Tender Results of Administrador De Infraestructuras Ferroviarias Spainish Railway Infrastructure Administrator Adif
Tender Results of Administrador De Infraestructuras Ferroviarias Spainish Railway Infrastructure Administrator Adif
Administrador De Infraestructuras Ferroviarias Spainish Railway Infrastructure Administrator ADIF Tender Result
Spain
Contract Date14 Nov 2024
Contract AmountEUR 701 K (USD 741.5 K)
Infrastructure Improvement Action (AMI) "Project drafting and execution of the works to replace RS biblock sleepers with monoblock sleepers on line 200 Madrid Chamartín to Barcelona - Estación de Francia. Section Madrid Chamartín - Sa Fernando de Henares pp.kk. 1+957 – 14+850 (tracks 1 and 2)"
Administrador De Infraestructuras Ferroviarias Spainish Railway Infrastructure Administrator ADIF Tender Result
Spain
Contract Date14 Nov 2024
Contract AmountEUR 749.1 K (USD 789 K)
Execution of the works of the construction project for the removal of the temporary speed limit by means of renewing the superstructure and electrifying the main tracks at PK 243+ 006 of the La Roda station in Albacete. Line 300: Madrid Chamartín- Valencia Estación del Norte
Administrador De Infraestructuras Ferroviarias Spainish Railway Infrastructure Administrator ADIF Tender Result
Spain
Contract Date14 Nov 2024
Contract AmountEUR 1.6 Million (USD 1.6 Million)
Supply and transport of sleepers for the extension of sidings up to a useful length of 750 m, in stations of the double-track line of Iberian gauge that links Madrid with Barcelona. Stations in Guadalajara: Humanes de Mohernando, Jadraque and Sigüenza. Stations in Soria: Arcos de Jalón.
Administrador De Infraestructuras Ferroviarias Spainish Railway Infrastructure Administrator ADIF Tender Result
Spain
Contract Date14 Nov 2024
Contract AmountEUR 1.7 Million (USD 1.8 Million)
Execution of works for the construction project to remove level crossings at PPKK 74/000, 74/286, 74/412, 74/555 and 74/661 on Line 230 of the General Interest Railway Network (RFIG) Plana Picamoixon – Reus, Municipal District of Alcover (Tarragona).
Administrador De Infraestructuras Ferroviarias Spainish Railway Infrastructure Administrator ADIF Tender Result
Spain
Contract Date14 Nov 2024
Contract AmountEUR 3.9 Million (USD 4.1 Million)
Consulting and assistance services for the control and monitoring of the works for the projects to widen the clearance in tunnels and overpasses on line 610-Teruel-Sagunto branch. Sections: Sagunto-Teruel-Zaragoza.
91-100 of 1742 active Tender Results