Tender Results of Administrador De Infraestructuras Ferroviarias Spainish Railway Infrastructure Administrator Adif

Tender Results of Administrador De Infraestructuras Ferroviarias Spainish Railway Infrastructure Administrator Adif

Administrador De Infraestructuras Ferroviarias Spainish Railway Infrastructure Administrator ADIF Tender Result

Result Stage: Awarded  (AOC Available)
Spain
Preventive and corrective maintenance service for electrical installations at freight transport terminals within the scope of the Northeast Logistics Services Subdirectorate
Contract Date15 Nov 2024
Contract AmountEUR 119.9 K (USD 126.3 K)

Administrador De Infraestructuras Ferroviarias Spainish Railway Infrastructure Administrator ADIF Tender Result

Result Stage: Awarded  (AOC Available)
Spain
Structural support service at the Adif health centre in Valladolid, by a professional specialising in occupational medicine
Contract Date15 Nov 2024
Contract AmountEUR 165.9 K (USD 175.2 K)

Administrador De Infraestructuras Ferroviarias Spainish Railway Infrastructure Administrator ADIF Tender Result

Result Stage: Awarded  (AOC Available)
Spain
PLO-LAC standardisation project to adapt them to NAE 112. Updating obsolete PLO-LAC stations with substation. Double track León-Palencia. Torneros-Sahagún section
Contract Date15 Nov 2024
Contract AmountEUR 302.2 K (USD 318.3 K)

Administrador De Infraestructuras Ferroviarias Spainish Railway Infrastructure Administrator ADIF Tender Result

Result Stage: Awarded  (AOC Available)
Spain
Construction project for the renewal of the contact wire of line 700 Casetas-Bilbao (Abando) in the Llodio-Bilbao section
Contract Date15 Nov 2024
Contract AmountEUR 372.6 K (USD 392.5 K)

Administrador De Infraestructuras Ferroviarias Spainish Railway Infrastructure Administrator ADIF Tender Result

Result Stage: Awarded  (AOC Available)
Spain
Project for the replacement of the AT cabins in AC of the traction groups and mobile SE of the l'Ametlla Substation
Contract Date14 Nov 2024
Contract AmountEUR 122.9 K (USD 129.4 K)

Administrador De Infraestructuras Ferroviarias Spainish Railway Infrastructure Administrator ADIF Tender Result

Result Stage: Awarded  (AOC Available)
Spain
Execution of works for the "Investment Project: Installation of a second power battery"
Contract Date14 Nov 2024
Contract AmountEUR 380.3 K (USD 400.5 K)

Administrador De Infraestructuras Ferroviarias Spainish Railway Infrastructure Administrator ADIF Tender Result

Result Stage: Awarded  (AOC Available)
Spain
Sixth order against the framework agreement of contract annex to 4.20/27520.0108 (lot 1). Project for actions to improve the gauge and repair damage to the La Anchada metal bridge with upper bracing on the L200 Madrid - Barcelona line. Kilometer point 248/680.
Contract Date14 Nov 2024
Contract AmountEUR 425.3 K (USD 448 K)

Administrador De Infraestructuras Ferroviarias Spainish Railway Infrastructure Administrator ADIF Tender Result

Result Stage: Awarded  (AOC Available)
Spain
Infrastructure Improvement Action (AMI) "Project drafting and execution of the works to replace RS biblock sleepers with monoblock sleepers on line 200 Madrid Chamartín to Barcelona - Estación de Francia. Section Madrid Chamartín - Sa Fernando de Henares pp.kk. 1+957 – 14+850 (tracks 1 and 2)"
Contract Date14 Nov 2024
Contract AmountEUR 701 K (USD 741.5 K)

Administrador De Infraestructuras Ferroviarias Spainish Railway Infrastructure Administrator ADIF Tender Result

Result Stage: Awarded  (AOC Available)
Spain
Execution of the works of the construction project for the removal of the temporary speed limit by means of renewing the superstructure and electrifying the main tracks at PK 243+ 006 of the La Roda station in Albacete. Line 300: Madrid Chamartín- Valencia Estación del Norte
Contract Date14 Nov 2024
Contract AmountEUR 749.1 K (USD 789 K)

Administrador De Infraestructuras Ferroviarias Spainish Railway Infrastructure Administrator ADIF Tender Result

Result Stage: Awarded  (AOC Available)
Spain
Execution of works to renew the secondary tracks at the Bárcena de Pie de Concha station.
Contract Date14 Nov 2024
Contract AmountEUR 1.2 Million (USD 1.3 Million)
81-90 of 1739 active Tender Results