Administrador De Infraestructuras Ferroviarias Spainish Railway Infrastructure Administrator ADIF Tender Result

View complete overview of Administrador De Infraestructuras Ferroviarias Spainish Railway Infrastructure Administrator ADIF Tender Result

Administrador De Infraestructuras Ferroviarias Spainish Railway Infrastructure Administrator ADIF Tender Result

Civil And Construction
Contract Date27 Sep 2024
Contract Period90 Days
Contract AmountEUR 19,52,087 (USD 20,61,921.4)

AOC Description

Translated

Execution of works on the treatment project for the trench located between PP.KK. 50+150 and 50+760. La Tour de Carol – Enveigt – Bif. Aigües line. Montcada Bif. – Les Franqueses del Valles – Vic section.

Original

Ejecución de las obras del proyecto de tratamiento de la trinchera situada entre los PP.KK. 50+150 y 50+760. Línea La Tour de Carol – Enveigt – Bif. Aigües. tramo Montcada Bif. – Les Franqueses del Valles – Vic.

Contact

Unlock the Tender details for free
AOC Documents
Bidder Details Information
Report Missing Document

Bidder Details

Unlock the Tender details for free
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Bidder AddressThis Information is for unsubscribed user
  • Award Amount234234234200
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Bidder AddressThis Information is for unsubscribed user
  • Award Amount234234234200
  • Qualified BiddersThis is message for unregistered
  • Lowest Bidder662
  • Number of Bids99
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.