Administrador De Infraestructuras Ferroviarias Spainish Railway Infrastructure Administrator ADIF Tender Result
Download AOC documents of Administrador De Infraestructuras Ferroviarias Spainish Railway Infrastructure Administrator ADIF Tender Result
Administrador De Infraestructuras Ferroviarias Spainish Railway Infrastructure Administrator ADIF Tender Result
Contract DateNA
Contract PeriodNot specified
Contract AmountEUR 5,74,695 (USD 6,52,122.8)
AOC Description
Translated
Execution of the works on the pedestrian walkway replacement project at pk 447/129 and removal of the level crossing at pk 446/350 of the León – La Coruña Line. Municipality of Rábade (Lugo)
Original
Ejecución de las obras del proyecto de reposición de pasarela peatonal en el p.k. 447/129 y supresión del paso a nivel del p.k. 446/350 de la Línea León – La Coruña. Término municipal de Rábade (Lugo)
Contact
Award Id
3.23/27507.0132Award No
3.23/27507.0132Tender Id
3.23/27507.0132Tender Authority
Administrador De Infraestructuras Ferroviarias Spainish Railway Infrastructure Administrator ADIF ViewPurchaser Address
Presentación Electrónica sitio Web: elicitadores.adif.es-28036-MADRIDWebsite
www.adif.es
Unlock the Tender details for free
AOC Documents
Report Missing Document
Bidder Details
Unlock the Tender details for free
- Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
- Bidder AddressThis Information is for unsubscribed user
- Award Amount234234234200
- Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
- Bidder AddressThis Information is for unsubscribed user
- Award Amount234234234200
- Qualified BiddersThis is message for unregistered
- Lowest Bidder662
- Number of Bids99