194 fax: 011-49-0203-9994415 thyssenkrupp Vdm Usa, Inc. attn: D. C. Agarwal 11210 Steeplecrest Drive, Suite 120 houston, Tx 77065-4939 phone: (281) 955-6683 3.20 Internal Threads - All Internal Threads Must Be Formed By Cutting. Cold Forming Of Internal Threads Is Not Acceptable. 3.21 Thread Lubricant - Thread Lubricants Containing Molybdenum Disulfide Must Not Be Used On This Material. Bacteria In Water, Especially Seawater, Causes Molybdenum Disulfide To Break Down. The By-products Of The Breakdown Form Compounds Which Attack The fasteners. Anti-galling Compound A-a-59004 Must Be Used As A Replacement When Thread Lubricant Is Required For Assembly. 3.22 O-ring Grooves And Mating Sealing Surfaces Must Be Inspected Per The Contractually Invoked Drawings Or Specifications. When The Drawings Or Specifications Do Not Provide Specific Defect Criteria Or State That No Defects Are Allowed, The General acceptance Criteria (gac) Standard Must Be Used For Inspecting O-ring Grooves And Mating Sealing Surfaces Only. Repairs To Sealing Surfaces And O-ring Grooves With Unacceptable Defects May Be Accomplished Within The Limits Of The Size And Tolerances Provided in The Applicable Drawing. Repairs Thatwould Exceed These Limits Require Approval (including Final Dimensions). The Data That Is Red Lined (crossed Out) Is Excluded From The Gac For This Contract And Is Not To Be Used For Acceptance Or Rejection Criteria. the Gac Document Is Identified As Contract Support Library Reference Number Csd008 At Https://register.nslc.navy.mil/ 3.23 Thread Inspection Requirements - All Threads On Threaded Parts Must Be Inspected Using Appropriate Inspection Methods, Inspection Systems, And Inspection Gages/instruments In Accordance With Fed-std-h28 Series. Substitution Of Thecommercial Equivalent inspection In Accordance With Asme B1 Series Is Acceptable. 3.23.1 System 21 Of Fed-std-h28/20 Must Be Used As A Minimum Inspection Requirement For Threads When The Design Drawing Or Design Specification Does Not Specify An Inspection Requirement. 3.23.2 For Navy And Shipyard Drawings, System 21 Of Fed-std-h28/20 May Be Substituted For System 22 Without Further Navy Approval When The Design Drawing Invokes System 22 And Does Not Cite Governing Specifications That Specifically Require System 22. System 22 Of Fed-std-h28/20 Must Be Used When The Drawing References Other Governing Specifications That Specifically Require System 22, Such As Certain Thread Types Of Mil-dtl-1222. 3.23.3 A Written Request For Concurrence Must Be Submitted When Utilizing Alternative Measuring Equipment Or Measuring Systems Not Applicable To The Specified Inspection System. 3.24 Welding Or Brazing - When Welding, Brazing, And Allied Processes Are Required, As Invoked By Section C Paragraph 3 Requirements, They Must Be In Accordance With S9074-ar-gib-010a/278, 0900-lp-001-7000 For Brazing Of Piping And Pressure Vessel applications, Or S9074-aq-gib-010/248 For Brazing Of Other Applications. For All Production And Repair Welding And Brazing, Personnel And Procedures Must Be Qualified Under S9074-aq-gib-010/248 Or 0900-lp-001-7000, As Applicable. Repair Welding Is Not permitted On ;on Alloy C90300 And Qq-n-286 Material; . Procedures And Qualification Data Must Be Submitted For Review And Approval Prior To Performing Any Welding Or Brazing. 3.25 Certificate Of Compliance - (special Emphasis Material) The Contractor Must Prepare And Submit A Certificate Of Compliance Certifying That The Items/components Furnished Under This Contract Comply With The Requirements Of The Procurement Document, including Any/all Invoked Specifications And Drawings. 3.26 Configuration Control - The Contractor Must Maintain The Total Equipment Baseline Configuration. For Items Of Proprietary Design, Contractor Drawings Showing The Latest Assembly Configuration Must Be Provided To The Government In Electronic (c4) Format. definitions Are Provided Elsewhere In The Contract/purchase Order. 3.26.1 Waivers/deviations - All Waivers And Deviations, Regardless Of Significance Or Classification Require Review And Approval By The Contracting Officer. Waivers And Deviations Must Be Designated As Critical, Major, Or Minor. The Contractor Must Provide a Copy Of This Request To The Qar. Requests Must Include The Information Listed Below. A. A Complete Description Of The Contract Requirement Affected And The Nature Of The Waiver/deviation (non-conformance), Including A Classification Of Critical, Major, Or Minor. B. Number Of Units (and Serial/lot Numbers) To Be Delivered In This Configuration. C. Any Impacts To Logistics Support Elements (such As Software, Manuals, Spares, Tools, And Similar) Being Utilized By Government Personnel Or Impacts To The Operational Use Of The Product. D. Information About Remedial Action Being Taken To Prevent Reoccurrence Of The Non-conformance. 3.26.2 All Requests For Waivers/deviations On Navsup-wss Contracts Must Be Submitted To The Navsup Wss Contracting Specialist Via Email. 3.26.3 Ecps - The Government Will Maintain Configuration Control And Change Authority For All Modifications Or Changes Affecting Form, Fit, Function, Or Interface Parameters Of The Equipment And Its Sub-assemblies. The Contractor Must Submit An Engineering change Proposal (ecp) For Any Class I Or Ii Changes That Impact The Equipment Covered By This Contract. Ecps Must Be Prepared In Contractor Format, And Must Include The Following Information: A. The Change Priority, Change Classification (class I Or Class Ii), And Change Justification. B. A Complete Description Of The Change To Be Made And The Need For That Change. C. A Complete Listing Of Other Configuration Items Impacted By The Proposed Change And A Description Of The Impact On Those Cis. D. Proposed Changes To Documents Controlled By The Government. E. Proposed Serial/lot Number Effectivities Of Units To Be Produced In, Or Retrofitted To, The Proposed Configuration. F. Recommendations About The Way A Retrofit Should Be Accomplished. G. Impacts To Any Logistics Support Elements (such As Software, Manuals, Spares, Tools, And Similar) Being Utilized By Government Personnel In Support Of The Product. H. Impacts To The Operational Use Of The Product. I. Complete Estimated Life-cycle Cost Impact Of The Proposed Change. J. Milestones Relating To The Processing And Implementation Of The Engineering Change. 3.27 Mercury Free - Mercury And Mercury Containing Compounds Must Not Be Intentionally Added Or Come In Direct Contact With Hardware Or Supplies Furnished Under This Contract. Mercury Contamination Of The Material Will Be Cause For Rejection. 3.28 Navsea 0948-lp-045-7010 - Any Applicable Requirements Of Navships 4410.17,navsea 0948-lp-045-7010, Or 0948-045-7010 Which The Contractor Must Meet Are Included In This Contract/purchase Order. The Above Documents Are For Governmentuse Only. Further application Of The Above Documents Is Prohibited.prohibited. 3.28.1 Marking Of Material With A Material Designator Per The Drawing Is Also Prohibited, With The Exception Of Fasteners. Fasteners Must Be Marked With A Material Symbol/designator As Specified Elsewhere In This Contract. ^ Quality Assurance Requirements ^ 3.29 See Cdrl Di-misc-80678 (test Certification) - A Statement Of Tests Performed, Listing The Pieces Tested Must Be Furnished Along With A Copy Of The Test Results. Certification Must Include The Contractor's Name, Address And Date, Quantity Inspected, identified To The Contract/purchase Order And Item Number, And The Contractor's Or Authorized Personnel's Signature. Test Certifications Must Reference The Standard/specification, Including The Revision, To Which The Testing Was Performed And The Acceptance criteria Used. Test Procedure Numbers May Also Be Referenced On Test Reports. Test Reports On Weldments Must Be Identified To Weld Joint And Layer. 3.30 Quality System Requirements - The Contractor Furnishing Items Under This Contract/purchase Order Must Provide And Maintain A Quality System In Accordance With Iso-9001 As Amplified Or Modified Herein, With The Calibration System Requirements Of Iso-10012 or Ansi-z540.3 With Iso-17025. A Quality System In Accordance With Mil-i-45208, With The Calibration System Requirements Of Mil-std-45662, Is Acceptable As An Alternate. 3.30.1 The Contractor's Quality System And Products Supplied Under The System Are Subject To Evaluation, Verification Inspection, And Acceptance/non-acceptance By The Government Representative To Determine The System's Effectiveness In Meeting The Quality requirements Established In The Contract/purchase Order. 3.30.2 The Contractor's Quality System Must Be Documented And Must Be Available For Review By The Contracting Officer Or His Representative Prior To Initiation Of Production And Throughout The Life Of The Contract. The Prime Contractor Must, Upon notification, Make His Facilities Available For Audit By The Contracting Officer Or His Authorized Representative. 3.30.3 See Cdrl Di-qcic-81110 (inspection System Procedures) - All Suppliers Of Level I/subsafe (li/ss) Material Are Required To Submit A Copy Of Their Current Documented Quality System Procedures To The Procurement Contracting Officer (pco) Prior To Award Of any Contract/purchase Order. Suppliers That Have A Copy Of Their Current Quality System Procedures On File At The Procuring Activity May Request The Pco Waive This Requirement. 3.30.4 This Contract Provides For The Performance Of Government Quality Assurance At Source. The Place Or Places Of Performance May Not Be Changed Without The Authorization Of The Procurement Contracting Officer. Upon Receipt Of This Order, Promptly notify The Government Representative Who Normally Services Your Plant So That Appropriate Planning For Government Inspection Can Be Accomplished. If You Do Not Have An Assigned Government Representative, Notify The Nearest Defense Contract Management Agency (dcma) Office. In The Event That A Local Government Representative Or Dcma Office Cannot Be Located, Our Purchasing Agent Should Be Notified Immediately. 3.30.5 Any Changes Made By The Contractor To A Qualified Quality System Will Require Re-submittal To The Pco And Concurrence By The Government Quality Assurance Representative Prior To Adoption. 3.31 Contractor Inspection Requirements - The Contractor Must Maintain Adequate Records Of All Inspections And Tests. The Records Must Indicate The Nature And Number Of Observations Made, The Number And Type Of Deficiencies Found, The Quantities Approved And rejected And The Nature Of Corrective Action Taken As Appropriate. Inspection Records Must Be Traceable To The Material Inspected. 3.31.1 The Supplier's Gages, Measuring And Test Equipment Must Be Made Available For Use By The Government Representative When Required To Determine Conformance With Contract Requirements. When Conditions Warrant, The Supplier's Personnel Must Be Made available For Operations Of Such Devices and For Verification Of Their Accuracy And Condition. 3.31.2 All Documents And Reference Data Applicable To This Contract Must Be Available For Review By The Government Representative. Copies Of Documents Required For Government Inspection Purposes Must Be Furnished In Accordance With The Instructions Provided by The Government Representative. 3.32 Subcontractor Inspection Requirements - The Government Has The Right To Inspect At Source, Any Supplies Or Services That Were Not Manufactured Or Performed Within The Contractor's Facility. Such Inspection Can Only Be Requested By Or Under Authorization of The Government Representative. Any Purchasing Documents To A Subcontractor Must Cite The Applicable Portions Of The Contractually Invoked Quality System (e.g. Calibration Requirements), Plus Any Product Requirements That Apply To The Supplies Being purchased. When The Government Elects To Perform Source Inspection At The Subcontractor's Facility, Applicable Purchase Documents Must Be Annotated With The Following Statement: "a Government Inspection Is Required Prior To Shipment From Your Plant. Upon receipt Of This Order, Promptly Notify The Government Representative Who Normally Services Your Plant So That Appropriate Planning For Government Inspection Can Be Accomplished. If You Do Not Have An Assigned Government Representative, Notify The Nearest defense Contract Management Agency (dcma) Office. In The Event That A Local Government Representative Or Dcma Office Cannot Be Located, Our Purchasing Agent Should Be Notified Immediately." 3.33 The Prime Contractor's Program Must Include Procedures To Assess The Capability Of The Prospective Suppliers To Produce The Products Or Supply The Services In Accordance With The Contract, Prior To The Issuance Of Any Purchase Document. 3.33.1 Each Sub-tier Supplier Of Material Or Services For Items In Section 3 Of This Contract Must Be Subjected To A Periodic Review Or Audit By The Prime To Determine The Continued Capability Of The Supplier To Control The Quality Of The Products Or Services specified In The Purchase Order Or Contract. 3.33.2 The Prime Contractor Must Ensure That The Purchased Product Conforms To Specified Purchase Requirements And This Contract. The Type And Extent Of Control Applied To The Supplier And The Purchased Product Must Be Dependent Upon The Effect Of The purchased Product On The End Item Represented By This Contract. 3.33.3 The Prime Contractor Must Evaluate The Requirements Of The Contract And Select Suppliers Based On Their Ability To Supply The Product In Accordance With The Prime Contractor's Requirements And The Contract. Criteria For Selection And Evaluation Must be Established. Records Of This Effort Must Be Available For Review By The Government. 3.33.4 The Prime Contractor's Supplier Quality Assurance Program Must Provide For A Review Of Purchase Documents To Assure Applicable Quality Requirements Are Included Or Referenced In The Documentation For Compliance By The Supplier. 3.34 Government Furnished Material And/or Equipment (gfm/gfe) - When Material Or Equipment Is Furnished By The Government, The Contractor Must Develop Documented Control Procedures That Require At Least The Following: 3.34.1 Visual Examination Upon Receipt To Detect Damage During Transit. 3.34.2 Inspection For Completeness And Proper Type. 3.34.3 Verification Of Material Quality Received. 3.34.4 Periodic Inspection And Precautions To Assure Adequate Storage Conditions And To Guard Against Damage From Handling And Deterioration During Storage. 3.34.5 Functional Testing, Either Prior To Or After Installation, Or Both, As Required By The Contract To Determine Satisfactory Operation. 3.34.6 Identification And Protection From Improper Use Or Disposition. 3.34.7 Reporting To The Government, Any Gfm Or Gfe Property Found Damaged, Malfunctioning, Or Otherwise Unsuitable For Use. In The Event Of Damage Or Malfunction During Or After Installation, The Supplier Must Determine And Record Probable Cause And necessity For Withholding The Material From Use. 3.34.8 For Gfe Material, And As Required By The Terms Of The Bailment Agreement, The Supplier Must Establish Procedures For Adequate Storage, Maintenance, And Inspection Of Bailed Government Material. Records Of All Inspection And Maintenance Performed On bailed Property Must Be Maintained. 3.34.9 Material Returned To The Contractor Must Be Handled As Gfm. 3.35 Traceability And Certification Requirements - To Assure That Correct Materials Are Installed In Level I/subsafe Systems, It Is Imperative That Traceability Be Maintained From The Material To The Material Certification Test Report And Other Required objective Quality Evidence (oqe). The Material Certification Report Must Completely And Accurately Reflect That The Material Supplied Meets The Specified Requirements. Materials Requiring Traceability And Certification Data Are Identified Within Paragraph 3, section C Of This Contract/purchase Order. 3.35.1 The Following Provides The Minimum Requirements For Maintaining Material Traceability And Supplements The Requirements Specified In Di-misc-81020 And Elsewhere In The Contract/purchase Order. The Contractor Must Develop Written Procedures That implement The Material Control Requirements Stated Herein. 3.36 Material Traceability - The Certification Data Report Must Be Identified Through A Unique Traceability Number, Heat-lot Number, Or Heat-treat Number For Metallic Material Or Batch Of Non-metallic Material, As Applicable, Which Must Also Be Marked On The material. This Traceability Marking On The Material Must Provide Direct Traceability To The Material's Chemical Composition And Mechanical Properties Certification Data. For Material Produced By Batch, Continuous Cast, Or Continuous Pour Processes, Samples must Be Taken No Less Than Once In Every Eight Hours Of Operation For The Purpose Of Validating Proper Chemical Composition And Mechanical Properties. Traceability Must Be Maintained Through All Process Operations Including Any Subcontracted Operations, To The finished Component. 3.36.1 Material Marking For Traceability And Identification - The Following Are The Minimum Marking Requirements. Additional/alternate Marking Requirements, If Applicable, Will Be Specified Elsewhere In The Contract/purchase Order. In Addition To The marking Requirements On Applicable Drawings And/or Specifications, Marking For Traceability Is Required. All Traceability Markings Must Be Permanently Applied In Accordance With Mil-std-792 (except As Specified Below). An Alternate Marking Method Is permissible Provided It Is An Available Option In The Contractually Invoked Specification Or Drawing, Except In Instances Where The Material Has Been Modified By This Contract/purchase Order And Differs From That Specified In The Specification Or Drawing. 3.36.2 Traceability Markings For Items With Precision Machined Or Plated Surfaces, Or Material With Suitable Marking Surface Areas Less Than 3/8 Inches Square (either 3/8" X 3/8" Or An Area Equal To 0.1406 Inches Square) Must Be Applied To A Durable Tag And the Tag Securely Affixed To The Material. 3.36.3 Permanent Marking Must Be Legible And Must Be Located So As To Not Affect The Form, Fit, And Function Of The Material. ;marking Area To Be As Shown On Drawing. Self-locking Hex Nuts To Be Marked On The Hex Flats. Balls To Be Marked On The Waterway and Seats To Be Marked On The Outer Cylindrical Surface.; 3.36.4 Seat Marking - Each Seat Must Be Permanently Marked In Accordance With Mil-std-792, Type I And As Stated Below, Except For Teflon Seats, Which Must Only Be Tagged. Type Ix Marking May Be Substituted For Type I, Provided The Minimum Character Size scribed By The Marking Tool Must Be Approximately 3/32 Inch High To Insure Legibility. Permanent Marking Is Not Permitted On Teflon Seats. seat Marking Requirements Must Maintain Complete Traceability To Certification Oqe. Seat Marking Must Be Either Heat/lot Or Batch Number, A Vendor Traceability Number/code, Or A Combination Thereof And Must Be Unique To The Material Certification. 3.36.5 Traceability Markings Must Be Maintained Through Assembly, And Whenever Possible Must Be Visible After Assembly. For Items Where The Marking Is Not Visible After Assembly, A Durable Tag Must Be Securely Attached To The Item Identifying The Part number, Piece Number, Traceability Number, And The Location Of The Permanent Mark. 3.37 See Cdrl-di-misc-81020 (chemical And Mechanical) And Cdrl Di-misc-80678 (seat Material) - Material Certifications - The Following Material Certification Requirements Apply: 3.37.1 Metallic Material - Quantitative Chemical And Mechanical Analysis Of Material Traceable To Traceability Markings Is Required. Material Certification Test Reports Must Include The Class, Form, Condition, Grade, Type, Finish, And/or Composition, As applicable, Of The Material Supplied. 3.37.2 Non-metallic Material - The Contractor Must Furnish The Applicable Test Reports For Each Heat/lot/batch Of Seat Material. Material Certification Test Reports Must Include, In Addition To The Specification, The Class, Form, Grade, Type, Process, And/or composition, As Applicable, Of The Material Supplied. 3.37.3 Re-identification And Re-certification Of Metallic Material Is Required When The Material Is Subjected To A Process Which Alters Its Properties. If The Starting Material Or Raw Stock Is Processed In A Manner That Will Not Affect Its Chemical composition Or Mechanical Properties, The Original Certifications For The Chemical Composition And Mechanical Properties, As Required By The Material Specification, Are Acceptable. Re-certification Of The Chemical Or Mechanical Properties Is Required If A process Is Used During Fabrication That Alters The Original Properties Of The Material (e.g. Alloying, Heat Treating, Or Forming). In These Instances, The Properties Of The Material Must Be Re-determined And Documented To Reflect The Altered Condition. The altered Material Must Be Uniquely Re-identified. The Properties Thus Determined And Documented, Are Required For Final Certification And Must Conform To The Material Specification Or The Contract/purchase Order Requirements. When Only The Mechanical Properties are Altered, The Original Certification Forchemical Composition Must Be Overstamped And Annotated With The Unique Traceability Marking Used With The Altered Material And At A Minimum Contain The Information Below. traceability Marking________________________________________________ (marking On Finished Item) is Fabricated From Raw Material Identified To heat/lot Number _______________ And Heat Treat Number ______________________ (when Applicable) _________________________________________ Date _____________________ (name And Signature Of Auth. Co. Rep.) 3.37.4 Material Certification Data Forwarded By The Manufacturer Must Contain A Signed Certification That The Report Results Represent The Actual Attributes Of The Material Furnished And Indicate Full Compliance With All Applicable Specification And Contract requirements. Transcription Of Certification Data Is Prohibited. 3.37.5 Statements On Material Certification Documents Must Be Positive And Unqualified. Disclaimers Such As "to The Best Of Our Knowledge" Or "we Believe The Information Contained Herein Is True" Are Not Acceptable. 3.37.6 If Material Is Received Without The Required Certification Papers Or With Incorrect/missing Data On The Certification Papers, The Material Will Be Rejected. 3.38 Material Handling - The Written Material Control Process Must Include The Following: 3.38.1 All Raw Materials Must Have Traceability Markings (except As Specified Below). 3.38.2 Stored Raw Materials Requiring Traceability Must Be Segregated To Preclude Intermingling With Materials Not Requiring Traceability. 3.38.3 When Traceability Markings Will Be Removed By A Manufacturing Or Fabrication Process, The Marking Must Be Recorded Prior To Removal And Be Immediately Restored Upon Completion Of The Process. If This Cannot Be Done Or Is Impractical, An Appropriate material Control Procedure (such As A Bag And Tag, Tagging, And/or Tote Box Control) Must Be Employed. The Material Control Procedure Must Provide A Method Of Positive Control To Preclude Commingling Of Heats/lots Or Loss Of Traceability. The Traceability marking Must Be Reapplied Upon Completion Of The Final Manufacturing Process. 3.38.4 Brazing Or Weld Filler Metals For Strength Welds Forming Or Integral With Pressure Containing Components Or Assemblies Requiring Traceability Must Be Verified To Be The Correct Material, And Type Or Grade, As Applicable, Prior To Consumption. At A minimum, Material Verification Must Consist Of Inspection Of Material Test Reports For Conformance To Specified Requirements. Control Of Welding And Brazing Filler Metals Must Be Maintained To The Point Of Consumption To Assure Use Of The Correct Type And grade. Markings And Traceability Requirements Do Not Apply To Brazing And Weld Filler Metals After Consumption. It Is The Responsibility Of The Prime Contractor To Ensure Conformance With The Above Requirements On Welds Performed By Their Subcontractors. 3.38.5 Purchase Orders For Raw Material Must Specify That The Material Be Traceable To Material Certification Test Reports By Traceability Markings On The Material And Identified On The Test Reports. The Certification Data Requirements Contained In di-misc-81020 Must Be Invoked By The Prime Contractor On All Subcontractors Supplying Level I Material. 3.38.6 The Material Control Process Must Include Requirements For The Maintenance Of Traceability For Items Sent Out For Subcontracted Operations. If Such Operations Would Remove Traceability Markings, Purchase Or Work Orders Must Specify A Method And marking Location For Remarking. The Contractor Must Also Ensure That Subcontractor Production Controls Are Adequate To Preclude Commingling Of Materials During Processing. 3.39 Receiving Inspection 3.39.1 Products And Services Produced By Sub-tier Suppliers For Incorporation In The Contract End Item Must Be Subject To Inspection Or Audit At The Time Of Receipt By The Prime Prior To Further Processing Within The Prime Contractor's Plant Or Shipment To another Location. 3.39.2 Receiving Inspection Must Include As A Minimum - verification That The Traceability Marking On The Material Agrees With That On The Certification Test Reports. verification That Certification Test Reports Are Legible And Complete. verification That The Contents Of The Certification Test Reports Are In Compliance With The Contractually Invoked Specifications And Requirements. 3.40 Discrepancy Reporting 3.40.1 Nonconforming Products Must Be Identified And Processed In Accordance With The Prime Contractor's Procedures For Controlling Nonconforming Products. The Prime Contractor Must Report The Receipt Of Any Nonconforming Products To The Responsible Sub-tier supplier In Accordance With Established Procedures. Nonconforming Material Records Will Be Maintained And Available For Review By The Government Quality Assurance Representative (qar). 3.41 Final Inspection - The Following Inspections Must Be Performed Prior To Government Inspection And Acceptance. 3.41.1 Material Sampling - Material Must Be Inspected For Form, Fit, And Function. Lot Acceptance Must Be Based On Zero Defects And Lot Rejection Based On One Defect. The Sample Size Must Be In Accordance With The Sampling Plan(s) In The Applicable Military specification Or Standard, Federal Specification Or Standard, Or Drawing To Which The Material Was Manufactured. In The Absence Of Such Sampling Plans, Sampling Inspection Must Be Per Ansi/asq-z1.4, General Inspection Level Ii (for Sample Size Selection Code), table Iia (for Sample Size). small Lot Sizes - For Lot Sizes Of Fifty Or Less, The Minimum Sample Size Must Be Eight Units. For Lot Sizes Of Eight Or Less, The Sample Size Must Be One Hundred Percent Of The Lot. 3.41.2 The Manufacturer May Elect To Use Statistical Process Control (spc) To Assure Product Quality In Lieu Of The Above Attribute Sampling Plan, Provided That The Spc Methodology/system Used Provides Acceptable Products To The Government. However, The government/navy Receipt Inspection Activity May Perform Their Acceptance Inspection Of The Material Using The Attribute Sampling Plan Outlined Above. 3.41.3 All Data Concerning Material Verification (chemical, Mechanical Or Physical Properties), Traceability (material Certifications To Material Marking), And Nondestructive Test (ndt) Certifications For Material Must Be 100% Inspected. The Certification test Reports Must Also Be 100% Inspected For Completeness And Legibility. 3.41.4 All Material Requiring Traceability Must Be 100% Inspected For Traceability Marking And That The Marking Is Legible. 3.41.5 Sampling For Certification Of Non-metallic Material Must Be On The Basis Of One Set Of Test Specimens From Each Heat/lot Or Batch. 3.42 Additional Marking For Fasteners - Fasteners Must Be Marked In Accordance With ;mil-dtl-1222, Except The Self-locking Hex Nuts Must Be Marked In Accordance With Nasm 17828; . The Method Of Marking Must Be Types I, Ii, Iii, V, Viii Or Ix Of Mil-std-792 except For Grades 410, 416 And 431 In The H Condition And Grades 8, 630, A574, And 4340 Which Must Be Marked By Method Ii When Marking Is Applied After The Final Heat Treatment. Markings On Fasteners That Are To Be Coated Must Be Marked Prior To Coating And have A Minimum Depth Of 4 Mils. Traceability Marking Must Be Legible After The Application Of Protective Compounds. 3.42.1 Marking Is Required For All Fasteners Regardless Of Size And Must Include The Material Symbol, The Manufacturer's Identification Symbol, And The Traceability Marking. Marking Must Be Applied On The Head Of Headed Fastener (top Preferred, Side location If Necessary). Self-locking Screws Must Also Be Marked With Six Dots. Where No Contract Invoked Specification Requirement Exists For This Marking, Self-locking Fasteners Must Be Marked With Six Dots Approximately .032" Diameter, Raised Or Depressed by Approximately .010" Located On The Top Perimeter Of The Head Of The Fastener In An Arc Or Circular Pattern. The Six Dots Must Be Distinguishable From All Other Required Markings. 3.43 See Cdrls Di-misc-80875 (welding Procedures) And Di-misc-80876 (weld Procedure Qualification Data) - When Production Or Repair Welding Is Required, The Applicable Welding Procedure(s) And Qualification Data Must Be Submitted For Review And Approval. In addition, The Consumed Weld Metal C Of C As Defined Below Must Be Submitted As Part Of The Certification Oqe Package Submitted By The Contractor. note: These Requirements Do Not Apply To Tack/spot Welds. 3.43.1 Approval Of The Contractor's Qualification Data Must Be Obtained Prior To Performing Any Welding (production Or Repair). 3.43.2 If The Contractors Qualification Data Has Previously Been Approved By The Navy For Other Contracts, A Copy Of The Original Approval Letter May Be Submitted Along With The Procedures And Qualification Data Report To Expedite The Approval Process. The approval Letter Must Reference The Applicable Welding Procedure And Qualification Data Report Identification/number. Prior Approval Does Not Guarantee Acceptance For This Or Any Future Contracts. As Far As Practical, All Procedures For The Contract Must Be submitted At The Same Time. Welding Procedures And Qualification Data Must Be Submitted In A Commercially Available Electronic Format Such As Adobe Acrobat Pdf. The Contractor Must State The Applicability Of Each Weld Procedure And Qualification Data Submitted, citing The Drawing Number And Pieces To Be Welded. (i.e. "wp-123 And Qd-123 Are Submitted For The Weld Joint Between Pieces 1 And 2 On Drawing Abc." Wp-456 And Qd-456 Are Submitted For The Hardfacing Of Piece 3 On Drawing Xyz.") 3.43.3 The Pco's Authorization For The Use Of Weld Procedure(s) And Qualification Data For The Specific Application As Submitted Does Not Mitigate The Vendors Responsibility To Comply With The Requirements Of S9074-aq-gib-010/248, S9074-ar-gib-010a/278, And the Contract. 3.43.4 Authority For The Repair Of Special Repairs In Castings, The Repair Of Wrought Material, Or The Repair Of Forged Material Must Be Obtained Via Request For Waiver From The Procurement Contracting Officer. This Request Must Describe The Defect; Including size, Depth, Location, And A Description Of The Proposed Repair. Repairs Deemed Minor Or Nominal In Accordance With S9074-ar-gib-010/278 Can Be Made At Contractor Discretion In Accordance With S9074-ar-gib-010/278 Requirements; However, Weld Procedure specification (wps) And Procedure Qualification Record (pqr) Submittals Are Still Required. This Request For Navsup-wss Contracts Must Be Submitted Via The Electronic Contractor Data Submission (ecds) Application. 3.43.5 Any New Procedure Qualification Performed Under This Contract Will Require The Vendor To Provide A Minimum 72 Hour Notification To Dcma With An Offer To Observe The Welding Of The Test Assemblies. The 72 Hour Time Limit May Be Modified Upon Mutual agreement Between The Vendor And Dcma. 3.43.6 When Drawings Require Hardfacing Surface Iron Or Nickel Content Not To Exceed 5%, The Contractor Must Verify Surface Iron Or Nickel Content By Performing Chemical Testing As Defined By The Applicable Drawing. The Chemical Test Results Must Be Submitted as Part Of The Qualification Data. 3.43.7 Additional Qualification Requirements For Production Hardfacing Thickness Less Than 1/8-inch: Macro-etch (or Legible Photomacrographs Clearly Showing The Fusion Area) Must Be Submitted For Review And Show Consistent, Minimized Dilution. All Essential elements And Any Elements Not Listed In S9074-aq-gib-010/248 That Influence Dilution Must Be In The Qualification Data And Weld Procedure, With Strict Limits Placed On Each Essential Element. 3.43.8 Preparation And Retention Of Weld Records Is Required, As Specified By Paragraph 4.1.3 Of S9074-ar-gib-010a/278. 3.43.9 When Production Or Repair Welding Is Required On Titanium Materials, The Applicable Fabrication Plan, Facilities Procedure, Training Plan, And Active Welder Qualification Must Also Be Submitted For Review And Approval. 3.43.10 If The Contractor's Fabrication Plan, Facilities Procedure, Training Plan, Or Active Welder Qualification Has Previously Been Approved By The Navy For Other Contracts, A Copy Of The Original Approval Letter May Be Submitted Along With The Applicable documentation To Expedite The Approval Process. The Approval Letter Must Reference The Applicable Documentation. Prior Approval Does Not Guarantee Acceptance For This Or Any Future Contracts. The Contractor's Fabrication Plan, Facilities Procedure, Training plan, And Active Welder Qualification Must Be Submitted At The Same Time As The Applicable Welding Procedure(s) And Weld Procedure Qualification Data. All Documentation Must Be Submitted In A Commercially Available Electronic Format, Such As Adobe Acrobat Pdf. 3.43.11 See Cdrl Di-misc-80678 (consumed Weld Metal) - A Certificate Of Compliance Is Required For All Weld Filler Metals Used For Production Or Repair Welding, And Must Include The Following: a) Filler Metal Lot Number(s) b) Specification And Type c) A Positive Statement That The Vendor Has Obtained Oqe And Verified That Each Lot Of Weld Filler Material Conforms To Specification Requirements. d) A Positive Statement Verifying That The Weld Filler Metals Were The Correct Material Type Or Grade Prior To Consumption. 3.43.12 When Production Welds Or Repair Welds Are Performed By A Subcontractor, The Requirement For Submission Of All Certification Documentation Required Herein Must Be Passed Down To The Subcontractor. 3.44 Radiography (rt) - Radiography Must Be Performed In Accordance With T9074-as-gib-010/271. Rt Acceptable Criteria For Castings To Be Criticality Level I Per The Applicable Table Of S9074-ar-gib-010a/278. Rt Acceptance Criteria For Weldments To Be Per The applicable Table Of S9074-ar-gib-010a/278 (p-1 Piping) Or Mil-std-2035, Class 1, As Applicable. 3.44.1 See Cdrl Di-misc-80678 (rss) - The Contractor Or Activity Performing The Radiography Must Be Responsible For Preparing The Radiographic Shooting Sketches (rss) In Accordance With T9074-as-gib-010/271. Shooting Sketch Approval Is Not Required For radiography Of Weldments. The Radiographic Standard Shooting Sketches (rsss) Referenced On The Applicable Drawing May Be Used, However, Since T9074-as-gib-010/271 Permits A Variety Of Processes, The Rsss May Not Be Applicable As They Will Not Necessarily Depend only On The Coverage Requirements, But Also On The Equipment And Procedures Of The Particular Radiographic Facility. Approval Of These Shooting Sketches Or Radiographic Standard Shooting Sketches Is Required Per S9074-ar-gib-010a/278. If This Data Has Been previously Approved By A Navy Activity, The Original Approval Letter Must Be Submitted At The Same Time As Rt Film And Reader Sheet Submittal. 3.44.2 All Pieces Radiographed Must Be Permanently Marked With "rt" And A Unique Rt Serial Number. (the Unique Rt Serial Number Must Be Directly Traceable To The Rt Film.) 3.44.3 See Cdrl Di-misc-80678 (production Radiography) - Production Radiography Requires Final Acceptance By The Navy. The Items Listed Below Must Be Submitted For Final Acceptance, Cataloging, File, And Retention. They Must Be Submitted And Approved Prior To shipment Of The Applicable Hardware. However, When The Source Certification Clause Is Invoked, They Must Be Submitted A Minimum Of Forty-five (45) Working Days Prior To The Date Of Source Certification Inspection. (a) Film (b) Rss/rsss (c) Rs (reader Sheets) (d) Documentation Record Listing The Part Number, Heat/lot Traceability, And Theunique Rt Serial Number (which Is Traceable To The Rt Film And Reader Sheet) 3.45 See Cdrl Di-misc-80678 (special Emphasis C Of C) - The Certificate Of Compliance Must Show Traceability To The Marking Applied On Each Individual Item, And Must Contain The Fo
Closing Date25 Oct 2024
Tender AmountRefer Documents 
721-730 of 808 archived Tenders