Qatarenergy Tender Result

View complete overview of Qatarenergy Tender Result

Qatarenergy Tender Result

Contract Date27 Aug 2023
Contract Period914 Days
Contract AmountQAR 2,55,10,500 (USD 70,05,074.5)

AOC Description

EPIC FOR FUEL GAS SUPPLY FROM STATION V TO RLPP-Brief Scope of Work Description The Contractor shall perform the detailed engineering, procurement, installation, construction, pre-commissioning, commissioning, preservation and start-up of the facility. The project scope is to provide all required new facilities and modification to existing facilities at Station V to supply Fuel Gas to RLPP. The project will be executed by two parties, QatarEnergy and RLPP, where the scope responsibility as the following: ",,QatarEnergy: Provide the required facilities from Station V to tie-in point around 13 meter outside Station V fence ",,RLPP: Provide the required facilities from the tie-in point outside Station V to RLPP ISBL The scope to be executed by QatarEnergy includes the following: ",,New tie-ins from existing 36" P1 and P2 Manifold and new 36" future tie-in connections at respective P1 and P2 manifold ",,New 12" fuel gas piping from P1 and P2 manifold tie-ins and common 12" piping till barred tee ",,New permanent pig launcher at Station V, with appropriate safe venting and protection, as per QatarEnergy standards. ",,New pipeline from new pig launcher extending outside Station V fence, providing a pipeline tie-in connection point for the pipeline going to RLPP ",,New ultrasonic flowmeter for monitoring purpose ",,Required ESDVs, MOVs and isolation valves ",,Vent, drain, instrument air tie-ins In addition, the scope of work includes the following optional and provisional scopes which will exercised by QatarEnergy if deemed necessary: The EPIC Contractor responsibility regarding the facilities commissioning split as the following: ",,Monitoring the preserved facilities and topping-up the Nitrogen when required ",,Demobilization after Mechanical Completion and remobilization before commencing the commissioning and gas-in activities. This will be exercised only if there is delays in gas-in activity from RLPP ",,Procuring the Line Pipes if RLPP reject to procure it as part of their scope The EPIC Contractor is responsible for preserving the facilities until it is ready for the Gas-in activity. For the Facilities and Pipeline commissioning and Start-up, EPIC Contractor responsibility are as the following: ",,EPIC Contractor is the main responsible for the commissioning and Start-up for the piping and associated equipment such as the ultrasonic flow meter all the way to pipeline (First Barred Tee) ",,EPIC Contractor to provide support for the Pipeline and Pig Launcher commissioning and Start-up which will be performed by RLPP Contractor

Contact

  • Award Id

    GT23101900
  • Award No

    GC23101900
  • Tender Id

    GT23101900 View
  • Tender Id

    GT23101900
  • Tender Authority

    Qatarenergy View
  • Purchaser Address

    QatarEnergy P.O. Box 3212, Doha, Qatar http://qatarenergy.qa
Unlock the Tender details for free

Bidder Details

Unlock the Tender details for free
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Bidder AddressThis Information is for unsubscribed user
  • Award Amount234234234200
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Bidder AddressThis Information is for unsubscribed user
  • Award Amount234234234200
  • Qualified BiddersThis is message for unregistered
  • Lowest Bidder662
  • Number of Bids99
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.