Qatarenergy Tender Result

View complete overview of Qatarenergy Tender Result

Qatarenergy Tender Result

Contract Date19 Oct 2014
Contract Period853 Days
Contract AmountQAR 8,13,58,970 (USD 2,23,46,762)

AOC Description

NEW SOUR GAS COMPRESSOR PROJECT, NGL-3, MESAIEED.-NGL-3 Plant was built in the year 1990 to process the Gas and Condensate feed stock from North Field Alfa (NFA). The plant basically consists of a Gas Processing section and a Condensate processing section. The feed stock to NGL-3 currently comprises PS-4 gas combined with Al-Shaheen gas and PS-4 condensate. The Gas and Condensate feed stock from North Field Alpha are transported by pipe lines to NGL-3 Plant at the Mesaieed Industrial Area for NGL extraction and Condensate stabilization. Feed Gas from North Field Alpha and Al-Shaheen are processed in NGL-3 Gas processing plant consisting of AGR, SRU, and NGL Extraction units. Condensate from NFA is processed in Condensate Fractionation plant where a rich gas stream is stripped out as a result of Condensate stabilization. This stripped gas (called Sour Gas) - is routed to NGL-3 Extraction unit using the Existing Sour Gas Compressor (6112-K-01) to process it along with main gas feed from NFA. The Existing Sour Gas Compressor (6112-K-01) has no standby unit and therefore, whenever this existing compressor trips due to any reason, Sour Gas stream is flared resulting in loss of NGL components and black smoke in the area. QP has decided to provide a new standby Sour Gas compressor - which is referred to as “New Compressor” and the associated New Sour Gas After Cooler. The New Compressor (6112-K-01A) and New After Cooler (6112-E-05A) are to be installed close to the existing Sour Gas Compressor (6112-K-01) in the NGL-3 Plant. 1.2,,SCOPE OF WORK : The scope of work for this Project mainly includes design, detail engineering, procurement, installation and commissioning of the following: ",,Install new Sour Gas Compressor, 6112-K-01A as well as the associate auxiliary equipment, i.e. lube oil system and dry gas seal system. ",,Install new Knock Out Drum, 6112-V-03A. ",,Install new Sour Gas Cooler, 6112-E-05A and new Lube Oil Cooler, 6112-E-08A. ",,Installation of the required equipment foundation, compressor house shelter, sour gas and lube oil cooler supporting structure, necessary supports and access platform including the EOT crane for compressor maintenance. ",,Installation of instrumentation system for monitoring, control and

Contact

  • Award Id

    GT14104300
  • Award No

    GC14104300
  • Tender Id

    GT14104300
  • Tender Authority

    Qatarenergy View
  • Purchaser Address

    QatarEnergy P.O. Box 3212, Doha, Qatar http://qatarenergy.qa
Unlock the Tender details for free

Bidder Details

Unlock the Tender details for free
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Bidder AddressThis Information is for unsubscribed user
  • Award Amount234234234200
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Bidder AddressThis Information is for unsubscribed user
  • Award Amount234234234200
  • Qualified BiddersThis is message for unregistered
  • Lowest Bidder662
  • Number of Bids99
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.