Indian Oil Corporation Limited Tender

With BidAssist, you can search for multiple business options for RWD Bihar tenders, RCD Bihar tenders, and any other e tender Bihar government is inviting bids for. Such Bihar tenders are posted on the eprocurement Bihar website, and on this page, you will get consolidated lists of Bihar tenders that can be sorted based on authority, department, city, and more.

Indian Oil Corporation Limited - IOCL Tender

Works
Civil And Construction
Pipe Line Project
Eprocure
Opening Date23 Apr 2024
Closing Date14 May 2024
Tender Amount₹ 96,86,057 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Receiving, handling, loading, transportation and unloading of owner supplied PE pipes or any other free issue material from Owner's designated stock yards to Contractor's own stock-yards / work-sites. Proper storing, stacking, identification, providing security and insurance cover for the materials.

-

-

-

... More
Survey of designated area & submission of plan for laying of Medium pressure/Low pressure network/service lines for societies / colonies/ localities shall be done by the contractor. However the MDPE pipe is to be laid on best probable route after discussion with EIC. All the Proposed route/kmz file of medium pressure main pipeline (180/125/90/63) and Low pressure network/service lines 32/20mm dia pipeline, as per site condition shall be discussed and finalised with IOCL/consultant for execution. Further, the scope of contractor also includes preparation of plan/kmz, for any change in route due to site condition for mainline (180/125/90/63) etc. Intimation to all other utility agencies through owner/ CBuD app as per the directives of EIC.

-

-

-

... More
Preparation and getting approval of schedules, execution procedures, drawings / sketches. Finalizing optimum route with consent of EIC.

-

-

-

... More
Uncoiling / stringing, laying and aligning of MDPE pipes in trench, clamping, jointing of the pipe ends / fittings / valves by qualified personnel using approved electro-fusion techniques as per specification. Achieving the desired top cover of MDPE pipeline

-

-

-

... More
Laying using any method with or without casing, survey of the under ground utilities, submission of site plans/layout drawings and HDD profiles for approval by EIC, execution of the work as per the specification, including excavation of the pits, moling with hole size not exceeding 20% of the the pipe dia. Jointing and insertion of the carrier pipe in casing pipe (on case to case basis) and subsequent backfilling, compaction & restoration. Item also includes dewatering from the trench before laying of the pipes if required.

-

-

-

... More
The laying shall be carried out by any methodology as per specification and site requirement as decided by Engineer-in-Charge (EIC).

-

-

-

... More
Lowering the PE pipe line in trench to required depth, padding around pipeline with suitable soil including supply of foreign soil/sand required in rocky area or any hard strata, supply & laying of PE warning mat over the pipeline along the complete route and backfilling with available excavated material, if suitable, after screening or procurement of suitable sand / soil as per directions of EIC. Compaction with manual technique / jumping jack compactor and water at subsequent layers of 150mm, placement of all tiles / slabs / kerb stones etc. removed during excavation. Roads, pavements, footpaths etc. shall be made motorable wherever pipeline is laid and shall be restored to original condition to the satisfaction of respective authority & EIC. Restoration Charges for all tiles / slabs / Kerb stones / Cement Concrete Road / Paver/ Brick soiling/ Asphalt road/ any type of tar road/ Red Sand Stone/ Channels etc. will be paid over and above with the separate SOR item rate

-

-

-

... More
Procurement & installation of Transition fitting, GI end plug at TF for domestic connections/ commercial and industrial installations as per Instruction of Owner/Owner's representative for satisfactory completion of job. Supply & Installation of Transition fitting of any required size for PNG Connection/SR/Domestic/Commercial/Industrial connection is included in the PE laying rate. No separate payment shall be made for supply & installation of TF.

-

-

-

... More
Excavation, breaking through any obstructions, insertion of pipe, sealing the annulus, firm fixing of the sleeves with concrete mix, preparation of concrete pedestal & restoration of excavated pits within the size of pedestal & the same pit with the laying of pipe as defined in technical specification / instruction of EIC. Concrete Padestal construction with supply of GI sleeve is included in the contractor's scope and no separate payment shall be made.

-

-

-

... More
GIS data collection: The scope includes Capturig GIS data of PE network along with all PE valves and fittings and sharing data in format prescribed by EIC/IOCL. The specification of the device to be used for GIS data capturing is part the technical volume. GIS data to be collected prior to backfilling of trenches to locate & depict the as laid underground pipelines on GIS portal. Payment for GIS data collection shall be paid seperately under relevant SOR.

-

-

-

... More
Cleaning the area of all unserviceable materials, debris, excess earth near trenches to the designated disposal area as per specifications, instructions of land owners / EIC to the complete satisfaction of local authorities. Supply & Installation of Pipeline Markers as per relavant SOR

-

-

-

... More
Flushing, cleaning, pneumatic testing, purging with nitrogen and commissioning as per scope of work, specification and approved procedures providing all tools and tackles, nitrogen, instruments, manpower and other related accessories and as per instructions of the EIC/ SIC. Maintaining the completed pipelines/ installation for any defect, failures during defect liability period.

-

-

-

... More
Preparation and submission of as-built drawings, crossings details, termination, utility graphs and deviation statements. Submission of all documents required for contract closure in numbers as mentioned in contract.

-

-

-

... More
Handing over the completed works to owner for their operation/ use, returning of all surplus material to owner stores, reconciliation of free issue material area wise and obtaining no objection certificate.

-

-

-

... More
Submission of as-graphs and as-built drawings as per the attached specification and the instruction of EIC/ Owner.

-

-

-

... More
Final clean-up of right-of-use or area disturbed by contractor during their construction activities for laying of pipeline works and disposal of debris and surplus material to designated disposal areas and backfilling of trench and compaction of the same as per satisfaction of Owner and / or as directed by EIC.

-

-

-

... More
Preparation, Certification and submission of (DPR) daily progress reports, graphs, As-built drawings, crossings details, utility graphs and deviation statements.

-

-

-

... More
Any other activities not mentioned / covered explicitly above, but otherwise required for satisfactory completion / operation / safety / statutory / maintenance of the works shall also be covered under the scope of work and has to be completed by the Contractor within specified schedule.

-

-

-

... More
The list of areas where the pipeline to be laid/ allocation of work will be done after awarding of the tender. The quantities are tentative and it may be changed during the tenure of contract as per the requirement of the Owner.

-

-

-

... More
In case more than 1 MDPE pipelines are laid in a common trench/bundle pulling, SOR rate of higher dia shall be paid as per relevant SOR. Payment for lower dia pipeline which is laid in common shall be made under item of common laying. No Separate payment shall be made for any additional excavation including rocky strata if required for maintaining sufficient gap between two PE pipelines.

-

-

-

... More
PE line should preferably be laid by open cut/moling methodology so that connection can be done easily as and when required. HDD method is allowed only after consent from Engineer In-charge (EIC) for any specific location/stretch for laying of PE line. Shallow depth to be preferred for HDD.

-

-

-

... More
Project area means areas where Low Pressure PE network (63/32mm) is not laid previosly as decided by EIC

-

-

-

... More
O&M area means areas where Low Pressure PE network (63/32mm) PE network is already laid & backfilled or commissioned previously provided line is not laid under same work order as decided by EIC

-

-

-

... More
PE PIPELINE LAYING

-

-

-

... More
PE Pipeline laying work up to backfilling, submission of graphs/reports etc. and completion of pipeline laying work in all respect inculding backfilling. Scope of testing, commissioning is provided under separate item. Supply and installation of TF is also included in the scope of Pipeline laying. Testing, pre-commissioning, commissioning, GIS data collection, HSE compliance shall be paid under relevant SOR wherever applicable.

-

-

-

... More
PE Pipe line laying without casing in all kinds of surfaces & All kinds of Soil/Strata including hard rock using any laying methodology

-

-

-

... More
Payment for cutting of Built-up (PCC/RCC/Asphalt) surfaces shall be made separately under relevent SOR wherever applicable. Paver block shall not be considered as built-up road and dismentalling of paver bloks is included in this item. This item includes laying in hard rock. No separate payment shall be made for rock excavation under any SOR item. If required, Supply of Foreign sand/soil for 150mm thick padding all around pipeline is included under scope.

-

-

-

... More
Laying in O&M Area : Laying of 20 mm dia (Service Line) PE Pipeline up to TF

3500

1451901

-

... More
PE Pipe line laying without casing in all kinds of surfaces & All kinds of Soil/Strata except hard rock stata using any laying methodology

-

-

-

... More
Payment for cutting of Built-up (PCC/RCC/Asphalt) surfaces shall be made separately under relevent SOR wherever applicable. If required, Supply of Foreign sand/soil for 150mm thick padding all around pipeline is included under scope. Paver block shall not be considered as built-up road and dismentalling of paver bloks is included in this item.

-

-

-

... More
Laying of 32 mm dia PE Pipeline in all areas

2500

482915

-

... More
PE Pipe line laying without casing in all kinds of surfaces including built-up & Hard Rock Strata using any laying methodology

-

-

-

... More
This item is applicable where rock breaker/blasting is used for excavation and diamond cutter and other rock drilling tools are used for HDD with approval of EIC. Supply of Foreign sand/soil for 150mm thick padding all around pipeline is included under scope. No separate payment shall be made for rock excavation & cutting of Built-up (PCC/RCC/Asphalt) surfaces under any relevent SOR.

-

-

-

... More
Laying of 32 mm dia PE Pipeline in all areas

10

4313

-

... More
PE Pipe line laying with HDPE casing in all type of soil/surface (normal/hard/CC/Built-up etc.) & Strata including hard rock using any laying methodology

-

-

-

... More
This item is applicable where rock breaker/blasting is used for excavation and diamond cutter and other rock drilling tools are used for HDD with approval of EIC. MDPE pipeline laying by any method with supply & installation of HDPE casing pipe of PE 100 PN 6/ GI casing pipe of heavy class as per specification in all kind of laying like Nala crossing, as per the scope of work, standard procedure, specifications & PNGRB T4S, including excavation of the pits, jointing and insertion of carrier pipe, subsequent backfilling, compaction, end sealing etc. The payment shall be made for length of casing pipe laid, remaining carrier pipe length without casing shall be paid under SOR relevant to laying without casing pipe. No separate payment shall be made for excavation including rocky strata under any SOR item. If required, Supply of Foreign sand/soil for 150mm thick padding all around pipeline is included under scope. No separate payment shall be made for rock excavation & cutting of built-up (PCC/RCC/Asphalt) surfaces under any relevent SOR.

-

-

-

... More
Laying of 20mm/32 mm Dia pipeline (in 63 mm dia HDPE casing pipe /3" GI casing pipe of heavy class) in O&M areas

400

211772

-

... More
20mm PE pipe laying (in project/O&M area) for Padestal/Varandah/Podium Crossing with supply of HDPE casing pipe as per tender reference drawing, HDPE Sleeves/Concrete U blocks & Clamps for protection to PE pipe including niche cutting on wall/platform, brick work, concrete work and any other civil/restoration work as per site condition. For Payment purpose, length of PE pipe shall be considered starting from tapping point of service line (20mm) till transition fitting(Except length of road crossing, if any - Which shall be paid under relevant SOR). No separate payment shall be made for any kind of restoration/civil work done for crossing portion. Length of PE paid under this item shall not be paid under any other item. All work required for safe laying of PE pipe as per PNGRB guideline/IOCL requirement is included in the scope of this SOR.

10

14908

-

... More
PE Pipeline laying in common with another PE pipeline in all type of soil/surface (normal/hard/CC/Built-up etc.) & Strata including Hard rock strata by any methodology

-

-

-

... More
Laying of PE pieline in common with another PE pipeline in same trench or same bore using any methodology in all kind of soil and surface. Payment of higher dia pipeline will be paid as per relevent SOR. For lower dia pipeline which is laid in common, payment shall be made under this SOR. No Separate payment shall be made for any additional excavation including rocky strata if required for maintaining sufficient gap between two PE pipelines. In case two same dia pipeline is laid one will be cosnidered for common laying for which payment shall be made under this item. Testing, pre-commissioning, commissioning shall be paid under relevant SOR. No separate payment shall be made for rock excavation & cutting of built-up (PCC/RCC/Asphalt) surfaces under any relevent SOR.

-

-

-

... More
Laying of PE pipeline in common trench/bore in all areas

100

5794

-

... More
GIS data collection for PE pipeline

-

-

-

... More
The scope includes Capturig GIS data of PE network along with all PE valves and fittings and sharing data in format prescribed by EIC/IOCL. The specification of the device to be used for GIS data capturing is part the technical volume. GIS data to be collected prior to backfilling of trenches to locate & depict the as laid underground pipelines on GIS portal. Any recitification/re-colloection of data if required during validation is to be done by contractor at no extra cost.

-

-

-

... More
GIS data collection for PE pipeline of any diameter

6400

86092

-

... More
Testing of PE Pipeline

-

-

-

... More
Flushing, cleaning, pneumatic testing and pressure preservation of PE pipeline laid by any method in all areas including PE pipe Line Repairing, excavation, leakage arrest, Electrofusion jointing, supply and installation of all fittings required & all work to make network ready for pre-commissioning. Identification of damages by sectionalising the pipeline network, repairing, jointing, Any excavation jointing/tie-in/looping/hook-up required is included in the scope of contractor. Submission/updation of as laid graphs/reports, as built drawings (if any) etc.

-

-

-

... More
20mm dia PE line

3900

262360

-

... More
32mm dia PE line

2500

210246

-

... More
Pre-Commissioning of PE Pipeline

-

-

-

... More
Pre commissioning as per specification and approved procedures, providing all tools and tackles, test ends, Nitrogen, instruments, manpower and other related accessories as per the instructions of the EIC. Purging with nitrogen at positive pressure as decided by EIC and Maintaining the completed pipelines/ installation for any defect, failures till hand over. Any excavation jointing/tie-in/looping/hook-up required is included in the scope of contractor. Submission/updation of as laid graphs/reports submission of as built drawings etc.

-

-

-

... More
20mm dia PE line

3900

21859

-

... More
32mm dia PE line

2500

21004

-

... More
Commissioning of PE Pipeline

-

-

-

... More
Commissioning of PE pipeline laid by any method in all areas as per scope of work, specification and approved procedures providing all tools and tackles, supply of nitrogen, instruments, manpower and other related accessories and as per instructions of the EIC/ SIC. Maintaining the completed pipelines/ installation for any defect, failures till hand over. Any excavation jointing/tie-in/looping/hook-up required is included in the scope of contractor. Submission/updation of as laid graphs/reports submission of as built drawings etc.

-

-

-

... More
20mm dia PE line

3900

32766

-

... More
32mm dia PE line

2500

35016

-

... More
Testing of already laid PE Pipeline

-

-

-

... More
This is for the line which is laid previously by other contractor. Flushing, cleaning, pneumatic testing and pressure preservation of PE pipeline laid by any method in all areas including identification of penidng tie-ins/joints, excavation, Electrofusion jointing, supply and installation of all fittings required & all work to make network ready for pre-commissioning. Any excavation jointing/tie-in/looping/hook-up required is included in the scope of contractor. Laying of any pup-piece for jointing of up to 2m length for is included in the scope of this item for which no extra payment shall be made. If more than 2m PE pipeline laying is required for jointing the laid network, it will be considered as fresh laying and accordingly payment for laying shall be made under relevant SOR item for length over and above 2m. PE Pipe required shall be issued by Owner as free issue material. Identification of damages by sectionalising the pipeline network and air filling or by any method as required. Repair work required at each identified damaged location shall be paid seprately under relevant SOR item. Scope includes Submission/updation of as laid graphs/reports, as built drawings (if any) etc.

-

-

-

... More
20mm dia PE line

1000

73997

-

... More
32mm dia PE line

2000

185000

-

... More
Pre-Commissioning & Commissioning of already laid PE Pipeline

-

-

-

... More
This is for the line which is laid previously by other contractor. Making the tested network ready for commissioning, Purging with nitrogen at positive pressure as decided by EIC and commissioning of PE pipeline laid by any method in all areas as per scope of work, specification and approved procedures providing all tools and tackles, supply of nitrogen, instruments, manpower and other related accessories and as per instructions of the EIC/ SIC. Maintaining the completed pipelines/ installation for any defect, failures till hand over. Any excavation jointing/tie-in/looping/hook-up required is included in the scope of contractor. Submission/updation of as laid graphs/reports submission of as built drawings etc.

-

-

-

... More
20mm dia PE line

1000

14006

-

... More
32mm dia PE line

2000

44840

-

... More
Cutting of built-up surfaces - PCC / RCC Road/asphalt multi-layer Road

-

-

-

... More
Cutting of built-up surfaces - PCC / RCC Road/asphalt multi-layer Road (along length of pipeline) of any width and excavation for laying of PE line in built-up surface as per direction of EIC. These rates are not applicable on HDD method and laying in hard rock starta. Paver block shall not be considered as built-up surface and no payment shall be made under this SOR for dismentalling paver blocks.

3000

608207

-

... More
Protection for Transition joint of all sizes

-

-

-

... More
Padestal - Providing PCC of grade (1:2:4) work supply and installation of GI Sleeves of 2.5" NB x 300 mm length to 3" NB x 300 mm, construction of concrete pedestal of adequate size with supply of all materials, supply & filling of sand etc. for domestic connections/ commercial and industrial installations as per Instruction of Owner/Owner's representative for satisfactory completion of job.

1000

119687

-

... More
HDPE Crash Guard - Proving PCC work supply and installation of GI Sleeves of 2.5" NB x 300 mm length to 3" NB x 300 mm, supply and installation HDPE Crash Guard, supply & filling of sand etc. for domestic connections/ commercial and industrial installations as per Instruction of Owner/Owner's representative for satisfactory completion of job.

20

14121

-

... More
Supply & Installation of GI/ MS/ Concrete Sleeves/HDPE Crash Guard (wherever required as a Special Case as per instructions of the Engineer-in-charge)

-

-

-

... More
Supply, installation of sleeve, insertion of pipe, sealing the annuals, firm fixing of Sleeves with concrete mix. Breaking through any obstructions and their subsequent restoration, as per specifications and instructions of the Engineer-in-charge. GI/MS Pipes shall be Heavy (C-Class) as per IS-1239. The decision regarding use of type of sleeves to be used at various locations shall be made by Engineer In Charge/ Owner.

-

-

-

... More
GI Sleeves /Concrete Sleeves

-

-

-

... More
2 1/2” NB, 1’ Length

1000

25842

-

... More
4” NB, 1’ Length

10

449

-

... More
MS Enamel Coated

-

-

-

... More
4” NB, 3’ Length

10

1035

-

... More
Concrete Sleeve (NP-2 Class)

-

-

-

... More
4” NB, 3’ Length

10

260

-

... More
6” NB, 3’ Length

10

413

-

... More
Restoration Work

-

-

-

... More
Restoration of excavated pits, trench, surface with required thickness as per original condition. Restoration of the roads, pavements, channels, footpaths, tiles, stones etc. to original condition including supply of the approved quality material required to complete the activities mentioned above as per local authorities norms, obtaining NOC from concerned local authorities / land owners / third party inspection agencies (if any) designated by owner and to​ the satisfaction of Engineer-in-charge.

-

-

-

... More
Asphalt road: Restoration of bitumen Asphalt road after laying of MDPE pipe line as per the drawing and to the original conditions, specifications and instruction of Engineer-In-Charge. Restoration of roads shall be done to the satisfaction of local authorities and to get NOC from the concerned authorities.

-

-

-

... More
Restoration of the all kind of pathway by using excavated material such as tiles/pavers/granite/red stone etc by providing PCC pf required thickness and making it as original as per the drawings and to the original conditions Item includes providing of extra material such as Tiles/Paver/Granite etc matching to original pathways.

-

-

-

... More
Concrete road/ Concrete pavement: Restoration of concrete road and pavements shall be done by providing PCC 1:4:8 of specified thickness as per the drawing and to the original condition. The cost of all materials, labours, Shuttering, compacting the base surface etc. are in the scope of this item.

-

-

-

... More
Asphalt Road/ any type of tar road

100

89886

-

... More
Cement Concrete Road

2000

2091054

-

... More
Tiles / Paver / Blocks / Kerb Stones, Red Sand Stone

500

186835

-

... More
Brick Soling / Channels, etc.

500

134207

-

... More
Fabrication & Installation of Pipeline Markers:

-

-

-

... More
Procurement and Installation of Route Markers / Pole Markers / Plate Markers as per the attached drawings, along the route / along boundary wall, lamp posts including all associated civil works such as excavation and construction in all types of soils, construction of pedestals and grouting with concrete, cleaning, procurement and application of approved colour and quality of primer and paint, stencil letter cutting of numbers, direction, chainage etc., restoration of area to original condition and performing all works as per drawings, specification and instruction of Engineer-in-Charge.

-

-

-

... More
Plate markers

500

232755

-

... More
Civil Works

-

-

-

... More
Earth Filling - Supplying and filling selected earth/ moorum (excluding black cotton soil) from Contractor's own borrow areas including royalty, with all leads and lifts in low laying areas and filling to required grade and level including watering, compacting in layers not exceeding 20 cm thickness, complete in all respects inclusive of cost of all labour, materials, tools, tackles etc. as per drawings, specifications anddirection of Site Engineer.

1

468

-

... More
Sand Filling - Supplying and filling in plinth with sand in low lying ares,foundation, including watering, ramming, consolidating and dressing complete.

1

2216

-

... More
Paver Blocks- Providing and laying 60 mm thick factory made cement concrete interlocking paver block of M-35 grade made by block making machine with strong vibratory compaction, of approved size, design & shape, laid in required colour and pattern over and including 50mm thickcompacted bed of coarse sand, filling the joints with line sand etc. all complete as per the direction of the Engineer-in-Charge.

1

1004

-

... More
Reinforced Cement Concrete (M-25)

-

-

-

... More
Excavation in any plane & dimension including disposal of excavated earth up to any lead in all conditions, backfilling using serviceable earth and disposal of surplus and unserviceable earth. Soil to be leveled and properly compacted complete in all respect as per scope of work including brick soiling and PCC, technical specification and directions of EIC. Providing and laying REINFORCED CEMENT CONCRETE (RCC) of M-25 Grade (Concrete shall be design mix / nominal mix) with 20mm & down size graded crushed stone aggregates in NON SUSPENDED slabs/pavement slabs including pedestals, ramps etc. leaving pockets, laying in alternate panels to required slopes, all necessary form work and finishing the top surface rough or smooth as required and directed, providing pockets/openings etc. including vibrating, tampering, curing, rendering and making smooth if required in any position, shape, level and thickness etc. as specified and directed by EIC. The rates include grouting of pockets, procurement of material, shuttering, tools & tackles, reinforcement etc.

1

15498

-

... More
Plain Cement Concrete (1:2:4)

-

-

-

... More
Excavation in any plane & dimension including disposal of excavated earth up to any lead in all conditions, backfilling using serviceable earth and disposal of surplus and unserviceable earth. Soil to be leveled and properly compacted complete in all respect as per scope of work, technical specification and directions of EIC. Providing and laying PLAIN CEMENT CONCRETE (PCC) (1:2:4) (Concrete shall be design mix / nominal mix) with 20mm & down size graded crushed stone aggregates in NON SUSPENDED slabs/pavement slabs including pedestals, ramps etc. leaving pockets, laying in alternate panels to required slopes, all necessary form work and finishing the top surface rough or smooth as required and directed, providing pockets/openings etc. including vibrating, tampering, curing, rendering and making smooth if required in any position, shape, level and thickness etc. as specified and directed by EIC.

1

5969

-

... More
LAST MILE CONNECTIVITY WORK

-

-

-

... More
Installation of Powder Coated GI Pipes (Heavy Class)/Cu tube/Multi Layered Composite (MLC) pipes for all floor levels including highrise alongwith supply & installation of GI, Cu, MLC Fittings, welded fittings, Brass fittings, Flexible Hose ( Anaconda) if required ,Appliance Valve & Isolation valve, Meter, Regulator to complete the work asper the satisfaction of EIC. Note:-Powder Coated GI Pipe, Cu Pipe, Isolation Valve, Appliance Valve of 1/4" dia, Meter & Regulators shall be free issue material.

-

-

-

... More
Assessment of material requirement for installation at site, Order placement for Purchasing of GI fittings, Copper fittings, Brass Fittings & Flexible Hose (Anaconda; adaptors to be used prefrebly, anaconda to be used only if unavoidable), 1/2" femaleX3/4" (or any size as required) male GI bush for GI to regulator & regulator to meter connection, 1/2" male X 3/4" (or any size as required) female SS adaptor for regulator to meter connection as per specification from approved/recommended vendors by Owner for completing the work, Scheduling, Planning of material & Forwarding inspection call, getting dispatch clearance, handling, loading, transportation and unloading of these items at respective contractor’s store. Receiving, taking over, handling, loading, transportation and unloading of owner supplied items i.e. GI & Cu Pipe, Isolation Valve, Appliance Valve Domestic, Commercial, & Industrial Meter & Regulator etc. as defined in specification from owners designated stock yard to contractors own store/ work site, proper storing stacking, identification, providing security and insurance cover. Preparation and approval of sketches, schedules & execution procedures. Finalizing optimum route with consent of customer from transition fitting to cooking oven / appliance and ensuring installations in well ventilated areas. Making temporary but stable platforms/ scaffolding/ rope ladders and supply of all other safety devices. SAP/ Portal entry / Data Entry for new connections - New registration tracking and feasibility survey and its updation as per Owner defined TAT, printing of stationary as per approved Owner formats required during connections. All fittings whatsoever required to complete the work is in contractor's scope.

-

-

-

... More
Connection using meter adaptor(s)/bush is preferrable instead of andconda. Anaconda to be used only for specific cases as directed by EIC.

-

-

-

... More
Installation of GI service pipes & fittings, regulators, Valves etc. including NPT threading, as specified, Drillings of holes through the walls (Brick, RCC), Granite, Marble, Wood Cutting, Glass Cutting with proper heavy duty hammer drill machine, tools & tackles, using proper sealant/grout material and colours to match the original replacement of the damages during drilling, restoring the area to the original condition, Painting of scratched length of powder coated pipe and fittings after proper surface finish by one coat of approved primer paint and two coats of approved synthetic enamel paint. Restoring the wall surface to original conditions.

-

-

-

... More
Copper tube shall be installed inside the kitchen only up to the Appliance valve as per requirement and the satisfaction of EIC, the contractor to provide all equipment, tools and materials necessary to execute the work in efficient manner by cutting, cleaning, flux application, soldering and lacquering. The work includes supply of tools, tackles and consumables including clamp for fixing the tubes.

-

-

-

... More
Supply & fixing of approved clamps & nylon rawl plugs with SS 304 2" screws, grout material, suitable thread sealant i.e. Teflon Tape, Joining of transition fitting to above ground service GI pipes, testing, purging and commission of the complete installation. The rates in connections also includes meter and regulator installation, tap off rates etc. Installation in already gas charged area, planning & coordinating with existing consumer's for New tap offs from existing riser with or without tee, testing of these existing risers and commissioning of these connections with newly tap offs etc. is inclusive.

-

-

-

... More
Project area means - area where riser after TF/RIV is not installed/commissioned previously

-

-

-

... More
O&M area means - areas where GI work is required for additional connection from already installed/commissioned riser provided riser work is not installed/commissioned under same work order. Area to be declared and decided by EIC.

-

-

-

... More
GI Pipe Installation - Threaded

-

-

-

... More
Installation of 1/2" GI Pipe in Project areas including supply & installation of contractor's Supplied Materials

1000

183655

-

... More
Installation of 1/2" GI Pipe in O&M areas including supply & installation of contractor's Supplied Materials

6000

1157084

-

... More
Installation of 3/4" GI Pipe in Project areas including supply & installation of contractor's Supplied Materials.

100

20716

-

... More
Installation of 3/4" GI Pipe in O&M areas including supply & installation of contractor's Supplied Materials

100

21750

-

... More
GI Pipe Installation - Welded

-

-

-

... More
Installation of 3/4" GI Pipe in all areas including supply & installation of contractor's Supplied Materials

100

22786

-

... More
Testing & Rectification of GI Pipe Installation in any area - all type

-

-

-

... More
Tetsing of GI network installed (new or previouly) inclduing all tools & tackels, materials, any rectification & making connection ready for conversion. Submission/updation of as laid graphs/reports, isometric drawings etc. as required. Updation of all data in SAP/IOCL apps as directed by EIC.

-

-

-

... More
1/2" GI Pipe

7000

428528

-

... More
3/4" GI Pipe

200

13808

-

... More
Meter-Regulator Installation

-

-

-

... More
Installation of regulator, meter with associated inlet & outlet connections with supply & installation of fittings/adaptors/anaconda, supply and fixing of approved meter brackets (as required) and other supports upto appliance valve & surakhsa hose inclduing supply of all material in contractor's scope - for any area. Scope includes online testing of gas meter and regulator assembly, GIS tagging of connection, Updation of all data in SAP/IOCL apps as directed by EIC.

800

280943

-

... More
Pre-Commisioning & Commisioning of GI Network

-

-

-

... More
Pre-commissioning & Commissioning of GI network inclduing all tools & tackels, materials, rectification/re-testing of any segment if required & making connection ready for gas supply. Submission/updation of as laid graphs/reports, isometric drawings etc. as required. Updation of all data in SAP/IOCL apps as directed by EIC.

-

-

-

... More
1/2" GI Pipe

7000

310823

-

... More
3/4" GI Pipe

200

10445

-

... More
Testing and Conversion of Domestic Appliances

-

-

-

... More
Conversions of all the burners of LPG Stove (one appliance per household) to Natural Gas (NG) based appliances, Supply & changing of the nozzles / jets and associated controls for domestic & imported appliances with proper tools and tackles. The rates include testing of Kitchen piping from meter to Appliance valve and supply and fixing of one Steel reinforced Flexible Hose as per IS 9573 (with Type as per latest PNGRB guidelines) per appliance/stove with clamps. Cleaning and performing minor maintenance including gas inlet side change in stove, greasing etc. of the appliance. Testing and showing the performance to the customer, signing of joint meter records (JMR) and instructing the customer on use & safety norms, complete as per specifications & to satisfaction of owner / Engineer in Charge. (Supply of Steel Reinforced Rubber hose, Nozzle jets for conversion of burners is inclusive.)

800

174630

-

... More
HSE Compliance - GI Work

-

-

-

... More
Charges for compliance to Health, Safety & Environment (HSE) as detailed in Scope of Work.

-

-

-

... More
Use of Safety Boots, harness belts, Hand gloves, Reflective jackets, Hard hats(helmets), Safety shoes, eye and ear safety equipments, Fire extinguishers, warning display board and as per the detailed scope of work in tender specifications and as per the direction of EIC.

-

-

-

... More
All HSE compliance for GI Work of any dia

7200

121068

-

... More
(Marketing) DMA WORK

-

-

-

... More
Interaction with individual household consumers, Registration for PNG(Domestic) supply by gettings prescribed For duly filled (Forms to be provided by IOCL), data entry in IOCL's mobile/desktop applications for PNG(D), submission of consolidated data in requisite format on daily basis. Providing assisstance for clerance of cheque in bank, Providing uniform and ID cards to marketing executives, collection of GPS cooridnates of consumers' household and submitting it in the requisite format

800

251104

-

... More
Notes: 1) The SOR items would be executed as per the job requirement. 2) The scope as mentioned in the above SOR is of indicative nature only and shall include all activities as detailed in the relevant clauses of the specifications. 3) Any other material & activities not mentioned/covered above, but otherwise required for satisfactory completion/safety of work as defined in tender has to be supplied / done by contractor at no extra cost to owner. 4) Prices quoted in column shall be all inclusive of all taxes / duties (including GST) and nothing extra shall be payable by the Owner. 5) The quantities mentioned in SOR are tentative only and for the purpose of evaluation and may vary as per the actual site condition. 6) The SOR shall be read along with the relevant clauses of tender document

-

-

-

... More
p014508

-

-

-



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.