Administrador De Infraestructuras Ferroviarias Spainish Railway Infrastructure Administrator ADIF Tender Result

View complete overview of Administrador De Infraestructuras Ferroviarias Spainish Railway Infrastructure Administrator ADIF Tender Result

Administrador De Infraestructuras Ferroviarias Spainish Railway Infrastructure Administrator ADIF Tender Result

Telecommunication Services
Contract Date9 Sep 2024
Contract Period90 Days
Contract AmountEUR 23,06,005 (USD 24,35,752.8)

AOC Description

Translated

Execution of the works of the construction project for the elimination of level crossings of PP.KK. 522/700 and 523/088 of the Santander-Llanes (RAM) line. Municipality of Santa Cruz de Bezana (Cantabria)

Original

Ejecución de las obras del proyecto de construcción para la supresión de los pasos a nivel de los PP.KK. 522/700 y 523/088 de la línea (RAM) Santander-Llanes. Término municipal de Santa Cruz de Bezana (Cantabria)

Contact

Unlock the Tender details for free
AOC Documents
Bidder Details Information
Report Missing Document

Bidder Details

Unlock the Tender details for free
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Bidder AddressThis Information is for unsubscribed user
  • Award Amount234234234200
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Bidder AddressThis Information is for unsubscribed user
  • Award Amount234234234200
  • Qualified BiddersThis is message for unregistered
  • Lowest Bidder662
  • Number of Bids99
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.