Administrador De Infraestructuras Ferroviarias Spainish Railway Infrastructure Administrator ADIF Tender Result

View complete overview of Administrador De Infraestructuras Ferroviarias Spainish Railway Infrastructure Administrator ADIF Tender Result

Administrador De Infraestructuras Ferroviarias Spainish Railway Infrastructure Administrator ADIF Tender Result

Civil And Construction
Construction Material
Contract Date19 Dec 2024
Contract Period90 Days
Contract AmountEUR 7,57,466 (USD 7,89,069.9)

AOC Description

Translated

Project drafting and execution of works to replace track materials between kilometer points 10/063 to 12/700 of line 790.

Original

Redacción de proyecto y ejecución de obra de sustitución de materiales de vía entre los puntos kilométricos 10/063 a 12/700 de la línea 790.

Contact

Unlock the Tender details for free
AOC Documents
Bidder Details Information
Report Missing Document

Bidder Details

Unlock the Tender details for free
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Bidder AddressThis Information is for unsubscribed user
  • Award Amount234234234200
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Bidder AddressThis Information is for unsubscribed user
  • Award Amount234234234200
  • Qualified BiddersThis is message for unregistered
  • Lowest Bidder662
  • Number of Bids99
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.