Summary

Repair And Maint To Ht Equipment, Vcbs, Rmus And Lt Distribution Network And Other Connected Works At 3brd Af Stn Chandigarh Under Ge (af) Mc Chandigarh

BOQ Items
ItemQuantityUnitsRateAmount
... more
Note for Srl Item No. 38.01 to 38.04 The payment shall be made on actual weight basis i.e. actual weight of finished coil after varnishing and baking.
038.5 -
... more
S&F in replacement microprocessor Numerical relay of VCB, complete all as specified and as directed by the Engineer-In-Charge. Make :- Crompton Greaves Model No CGI 14N or equivalent of Schneider/Legrand
5Each59 -
... more
200/250 KVA Capacity Transformer
8Each35.02 -
... more
300/400 KVA Capacity Transformer
8Each37.03 -
... more
Material and labour in replacement of HT bushing Gun metal Rod complete with nuts bolts and washer complete all as specified and as directed by the Engineer-In-Charge for following:-
036 -
... more
S&F in replacement Control Wiring 1.5 sqmm FRLS PVC insulated copper conductor for control circuits and 2.5 sqmm FRLS PVC insulated copper conductor for CT circuits as per existing diagram including provided cable ties, beading etc of VCB or RMU, complete all as specified and as directed by the Engineer-In-Charge. Make of wire:- FINOLEX / L & T / RPG / POLYCAB / GRANDLAY
12Each Job66 -
... more
Replacement of HV Coil in copper winding with insulation varnishing and baking coil assembly.
500Kg38.03 -
... more
S&F in replacement indicator lamps as per existing colour code for 11 KV VCB & RMUs, complete all as specified and as directed by the Engineer-In-Charge. Make :- L&T/AE/Secure /Schneider
20Each56 -
... more
All as per Srl Item No. 12.00 here-in-before but out door type, complete all as specified and directed by Engineer-in-Charge. Make: Denson/ M Seal/3M
10Each Job13 -
... more
S&F in replacement Closing coil 24 V DC of VCB trolley as per existing sample, complete all as specified and as directed by the Engineer-In-Charge.
5Each62 -
... more
S&F in replacement multifunction meter for 11 KV VCB as per existing sample, complete all as specified and as directed by the Engineer-In-Charge. Make :- Schneider Model Conzerv M 6459 or equivalent of L&T/Legrand
7Each55 -
... more
300/400 KVA Capacity Transformer
8Each35.03 -
... more
S&F in replacement Resin encapsulated vacuum interrupter bottles of the same specification as per existing sample of circuit breaker trolley of 11 KV VCB, complete all as specified and as directed by the Engineer-In-Charge. Make : ABB/ Schneider/ Crompton Greaves/ Siemens/ ITL.
2Set of three65 -
... more
Removing excavated material to a distance n.exc 50 m & depositing where directed at a level n.exc 1.50 m above the starting point, complete all as specified and directed by Engineer-in-Charge.
36Cum3 -
... more
75/125 KVA Capacity Transformer.
8Each35.01 -
... more
Replacement of LV leg coil in aluminum winding with insulation varnishing and baking coil assembly.
250Kg38.02 -
... more
All as per item No 46.00 here-in-before but for RMU 4 way , complete all as specified and as directed by the Engineer-In-Charge.
5Each Job47 -
... more
50 mm bore
120RM39.02 -
... more
Disconnecting/removing of HT/LT cable and earth connections opening of the transformer aluminium/copper wound 11KV/433 volts, 200/250 KVA capacity outdoor/indoor type, transformer of any make, draining out of the transformer oil taking out core and coil assembly, removing of the burnt part i.e tape, paper, insulation strips etc gently & carefully, washing of the dust, rust and dirt from all parts including core,tank and cooling tubes, removing of existing paint and re-assembling after suitable repair/replacement of parts, baking on dust proof oven and testing, complete all as specified and as directed by the Engineer-in- Charge.
15Each30 -
... more
4 Pole structure
4Each Job20.04 -
... more
v) The above shall however does not absolve the responsibility of the Contractor for rectification of any defects if any noticed during guarantee period of 1 year as per condition 46 of IAFW-2249 and the Contractor shall be solely responsible for entire completion of the work and for rectification of the defects/replacement of the items/parts as required & pointed out by the GE During defects liability of One year. vi)  Payment only for dehydration of the transformer oil & painting of the transformer & Replacement of certain items considered separately here-in-after shall only be made for separately & all other minor repairs/replacement required & ordered by the Engineer-in-Charge for entire completion of the work shall be deemed to be included in the unit rate of the above items. vii) Cleaning of the breathers shall be included in the quoted rates.
032.02 -
... more
300/400 KVA Capacity Transformer.
6Each34.03 -
... more
Note for Srl. Item No. 29.00 to 31.00 here-in-before The unit rates quoted by the contractor shall be deemed to include the following also:- i) The Contractor shall produce test certificates as per IS-2026 along with high voltage tests from the firm after repairs. ii) The rates quoted by tenderer shall include for transportation of transformer from sub station to work shop and again transporting the same back after repairs and installation, commissioning to the existing location of 2pole/4pole structure or inside sub station building all directed by Engineer-in-Charge. iii)  All the testing arrangement shall be provided by the Contractor without any extra payment. iv) The contractor shall also furnish a guarantee certificate himself and from the firm where the transformer are repaired by the contractor for rectification of defects, if any noticed during defect liability period of 24 months from certified date of completion.
032.01 -
... more
All as per Srl Item No. 12.00 here-in-before but for straight through, complete all as specified and directed by Engineer-in-Charge. Make: Denson/ M Seal/3M
17Each Job14 -
... more
S&F in replacement spring charging motor AC /DC of VCB trolley as per existing sample, complete all as specified and as directed by the Engineer-In-Charge. Make:- DELCO/ Electra.
2Each Job51 -
... more
M&L for preparation of rusted surface of HT/LT steel pole with brackets of any size/shape/type at any height and painting with aluminium paint and alternate color of sky blue 3 strip and white paint 2 strip of 30 cm height at bottom of the pole (1.5 Mtr from ground) and numbering the pole 5 cm height black paint with back ground yellow paint 10 cm dia circle complete all as specified and directed by Engineer-in-Charge.
150Each16 -
... more
S&F in replacement Plug & socket assembly as per existing sample of VCB trolley , complete all as specified and as directed by the Engineer-In-Charge.
7Each64 -
... more
Replacement of LV leg coil in copper winding with insulation varnishing and baking coil assembly.
500Kg38.04 -
... more
Taking out old unserviceable heavy duty long neck thimble from HT cable end, Supply and fix aluminium heavy duty long neck thimble of following size with using crimping tool including shutdown arrangement, complete all as specified and as directed by the Engineer-In-Charge for the followings.
044 -
... more
75/125 KVA Capacity Transformer
6Each34.01 -
... more
S&F in replacement volt meter digital type, 96 x 96 mm, 0-12 KV with built in selector switch complete for VCB 11 KV & RMU , complete all as specified and as directed by the Engineer-In-Charge. Make : L&T/AE/Secure/ Schneider/ Legrand/ Hager
5Each54 -
... more
80 mm bore
100RM39.01 -
... more
Supply and fixing Cold shrinkable joint HT 11 KV indoor type cable end termination cable jointing kit suitable for XLPE cable aluminium conductor size 120sq mm to 185 sq mm 3 core with earth system with necessary jointing materials jointing/connecting and testing , including preparation for jointing i.e cut the old joint and making the preparation for new joint including taking down old joints, complete all as specified and directed by Engineer-in-Charge. Make: Denson/ M Seal
15Each Job12 -
... more
Taking out existing HT cable 11 KV and testing the defects and relaying the same in excavated trench after rectification of cable 3 core 185 sq mm / or any size laid from Sub stn to sub stn, complete all as specified and directed by Engineer-in-Charge. Note: Excavation will be measured and paid separately under respective iten of this schedule.
400RM26 -
... more
Disconnecting of HT connections and DC connections from existing bus bar and disconnecting trolley including servicing of complete parts of VCB, cleaning with carbon tetra chloride, lubrication of mechanical parts, adjustment and calibration of complete relays etc and checking complete parts, repairs to control wiring with single core PVC insulated copper conductors of existing size as required at site of VCB of make Crompton Greaves of capacity 630 Amp for satisfactory running and replacement of defective spare parts, applying one coat of 11 KV insulation paint on busbar, spouts and other connected parts and reassembling the same re-connecting all HT & AC / DC connections complete in functional order including testing on existing load complete all as specified and directed. Note :- (i) Spare parts shall be measured and paid for separately under respective items of this schedule as supply only (in replacement). These shall be identical to those specified by original manufacturer and small parts such as nuts, bolts, screws & washers required at site are deemed to be included in the cost quoted by the contractor, complete all as specified and as directed by the Engineer-In-Charge. (ii) Calibration to be done by OEM or PSEB. Test report alongwith guarantee certificate to be provided after the test.
12Each Job50 -
... more
S&F in replacement motor cut off switch for spring charging motor of VCB trolley as per existing sample , complete all as specified and as directed by the Engineer-In-Charge.
5Each Job52 -
... more
Supply and fixing breather assembly for transformer 250 KVA to 400 KVA including dismantling old unserviceable breather, complete all as specified and directed by Engineer-in-Charge.
20Each Job18 -
... more
Disconnection of HT connections and DC connections from existing bus bar and disconnecting trolley including servicing of complete parts of RMU 3 way, cleaning with carbon tetra chloride, lubrication of mechanical parts, adjustment and calibration of complete relays etc and checking complete parts, repairs to control wiring with single core copper conductors of existing size as required at site (RMU of make ABB/ITL/Siemens) for satisfactory running and replacement of defective spare parts, applying one coat of 11 KV insulation paint on bus bar, spouts and other connected parts and reassembling the same re-connecting all HT & AC / DC connections complete in functional order including testing on existing load complete all as specified and as directed. Note :- (i) Spare parts shall be measured and paid for separately under respective items of this schedule as supply only (in replacement). These shall be identical to those specified by original manufacturer and Small parts such as nuts, bolts, screw & washers required at site are deemed to be included in the cost quoted by the contractor, complete all as specified and as directed by the Engineer-in-Charge. (ii) Calibration to be done by OEM or PSEB. Test report alongwith guarantee certificate to be provided after the test.
3Each Job46 -
... more
M&L for preparation for painting including removing dust flake etc and painting with synthetic enamel paint with spray painting method one coat of approved colour for power transformer complete of following capacity , complete all as specified and directed by Engineer-in-Charge:-
020 -
... more
Taking out existing unserviceable 11 KV Potential transformer of ratio of 11000/110 supply, fixing, commissioning and testing of potential Transforms of ratio of 11000/110 all as directed and specified by Engr - In- Charge. Note. The work includes taking out old unsv PT, new PT fitting and related minor parts if required, complete all as specified and as directed by the Engineer-In-Charge.
3Set of three41 -
... more
300/400 KVA Capacity Transformer
12Each36.03 -
... more
Disconnecting/removing of HT/LT cable and earth connections opening of the transformer aluminium/copper wound 11KV/433 volts, 75/100 KVA capacity outdoor/indoor type, transformer of any make, draining out of the transformer oil taking out core and coil assembly, removing of the burnt part i.e tape, paper, insulation strips etc gently & carefully, washing of the dust, rust and dirt from all parts including core,tank and cooling tubes, removing of existing paint and re-assembling after suitable repair/replacement of parts, baking on dust proof oven and testing, complete all as specified and as directed by the Engineer-in- Charge.
10Each29 -
... more
Material and labour for Boring/drilling holes underneath road / PCC manually including insertion HDPE pipe of 80mm dia of pressure 0.4 Mpa, complete all as specified and as directed by the Engineer-In-Charge.
100RM40 -
... more
Material and labour for find out HT 11 KV cable fault locating instrument suitable to locate and pin point of the cable sizes of 120, 150, 185 and 225 x 3 core all as directed and specified by engineer incharge, complete all as specified and as directed by the Engineer-in-Charge.
14Each Job43 -
... more
Supply & fixing in replacement of unserviceable HT Feeder Pillar Box 11 KV made out of MS sheet of size 3.00 mm thick , 3 Nos copper bus bar of size 50 mm x 10 mm x 0.45 Mtr fixed on HT 6 Nos insulators 11 KV of size 1 M X 1.2 M x 0.60 MM with legs made out of MS angle 50X50X10 mm & 0.75 Mtr in length , locking arrangements and tested, complete all as specified and directed by Engineer-in-Charge.
8Each 17 -
... more
Supply, laying and testing of HT cable XLPE insulated screened PVC bedded galvanized steel grip or wire armoured electric power cable (heavy duty) 11000 volts grade with stranded aluminium conductor including making input and output connections with using suitable size of thimbles and gland complete all as directed for size 3 core 150 sqmm complete all as specified and directed by Engineer-in-Charge.
400Rm 8 -
... more
200/250 KVA Capacity Transformer.
10Each37.02 -
... more
Material and labour in replacement of LT bushing complete with gasket set complete all as specified and as directed by the Engineer-In-Charge for the following:-
035 -
... more
Laying only old bricks taking out as excavation ( item No 1.00 ) of existing cable for cable protection, complete all as specified and directed by Engineer-in-Charge.
1000Each6 -
... more
Taking down U/S lightning arresters from two/four pole structure and supply & fix lightning arresters expulsion type complete with all fittings, transmission class, of discharge capacity 65 Kilo Amps complete suitable for 11000 volts, complete all as specified and directed by Engineer-in-Charge. Make: Jaipuria/Atlas
1Set of three11 -
... more
Material and labour earthling complete with GI earth electrode , 60x60 cmx6 mm thick , buried directly in ground (earth pit not less than 2.25 meters deep below ground level) with top edge of the plate not less than 1.5 meters below normal ground level, connected to GI strip of size 32x6 mm by means of bolts , nuts , check nuts and washers of galvanised iron or steel all as shown in electrical plate No-3 connected to earthing test point all as specified including PCC pit type C-1 (1:3:6) using 20mm graded stone aggregate in cement concrete & 40 mm thick precast RCC cover in (1:2:4) type B-1 using 20mm graded stone aggregate reinforced with 8 mm dia MS round bar @ 75 c/c both ways with 02 Nos lifting handles of 12 mm dia MS plain bar, GI pipe 20 mm dia light grade with funnels and wire mesh for watering and 40 mm dia light grade GI pipe for earth lead protection, including earth work etc, complete all as specified and as directed by the Engineer-in-Charge. Note:- GI strip and protection pipe of 40 mm dia upto 7.5 metre length is deemed included in the rate quoted.
20Each28 -
... more
Supply and filling silica gel in the transformer breather assembly including taking out unserviceable gel, complete all as specified and directed by Engineer-in-Charge.
10Kg24 -
... more
Material and labour GI light grade pipe for protection of cable complete all as specified and as directed by the Engineer-In-Charge for the following size:- Make: Tata/Swastic/Jindal/Prakash
039 -
... more
M&L for dry sand cushioning to under ground cable in trenches incl spreading, leveling and hand punning, complete all as specified and directed by Engineer-in-Charge.
40Cum4 -
... more
Supply and laying stone aggregate for surrounding of sub stns /4 pole structure of size 60 to 90 mm, complete all as specified and directed by Engineer-in-Charge.
20Cum25 -
... more
Excavation in trenches, n.exc 1.5 m wide and n.exc 1.5 m depth and getting out in any type of soil for locating fault, laying of cable and pipe or taking out old u/s cable complete and depositing in MES store yard including taking out & stacking old bricks/pipes, etc and making good to the disturb surface, complete all as specified and directed by Engineer-in-Charge.
390Cum1 -
... more
75/160 KVA Capacity Transformer.
8Each37.01 -
... more
Taking out of the following old defective part from existing transformer of capacity 75KVA to 400 KVA of any make and in lieu providing new part in the above transformer, complete all as specified and as directed by the Engineer-in-Charge. Note:- Payment shall be made on actual weight basis i.e. actual weight of finished coil after varnishing and baking.
038 -
... more
Material and labour in replacement of HT busing complete with gasket set complete all as specified and as directed by the Engineer-In-Charge for the following:-
034 -
... more
75/160 KVA Capacity Transformer.
10Each36.01 -
... more
75 KVA to 100 KVA
12Each Job20.01 -
... more
Note for srl item No 12.00 , 13.00 & 14.00 here-in-before:- 1. Removing of cable loop shall deemed included in quoted rate. 2. Earth work will be measured and paid separately under respective item of this schedule.
015 -
... more
S&F in replacement Shunt Tripping coil 24V DC of VCB trolley as per existing sample, complete all as specified and as directed by the Engineer-In-Charge.
6Each61 -
... more
Disconnect HT supply and opening up top and bottom cover of HT panel, checking and tightening of all cable and bus bar connections, checking and tightening of CT/PT connections including cleaning the connection with electric panel spray and providing reinsulation with HT tapes/ HT sleeves as required in bus bars, closing of all holes/gapes with mano plast to arrest entry of rats/squirrel etc, refixing cover, re connecting cable connection, testing and commissioning, complete all as specified and directed by Engineer-in-Charge.
2Set of four 22 -
... more
S&F in replacement spring charging Gear assembly of VCB trolley as per existing sample, complete all as specified and as directed by the Engineer-In-Charge.
4Each60 -
... more
Dismantling of old stampings from core assembly and replaced with new steel stamping as per original pattern and gauge, complete all as specified and as directed by Engineer-in-Charge.
315KG33 -
... more
200/250 KVA Capacity Transformer
6Each34.02 -
... more
All as per item No 46.00 here-in-before but for RMU 5 way , complete all as specified and as directed by the Engineer-In-Charge. .
5Each Job48 -
... more
M&L for filtration of transformer oil of Transformer/ HT OCB/ VL & OD units through streamline filtration plant for extracting moisture content in the oil and carbon deposits and bringing the electric strength to 40 KV for one minute with a gap of 2.5 mm and also checking the acidity test kit and submitting the necessary test report/certificate refilling the filtered oil into transformer/HT OCB etc, complete all as specified and directed by Engineer-in-Charge.
12000Litres21 -
... more
Supply and laying common burnt clay building sub class B old size bricks, laid in right angle along the cable, complete all as specified and directed by Engineer-in-Charge.
5.8Per 1000 Nos5 -
... more
Supply and fixing cross arms ,bracings,supports,clamps and black plates fabricated from structural steel sections including nuts,bolts,washers, welding, bending cold or hot ,drilling holes for bolts, in any shape or size as indicated or directed and inclusive of one coat of red oxide primer , one under coat and one finishing coat of synthetic enamel paint, complete all as specified and directed by Engineer-in-Charge.
2Per Qtl9 -
... more
Supply and fix breather assembly for transformer 100 KVA to 200 KVA including dismantling old unserviceable breather, complete all as specified and directed by Engineer-in-Charge.
10Each Job19 -
... more
400 KVA to 500 KVA
8Each Job20.03 -
... more
Material and labour in replacement of LT busing Gun metal Rod complete with nuts bolts and washer complete all as specified and as directed by the Engineer-In-Charge for following:-
037 -
... more
S&F in replacement common alarm relay voltage range 24-30V DC of VCB, complete all as specified and as directed by the Engineer-In-Charge. Make : Ashida electronics, Type AVAJH13 or equivalent of Schneider/Legrand
6Each58 -
... more
S&F in replacement selector switch suitable for Amp meter / volt meter as per existing sample of 11 KV VCB & RMUs , complete all as specified and as directed by the Engineer-In-Charge. Make :- L&T/Schneider/Legrand
12Each57 -
... more
Taking out existing unserviceable 11 KV Current transformer of ratio of 200/5, 100/5 and 50/1 supply, fixing, commissioning and testing of Current Transforms of ratio of 200/5, 100/5 and 50/1 all as directed and specified by Engr -in- Charge. Note. The work includes taking out old unsv CT, new CT fitting and related minor parts if required, complete all as specified and as directed by the Engineer-in-Charge.
3Set of three42 -
... more
S&F in replacement Ampere meter digital type, 96 x 96 mm, 0-200 Amp with built in selector switch complete for VCB 11 KV, complete all as specified and as directed by the Engineer-In-Charge. Make : L&T/AE/Secure/ Schneider/ Legrand/ Hager
5Each53 -
... more
Taking down unserviceable GOD from existing two/four pole structure and Supply and fix Air Break, Gang operated Triple pole switches/device , mechanically operated, mounted on insulator and steel frame, with operating mechanism of GI tubing 25 mm suitable length worked from ground level including locking accessories complete for current rating up to 400 Amps complete all as specified and directed by Engr in Charge. Make: Jaipuria/Atlas
1Each set 10 -
... more
Shifting of Transformer or VL/OD unit any capacity from substation to substation with in 500 Mtr distance including disconnecting incoming and outgoing electrical connections and connecting all electrical connection and testing, complete all as directed and specified by Engineer - charge.
10Each Job45 -
... more
All as per item No 46.00 here-in-before but for RMU 6 way , complete all as specified and as directed by the Engineer-In-Charge.
4Each Job49 -
... more
Repair/Rectification the leakage of Gas (SF 6 ) of 4 way RMU and refill Gas (SF6) of 4 way RMU at required pressure and testing complete including servicing of complete parts of RMU 4 way, cleaning with carbon tetra chloride, lubrication of mechanical parts, adjustment and calibration of complete relays etc and checking complete parts, repairs to control wiring with single core copper conductors of existing size as required at site for satisfactory running and replacement of defective spare parts, applying one coat of 11 KV insulation paint on bus bar, spouts and other connected parts and reassembling the same re-connecting all HT & AC / DC connections complete in functional order including testing on existing load , complete all as specified and as directed by the Engineer-In-Charge. Note:- Calibration to be done by OEM or PSEB. Test report alongwith guarantee certificate to be provided after the test.
1Each Job68 -
... more
Taking down the unserviceable RMU 4/5/6 way from sub station and Transporting to civil workshop replace the burnt parts i.e HT insulator, HT bus bar, etc including servicing of complete parts of RMU 4/5/6 way, cleaning with carbon tetra chloride, lubrication of mechanical parts, adjustment and calibration of complete relays etc and checking complete parts, repairs to control wiring with single core copper conductors of existing size as required at site (RMU of make ABB/ITL/Siemens) for satisfactory running and replacement of defective spare parts, applying one coat of 11 KV insulation paint on bus bar, spouts and other connected parts and reassembling the same re-connecting all HT & AC / DC connections complete in functional order including testing on existing load , complete all as specified and as directed by the Engineer-In-Charge. Note:- Calibration to be done by OEM or PSEB. Test report alongwith guarantee certificate to be provided after the test.
2Each Job67 -
... more
95 sq mm to 120 sq mm
100Each 44.01 -
... more
S&F in replacement Power pack with input 220-110V AC and output 24V DC of VCB as per existing sample , complete all as specified and as directed by the Engineer-In-Charge. Make:- Mahamai/Alan/Gagate.
6Each63 -
... more
150 sq mm to 185 sq mm
100Each 44.02 -
... more
200 KVA to 300 KVA
13Each Job20.02 -
... more
200/250 KVA Capacity Transformer.
8Each36.02 -
... more
Replacement of HV leg coil in Aluminum winding with insulation varnishing and baking coil assembly.
250Kg38.01 -
... more
Supply and filling transformer oil (up to 65 KV ) duly filtered conforming to IS 335-1963 as amended including testing , complete all as specified and directed by Engineer-in-Charge. Make: Savita/Power oil
1000Ltr23 -
... more
Disconnecting/removing of HT/LT cable and earth connections opening of the transformer aluminium/copper wound 11KV/433 volts, 300/400 KVA capacity outdoor/indoor type, transformer of any make, draining out of the transformer oil taking out core and coil assembly, removing of the burnt part i.e tape, paper, insulation strips etc gently & carefully, washing of the dust, rust and dirt from all parts including core,tank and cooling tubes, removing of existing paint and re-assembling after suitable repair/replacement of parts, baking on dust proof oven and testing, complete all as specified and as directed by the Engineer-in- Charge.
10Each31 -
... more
Returning and filling in, including spreading and well ramming in layers n.exc 25 cm, complete all as specified and directed by Engineer-in-Charge.
354Cum2 -
... more
Supply, laying and testing of HT cable XLPE insulated screened PVC bedded galvanized steel grip or wire armoured electric power cable (heavy duty) 11000 volts grade with stranded aluminium conductor including making input and output connections with using suitable size of thimbles and gland complete all as directed for size 3 core 185 sqmm complete all as specified and directed by Engineer-in-Charge.
475Rm 7 -
... more
Calibration of HT Micom relays 11 KV through primary and secondary injection method and testing complete relays like IDMT relays instantaneous earth fault relay and over load relay on HT VCB panel and control relay panel etc, complete all as specified and directed by Engineer-in-Charge.
8Each 27 -

CA NO. CWE/TKD/CHD/TOKEN-14/2018-19 Srl Page No. 10 APPENDIX 'A' TO NOTICE INVITING TENDER (NIT) Commander Works Engineer, Air Force, Tughlakabad, New Delhi-110080 on behalf of President of India invites applications from eligible enlisted contractors of MES and enlisted/ Un-enlisted contractors working with other Govt. Departments meeting eligibility criteria for considering the tender. The prospective/likely contractors are requested to look up the website “eprocuremes.gov.in” This is and e- tender, manual offered bids for this tender will not be accepted under any circumstances, only electronic offer bids shall be accepted. For detailed instructions, please refer the website. Tender information is also available in www. mes.gov. in. A condensed version of Notice of Tender to be read with main Notice of Tender (IAFW-2160 Revised 1960) is submitted. 1. Name of work : REPAIR AND MAINT TO HT EQUIPMENT, VCB’S, RMU’S AND LT DISTRIBUTION NETWORK AND OTHER CONNECTED WORKS AT 3BRD AF STN CHANDIGARH UNDER GE (AF) MC CHANDIGARH 2. Estimated Cost of Work : RS 30.00 LAKHS 3. Period of completion : 180 Days 4. Cost of tender documents : Rs 500/- in the shape of DD/Bankers cheque from any schedule Bank in favour of GE (AF) MC Chandigarh and payable at Chandigarh. 5. Website/portal address : www.edefproc.gov.in and www.mes.gov.in 6. Type of contract : he tender shall be Item Rate Contract based on IAFW-1779A and General Conditions of Contract (IAFW-2249) with Schedule ‘A’ (list of items of work) to be quoted by the contractor. 7. Information & Details :- (a) Bid submission start date Refer critical dates (b) Last date of bid submission (c) Date of bid opening 8. Eligibility Criteria (a) For MES enlisted contractor : All contractor enlisted with MES in Class ‘D’ and above and category b (ii) subject to the remarks w.r.t. performance in respect of Wks in hand reflected in Workload return (WLR) circulated by competent engineer authority. Refer Note-below (b) For other contractors : (a) The firm not enlisted with MES shall meet the enlistment criteria of ‘D’ class MES contractors & category b (ii) i.e. with regard to having satisfactorily completed requisite value works. Annual turnover, Solvency, working capital, immovable property/fixed assets, T&P, Engineering establishment, no recovery outstanding in any Govt Department, Police verification/Passport etc. As per enlistment criteria given in Para 1.4 and 1.5 of Section 1 Part of I of MES Manual Contracts-2007 (Reprint 2012) as available in all MES Formations. (b) These firms shall also submit copy of police verification from police authority of the area where the registered office of the firm is located/notarised copy of valid passport of proprietor/each partner/each Director. (c) Firm should not carry adverse remarks in WLR or any other similar report of any authority. (c) For all contractors : Contractor will not be allowed to execute the work by subletting or through power of attorney holder on his behalf to a third party/another firm except sons/daughters/spouse of proprietor/partner/ Director and firm’s own employees, Director, Project Manager. This shall be subject to certain conditions which will be prescribed in the NOT forming part of the tender documents. 9. Tender issuing and Accepting Officer : HQ CWE (AF) TUGHLAKABAD, NEW DELHI 10 Executing agency : GE (AF) MC Chandigarh CA NO. CWE/TKD/CHD/TOKEN-14/2018-19 Srl Page No. 11 11 Earnest Money : Rs 60,000/- in form of DD/ Banker's cheque from any Scheduled/Nationalized bank in favour of GE (AF) MC Chandigarh payable at Chandigarh. MES enlisted contractor are exempted from submission of EMD (copy to be uploaded online and original to fwd offline to receive before due date) NOTES : (a) Contractor one class below (two class below in case

Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.