Rural Works Department Tender
With BidAssist, you can search for multiple business options for RWD Bihar tenders, RCD Bihar tenders, and any other e tender Bihar government is inviting bids for. Such Bihar tenders are posted on the eprocurement Bihar website, and on this page, you will get consolidated lists of Bihar tenders that can be sorted based on authority, department, city, and more.
Costs
EMD
₹ 58,062Document Cost
Refer DocumentsTender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2018_ECBIH_63727_1Bid Award Id
ViewTender No
BR-23R-457Tender Authority
Rural Works Department ViewPurchaser Address
-Website
http://https://rwdbihar.gov.in/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
... More
Construction of embankment with approved material obtained from borrow pits with a lift upto 1.5 m, transporting to site, spreading, grading to required slope and compacting to meet requirement of Tables 300.1 and 300.2 with a lead upto 1000 m. (RATE OF SUM OF 3.3 AND 3.5)
9.17
1248
136.1
... More
Construction of Subgrade and Earthen Shoulders Construction of subgrade and earthen shoulders with approved material obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of Table 300.2 with lead upto 1000 m as per Technical Specification Clause 303.1.
1403.34
193099
137.6
... More
Construction of granular sub-base by providing coarse graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with vibratory roller to achieve the desired density, complete as per clause 401. For Grading I Material
420.54
1053368
2504.8
... More
WBM Grading 3 ( By Manual Means ) Providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with 3 wheeled steel/ vibratory roller 8-10 tonnes in stages to proper grade and camber, applying and brooming requisite type of screening/ binding Materials to fill up the interstices of coarse aggregate, watering and compacting to the required density.
146.01
446866
3060.52
... More
Providing and applying primer coat with Bitumen emulsion (SS-1) on prepared surface of granular base including cleaning of road surface and spraying primer at the rate of 0.90- 1.2 kg/sqm using mechanical means as per Technical Specification Clause 502.
1946.92
89052
45.74
... More
Providing and applying tack coat with Bitumen emulsion (RS-1) using emulsion distributor at the rate of 0.25-0.30kg per sqm on the prepared granular surfaces treated with primer & cleaned with Hydraulic broom as per Technical Specification Clause 503.
1946.92
29632
15.22
... More
Mix Seal Surfacing Providing, laying and rolling of close-graded premix surfacing material of 20 mm thickness composed of 11.2 mm to 0.9 mm (Type-A) or 13.2 mm to 0.9 mm (Type-B) aggregates using penetration grade bitumen to required line, grade and level to serve as wearing course on a previously prepared base, including mixing in a suitable plant, laying and rolling with a three wheel 8-10 kN static roller and finishing to required level and grades as per Technical Specification Clause 509
1946.92
382005
196.21
... More
Ordinary Kilometer Stone (Precast)
2
4289
2144.55
... More
200 m stone (precast)
2
1203
601.81
... More
600 mm equilateral & triangle, OR
3
4960
1653.62
... More
800 mm x 600 mm rectangular, OR
2
3634
1817.44
... More
900 mm side octagon, OR
2
3829
1914.51
... More
Providing and laying of hot applied thermoplastic compound 2.5 mm thick including reflectorising glass beads @ 250 gms per sqm area, thickness of 2.5 mm is exclusive of surface applied glass beads as per IRC:35 . The finished surface to be level , uniform and free from streaks and holes.
2
5399
2699.64
... More
Road Marking with Hot Applied Thermoplastic Compound with Reflectorising Glass Beads on Bituminous Surface
101.8
82458
810
... More
(I)Providing and Fixing 'Logo' of PMGSY Project
2
16187
8093.67
... More
( III ) Providing & Fixing of LOGO of "Citizen Information Board"
2
19000
9500
... More
Earthwork in excavation for structures as per drawing and technical specification clause 305.1 including setting out const. of shoring and bracing, removal of stumps and other delitarious matter, and disposal upto a lead of 50m, dressing of sides and bottom and backfilling in treanches with excavated suitable material.
36.62
8745
238.83
... More
Laying cement concrete bedding in M 10 as per clause 1105 ( ii )
3.63
19128
5269.44
... More
Providing concrete for plain/ reinforced concrete in open foundation complete as per drawing and technical specification clause 802,803,1202,&1203.
2.65
13964
5269.44
... More
Brick masonry work in cement mortar in substructure complete excepting pointing and plastering, as per drawing and technical specification Clauses 602, 603, 604, 1202 & 1204
26.51
156363
5898.3
... More
1000 mm Pipe in Single Row
7.5
29845
3979.35
... More
Pointing with CM 1:3 on brickwork as per technical specification clause 613.4
31.98
1825
57.07
... More
Filling in foundation trenches as per drawing and technical specification clause 305.3.9
6.1
2389
391.72
... More
Maintenance cost of Project road for the Ist year=
1
19562
19562.69
... More
Maintenance cost of Project road for the 2nd year=
1
12798
12798.81
... More
Maintenance cost of Project road for the 3rd year=
1
79735
79735.69
... More
Maintenance cost of Project road for the 4th year=
1
86944
86944.53
... More
Maintenance cost of Project road for the 5th year=
1
115707
115707.45
Evaluation Notes How It Works ?
Potential Partner