Administrador De Infraestructuras Ferroviarias Spainish Railway Infrastructure Administrator ADIF Tender Result

View complete overview of Administrador De Infraestructuras Ferroviarias Spainish Railway Infrastructure Administrator ADIF Tender Result

Administrador De Infraestructuras Ferroviarias Spainish Railway Infrastructure Administrator ADIF Tender Result

Contract Date10 Oct 2024
Contract Period90 Days
Contract AmountEUR 82,009 (USD 85,910.086)

AOC Description

Translated

Technical assistance for quantitative and qualitative quality control of the execution of works for the construction project to remove the level crossing at PK 5/037 on the León-Matallana Narrow Gauge line. TM Villaquilambre (León).

Original

Asistencia técnica para el control de calidad cuantitativo y cualitativo de la ejecución de las obras del proyecto de construcción de supresión del paso a nivel del P.K. 5/037 en la línea de León-Matallana de Ancho Métrico. T.M. Villaquilambre(León).

Contact

Unlock the Tender details for free
AOC Documents
Bidder Details Information
Report Missing Document

Bidder Details

Unlock the Tender details for free
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Bidder AddressThis Information is for unsubscribed user
  • Award Amount234234234200
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Bidder AddressThis Information is for unsubscribed user
  • Award Amount234234234200
  • Qualified BiddersThis is message for unregistered
  • Lowest Bidder662
  • Number of Bids99
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.