Administrador De Infraestructuras Ferroviarias Spainish Railway Infrastructure Administrator ADIF Tender Result

Download AOC documents of Administrador De Infraestructuras Ferroviarias Spainish Railway Infrastructure Administrator ADIF Tender Result

Administrador De Infraestructuras Ferroviarias Spainish Railway Infrastructure Administrator ADIF Tender Result

Civil And Construction
Contract Date25 Mar 2025
Contract Period90 Days
Contract AmountEUR 70,45,748 (USD 80,12,714.5)

AOC Description

Translated

Works to replace beams and rails on Line 700 Casetas – Bilbao. Subway Cortes de Navarra – Castejón de Ebro from PK 53+400 to PK 93+ 006 on double roads.

Original

Obras de sustitución de traviesas y carril Línea 700 Casetas – Bilbao. Subtramo Cortes de Navarra – Castejón de Ebro del P.K 53+400 al P.K 93+ 006 en doble vía.

Contact

Unlock the Tender details for free
AOC Documents
Bidder Details Information
Report Missing Document

Bidder Details

Unlock the Tender details for free
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Bidder AddressThis Information is for unsubscribed user
  • Award Amount234234234200
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Bidder AddressThis Information is for unsubscribed user
  • Award Amount234234234200
  • Qualified BiddersThis is message for unregistered
  • Lowest Bidder662
  • Number of Bids99
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.