If you're typing tender ID over and again or finding it difficult to go through the cumbersome government websites for looking at Delhi tenders online. We have come up with a solution i.e. we have collated every eprocurement Delhi tender on BidAssist. Also, for any queries related to an e-tender Delhi, like the bidding process, registration process, etc., the same are explained below.
Costs
EMD
₹ 1,56,400Document Cost
Refer DocumentsTender Fee
Refer Documents
Summary
Provision Of 25 Kv/230 V, 10 Kva, Auxiliary Transformer Inconnection With Provision Of automatic Signalling Between Dli-re Section Of Delhi Division.
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
41-TRD-NDLS-2023-24-DELHI DIVISION-ELECTRICAL/NORTHERN RLYTender No
41-TRD-NDLS-2023-24Tender Authority
Northern Railway ViewPurchaser Address
-Website
http://ireps.gov.in
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
BOQ Items
... More
4.Prov. Of supply & erection of fabricated & galvanised structure (T-150) for mounting of LT Transformer.(Supply)
10.5
20158
1222330.73
... More
4.Prov. Of supply & erection of fabricated & galvanised structure (T-150) for mounting of LT Transformer.(Erection) 5 2.80 MT 20158.00 56442.40 477.50 325954.86
10.5
2313
140254.54
... More
5.Supply & erection of fabricated steel work other than masts.(Erection)
2.8
2313
37401.21
... More
6.Supply and erection of a structure bond.(Supply) 6 56.00 Each 63.00 3528.00 477.50 20374.20
56
137
44305.8
... More
17.Supply & erection of GI Pipe (50NB medium class ISI Marked) (Erection)
70
50
4025
... More
18.Supply & erection of large copper jumper 160 sq.mm.(Supply)
10
7586
75864.5
... More
18.Supply & erection of large copper jumper 160 sq.mm.(Erection)
10
625
6251.5
... More
19(a).Extra on erection rates @ 100% for work under a power block for item no.1 Supply, Erection, oil- filtration, testing and commissioning of 25kV/240V, 10 KVA L.T. supply transformers.
28
1179
177003.74
... More
19(b).Extra on erection rates @ 100% for work under a power block for item no.2 Supply without Insulator & erection of 25 KV Fuse Switch.
35
115
21581.25
... More
19(c).Extra on erection rates @ 100% for work under a power block for item no. 4 Prov. Of supply & erection of fabricated & galvanised structure (T-150) for mounting of LT Transformer.
10.5
2313
140254.54
... More
19(d).Extra on erection rates @ 100% for work under a power block for item no.5 Supply & erection of fabricated steel work other than masts.
2.8
2313
37401.21
... More
19(e).Extra on erection rates @ 100% for work under a power block for item no.7 Supply and erection of 25KV Caution Board/plate.
28
20
3234
... More
19(f).Extra on erection rates @ 100% for work under a power block for item no.8 Supply and erection of anticlimbing device etc: L.T. Supply transformer station.
28
72
11642.4
... More
19(g).Extra on erection rates @ 100% for work under a power block for item no.11 Supply & erection of a jumper wire for drop out fuse switch.
28
58
8901.63
... More
19(h).Extra on erection rates @ 100% for work under a power block for item no.14 Supply and erection of a solid core suspension Insulator.
28
81
11968.24
... More
19(i).Extra on erection rates @ 100% for work under a power block for item no.18 Supply & erectio of large copper jumper 160 sq.mm.
10
625
6251.5
... More
20.Extra on erection rates @ 50% for steel work manually under Item item no.4 Prov. Of supply & erection of fabricated & galvanised structure (T-150) for mounting of LT Transformer.
10.5
1156
70127.27