Rural Works Department Tender
With BidAssist, you can search for multiple business options for RWD Bihar tenders, RCD Bihar tenders, and any other e tender Bihar government is inviting bids for. Such Bihar tenders are posted on the eprocurement Bihar website, and on this page, you will get consolidated lists of Bihar tenders that can be sorted based on authority, department, city, and more.
Rural Works Department - RWD Tender
Eprocure
Opening Date27 Jun 2018
Closing Date3 Jul 2018
Tender Amount₹ 2,86,95,934
Costs
EMD
₹ 5,73,919Document Cost
Refer DocumentsTender Fee
Refer Documents
Summary
Construction of road from Churli To Pathariya Via Dhapodangi, Jogi Tola Hote Hue Gidingola Tak
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2018_ECBIH_65131_1Bid Award Id
ViewTender No
FDR-18-KISHANGANJ-2-14Tender Authority
Rural Works Department ViewPurchaser Address
-Website
http://https://rwdbihar.gov.in/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
Providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with three wheel 80-100 kN static roller in stages to proper grade and camber, applying and brooming, crushable screening to fill-up the interstices of coarse aggregate, watering and compacting to the required density Grading 3 as per Technical Specification Clause 405.
1198.13
2944248
2457.37
Providing and applying primer coat with Bitumen emulsion (SS-1) on prepared surface of granular base including cleaning of road surface and spraying primer at the rate of 0.90- 1.2 kg/sqm using mechanical means as per Technical Specification Clause 502.
15975
789804
49.44
Providing and applying tack coat with bitumen emulsion (RS ) using emulsion distributor @ 0.25 to 0.30 kg per sq m on the prepared bituminous surface cleaned with hydraulic broom as per technical specification clause 503.
45000
743400
16.52
Mix Seal Surfacing Providing, laying and rolling of close-graded premix surfacing material of 20 mm thickness composed of 11.2 mm to 0.9 mm (Type-A) or 13.2 mm to 0.9 mm (Type-B) aggregates using penetration grade bitumen to required line, grade and level to serve as wearing course on a previously prepared base, including mixing in a suitable plant, laying and rolling with a three wheel 8-10 kN static roller and finishing to required level and grades as per Technical Specification Clause 509
45000
10347300
229.94
Km Stone
13
28773
2213.33
200 M Stone
48
31088
647.68
600 mm equilateral & triangle, OR
48
282961
5895.04
600 mm circular , OR
30
179007
5966.92
800 mm x 600 mm rectangular, OR
48
291764
6078.43
600 mm x 450 mm rectangular, OR
30
178786
5959.56
Road Marking with Hot Applied Thermoplastic Compound with Reflectorising Glass Beads On Bituminous Surface
2400
2082648
867.77
Boundary Pillar
30
14313
477.13
Direction And Place Indentification Signs Up To 0.9 Sqm Size Board
37
112212
3032.78
(I) Providing and Fixing 'Logo' of PMGSY Project (II) Providing & Fixing of LOGO of "Citizen Information Board (III) Maintenance Board
3
30141
10047.17
Brick Masonary in C.M.(1:3) in parapet
21.84
157848
7227.5
PCC M-20
91
37003
406.63
Plastering with cement mortar (1:4)
152.32
28136
184.72
First Year Maintenance Cost
1
313338
313338
Second Year Maintenance Cost
1
392508
392508
Third Year Maintenance Cost
1
2990422
2990422
Forth Year Maintenance Cost
1
844758
844758
Fifth Year Maintenance Cost
1
3358892
3358892
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements