Raipur Smart City Limited Tender

BidAssist is a very user-friendly website that lets us explore new opportunities which further helps in the growth of the business. We can get any information regarding any e-tender the Chhattisgarh government has posted on its website in a very hassle-free manner.

Raipur Smart City Limited Tender

Opening Date8 Jan 2020
Closing Date29 Jan 2020
Tender Amount₹ 5,28,84,000 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE

186.03

-

-

... More
Extra for every additional lift of 1.5 m or part thereof.

-

-

-

... More
All types of soils

-

-

-

... More
Tranch Excavation

578.4

-

-

... More
Filling from available excavated stuff (Excluding rock) in trenches, plinth, sides of foundation etc. in layers not exceeding 20cm in depth consolidating each deposited layer by ramming and watering with a lead upto 50 M. and lift upto 1.5 M.

-

-

-

... More
Reused Qty

1071

69615

65

... More
Carriage by mechanical transport upto 5 km lead:

-

-

-

714

79254

111

... More
Providing and laying nominal mix plain cement concrete with crushed stone aggregate using concrete mixer in all works upto plinth level excluding cost of form work.

-

-

-

... More
1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 40mm nominal size).

-

-

-

39.47

-

-

6.14

-

-

0.77

-

-

3.84

-

-

... More
BELOW BEAM

-

-

-

... More
Lock up (M&F)

1.3

-

-

... More
Toilet Block (M&F)

0.3

-

-

... More
P.A. , Wating & Corridor

0.96

-

-

... More
Senior T.I. Chamber & Duty Officer

1.06

-

-

... More
Toilet & Lift

0.64

-

-

... More
Duct & Staircase

0.36

-

-

... More
Porch &Ramp

1.11

-

-

... More
Lock up (M&F)

0.64

-

-

... More
Toilet Block (M&F)

0.26

-

-

... More
P.A. , Wating & Corridor

0.96

-

-

... More
Senior T.I. Chamber & Duty Officer

0.36

-

-

... More
Toilet & Lift

0.38

-

-

... More
Duct & Staircase

0.06

-

-

... More
Porch &Ramp

0.33

-

-

... More
Below Floor

-

-

-

... More
Lock up (M&F)

8.26

-

-

... More
Toilet Block (M&F)

2.98

-

-

0.52

-

-

... More
P.A. , Wating

1.8

-

-

... More
Senior T.I. Chamber & Duty Officer

3.96

-

-

... More
Toilet & Lift

0.96

-

-

... More
Duct & Staircase

1.65

-

-

... More
2.4m Corridor

3.31

-

-

... More
Front of Toilet Block

1.33

-

-

... More
Porch &Ramp

4.18

-

-

... More
First Floor

-

-

-

... More
Toilet Block (M&F)

3.66

-

-

... More
Toilet

0.86

-

-

... More
Second Floor

4.52

-

-

... More
Third Floor

4.52

-

-

... More
Fourth Floor

4.52

-

-

... More
Fifth Floor

4.52

-

-

... More
Sixth Floor

4.52

-

-

... More
Providing and laying design mix reinforced cement concrete with crushed graded stone aggregate 20mm nominal size using batching plant, transit mixer and concrete pump, in all works upto plinth level excluding cost of form work.

-

-

-

... More
M-25 Grade

-

-

-

... More
upto Plinth

-

-

-

144.14

-

-

23.4

-

-

1.76

-

-

8.82

-

-

... More
Column upto plinth

20.2

-

-

... More
Plinth/Ground Beam

-

-

-

... More
Lock up (M&F)

3.24

-

-

... More
Toilet Block (M&F)

0.74

-

-

... More
P.A. , Wating & Corridor

2.4

-

-

... More
Senior T.I. Chamber & Duty Officer

2.64

-

-

... More
Toilet & Lift

1.6

-

-

... More
Duct & Staircase

0.9

-

-

... More
Porch &Ramp

3.33

-

-

... More
Lock up (M&F)

1.6

-

-

... More
Toilet Block (M&F)

0.64

-

-

... More
P.A. , Wating & Corridor

2.4

-

-

... More
Senior T.I. Chamber & Duty Officer

1.8

-

-

... More
Toilet & Lift

0.96

-

-

... More
Duct & Staircase

0.15

-

-

... More
Porch &Ramp

1.65

-

-

... More
Lift Wall

4.24

-

-

... More
Elevational Beam

0.99

-

-

... More
Ground Floor

-

-

-

... More
Column upto slab

28.51

-

-

... More
Lintel Beam - Outer Wall

1.3

-

-

... More
Lintel Beam - Inner Wall

0.65

-

-

... More
Sill Beam -Window/Vent.

0.96

-

-

... More
Slab Beam

-

-

-

... More
Lock up (M&F)

5.83

-

-

... More
Toilet Block (M&F)

1.33

-

-

... More
P.A. , Wating & Corridor

4.32

-

-

... More
Senior T.I. Chamber & Duty Officer

4.75

-

-

... More
Toilet & Lift

2.88

-

-

... More
Duct & Staircase

1.62

-

-

... More
Porch

4

-

-

... More
Lock up (M&F)

2.88

-

-

... More
Toilet Block (M&F)

1.15

-

-

... More
P.A. , Wating & Corridor

4.32

-

-

... More
Senior T.I. Chamber & Duty Officer

2.16

-

-

... More
Toilet & Lift

1.73

-

-

... More
Duct & Staircase

0.27

-

-

... More
Porch

1.98

-

-

... More
Elevational Beam

0.99

-

-

-

-

-

... More
Lock up (M&F)

12.39

-

-

... More
Toilet Block (M&F)

4.47

-

-

0.78

-

-

... More
P.A. , Wating

2.7

-

-

... More
Senior T.I. Chamber & Duty Officer

5.94

-

-

... More
Toilet

1.44

-

-

... More
2.4m Corridor

6.41

-

-

... More
Front of Toilet Block

1.99

-

-

... More
Porch

6.27

-

-

... More
Staircase W/slab

1.58

-

-

... More
Midlanding

0.67

-

-

0.81

-

-

... More
Chhajja

0.49

-

-

... More
Lift Wall

5.76

-

-

... More
First Floor

-

-

-

... More
Column upto Slab

28.51

-

-

... More
Lintel Beam - Outer Wall

1.3

-

-

... More
Lintel Beam - Inner Wall

0.65

-

-

... More
Sill Beam -Window/Vent.

1.04

-

-

... More
Slab Beam

-

-

-

... More
Asst. Sub Inspector

5.83

-

-

... More
Toilet Block (M&F)

1.33

-

-

... More
P.A. , Wating & Corridor

4.32

-

-

... More
Senior T.I. Chamber & Duty Officer

4.75

-

-

... More
Toilet & Lift

2.88

-

-

... More
Duct & Staircase

1.62

-

-

... More
Asst. Sub Inspector

2.88

-

-

... More
Toilet Block (M&F)

1.15

-

-

... More
P.A. , Wating & Corridor

4.32

-

-

... More
Senior T.I. Chamber & Duty Officer

2.16

-

-

... More
Toilet & Lift

1.73

-

-

... More
Duct & Staircase

0.27

-

-

... More
Elevational Beam

1.94

-

-

-

-

-

... More
Asst. Sub Inspector

12.39

-

-

... More
Toilet Block (M&F)

4.47

-

-

0.78

-

-

... More
P.A. , Wating

2.7

-

-

... More
Senior T.I. Chamber & Duty Officer

5.94

-

-

... More
Toilet

1.44

-

-

... More
2.4m Corridor

6.41

-

-

... More
Front of Toilet Block

1.99

-

-

... More
Staircase W/slab

1.58

-

-

... More
Midlanding

0.67

-

-

0.81

-

-

... More
Chhajja

0.97

-

-

... More
Lift Wall

5.76

-

-

... More
Second Floor

-

-

-

... More
Column upto Slab

28.51

-

-

... More
Lintel Beam - Outer Wall

1.3

-

-

... More
Lintel Beam - Inner Wall

0.65

-

-

... More
Sill Beam -Window/Vent.

1.04

-

-

... More
Slab Beam

-

-

-

... More
Meeting & Document Room

5.83

-

-

... More
Toilet Block (M&F)

1.33

-

-

... More
Investigation room

4.32

-

-

... More
Toilet & Lift

2.88

-

-

... More
Duct & Staircase

1.62

-

-

... More
Meeting & Document Room

2.88

-

-

... More
Toilet Block (M&F)

1.15

-

-

... More
Investigation room

4.32

-

-

... More
Toilet & Lift

1.73

-

-

... More
Duct & Staircase

0.27

-

-

... More
Elevational Beam

1.94

-

-

-

-

-

... More
Meeting & Document Room

12.39

-

-

... More
Toilet Block (M&F)

4.47

-

-

0.78

-

-

... More
Investigation room

11.7

-

-

... More
Toilet

1.44

-

-

... More
2.4m Corridor

6.41

-

-

... More
Front of Toilet Block

1.99

-

-

... More
Staircase W/slab

1.58

-

-

... More
Midlanding

0.67

-

-

0.81

-

-

... More
Chhajja

0.97

-

-

... More
Lift Wall

5.76

-

-

... More
Third Floor

-

-

-

... More
Column upto Slab

28.51

-

-

... More
Lintel Beam - Outer Wall

1.3

-

-

... More
Lintel Beam - Inner Wall

0.65

-

-

... More
Sill Beam -Window/Vent.

1.04

-

-

... More
Slab Beam

-

-

-

... More
Ammunation & Malkhana Room

5.83

-

-

... More
Toilet Block (M&F)

1.33

-

-

... More
Computer & Staff Dining

4.32

-

-

... More
Pantry & Lift

2.88

-

-

... More
Duct & Staircase

1.62

-

-

... More
Ammunation & Malkhana Room

2.88

-

-

... More
Toilet Block (M&F)

1.15

-

-

... More
Computer & Staff Dining

4.32

-

-

... More
Pantry & Lift

1.73

-

-

... More
Duct & Staircase

0.27

-

-

... More
Elevational Beam

1.94

-

-

-

-

-

... More
Ammunation & Malkhana Room

12.39

-

-

... More
Toilet Block (M&F)

4.47

-

-

0.78

-

-

... More
Computer & Staff Dining

11.7

-

-

... More
Server & Pantry

1.44

-

-

... More
2.4m Corridor

6.41

-

-

... More
Front of Toilet Block

1.99

-

-

... More
Staircase W/slab

1.58

-

-

... More
Midlanding

0.67

-

-

0.81

-

-

... More
Chhajja

0.97

-

-

... More
Lift Wall

5.76

-

-

... More
Fourth Floor

-

-

-

... More
Column upto Slab

28.51

-

-

... More
Lintel Beam - Outer Wall

1.3

-

-

... More
Lintel Beam - Inner Wall

0.65

-

-

... More
Sill Beam -Window/Vent.

1.04

-

-

... More
Slab Beam

-

-

-

... More
Transit Dormitory

5.83

-

-

... More
Toilet Block (M&F)

1.33

-

-

... More
Recreational Room

4.32

-

-

... More
Store & Lift

2.88

-

-

... More
Duct & Staircase

1.62

-

-

... More
Transit Dormitory

2.88

-

-

... More
Toilet Block (M&F)

1.15

-

-

... More
Recreational Room

4.32

-

-

... More
Store & Lift

1.73

-

-

... More
Duct & Staircase

0.27

-

-

... More
Elevational Beam

1.94

-

-

-

-

-

... More
Transit Dormitory

12.39

-

-

... More
Toilet Block (M&F)

4.47

-

-

0.78

-

-

... More
Recreational Room

11.7

-

-

1.44

-

-

... More
2.4m Corridor

6.41

-

-

... More
Front of Toilet Block

1.99

-

-

... More
Staircase W/slab

1.58

-

-

... More
Midlanding

0.67

-

-

0.81

-

-

... More
Chhajja

0.97

-

-

... More
Lift Wall

5.76

-

-

... More
Fifth Floor

-

-

-

... More
Column upto Slab

28.51

-

-

... More
Lintel Beam - Outer Wall

1.3

-

-

... More
Lintel Beam - Inner Wall

0.65

-

-

... More
Sill Beam -Window/Vent.

1.04

-

-

... More
Slab Beam

-

-

-

... More
Staff WorkStation

5.83

-

-

... More
Toilet Block (M&F)

1.33

-

-

... More
P.A. , Wating & Corridor

4.32

-

-

... More
Chief Superintendent & Sub Inspector

4.75

-

-

... More
Toilet & Lift

2.88

-

-

... More
Duct & Staircase

1.62

-

-

... More
Staff WorkStation

2.88

-

-

... More
Toilet Block (M&F)

1.15

-

-

... More
P.A. , Wating & Corridor

4.32

-

-

... More
Chief Superintendent & Sub Inspector

2.16

-

-

... More
Toilet & Lift

1.73

-

-

... More
Duct & Staircase

0.27

-

-

... More
Elevational Beam

1.94

-

-

... More
Projected Beam

8.57

-

-

-

-

-

... More
Staff WorkStation

12.39

-

-

... More
Toilet Block (M&F)

4.47

-

-

0.78

-

-

... More
P.A. , Wating

2.7

-

-

... More
Chief Superintendent & Sub Inspector

5.94

-

-

... More
Toilet

1.44

-

-

... More
2.4m Corridor

6.41

-

-

... More
Front of Toilet Block

1.99

-

-

... More
Projected Slab

21.42

-

-

... More
Staircase W/slab

1.58

-

-

... More
Midlanding

0.67

-

-

0.81

-

-

... More
Chhajja

0.97

-

-

... More
Lift Wall

5.76

-

-

... More
Sixth Floor

-

-

-

... More
Column upto Slab

22.03

-

-

... More
Lintel Beam - Outer Wall

0.24

-

-

... More
Slab Beam

-

-

-

... More
Projected Beam

6.55

-

-

-

-

-

36.3

-

-

... More
Deduct: Lift

-1.2

-

-

... More
Duct & Staircase

-2.45

-

-

... More
Projected Slab

16.8

-

-

... More
Staircase W/slab

1.58

-

-

... More
Midlanding

0.67

-

-

0.81

-

-

... More
Lift Wall

5.76

-

-

... More
Terrace Floor

-

-

-

... More
Column upto Slab

10.37

-

-

... More
Slab Beam

-

-

-

-

-

-

... More
Lift &Staircase Lobby

10.3

-

-

... More
Around Tower

3.2

-

-

... More
LMR & Water Tank Slab

6.32

-

-

... More
Water Tank Wall

2.16

-

-

... More
Extra for laying PCC/RCC of any grade in superstructure above plinth level for every floor or part thereof in addition to rate for foundation and plinth:

-

-

-

... More
Ground Floor

161.6

15756

97.5

... More
First Floor

151.61

29564

195

... More
Second Floor

151.19

44224

292.5

... More
Third Floor

151.19

58966

390

... More
Fourth Floor

151.19

73707

487.5

... More
Fifth Floor

200.02

117011

585

... More
Sixth Floor

155.02

105802

682.5

... More
Terrace Floor

65.03

50727

780

... More
Providing and placing in position reinforcement for R.C.C. work including straightening, cutting, bending, binding etc. complete as per drawings including cost of binding wire.All complete

-

-

-

... More
Thermo-Mechanically treated bars FE 500D

269000

14660500

54.5

... More
Providing and fixing form work including centering, shuttering, strutting, staging, propping bracing etc. complete and including its removal at all levels, for:

-

-

-

... More
Foundations, footings, bases of columns plinth beam, curtain wall in any shape and size and all type of wall below plinth level.

-

-

-

... More
For PCC

-

-

-

64.68

-

-

7.68

-

-

1.92

-

-

9.6

-

-

... More
BELOW BEAM

-

-

-

... More
Lock up (M&F)

6.48

-

-

... More
RCC Work

-

-

-

257.4

-

-

31.2

-

-

5.04

-

-

25.2

-

-

... More
Column upto plinth

201.96

-

-

... More
Plinth/Ground Beam

-

-

-

... More
Lock up (M&F)

32.4

-

-

... More
Toilet Block (M&F)

7.4

-

-

... More
P.A. , Wating & Corridor

24

-

-

... More
Senior T.I. Chamber & Duty Officer

26.4

-

-

... More
Toilet & Lift

16

-

-

... More
Duct & Staircase

9

-

-

... More
Porch &Ramp

22.2

-

-

... More
Lock up (M&F)

16

-

-

... More
Toilet Block (M&F)

6.4

-

-

... More
P.A. , Wating & Corridor

24

-

-

... More
Senior T.I. Chamber & Duty Officer

12

-

-

... More
Toilet & Lift

9.6

-

-

... More
Duct & Staircase

1.5

-

-

... More
Porch &Ramp

11

-

-

... More
Lift Wall

42.4

-

-

... More
Elevational Beam

9.9

-

-

... More
Columns, Pillars, Piers and likes- rectangular or square in shape

-

-

-

... More
Ground Floor

-

-

-

... More
Column upto slab

285.12

-

-

... More
First Floor

-

-

-

... More
Column upto Slab

285.12

-

-

... More
Second Floor

-

-

-

... More
Column upto Slab

285.12

-

-

... More
Third Floor

-

-

-

... More
Column upto Slab

285.12

-

-

... More
Fourth Floor

-

-

-

... More
Column upto Slab

285.12

-

-

... More
Fifth Floor

-

-

-

... More
Column upto Slab

285.12

-

-

... More
Sixth Floor

-

-

-

... More
Column upto Slab

220.32

-

-

... More
Terrace Floor

-

-

-

... More
Column upto Slab

103.68

-

-

... More
Beams, lintels, cantilevers & walls

-

-

-

... More
Lintel Beam - Outer Wall

17.28

-

-

... More
Lintel Beam - Inner Wall

8.64

-

-

... More
Sill Beam -Window/Vent.

14.4

-

-

... More
Slab Beam

-

-

-

... More
Lock up (M&F)

48.6

-

-

... More
Toilet Block (M&F)

11.1

-

-

... More
P.A. , Wating & Corridor

36

-

-

... More
Senior T.I. Chamber & Duty Officer

39.6

-

-

... More
Toilet & Lift

24

-

-

... More
Duct & Staircase

13.5

-

-

... More
Porch

33.3

-

-

... More
Lock up (M&F)

24

-

-

... More
Toilet Block (M&F)

9.6

-

-

... More
P.A. , Wating & Corridor

36

-

-

... More
Senior T.I. Chamber & Duty Officer

18

-

-

... More
Toilet & Lift

14.4

-

-

... More
Duct & Staircase

2.25

-

-

... More
Porch

16.5

-

-

... More
Elevational Beam

11.88

-

-

... More
First Floor

-

-

-

... More
Lintel Beam - Outer Wall

17.28

-

-

... More
Lintel Beam - Inner Wall

8.64

-

-

... More
Sill Beam -Window/Vent.

15.6

-

-

... More
Slab Beam

-

-

-

... More
Asst. Sub Inspector

48.6

-

-

... More
Toilet Block (M&F)

11.1

-

-

... More
P.A. , Wating & Corridor

36

-

-

... More
Senior T.I. Chamber & Duty Officer

39.6

-

-

... More
Toilet & Lift

24

-

-

... More
Duct & Staircase

13.5

-

-

... More
Asst. Sub Inspector

24

-

-

... More
Toilet Block (M&F)

9.6

-

-

... More
P.A. , Wating & Corridor

36

-

-

... More
Senior T.I. Chamber & Duty Officer

18

-

-

... More
Toilet & Lift

14.4

-

-

... More
Duct & Staircase

2.25

-

-

... More
Elevational Beam

16.2

-

-

... More
Second Floor

-

-

-

... More
Lintel Beam - Outer Wall

17.28

-

-

... More
Lintel Beam - Inner Wall

8.64

-

-

... More
Sill Beam -Window/Vent.

15.6

-

-

... More
Slab Beam

-

-

-

... More
Meeting & Document Room

48.6

-

-

... More
Toilet Block (M&F)

11.1

-

-

... More
Investigation room

36

-

-

... More
Toilet & Lift

24

-

-

... More
Duct & Staircase

13.5

-

-

... More
Meeting & Document Room

24

-

-

... More
Toilet Block (M&F)

9.6

-

-

... More
Investigation room

36

-

-

... More
Toilet & Lift

14.4

-

-

... More
Duct & Staircase

2.25

-

-

... More
Elevational Beam

16.2

-

-

... More
Third Floor

-

-

-

... More
Lintel Beam - Outer Wall

17.28

-

-

... More
Lintel Beam - Inner Wall

8.64

-

-

... More
Sill Beam -Window/Vent.

15.6

-

-

... More
Slab Beam

-

-

-

... More
Ammunation & Malkhana Room

48.6

-

-

... More
Toilet Block (M&F)

11.1

-

-

... More
Computer & Staff Dining

36

-

-

... More
Pantry & Lift

24

-

-

... More
Duct & Staircase

13.5

-

-

... More
Ammunation & Malkhana Room

24

-

-

... More
Toilet Block (M&F)

9.6

-

-

... More
Computer & Staff Dining

36

-

-

... More
Pantry & Lift

14.4

-

-

... More
Duct & Staircase

2.25

-

-

... More
Elevational Beam

16.2

-

-

... More
Fourth Floor

-

-

-

... More
Lintel Beam - Outer Wall

17.28

-

-

... More
Lintel Beam - Inner Wall

8.64

-

-

... More
Sill Beam -Window/Vent.

15.6

-

-

... More
Slab Beam

-

-

-

... More
Transit Dormitory

48.6

-

-

... More
Toilet Block (M&F)

11.1

-

-

... More
Recreational Room

36

-

-

... More
Store & Lift

24

-

-

... More
Duct & Staircase

13.5

-

-

... More
Transit Dormitory

24

-

-

... More
Toilet Block (M&F)

9.6

-

-

... More
Recreational Room

36

-

-

... More
Store & Lift

14.4

-

-

... More
Duct & Staircase

2.25

-

-

... More
Elevational Beam

16.2

-

-

... More
Fifth Floor

-

-

-

... More
Lintel Beam - Outer Wall

17.28

-

-

... More
Lintel Beam - Inner Wall

8.64

-

-

... More
Sill Beam -Window/Vent.

15.6

-

-

... More
Slab Beam

-

-

-

... More
Staff WorkStation

48.6

-

-

... More
Toilet Block (M&F)

11.1

-

-

... More
P.A. , Wating & Corridor

36

-

-

... More
Chief Superintendent & Sub Inspector

39.6

-

-

... More
Toilet & Lift

24

-

-

... More
Duct & Staircase

13.5

-

-

... More
Staff WorkStation

24

-

-

... More
Toilet Block (M&F)

9.6

-

-

... More
P.A. , Wating & Corridor

36

-

-

... More
Chief Superintendent & Sub Inspector

18

-

-

... More
Toilet & Lift

14.4

-

-

... More
Duct & Staircase

2.25

-

-

... More
Elevational Beam

16.2

-

-

... More
Projected Beam

71.4

-

-

... More
Sixth Floor

-

-

-

... More
Lintel Beam - Outer Wall

3.2

-

-

... More
Slab Beam

-

-

-

... More
Projected Beam

54.6

-

-

... More
Terrace Floor

-

-

-

... More
Slab Beam

-

-

-

... More
Suspended floors, roofs, access platform, balconies (plain surfaces) and shelves (cast in situ)

-

-

-

-

-

-

... More
Lock up (M&F)

82.62

-

-

... More
Toilet Block (M&F)

29.8

-

-

5.2

-

-

... More
P.A. , Wating

18

-

-

... More
Senior T.I. Chamber & Duty Officer

39.6

-

-

... More
Toilet

9.6

-

-

... More
2.4m Corridor

42.72

-

-

... More
Front of Toilet Block

13.28

-

-

... More
Porch

41.8

-

-

... More
First Floor

-

-

-

-

-

-

... More
Asst. Sub Inspector

82.62

-

-

... More
Toilet Block (M&F)

29.8

-

-

5.2

-

-

... More
P.A. , Wating

18

-

-

... More
Senior T.I. Chamber & Duty Officer

39.6

-

-

... More
Toilet

9.6

-

-

... More
2.4m Corridor

42.72

-

-

... More
Front of Toilet Block

13.28

-

-

... More
Second Floor

-

-

-

-

-

-

... More
Meeting & Document Room

82.62

-

-

... More
Toilet Block (M&F)

29.8

-

-

5.2

-

-

... More
Investigation room

78

-

-

... More
Toilet

9.6

-

-

... More
2.4m Corridor

42.72

-

-

... More
Front of Toilet Block

13.28

-

-

... More
Third Floor

-

-

-

-

-

-

... More
Ammunation & Malkhana Room

82.62

-

-

... More
Toilet Block (M&F)

29.8

-

-

5.2

-

-

... More
Computer & Staff Dining

78

-

-

... More
Server & Pantry

9.6

-

-

... More
2.4m Corridor

42.72

-

-

... More
Front of Toilet Block

13.28

-

-

... More
Fourth Floor

-

-

-

-

-

-

... More
Transit Dormitory

82.62

-

-

... More
Toilet Block (M&F)

29.8

-

-

5.2

-

-

... More
Recreational Room

78

-

-

9.6

-

-

... More
2.4m Corridor

42.72

-

-

... More
Front of Toilet Block

13.28

-

-

... More
Fifth Floor

-

-

-

-

-

-

... More
Staff WorkStation

82.62

-

-

... More
Toilet Block (M&F)

29.8

-

-

5.2

-

-

... More
P.A. , Wating

18

-

-

... More
Chief Superintendent & Sub Inspector

39.6

-

-

... More
Toilet

9.6

-

-

... More
2.4m Corridor

42.72

-

-

... More
Front of Toilet Block

13.28

-

-

... More
Projected Slab

142.8

-

-

... More
Sixth Floor

-

-

-

-

-

-

242

-

-

... More
Deduct: Lift

-8

-

-

... More
Duct & Staircase

-16.35

-

-

... More
Projected Slab

112

-

-

... More
Terrace Floor

-

-

-

-

-

-

... More
Lift &Staircase Lobby

68.64

-

-

... More
Around Tower

21.36

-

-

... More
LMR & Water Tank Slab

42.12

-

-

... More
Stair cases of all types excluding spiral and folded plate type, including risers and landings

-

-

-

... More
Ground Floor

-

-

-

... More
Staircase W/slab

10.5

-

-

... More
Midlanding

4.5

-

-

5.4

-

-

4.2

-

-

... More
First Floor

-

-

-

... More
Staircase W/slab

10.5

-

-

... More
Midlanding

4.5

-

-

5.4

-

-

4.2

-

-

... More
Second Floor

-

-

-

... More
Staircase W/slab

10.5

-

-

... More
Midlanding

4.5

-

-

5.4

-

-

4.2

-

-

... More
Third Floor

-

-

-

... More
Staircase W/slab

10.5

-

-

... More
Midlanding

4.5

-

-

5.4

-

-

4.2

-

-

... More
Fourth Floor

-

-

-

... More
Staircase W/slab

10.5

-

-

... More
Midlanding

4.5

-

-

5.4

-

-

4.2

-

-

... More
Fifth Floor

-

-

-

... More
Staircase W/slab

10.5

-

-

... More
Midlanding

4.5

-

-

5.4

-

-

4.2

-

-

... More
Sixth Floor

-

-

-

... More
Staircase W/slab

10.5

-

-

... More
Midlanding

4.5

-

-

5.4

-

-

4.2

-

-

... More
Weather shade, chhajja, Cornices and mouldings

-

-

-

... More
Ground Floor

-

-

-

... More
Chhajja

5.94

-

-

... More
First Floor

-

-

-

... More
Chhajja

11.88

-

-

... More
Second Floor

-

-

-

... More
Chhajja

11.88

-

-

... More
Third Floor

-

-

-

... More
Chhajja

11.88

-

-

... More
Fourth Floor

-

-

-

... More
Chhajja

11.88

-

-

... More
Fifth Floor

-

-

-

... More
Chhajja

11.88

-

-

... More
Wall of any thickness including attached pilasters, buttresses etc. in super structure.

-

-

-

... More
Ground Floor

-

-

-

... More
Lift Wall

57.6

-

-

... More
First Floor

-

-

-

... More
Lift Wall

115.2

-

-

... More
Second Floor

-

-

-

... More
Lift Wall

57.6

-

-

... More
Third Floor

-

-

-

... More
Lift Wall

57.6

-

-

... More
Fourth Floor

-

-

-

... More
Lift Wall

57.6

-

-

... More
Fifth Floor

-

-

-

... More
Lift Wall

57.6

-

-

... More
Sixth Floor

-

-

-

... More
Lift Wall

57.6

-

-

... More
Seventh Floor

-

-

-

... More
Water Tank Wall

21.6

-

-

... More
Providing and filling in plinth with sand/ Crusher dust and hard moorum under floor in layers not exceeding 20cm in depth consolidating each deposited layer by ramming and watering, including dressing etc. complete.

-

-

-

... More
Total Excavation

1785

-

-

... More
Deduct: PCC

-97.14

-

-

... More
Deduct: RCC

-247.33

-

-

... More
Deduct: Reused Qty

-1071

-

-

... More
Below Floor

-

-

-

... More
Lock up (M&F)

49.57

-

-

... More
Toilet Block (M&F)

17.88

-

-

3.12

-

-

... More
P.A. , Wating

10.8

-

-

... More
Senior T.I. Chamber & Duty Officer

23.76

-

-

... More
Toilet & Lift

5.76

-

-

... More
Duct & Staircase

9.9

-

-

... More
2.4m Corridor

19.87

-

-

... More
Front of Toilet Block

7.97

-

-

... More
Porch &Ramp

25.08

-

-

... More
Providing and laying damp proof course (upto 50mm thick) with plain cement concrete 1:2:4 (1 cement : 2 coarse sand : 4 graded crushed stone aggregate 20mm nominal size) including form work.

2.8

11864

4237

... More
Diluting chemical emulsion (chlorpyrifos/ lindane) in water as per manufacturers recommendation and injecting for pre-constructional curative cum preventive anti-termite treatment:(Five year service guarantee bond to be signed by contractor) Surface treatment by spreading emulsion under floor, over the plinth area

-

-

-

... More
before laying base concrete @ 5 litres / sqm

-

-

-

... More
Plinth Area

298.8

8217

27.5

... More
Supplying chlorpyrifos/ Lindane emulsifiable concentrate of 20% in sealed containers including delivery as specified.

200

41600

208

... More
Making 50mm thick plinth protection of plain cement concrete 1:3:6 (1 cement : 3 coarse sand : 6 graded crushed stone aggregate 20mm nominal size) over 75mm bed of dry brick ballast 40mm nominal size well rammed and consolidated and grouted with sand including finishing the top smooth.

448.2

122359

273

... More
Treatment of inside of plinth masonry wall on using diluted chemical emulsion @ 1.5 litre per hole, including drilling 12 mm diameter holes in plinth wall below plinth protection at the interval of 300 mm and plugging with cement mortar 1 :2 (1 cement : 2 Coarse sand).

84.4

1604

19

... More
Treatment of outer side of plinth masonry wall using diluted chemical emulsion @ 1.5 litre per hole, including drilling 12 mm diameter holes in plinth wall at the junction of floor at the interval of 300 mm and plugging with cement mortar 1 :2 (1 cement : 2 Coarse sand).

84.4

1139

13.5

... More
Brick work with modular fly-ash lime bricks (FaLG Bricks) confirming to IS:12894-2002 of class designation 4.0 in foundation and plinth in:

-

-

-

... More
Cement Mortar 1:6 (1 cement : 6 coarse sand)

-

-

-

... More
Below Beam

29.4

-

-

... More
Front Steps

1.03

-

-

... More
Ground Floor - Super Structure

-

-

-

... More
Lock up (F&M)

19.44

-

-

... More
Toilet (F&M)

4.44

-

-

2.28

-

-

... More
P.A., Waiting

7.2

-

-

... More
Senior TI Chamber

7.92

-

-

... More
Toilet &Lift

9.6

-

-

... More
Duct &Staircase

3.6

-

-

... More
Corridor

3.6

-

-

... More
Lock up (F&M)

18.36

-

-

... More
Toilet (F&M)

3.84

-

-

... More
P.A., Waiting

3.6

-

-

... More
Senior TI Chamber

7.2

-

-

... More
Toilet &Lift

2.88

-

-

... More
Duct &Staircase

0.9

-

-

... More
Elevational Beam

5.94

-

-

... More
Deduct: Opening

-

-

-

-0.86

-

-

-1.44

-

-

-2.88

-

-

... More
Lift opening

-0.76

-

-

-7.56

-

-

-0.9

-

-

-0.72

-

-

-0.24

-

-

-0.14

-

-

... More
Lockup Grill

-3.46

-

-

... More
First Floor - Super Structure

-

-

-

... More
Asst. Sub Inspector

12.96

-

-

... More
Toilet (F&M)

4.44

-

-

2.28

-

-

... More
P.A., Waiting

7.2

-

-

... More
TI Chamber

7.92

-

-

... More
Toilet &Lift

9.6

-

-

... More
Duct &Staircase

3.6

-

-

... More
Corridor

3.6

-

-

... More
Asst. Sub Inspector

18.36

-

-

... More
Toilet (F&M)

3.84

-

-

... More
P.A., Waiting

3.6

-

-

... More
TI Chamber

7.2

-

-

... More
Toilet &Lift

2.88

-

-

... More
Duct &Staircase

0.9

-

-

... More
Above Porch

4.8

-

-

... More
Elevational Beam

6.48

-

-

... More
Deduct: Opening

-

-

-

-1.44

-

-

-2.88

-

-

... More
Lift opening

-0.76

-

-

-10.8

-

-

-0.9

-

-

-0.72

-

-

-0.24

-

-

-0.14

-

-

... More
Second Floor - Super Structure

-

-

-

... More
Meeting & Document Room

12.96

-

-

... More
Toilet (F&M)

4.44

-

-

2.28

-

-

... More
Investigation Room

15.6

-

-

... More
Toilet &Lift

9.6

-

-

... More
Duct &Staircase

3.6

-

-

... More
Corridor

3.6

-

-

... More
Meeting & Document Room

18.36

-

-

... More
Toilet (F&M)

3.84

-

-

... More
Investigation Room

7.2

-

-

... More
Toilet &Lift

2.88

-

-

... More
Duct &Staircase

0.9

-

-

... More
Elevational Beam

6.48

-

-

... More
Deduct: Opening

-

-

-

-1.44

-

-

-1.92

-

-

... More
Lift opening

-0.76

-

-

-10.8

-

-

-0.9

-

-

-1.44

-

-

-0.24

-

-

-0.14

-

-

... More
Third Floor - Super Structure

-

-

-

... More
Ammunation & Malkhana Room

12.96

-

-

... More
Toilet (F&M)

4.44

-

-

2.28

-

-

... More
Computer & Staff Room

15.6

-

-

... More
Pantry &Lift

9.6

-

-

... More
Duct &Staircase

3.6

-

-

... More
Corridor

3.6

-

-

... More
Ammunation & Malkhana Room

18.36

-

-

... More
Toilet (F&M)

3.84

-

-

... More
Computer & Staff Room

7.2

-

-

... More
Pantry &Lift

2.88

-

-

... More
Duct &Staircase

0.9

-

-

... More
Elevational Beam

6.48

-

-

... More
Deduct: Opening

-

-

-

-1.44

-

-

-2.88

-

-

... More
Lift opening

-0.76

-

-

-10.8

-

-

-0.9

-

-

-1.44

-

-

-0.24

-

-

-0.14

-

-

... More
Fourth Floor - Super Structure

-

-

-

... More
Transit Dormitory

12.96

-

-

... More
Toilet (F&M)

4.44

-

-

2.28

-

-

... More
Recreational Room

15.6

-

-

... More
Store &Lift

9.6

-

-

... More
Duct &Staircase

3.6

-

-

... More
Corridor

3.6

-

-

... More
Transit Dormitory

18.36

-

-

... More
Toilet (F&M)

3.84

-

-

... More
Recreational Room

7.2

-

-

... More
Store &Lift

2.88

-

-

... More
Duct &Staircase

0.9

-

-

... More
Elevational Beam

6.48

-

-

... More
Deduct: Opening

-

-

-

-1.44

-

-

-2.88

-

-

... More
Lift opening

-0.76

-

-

-9.72

-

-

-0.9

-

-

-1.44

-

-

-0.24

-

-

-0.14

-

-

... More
Fifth Floor - Super Structure

-

-

-

... More
Staff WorkStation

12.96

-

-

... More
Toilet (F&M)

4.44

-

-

2.28

-

-

... More
P.A., Waiting

7.2

-

-

... More
Chief Superintendent & Sub Inspector

7.92

-

-

... More
Toilet &Lift

9.6

-

-

... More
Duct &Staircase

3.6

-

-

... More
Corridor

3.6

-

-

... More
Staff WorkStation

18.36

-

-

... More
Toilet (F&M)

3.84

-

-

... More
P.A., Waiting

3.6

-

-

... More
Chief Superintendent & Sub Inspector

7.2

-

-

... More
Toilet &Lift

2.88

-

-

... More
Duct &Staircase

0.9

-

-

... More
Elevational Beam

6.48

-

-

... More
Deduct: Opening

-

-

-

-1.44

-

-

-2.88

-

-

... More
Lift opening

-0.76

-

-

-10.8

-

-

-0.9

-

-

-0.72

-

-

-0.24

-

-

-0.14

-

-

... More
Sixth Floor - Super Structure

-

-

-

... More
Toilet &Lift

9.6

-

-

... More
Duct &Staircase

3.6

-

-

... More
Corridor

3.6

-

-

... More
Toilet &Lift

2.88

-

-

... More
Duct &Staircase

0.9

-

-

... More
Terrace Wall

7.49

-

-

... More
Deduct: Opening

-

-

-

-1.44

-

-

... More
Lift opening

-0.76

-

-

-1.08

-

-

-0.14

-

-

... More
Terrace Floor

-

-

-

... More
LMR &Lift

9.6

-

-

... More
Duct & Staircase

3.6

-

-

... More
Corridor

3.6

-

-

... More
Toilet &Lift

2.88

-

-

... More
Duct &Staircase

0.9

-

-

... More
Terrace Wall

19.2

-

-

... More
Deduct: Opening

-

-

-

-1.44

-

-

-0.76

-

-

-1.08

-

-

-0.14

-

-

... More
Extra for brick work in superstructure above plinth level for every floor or part thereof in addition to rate for foundation and plinth:

-

-

-

... More
Ground Floor

107.88

13054

121

... More
First Floor

108.9

26354

242

... More
Second Floor

97.74

35480

363

... More
Third Floor

96.78

46842

484

... More
Fourth Floor

97.86

59206

605

... More
Fifth Floor

104.1

75577

726

... More
Sixth Floor

44.33

37546

847

... More
Seventh Floor

54.36

52621

968

... More
Half brick thick brick masonry with fly-ash lime bricks (FaLG Bricks) confirming to IS:12894-2002 of class designation 4.0 in superstructure above plinth level.

-

-

-

... More
Cement Mortar 1:4 (1 cement : 4 coarse sand)

-

-

-

... More
Ground Floor

-

-

-

... More
Partition &Toilet wall

43.2

-

-

... More
Deduct: Opening

-

-

-

-9.6

-

-

-7.88

-

-

... More
First Floor

-

-

-

... More
Partition &Toilet wall

43.2

-

-

... More
Deduct: Opening

-

-

-

-9.6

-

-

-7.88

-

-

... More
Second Floor

-

-

-

... More
Partition &Toilet wall

21.6

-

-

... More
Deduct: Opening

-

-

-

-4.8

-

-

-7.88

-

-

... More
Third Floor

-

-

-

... More
Partition &Toilet wall

21.6

-

-

... More
Deduct: Opening

-

-

-

-4.8

-

-

-7.88

-

-

... More
Fourth Floor

-

-

-

... More
Partition &Toilet wall

21.6

-

-

... More
Deduct: Opening

-

-

-

-4.8

-

-

-7.88

-

-

... More
Fifth Floor

-

-

-

... More
Partition &Toilet wall

43.2

-

-

... More
Deduct: Opening

-

-

-

-9.6

-

-

-7.88

-

-

... More
Sixth Floor

-

-

-

... More
Partition &Toilet wall

17.28

-

-

... More
Deduct: Opening

-

-

-

-3.15

-

-

... More
Extra for half brick work in superstructure above plinth level for every story or part thereof in addition to rate for upto plinth level:

-

-

-

... More
Ground Floor

91.25

1004

11

... More
First Floor

91.25

2008

22

... More
Second Floor

74.45

2457

33

... More
Third Floor

74.45

3276

44

... More
Fourth Floor

74.45

4095

55

... More
Fifth Floor

91.25

6023

66

... More
Sixth Floor

14.13

1089

77

... More
Extra for providing and placing in position hopping 25x1.60 mm or 2 Nos 6mm dia MS bars reinforcement at every third course of half brick masonry.

511.2

31950

62.5

... More
Providing wood work in frames of doors, windows, clerestory windows and other frames wrought framed and fixed in position.

-

-

-

... More
Sal, bijasal, benteak, khair, haldu

-

-

-

... More
Ground to Terrace Floor

-

-

-

0.05

-

-

0.72

-

-

1.89

-

-

1.29

-

-

... More
Providing and fixing flush door shutters, conforming to IS : 2202 (Part-I), decorative type core of block board construction with frame of first class hard wood and well matched teak ply veneering with vertical grains or cross bands and face veneers on both faces of shutters excluding hinges.

-

-

-

... More
35 mm. thick (single leaf)

-

-

-

... More
Ground to Terrace Floor

-

-

-

4.32

-

-

50.4

-

-

96

-

-

... More
30 mm. thick (single leaf)

-

-

-

... More
Ground to Terrace Floor

-

-

-

50.4

-

-

... More
Extra for double leaf shutter instead of single leaf.

-

-

-

... More
Ground to Terrace Floor

-

-

-

4.32

-

-

50.4

-

-

... More
Providing 40x5mm iron hold fast 40cm long including fixing to frame with 10mm bolts nuts and wooden plug and embedding in Cement Concrete 1:2:4 in blocks of size 30x10x15cm.

-

-

-

... More
all Floor

696

50460

72.5

... More
Providing and fixing bright finished brass butt hinges with brass polished MS screws complete:

-

-

-

... More
125x85x5.50 mm (Heavy Type)

-

-

-

... More
Single Leaf

288

-

-

... More
Double Leaf

120

-

-

... More
Providing and fixing bright finished brass sliding door bolt with nuts and brass polished MS screws complete:

-

-

-

... More
300x16mm

-

-

-

... More
Single Leaf

72

-

-

... More
Double Leaf

15

-

-

... More
Providing and fixing brass door latch with brass polished MS screws complete:

-

-

-

... More
250x16x5 mm

-

-

-

... More
Single Leaf

72

-

-

... More
Double Leaf

15

-

-

... More
Providing and fixing bright finished brass tower bolts (barrel type) with brass polished MS screws complete:

-

-

-

... More
150x10mm

-

-

-

... More
Single Leaf

72

-

-

... More
Double Leaf

30

-

-

... More
Providing and fixing bright finished brass door handles with brass polished MS screws complete:

-

-

-

... More
125 mm

-

-

-

... More
Single Leaf

144

-

-

... More
Double Leaf

60

-

-

... More
Providing and fixing M.S. grill of approved pattern made of M.S. flats or square or round bars welded to steel frame of windows etc. including applying a priming coat welded to frame with all necessary fitting complete including applying a priming of red oxide zinc chromate primer.

-

-

-

... More
Ground to terrace Floor

-

-

-

6156

-

-

540

-

-

648

-

-

144

-

-

100.8

-

-

... More
20 kg/sqm

7588.8

512244

67.5

... More
Steel work welded in built up sections/ framed work including cutting, hoisting, fixing in position and applying a priming coat of red oxide zinc chromate primer.

-

-

-

... More
In gratings, frames, guard bar, ladder, railings, brackets, gates and similar works.

-

-

-

... More
Lock up Grill

972

-

-

... More
Providing and fixing aluminium work for doors, windows, ventilators and partitions made out of extruded aluminium standard sections (main section with minimum 1.5mm thickness) conforming to IS: 733, IS: 1285 mitred and jointed mechanically including aluminium cleats, neoprene weather stripping gasket beveled edge beading, screws duly fixed in wall/ floor with fixing clips or hold fasteners or bolts and nuts as required aluminium sections shall be anodized transparent or dyed to approved shade according to IS: 1868, minimum anodic coating shall be of grade AC-15. (Glazing to be paid for separately:

-

-

-

... More
For fixed portion

-

-

-

... More
Ground to terrace Floor

-

-

-

1846.8

-

-

162

-

-

194.4

-

-

43.2

-

-

30.24

-

-

... More
6.0 kg/sqm

2276.64

753568

331

... More
For shutter of doors, windows & ventilators including providing and making provision for fixing of fitting wherever required including the cost of PVC/ neoprene gasket required (Fittings shall be paid for separately).

2276.64

769505

338

... More
Extra for powder coated (minimum 50 micron) aluminium sections instead of anodized.

4553.28

122939

27

... More
Providing and fixing glazing in aluminium door, window, ventilator shutters and partitions etc. with PVC/ neoprene gasket etc. complete. (Cost of aluminium snap beading shall be paid in basic item):

-

-

-

... More
With float glass panes of 5 mm thickness

-

-

-

... More
Ground to terrace Floor

-

-

-

307.8

-

-

27

-

-

32.4

-

-

7.2

-

-

5.04

-

-

... More
Providing and fixing stainless wire gauge of average width of aperture 1.56mm with wire of 0.35mm to existing steel door, window shutter frames with necessary M.S. strip beading etc. complete.

-

-

-

... More
Ground to terrace Floor

-

-

-

153.9

-

-

13.5

-

-

16.2

-

-

3.6

-

-

2.52

-

-

... More
50% of Opening

189.72

150069

791

... More
Providing and fixing clear float toughened glass door or partition in required thickness frameless in appropriated size inclusive of edge molding polish and making required size slot or hole for patch fitting/hardware etc. The glass to be assembled together with patch fitting and hardware in proper alignment with all labour tools and tackles etc. complete. (Patch fittings and hardware to be paid for separately)

-

-

-

... More
12mm thick for door/partition

-

-

-

... More
Investingation Room i/c Door

46.8

-

-

... More
Providing and fixing of stainless steel grade316 patch fittingand hardware of approved (hardwyn,Ozone,Godraj) make in frame less toughened glass door or partition in proper aligment with all tools tackles and labour etc.complete

-

-

-

... More
Top Patch with pivot SS grade 304

18

41346

2297

... More
Top/Side patch glass or L-connector patch SS grade 304

4

12232

3058

... More
Bottom patch to be connected with floor machine

18

38610

2145

... More
Bottom lock patch with three key SS grade 304

4

12980

3245

... More
Corner patch fitting with pivot SS grade 304

4

12232

3058

... More
Two way action Hydraulic floor spring machine heavy duty double cylinder type Capacity 120/150 Kg mounted on floor including required cutting on floor and proper grouting with rich cement mortar.

4

31540

7885

... More
H type handle 32x600mm SS 304 grade

4

11484

2871

... More
Floor/Wall to Glass Connector SS grade 304

12

13008

1084

... More
Providing and fixing ISI Marked designer tiles of approved design and size confirming to IS: 13801 over and including 20mm thick cement plaster 1:3 including floating coat of cement slurry on bed and filling joints with neat cement slurry mixed with pigment to match the shade of tiles complete.

-

-

-

... More
Ground Floor

-

-

-

32.56

-

-

11.4

-

-

... More
Providing and laying Glazed Vitrified Floor tiles (GVT/PGVT) with digital print of random design with water absorption less than 0.05% and conforming to IS: 15622-2017 of 1st quality of approved make in all colours,shade and size mensioned below(+/- 10mm),laid on 20mm thick cement mortar 1:4 (1cement:4 course sand) including grouting th ejoints with white cement and matching pigments etc. complete.

-

-

-

... More
Size 800x800 mm thickness 9 to 10 mm

-

-

-

... More
Ground Floor

-

-

-

... More
Lockup (M&F)

82.62

-

-

... More
Waiting Room

17.4

-

-

18

-

-

... More
Senior TI chamber & Duty officer room

39.6

-

-

... More
Door Sill

0.36

-

-

... More
Skirting

-

-

-

... More
Lockup (M&F)

7.83

-

-

... More
Waiting Room

3.54

-

-

3.6

-

-

... More
Senior TI chamber & Duty officer room

5.58

-

-

... More
First Floor

-

-

-

... More
Asst. Sub Inspector WorkStation

82.62

-

-

... More
Waiting Room

17.4

-

-

18

-

-

... More
TI Chamber (Criminal) & Law&oder

39.6

-

-

... More
Door Sill

0.6

-

-

... More
Skirting

-

-

-

... More
Asst. Sub Inspector WorkStation

7.83

-

-

... More
Waiting Room

3.54

-

-

3.6

-

-

... More
TI Chamber (Criminal) & Law&oder

5.58

-

-

... More
Second Floor

-

-

-

... More
Meeting room

82.62

-

-

... More
Investigation room

78

-

-

... More
Door Sill

0.6

-

-

... More
Skirting

-

-

-

... More
Meeting room

7.83

-

-

... More
Investigation room

7.5

-

-

... More
Third Floor

-

-

-

... More
Annumation room &Malkhana

82.62

-

-

... More
Computer &Staff Dining room

78

-

-

... More
Door Sill

0.6

-

-

... More
Skirting

-

-

-

... More
Annumation room &Malkhana

7.83

-

-

... More
Computer &Staff Dining room

7.5

-

-

... More
Fourth Floor

-

-

-

... More
Transit Dormitory

82.62

-

-

... More
Recreation Room

78

-

-

... More
Door Sill

0.6

-

-

... More
Skirting

-

-

-

... More
Transit Dormitory

7.83

-

-

... More
Recreation Room

7.5

-

-

... More
Fifth Floor

-

-

-

... More
Staff Work Station

82.62

-

-

... More
Waiting Room

17.4

-

-

18

-

-

... More
Chief Superintendent &Sub Inspector

39.6

-

-

... More
Door Sill

0.6

-

-

... More
Skirting

-

-

-

... More
Staff Work Station

7.83

-

-

... More
Waiting Room

3.54

-

-

3.6

-

-

... More
Chief Superintendent &Sub Inspector

5.58

-

-

... More
Sixth Floor

-

-

-

342

-

-

... More
Deduct: Area

-78

-

-

... More
Skirting

17.94

-

-

... More
15 mm thick Table rubbed polished Granite stone slab flooring laid over 20mm (Average) thick base of cement mortar 1:4 (1 cement : 4 coarse sand) laid and jointed with grey cement slurry including rubbing and polishing etc. complete. (Area of slab should be 0.50 sqm and above)

-

-

-

... More
Ground Floor

-

-

-

... More
2.4m Corridor

42.72

-

-

... More
Front of Toilet Block

13.28

-

-

... More
Skirting

-

-

-

... More
2.4m Corridor

6.78

-

-

... More
First Floor

-

-

-

... More
2.4m Corridor

42.72

-

-

... More
Front of Toilet Block

13.28

-

-

... More
Skirting

-

-

-

... More
2.4m Corridor

6.78

-

-

... More
Second Floor

-

-

-

... More
2.4m Corridor

42.72

-

-

... More
Front of Toilet Block

13.28

-

-

... More
Skirting

-

-

-

... More
2.4m Corridor

6.78

-

-

... More
Third Floor

-

-

-

... More
2.4m Corridor

42.72

-

-

... More
Front of Toilet Block

13.28

-

-

... More
Skirting

-

-

-

... More
2.4m Corridor

6.78

-

-

... More
Fourth Floor

-

-

-

... More
2.4m Corridor

42.72

-

-

... More
Front of Toilet Block

13.28

-

-

... More
Skirting

-

-

-

... More
2.4m Corridor

6.78

-

-

... More
Fifth Floor

-

-

-

... More
2.4m Corridor

42.72

-

-

... More
Front of Toilet Block

13.28

-

-

... More
Skirting

-

-

-

... More
2.4m Corridor

6.78

-

-

... More
Sixth Floor

-

-

-

... More
Front of Staircase

34.04

-

-

... More
Skirting

-

-

-

... More
Granite stone grey/pink

235.72

423352

1796

... More
Granite stone black

353.58

935570

2646

... More
Providing and Fixing rectified glazed ceramic wall/dado tiles of 1st quality conforming to IS: 15622-2017 of approved make,in all colours shade in wall and dado over 12mm thick bed of cement mortar 1:3 (1 cement:3 course sand) and joining with grey cement slurry @ 3.3kg per sqm. including pointing in white cement mixed with matching pigment complete.

-

-

-

... More
Size 300x450 mm thickness 7 to 8 mm

-

-

-

... More
Ground Floor

-

-

-

... More
Toilet F

17.76

-

-

11.52

-

-

... More
Toilet M

17.76

-

-

5.76

-

-

... More
Partition

3.12

-

-

... More
Toilet_ Senior T.I. chamber

10.08

-

-

... More
Toilet_ Duty officer chamber

10.08

-

-

... More
Deduction:- opening

-

-

-

-4.8

-

-

-12.6

-

-

... More
First Floor

-

-

-

... More
Toilet F

17.76

-

-

11.52

-

-

... More
Toilet M

17.76

-

-

5.76

-

-

... More
Partition

3.12

-

-

... More
T.I. chamber

20.16

-

-

... More
Deduction:- opening

-

-

-

-4.8

-

-

-12.6

-

-

... More
Second Floor

-

-

-

... More
Toilet F

17.76

-

-

11.52

-

-

... More
Toilet M

17.76

-

-

5.76

-

-

... More
Partition

3.12

-

-

... More
Investigation Room

20.16

-

-

... More
Deduction:- opening

-

-

-

-4.8

-

-

-12.6

-

-

... More
Third Floor

-

-

-

... More
Above Pantry Platform

4.28

-

-

... More
Fourth Floor

-

-

-

... More
Toilet F

17.76

-

-

11.52

-

-

... More
Toilet M

17.76

-

-

5.76

-

-

... More
Partition

3.12

-

-

... More
Recreational Room

20.16

-

-

... More
Deduction:- opening

-

-

-

-4.8

-

-

-12.6

-

-

... More
Fifth Floor

-

-

-

... More
Toilet F

17.76

-

-

11.52

-

-

... More
Toilet M

17.76

-

-

5.76

-

-

... More
Partition

3.12

-

-

... More
Chief Superintendent &Sub Inspector

20.16

-

-

... More
Deduction:- opening

-

-

-

-4.8

-

-

-12.6

-

-

... More
Sixth Floor

-

-

-

... More
Toilet

20.16

-

-

... More
Deduction:- opening

-

-

-

-3.15

-

-

... More
Providing and Fixing rectified glazed ceramic floor tiles of 1st quality conforming to IS: 15622-2017 of approved make,in all colours shade over 20mm thick bed of cement mortar 1:3 (1 cement:3 course sand) and joining with grey cement slurry @ 3.3kg per sqm. including pointing in white cement mixed with matching pigment complete.

-

-

-

... More
Size 300x300 mm thickness 7 to 8 mm

-

-

-

... More
Ground Floor

-

-

-

... More
Toilet M & F

30.34

-

-

... More
Toilet_ Senior T.I. chamber

10.08

-

-

... More
First Floor

-

-

-

... More
Toilet M & F

30.34

-

-

... More
T.I. chamber

10.08

-

-

... More
Second Floor

-

-

-

... More
Toilet M & F

30.34

-

-

... More
Investigation Room

10.08

-

-

... More
Third Floor

-

-

-

... More
Toilet M & F

30.34

-

-

... More
Server & Pantry

10.08

-

-

... More
Fourth Floor

-

-

-

... More
Toilet M & F

30.34

-

-

... More
Recreational Room

10.08

-

-

... More
Fifth Floor

-

-

-

... More
Toilet M & F

30.34

-

-

... More
Chief Superintendent &Sub Inspector

10.08

-

-

... More
Sixth Floor

-

-

-

... More
Toilet

10.08

-

-

... More
15 mm thick Table rubbed polished Granite stone slab in risers and treads of steps skirting dado and pillars laid on 12mm (Average) thick base of cement mortar 1:3 (1 cement : 3 coarse sand) and jointed with grey cement slurry including rubbing and polishing etc. complete (single stone is to be used for risers and treads of steps and width of stone for skirting and dado shall be equal to the height of skirting & dado and length of 1.0 m).

-

-

-

... More
Granite stone grey/pink

-

-

-

... More
Staircase -all Floor

-

-

-

17.64

-

-

... More
Front Steps

3.24

-

-

... More
Granite stone black

-

-

-

... More
Staircase -all Floor

-

-

-

... More
Midlanding

31.5

-

-

... More
Treads

35.28

-

-

... More
Front Steps

6.48

-

-

... More
Landing

6.48

-

-

... More
15mm thick Granite work (machine cut, table rubbed & mirror polished) for wall lining (veneer work) in cement mortar 1:3 (1 cement : 3 coarse sand) including pointing with cement mortar 1:2 (1 white cement: 2 marble dust) mixed with matching pigment. (Area of slab should be over 0.5 sqm).

-

-

-

... More
Granite stone black

-

-

-

... More
Lift Wall - office all Floor

705.6

-

-

... More
Deduct Opening

-13.23

-

-

... More
Opening top &Side

5.88

-

-

... More
15mm thick Granite work (machine cut, table rubbed & mirror polished) for kitchen platform, vanity counters, window sills and similar locations of required size laid over 20mm thick base cement mortar 1:4 (1 cement : 4 coarse sand) including joints treated with white cement mixed with matching pigment including rubbing and polishing to edge moulding to give high gloss finish.

-

-

-

... More
Granite stone black

-

-

-

... More
Pantry Platform

2.54

-

-

... More
Basin Platform

15.79

-

-

... More
Side Drop

0.78

-

-

... More
Providing and fixing one side polished 25 mm thick RAJIM SAND STONE shelves fixed in walls in cement mortar 1:3 (1 cement : 3 coarse sand) including finishing complete.

-

-

-

... More
One side polished

-

-

-

... More
Below Platform

-

-

-

... More
Pantry Platform

2.54

-

-

... More
Basin Platform

15.79

-

-

... More
Providing and fixing chicken mesh weighting not less than 250 gms/sqm as per IS : specification in the required width with 40mm long steel nails on vertical and horizontal surface near R.C.C. and brick walls junctions including scaffolding and all lead and lifts etc. complete before plastering upto 10mts in height.

-

-

-

... More
First Floor

-

-

-

273.36

-

-

... More
Column

216

-

-

... More
Second Floor

-

-

-

273.36

-

-

... More
Column

216

-

-

... More
Third Floor

-

-

-

273.36

-

-

... More
Column

216

-

-

... More
Fourth Floor

-

-

-

273.36

-

-

... More
Column

216

-

-

... More
Fifth Floor

-

-

-

366.21

-

-

... More
Column

216

-

-

... More
Sixth Floor

-

-

-

219.39

-

-

... More
Column

216

-

-

... More
Terrace Floor

-

-

-

71.4

-

-

... More
Column

69.12

-

-

... More
Providing and making 6mm thick cement plaster of mix:

-

-

-

... More
In Cement mortar 1:4 (1 cement : 4 fine sand)

-

-

-

... More
Ground Floor

-

-

-

... More
Lock up (M&F)

82.62

-

-

... More
Toilet Block (M&F)

29.8

-

-

5.2

-

-

... More
P.A. , Wating

18

-

-

... More
Senior T.I. Chamber & Duty Officer

39.6

-

-

... More
Toilet

9.6

-

-

... More
2.4m Corridor

42.72

-

-

... More
Front of Toilet Block

13.28

-

-

... More
Porch

41.8

-

-

... More
Staircase W/slab

10.5

-

-

... More
Midlanding

4.5

-

-

... More
Chhajja (Bottom & Top)

9.72

-

-

... More
First Floor

-

-

-

... More
Asst. Sub Inspector

82.62

-

-

... More
Toilet Block (M&F)

29.8

-

-

5.2

-

-

... More
P.A. , Wating

18

-

-

... More
Senior T.I. Chamber & Duty Officer

39.6

-

-

... More
Toilet

9.6

-

-

... More
2.4m Corridor

42.72

-

-

... More
Front of Toilet Block

13.28

-

-

... More
Staircase W/slab

10.5

-

-

... More
Midlanding

4.5

-

-

... More
Chhajja (Bottom & Top)

19.44

-

-

... More
Second Floor

-

-

-

... More
Meeting & Document Room

82.62

-

-

... More
Toilet Block (M&F)

29.8

-

-

5.2

-

-

... More
Investigation room

78

-

-

... More
Toilet

9.6

-

-

... More
2.4m Corridor

42.72

-

-

... More
Front of Toilet Block

13.28

-

-

... More
Staircase W/slab

10.5

-

-

... More
Midlanding

4.5

-

-

... More
Chhajja (Bottom & Top)

19.44

-

-

... More
Third Floor

-

-

-

... More
Ammunation & Malkhana Room

82.62

-

-

... More
Toilet Block (M&F)

29.8

-

-

5.2

-

-

... More
Computer & Staff Dining

78

-

-

... More
Server & Pantry

9.6

-

-

... More
2.4m Corridor

42.72

-

-

... More
Front of Toilet Block

13.28

-

-

... More
Staircase W/slab

10.5

-

-

... More
Midlanding

4.5

-

-

... More
Chhajja (Bottom & Top)

19.44

-

-

... More
Fourth Floor

-

-

-

... More
Transit Dormitory

82.62

-

-

... More
Toilet Block (M&F)

29.8

-

-

5.2

-

-

... More
Recreational Room

78

-

-

9.6

-

-

... More
2.4m Corridor

42.72

-

-

... More
Front of Toilet Block

13.28

-

-

... More
Staircase W/slab

10.5

-

-

... More
Midlanding

4.5

-

-

... More
Chhajja (Bottom & Top)

19.44

-

-

... More
Fifth Floor

-

-

-

... More
Staff WorkStation

82.62

-

-

... More
Toilet Block (M&F)

29.8

-

-

5.2

-

-

... More
P.A. , Wating

18

-

-

... More
Chief Superintendent & Sub Inspector

39.6

-

-

... More
Toilet

9.6

-

-

... More
2.4m Corridor

42.72

-

-

... More
Front of Toilet Block

13.28

-

-

... More
Projected Slab (bothside)

285.6

-

-

... More
Staircase W/slab

10.5

-

-

... More
Midlanding

4.5

-

-

... More
Chhajja (Bottom & Top)

19.44

-

-

... More
Sixth Floor

-

-

-

360

-

-

... More
Deduct : Lift &Duct

-8

-

-

... More
Duct &Staircase

-16.35

-

-

... More
Staircase W/slab

10.5

-

-

... More
Midlanding

4.5

-

-

... More
Terrace Floor

-

-

-

68.64

-

-

... More
Projected Slab (bothside)

42.72

-

-

... More
Add 20% beam offset

565.05

-

-

... More
Providing and making 12mm thick cement plaster of mix:

-

-

-

... More
In Cement Mortar 1:6 (1 cement : 6 fine sand)

-

-

-

... More
Ground Floor

-

-

-

... More
Lockup F

38.88

-

-

... More
Waiting Room

21.6

-

-

21.6

-

-

... More
Senior TI chamber

23.76

-

-

... More
Duty officer room

23.76

-

-

... More
Waiting Room

21.6

-

-

21.6

-

-

... More
Lockup M

38.88

-

-

... More
2.4m. Wide Corridor

227.34

-

-

... More
Toilet F

26.64

-

-

17.28

-

-

... More
Partition

4.68

-

-

... More
Toilet M

26.64

-

-

8.64

-

-

... More
Partition

4.68

-

-

... More
Toilet_ Senior T.I. chamber

15.12

-

-

... More
Toilet_ Duty officer chamber

15.12

-

-

25.92

-

-

... More
Staircase wall

34.56

-

-

21.6

-

-

... More
Deduct 50% Opening

-

-

-

-2.16

-

-

-7.2

-

-

-19.2

-

-

-7.88

-

-

... More
Lift opening

-3.78

-

-

-16.2

-

-

-2.25

-

-

-1.8

-

-

... More
First Floor

-

-

-

... More
ASI Workstation

77.76

-

-

... More
Waiting Room

21.6

-

-

21.6

-

-

... More
TI Chamber (Criminal)

23.76

-

-

... More
TI Chamber (Law & Order)

23.76

-

-

... More
Waiting Room

21.6

-

-

21.6

-

-

... More
2.4m. Wide Corridor

227.34

-

-

... More
Toilet F

26.64

-

-

17.28

-

-

... More
Partition

4.68

-

-

... More
Toilet M

26.64

-

-

8.64

-

-

... More
Partition

4.68

-

-

... More
Toilet_ T.I. chamber (Criminal)

15.12

-

-

... More
Toilet_ T.I. chamber (Law & Order)

15.12

-

-

25.92

-

-

... More
Staircase wall

34.56

-

-

21.6

-

-

... More
Deduct 50% Opening

-

-

-

-7.2

-

-

-19.2

-

-

-7.88

-

-

... More
Lift opening

-3.78

-

-

-27

-

-

-2.25

-

-

-1.8

-

-

... More
Second Floor

-

-

-

... More
Meeting room

77.76

-

-

... More
Investigation room

93.6

-

-

... More
2.4m. Wide Corridor

227.34

-

-

... More
Toilet F

26.64

-

-

17.28

-

-

... More
Partition

4.68

-

-

... More
Toilet M

26.64

-

-

8.64

-

-

... More
Partition

4.68

-

-

... More
Toilet_ Investigation Room

30.24

-

-

25.92

-

-

... More
Staircase wall

34.56

-

-

21.6

-

-

... More
Deduct 50% Opening

-

-

-

-7.2

-

-

-9.6

-

-

-7.88

-

-

... More
Lift opening

-3.78

-

-

-27

-

-

-2.25

-

-

-3.6

-

-

... More
Third Floor

-

-

-

... More
Annumation room

38.88

-

-

... More
Computer room

46.8

-

-

... More
Staff Dining

46.8

-

-

... More
Malkhana

38.88

-

-

... More
2.4m. Wide Corridor

227.34

-

-

... More
Toilet F

26.64

-

-

17.28

-

-

... More
Partition

4.68

-

-

... More
Toilet M

26.64

-

-

8.64

-

-

... More
Partition

4.68

-

-

... More
Toilet_ Computer Room

15.12

-

-

... More
Toilet_ Staff Dining

15.12

-

-

25.92

-

-

... More
Staircase wall

34.56

-

-

21.6

-

-

... More
Deduct 50% Opening

-

-

-

-7.2

-

-

-9.6

-

-

-7.88

-

-

... More
Lift opening

-3.78

-

-

-27

-

-

-2.25

-

-

-3.6

-

-

... More
Fourth Floor - Super Structure

-

-

-

... More
Recretional room

93.6

-

-

... More
Transit Dormitary

77.76

-

-

... More
2.4m. Wide Corridor

227.34

-

-

... More
Toilet F

26.64

-

-

17.28

-

-

... More
Partition

4.68

-

-

... More
Toilet M

26.64

-

-

8.64

-

-

... More
Partition

4.68

-

-

... More
Toilet_ Recretional room

40.32

-

-

25.92

-

-

... More
Staircase wall

34.56

-

-

21.6

-

-

... More
Deduct 50% Opening

-

-

-

-7.2

-

-

-14.4

-

-

-7.88

-

-

... More
Lift opening

-3.78

-

-

-27

-

-

-2.25

-

-

-3.6

-

-

... More
Fifth Floor - Super Structure

-

-

-

... More
Staff Workstation

77.76

-

-

... More
Waiting Room

21.6

-

-

21.6

-

-

... More
Chief Superintending

23.76

-

-

... More
Sub Inspector Chamber

23.76

-

-

... More
Waiting Room

21.6

-

-

21.6

-

-

... More
2.4m. Wide Corridor

227.34

-

-

... More
Toilet F

26.64

-

-

17.28

-

-

... More
Partition

4.68

-

-

... More
Toilet M

26.64

-

-

8.64

-

-

... More
Partition

4.68

-

-

... More
Toilet_ Chief Superintendent

15.12

-

-

... More
Toilet_ Sub Inspector

15.12

-

-

25.92

-

-

... More
Staircase wall

34.56

-

-

21.6

-

-

... More
Deduct 50% Opening

-

-

-

-7.2

-

-

-14.4

-

-

-7.88

-

-

... More
Lift opening

-3.78

-

-

-27

-

-

-2.25

-

-

-3.6

-

-

... More
Sixth Floor - Super Structure

-

-

-

... More
Staircase Hall

53.28

-

-

... More
Staircase wall

34.56

-

-

... More
Toilet_ Hall

30.24

-

-

25.92

-

-

21.6

-

-

... More
Outer face of wall

28.08

-

-

... More
Deduct 50% Opening

-

-

-

-7.2

-

-

-3.15

-

-

... More
Lift opening

-3.78

-

-

-2.7

-

-

-0.36

-

-

... More
Terrace Floor

-

-

-

28.8

-

-

67.2

-

-

34.56

-

-

... More
Deduct 50% Opening

-

-

-

... More
Mumty Door

-4.8

-

-

-2.7

-

-

... More
Add 10% Column offsets

679.88

-

-

... More
50% 15mm Plaster of inner wall

3739.36

-

-

... More
50% 12mm Plaster of inner wall

3739.36

342152

91.5

... More
Providing and making 15mm thick cement plaster on the rough side of single or half brick wall of mix:

-

-

-

... More
In Cement Mortar 1:6 (1 cement : 6 fine sand)

3739.36

400112

107

... More
Providing and making 18 mm thick cement plaster with under layer of 12mm thick cement plaster 1:5 (1 cement : 5 fine sand) finished with a top layer of 6mm thick cement plaster 1:3 (1 cement : 3 fine sand).

-

-

-

... More
Ground Floor

-

-

-

... More
Exterior Wall

90.3

-

-

... More
boxing offset

22.68

-

-

... More
window offset

45.36

-

-

... More
Deduct 50% Opening

-

-

-

-2.16

-

-

-14.85

-

-

-0.9

-

-

-0.36

-

-

... More
First Floor

-

-

-

... More
Exterior Wall

77.4

-

-

... More
boxing offset

19.44

-

-

... More
window offset

38.88

-

-

... More
Above Porch (both side)

10.08

-

-

... More
Deduct 50% Opening

-

-

-

-25.65

-

-

-0.9

-

-

-0.36

-

-

... More
Second Floor

-

-

-

... More
Exterior Wall

77.4

-

-

... More
boxing offset

19.44

-

-

... More
window offset

38.88

-

-

... More
Deduct 50% Opening

-

-

-

-25.65

-

-

-0.9

-

-

-0.36

-

-

... More
Third Floor

-

-

-

... More
Exterior Wall

77.4

-

-

... More
boxing offset

19.44

-

-

... More
window offset

38.88

-

-

... More
Deduct 50% Opening

-

-

-

-25.65

-

-

-0.9

-

-

-0.36

-

-

... More
Fourth Floor

-

-

-

... More
Exterior Wall

77.4

-

-

... More
boxing offset

19.44

-

-

... More
window offset

38.88

-

-

... More
Deduct 50% Opening

-

-

-

-25.65

-

-

-0.9

-

-

-0.36

-

-

... More
Fifth Floor

-

-

-

... More
Exterior Wall

77.4

-

-

... More
boxing offset

19.44

-

-

... More
window offset

38.88

-

-

... More
Terrace Wall

74.88

-

-

... More
Deduct 50% Opening

-

-

-

-25.65

-

-

-0.9

-

-

-0.36

-

-

... More
Terrace Floor

-

-

-

... More
Mumty & LMR

74.88

-

-

... More
Parapet Wall (both side)

192

-

-

... More
Deduct 50% Opening

-

-

-

... More
LMR door

-2.4

-

-

-4.05

-

-

... More
Extra for plastering of exterior walls when height exceeds 10m above ground level for every additional height of 3.0m or part thereof.

-

-

-

... More
Third Floor

370.71

8341

22.5

... More
Fourth Floor

370.71

16682

45

... More
Fifth Floor

445.59

30078

67.5

... More
Sixth Floor

346.83

31215

90

... More
Applying one coat of cement primer on wall surface (applied @0.80 litrs/10 sqm) complete.

-

-

-

... More
Qty. of 12/15mm thick plaster

7478.72

172011

23

... More
Providing and applying 2mm thick ready mix exterior grade approved make putty (like Birla wall care, Alltek Superfine W/R of (NCL), Asian, ICI, Nerolac, J.K. wall putty) on walls to make the surface smooth and even.

-

-

-

... More
Qty. of 6mm thick plaster

3390.32

-

-

... More
Qty. of 12/15mm thick plaster

7478.72

-

-

... More
Qty. of 18mm thick plaster

2752.74

-

-

... More
Wall painting with acrylic premium emulsion (plastic) paint of required shade to give an even shade.

-

-

-

... More
On new work (two or more coats)

-

-

-

... More
Qty. of 6mm thick plaster

3390.32

-

-

... More
Qty. of 12/15mm thick plaster

7478.72

-

-

... More
Painting exterior surface with PREMIUM ACRYLIC SMOOTH exterior paint of required shade as per manufacturer's specifications to give protective and decorative finish including cleaning washing of surface etc. complete with:

-

-

-

... More
On new work (Two or more coats applied @ 1.43 ltr/ 10 sqm over and including priming coat of exterior primer applied @ 2.20 kg/ 10 sqm)

-

-

-

... More
Qty. of 18mm thick plaster

2752.74

-

-

... More
Providing stainless steel railing/ grill made of S.S. flats, hollow S.S. pipe or square/ rectangular sections of approved design fixing in stair case, balcony or other places with metal fasteners and stainless steel bolts etc complete.

-

-

-

... More
SS Grade 204

-

-

-

... More
Staircase- All Floor 7.5kg/sqm

360

-

-

... More
Painting on new work (two or more coats) to give an even shade with:

-

-

-

... More
Premium synthetic enamel paint

-

-

-

... More
Window Grill

-

-

-

415.53

-

-

36.45

-

-

43.74

-

-

9.72

-

-

6.8

-

-

... More
Lock up Grill

29.16

-

-

... More
Providing and laying Melamine polish on new wood work (two or more coats) with spray machine after preparing surface by rubbing down smooth with sand papers, preparation of surface, applying 5 to 10 coats of French sprit polish, applying two coats of Melamine sealer and finally applying two coats of Melamine clear as per manufacturers specifications complete:

-

-

-

10.37

-

-

120.96

-

-

230.4

-

-

120.96

-

-

... More
Providing and laying water proofing treatment in sunken portion of WCs, bathroom, kitchen etc., by applying cement slurry mixed with water proofing cement compound consisting of following applications including surface preparation:

-

-

-

... More
i) First layer of slurry of cement @ 0.488 kg/sqm mixed with water proofing cement compound @ 0.253 kg/sqm. This layer will be allowed to air cure for 4 hours.

-

-

-

... More
ii) Second layer of slurry of cement @ 0.242 kg/sqm mixed with water proofing cement compound@ 0.126 kg/sqm. This layer will be allowed to air cure for 4 hours followed with water curing for 48 hours. The rate includes treatment and sealing of all joints, corners, junctions of pipes and masonry with polymer mixed slurry.

-

-

-

... More
First Floor

-

-

-

... More
Toilet M & F

30.34

-

-

... More
Toilet

10.08

-

-

... More
Wall Surface

-

-

-

... More
Toilet M & F

14.04

-

-

... More
Second Floor

62.56

-

-

... More
Third Floor

62.56

-

-

... More
Fourth Floor

62.56

-

-

... More
Fifth Floor

62.56

-

-

... More
Sixth Floor

-

-

-

... More
Toilet

10.08

-

-

... More
Wall Surface

-

-

-

... More
Providing gola 75x75 mm in cement concrete 1:2:4 (1 cement : 2 coarse sand : 4 stone aggregate 10mm and down grade) including finishing with cement mortar 1:3 (1 cement : 3 fine sand) as per standard design :

-

-

-

... More
Six Floor Terrace wall

32

-

-

... More
Terrace Floor

80

-

-

... More
Designing, providing and fixing aluminium frame work made of special aluminium section on building face with M.S. angle iron brackets fixed on RCC structure with S.S. hold fasteners, including providing and fixing two sided structural adhesive tape of appropriate grade (NORTON or equivalent), on aluminium sections for fixing aluminium/ glass panel, sealing on periphery of frame work, by providing EPDM gasket, silicon weather sealant between aluminium frame and building structure including hire charges of double scaffolding complete.

-

-

-

... More
Providing and fixing laminated glass sheet of 8.76mm thickness in approved sizes on aluminium frame work on face of building. (Frame to be paid for separately).

-

-

-

... More
Providing and laying integral cement based water proofing treatment on roofs, balconies, terraces etc with average thickness of 120mm and minimum thickness at khurra as 65 mm, consisting of following operations including surface preparation: i) Applying a slurry coat of neat cement using 2.75 kg/sqm. of cement mixed with water proofing compound conforming to IS. 2645 over the RCC slab including adjoining walls upto 300mm height. ii) Laying brick bats with mortar using broken bricks/brick bats 25 mm to 115mm size with 50% of cement mortar 1:5 (1 cement : 5 coarse sand) mixed with water proofing compound conforming to IS : 2645 over 20 mm thick layer of cement mortar of mix 1:5 (1 cement :5 coarse sand ) mixed with water proofing compound conforming to IS : 2645 to required slope and treating similarly the adjoining walls upto 300 mm height including rounding of junctions of walls and slabs. iii) After two days of proper curing applying a second coat of cement slurry using 2.75kg/ sqm of cement admixed with water proofing compound conforming to IS : 2645. iv) Finishing the surface with 20 mm thick jointless cement mortar of mix 1:4 (1 cement :4 coarse sand) mixed with water proofing compound conforming to IS : 2645 including laying glass fibre cloth of approved quality in top layer of plaster and finally finishing the surface with trowel with neat cement slurry and making pattern of 300x300 mm square 3mm deep. v) The whole terrace so finished shall be flooded with water for a minimum period of two weeks for curing and for final test. All above operations to be done in order:

-

-

-

... More
Sixth Floor

61

-

-

... More
Terrace Floor

360

-

-



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.