Administrador De Infraestructuras Ferroviarias Spainish Railway Infrastructure Administrator ADIF Tender Result

View complete overview of Administrador De Infraestructuras Ferroviarias Spainish Railway Infrastructure Administrator ADIF Tender Result

Administrador De Infraestructuras Ferroviarias Spainish Railway Infrastructure Administrator ADIF Tender Result

Contract DateNA
Contract PeriodNot specified
Contract AmountEUR 11,86,500 (USD 12,44,656.6)

AOC Description

Translated

Emergency of the works and services due to serious damage to the entrance trench walls to the Córdoba station. Line 400, Alcázar de San Juan-Cádiz. Kilometer point 440+200.

Original

Emergencia de las obras y de los servicios por graves daños en los muros trinchera de entrada a la estación de Córdoba. Línea 400, Alcázar de San Juan-Cádiz. Punto kilométrico 440+200.

Contact

Unlock the Tender details for free
AOC Documents
Bidder Details Information
Report Missing Document

Bidder Details

Unlock the Tender details for free
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Bidder AddressThis Information is for unsubscribed user
  • Award Amount234234234200
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Bidder AddressThis Information is for unsubscribed user
  • Award Amount234234234200
  • Qualified BiddersThis is message for unregistered
  • Lowest Bidder662
  • Number of Bids99
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.