Tender Results of Administrador De Infraestructuras Ferroviarias Spainish Railway Infrastructure Administrator Adif
Administrador De Infraestructuras Ferroviarias Spainish Railway Infrastructure Administrator ADIF Tender Result
Result Stage: Awarded (AOC Available)
Spain
Execution works of the construction project for priority actions to improve evacuation and ventilation conditions in the event of fire in the Getafe downtown underground commuter station (Madrid)
Contract DateNA
Contract AmountEUR 699 K (USD 736.7 K)
Administrador De Infraestructuras Ferroviarias Spainish Railway Infrastructure Administrator ADIF Tender Result
Result Stage: Awarded (AOC Available)
Spain
Action for Infrastructure Improvement (AMI) "Project drafting and execution of level crossing renovation work on line 500. Planetarium Bif. - Valencia de Alcántara, in the section between the Griñón and Navalmoral de la Mata stations "
Contract DateNA
Contract AmountEUR 701.9 K (USD 761.8 K)
Administrador De Infraestructuras Ferroviarias Spainish Railway Infrastructure Administrator ADIF Tender Result
Result Stage: Awarded (AOC Available)
Spain
Emergency for track repair works and services and hillside consolidation due to rockfall that derailed Alvia 623 train at kilometer 340+000 on August 26, 2022. San Clodio Quiroga-Freixeiro section, line 800 León-A Shit.
Contract DateNA
Contract AmountEUR 712.9 K (USD 751.3 K)
Administrador De Infraestructuras Ferroviarias Spainish Railway Infrastructure Administrator ADIF Tender Result
Result Stage: Awarded (AOC Available)
Spain
Action to improve infrastructure (AMI) "drafting of the project and execution of the work to replace PR01 sleepers with monoblock sleepers. Line 300. Madrid Chamartín to Valencia Estación del Norte. Section: Ciempozuelos - Aranjuez PP.KK.
Contract DateNA
Contract AmountEUR 719.1 K (USD 782.4 K)
Administrador De Infraestructuras Ferroviarias Spainish Railway Infrastructure Administrator ADIF Tender Result
Result Stage: Awarded (AOC Available)
Spain
Execution of the works for the rail and sleeper replacement project on track 1 between PK 68/043 and 71/835 and between PK 73/330 and 76/760, on the Ribaforada-Tudela route. Line 700 intermodal Abando Indalecio Prieto-Casetas.
Contract DateNA
Contract AmountEUR 721 K (USD 759.9 K)
1741-1750 of 2250 active Tender Results