Qatarenergy Tender Result

View complete overview of Qatarenergy Tender Result

Qatarenergy Tender Result

Contract Date22 Apr 2021
Contract Period882 Days
Contract AmountQAR 4,49,46,080 (USD 1,23,44,138)

AOC Description

EPIC FOR REPLACEMENT OF REFINERY PIPELINE CULVERTS IN MIC-The scope of Work for the EPIC Works is as summarized below: 1.,,EPIC of New Culverts EPIC of eight (08) new RCC culverts to replace the existing culverts which are in a poor state of repair shall be provided according to the changed site & loading conditions, applicable local and international codes/ standards and QP/ Shell DEPs. Topographic and geotechnical investigation will be required at these locations. Alignment of culverts will remain the same. Particular attention shall be given in the design and construction to prevent ground water ingress into the culverts. 2.,,Protection of existing pipelines inside Culverts. As the pipe lines services cannot be disrupted, the existing pipelines shall be properly protected/ secured prior to and during the demolition of existing culverts and construction of new culverts. 3.,,Demolition of Existing Culverts & Asphalt Road Overlay The culverts are located under busy MIC roads, hence the re-construction of these culverts should be carried out in phases with close coordination with MIC to ensure continuous traffic flow with minimum disruptions. Demolition of existing shall be undertaken to ensure no loss of service of any pipelines and be undertaken in line with highest health and safety standards. The reconstruction of culverts shall require construction of temporary roads for traffic diversions, open cutting of existing asphalt roads, and demolition of existing culverts. Traffic management including all safety barriers and warnings shall be provided during the demolition and re-construction culverts. 4.,,New Culverts Construction The construction of eight (08) new culverts shall comply with the current standards / codes, changed site conditions and QP safety requirements. Dewatering works will also be involved throughout the demolition and construction. Construction on new culverts shall be undertaken to ensure no loss of service of any pipelines and be undertaken in line with highest health and safety standards. 5.,,Reinstatement of Asphalt Road Overlay Reinstatement of asphalt road to be done as per MIC specifications and referenced standards.

Contact

  • Award Id

    GT20105800
  • Award No

    GC20105800
  • Tender Id

    GT20105800
  • Tender Authority

    Qatarenergy View
  • Purchaser Address

    QatarEnergy P.O. Box 3212, Doha, Qatar http://qatarenergy.qa
Unlock the Tender details for free

Bidder Details

Unlock the Tender details for free
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Bidder AddressThis Information is for unsubscribed user
  • Award Amount234234234200
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Bidder AddressThis Information is for unsubscribed user
  • Award Amount234234234200
  • Qualified BiddersThis is message for unregistered
  • Lowest Bidder662
  • Number of Bids99
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.