Indian Oil Corporation Limited Tender

With BidAssist, you can search for multiple business options for RWD Bihar tenders, RCD Bihar tenders, and any other e tender Bihar government is inviting bids for. Such Bihar tenders are posted on the eprocurement Bihar website, and on this page, you will get consolidated lists of Bihar tenders that can be sorted based on authority, department, city, and more.

Indian Oil Corporation Limited - IOCL Tender

Works
Civil And Construction
Telecommunication Services
Eprocure
Opening Date18 Nov 2024
Closing Date2 Dec 2024
Tender Amount₹ 6,21,23,321 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Laying of MDPE Pipeline of PE100 grade with SDR 11 by any methodology (open cut trenching/trenchless/manaul or mechanical boring/moling/HDD) in all kind of soil (soft/hard/rock) with all kind of surface (normal/built-up/CC) as mentioned in SOR item. Raking up of built-up surface for the entry and exit pit, in case of laying by moling/HDD or open trenching in case line is laid by open cut menthod is covered under the scope of this item. Restoration shall be paid under relevent SOR. The following are in the scope of this item: Procurement and Installation of PE Fittings, Transition Fittings, GI/Concrete/HDPE Crash Gaurd, Warning Mats and any other items not mentioned but required for execution shall also be in Contractor's scope. Preparation of detailed route plan, making trial pits to determine the underground utilities/ services etc. Liasioning shall be carried out by the contractor to complete the project in totality, payment for same will be released as per the separate item rate mentioned in SOR. Restoration of the abandoned excavation / trial pits (excavated to depth of 1.5 m or more as per satisfaction to Engineer- Incharge (EIC)) to original condition, barricading the work area as per the procedures & drawings provided in the tender and as per the directions of EIC. Dewatering of trenches / pits if required as per site condition. Repairing of all damaged utilities if any, and payment of any compensation (if claimed by owner / other utility agencies). Trenching to the required depth in all type of surface/soil, providing addtional protection like CC slab etc. as per PNGRB guideline where sufficient depth can not be attained, uncoiling / stringing of PE pipes, jointing of the PE pipe ends / fittings / valves by qualified personnel, using approved electro fusion techniques as per the specification. No Separate rate is payable for excavation in any kind of strata including rock.

-

-

-

... More
Receiving, handling, loading, transportation and unloading of owner supplied PE pipes from or any other free issue material Owner's designated stock yards to Contractor's own stock-yards / work-sites. Proper storing, stacking, identification, providing security and insurance cover for the materials.

-

-

-

... More
Survey of designated area, preparation & submission of survey drawings for laying of Medium pressure/Low pressure network/service lines for societies / colonies/ localities shall be prepared and submitted by the contractor. However the MDPE pipe is to be laid on best probable route after discussion with EIC. All the Proposed route drawings/kmz file of medium pressure main pipeline (125/90/63) shall be indicated by IOCL/consultant . However for 32/20mm dia pipeline, survey & route map drawings, as per site condition shall be prepared by contractor and submitted to IOCL/consultant for approval and execution shall start after due approval. Further, the scope also includes preparation of drawing, for any change in route due to site condition for mainline (125/90/63) , re- route alignment drawing shall also be prepared by contractor.

-

-

-

... More
Preparation and getting approval of schedules, execution procedures, drawings / sketches. Finalizing optimum route with consent of EIC.

-

-

-

... More
Uncoiling, stringing, laying and alignment of the MDPE pipes of the required sizes in trench to achieve desired top cover of pipeline.

-

-

-

... More
Laying using any method with or without casing, it Includes survey of the under ground utilities, submission of site plans/layout drawings and HDD profiles for approval by EIC, execution of the work as per the specification, including excavation of the pits, moling with hole size not exceeding 20% of the the pipe dia. Jointing and insertion of the carrier pipe in casing pipe (on case to case basis) and subsequent backfilling, compaction & restoration. Item also includes dewatering from the trench before laying of the pipes if required.

-

-

-

... More
The laying shall be carried out by any methodology as per specification and site requirement as decided by Engineer-in-Charge (EIC).

-

-

-

... More
Lowering the PE pipe line in trench, padding around pipeline with suitable soil including supply of foreign soil/sand required in rocky area or any hard strata, supply & laying of PE warning mat over the pipeline along the complete route and backfilling with available excavated material, if suitable, after screening or procurement of suitable sand / soil as per directions of EIC. Compaction with manual technique / jumping jack compactor and water at subsequent layers of 150mm, placement of all tiles / slabs / kerb stones etc. removed during excavation. Roads, pavements, footpaths etc. shall be made motorable wherever pipeline is laid and shall be restored to original condition to the satisfaction of respective authority & EIC. Restoration Charges for all tiles / slabs / Kerb stones etc. will be paid over and above with the separate SOR item rate

-

-

-

... More
Scope includes Procurement & installation of Transition fitting, GI end plug at TF, Heavy (C-Class) as per IS-1239 GI Sleeves of 2.5" NB x 300 mm length to 3" NB x 300 mm length for domestic connections/ commercial and industrial installations as per Instruction of Owner/Owner's representative for satisfactory completion of job.

-

-

-

... More
Excavation, breaking through any obstructions, insertion of pipe, sealing the annulus, firm fixing of the sleeves with concrete mix, preparation of concrete pedestal & restoration of excavated pits within the size of pedestal & the same pit with the laying of pipe as defined in technical specification / instruction of EIC. Concrete Padestal construction with supply of GI sleeve is included in the scope and no separate payment shall be made.

-

-

-

... More
Installation of HDPE Crash Guard including clamps. Wherever HDPE Crash guard is installed instead of concrete padestal construction, separate payment for supply of HDPE Crash Guard shall be made under relevant SOR. However supply & installation of GI sleeve inside crash gaurd included in PE laying rate.

-

-

-

... More
Supply & Installation of Transition fitting of any required size for SR/Domestic/Commercial/Industrial connection is in the scope of contractor and is included in the PE laying rate

-

-

-

... More
GIS data collection: The scope includes Capturig GIS data of PE network along with all PE valves and fittings and sharing data in format prescribed by EIC/IOCL. The specification of the device to be used for GIS data capturing is part the technical volume

-

-

-

... More
Cleaning the area of all unserviceable materials, debris, excess earth near trenches to the designated disposal area as per specifications, instructions of land owners / EIC to the complete satisfaction of local authorities. Supply & Installation of Pipeline Markers as per relavant SOR

-

-

-

... More
Flushing, cleaning, pneumatic testing, purging with nitrogen and commissioning as per scope of work, specification and approved procedures providing all tools and tackles, nitrogen, instruments, manpower and other related accessories and as per instructions of the EIC/ SIC. Maintaining the completed pipelines/ installation for any defect, failures during defect liability period.

-

-

-

... More
On completion of gas charging of pipelines, preparation and submission of as-built drawings, crossings details, termination, utility graphs and deviation statements. Submission of all documents required for contract closure in numbers as mentioned in contract.

-

-

-

... More
Handing over the completed works to owner for their operation/ use, returning of all surplus material to owner stores, reconciliation of free issue material area wise and obtaining no objection certificate.

-

-

-

... More
Submission of as-graphs and as-built drawings as per the attached specification and the instruction of EIC/ Owner.

-

-

-

... More
Final clean-up of right-of-use or area disturbed by contractor during their construction activities for laying of pipeline works and disposal of debris and surplus material to designated disposal areas and backfilling of trench and compaction of the same as per satisfaction of Owner and / or as directed by EIC.

-

-

-

... More
Preparation, Certification and submission of (DPR) daily progress reports, graphs, As-built drawings, crossings details, utility graphs and deviation statements.

-

-

-

... More
Any other activities not mentioned / covered explicitly above, but otherwise required for satisfactory completion / operation / safety / statutory / maintenance of the works shall also be covered under the scope of work and has to be completed by the Contractor within specified schedule at no extra cost to Owner. All the work shall be executed in accordance with the provision of contract.

-

-

-

... More
The list of areas where the pipeline to be laid/ allocation of work will be done after awarding of the tender. The quantities are tentative and it may be changed during the tenure of contract as per the requirement of the Owner.

-

-

-

... More
In case more than 1 MDPE pipelines are laid in a common trench/bundle pulling, SOR rate of higher dia shall be paid as per relevant SOR. Payment for lower dia pipeline which is laid in common shall be made under item of common laying. No Separate payment shall be made for any additional excavation including rocky strata if required for maintaining sufficient gap between two PE pipelines.

-

-

-

... More
32mm line should preferably be laid by open cut/moling methodology so that service line connection can be done easily as and when required. HDD method is allowed only after written consent from Engineer In-charge (EIC) for any specific location/stretch for laying 32mm pipeline. Shallow technique to be adopted for HDD.

-

-

-

... More
PE Pipe line laying in all type of Surface (normal/hard/CC/Built-up etc.) & All kind of Soil/Strata including hard rock using any laying methodology

-

-

-

... More
This item includes laying in hard rock. No separate payment shall be made for excavation under any SOR item. If required, Supply of Foreign sand/soil for 150mm thick padding all around pipeline is included under scope.

-

-

-

... More
Laying of 20 mm dia (Service Line) PE Pipeline up to TF

7765.98

-

2951678.15

... More
Laying of 20 mm dia (Service Line) PE Pipeline up to TF - in area where PE pipeline network is already laid previously under previous tender ( This item is only for ground connection and service line laying (of 20mm) where LP (upto 32mm) network is already laid previously by other contractor under previous tender).

4810.86

-

2285657.13

... More
PE Pipe line laying in all type of Surface (normal/hard/CC/Built-up etc.) & All kind of Soil/Strata except Hard Rock using any laying methodology

-

-

-

... More
If required, Supply of Foreign sand/soil for 150mm thick padding all around pipeline is included under scope of this item.

-

-

-

... More
Laying of 32 mm dia PE Pipeline

15479.98

-

4134228.97

... More
Laying of 63 mm dia PE Pipeline

10330.3

-

2891287.75

... More
PE Pipe line laying in all type of Surface (normal/hard/CC/Built-up etc.) & Hard Rock Strata using any laying methodology

-

-

-

... More
This item is applicable for stretches where rock breaker/blasting is used for excavation or diamond cutter is used for HDD with approval of EIC. Supply of Foreign sand/soil for 150mm thick padding all around pipeline is included under scope.

-

-

-

... More
Laying of 32 mm dia PE Pipeline

8750

-

3505234.25

... More
Laying of 63 mm dia PE Pipeline

5400

-

2267030.16

... More
PE Pipe line laying with HDPE casing in all type of soil/surface/Strata including hard rock using any laying methodology

-

-

-

... More
MDPE pipeline laying by any method with supply & installation of HDPE casing pipe of PE 100 PN 6/ GI casing pipe of heavy class as per specification in all kind of laying like Nala crossing, utility corssing, normal laying etc.n including survey of the underground utilities, intimation to all other utility agencies through owner, submission of HDD profile for approval, execution of the work as per the scope of work, standard procedure, specifications & PNGRB T4S, including excavation of the pits, jointing and insertion of carrier pipe, subsequent backfilling, compaction, restoration, submission of as-built drawings/ graphs as per specification and the instructions of EIC/ SIC of owner. The all other activities as described in the SOR Item No. 1 which will be required to complete the work in all respect shall be scope of the Contractor within the quoted rates. The payment shall be made for length of casing pipe laid, remaining carrier pipe length without casing shall be paid under SOR relevant to laying without casing pipe. No separate payment shall be made for excavation including rocky strata under any SOR item. If required, Supply of Foreign sand/soil for 150mm thick padding all around pipeline is included under scope.

-

-

-

... More
20mm/32 mm Dia (in 63 mm dia HDPE casing pipe /3" GI casing pipe of heavy class)

700

-

299012

... More
63 mm Dia (in 125mm dia HDPE casing pipe)

1800

-

1468873.44

... More
20mm PE pipe laying for Padestal/Varandah/Podium Crossing with supply of HDPE casing pipe, HDPE Sleeves/Concrete U blocks & Clamps for protection to PE pipe including niche cutting on wall/platform, brick work, concrete work and any other civil/restoration work as per site condition. For Payment purpose, length of PE pipe shall be considered starting from abovegroung verticle point till transition fitting. No separate payment shall be made for any kind of restoration/civil work done for crossing portion. Length of PE paid under this item shall not be paid under any other item. All work required for safe laying of PE pipe as per PNGRB guideline/IOCL requirement is included in the scope of this SOR.

1500

-

1679145.9

... More
PE Pipeline laying in common with another PE pipeline in all type of soil/surface/Strata including rock strata by any methodology

-

-

-

... More
Laying of PE pieline in common with another PE pipeline in same trench or same bore unsing any methodology in all kind of soil and surface. Payment of higher dia pipeline will be paid as per relevent SOR. For lower dia pipeline which is laid in common, payment shall be made under this SOR. No Separate payment shall be made for any additional excavation including rocky strata if required for maintaining sufficient gap between two PE pipelines.

-

-

-

... More
All other scope same as Item No.-1

-

-

-

... More
Laying of 32mm pipeline in common with 63/90/125mm pipeline

3500

-

276049.2

... More
PE Pipe line laying in all type of Surface (normal/hard/CC/Built-up etc.) & All kind of Soil/Strata except Hard Rock

-

-

-

... More
Scope is same as Item No.1 of this SOR for laying of pipeline in all type of soil by after raking up of surface of any type. Roads, Pavement, Footpaths, Kutcha etc. shall be made motorable once the pipeline is laid. Payment for Restoration shall be paid as per relevant SOR.

-

-

-

... More
Laying of 90 mm dia by open trench menthod

4200

-

1543397.52

... More
Laying of 90 mm dia by moling/boring menthod

1200

-

485064.96

... More
Laying of 125 mm dia by open trench menthod

2204.3

-

911858.51

... More
Laying of 125 mm dia by moling/boring menthod

1000

-

455043.4

... More
PE Pipe line laying in all type of Surface (normal/hard/CC/Built-up etc.) & Hard Rock Strata

-

-

-

... More
Scope is same as Item No.1 of this SOR for laying of pipeline in hard rock raking up of surface of any type. Roads, Pavement, Footpaths, Kutcha etc. shall be made motorable once the pipeline is laid. Payment for Restoration shall be paid as per relevant SOR. This item is applicable for stretches where rock breaker/blasting is used for excavation with approval of EIC. Supply of Foreign sand/soil for 150mm thick padding all around pipeline is included under scope.

-

-

-

... More
Laying of 90 mm dia by open trench menthod

4080

-

2248950.67

... More
Laying of 125 mm dia by open trench menthod

3400

-

2109710.2

... More
PE Pipe line laying by Trenchless Method, without casing in all kind of Soil.Surface/Strata including rocky strata

-

-

-

... More
MDPE pipeline laying by HDD method without casing pipe in all kind of terrian & soil condition including survey of the underground utilities, intimation to all other utility agencies through owner, submission of HDD profile for approval, execution of the work as per the scope of work, standard procedure, specifications & PNGRB T4S, including excavation of the pits, jointing and insertion of carrier pipe, subsequent backfilling, compaction, restoration, submission of as-built drawings/ graphs as per specification and the instructions of EIC/ SIC of owner. The all other activities as described in the SOR Item No. 1 which will be required to complete the work in all respect shall be scope of the Contractor within the quoted rates.

-

-

-

... More
Laying of 90 mm dia

2400

-

1894608

... More
Laying of 125 mm dia

999

-

1101065.03

... More
PE Pipe line laying by Trenchless Method, with casing (Including supply & installation of HDPE casing pipe) in all kind of Soil/Surface/Strata including rocky strata

-

-

-

... More
MDPE pipeline laying by HDD method with supply & installation of HDPE casing pipe of PE 100 PN 6 as per specification in all kind of terrian & soil condition including survey of the underground utilities, intimation to all other utility agencies through owner, submission of HDD profile for approval, execution of the work as per the scope of work, standard procedure, specifications & PNGRB T4S, including excavation of the pits, jointing and insertion of carrier pipe, subsequent backfilling, compaction, restoration, submission of as-built drawings/ graphs as per specification and the instructions of EIC/ SIC of owner. The all other activities as described in the SOR Item No. 1 which will be required to complete the work in all respect shall be scope of the Contractor within the quoted rates. The payment shall be made for length of casing pipe laid in HDD, remaining carrier pipe length without casing shall be paid under SOR relevant to laying without casing pipe.

-

-

-

... More
Laying of 90 mm dia (in 180 mm HDPE casing pipe)

120

-

236888.3

... More
Laying of 125 mm dia (in 200 mm HDPE casing pipe)

100

-

267154.36

... More
Supply of GI/ MS/ Concrete Sleeves (wherever required as a Special Case as per instructions of the Engineer-in-charge)

-

-

-

... More
Supply, installation of sleeve, insertion of pipe, sealing the annuals, firm fixing of Sleeves with concrete mix. Breaking through any obstructions and their subsequent restoration, as per specifications and instructions of the Engineer-in-charge. GI/MS Pipes shall be Heavy (C-Class) as per IS-1239. The decision regarding use of type of sleeves to be used at various locations shall be made by Engineer In Charge/ Owner.

-

-

-

... More
GI Sleeves /Concrete Sleeves

-

-

-

... More
2 1/2” NB, 1’ Length

4

-

73.58

... More
4” NB, 1’ Length

4

-

128.05

... More
MS Enamel Coated

-

-

-

... More
4” NB, 3’ Length

4

-

294.95

... More
Concrete Sleeve (NP-2 Class)

-

-

-

... More
4” NB, 3’ Length

4

-

74.15

... More
6” NB, 3’ Length

4

-

117.76

... More
Supply of HDPE Crash Guard

2000

-

929415.2

... More
Restoration Work

-

-

-

... More
Restoration of excavated pits, trench, surface with required thickness as per original condition. Restoration of the roads, pavements, channels, footpaths, tiles, stones etc. to original condition including supply of the approved quality material required to complete the activities mentioned above as per local authorities norms, obtaining NOC from concerned local authorities / land owners / third party inspection agencies (if any) designated by owner and to​ the satisfaction of Engineer-in-charge.

-

-

-

... More
Asphalt road: Restoration of bitumen Asphalt road after laying of MDPE pipe line as per the drawing and to the original conditions, specifications and instruction of Engineer-In-Charge. Restoration of roads shall be done to the satisfaction of local authorities and to get NOC from the concerned authorities.

-

-

-

... More
Restoration of the all kind of pathway by using excavated material such as tiles/pavers/granite/red stone etc by providing PCC pf required thickness and making it as original as per the drawings and to the original conditions Item includes providing of extra material such as Tiles/Paver/Granite etc matching to original pathways.

-

-

-

... More
Concrete road/ Concrete pavement: Restoration of concrete road and pavements shall be done by providing PCC 1:4:8 and/or RCC 1:2:4 of specified thickness as per the drawing and to the original condition. The cost of all materials, labours, reinforcement. Shuttering, compacting the base surface etc. are in the scope of this item.

-

-

-

... More
Asphalt Road/ any type of tar road

5625

-

3600246.38

... More
Cement Concrete Road

5625

-

4187665.13

... More
Tiles / Paver / Blocks / Curb Stones, Red Sand Stone

6563

-

1746271.23

... More
Brick Soling / Channels, etc.

938

-

179274.87

... More
Installation of valve in pit including supply of PE valves

-

-

-

... More
Supply of isolation valves (as per data sheet) and installation of valves in the valve pits as per typical drawing and specification enclosed and instructions of Engineer-in-charge. Payment of civil construction of valve Pits shall be paid separately as per relevant SOR.

-

-

-

... More
PE Valve 32 mm dia

7

-

30262.41

... More
PE Valve 63 mm dia

18

-

157033.05

... More
PE Valve 90 mm dia

12

-

157986.66

... More
PE Valve 125mm dia

10

-

177329.69

... More
Construction of Valve Pits

-

-

-

... More
Construction of Valve Pits as per the enclosed tender drawing and specification. The item includes supply of all the material including Pre-cast RCC cover, shuttering, reinforcement, labour, curing etc as per the drgs, specification and instruction of EIC.

-

-

-

... More
Type-I having Internal size of approximately Rs. 1000 x 1000mm

12

-

193190.12

... More
Type-II having Internal size of approximately 600 x 600mm

25

-

375524.08

... More
Type-III having Internal size of approximately 1500mm x 1500mm

10

-

218088.19

... More
Note: The tender drawing enclosed is only for reference purpose and contractor shall be required to prepare drawings (in line with reference tender drawing) for specific sizes of Valve pits and the same shall be approved by EIC.

-

-

-

... More
Fabrication & Installation of Pipeline Markers:

-

-

-

... More
Procurement and Installation of Route Markers / Pole Markers / Plate Markers as per the attached drawings, along the route / along boundary wall, lamp posts including all associated civil works such as excavation and construction in all types of soils, construction of pedestals and grouting with concrete, cleaning, procurement and application of approved colour and quality of primer and paint, stencil letter cutting of numbers, direction, chainage etc., restoration of area to original condition and performing all works as per drawings, specification and instruction of Engineer-in-Charge.

-

-

-

... More
RCC Route Markers

1330.1

-

830290.72

... More
Pole markers with foundation

160

-

412607.3

... More
Plate markers

1422.6

-

471571.41

... More
Civil Works

-

-

-

... More
Foundation works: (Excavation, Providing and Laying Reinforced Cement Concrete (M-25))

-

-

-

... More
Excavation in any plane & dimension including disposal of excavated earth up to any lead in all conditions, backfilling using serviceable earth and disposal of surplus and unserviceable earth. Soil to be leveled and properly compacted complete in all respect as per scope of work including brick soiling and PCC, technical specification and directions of EIC. Providing and laying REINFORCED CEMENT CONCRETE (RCC) of M-25 Grade (Concrete shall be design mix / nominal mix) with 20mm & down size graded crushed stone aggregates in NON SUSPENDED slabs/pavement slabs including pedestals, ramps etc. leaving pockets, laying in alternate panels to required slopes, all necessary form work and finishing the top surface rough or smooth as required and directed, providing pockets/openings etc. including vibrating, tampering, curing, rendering and making smooth if required in any position, shape, level and thickness etc. as specified and directed by EIC. The rates include grouting of pockets, procurement of material, shuttering, tools & tackles, reinforcement etc.

15

-

170114.17

... More
Foundation works: (Excavation, Providing and Laying Plain Cement Concrete (1:2:4))

-

-

-

... More
Excavation in any plane & dimension including disposal of excavated earth up to any lead in all conditions, backfilling using serviceable earth and disposal of surplus and unserviceable earth. Soil to be leveled and properly compacted complete in all respect as per scope of work, technical specification and directions of EIC. Providing and laying PLAIN CEMENT CONCRETE (PCC) (1:2:4) (Concrete shall be design mix / nominal mix) with 20mm & down size graded crushed stone aggregates in NON SUSPENDED slabs/pavement slabs including pedestals, ramps etc. leaving pockets, laying in alternate panels to required slopes, all necessary form work and finishing the top surface rough or smooth as required and directed, providing pockets/openings etc. including vibrating, tampering, curing, rendering and making smooth if required in any position, shape, level and thickness etc. as specified and directed by EIC.

10

-

43683.48

... More
Gate and Fencing

-

-

-

... More
Supply of erection of single leaf mild steel gate 2.5m high with mesh up to 2m height and Concertina coil fencing with barbed wire and 2m wide complete in all respect including painting as per TS on all MS items, all works as per specification and drawings including foundations and RCC beams.

3

-

66667.72

... More
Supply of all materials, fabrication and erection of chain link fencing 2.5m high with mesh up to 2m height and Concertina coil fencing with barbed wire complete in all respects including painting as per TS on all MS items, all works as per specification and drawings including foundation and RCC beams as per drawing and instruction of EIC.

78

-

216609.7

... More
Miscellaneous

-

-

-

... More
Installations of DRS/DCU/MRS/ Metering Skid / Service Regulator

-

-

-

... More
Receiving, handling, loading, transportation and unloading of owner supplied DRS/MRS/ Metering Skid/ service regulator including wall mounted SR from Owner's designated stock yards to Contractor's own stock-yards/ work-sites. Proper storing, stacking, identification, providing security and insurance cover for the materials. Supply of cover box for service regulator is in the scope of contractor. Installations of DRS/MRS/ Metering Skid/ service regulator with all associated work at foundation and hooking up with PE pipe line.The scope includes supply of transition fittings and other PE and CS fittings, GI as per requirements and various associated works (including steel welding with NDT and hydrotesting, if required) to commission DRS/MRS/Metering Skid/Service Regulator. Payment towards civil foundation work & structural work for gate and fencing shall be payable as per relevant SOR items.

-

-

-

... More
DRS / DCU

2

-

58280.77

... More
MRS / Metering Skids

1

-

19054.1

... More
Wall mounted/ on ground type Service Regulator Module: Installation of Service Regulator along with piping and fabrication & supply of Cover box, painting etc. as per drawing & Construction of Brick/RCC Foundation with plaster including sand filling.

30

-

289820.86

... More
Pipeline laying liaisoning and getting permissions from the statutory authorities

-

-

-

... More
Submission of applications as per approved drawing provided by owner / owner's representative (Initial Route survey, prepartion of drawing, measuring and providing details of surface type shall be in scope of contractor with approval from owner / owner's representative), obtaining and submission of demand note, coordination, Liaisoning, obtaining written permission from land owing agencies like NHAI, Indian Railways and any other government agencies who maintains the public lands (all fee paid to authorities excluding demand charges or Bank Guarantees shall be reimbursed against documentary evidence). This rates are not applicable for Private lands i.e. Apartments etc. Permissions required from various authorities like NHAI / Railways / Irrigation (Canal) etc. falling enroute shall be inclusive in the item rate.

75000

-

1520430

... More
Ground Penetrating RADAR

-

-

-

... More
Carrying out subsurface utility survey along the proposed pipeline route and/ or as specified by Engineer-In-Charge for 5 m corridor using Ground Penetrating Radar (GPR) for depth upto 5m below the existing ground level to locate and identify all existing underground utilities/buried objects including but not limited to pipelines, sewers, conduits, cables, drains, manholes, appurtenances etc in the proposed corridor along with location, DGPS coordinates, depth, shape and dimensional details of utilities. Four (4) Copies of Report and Drawings incorporating all collected datas shall be submitted as per scope of work and direction of the Engineer-in-charge. Scale of Drawing shall be Planimetry (X Axis 1:1000, Y Axis 1:100), Longitudinal Section (Z Axis 1:100) and Transverse Section at critical location. Note: 1.Survey Agency for execution of GPR Survey Work to be engaged by the Contractor shall be submitted for approval of Owner/ Counsulatant prior to start of work. 2. GPR Work shall be carried in presence of Contractor Representative, EPMC & TPI.

15000

-

238773

... More
Electrical

-

-

-

... More
Supply, Installation, testing & commissioning of Maintenance free  Earthing with GI earth pipe, 3.0 mtr long, 100 mm dia including accessories and providing masonary enclosure with cover plate  having  locking  arrangement etc, (with charcoal and salt ) as required as per IS 3043. Supply and installation of GI earthling conductor of the following sizes:- Above ground/buried under ground

3

-

26425.22

... More
25X 6mm GI Strip

30

-

3380.35

... More
2.5 sq.mm CuPVC wire

30

-

1228.38

... More
10sq. mm Cu PVC insulated cable

30

-

2765.8

... More
GI Section - LMC

-

-

-

... More
Domestic Connection

-

-

-

... More
Installation of Powder Coated GI Pipes (Heavy Class) alongwith GI & Cu Fittings, Brass fittings, Flexible Hose ( Anaconda),Appliance Valve & Isolation valve, Meter, Regulator to complete the work asper the satisfaction of EIC Note:-Powder Coated GI Pipe, Cu Pipe, Isolation Valve, Appliance Valve, Meter & Regulators shall be free issue material.

-

-

-

... More
Assessment of material requirement for installation at site, Order placement for Purchasing of GI fittings, Copper fittings, Brass Fittings & Flexible Hose (Anaconda), 1/2" femaleX3/4" male GI bush for GI to regulator & regulator to meter connection, 1/2" male X 3/4" female SS adaptor for regulator to meter connection as per specification from approved/recommended vendors by Owner for completing the work, Scheduling, Planning of material & Forwarding inspection call, getting dispatch clearance, handling, loading, transportation and unloading of these items at respective contractor’s store. Receiving, taking over, handling, loading, transportation and unloading of owner supplied items i.e. GI & Cu Pipe, Isolation Valve, Appliance Valve Domestic, Commercial, & Industrial Meter & Regulator etc. as defined in specification from owners designated stock yard to contractors own store/ work site, proper storing stacking, identification, providing security and insurance cover. Preparation and approval of sketches, schedules & execution procedures. Finalizing optimum route with consent of customer from transition fitting to cooking oven / appliance and ensuring installations in well ventilated areas. Making temporary but stable platforms/ scaffolding/ rope ladders and supply of all other safety devices. SAP/ Portal entry / Data Entry for new connections - New registration tracking and feasibility survey and its updation as per Owner defined TAT, printing of stationary as per approved Owner formats required during connections.

-

-

-

... More
Installation of GI service pipes & fittings, regulators, Valves etc. including NPT threading, as specified, Drillings of holes through the walls (Brick, RCC), Granite, Marble, Wood Cutting, Glass Cutting with proper heavy duty hammer drill machine, tools & tackles, using proper sealant/grout material and colours to match the original replacement of the damages during drilling, restoring the area to the original condition, Painting of scratched length of powder coated pipe and fittings after proper surface finish by one coat of approved primer paint and two coats of approved synthetic enamel paint. Restoring the wall surface to original conditions.

-

-

-

... More
Copper tube shall be installed inside the kitchen only up to the Appliance valve as per requirement and the satisfaction of EIC, the contractor to provide all equipment, tools and materials necessary to execute the work in efficient manner by cutting, cleaning, flux application, soldering and lacquering. The work includes supply of tools, tackles and consumables including clamp for fixing the tubes.

-

-

-

... More
Supply & fixing of approved clamps & nylon rawl plugs with SS 304 2" screws, grout material, suitable thread sealant i.e. Teflon Tape, Joining of transition fitting to above ground service GI pipes, testing, purging and commission of the complete installation. The rates in connections also includes meter and regulator installation, tap off rates etc. Installation in already gas charged area, planning & coordinating with existing consumer's for New tap offs from existing riser with or without tee, testing of these existing risers and commissioning of these connections with newly tap offs etc. is inclusive.

-

-

-

... More
Installation, testing & commissioning of 1/2" GI Pipe including supply & installation of contractor's Supplied Materials.

29517.92

-

6434009.76

... More
Installation, testing & commissioning of 1/2" GI Pipe including supply & installation of contractor's Supplied Materials - in area where PE pipeline network of 32 mm is already laid previously previously by other contractor under previous tenders (This item is for GI work in areas where PE network other than ground connection is not required to be laid OR for areas where GI work is required for additional connection from already installed / commissioned riser)

12959.91

-

3014190.06

... More
Installation, testing & commissioning of 3/4" GI Pipe including supply & installation of contractor's Supplied Materials.

1650

-

405657.45

... More
Installation, testing & commissioning of 3/4" GI Pipe including supply & installation of contractor's Supplied Materials - in area where PE pipeline network is already laid in area where PE pipeline network of 32 mm is already laid previously previously by other contractor under previous tenders (This item is for GI work in areas where PE network other than ground connection is not required to be laid OR for areas where GI work is required for additional connection from already installed / commissioned riser)

825

-

216418.78

... More
Installation, testing & commissioning 12 mm Copper Tube - Inside kitchen location only - including supply & installation of contractor's Supplied Materials.

3600

-

755634.24

... More
Installation, testing & commissioning 12 mm Copper Tube - Inside kitchen location only - including supply & installation of contractor's Supplied Materials - in area where PE pipeline network is already laid in area where PE pipeline network of 32 mm is already laid previously previously by other contractor under previous tenders (This item is for GI work in areas where PE network other than ground connection is not required to be laid OR for areas where GI work is required for additional connection from already installed / commissioned riser)

1800

-

403113.96

... More
Installation of regulator, meter with associated inlet & outlet connections/ fittings/adaptors/anaconda, supply and fixing of approved meter brackets and other supports upto appliance valve & surakhsa hose inclduing supply of all material in contractor's scope - for any area

2487.9

-

622138.21

... More
Commercial Connection / Industrial Connection

-

-

-

... More
Installation of Powder Coated GI Pipes (Heavy Class) alongwith GI & Cu Fittings, Brass fittings, Flexible Hose ( Anaconda),Appliance Valve & Isolation valve, Meter, Regulator to complete the work asper the satisfaction of EIC Note:-Powder Coated GI Pipe, Cu Pipe, Isolation Valve, Appliance Valve, Meter & Regulators shall be free issue material.

-

-

-

... More
Assessment of material requirement for installation at site, Order placement for Purchasing of GI fittings, Copper fittings, Brass Fittings & Flexible Hose (Anaconda), 1/2" femaleX3/4" male GI bush for GI to regulator & regulator to meter connection, 1/2" male X 3/4" female SS adaptor for regulator to meter connection as per specification from approved/recommended vendors by Owner for completing the work, Scheduling, Planning of material & Forwarding inspection call, getting dispatch clearance, handling, loading, transportation and unloading of these items at respective contractor’s store. Receiving, taking over, handling, loading, transportation and unloading of owner supplied items i.e. GI & Cu Pipe, Isolation Valve, Appliance Valve Domestic, Commercial, & Industrial Meter & Regulator etc. as defined in specification from owners designated stock yard to contractors own store/ work site, proper storing stacking, identification, providing security and insurance cover. Preparation and approval of sketches, schedules & execution procedures. Finalizing optimum route with consent of customer from transition fitting to cooking oven / appliance and ensuring installations in well ventilated areas. Making temporary but stable platforms/ scaffolding/ rope ladders and supply of all other safety devices. SAP/ Portal entry / Data Entry for new connections - New registration tracking and feasibility survey and its updation as per Owner defined TAT, printing of stationary as per approved Owner formats required during connections.

-

-

-

... More
Installation of GI service pipes & fittings, regulators, Valves etc. including NPT threading, as specified, Drillings of holes through the walls (Brick, RCC), Granite, Marble, Wood Cutting, Glass Cutting with proper heavy duty hammer drill machine, tools & tackles, using proper sealant/grout material and colours to match the original replacement of the damages during drilling, restoring the area to the original condition, Painting of scratched length of powder coated pipe and fittings after proper surface finish by one coat of approved primer paint and two coats of approved synthetic enamel paint. Restoring the wall surface to original conditions.

-

-

-

... More
Copper tube shall be installed inside the kitchen only up to the Appliance valve as per requirement and the satisfaction of EIC, the contractor to provide all equipment, tools and materials necessary to execute the work in efficient manner by cutting, cleaning, flux application, soldering and lacquering. The work includes supply of tools, tackles and consumables including clamp for fixing the tubes.

-

-

-

... More
Supply & fixing of approved clamps & nylon rawl plugs with SS 304 2" screws, grout material, suitable thread sealant i.e. Teflon Tape, Joining of transition fitting to above ground service GI pipes, testing, purging and commission of the complete installation. The rates in connections also includes meter and regulator installation, tap off rates etc. Installation in already gas charged area, planning & coordinating with existing consumer's for New tap offs from existing riser with or without tee, testing of these existing risers and commissioning of these connections with newly tap offs etc. is inclusive.

-

-

-

... More
Procurement & installation of GI Sleeves/pipes of 2.5" NB x 300 mm length to 3" NB x 300 mm length and Half Round HDPE Crash Guard/Sleeves for commercial and industrial installations as per Instruction of EIC for satisfactory completion of job. Excavation, breaking through any obstructions, insertion of pipe, sealing the annulus, firm fixing of the crash guard with screwed clamp, sand filling etc. & restoration of excavated pits as defined in technical specification / instruction of EIC. If EIC permit, places where installation of crash guard is technically not possible, concrete pedestal with GI sleeves/pipes to be constructed and GI pipe to be filled with sand as per specifictaion and insruction of EIC.

-

-

-

... More
Installation, testing & commissioning of 1" GI Pipe including supply & installation of contractor's Supplied Materials.

200

-

47487.92

... More
Installation, testing & commissioning of 1.5" GI Pipe including supply & installation of contractor's Supplied Materials.

20

-

5698.46

... More
Installation/Fixing of Commercial/Non-Commercial meter and regulator with associated inlet & outlet connections fittings,anaconda,valves. Using approved meters & regulator brackets and other supports by proper scaffolding/grouting. Restoring the area/walls to original condition as per specification and to complete satisfaction of consumer and EIC.

11

-

11411.37

... More
Testing and Conversion of Domestic Appliances

-

-

-

... More
Conversions of all the burners of LPG Stove (one appliance per household) to Natural Gas (NG) based appliances, Supply & changing of the nozzles / jets and associated controls for domestic & imported appliances with proper tools and tackles. The rates include testing of Kitchen piping from meter to Appliance valve and supply and fixing of one Steel reinforced Flexible Hose as per IS 9573 (with Type as per latest PNGRB guidelines) per appliance/stove with clamps. Cleaning and performing minor maintenance including gas inlet side change in stove, greasing etc. of the appliance. Testing and showing the performance to the customer, signing of joint meter records (JMR) and instructing the customer on use & safety norms, complete as per specifications & to satisfaction of owner / Engineer in Charge. (Supply of Steel Reinforced Rubber hose, Nozzle jets for conversion of burners is inclusive.)

3000

-

466324.2

... More
(Marketing) DMA WORK

-

-

-

... More
Carrying out the work of obtaining PNG registration in all respect as detailed in Scope of work and Special Conditions of contract and as per directions/instructions of Engineer In charge /Authorized representative including but not limited to following : 1) Enrolment & Registration of PNG Customers as per the given target. 2) Collection of filled up form along with Security Deposit amount (only in the form of cheque/Demand Draft/ Online mode) and relevant documents. 3) Carrying out the work of demand registration, evaluation, facilitation of signing of GSA and collection of security deposit and payment against payment security as detailed in scope of work and special condition of contract of tender document as per requirement and the satisfaction of the EIC for industrial and commercial customers. 4) Carrying out the marketing activities for PNG connection as per directions/instructions of the EIC including but not limited to the following: Printing & Distribution of leaflets & FAQ, Printing & Installation of banners at prime locations, Awareness cum Registration Camp, Audio/Visual Presentations, Organizing Road Shows, etc.

-

-

-

... More
Domestic PNG Connections

1742.8

-

389542.99

... More
Commercial PNG Connections

10

-

13068.97

... More
Industrial PNG Connections

1

-

1984.88

... More
Notes: 1) The SOR items would be executed as per the job requirement. 2) The scope as mentioned in the above SOR is of indicative nature only and shall include all activities as detailed in the relevant clauses of the specifications. 3) Any other material & activities not mentioned/covered above, but otherwise required for satisfactory completion/safety of work as defined in tender has to be supplied / done by contractor at no extra cost to owner. 4) Prices quoted in column shall be all inclusive of all taxes / duties (excluding GST) and nothing extra shall be payable by the Owner except for statutory variation in GST. 5) The quantities mentioned in SOR are tentative only and for the purpose of evaluation and may vary as per the actual site condition. 6) The SOR shall be read along with the relevant clauses of tender document

-

-

-



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements

Past Bidders
This list is curated from the bidders of the similar tenders in the past

Unlock the Tender details for free
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.