Tender Results of Administrador De Infraestructuras Ferroviarias Spainish Railway Infrastructure Administrator Adif

Tender Results of Administrador De Infraestructuras Ferroviarias Spainish Railway Infrastructure Administrator Adif

Administrador De Infraestructuras Ferroviarias Spainish Railway Infrastructure Administrator ADIF Tender Result

Result Stage: Awarded  (AOC Available)
Spain
Technical management and technical assistance for the supervision of works of the "Construction project for the installation of two elevators and heightening of two platforms at the Linares-Baeza station (Jaén)"
Contract Date13 Jan 2025
Contract AmountEUR 183.8 K (USD 189.3 K)

Administrador De Infraestructuras Ferroviarias Spainish Railway Infrastructure Administrator ADIF Tender Result

Result Stage: Awarded  (AOC Available)
Spain
Repair of Guardian type DC (direct current) and AC (alternating current) power equipment.
Contract Date10 Jan 2025
Contract AmountEUR 50 K (USD 51.8 K)

Administrador De Infraestructuras Ferroviarias Spainish Railway Infrastructure Administrator ADIF Tender Result

Result Stage: Awarded  (AOC Available)
Spain
Consulting and assistance contract for the control of the works for the execution of the construction project for priority actions to improve evacuation and ventilation conditions in the event of fire at the Embajadores underground commuter train station - Madrid (Phase I)
Contract Date9 Jan 2025
Contract AmountEUR 68.5 K (USD 70.5 K)

Administrador De Infraestructuras Ferroviarias Spainish Railway Infrastructure Administrator ADIF Tender Result

Result Stage: Awarded  (AOC Available)
Spain
Technical assistance services for the control and monitoring of the works of the construction project for the rationalization of the tracks at the Guadalajara station (Cercanías)
Contract Date9 Jan 2025
Contract AmountEUR 286.6 K (USD 295 K)

Administrador De Infraestructuras Ferroviarias Spainish Railway Infrastructure Administrator ADIF Tender Result

Result Stage: Awarded  (AOC Available)
Spain
Pest control service at the CFT DE VALENCIA. Second request against the "Framework Agreement on pest control services in ADIF premises and spaces".
Contract Date3 Jan 2025
Contract AmountEUR 9.2 K (USD 9.5 K)

Administrador De Infraestructuras Ferroviarias Spainish Railway Infrastructure Administrator ADIF Tender Result

Result Stage: Awarded  (AOC Available)
Spain
Consulting services for the drafting of the execution project for the warehouse with a pit for locomotive repairs at the Barcelona Can Tunis TTM
Contract Date3 Jan 2025
Contract AmountEUR 36 K (USD 37 K)

Administrador De Infraestructuras Ferroviarias Spainish Railway Infrastructure Administrator ADIF Tender Result

Result Stage: Awarded  (AOC Available)
Spain
Execution works for the modernisation project and improvement of the energy efficiency of the lighting of the platforms and the hall of the Logroño Station
Contract Date3 Jan 2025
Contract AmountEUR 99 K (USD 101.7 K)

Administrador De Infraestructuras Ferroviarias Spainish Railway Infrastructure Administrator ADIF Tender Result

Result Stage: Awarded  (AOC Available)
Spain
Maintenance of the hardware and software equipment of the 1.5kV, 3kV and 25kV energy remote controls of the Conventional Network
Contract Date23 Dec 2024
Contract AmountEUR 6.8 Million (USD 7 Million)

Administrador De Infraestructuras Ferroviarias Spainish Railway Infrastructure Administrator ADIF Tender Result

Result Stage: Awarded  (AOC Available)
Spain
Technical assistance service for the control of the remodelling works of the stations between the Aranda-Aranda fork. Line 102. Track.
Contract Date20 Dec 2024
Contract AmountEUR 114.7 K (USD 118.1 K)

Administrador De Infraestructuras Ferroviarias Spainish Railway Infrastructure Administrator ADIF Tender Result

Result Stage: Awarded  (AOC Available)
Spain
Project drafting and execution of works for the construction of a rockfill wall to contain landslides at km 55/700 of line 740.
Contract Date20 Dec 2024
Contract AmountEUR 125.6 K (USD 130.9 K)
81-90 of 1874 active Tender Results