- Home/
- United States/
- DEPT OF THE NAVY USA/
- Overview
DEPT OF THE NAVY USA Tender
DEPT OF THE NAVY USA Tender
Costs
Description
Contact Information|4|n743.5|tbd|7176053229|joel.j.curtis.civ@us.navy.mil| item Unique Identification And Valuation (jan 2023)|19|||||||||||||||||||| higher-level Contract Quality Requirement (navicp Review Feb 1991)(feb 1999)|1|see Specification Sections C And E.| inspection Of Supplies--fixed-price (aug 1996)|2||| wide Area Workflow Payment Instructions (jan 2023)|16|stand-alone Receiving Report-certifications Combo-receiving Report & Invoice-material |na|tbd|n00104|tbd|n39040 - Certifications, S4306a - Material |n50286|tbd|133.2|na|na|n39040 - Certifications|na|na|see Dd 1423|port_ptnh_wawf_notification@navy.mil| navy Use Of Abilityone Support Contractor - Release Of Offeror Information (3-18))|1|| equal Opportunity (sep 2016)|2||| warranty Of Supplies Of A Noncomplex Nature (june 2003)|6|one Year From Date Of Delivery.|one Year From Date Of Delivery.||||| warranty Of Data--basic (mar 2014)|2||| buy American-free Trade Agreements-balance Of Payments Program-basic (feb 2024)|11|||||||||||| alternate A, Annual Representations And Certifications (nov 2023)|13|||||||||||||| buy American-free Trade Agreements-balance Of Payments Program Certificate-basic (feb 2024))|5|||||| buy American-balance Of Payments Program Certificate-basic (feb 2024)|1|| annual Representations And Certifications (may 2024)|13|332919|750 Employees|||||||||||| notice Of Priority Rating For National Defense, Emergency Perpardeness, And Enrgy Progam Use (april 2008))|2||x| 1.data Item A001 (inspection And Test Plan) May Be Waived If Already On File At Navsup Wss Mech. 2. This Is A Rated Order Certified For National Defense Use, And The Contractor Will Follow All The Requirements Of The Defense Priorities And Allocations System Regulation (15 Cfr 700). 3. This Solicitation Is And Resulting Award Will Be Issued Iaw Eaf. 1. Scope 1.1 The Material Covered In This Contract/purchase Order Will Be Used In A Crucial Shipboard System. The Use Of Incorrect Or Defective Material Would Create A High Probability Of Failure Resulting In Serious Personnel Injury, Loss Of Life, Loss Of Vital shipboard Systems, Or Loss Of The Ship Itself. Therefore, The Material Has Been Designated As Special Emphasis Material (level I, Scope Of Certification, Or Quality Assured) And Special Control Procedures Are Invoked To Ensure Receipt Of Correct Material. 2. Applicable Documents 2.1 Order Of Precedence - In The Event Of A Conflict Between The Text Of This Contract/purchase Order And The References And/or Drawings Cited Herein, The Text Of This Contract/purchase Order Must Take Precedence. Nothing In This Contract/purchase Order, however, Must Supersede Applicable Laws And Regulations Unless A Specific Exemption Has Been Obtained. 2.2 Applicable Documents - The Document(s) Listed Below Form A Part Of This Contract/purchase Order Including Modifications Or Exclusions. 2.2.1 Specification Revisions - The Specification Revisions Listed Under "documents References" Below Are The Preferred Revision. Older And/or Newer R Evisions Are Acceptable When Listed Within Contract Support Library Reference Number Csd155 In Ecds (electric contractor Data Submission) At: Ht Tps://register.nslc.navy.mil/. This Is To Allow Contractors To Use Certain Acceptable Older Specification Revisions To Purge Their Existing Stock Of Material Certified To Those Older Revisions Or To Use Newer Specification revisions When Material Is Certified To Newly Released Revisions,without Requiring The Submittal Of Waiver/deviation Requests For Each Specification Revision On Every Contract. Revisions Of Specifications Reflecting Editorial And/or Re-approval (e.g. E2009, r2014, Etc.) Are Considered Inconsequential, But Are Acceptable When Their Revisions Are Listedwithin Csd155 Or Elsewhere Within This Contract. 2.2.2 "document References" Listed Below Must Be Obtained By The Contractor. Ordering Information Is Included As An Attachment To This Contract/purchase Order. 2.2.3 The Documents And Drawings Listed Below Under Drawing No. Are Not Provided With This Contract/purchase Order. drawing No Cage Rev Distr Cd ;300057 27826 H B 299943 27826 C B 300010 27826 B B 300012 27826 B B 300015 27826 C B 300014 27826 C B 300035 27826 B B; document Ref Data=fed-std-h28 | | |b |190424|a| | | document Ref Data=fed-std-h28 |0020| |b |941221|a| |01| document Ref Data=ff-s-86 | | |g |210127|a| | | document Ref Data=ansi/asq Z1.4 | | | |080101|a| | | document Ref Data=qq-n-281 | | |d |851023|a| 2| | document Ref Data=qq-n-286 | | |g |001207|a| | | document Ref Data=astm-a574 | | | |211201|a| | | document Ref Data=astm-f606 | | | |191115|a| | | document Ref Data=mil-std-792 | | |f |060519|a| | | document Ref Data=mil-dtl-1222 | | |j |001208|a| | | document Ref Data=astm-e1417 | | | |160615|a| | | document Ref Data=astm-e1444 | | | |160601|a| | | document Ref Data=mil-std-2035 | | |a |950515|a| | | document Ref Data=mil-std-2132 | | |d |080310|f| |01| document Ref Data=astm-d4066 | | | |130701|a| | | document Ref Data=iso_9001 | | | |081115|a| | | document Ref Data=iso10012 | | | |030415|a| | | document Ref Data=mil-dtl-15024 | | |g |180303|a| | | document Ref Data=mil-c-15726 | | |f |911008|a| 1| | document Ref Data=mil-t-16420 | | |k |880916|a| 1| | document Ref Data=iso/iec 17025 | | | |050515|a| | | document Ref Data=mil-dtl-18240 | | |f |000313|a| 1| | document Ref Data=qpl 18240 | | |qpd|170619|a| | | document Ref Data=mil-dtl-24202 | | |a |171017|a| | | document Ref Data=mil-c-24679 | | | |880506|a| | | document Ref Data=qpl 25027 | | |17 |000207|a| | | document Ref Data=mil-i-45208 | | |a |810724|a| 1| | document Ref Data=mil-std-45662 | | |a |880801|a| | | document Ref Data=a-a-50433 | | | |890815|a| | | document Ref Data=a-a-59004 | | |b |081118|a| | | document Ref Data=ansi/ncsl Z540.3 | | | |130326|a| | | document Ref Data=0900-lp-001-7000 | | | |810101|c| |01| document Ref Data=0900-lp-003-8000 | | | |740701|a| |02| document Ref Data=aia/nas Nasm 17828 | | |1 |130430|a| | | document Ref Data=aia/nas Nasm 25027 | | |1 |121221|a| | | document Ref Data=s9074-aq-gib-010/248 | | |1 |191112|a| | | document Ref Data=t9074-as-gib-010/271 | | |1 |140911|a| | | document Ref Data=s9074-ar-gib-010a/278 (chg A) | | | |130214|a| | | 3. Requirements 3.1 ;the 6 Inch, 700 Psi, Flanged, Seawater Sound Isolation Coupling Must Be In Accordance With Murdock Drawing 299943, Assembly 299943-400, Except As Amplified Or Modified Herein.; 3.2 Material For Parts Requiring Certification - Quantitative Chemical And Mechanical Analysis Is Required For The Parts Listed Below Unless Specifically Stated Otherwise: part - ;body, Item 1 And Attach Flange, Item 6 On Murdock Drawing 299943; Back Flange, Item 14 On Murdock Drawing 300035; Thread End, Item 7 And Flare End, Item 10 On Murdock Drawing 300015; material - ;mil-c-15726, Alloy C71500 Or Mil-c-24679, Alloy C71500; part - ;stud, Item 8 On Murdock Drawing 299943; material - ;qq-n-281, Class A; part - ;self-locking Nut, Item 9 On Murdock Drawing 299943 In Accordance With Nasm 17828; material - ;qq-n-281, B Cold Drawn. self-locking Element- Astm-d4066, Group 01, Class 1, Grade 1; part - ;socket Head Cap Screw, Item 7 On Murdock Drawing 299943; material - ;ff-s-86, Qq-n-286, Form 2, Annealed And Age Hardened With Self-locking Element In Accordance With Mil-dtl-18240; part - ;elbow, Item 8 On Murdock Drawing 300015; material - ;mil-t-16420, Type I, Composition 70/30 And In Accordance With Murdock Drawing 300057 And Mildtl-24202; 3.3 Testing Certification - Certifications Are Required For The Following Tests On The Items Listed Below. Additional Testing On Other Piece Parts (if Any) Per Applicable Drawings And Specifications Is Still Required, But Certifications Are Only Required As listed Below. test - Non-destructive Tests item - ;weld Repair (as Applicable); performance - Per Applicable Fabrication Specification acceptance - Per Applicable Fabrication Specification test - ;dye Penetrant Inspection; item - ;body, Item 1 And Attach Flange, Item 6 On Murdock Drawing 299943; Back Flange, Item 14 On Murdock Drawing 300035; Thread End, Item 7 And Flare End, Item 10 On Murdock Drawing 300015; performance - ;t9074-as-gib-010/271; acceptance - ;for Mil-c-15726 Material Use Mil-std-2035 Or 0900-lp-003-8000, For Mil-c-24679 Forgings Use Mil-c-24679; test - ;liquid Penetrant Inspection; item - ;socket Head Cap Screw, Item 7 And Stud, Item 8 On Murdock Drawing 299943; performance - T9074-as-gib-010/271; Sampling Must Be Per Mil-dtl-1222 acceptance - Mil-dtl-1222 test - ;dye Penetrant Inspection For Non-magnetic Grades; item - ;self-locking Nut Item 9 On Murdock Drawing 299943; performance - T9074-as-gib-010/271 Or Astm-e1417/astm-e1444 (method C Solvent Removal Techniques Must Not Be Used On Thread) acceptance - ;nasm25027; test - ;dye Penetrant Inspection; item - ;elbow, Item 8 On Murdock Drawing 300015; performance - ;t9074-as-gib-010/271; acceptance - ;mil-std-2035 Or 0900-lp-003-8000; test - ;visual And Dye Penetrant Inspection (final Layer); item - ;weldments; performance - ;t9074-as-gib-010/271; acceptance - ;mil-std-2035 Or 0900-lp-003-8000; test - ;hydrostatic Pressure Test; item - ;each Assembly; performance - ;the Test Pressure Of Drawing 299943 Note 6 +50/-0 Psig For 5 Minutes Minimum; acceptance - ;no Leakage Or Permanent Deformation Is Allowed; attribute - Certificate Of Compliance item - Self-locking Nuts performance - This Certificate Must State That Self-locking Nuts Were Manufactured By An Approved Source. Approved Sources Are Those Listed On Qpl-25027 For The Appropriate Fastener. This Qpl May Also Be Considered As Approved Sources For Heavy Hex self-locking Nuts. attribute - Certificate Of Completion item - Self-locking Nut Nonmetallic Insert performance - ;astm-d4066, Group 01, Class 1, Grade 1; test - Quality Conformance Tests item - Self-locking Nuts performance - ;nasm25027; acceptance - ;nasm25027; test - Ultrasonic Inspection On Starting Material item - ;all Items Requiring Certification Made From Qq-n-286 With A Diameter Or Minimum Distance Between Parallel Surfaces Of 4 Inches Or Greater Of The Starting Material, Or When Required By A Drawing Or Specification Invoked Elsewhere In This Contract; performance - T9074-as-gib-010/271 Or Mil-std-2132, And Qq-n-286 acceptance - Qq-n-286 attribute - Annealing And Age Hardening item - ;socket Head Cap Screw, Item 7 On Murdock Drawing 299943; performance - Qq-n-286 attribute - Certificate Of Compliance For Seamless Tubing/pipe item - ;elbow, Item 8 On Murdock Drawing 300015; performance - Material Supplied Must Be In The Seamless Condition. 3.4 The Pressure Tolerance Must Be As Specified In The Assembly Drawing, Detail Drawing, Design Specification Or Elsewhere In This Contract. Where Pressure Tolerances Are Not Provided By Drawings, Specifications Or Specified Elsewhere In This Contract, The following Must Be Used: For Pressure Tests Below 100 Psig, The Pressure Tolerance Must Be +1 Psig / -0 Psig. For Pressure Tests At Or Above 100 Psig Up To And Including 2500 Psig, The Pressure Tolerance Must Be +2% / -0 Psig Rounded Off To The Nearest Multiple Of The Smallest Graduation On An Analog Test Pressure Gauge, Not To Exceed 50 Psig. For Pressure Tests Above 2500 Psig, The Pressure Tolerance Must Be +2% / -0 Psig, Rounded Off To The Nearest Multiple Of The Smallest Graduation On An Analog Test Pressure Gauge, Not To Exceed 200 Psig. the Pressure Test Time Tolerance Must Be As Specified In The Assembly Drawing, Detail Drawing, Design Specification Or Elsewhere In This Contract. Where Pressure Test Time Tolerances Are Not Provided By Drawings, Specifications Or Specified Elsewhere In This contract, The Following Must Be Used: For A Test Duration Up To And Including 1 Hour, The Tolerance Must Be +5 Minutes / - 0 Minutes. For A Test Duration Of More Than 1 Hour Up To And Including 24 Hours, The Tolerance Must Be +30 Minutes / - 0 Minutes. For A Test Duration Of More Than 24 Hours, The Tolerance Must Be +60 Minutes / - 0 Minutes. 3.5 Radiography Is Required On ;weldments Per Note 2 On Murdock Drawing 300015 And Must Be Identified To The Weld Joint; . 3.6 Wedge Tensile Test Specimens (headed Fasteners) - A Wedge Tensile Test Must Be Conducted On A Full Size Fastener For Each Production Lot And Reported Aspart Of The Mechanical Properties. The Required Specimens For The Wedge Tensile Test Must Be Separate fasteners From Those Required For The Yield Test. 3.6.1 Testing For Socket Head Cap Screws Must Be In Accordance Mil-dtl-1222, Paragraphs 4.5.2.3 And 4.5.2.3.1. 3.6.2 Testing For All Other Headed Fasteners With A Nominal Diameter Greater Than 1/4-inch Must Be In Accordance With Astm-f606 For Grades 5, 8, B7, And B16.for All Other Grades, The Following Wedge Angles Must Be Used. a. Except As Specified In Item C Below, Fasteners With A Nominal Diameter Of 1/4-inch Through 1-inch (inclusive) Must Be Tested With A Ten Degree Wedge. b. Except As Specified In Item C Below, Fasteners With A Nominal Diameter Over 1-inch Must Be Tested With A Six Degree Wedge. c. Fasteners That Are Of Grades 8, B7, B16, 410, 416, 416se, 431, And 630 And Are Threaded Within One Diameter To The Underside Of The Head Must Be Tested As Follows: sizes 1/4 Inch Through 3/4 Inch (inclusive) Use A Six Degree Wedgesizes Over 3/4 Inch Use A Four Degree Wedge d. Fasteners Which Have Passed Testing With Wedge Angles Greater Than Those Specified Should Be Considered Acceptable. 3.6.3 For Fasteners Having A Length Less Than The Minimum Specified In Table 1 Of Astm-f606, One "test Specimen Fastener" Must Be Manufactured From Each Lot Of Fasteners And Tested To Represent That Lot. The Length Of These Test Specimen Fasteners Must Meet the Minimum Specified In Table 1 Of Astm-f606 But Must Not Exceed It By More Than 1/4 Inch. Test Specimen Fasteners Must Be The Same Type, Style, And Diameter As The Production Lot And Must Be Manufactured From The Same Starting Material, Using The Same manufacturing Techniques As The Production Lot, And Must Be Heat Treated (if Required) Along With The Production Lot. 3.7 Thread Inspection Requirements - All Threads On Threaded Parts Must Be Inspected Using Appropriate Inspection Methods, Inspection Systems, And Inspection Gages/instruments In Accordance With Fed-std-h28 Series. Substitution Of Thecommercial Equivalent inspection In Accordance With Asme B1 Series Is Acceptable. 3.7.1 System 21 Of Fed-std-h28/20 Must Be Used As A Minimum Inspection Requirement For Threads When The Design Drawing Or Design Specification Does Not Specify An Inspection Requirement. 3.7.2 For Navy And Shipyard Drawings, System 21 Of Fed-std-h28/20 May Be Substituted For System 22 Without Further Navy Approval When The Design Drawing Invokes System 22 And Does Not Cite Governing Specifications That Specifically Require System 22. System 22 of Fed-std-h28/20 Must Be Used When The Drawing References Other Governing Specifications That Specifically Require System 22, Such As Certain Thread Types Of Mil-dtl-1222. 3.7.3 A Written Request For Concurrence Must Be Submitted When Utilizing Alternative Measuring Equipment Or Measuring Systems Not Applicable To The Specified Inspection System. 3.8 O-ring Grooves And Mating Sealing Surfaces Must Be Inspected Per The Contractually Invoked Drawings Or Specifications. When The Drawings Or Specifications Do Not Provide Specific Defect Criteria Or State That No Defects Are Allowed, The General Acceptance criteria (gac) Standard Must Be Used For Inspecting O-ring Grooves And Mating Sealing Surfaces Only. Repairs To Sealing Surfaces And O-ring Grooves With Unacceptable Defects May Be Accomplished Within The Limits Of The Size And Tolerances Provided In The applicable Drawing. Repairs Thatwould Exceed These Limits Require Approval (including Final Dimensions). The Data That Is Red Lined (crossed Out) Is Excluded From The Gac For This Contract And Is Not To Be Used For Acceptance Or Rejection Criteria. The Gac document Is Identified As Contract Support Library Reference Number Csd008 At Https://register.nslc.navy.mil/ 3.9 Recorded Dimensions - A Certification Of Recorded Dimensions As Depicted In Note 6 Of Murdock Machine And Engineering Company Drawing 300057 Is Required. Certification Must Include The Actual Measured Dimensions. At The Time Of Receipt Inspection, rejection Of Any Single Piece Must Be Cause For Rejection Of The Entire Lot. 3.10 Slow Strain Rate Tensile Test Laboratories - The Slow Strain Rate Tensile Test Of Qq-n-286 Must Be Performed By One Of The Following Laboratories: huntington Alloys, A Special Metals Company attn: Bill Bolenr 3200 Riverside Drive huntington, Wv 257059 phone: (304) 526-5889 fax: (304) 526-5973 metallurgical Consultants, Inc. attn: W. M. Buehler 4820 Caroline po Box 88046 houston, Tx 77288-0046 phone: (713) 526-6351 fax: (713) 526-2964 naval Surface Warfare Center, Carderock Division attn: Eric Focht Code 614 9500 Macarthur Blvd west Bethesda, Md 20817-5700 phone: (301) 227-5032 fax: (301) 227-5576 teledyne Allvac attn: Dr. W. D. Cao 2020 Ashcraft Ave. monroe, Nc 28110 phone: (704) 289-4511 fax: (704) 289-4269 westmoreland Mechanical Testing And Research Inc. attn: Andrew Wisniewski p.o. Box 388 youngstown, Pa 15696-0388 mannesmann Rohrenwerke mannesmann Forschungsinstitut (mfi) attn: Dr. Weiss postfach 251160 47251 Duisburg germany phone: 011-49-0203-9993194 fax: 011-49-0203-9994415 thyssenkrupp Vdm Usa, Inc. attn: D. C. Agarwal 11210 Steeplecrest Drive, Suite 120 houston, Tx 77065-4939 phone: (281) 955-6683 3.11 K-monel Fasteners - Material Must Be Heat Treated Per Qq-n-286. 3.11.1 Fasteners That Have Been Hot Or Cold Headed Or Roll Threaded Must Be Solution Annealed Followed By Age Hardening Subsequent To All Heading And Thread Rolling Operations. The Mechanical Properties On Certifications Must Be Actual Properties Of The annealed And Age Hardened Material And Must Meet The Requirements Of Qq-n-286. 3.11.2 Qq-n-286 Fasteners That Have Been Headed And/or Roll Threaded Must Not Beage Hardened Unless The Material Has Been Solution Annealed Subsequent To The Heading And Threading Operations. Threads Formed After The Final Age Hardening Heat Treatment Must Be cut Or Ground Only. 3.12 Ff-s-86 Mechanical Property And Metallographic Testing Sample Sizes Must Use Asq Z1.4 Inspection Level S-1 With Aql = 1.0.note: The Sample Size Values Must Conform To Ff-s-86e And Earlier Revisions. 3.13 Specification Change - For Qq-n-281, Class B Material: 1 - Footnote 9 To Table Ii Of Qq-n-281 Does Not Apply. 2 - When Starting Material Is Round Bar Greater Than 3" Dia, The Mechanical Properties Of Hex Bar Apply. 3.14 Change To Table Vii Of Mil-t-16420: the Column Headed "longer Lengths (max)" In All Classes Of Table Vii Must Be Changed To Read "longer Lengths (min)". All Rows In Aforementioned Column Reading "25" Must Be Changed To Read "20". The Maximum Length Must Be 25 Feet Per Paragraph 3.8.5.2 Of mil-t-16420. example: Class 700 Tube Having O.d. Of .540 And Wall Thickness Of .065 Must Be Supplied With A Minimum Length Of 12 Feet, With 80% (by Weight) In Lengths Of 20 To 25 Feet. 3.15 Change Paragraph 3.2.5 Of Mil-f-24202 To Read: 3.2.5 All Finished Fittings Must Be Furnished In The Fully Annealed Condition. 3.2.5.1 After Annealing, Fittings Produced From Tubular Stock Must Not Exceed A Maximum Hardness Of 51 Rockwell 30t Determined In The Area Of Maximum Bending Or Forming When Manufactured In Accordance With Paragraph 3.2.3. 3.2.5.2 Fittings Produced From Bar, Plate, Or Forgings In Accordance With 3.2.4 Must Meet The Hardness Required By 3.2.5.1, Except That The Location For Hardness Tests May Be Any Area Of The Finished Fitting. 3.16 ;lubricate O-rings With Grease Per Cid A-a-50433 (termalene No. 2). lubricate Threads With Lubricant Per Cid A-a-59004 (molykote P-37 Paste).; 3.17 Changes To Mil-t-16420 Mechanical Properties (table Ii): copper Alloy Outside Tensile Yield Strength Elongation In and Temper Diameter Strength (.5% Under Load) 2" Or 4x Dia. 715 (70/30)...all.......50,000....18,000............30.0% (min) fully Sizes annealed 3.18 Mil-t-16420 Ut Changes - Delete Paragraph 3.4.3.4 And Substitute: "3.4.3.4 Laminations. Tube Required To Meet The Ultrasonic Requirements Specified In 3.4.3 Must Be Examined For Laminar Discontinuities That Present Indications Exceeding Exploration threshold Levels (20 Percent For The Contact Method At +6 Db; 30 Percent For The Immersion Method At Calibration) Must Be Rejected." 3.18.1 In The Second Sentence Of Paragraph 4.4.7; Delete "18 Inch" And Substitute "1 Inch". In The Last Sentence, Insert "3.4.3.4 And" Before "3.8.2". 3.19 Component Identification Description (cid) - When Applicable Drawing(s) And/or Specification(s) Specify That A Nameplate Or Identification Plate Is Required, The Cid Number ( ;cid 990997159; ) Must Be Added. When No Plate Is Specified, An Identification plate In Accordance With Mil-dtl-15024, Type "c" On Brass Or Type "h" On Aluminum Must Be Securely Attached To Each Assembly Showing The Above Cid Number. No Assembly Must Be Shipped Without The Cid Number Attached. 3.20 Internal Threads - All Internal Threads Must Be Formed By Cutting. Cold Forming Of Internal Threads Is Not Acceptable. 3.21 Welding Or Brazing - When Welding, Brazing, And Allied Processes Are Required, As Invoked By Section C Paragraph 3 Requirements, They Must Be In Accordance With S9074-ar-gib-010a/278, 0900-lp-001-7000 For Brazing Of Piping And Pressure Vessel applications, Or S9074-aq-gib-010/248 For Brazing Of Other Applications. For All Production And Repair Welding And Brazing, Personnel And Procedures Must Be Qualified Under S9074-aq-gib-010/248 Or 0900-lp-001-7000, As Applicable. Repair Welding Is Not permitted On ;qq-n-286 Material; . Procedures And Qualification Data Must Be Submitted For Review And Approval Prior To Performing Any Welding Or Brazing. 3.22 Configuration Control - The Contractor Must Maintain The Total Equipment Baseline Configuration. For Items Of Proprietary Design, Contractor Drawings Showing The Latest Assembly Configuration Must Be Provided To The Government In Electronic (c4) Format. definitions Are Provided Elsewhere In The Contract/purchase Order. 3.22.1 Waivers/deviations - All Waivers And Deviations, Regardless Of Significance Or Classification Require Review And Approval By The Contracting Officer. Waivers And Deviations Must Be Designated As Critical, Major, Or Minor. The Contractor Must Provide a Copy Of This Request To The Qar. Requests Must Include The Information Listed Below. A. A Complete Description Of The Contract Requirement Affected And The Nature Of The Waiver/deviation (non-conformance), Including A Classification Of Critical, Major, Or Minor. B. Number Of Units (and Serial/lot Numbers) To Be Delivered In This Configuration. C. Any Impacts To Logistics Support Elements (such As Software, Manuals, Spares, Tools, And Similar) Being Utilized By Government Personnel Or Impacts To The Operational Use Of The Product. D. Information About Remedial Action Being Taken To Prevent Reoccurrence Of The Non-conformance. 3.22.2 All Requests For Waivers/deviations On Navsup-wss Contracts Must Be Submitted To The Navsup Wss Contracting Specialist Via Email. 3.22.3 Ecps - The Government Will Maintain Configuration Control And Change Authority For All Modifications Or Changes Affecting Form, Fit, Function, Or Interface Parameters Of The Equipment And Its Sub-assemblies. The Contractor Must Submit An Engineering change Proposal (ecp) For Any Class I Or Ii Changes That Impact The Equipment Covered By This Contract. Ecps Must Be Prepared In Contractor Format, And Must Include The Following Information: A. The Change Priority, Change Classification (class I Or Class Ii), And Change Justification. B. A Complete Description Of The Change To Be Made And The Need For That Change. C. A Complete Listing Of Other Configuration Items Impacted By The Proposed Change And A Description Of The Impact On Those Cis. D. Proposed Changes To Documents Controlled By The Government. E. Proposed Serial/lot Number Effectivities Of Units To Be Produced In, Or Retrofitted To, The Proposed Configuration. F. Recommendations About The Way A Retrofit Should Be Accomplished. G. Impacts To Any Logistics Support Elements (such As Software, Manuals, Spares, Tools, And Similar) Being Utilized By Government Personnel In Support Of The Product. H. Impacts To The Operational Use Of The Product. I. Complete Estimated Life-cycle Cost Impact Of The Proposed Change. J. Milestones Relating To The Processing And Implementation Of The Engineering Change. 3.23 Mercury Free - Mercury And Mercury Containing Compounds Must Not Be Intentionally Added Or Come In Direct Contact With Hardware Or Supplies Furnished Under This Contract. Mercury Contamination Of The Material Will Be Cause For Rejection. 3.24 Navsea 0948-lp-045-7010 - Any Applicable Requirements Of Navships 4410.17,navsea 0948-lp-045-7010, Or 0948-045-7010 Which The Contractor Must Meet Are Included In This Contract/purchase Order. The Above Documents Are For Governmentuse Only. Further application Of The Above Documents Is Prohibited.prohibited. 3.24.1 Marking Of Material With A Material Designator Per The Drawing Is Also Prohibited, With The Exception Of Fasteners. Fasteners Must Be Marked With A Material Symbol/designator As Specified Elsewhere In This Contract. 3.25 Certificate Of Compliance - (special Emphasis Material) The Contractor Must Prepare And Submit A Certificate Of Compliance Certifying That The Items/components Furnished Under This Contract Comply With The Requirements Of The Procurement Document, including Any/all Invoked Specifications And Drawings. ^ Quality Assurance Requirements ^ 3.26 See Cdrl Di-misc-80678 (test Certification) - A Statement Of Tests Performed, Listing The Pieces Tested Must Be Furnished Along With A Copy Of The Test Results. Certification Must Include The Contractor's Name, Address And Date, Quantity Inspected, identified To The Contract/purchase Order And Item Number, And The Contractor's Or Authorized Personnel's Signature. Test Certifications Must Reference The Standard/specification, Including The Revision, To Which The Testing Was Performed And The Acceptance criteria Used. Test Procedure Numbers May Also Be Referenced On Test Reports. Test Reports On Weldments Must Be Identified To Weld Joint And Layer. 3.27 See Cdrls Di-misc-80875 (welding Procedures) And Di-misc-80876 (weld Procedure Qualification Data) - When Production Or Repair Welding Is Required, The Applicable Welding Procedure(s) And Qualification Data Must Be Submitted For Review And Approval. In addition, The Consumed Weld Metal C Of C As Defined Below Must Be Submitted As Part Of The Certification Oqe Package Submitted By The Contractor. note: These Requirements Do Not Apply To Tack/spot Welds When The Conditions Of Section 4.2.1.1 Of S9074-ar-gib-010a/278 Are Met. 3.27.1 Approval Of The Contractor's Qualification Data Must Be Obtained Prior To Performing Any Welding (production Or Repair). 3.27.2 If The Contractors Qualification Data Has Previously Been Approved By The Navy For Other Contracts, A Copy Of The Original Approval Letter May Be Submitted Along With The Procedures And Qualification Data Report To Expedite The Approval Process. The approval Letter Must Reference The Applicable Welding Procedure And Qualification Data Report Identification/number. Prior Approval Does Not Guarantee Acceptance For This Or Any Future Contracts. As Far As Practical, All Procedures For The Contract Must Be submitted At The Same Time. Welding Procedures And Qualification Data Must Be Submitted In A Commercially Available Electronic Format Such As Adobe Acrobat Pdf. The Contractor Must State The Applicability Of Each Weld Procedure And Qualification Data Submitted, citing The Drawing Number And Pieces To Be Welded. (i.e. "wp-123 And Qd-123 Are Submitted For The Weld Joint Between Pieces 1 And 2 On Drawing Abc." Wp-456 And Qd-456 Are Submitted For The Hardfacing Of Piece 3 On Drawing Xyz.") 3.27.3 The Pco's Authorization For The Use Of Weld Procedure(s) And Qualification Data For The Specific Application As Submitted Does Not Mitigate The Vendors Responsibility To Comply With The Requirements Of S9074-aq-gib-010/248, S9074-ar-gib-010a/278, And the Contract. 3.27.4 Authority For The Repair Of Special Repairs In Castings, The Repair Of Wrought Material, Or The Repair Of Forged Material Must Be Obtained Via Request For Waiver From The Procurement Contracting Officer. This Request Must Describe The Defect; Including size, Depth, Location, And A Description Of The Proposed Repair. Repairs Deemed Minor Or Nominal In Accordance With S9074-ar-gib-010/278 Can Be Made At Contractor Discretion In Accordance With S9074-ar-gib-010/278 Requirements; However, Weld Procedure specification (wps) And Procedure Qualification Record (pqr) Submittals Are Still Required. This Request For Navsup-wss Contracts Must Be Submitted Via The Electronic Contractor Data Submission (ecds) Application. 3.27.5 Any New Procedure Qualification Performed Under This Contract Will Require The Vendor To Provide A Minimum 72 Hour Notification To Dcma With An Offer To Observe The Welding Of The Test Assemblies. The 72 Hour Time Limit May Be Modified Upon Mutual agreement Between The Vendor And Dcma. 3.27.6 When Drawings Require Hardfacing Surface Iron Or Nickel Content Not To Exceed 5%, The Contractor Must Verify Surface Iron Or Nickel Content By Performing Chemical Testing As Defined By The Applicable Drawing. The Chemical Test Results Must Be Submitted as Part Of The Qualification Data. 3.27.7 Additional Qualification Requirements For Production Hardfacing Thickness Less Than 1/8-inch: Macro-etch (or Legible Photomacrographs Clearly Showing The Fusion Area) Must Be Submitted For Review And Show Consistent, Minimized Dilution. All Essential elements And Any Elements Not Listed In S9074-aq-gib-010/248 That Influence Dilution Must Be In The Qualification Data And Weld Procedure, With Strict Limits Placed On Each Essential Element. 3.27.8 Preparation And Retention Of Weld Records Is Required, As Specified By Paragraph 4.1.3 Of S9074-ar-gib-010a/278. 3.27.9 When Production Or Repair Welding Is Required On Titanium Materials, The Applicable Fabrication Plan, Facilities Procedure, Training Plan, And Active Welder Qualification Must Also Be Submitted For Review And Approval. 3.27.10 If The Contractor's Fabrication Plan, Facilities Procedure, Training Plan, Or Active Welder Qualification Has Previously Been Approved By The Navy For Other Contracts, A Copy Of The Original Approval Letter May Be Submitted Along With The Applicable documentation To Expedite The Approval Process. The Approval Letter Must Reference The Applicable Documentation. Prior Approval Does Not Guarantee Acceptance For This Or Any Future Contracts. The Contractor's Fabrication Plan, Facilities Procedure, Training plan, And Active Welder Qualification Must Be Submitted At The Same Time As The Applicable Welding Procedure(s) And Weld Procedure Qualification Data. All Documentation Must Be Submitted In A Commercially Available Electronic Format, Such As Adobe Acrobat Pdf. 3.27.11 See Cdrl Di-misc-80678 (consumed Weld Metal) - A Certificate Of Compliance Is Required For All Weld Filler Metals Used For Production Or Repair Welding, And Must Include The Following: a) Filler Metal Lot Number(s) b) Specification And Type c) A Positive Statement That The Vendor Has Obtained Oqe And Verified That Each Lot Of Weld Filler Material Conforms To Specification Requirements. d) A Positive Statement Verifying That The Weld Filler Metals Were The Correct Material Type Or Grade Prior To Consumption. 3.27.12 When Production Welds Or Repair Welds Are Performed By A Subcontractor,the Requirement For Submission Of All Certification Documentation Required Herein Must Be Passed Down To The Subcontractor. 3.28 Radiography (rt) - Radiography Must Be Performed In Accordance With T9074-as-gib-010/271. Rt Acceptance Criteria For Weldments To Be Per The Applicabletable Of S9074-ar-gib-010a/278 (p-1 Piping) Or Mil-std-2035, Class 1, As Applicable. 3.28.1 Submission Of Radiographic Shooting Sketches For Approval Is Not Requiredfor Weldments. 3.28.2 All Pieces Radiographed Must Be Permanently Marked With "rt" And A Unique Traceability Number. (unique Traceability Number Must Be Directly Traceable To The Rt Film.) 3.28.3 See Cdrl Di-misc-80678 (production Radiography) - Production Radiographyrequires Final Acceptance By The Navy. The Items Listed Below Must Be Submitted For Final Acceptance, Cataloging, File, And Retention. They Must Be Submitted And Approved By The navy Prior To Shipment Of The Applicable Hardware. However, When The Source Certification Clause Is Invoked, They Must Be Submitted A Minimum Of Forty-five (45) Working Days Prior To The Date Of Source Certification Inspection. (a) Film (b) Rss/rsss (c) Rs (d) Dd250 (with Heat Numbers Corresponding To Rt Numbers Referenced In Block 16) 3.29 Quality System Requirements - The Contractor Furnishing Items Under This Contract/purchase Order Must Provide And Maintain A Quality System In Accordance With Iso-9001 As Amplified Or Modified Herein, With The Calibration System Requirements Of Iso-10012 or Ansi-z540.3 With Iso-17025. A Quality System In Accordance With Mil-i-45208, With The Calibration System Requirements Of Mil-std-45662, Is Acceptable As An Alternate. 3.29.1 The Contractor's Quality System And Products Supplied Under The System Are Subject To Evaluation, Verification Inspection, And Acceptance/nonacceptance By The Government Representative To Determine The System's Effectiveness In Meeting The Quality requirements Established In The Contract/purchase Order. 3.29.2 The Contractor's Quality System Must Be Documented And Must Be Available For Review By The Contracting Officer Or His Representative Prior To Initiation Of Production And Throughout The Life Of The Contract. The Prime Contractor Must, Upon notification, Make His Facilities Available For Audit By The Contracting Officer Or His Authorized Representative. 3.29.3 See Cdrl Di-qcic-81110 (inspection System Procedures) - All Suppliers Of Level I/subsafe (li/ss) Material Are Required To Submit A Copy Of Their Current Documented Quality System Procedures To The Procurement Contracting Officer (pco) Prior To Award Of any Contract/purchase Order. Suppliers That Have A Copy Of Their Current Quality System Procedures On File At The Procuring Activity May Request The Pco Waive This Requirement. 3.29.4 This Contract Provides For The Performance Of Government Quality Assurance At Source. The Place Or Places Of Performance May Not Be Changed Without The Authorization Of The Procurement Contracting Officer. Upon Receipt Of This Order, Promptly notify The Government Representative Who Normally Services Your Plant So That Appropriate Planning For Government Inspection Can Be Accomplished. If You Do Not Have An Assigned Government Representative, Notify The Nearest Defense Contract Management Agency (dcma) Office. In The Event That A Local Government Representative Or Dcma Office Cannot Be Located, Our Purchasing Agent Should Be Notified Immediately. 3.29.5 Any Changes Made By The Contractor To A Qualified Quality System Will Require Re-submittal To The Pco And Concurrence By The Government Quality Assurance Representative Prior To Adoption. 3.30 Contractor Inspection Requirements - The Contractor Must Maintain Adequate Records Of All Inspections And Tests. The Records Must Indicate The Nature And Number Of Observations Made, The Number And Type Of Deficiencies Found, The Quantities Approved And rejected And The Nature Of Corrective Action Taken As Appropriate. Inspection Records Must Be Traceable To The Material Inspected. 3.30.1 The Supplier's Gages, Measuring And Test Equipment Must Be Made Available For Use By The Government Representative When Required To Determine Conformance With Contract Requirements. When Conditions Warrant, The Supplier's Personnel Must Be Made available For Operations Of Such Devices And For Verification Of Their Accuracy And Condition. 3.30.2 All Documents And Reference Data Applicable To This Contract Must Be Available For Review By The Government Representative. Copies Of Documents Required For Government Inspection Purposes Must Be Furnished In Accordance With The Instructions Provided by The Government Representative. 3.31 Subcontractor Inspection Requirements - The Government Has The Right To Inspect At Source, Any Supplies Or Services That Were Not Manufactured Or Performed Within The Contractor's Facility. Such Inspection Can Only Be Requested By Or Under Authorization of The Government Representative. Any Purchasing Documents To A Subcontractor Must Cite The Applicable Portions Of The Contractually Invoked Quality System (e.g. Calibration Requirements), Plus Any Product Requirements That Apply To The Supplies Being purchased. When The Government Elects To Perform Source Inspection At The Subcontractor's Facility, Applicable Purchase Documents Must Be Annotated With The Following Statement: "a Government Inspection Is Required Prior To Shipment From Your Plant. Upon receipt Of This Order, Promptly Notify The Government Representative Who Normally Services Your Plant So That Appropriate Planning For Government Inspection Can Be Accomplished. If You Do Not Have An Assigned Government Representative, Notify The Nearest defense Contract Management Agency (dcma) Office. In The Event That A Local Government Representative Or Dcma Office Cannot Be Located, Our Purchasing Agent Should Be Notified Immediately." 3.31.1 The Prime Contractor's Program Must Include Procedures To Assess The Capability Of The Prospective Suppliers To Produce The Products Or Supply The Services In Accordance With The Contract, Prior To The Issuance Of Any Purchase Document. 3.31.2 Each Sub-tier Supplier Of Material Or Services For Items In Section 3 Of This Contract Must Be Subjected To A Periodic Review Or Audit By The Prime To Determine The Continued Capability Of The Supplier To Control The Quality Of The Products Or Services specified In The Purchase Order Or Contract. 3.31.3 The Prime Contractor Must Ensure That The Purchased Product Conformsto Specified Purchase Requirements And This Contract. The Type And Extent Of Control Applied To The Supplier And The Purchased Product Must Be Dependent Upon The Effect Of The purchased Product On The End Item Represented By This Contract. 3.31.4 The Prime Contractor Must Evaluate The Requirements Of The Contractand Select Suppliers Based On Their Ability To Supply The Product In Accordance With The Prime Contractor's Requirements And The Contract. Criteria For Selection And Evaluation Must Be established. Records Of This Effort Must Be Available For Review By The Government. 3.31.5 The Prime Contractor's Supplier Quality Assurance Program Must Provide For A Review Of Purchase Documents To Assure Applicable Quality Requirements Are Included Or Referenced In The Documentation For Compliance By The Supplier. 3.32 Government Furnished Material And/or Equipment (gfm/gfe) - When Material Or Equipment Is Furnished By The Government, The Contractor Must Develop Documented Control Procedures That Require At Least The Following: 3.32.1 Visual Examination Upon Receipt To Detect Damage During Transit. 3.32.2 Inspection For Completeness And Proper Type. 3.32.3 Verification Of Material Quality Received. 3.32.4 Periodic Inspection And Precautions To Assure Adequate Storage Conditions And To Guard Against Damage From Handling And Deterioration During Storage. 3.32.5 Functional Testing, Either Prior To Or After Installation, Or Both, As Required By The Contract To Determine Satisfactory Operation. 3.32.6 Identification And Protection From Improper Use Or Disposition. 3.32.7 Reporting To The Government, Any Gfm Or Gfe Property Found Damaged, Malfunctioning, Or Otherwise Unsuitable For Use. In The Event Of Damage Or Malfunction During Or After Installation, The Supplier Must Determine And Record Probable Cause And necessity For Withholding The Material From Use. 3.32.8 For Gfe Material, And As Required By The Terms Of The Bailment Agreement, The Supplier Must Establish Procedures For Adequate Storage, Maintenance, And Inspection Of Bailed Government Material. Records Of All Inspection And Maintenance Performed On bailed Property Must Be Maintained. 3.32.9 Material Returned To The Contractor Must Be Handled As Gfm. 3.33 Traceability And Certification Requirements - To Assure That Correct Materials Are Installed In Level I/subsafe Systems, It Is Imperative That Traceability Be Maintained From The Material To The Material Certification Test Report And Other Required objective Quality Evidence (oqe). The Material Certification Report Must Completely And Accurately Reflect That The Material Supplied Meets The Specified Requirements. Materials Requiring Traceability And Certification Data Are Identified Within Paragraph 3, section C Of This Contract/purchase Order. 3.33.1 The Following Provides The Minimum Requirements For Maintaining Material Traceability And Supplements The Requirements Specified In Di-misc-81020 And Elsewhere In The Contract/purchase Order. The Contractor Must Develop Written Procedures That implement The Material Control Requirements Stated Herein And Elsewhere In This Contract/purchase Order. 3.34 Material Traceability - The Certification Data Report Must Be Identified Through A Unique Traceability Number, Heat-lot Number, Or Heat-treat Number, As Applicable, Which Must Also Be Marked On The Material. This Traceability Marking On The Material Must provide Direct Traceability To The Material's Chemical Composition And Mechanical Properties Certification Data. For Material Produced By Batch, Continuous Cast, Or Continuous Pour Processes, Samples Must Be Taken No Less Than Once In Every Eight Hours Of operation For The Purpose Of Validating Proper Chemical Composition And Mechanical Properties. Traceability Must Be Maintained Through All Process Operations Including Any Subcontracted Operations, To The Finished Component. 3.34.1 Material Marking For Traceability And Identification - The Following Are The Minimum Marking Requirements. Additional/alternate Marking Requirements, If Applicable, Will Be Specified Elsewhere In The Contract/purchase Order. In Addition To The marking Requirements On Applicable Drawings And/or Specifications, Marking For Traceability Is Required. All Traceability Markings Must Be Permanently Applied In Accordance With Mil-std-792 (except As Specified Below). An Alternate Marking Method Is permissible Provided It Is An Available Option In The Contractually Invoked Specification Or Drawing, Except In Instances Where The Material Has Been Modified By This Contract/purchase Order And Differs From That Specified In The Specification Or Drawing. 3.34.2 Traceability Markings For Items With Precision Machined Or Plated Surfaces, Or Material With Suitable Marking Surface Areas Less Than 3/8 Inches Square (either 3/8" X 3/8" Or An Area Equal To 0.1406 Inches Square) Must Be Applied To A Durable Tag And the Tag Securely Affixed To The Material. 3.34.3 Traceability Markings Must Be Maintained Through Assembly, And Whenever Possible Must Be Visible After Assembly. For Items Where The Marking Is Not Visible After Assembly, A Durable Tag Must Be Securely Attached To The Assembly Identifying The Part number, Piece Number, Traceability Number, And The Location Of The Permanent Mark. 3.34.4 Marking Must Be Legible And Must Be Located So As To Not Affect The Form, Fit, And Function Of The Material. ;marking Area To Be As Shown On Drawing.; 3.35 See Cdrl Di-misc-81020 (chemical And Mechanical) - Material Certification - In Addition To The Certification Data Requirements Specified In Di-misc-81020, The Following Material Certification Requirements Apply: 3.35.1 Quantitative Chemical And Mechanical Analysis Of Material Traceable To Traceability Markings Is Required. Material Certification Test Reports Must Include The Class, Form, Condition, Grade, Type, Finish, And/or Composition, As Applicable, Of The material Supplied. 3.35.2 Re-identification And Re-certification Of Material Is Required When The Material Is Subjected To A Process Which Alters It's Properties. If The Starting Material Or Raw Stock Is Processed In A Manner That Will Not Affect Its Chemical Composition Or mechanical Properties, The Original Certifications For The Chemical Composition And Mechanical Properties, As Required By The Material Specification, Are Acceptable. Re-certification Of The Chemical Or Mechanical Properties Is Required If A Process Is Used during Fabrication That Alters The Original Properties Of The Material (e.g. Alloying, Heat Treating, Or Forming). In These Instances, The Properties Of The Material Must Be Re-determined And Documented To Reflect The Altered Condition. The Altered Material must Be Uniquely Re-identified. The Properties Thus Determined And Documented, Are Required For Final Certification And Must Conform To The Material Specification Or The Contract/purchase Order Requirements. When Only The Mechanical Properties Are Altered, the Original Certification Forchemical Composition Must Be Overstamped And Annotated With The Unique Traceability Material And At A Minimum Contain The Information Below. traceability Marking ________________________________________________ (marking On Finished Item) is Fabricated From Raw Material Identified To heat/lot Number ______________ And Heat Treat Number _____________________ (when Applicable) _________________________________________ Date _____________________ (name And Signature Of Auth. Co. Rep.) 3.35.3 Material Certification Data Forwarded By The Manufacturer Must Contain A Signed Certification That The Report Results Represent The Actual Attributes Of The Material Furnished And Indicate Full Compliance With All Applicable Specification And Contract requirements. Transcription Of Certification Data Is Prohibited. 3.35.4 Statements On Material Certification Documents Must Be Positive And Unqualified. Disclaimers Such As "to The Best Of Our Knowledge" Or "we Believe The Information Contained Herein Is True" Are Not Acceptable. 3.35.5 If Material Is Received Without The Required Certification Papers Or With Incorrect/missing Data On The Certification Papers, The Material Will Be Rejected. 3.36 Material Handling - The Written Material Control Process Must Include The Following: 3.36.1 All Raw Materials Must Have Traceability Markings (except As Specified Below). 3.36.2 Stored Raw Materials Requiring Traceability Must Be Segregated To Preclude Intermingling With Materials Not Requiring Traceability. 3.36.3 When Traceability Markings Will Be Removed By A Manufacturing Or Fabrication Process, The Marking Must Be Recorded Prior To Removal And Be Immediately Restored Upon Completion Of The Process. If This Cannot Be Done Or Is Impractical, An Appropriate material Control Procedure (such As A Bag And Tag, Tagging, And/or Tote Box Control) Must Be Employed. The Material Control Procedure Must Provide A Method Of Positive Control To Preclude Commingling Of Heats/lots Or Loss Of Traceability. The Traceability marking Must Be Reapplied Upon Completion Of The Final Manufacturing Process. 3.36.4 Brazing Or Weld Filler Metals For Strength Welds Forming Or Integral With Pressure Containing Components Or Assemblies Requiring Traceability Must Be Verified To Be The Correct Material, And Type Or Grade, As Applicable, Prior To Consumption. At A minimum, Material Verification Must Consist Of Inspection Of Material Test Reports For Conformance To Specified Requirements. Control Of Welding And Brazing Filler Metals Must Be Maintained To The Point Of Consumption To Assure Use Of The Correct Type And grade. Markings And Traceability Requirements Do Not Apply To Brazing And Weld Filler Metals After Consumption. It Is The Responsibility Of The Prime Contractor To Ensure Conformance With The Above Requirements On Welds Performed By Their Subcontractors. 3.36.5 Purchase Orders For Raw Material Must Specify That The Material Be Traceable To Material Certification Test Reports By Traceability Markings On The Material And Identified On The Test Reports. The Certification Data Requirements Contained In di-misc-81020 Must Be Invoked By The Prime Contractor On All Subcontractors Supplying Level I Material. 3.36.6 The Material Control Process Must Include Requirements For The Maintenance Of Traceability For Items Sent Out For Subcontracted Operations. If Such Operations Would Remove Traceability Markings, Purchase Or Work Orders Must Specify A Method And Marking location For Remarking. The Contractor Must Also Ensure That Subcontractor Production Controls Are Adequate To Preclude Commingling Of Materials During Processing. 3.37 Receiving Inspection - 3.37.1 Products And Services Produced By Sub-tier Suppliers For Incorporation In The Contract End Item Must Be Subject To Inspection Or Audit At The Time Of Receipt By The Prime Prior To Further Processing Within The Prime Contractor's Plant Or Shipment To another Location. 3.37.2 Receiving Inspection Must Include As A Minimum - verification That The Traceability Marking On The Material Agrees With That On The Certification Test Reports. verification That Certification Test Reports Are Legible And Complete. verification That The Contents Of The Certification Test Reports Are In Compliance With The Contractually Invoked Specifications And Requirements. 3.38 Discrepancy Reporting - 3.38.1 Nonconforming Products From Sub-tier Suppliers Must Be Identified And Processed In Accordance With The Prime Contractor's Procedures For Controlling Nonconforming Products. The Prime Contractor Must Report The Receipt Of Any Nonconforming Products To the Responsible Sub-tier Supplier In Accordance With Established Procedures. Nonconforming Material Records Must Be Maintained And Available For Review By The Government Quality Assurance Representative (qar). 3.39 Final Inspection - The Following Inspections Must Be Performed Prior To Government Inspection And Acceptance. 3.39.1 Material Sampling - Material Must Be Inspected For Form, Fit, And Function. Lot Acceptance Must Be Based On Zero Defects And Lot Rejection Based On One Defect. The Sample Size Must Be In Accordance With The Sampling Plan(s) In The Applicable Military specification Or Standard, Federal Specification Or Standard, Or Drawing To Which The Material Was Manufactured. In The Absence Of Such Sampling Plans, Sampling Inspection Must Be Per Ansi/asq-z1.4, General Inspection Level Ii (for Sample Size Selection Code), table Iia (for Sample Size). small Lot Sizes - For Lot Sizes Of Fifty Or Less, The Minimum Sample Size Must Be Eight Units. For Lot Sizes Of Eight Or Less, The Sample Size Must Be One Hundred Percent Of The Lot. 3.39.2 The Manufacturer May Elect To Use Statistical Process Control (spc) To Assure Product Quality In Lieu Of The Above Attribute Sampling Plan, Provided That The Spc Methodology/system Used Provides Acceptable Products To The Government. However, The government/navy Receipt Inspection Activity May Perform Their Acceptance Inspection Of The Material Using The Attribute Sampling Plan Outlined Above. 3.39.3 All Data Concerning Material Verification (chemical, Mechanical Or Physical Properties), Traceability (material Certifications To Material Marking), And Nondestructive Test (ndt) Certifications For Material Must Be 100% Inspected. The Certification test Reports Must Also Be 100% Inspected For Completeness And Legibility. 3.39.4 All Material Requiring Traceability Must Be 100% Inspected For Traceability Marking And That The Marking Is Legible. 3.40 Additional Marking For Fasteners - Fasteners Must Be Marked In Accordance With ;mil-dtl-1222, Except The Self-locking Hex Nuts Must Be Marked In Accordance With Nasm 17828. Nasm 17828 Nuts Must Be Marked On The Wrenching Surface With The Manufacturer's identification Symbol, Material Symbol And Heat/lot Traceability Code; . The Method Of Marking Must Be Types I, Ii, Iii, V, Viii Or Ix Of Mil-std-792 Except For Grades 410, 416 And 431 In The H Condition And Grades 8, 630, A574, And 4340 Which Must Be Marked by Method Ii When Marking Is Applied After The Final Heat Treatment. Markings On Fasteners That Are To Be Coated Must Be Marked Prior To Coating And Have A Minimum Depth Of 4 Mils. Traceability Marking Must Be Legible After The Application Of Protective compounds. 3.40.1 Marking Is Required For All Fasteners Regardless Of Size And Must Include The Material Symbol, The Manufacturer's Identification Symbol, And The Traceability Marking. Marking Must Be Applied On The Head Of Headed Fastener (top Preferred, Side location If Necessary). Self-locking Screws Must Also Be Marked With Six Dots. Where No Contract Invoked Specification Requirement Exists For This Marking, Self-locking Fasteners Must Be Marked With Six Dots Approximately .032" Diameter, Raised Or Depressed by Approximately .010" Located On The Top Perimeter Of The Head Of The Fastener In An Arc Or Circular Pattern. The Six Dots Must Be Distinguishable From All Other Required Markings. 3.40.2 In Addition To All Other Marking, The Cure Date Of The Molded Seal Must Be Marked On The Outside Of Each Unit Package. 3.41 See Cdrl Di-misc-80678 (special Emphasis C Of C) - The Certificate Of Compliance Must Show Traceability To The Marking Applied On Each Individual Item, And Must Contain The Following Information: 1. Contractor's Name, Address And Date. 2. The Contract/purchase Order Number (for Example: N00104-11-p-fa12) 3. The National Stock Number (nsn). The 18 Character National Stock Number For Special Emphasis Material Includes The Two Digit Cog, The Four Digit Fsc, The 9 Digit Niin, And The Two Digit Smic (for Example: 1h 4820 012345678 L1) ("n/a" When Not Applicable). 4. Lubricants, Sealants, Anti-seize, And/or Thread Locking Compounds ("n/a" When Not Applicable). 5. Certification That O-rings, Packing, Gaskets, Or Other Elastomeric Products Were Installed In A Compressed State Within An Assembly Or Sub-assembly, Prior To Expiration Of The Shelf Life ("n/a" When Not Applicable). 6. Manufacturer's Compound Number ("n/a" When Not Applicable). 7. When Weld Procedure Submittal Is Required By The Contract, A Statement That The Approval Date Of The Qualification Data Precedes Any Production Or Repair Welding Performed On This Contract. ("n/a" When Not Applicable). 8. A Statement To The Effect That All Items Furnished On This Contract Are In Full Compliance With The Specifications And Requirements And List Each Contractually Invoked Conformance/compliance Test Performed By Name And That It Was Performed satisfactorily. 9. Contractor's Or Authorized Personnel's Signature. 4. Quality Assurance 4.1 Notes To Dcma Qar And The Contractor - 4.1.1 Dcma Qar And The Contractor For Proprietary Designs - Departures From Contractor Imposed Requirements, Not Specifically Covered By The Contract, Must Be Judged Individually On The Basis Of The Effect, If Any, On Contractual Requirements. When There Is A disagreement Between The Contractor And The Government Representative As To The Effect On Contractual Requirements, The Departure Must Be Considered A Nonconformance And Be Submitted To The Pco For Disposition. 4.1.2 Dcma Qar And The Contractor For Proprietary Designs - All Records Of Departures From Contractor Imposed Requirements Must Be Maintained And Available For Review At The Contractor's Facility. A Copy Must Be Given To The Local Government Representative. A record Of These Departures, Traceable To The Applicablepart Number And Contract Number Must Be Submitted To The Pco. 4.1.3 Dcma Qar And The Contractor For Proprietary Designs - For Proprietary Designs, The Contractor's Part Numbers Are Acceptable For Reference Only. The Delivered Material Must Conform To All Drawings, Specifications, And Other Contractual Requirements. 4.1.4 Dcma Qar - It Is The Responsibility Of Dcma Qar To Review Non-destructive Testing (ndt) Procedures For Navsup Contracts/purchase Orders. 4.1.5 Dcma Qar And The Contractor - The Ecds (electronic Contractor Data Submission) System Is Available For Certain Data Submissions And To Submit Questions And Clarifications, And Waiver Requests On Contracts And Solicitations. Ecds Can Be Found At: https://register.nslc.navy.mil/ 5. Packaging 5.1 Preservation, Packaging, Packing And Marking - Preservation, Packaging, Packing And Marking Must Be In Accordance With The Contract/purchase Order Schedule And As Specified Below. mil-std 2073 Packaging Applies As Found Elsewhere In The Schedule 6. Notes 6.1 Several Definitions Of Terms That Apply To Csi Items Are Listed Below. All Terms May Not Apply To Every Item. 6.1.1 The Ecds (electronic Contractor Data Submission) System Is At: Https://register.nslc.navy.mil/ This Application Will Require Advance Registration Using A Pki Digital Certificate On A Cac. A Vendor User Guide Is Available As Csd001 In The Csd (contract Support Document) Library Within Ecds. 6.1.2 Critical Safety Item (csi) - Any Ship Part, Assembly, Or Support Equipment Containing A Critical Characteristic Whose Failure, Malfunction, Or Absence Of Which Could Cause A Catastrophic Or Critical Failure Resulting In Loss Of, Or Serious Damage To The ship, Or Unacceptable Risk Of Personal Injury Or Loss Of Life. 6.1.3 Critical Process - As Determined By The Twh, Any Process, Operation Or Action Performed On A Ship Csi That Serves To Establish A Critical Characteristic (such As Welding, Soldering, Machining, Polishing, Cleaning, Or Assembling) Or Confirm That A critical Characteristic Is Within Drawing Or Specification Compliance (such As, Testing, Measurement, Or Non-destructive Evaluation). 6.1.4 First Article - Pre-production Models, Initial Product Samples, Test Samples Produced To Ensure A Manufacturer's Capability To Meet Full Specification Requirements. 6.1.5 First Article Test (fat) - Contractually Required Testing And Inspection Of A Supplier's Pre-production, Production, Or "production Representative" Specimens To Evaluate A Manufacturer's Ability To Produce Conforming Product Prior To The Government's commitment To Receive Subsequent Production Items. First Article Testing Is Product Specific And Does Not Assess Manufacturing Process Controls Nor Does It Assure The Effectiveness Of The Manufacturer's Quality Program. 6.1.6 Government Source Inspection (gsi) - Gsi Is Independent Oversight Performed By A Government Representative Usually A Dcma Quality Assurance Representative (qar)) To Assure That Those Unique Product Quality And System Elements, Identified By The contracting Agency As Important, Are Observed And Evaluated. 6.1.7 Quality Assurance Letter Of Instruction (qali) - A Qali Is A Formal Document Initiated By A Contracting Activity That Provides Essential Requirements And Instructions For Contracted Materials To Be Independently Verified And Accepted By A Government representative Prior To Shipment. 6.1.8 Objective Quality Evidence (oqe) - The Quantitative And Qualitative Data Of All Mechanical, Chemical, And Performance Tests Performed (as Required By The Applicable Specification, Drawing, Or Purchase Document) To Prove That The Material Supplied conforms To The Specified Requirements. 6.1.9 Surface Discontinuity - Any Surface Irregularity, Marking, Or Localized Change In Physical Character Of The Surface, Other Than Dimensional, That Exists Infrequently At One Or Several Places. (examples: Burrs, Dents, Nicks, Scratches, Gouges, Pits, center-punches, Scribes, And Tool Marks) Surface Discontinuities Less Than 0.005-inch In Depth Are Acceptable Provided They Do Not Violate Any Other Design Requirements Specified In This Contract/purchase Order. 6.1.10 Traceability Code - A Code Or Number Providing Traceability To The Actual Chemical And Mechanical Properties Of The Specified Heat, Batch, Or Form From Which The Material Originated. 6.1.11 Verification - An Examination Performed To Determine Compliance With A Specific Requirement. 6.1.12 Nonconformance - A Nonconformance Is Defined As Affecting Or Violating The Following: - The Requirements Of This Contract/purchase Order. - Contractually Invoked Drawings (i.e. Envelope Dimensions, Interface Dimensions With Mating Parts/equipment, Center Of Gravity, Weights, Piece Part Identification, Material, Etc.). - Contractually Invoked Federal, Military, Or Commercial Specifications And/or Standards. - Form, Fit, Function, Performance To Contract Requirements, Reliability, Maintainability, Interchangeability, Safety Of Personnel Or Equipment, Or Additional Cost To The Government. 6.1.13 Waiver - A Written Authorization To Accept An Item, Which During Manufacture, Or After Having Been Submitted For Government Inspection Or Acceptance, Is Found To Depart From Specified Requirements, But Nevertheless Is Considered Suitable For Use As Is or After Repair By An Approved Method. 6.1.14 Deviation - A Specific Written Authorization (granted Prior To The Manufacture Of An Item) To Depart From A Particular Requirement(s) Of An Item's Current Approved Configuration Documentation For A Specific Number Of Units Or A Specified Period Of time, And To Accept An Item Which Is Found To Depart From Specified Requirements, But Nevertheless Is Considered Suitable For Use "as Is" Or After Repair By An Approved Method. 6.1.15 Critical Waiver/deviation - This Waiver/deviation Consists Of A Departure Involving Safety. 6.1.16 Major Waiver/deviation - This Waiver/deviation Consists Of A Departure Involving: - Performance - Interchangeability, Reliability, Survivability, Maintainability, Or Durability Of The Item Or Its Repair Parts - Health Or Safety - Effective Use Or Operation - Weight, Stability, Or Structural Integrity - System Design Parameters As Schematics, Flows, Pressures Or Temperatures - Compartment Arrangements Or Assigned Function 6.1.17 Minor Waiver/deviation - This Waiver/deviation Consists Of A Departure Which Does Not Involve Any Of The Factors Listed As Critical Or Major. 6.1.18 Engineering Change (ec) - A Change To The Current Approved Configuration Documentation Of A Configuration Item At Any Point In The Life Cycle Of The Item. 6.1.19 Engineering Change Proposal (ecp) - A Proposed Engineering Change And The Documentation By Which The Change Is Described, Justified, And Submitted To The Government For Approval Or Disapproval. 6.1.20 Class I Ecp - A Class I Ecp Is Approved By The Government's Configuration Control Board And Authorized With A Contract Modification. 6.1.21 Class Ii Ecp - A Class Ii Change Is Typically Reviewed For Concurrence In Classification By The Local Government Representative, Unless Otherwise Specified Elsewhere In The Contract/purchase Order. 6.2 In Accordance With Opnavinst 5510.1 All Documents And Drawings Provided By The U.s. Navy To Perspective Contractors Must Include A "distribution Statement" To Inform The Contractor Of The Limits Of Distributi
Contact
Tender Id
N0010424QFE06Tender No
N0010424QFE06Tender Authority
DEPT OF THE NAVY USA ViewPurchaser Address
-Website
beta.sam.gov