Tender Results of Administrador De Infraestructuras Ferroviarias Spainish Railway Infrastructure Administrator Adif

Tender Results of Administrador De Infraestructuras Ferroviarias Spainish Railway Infrastructure Administrator Adif

Administrador De Infraestructuras Ferroviarias Spainish Railway Infrastructure Administrator ADIF Tender Result

Result Stage: Awarded  (AOC Available)
Spain
Supply of a mobile crane for leasing for handling intermodal transport units (ITUs) at the Bilbao intermodal freight terminal.
Contract Date26 Mar 2025
Contract AmountEUR 90 K (USD 97.6 K)

Administrador De Infraestructuras Ferroviarias Spainish Railway Infrastructure Administrator ADIF Tender Result

Result Stage: Awarded  (AOC Available)
Spain
Managed infrastructure service for the MAINFRAME platform.
Contract Date25 Mar 2025
Contract AmountEUR 7.1 Million (USD 7.7 Million)

Administrador De Infraestructuras Ferroviarias Spainish Railway Infrastructure Administrator ADIF Tender Result

Result Stage: Awarded  (AOC Available)
Spain
3 KV underground line between the Reception, Measurement and Transformation Center and the Overhead Transformation Center for power supply to the future SIC+ Can Tunis (Barcelona).
Contract Date24 Mar 2025
Contract AmountEUR 86.3 K (USD 93.7 K)

Administrador De Infraestructuras Ferroviarias Spainish Railway Infrastructure Administrator ADIF Tender Result

Result Stage: Awarded  (AOC Available)
Spain
Order No. 7 against the framework agreement for functional adaptation works at level crossings resulting from changes in operation on the lines of the General Interest Railway Network (RFIG) to improve the protection of the level crossing located at pk127/430 of line 500 Planetario Bifurcation - Casa de la Torre Bifurcation in the municipality of Cazalegas (Castilla la Mancha)
Contract Date24 Mar 2025
Contract AmountEUR 241.4 K (USD 262 K)

Administrador De Infraestructuras Ferroviarias Spainish Railway Infrastructure Administrator ADIF Tender Result

Result Stage: Awarded  (AOC Available)
Spain
Infrastructure Improvement Action (AMI) "project drafting and execution of works for the renovation of track 4 of Sant Miquel de Fluvià station from kilometer point 236/289 to kilometer point 236/989 of line 270 Cerbere – Aragó junction".
Contract Date21 Mar 2025
Contract AmountEUR 622.2 K (USD 675.3 K)

Administrador De Infraestructuras Ferroviarias Spainish Railway Infrastructure Administrator ADIF Tender Result

Result Stage: Awarded  (AOC Available)
Spain
Execution of works for the project to improve the permeability of the Palencia-La Coruña railway line in the Valdeorras area (Ourense).
Contract Date21 Mar 2025
Contract AmountEUR 626.9 K (USD 680.3 K)

Administrador De Infraestructuras Ferroviarias Spainish Railway Infrastructure Administrator ADIF Tender Result

Result Stage: Awarded  (AOC Available)
Spain
Execution of the project for the replacement and construction of enclosures between stations 42/400 and 57/777 of Line 100, Madrid Chamartín - Hendaye. Municipalities of El Escorial (Madrid) and Zarzalejo (Madrid).
Contract Date21 Mar 2025
Contract AmountEUR 672.2 K (USD 729.5 K)

Administrador De Infraestructuras Ferroviarias Spainish Railway Infrastructure Administrator ADIF Tender Result

Result Stage: Awarded  (AOC Available)
Spain
Technical assistance services for surveillance control during the construction of the new Parets del Vallès station (Barcelona).
Contract Date21 Mar 2025
Contract AmountEUR 703.2 K (USD 763.2 K)

Administrador De Infraestructuras Ferroviarias Spainish Railway Infrastructure Administrator ADIF Tender Result

Result Stage: Awarded  (AOC Available)
Spain
Drafting and execution of works for the renovation of automatic protection at level crossings, kilometer point 217/938, improvement of automatic protection at level crossings, kilometer point 280/683, and new installation of automatic protection at level crossings, kilometer point 277/811, line 200, Madrid Chamartín–Barcelona França, located in the province of Zaragoza.
Contract Date21 Mar 2025
Contract AmountEUR 1 Million (USD 1.1 Million)

Administrador De Infraestructuras Ferroviarias Spainish Railway Infrastructure Administrator ADIF Tender Result

Result Stage: Awarded  (AOC Available)
Spain
Order No. 2 framework agreement for the supply of new rail for the needs of the general interest railway network
Contract Date21 Mar 2025
Contract AmountEUR 4.2 Million (USD 4.6 Million)
1-10 of 1988 active Tender Results