India Meteorological Department Tender

If you're typing tender ID over and again or finding it difficult to go through the cumbersome government websites for looking at Delhi tenders online. We have come up with a solution i.e. we have collated every eprocurement Delhi tender on BidAssist. Also, for any queries related to an e-tender Delhi, like the bidding process, registration process, etc., the same are explained below.

India Meteorological Department - IMD Tender

Eprocure
Opening Date28 Jul 2020
Closing DateCancelled
Tender AmountRefer Documents 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Wind installation support accessories

78

-

100

... More
Temperature & Humidity sensor with radiation shield and installation support accessories

52

-

100

... More
High precision pressure transducers for reporting QFE/QNH values

52

-

100

... More
System for measurement of Visibility/MOR and Runway Visual Range as per ICAO requirements including Back ground Luminance Sensor

54

-

100

... More
Laser ceilometer as per specifications

26

-

100

... More
Present weather sensors

52

-

100

... More
Mast and accessories:

-

-

-

... More
10m frangible wind mast (tiltable)

78

-

100

... More
Lightning arrestor

78

-

100

... More
Obstruction light

78

-

100

... More
Weatherproof termination boxes both for power supply and signal termination

78

-

100

... More
Weather proof termination box with battery & battery charger of suitable capacity for supply of power to Data logger, Wind, Temperature & humidity, pressure sensors and communication Modem for 24 hrs

78

-

100

... More
Data Acquisition System (DAS):

-

-

-

... More
DAS

78

-

100

... More
Battery back-up facility for DAS and all sensors (Except RVR) For 24hrs or better

78

-

100

... More
GPS receiver

36

-

100

... More
Comprehensive Surge protection Systems for protection of all AWOS sensors/ Units/ Sub units.

78

-

100

... More
Data processing & integration Unit (MBR Site):

-

-

-

... More
Rack mountable dual server computer

18

-

100

... More
Licensed Operating system

18

-

100

... More
Battery Powered Data processor & Integrator (BPDPI)

18

-

100

... More
Color display 21” Flat panel

18

-

100

... More
Over-voltage protection kit

18

-

100

... More
Mains Power distribution board

18

-

100

... More
Online UPS for both servers

18

-

100

... More
Workstations

-

-

-

... More
Workstations

72

-

100

... More
Colour display 24” LED type

72

-

100

... More
UPS

72

-

100

... More
Slave Display Units

-

-

-

... More
Wireless router for 300 mts with Battery backup for 30min.

90

-

100

... More
10.1” or better touch screen Tablet PC with 30min battery backup facility

180

-

100

... More
42-inch LED Display with zoom control facility for display of single or Multiple runway data as per user selection

72

-

100

... More
42-inch Slave display for passenger lounge

36

-

100

... More
Central web server at Pune & Delhi with static IP and its software for viewing & downloading Air-port data from 18 airports.

2

-

100

... More
Multi-functional Device (MFD)

-

-

-

... More
Printer-Fax-Scanner

18

-

100

... More
Heavy duty black &white laser printer

18

-

100

... More
Licenses and Documentation

-

-

-

... More
All licensed (system and application) software with License Nos. and CD’s including web-based monitoring and remote maintenance and virus protection software

18

-

100

... More
Documentation (Installation, operation and maintenance manual) and softcopy for all the manuals

18

-

100

... More
Communication

-

-

-

... More
Wireless modems (License free band) for data communication between AMI sites to ATC and MBR

78

-

100

... More
Land Line Modems/ Suitable Media convertor for data communication through OFC between AMI sites to ATC and MBR

78

-

100

... More
24 port Ethernet Switch

18

-

100

... More
LAN Extender

18

-

100

... More
Services

-

-

-

... More
Construction of RCC platform on hard soil with foundation grouting of templates for erection of Frangible and foldable 10mts Wind mast as per standards and installation of wind mast.

78

-

100

... More
Installation of Comprehensive Lightning & Surge Protection Systems for protection of all AWOS sensors/Units and Sub systems at Two sites of Runway (as per Annexure-I of RFP).

78

-

100

... More
Installations of maintenance free Earth Pits (Signal, Power & Lightning) including all required copper cables for protection of complete field system from Lightning and Power Surges.

78

-

100

... More
Outdoor cabling for both AMI sites. Underground Armored Twisted pair cable is to be used for Integration of RVR with DAS

1800

-

100

... More
Indoor cabling works for the installation of communication systems, Servers, work stations, Wireless Router Etc.

1800

-

100

... More
Integration & Commissioning of total AWOS

18

-

100

... More
Project implementation cost for providing the turn key solution.

18

-

100

... More
Local transportation cost for delivering equipment at airport

18

-

100

... More
Onsite training of IMD officials at each airport as per Para 7.4.

18

-

100

... More
Site Acceptance Test (Para 7.5.2)

18

-

100

... More
All expenses for Factory Acceptance for 18 systems for Five officials at OEM place for 15 days including their Travel & per diem

1

-

100

... More
Charges for Two Year extended Warranty (Normal one year + 2 Year extended)

18

-

100

... More
Comprehensive Annual Maintenance Contract

-

-

-

... More
Charges for 1st Year Comprehensive Annual Maintenance contract (CAMC)

18

-

100

... More
Charges for 2nd Year CAMC

18

-

100

... More
Charges for 3rd Year CAMC

18

-

100

... More
Charges for 4th Year CAMC

18

-

100

... More
Charges for 5th Year CAMC

18

-

100



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.