Military Engineer Services Tender
If you're typing tender ID over and again or finding it difficult to go through the cumbersome government websites for looking at Delhi tenders online. We have come up with a solution i.e. we have collated every eprocurement Delhi tender on BidAssist. Also, for any queries related to an e-tender Delhi, like the bidding process, registration process, etc., the same are explained below.
Costs
EMD
₹ 95,500Document Cost
₹ 500Tender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2023_MES_633510_1Bid Award Id
ViewTender No
CWE/PM/SP-21/2023-24Tender Authority
Military Engineer Services ViewPurchaser Address
-Website
http://http://mes.gov.in/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
Comprehensive, preventive and periodical maintenance of 01 No electrically operated ThyssenKrupp make hospital lift of capacity 1360 kgs carrying, 20 passengers suitable for serving G+1 Floors ( total 01 landings) with electric power operated doors, auto electric levelling device complete with ARD facility installed at AFCME at Subroto park to be maintained round the clock as described here-in-after in reliable,safe and efficient operating condition by regularly examining the lubricating and adjust the electrical and mechanical driving equipment , governor, sleeve, shaft assembly bearing/ contacts & governor jaws, car & hall mechanical buttons, car & hall position indicators and all other car and landing signal fixtures, deflectors, car and counter weight guide rails and buffers and carry out planned maintenance in a systematic and controlled manner using techniques and expertise consultancy including labour charge for replacement of spare parts such as door sensor, CTU/MCU/CCU card, door spring, door roller, door drive, contactors, V3F drive, door spring,TR type switches etc. and quoted rate is including replacement of alarm, open & close, up &down, floor indication, firemen switches, replacement of broken glasses of firemen switch, wire, lugs, lubricants, air cord, landing wheel, nuts and bolts, rubber bushes, rollers of doors, lift cabin button, break shoe liner, training cable all type of relays in the control boards , transformers rectifiers etc, as and when required and necessary welding work if required, complete all as specified and directed to the entire satisfaction of the Engineer-In-charge.
11
-
-
Notes for ser item Nos 01 to 04 :-
(a) The entire work mentioned in item No. 01 to 04 of BOQ/sch 'A', including comprehensive , Preventive and periodical maintenance of lifts shall be got executed through OEM i.e. M/s ThyssenKrupp Elevators (India) Pvt. Ltd. . The contractor shall upload/submit the Intent of MOU with OEM in cover-1, failing which the tender application/ bid will be summarily rejected. The contractor will also submit the physical copy of Intent of MOU alongwith their application in the office of tender inviting authority prior to bid opening date (Cover 1) failing which bid submitted by the contractor cover No.2 shall not be opened. L-1 (Lowest bidder) shall submit MOU with OEM to GE after acceptance of tender and same shall be checked/verified by GE before commencement of work. (b) The tenderer shall have to replace the U/s materials within the OEM materials only. Necessary paid vouchers shall be submitted from OEM for the materials like ARD, drive, etc. Contractor is responsible for renewal of license fee. The charges for annual Government inspection is deemed to be included in the quoted rate. (c) The comprehensive maintenance include weekly, fortnightly, monthly , quarterly, half yearly inspection/testing/ preventive maintenance, replacement of unserviceable parts/ material including labour, transportation etc. complete all as specified and directed. (d) The complaints shall be attended forthwith as the complaint/failure from the time to time of receipt of the same. The contractor shall deploy sufficient lift mechanic and helper. Rate quoted is deemed to be inclusive of T&P required to carry out repairs, stationery for upkeep of records, uniform to mechanic and helper etc. The contractor shall maintain the attendance register of personnel deployed for the work and the same shall be put upto the Engineer-In-Charge as and when asked.
-
-
-
Notes contd...(e) The contractor shall obtain signature of Authorized representative of GE as token of satisfactory rectification of defects. Any minor complaints requiring no spare parts shall be rectified within 0ne hour and if requiring minor parts, shall be rectified within two hours. Any major complaints requiring major parts / repair shall be rectified within 24 hrs. In case delay in rectification of minor complaints , a panel recovery @ Rs. 100.00 per hour shall be imposed upon the contractor and in case of delay in major repair of the lifts for more than 24 hours and upto 10 (ten) days, penalty on the contractor for a sum of Rs. 2000.00 per lift per day or part thereof and Rs. 4000.00 per lift per day or part thereof after 10 (ten) days shall be imposed. The decision of the GE as to particular repair is minor/ major and a particular lift has been maintained or not on a particular day, will be final and binding. The above penalty shall be in addition to the provision made in Clause No. 50 of IAFW-2249. In the event of burning of motor , a time of 7 days shall be allowed to the contractor for rectification of fault. After that period, penal recovery at the rate of Rs.2000.00 per day shall be imposed on the contractor. (f) A complaint register will be maintained by the contractor and the contractor will obtain the complaint from JE/ AGE E/M office on every working day at 0800 hrs or will be informed telephonically by the Dept. at any time. Two mobile Nos and two email IDs to be maintained by the contractor to communicate the complaints. After attending the complaints, the contractor will obtain the signature from the Authorised Representative of GE every day as token of complaints attended. (g) Ser Item No. 01 to 04 of BOQ mentioned here-in-above consists of comprehensive maintenance of M/S ThyssenKrupp lifts at CAMERO & WAC Area at Subroto Park. The work will be carried out under Authorised dealer for comprehensive maintenance of lifts complete all as specified in Sch'A'/ BOQ, Special condition, Particular specification, MES SSR and as directed by GE/Engineer-In-Charge.
-
-
-
Notes contd.. (h) Lift mechanic shall be well experienced in lift/elevators repairs and maintenance and fully equipped with required T&P.
(i) Contractor shall submit police verification certificates of personnel employed before commencement of works.
(j) Contractor shall carry out daily, weekly, fortnightly, monthly, quarterly and half yearly inspection and report of the same shall be submitted to the Engineer-In-Charge.
(k) Contractor shall provide uniform to the personnel employed without any extra cost to the Deptt. And cost of the same is deemed to be included in the rate quoted of ser item Nos 1 to 4 above and for non wearing of uniforms by the personnel employed by the contractor a penalty of Rs. 500.00 shall be levied per person per shift.
(l) The contractor shall ensure proper functioning of safety devices.
(m) The contractor shall stick/paste safety instructions at inside the cabins of all lifts with the contact number of operator/mechanic.
-
-
-
Notes contd..(n) The following repairs are deemed to be included in the rate quoted by the contractor under comprehensive maintenance :- (i) CAR CABIN: (aa) Maintenance/repairs of cabin fan ( except rewinding)
(ab) Contractor is responsible for maintaining the car cabin neat and clean. Necessary cleaning to car cabin shall be done by the contractor on daily basis. (ii) CONTROLLER: (aa) Checking fuses of controller and mains, replace if any found defective.
(ab) Checking the condition of brake oil and replacement, if required.
(ac) Checking the flexible leads to relays to make them serviceable. (iii) AC MOTOR: (aa) Lubricate bearing with suitable lubricants.
(ab) Clean ventilation passages on weekly basis.
(ac) Carry out the insulation test and continuity test of motor on quarterly basis and make them in serviceable condition.
(ad) Checking the alignment of motor shaft and realignment of shaft.
-
-
-
Notes contd..
(iv) GOVERNOR: (aa) Lubricate bearing on weekly basis with suitable lubricants
(ab) Checking that levers working smoothly.
(ac) Checking that electrical contacts opens before rope get locked (v) ROPES: (aa) Checking the condition of hoist and governor ropes.
(ab) Lubricate ropes on weekly basis
(ac) Checking the dia of ropes and record in maintenance book on quarterly basis for its proper functioning. (vi) HOIST WAY: (aa) Lubricate guides and guide shoes on weekly basis with suitable lubricants.
(ab) Checking that the buffers are in proper position and measure and record counter weight and buffer cleans with the car at the top.
(ac) Checking the rope fastening at the car and counter weight
(ad) Checking the guide clamps and adjusted
(ae) Checking the upper and lower limit switches for proper connection after physical inspection get the lift to travel by holding from the controller and see that the switches operate properly.
(af) Checking the condition of travelling cables and termination at junction boxes.
-
-
-
Notes contd.. (vii) MACHINE ROOM: (aa) Checking and adjusting of over load relay and phase failure relay.
(ab) Checking power wiring termination in switch motor controller and power switching relays.
(ac) Checking lubrication of all equipments on weekly basis.
(ad) Cleaning the machine room on daily basis.
(ae) Cleaning the relay contacts, replacement of contacts. (viii) GEAR BOX: (aa) Inspect for stray noises.
(ab) Checking axial play of work shaft.
(ac) Lubricate bearing and top up oil in gear box as and when required. (ix) BREAKES: (aa) Cleaning of oil surfaces and trace source of oil leakage and arrest the leakages.
(ab) Adjust clearance between shoes and drum on monthly basis. (x) RETIRING CAR AND LOCKS: (aa) Checking operation car and lock from the top at each landing, checking that the retiring car solenoid is not getting over heated and that the movement of car is smooth.
-
-
-
Notes contd.. (ab) Checking that all locks are functioning properly, mechanically and electrically after opening of covers, checking all set screws and springs and replace if necessary. The lever should lock the breake properly.
(ac) Checking that the retiring car does not touch the lock roller at the landing which is being passed.
(ad) Checking the door closes safely, clean and adjust if necessary.
(ae) Checking the car gear switch operates properly.
(af) Lubricate top track and door motor and linkage.
(ag) Checking the landing door and can be operated by emergency keys.
(ah) Repair/replacement of retiring car solenoid lock doors closer safety switch. (xi) GENERAL:
(aa) Checking the car frame for bends or cracks and correct, if required.
(ab) Checking and carry out insulation resistance test half yearly basis for the following:- (i) All power circuit cables and incoming cables. (ii) Switch and feed upto controller (iii) Between different power relays (iv) Power card in the travelling cables (v) Motor (vi) Checking operation of the car over speed safety gear by moving the levers manually landing so that the safety locks up properly.
-
-
-
Notes contd.. (ac) Checking that the sheaves are tight on the shaft , also checking with hammer sounding for cracks, check sheave bearing clean and re-lubricate. Adjust for proper axial play.
(ad) Unload car(s) checking the worn gear lash and adjust by removal of sheaves as required.
(ae) Checking of motor bearing, clean and lubricate.
(af) Checking that the gear coupling belts are tight.
(ag) Checking the oil seal of gear box and fill fresh oil if required.
(ah) Contractor is responsible for maintenance of lift well/pit/ shaft/ machine room in dry and clean condition at all times. Any entry of water needs to be pumped immediately and rate quoted is inclusive of the cost of necessary pumping arrangement. A pump should be kept in store at all time to meet the emergency requirement. No extra payment will be done on this account.
(aj) Remove brake shoes clean and refit or replace brake linings inspect pins springs clean and reassemble. Checking that the brake drum is not scored or worn unevenly.
(ak) The cost of additional technicians required to do periodical maintenance checks is deemed to be included in the rates quoted. Nothing extra shall be paid on this account.
-
-
-
Notes for ser item Nos 05 to 18 :- Charges for fixing, replacement, installation and testing is inclusive in comprehensive maintenance quoted rates in items mentioned above. Nothing extra shall be admissible from department for fixing, replacement,installation and testing .
-
-
-
Supply only in replacement UPS for ARD 2200 KVA suitable for Thyssenkrupp lift including taking down unserviceable items from existing position complete all as specified and directed by Engineer-in-Charge.
4
-
-
Supply only in replacement Main VVF/VVVRF drive 15 Kw fuji suitable for Thyssenkrupp lift including taking down unserviceable items from existing position complete all as specified and directed by Engineer-in-Charge. Make : Fuji cat part no. 100043230
1
-
-
Supply only in replacement main VVF/VVVRF drive 11 Kw fuji suitable for Thyssenkrupp lift including taking down unserviceable items from existing position complete all as specified and directed by Engineer-in-Charge. Make : Fuji cat part no. 100043229
1
-
-
Supply only in replacement of LOP 1Btn W Floor Pi F2 LIFT UP suitable for Thyssenkrupp lift including taking down unserviceable items from existing position complete all as specified and directed by Engineer-in-Charge. Make: TK Elevator cat part no. 1000065584
2
-
-
Supply only in replacement of UPS battery 12 V 18 Ah suitable for Thyssenkrupp lift with suitable connector( male/female/both ) including taking down unserviceable items from existing position complete all as specified and directed by Engineer-in-Charge. Make: EXIDE/AMARON/LUMINOUS
20
-
-
Supply only in replacement of Door drive suitable for Thyssenkrupp lift including taking down unserviceable items from existing position complete all as specified and directed by Engineer-in-Charge. Make: TK Elevator cat part no.1000043284
2
-
-
Supply only in replacement of PCB Lcuv Lop Tic -V suitable for Thyssenkrupp lift including taking down unserviceable items from existing position complete all as specified and directed by Engineer-in-Charge. Make: TK Elevator cat part 1000043621
2
-
-
Supply only in replacement door sensor infrared beam suitable for Thyssenkrupp lift complete all as specified and directed . Make: TK Elevator
2
-
-
Supply only in replacement of lift fan 300mm sweep 230 volt ,50 Hz fitting suitable for Thyssenkrupp lift complete all as specified and directed . Make: Bajaj Ultima /Crompton/ khaitan
4
-
-
Supply only in replacement of Steel wire governor rope 8 mm size,disconnecting from lift without damage at any position suitable for Thyssenkrupp lift including taking down unserviceable items from existing position complete all as specified and directed by Engineer-in-Charge.
420
-
-
Supply only in replacement of Steel wire main rope 13 mm size,disconnecting from lift without damage at any position suitable for Thyssenkrupp lift including taking down unserviceable items from existing position complete all as specified and directed by Engineer-in-Charge.
620
-
-
Supply only in replacement of LED round recessed mounting ceiling light fitting 6 watt complete all as specified and directed . Make: CG/Philips/Halonix
10
-
-
Supply only in replacement of PCB Mcu Motherboard Tic 2 suitable for Thyssenkrupp lift including taking down unserviceable item from existing position complete all as specified and directed by Engineer - in -Charge
1
-
-
Supply only in replacement main VVF/VVVRF drive fuji suitable for 8 passenger ThyssenKrupp lift tic II type including taking down unserviceable items from existing position complete all as specified and directed by Engineer-in-Charge.
1
-
-
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements