Tender Results of Administrador De Infraestructuras Ferroviarias Spainish Railway Infrastructure Administrator Adif
Tender Results of Administrador De Infraestructuras Ferroviarias Spainish Railway Infrastructure Administrator Adif
Administrador De Infraestructuras Ferroviarias Spainish Railway Infrastructure Administrator ADIF Tender Result
Result Stage: Awarded (AOC Available)
Spain
Sixth order against the framework agreement of contract annex to 4.20/27520.0108 (lot 1). Project for actions to improve the gauge and repair damage to the La Anchada metal bridge with upper bracing on the L200 Madrid - Barcelona line. Kilometer point 248/680.
Contract Date14 Nov 2024
Contract AmountEUR 425.3 K (USD 448 K)
Administrador De Infraestructuras Ferroviarias Spainish Railway Infrastructure Administrator ADIF Tender Result
Result Stage: Awarded (AOC Available)
Spain
Infrastructure Improvement Action (AMI) "Project drafting and execution of the works to replace RS biblock sleepers with monoblock sleepers on line 200 Madrid Chamartín to Barcelona - Estación de Francia. Section Madrid Chamartín - Sa Fernando de Henares pp.kk. 1+957 – 14+850 (tracks 1 and 2)"
Contract Date14 Nov 2024
Contract AmountEUR 701 K (USD 741.5 K)
Administrador De Infraestructuras Ferroviarias Spainish Railway Infrastructure Administrator ADIF Tender Result
Result Stage: Awarded (AOC Available)
Spain
Execution of the works of the construction project for the removal of the temporary speed limit by means of renewing the superstructure and electrifying the main tracks at PK 243+ 006 of the La Roda station in Albacete. Line 300: Madrid Chamartín- Valencia Estación del Norte
Contract Date14 Nov 2024
Contract AmountEUR 749.1 K (USD 789 K)
81-90 of 1739 active Tender Results