Indian Oil Corporation Limited Tender

With BidAssist, you can search for multiple business options for RWD Bihar tenders, RCD Bihar tenders, and any other e tender Bihar government is inviting bids for. Such Bihar tenders are posted on the eprocurement Bihar website, and on this page, you will get consolidated lists of Bihar tenders that can be sorted based on authority, department, city, and more.

Indian Oil Corporation Limited - IOCL Tender

Works
Civil And Construction
Pipe Line Project
Eprocure
Opening Date20 Jun 2024
Closing Date4 Jul 2024
Tender Amount₹ 2,00,62,608 
This is an estimated amount, exact amount may vary.
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
Report Missing Document

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Helper (QRT) extra hourly charges beyond duty hours/ odd hours as approved by Site Engineer/ EIC (1 EA = 1 HR)

50

216

183.5

... More
QRT vehicle driver extra hourly charges beyond duty hours/ odd hours as approved by Site Engineer/ EIC (1 EA = 1 HR)

50

216

183.5

... More
PIDWS alarm verification team: Monthly charges for providing PIDWS alarm verification team detailed in Annexure B. The normal duty hours for the PIDWS Alarm verification crew shall be 8 hours in night time. However, the team shall render the services round the clock as per the requirement of the Owner. PIDWS Alarm verification crew shall always remain alert and shall remain in touch with PIDWS control room, operation group, mainline maintenance group so as to immediately act upon receiving any alarm information in PIDWS system. PIDWS verification team can also be used in other mainline/station works as per discretion of EIC. The Contractor shall maintain an establishment at his own cost & expenses for accommodating PIDWS alarm verification team near respective station or as directed by EIC along with telephone and mobile facilities for all team members for un-interrupted communication. No extra payment shall be made for PIDWS alarm verification team other than this SOR Item. This item is inclusive of overhead charges such as establishment, communication etc.

24

85607

72548.93

... More
Unarmed Guard (PIDWA AVT) extra hourly charges beyond duty hours/ odd hours as approved by Site Engineer/ EIC (1 EA = 1 HR)

50

249

211.73

... More
PIDWS AVT vehicle driver extra hourly charges beyond duty hours/ odd hours as approved by Site Engineer/ EIC (1 EA = 1 HR)

50

216

183.5

... More
Manning of SV/RCP stations: Providing personnel (Skilled manpower) for round the clock (including weekly off/Holiday) manning at SV/RCP locations of PHDPL. At each SV location, minimum 03 nos. manpower to be provided per day.The minimum qualification of these personnel shall be ITI (preferably Electrical / Mechanical), in any trade. Remuneration of these personnel shall be as per the prevailing statutory rules & regulations viz. EPF, ESI, Labour Laws etc. Rate is inclusive of all other incidental and logistic charges such as food and lodging, transportation etc. (Note* - Personnel will be deployed in a phased manner as per the instruction of EIC and payment will be done proportionately as per the actual item execution i.e. no. of SV locations where manpower is deployed for that month). Unit of Measurment is MON i.e. Man-Month

168

27427

23243.93

... More
VARIABLE PART- TO BE QUOTED

-

-

-

... More
Coating Refurbishment - Coat &Wrap ( C&W) refurbishment of exposed pipeline of different size with owner supplied coating material including tools ,tackles, mobilization, manpower consumables etc in all respect as per instructions of E-I-C.

15

2641

2238.17

... More
Coating Removal - Surface Preparation of Pipe : Removal of old Coating of the pipe surface is to be removed by mechanical means i.e. by chiesel and onward surface preparation by Grinder for cleaning the coating bond material with portable power grinder driven emery paper (duty approved by IOCL). This shall be inclusive of pipe fitter, Grinder, helper required for cleaning of the pipe surface.

15

467

396.43

... More
Sleeve Welding ( Type-B) - Fabrication, fitment and welding of full encirclement sleeves from owners supplied pipes over pitted/defect sections of the exposed pipeline including testing/inspection (DP/ Tell taletest), supply of all equipment(s) including portable DG set, welding machine, grinding machine , consumables including electrodes, grinding wheels etc , and manpower required to complete the work in all respects as per the specifications and direction of the Site Engineer/EIC. Pipes will be supplied by the Owner from Owner's Store yards and shall be transported to site at the Contractor's risk & cost. Unit of Measurement is Metre = longitudinal length of the sleeve welded on the pipe irrespective of length of welding performed.

-

-

-

... More
12" - Sleeve Welding

10

9859

8355.14

... More
Fabrication of Sleeve - Preparation of half cut sleeves by taking MS pipes from owner's store (MS pipe will be supplied by the Owner) or IOCL designated location including fitting on pipe. The pipe is to be cut into halves of required length and circumference and make bevel edges as per direction, transporting the prepared sleeves from IOCL designated location to site, including providing man, machine & consumables like, generator, grinding machine, complete as per site requirement and direction. 1 half cut sleeve means 2 halves so that iten circles/grips the full circumference of the existing running pipeline. Unit: Length of the one set of sleeves comprising of two halves.

-

-

-

... More
12" - Fabrication of Half cut Sleeves

10

11485

9733.82

... More
Radiographic Inspection - Inspection of welding by radiographic method on all types of piping including processing of films and interpreting the results of weld quality and reporting the same to the Site Engineer together with recommendations as to the acceptability or otherwise of the welds, submitting the finished radiographic films as may be approved or directed by Engineer-in-Charge inclusive of supply of all pesonnel, labour, materials, equipment, consumable, inputs, etc. and providing all services complete in all respects as envisaged in the contract documents. Note: i) Payment will be on the basis of number of welds of the respective size radiographed and shall be all inclusive for the complete job of radiographic inspection as envisaged in the contract document. ii) Radiography not involving full girth weld will be paid at 50% of the rate for full girth weld for the respective size. iii) For set-on type branch welding, the rate for radiography will be as applicable to the branch pipe size. iv) Repeat radiography of individual welds due to defective films or repair of welds shall be done at contractor's cost.

-

-

-

... More
12" - NB Pipe Joints

2

3486

2954.35

... More
Fitting and Welding of leak clamp - Fitting and Welding of leak clamp on pipe after depressurising the mainline, fitting, tightening and welding of leak repair clamp shall be carried out. Contractor shall give all required assistance for depresurising the line, temporarily plugging leak point, assistance for closure of Mainline Valve in upstream & in downstrem of leak point. Only Leak clamp shall be provided by owner from nearest owner store yard. Fitting and Welding of leak clamp of length maximum upto 1000 mm, over mainline pipe with all tools tackles, i.e. Hydra, welding machine and qualified welder under the direction and supervision of site engineer/EIC. Fit-Up & Welding charges include fuel charges for the DG Machine, charges of the welder, fitter, helper, Grinder and supervisor , cost of welding rods, other accessories etc. complete in all respect. Welding of leak clamp includes welding circumferentialy and longitudinaly including welding of fasteners (nuts &bolts), Testing of welding integrity with Dye Penetration (DP) test complete in all respect as per direction of EIC/ Site Engineer/Site Representative.

-

-

-

... More
12" - Fitting and Welding of leak clamp

2

31545

26733.31

... More
Hydrotesting of Mainline Pipes - Taking pipe from owner's stocking point with the help of suitable lifting arrangement (Hydra/ Crane) and putting on wooden slippers and bags etc. at testing area. Fitting/ Welding of pipes in desired length as per specification & direction with E-6010/E-7018 electrodes, Welding of suitable blinds on open end of test pipe section, fitting of all attachments for filling of water, air bleeding, calibrated pressure gauge installation, pressurisation machine etc. by providing all required material, instruments, pressure testing machine for succesful completion of hydrotesting of pipes. All safety precautions shall be taken and observed by the contractor throughout the work & testing. Testing shall be done at pressure as decided by owner (1.25 times of design pressure) during testing time for a period of four (4) hours / as decided by owner. After completion of the hydrotesting, pipes shall be cut and suitable machining shall be done to restore its original shape/ contour e.g. bevelling of open ends by grinding etc. In no case coated section shall be damaged by the contractor the reason whatsoever. Subsequent upon hydrotesting and making pipes in original shape, contour etc., the pipes shall be stackedat locations desired in a safe manner on wooden slippers/sand bags etc after one coat of primer on uncoated pipe and with bevel protector at each end. Only pipes shall be supplied by owner to the contractor. All other machines, materials, blinds (16 MM MS Cap), instruments, fittings, labour, water etc. shall be arranged by the contractor for successful completion of the work. Date of hydrotesting, hydrotesting pressure, duration of testing, length of pipe, Grade & thickness of pipe shall be written by the contractor with synthetic enamel paint on pipe. The work shall be conducted in a best work manship manner and as per instruction of EIC/Site Engineer.

-

-

-

... More
12" - Hydrotesting of Mainline pipes

2

26020

22050.89

... More
Phased Array Ultrasonic Testing of S-SAW/L-SAW Defect - Phased Array Ultrasonic Testing OF S-SAW / L-SAW defect (COMPLETE ONE FULL LENGTH PIPE) by qualified & experienced technician and probe as per procedure mentioned in work specification including mobilization & demobilization of NDT equipments, supply of all consumables, making arrangement for inspection in ditch (clean pipe surface and gap under pipe shall be provided by contractor), labourers, inspection personnel, submission of reports etc. to complete the work in all respect as per technical specifications and direction of EIC (One pipe lenght shall be scanned for each anomaly and measurement of work shall be taken as EA for one anomaly location)

2

14145

11987.81

... More
Cold cutting of piping - After evacuation of product from the piping, the Contractor shall arrange suitable cold cutting machine, associated tools & tackles, operators, consumables, compressor, hoses etc. to cut pipe at mentioned location as per instructions of Engineer-in-Charge/ Site Engineer(the location shall be accessible for installation of the cold cutting machine before carrying out the job which is not covered in the scope of this item). The Contractor scope is including all required manpower, equipments, tools, tackles, materials, consumables etc. for completion of work in all respects as per instructions of Engineer-in-Charge/ Site Engineer. Note: Unit #EA# shall mean one full circumferential cut.

-

-

-

... More
12" - Pipe cold cutting

2

86029

72906.69

... More
Pipe Replacement - Carrying out tieing-in and hook-up with existing Mainline on either sides including all excavation/ trenching in all kinds of soil including rock,transportation of pipe from owner's stackyard, cold cutting of pipe, pre-testing(hydrotest) of pipe sections before hook-up, making field bends out of pre-tested pipes (pipes shall be supplied by Owner) to match the site requirement, welding with safety equipments, Nitrogen purging, mud plugging, foam pigs insertion, ultrasonic thickness of pipe, DP test, TOR fittings and welding on pipe, carrying out 100% radiography, field joint coating, holiday detection, repair of damaged coating, backfilling and making through the pipeline etc. complete in all respects in line with standard operating procedure under close supervision and as per the direction of the Site-Engineer /Engineer-in-charge.

1

525007

444921.54

... More
Excavation - Earth work in excavation in all kinds of soil, both wet & dry condition (except hard rock requiring blasting, chiselling / pneumatic drilling) for foundation, substructures, trenches, sumps, pits etc. to the following depths including shoring, strutting, trimming of sides of the trenches, dressing, ramming and levelling the bottom of the trenches correct to level, grade etc. including bailing out of water (if any), stacking selected excavated earth for backfilling, filling available excavated earth in trenches, foundation, plinth etc. and/or disposing the excess earth outside IOCL premises to an unobjectionable area with all leads & lifts, etc. complete in all respects inclusive of cost of all labour, materials, tools, tackles etc. as per drawings, specifications and direction of the Site Engineer/EIC.

-

-

-

... More
Excavatiopn Up To 2.5 M - All kind of soil except hard rock (Measured from original ground level)

300

353

299.89

... More
Excavatiopn B/w 2.5 M to 5 M - All kind of soil except hard rock

90

637

539.89

... More
Excavatiopn B/w 5 M & up to 50 M - All kind of soil except hard rock

60

1045

886.28

... More
Hard Rock Removal - Excavation and backfilling in hard rock (requiring blasting chiselling / pneumatic drilling) dewatering if required, consolidatingthe trench bed, as per drawing and/or the direction of the EIC.

60

1221

1035.27

... More
Providing & Operating JCB - Providing & operating JCB for earth work in excavation in both ordinary & Rocky soil for ROW cleaning, washout rectification/ installation ofanode ground bed, sacrificial anodes, cable trenches, pipelinetrenches, etc. including backfilling the same after completion of workin all respect and up to the satisfaction of Site Engineer / EIC & thecost includes all labour, materials complete as per direction of SiteEngineer/ EIC.

96

2009

1702.61

... More
Backfilling - Backfilling of Excavated Pit / Trecnch:Backfilling of the excavated pit/trench by Hydraulic means (JCB)/Manual Means, soil (excluding rock) removed during excavation of trench (stored within 50 m radius of the excavated trench).

300

315

267.48

... More
Soil Supply - Supply & Stacking of soft soil, at site of any excavated trench (not from anywhere within 50 M radius of excavated trench) by deploying all sort of lifting / unloading machinaries, transportation means, manpower whatsoever required.

495

611

518.25

... More
Shifting of oil soaked Soil - Shifting of oil soaked soil from the leak/ pilferage site to other location with a range of 50 KM in all respcet as per direction of Site engineer/EIC

60

778

659.5

... More
Transportation of Soil/ Debris - Transportation of earth, debris etc from site Transportation of earth, debris etc. up to 1 Km, lead from the area of excavated trench, all complete including loading, unloading and leveling as per instruction of EIC. This shall also include, all loading, unloading & transportation machinaries, manpower, tools whatsoever required for the job.

50

522

443.08

... More
Laying, Spreading of Morrum for Road Diversion - Laying, Spreading of Morrum by deployment of all required machinaries, tools, manpower, whatsoever for making Road Diversion as per job requirement and as per IOCL's requirement.

50

253

214.63

... More
HDPE Earthfilled bags - The work includes Providing and laying in position empty HDPE/GSM Based cementbags (Good condition & with filled material load bearing strength)filled cement bags after sewing the bag, including placing ,handling, watering as directed by Engineer-In-Charge at washout sites along the pipeline

100

38

33.04

... More
HDPE Sand bags - "The work includes Providing and laying in position empty HDPE cementbags (Good condition & with filled material load bearing strength)filled with cement sand in the ratio 1:10 (1 cement:10 coarse sand),sewing the bags, handling, placing & watering etc. complete as directed by Engineer-In-Charge at washout sites along the pipeline "

100

135

114.9

... More
HDPE Stone bags - "Supplying and laying of HDPE cement bags filled with Stone Agrregate (Single Size): 06 mm nominal size: Supplying and laying in position HDPE cement bags filled with Stone Agrregate (Single Size) : 06 mm nominal size including sewing the bags, handling, placing at work site as directed by Engineer-in-charge"

100

61

51.79

... More
Road Cutting - Cutting bituminous or water bound macadam road, stacking the material and making good the same as previous including supply of extra quantityof aggregate, moorum grit and bitumem etc. required, disposal of surplus earth if any/ complete as per the description of EIC. Job includes supply of all labour, equipments etc.

45

803

681.08

... More
SITE GRADING - Surface dressing (cleaning, levelling, stripping etc whatsoever to make approachable access for movement of machinaries at intended site) of the ground including removing vegetation and in - equalities not exsceeding 15 cm deep and siposal or fubbish, lead upto 50 m and lift upto 1.5 m - All kinds of soil surface, as per job requirement & directions of Engineer-in-charge.

2160

17

14.84

... More
Supplying & fixing of fencing - Supplying & fixing GI chain link fencing (for CP station/AJBenclosure/MOV) of approx. size 3"" x 3"" diamond shape (10 guage) withhorizontal GI wire (8 SWG) at top & bottom for fixing chain link to existing structures including necessary clamps, cleat, painting, all labour & material etc complete as directed by Site Engineer/Engineer-in-Charge.

25

879

745.26

... More
Removing the existing fencing - Removing the existing chain link fencing (in CP/ Anode JCB/ MOV stationenclosure) winding in bundles, transporting and stacking in stores asdirected by Site Engineer/ Engineer-in-Charge inclusive of labour, tools& tackles etc.

25

222

188.47

... More
Repainting of Mainline facilities - Painting of sign boards of all sizes, including surface preparation ,minimum two coats of ready mixed synthetic enamel paint of reputed/approved brand to give an even shade over a coat of red oxide primer. Cleaning with wire brush, surface preparation, applying two coats of approved synthetic enamel paint and re-Iettering on the markers inclusive of ransportation, cost of paint, labour, tools and tackle complete as per direction of Site Engineeer/ Engineer-in-Charge. (The item includes cost of material and labour required for painting and re-lettering complete)

-

-

-

... More
Warning Sign Boards - Repainting

40

877

743.67

... More
Boundary Pillars - Repainting

79

156

132.32

... More
Kilometer Posts - Repainting

20

877

743.67

... More
Turning Points/ Crossing/ Direction Marker - Repainting

20

877

743.67

... More
Danger Markers - Repainting

50

780

661.62

... More
Aerial Markers - Repainting

25

877

743.67

... More
Boundary Pillers - Supplying & fixing in position precasted boundary pillars with foundation block of size 1200 mm x 300mm x 100 mm tick made with RCC concrete in mix 1:1.5:3 (1 cement, 1.5 sand and 3 stone aggregate) of 20 mm nominal size inclusive of providing MS Reinforcement of 04 (Four) Nos. 10mm dia. main bars of length 1050mm approximately and 05(Five) Nos. 6mm dia. stirrups at 225mm c/c; engraving letters of the respective pipeline of size 2" X 2", on top face writing respective chainages as per drawing, providing suitable holes at the bottom to receive 02 (Two) Nos.of 12mm dia. dowel bars. "Transporting precast boundary pillars to the required location in ROW, excavating the pit of required size in all kinds of soil including hard murrum/ soft rock and embedding the bottom400mm of the pillar in 1:2:4 P.C.C. (Plain Cement Concrete) of size600mm X 500mm X 400mm, supplying & inserting 2 (Two)Nos. dowel bars400mm long & 12mm dia. at the bottom of the boundary pillars. "Applying one coat of primer and two coats of synthetic enamel paint of approved quality and shades after thorough cleaning of surface. "Disposing off the surplus excavated earth after refilling, etc. all complete in every respect as per drawings, specifications and directions of Site Engineer/Engineer-in-Charge.

40

1574

1334.15

... More
Warning Sign Board - Supply, fabrication and erection of sign board on the Mainline Right ofWay (ROW) at various canal, road, river crossings etc., as perdirection. The boards are to be made of MS plate of 3 mm thick . The support pillars are to be made of 50x50x5 MS angles and frame of 25x25x5mm on all four sides. The board is to be transported to various locationon the mainline ROW. Each board is to be provided with two coat of synthetic enamel paint over a coat primer of approved quality & shadeand lettering in English /Hindi /local language as well as drawing of IOCmonogram etc., complete. Each board's upport pillars are to be groutedin two pits of size 300 x 300 mm and 600 mm depth foundation block ofcement concrete 1:2:4 (1 Cement: 2 Sand : 4 stone aggregate of 20 mmnominal size) inclusive of material, labour, foundation block, painting,lettering, tools & tackles etc., complete as per direction of SiteEngineeer/ Engineer-in-Charge. (Including letter writing)

-

-

-

... More
(a) Sign Board - Sign Board of size 3 Feet x 2 Feet

5

9535

8080.96

... More
(b) Sign Board - Sign Board of size 4 Feet x 3 Feet

5

13287

11260.34

... More
Supply and installation of pipeline facilities - Supply & Installation of various types of markers at designated location/ Chainage, including fabrication from steel as per drawing &specification, applying a primer coat of approved red oxide zinc chromate primer, transportation up to the work site, excavation in foundation, concreting as per drawing/spec, backfilling, painting &lettering of markers by using approved brand of paint & disposal of surplus materials. The item includes supply cost of all the construction materials, consumable, fabrication work, transportation, labour changes ,cost of primer, paint tools which are required for complete work as per the drawing notes, specifications & satisfaction Engineer-In-Charge.

-

-

-

... More
Direction /Turning Point Marker - Supply & Installation

15

9524

8071.26

... More
Kilometer Post Marker - Supply & Installation

15

10617

8997.46

... More
Aerial Marker - Supply & Installation

5

10460

8865.16

... More
Danger marker - Supply & Installation

25

9211

7806.62

... More
OFC Marker - Supply & Installation

3

9446

8005.1

... More
Crossing marker - Supply & Installation

10

9524

8071.26

... More
Vent & Drain Pipes - Supply & Installation

2

7324

6207.5

... More
ROW demarcation - Providing assistance in ROW demarcation / joint site inspection by locating pipe with poke rod, pipeline locator including pegging by pegs supplied by contractor, painting the pegs with bright red or yellow paint, taking measurements etc. as directed

25

1126

954.3

... More
Demarcation of land - Arranging Govt approved surveyor with required assistance including transportation for demarcation of land within ROW, calculation of area for providing compensations, IOCL pipeline location identification with IOCL provided Line Locator and GPS etc. Unit to be considered upon number of days. Detailed Field map to be prepared by surveyor.

10

6537

5539.85

... More
MS structural steel - Supplying, fabricating and erecting including embedding in RCC / PCC inposition MS structural steel section such as angle, tees, channels ,beams and ther standard sections, painting two coats of synthetic enamel paint of 25 microns DFT each over a coat of Red Oxide steel primerof 25 micron DFT including cleaning the surface of mill scales, rusts,oil, grease and weld slags etc. by hand cleaning, welding as per IS BOO ,including the cost of all materials, ransportation, welding, labour ,tools, tackles, consumables, power etc. complete in all respects as per specifications and directions of Engineer-in-charge/ Site Engineer. Item shall be paid for in Metric Tone.

-

-

-

... More
Contractor Supplied MS steel structure - Members fabricated from rolled steel sections/ plates/ strips etc. form an hole covers, gates, grills and other items

1

175226

148496.88

... More
IOC Supplied MS steel structure - Welding, erection, fabrication of IOC supplied steel structure.

1

66726

56548

... More
Reinforcement with TOR - Supply and fixing of Reinforcement with TOR steel bars for RCC work including cutting, straightening, bending, placing inposition and binding complete in all respect Item includes supply, transportation of all requisite material, manpower, tools and tackles at site

500

125

106.35

... More
Powercrete R-95 - Flood coating by R-95 Powercrete Liquid epoxy paint (Consisting Part A & Part B mixed in ratio as per manufacture recommendation over mainline pipe/ leak clamp/ sleeve etc. including surface preparation as per tender specification & application of liquid epoxy paint (Powercrete R-95) over finished surface. The cost includes all materials( liquid epoxy R-95) consumables, labour etc. The thickness of flood coating shall be 900-1000 micron.

11

8651

7331.93

... More
Mainline ROW Dressing - Area grading, levelling etc including cutting of rank vegetation, grass, brush wood, wild bushes, Babool trees, shrubs etc from the mainline ROW of 18/28/31/41/51 meters wide by deploying of mechanical means such as JCB, Excavators etc and saplings of girth upto 30 cms measured at a height of 1 Mts above ground level . The uprooted debris are to be cleared from the ROW and safely disposed upto a distance of 50 m outside the periphery of the area cleared. The ROW area to be properly refilled and levelled. The job is to be completed by supplying labors, tools, tackles, equipments, machinery etc complete by the contractor.

16

16514

13995.73

... More
Felling of trees - Felling trees of girth (measured at height of 1.0m above ground level), including cutting of trunks & branches, removing the roots up to 1.0m below ground level, filling approved earth, watering, ramming, stacking the serviceable material and disposal of unserviceable material as directed by the Site Engineer with all labour, supervision, tools, tackles, equipment, etc. complete in all respects.

-

-

-

... More
Girth 30 CM to 60 CM - Beyond 30 cm girth up to and including 60 cm girth

2

313

265.53

... More
Girth 60 CM to 120 CM - Beyond 60 cm girth upto and including 120 cm girth

2

1388

1176.98

... More
Girth 120 CM to 240 CM - Beyond 120 cm girth upto and including 240 cm girth

2

6423

5443.7

... More
Above 240 CM girth - Above 240 cm girth

2

12882

10916.96

... More
Painting / Lettering Writing Works - Painting / Lettering Works on steel or other metal surface at height up to 10 m, with best quality Primer and Paint, including smoothening surface by sand papering etc. Complete with All Materials, Labor, Tools, Equipment

-

-

-

... More
Removing loose scales,blisters - Removing loose scales,blisters etc from old painted surface by scrapping with wire brush thoroughly and smoothening the surface to make it suit- able for receiving fresh coat of paint

25

12

10.58

... More
Red oxide zinc chromate primer - Application of one coat ready mixed oil based red oxide zinc chromate primer

25

31

26.83

... More
Synthetic Enamel Paint - Application of Two or more coats of any shade of Synthetic Enamel Paint

25

126

107.32

... More
Aluminium Paint - Application of Two or more coats of any shade of Aluminium Paint

25

76

64.63

... More
Letter Writing - Lettering of any Font size, type, language, etc. for Monograms / Symbols / Diagrams / References / Instructions / Art Work /Slogan / Messages, etc. by application of two or more coats of sythetic enamel paint of any shade.

25

1010

856.2

... More
Supply & Installation of Shelter - Supply & Installation of Rain Proof Water Shed by Tarpouline & Bomboo structure and removal of the same, as per job requirement and as per IOCL discretion. This shed is to be erected for preventing entrance of Rain Water from sky into the trench. Measurement of this SOR, shall be as per surface Ground area covered at actual by erectred shed

10

152

129.42

... More
Removal of Pilferage Welding Arrangment - When pipe, flange and valve assembly found welded over mainline pipe with or without patch welding, Removal of pilferer's welded valve and pipe assembly with Grinding/ Cutting Machine/manualy including charges of the cutter/ grinder, generator, fuel etc. complete in all respect as per direction of EIC/ Site Engineer/ Site Representative

8

13469

11415.17

... More
Protection Measures of excavated pit /Trench - Cetering and Shuttering to prevent Earth Collapse of Excavated Pit / Trench: Providing and fixing Centering and shuttering including strutting, propping etc. and removal of form, with double scaffolding system (cup lock type) and MS centring plates (with bolting arrangement) all - around inner side of excavated pit to retain the earth and prevent collapsing of trench. Cup Lock made with 40 mm dia M.S. tube, placed 1.5 meter centre to centre, horizontal & vertical tubes joint with cup & lock system with M.S. Tubes, M.S. tube challis, M.S. clamps. MS Shuttering Plates should be connected with nut bolt system to each other and these are tied (with the outer face of the erected scaffold structure) cup lock scaffolding by MS binding wire. The scoffolding system shall be stiffened with bracings, runners at required locations with essential safety features for the workmen etc., complete as per directions and approval of Engineer - in - charge. Same items are to be removed, after completion of the of the requirement of the same. This shall also include, transportation, material handling equipment, manpower, tools whatsoever requied for the job and duration of installed structure in the trenach, shall be as required for safe completion of the job as per IOCL'S descrition. The elevational area of the scaffolding shall be measured for payment purpose.

100

84

71.54

... More
Shifting of Drums - Shifting of empty drums to the site from owner premises and oil filled drums from site to owners premises back. The payment shall be made for per drum shifted to site and back to owners premises.

12

444

376.87

... More
Hydra - Providing Hydra ( 10-12 TON capacity ) along with belts, chains, hooks etc at site for shifting heavy material or equipments like pipes, welding machine, cold cutting machine etc.The rate is inclusive of mobilisation and demobilisation cost, hiring and running cost, fuels, consumables, lube oil cost, operator cost etc., as per direction of EIC. Payment towards equipment running charges shall be made only if payments are not covered in any of the SOR items elese where in this contract.

2

7952

6739.42

... More
Idle charges for Tanker - Hire charges for mobilisation & demobilisation, including manpower & resources of empty oil tanker of capacity 20KL/ 24KL at mainline leak/pilferage site in ROW.

1

9441

8001.61

... More
Shifting of Oil through Tanker - Hire charges for shifting of retrieved crude oil from mainline leak/ pilferage site in ROW to nearest IOCL pumping station/ installation per trip of 20KL/ 24KL tanker within 50 km of leak site. Rate of this item is also inclusive of demobilisation charges with all manpower, material and resources deployed at site after completion of work.

1

11942

10121.12

... More
Extra charges for transportation of oil soaked soil - Extra charges for transportation of oil soaked soil from the leak/philferage site to other location in all respect beyound 50KM measerment unit each(EA) describe per cum per KM shifting of retrivedoil soaked earth from mainline leak/burst/philferage site to designatedlocation as instructed by EIC.

25

134

113.6

... More
Supply of additional Services - Supply of additional services, if required to be deployed for Attending the job at site, as per job requirement & at IOCL's descrition. One day shall be of 8 hours duration of uninterrupted availability for continuous usage of the deployed service, i.e. for the first Eight hours or part thereof from the time of deployment - contractor shall be paid amount equal to one day. (i.e. 1 equipment day = 8 hrs of deployment and availability for contnuous usage). The working hours shall start from the time of deployment of the pumping set at site. This will be inclusive of Mobilisation & Demobilisation Charges, Operational Charges (Fuel, Consumables, Operator etc whatsoever is required for intended operational at site); Job is to be carried out as per Tender Document and as per Instruction of EIC. Any additional deployment beyond Eight (8) hours, shall be paid extra as additional proporationate Day, and shall not be liable for any short of overtime / payment in any form. (i.e. for deployment of any sort of following services for a period of 10 hours in a day, same shall be paid as 1.25 Days (For items below)

-

-

-

... More
Tractor - Tractor with Fuel, operator for Transportation as per Job requirement

4

5916

5014.36

... More
Dewatering Pump - Providing diesel engine driven (of capacity not less than 2.5 HP) water pump set including mobilisation and demobilisation charges, Operator, fuel, hose length of suction / discharge side of at least 15 meter for continuous functioning of the same at site

2

3379

2863.58

... More
Portable DG Set - Providing diesel engine driven (of capacity not less than 2.5 HP) water pump set including mobilisation and demobilisation charges, Operator, fuel, hose length of suction / discharge side of at least 15 meter for continuous functioning of the same at site

6

8442

7154.5

... More
Halogen / focus set - Halogen / focus set with 30 mtr. Extension cabel including spare lamp 1000 watt for illumination of working area

32

844

715.43

... More
Air Compressor - Providing the air compressor of suitable capacity for flushing of annular space of carrier casing as per direction of EIC. One day shall be equivalent to 24 hrs.

10

26371

22348.8

... More
Service Crew for Mechanical Miscllaneous Job - This must be inclusive of 1 Pipe Line fitter & 2 Rigger with Technician Tool boxes for size upto 32 mm

6

2534

2147.68

... More
Repair of OFC - Repair of OFC defects in existing optical fibre cable already laid along the pipeline in various stretches .The job includes locating OFC defects/joint losses by taking OTDR , exposing the cable by excavation/trenching in all kinds of soil including rock, repairing the cut/damaged OFC by splicing and restoring the trenches in original condition, checking , ensuring continuity of OFC with acceptable losses as per direction of site engineer/EIC. Supply and installation of all required materials for repair such as joint kit, Fid marker( with stamping from owner's electronic marker cum locator) , RCC joint box etc shall be in scope of contractor. OFC cable if required for repair works shall be provided by owner. All the test/repair equipments such as OTDR machine, splicing machine, tools/tackles,labour,consumable necessary for performance of work shall be arranged by the contractor. supply of joint kit, Rfid marker shall be as per approved make in the tender. payment will not be made where OFC joint cut by contractor fault.

5

47860

40559.74

... More
Mobilization to site within stipulated time - Mobilisation to site within contractual time with manpower, security guard, labour, tools, tackles, cold cutting machine, equipments and all other resources (eg JCB, compressors, dewatering pump, DG sets, dumper, trailer, welding generator, Hydra, pick-up, Dumper, tents & chairs etc) with fuels and consumables etc as outlined in tender document for execution of job. Rate is Lumpsum basis and shall be payable to contractor on complete mobilisation to site to the satisfaction of EIC. Rate of this item is also inclusive of demobilisation charges with all manpower, material and resources deployed at site after completion of work. The contractor shall also liasion with local villager, local police for safe and secure rectification of the work.

2

39801

33729.66

... More
Providing welder, cutter, grinder team - Providing welder, cutter, grinder team

3

5602

4747.47

... More
Supplying & filling selected earth/ moorum (excluding black cotton soil) from Contractor's own borrow areas including royalty, with all leads and lifts at various location at all depths including watering, compacting in layers not exceeding 20cm thickness.Payment towards this SOR shall be made only if payments are not covered in any of the SOR items elesewhere in this contract.The SOR is inclusive of all cost of supply and services as mentioned in general note for completion of work.

25

530

449.63

... More
Sand filling in plinth/ floors - Supplying and filling in plinth with sand under floors, including watering, ramming, consolidating and dressing complete.

50

2509

2126.72

... More
Flat brick soling - Supplying and laying flat brick soling in foundation trench, in floors, garages, sumps, etc., with bricks of class designation 50 laid to proper slope, level and grade etc. filling of the joints with sand etc. complete in all respects inclusive of cost of all labour, materials, tools, tackles etc. as per drawings, specifications and directions of the Engineer-in-Charge.

12

800

678.56

... More
Brickwork (Non Modular)-In Superstructure: - Brick work with common burnt clay F.P.S. (non-modular) bricks of class designation 7.5 in superstructure above plinth level up to floor V level in all shapes and sizes in :

-

-

-

... More
In CM 1:4 - Cement mortar 1:4 (1 cement : 4 coarse sand)

12

10034

8503.67

... More
In CM 1:6 - Cement mortar 1:6 (1 cement : 6 coarse sand)

12

9753

8265.41

... More
PCC/RCC (Reinforcement to be paid extra as per SOR) - Providing and laying cement concrete in retaining walls, return walls, walls (any thickness) including attached pilasters, columns, piers, abutments, pillars, posts, struts, buttresses, string or lacing courses, parapets, coping, bed blocks, anchor blocks, plain window sills, fillets, sunken floor etc., up to floor five level, excluding the cost of centering, shuttering and finishing :

-

-

-

... More
1:1.5:3 (Coarse Sand & Aggregate-20mm) - 1:1.5:3 [1 cement : 1.5 coarse sand (Zone-III) derived from natural sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources]

10

11534

9774.66

... More
1:2:4 (Coarse Sand & Aggregate-20mm) - 1:2:4 [1 cement : 2 coarse sand (Zone-III) derived from natural sources : 4 graded stone aggregate 20 mm nominal size derived from natural sources]

10

10991

9315.18

... More
15mm plaster (in coarse sand): - 15 mm cement plaster on rough side of single or half brick wall of mix :

-

-

-

... More
1:4 (1 cement : 4 coarse sand) - 1:4 (1 cement : 4 coarse sand)

3

409

347.31

... More
Demolishing cement concrete: - Demolishing cement concrete manually/ by mechanical means including disposal of material within 50 metres lead as per the directions of Engineer-in-Charge. [Notes: (1) Dismantling shall be allowed during day shift only & prior permission for the same shall be obtained. (2) Providing of necessary covers/ barricades around the work area shall be done prior to dismantling operations] :

-

-

-

... More
Nominal concrete 1:3:6 or richer mix - Nominal concrete 1:3:6 or richer mix (including equivalent design mix)

5

2232

1891.95

... More
Demolishing RCC Work - Demolishing R.C.C. work manually/ by mechanical means including stacking of steel bars and disposal of unserviceable material within 50 metres lead as per the directions of Engineer-in-Charge. [Notes: (1) Dismantling shall be allowed during day shift only & prior permission for the same shall be obtained. (2) Providing of necessary covers/ barricades around the work area shall be done prior to dismantling operations. (3) Cutting of all reinforcement shall be done using hack saw or chiesel or any other method as approved by the Engineer-in-Charge]

5

3256

2760.09

... More
Demolishing brickwork - Demolishing brick work in cement mortar manually or by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per the directions of Engineer-in-Charge. [Notes: (1) Dismantling shall be allowed during day shift only & prior permission for the same shall be obtained. (2) Providing of necessary covers/ barricades around the work area shall be done prior to dismantling operations]

5

1888

1600.61

... More
Dismantle barbed/flexible wire in fence - Dismantling barbed wire or flexible wire rope in fencing including making rolls and stacking within 50 metres lead.

50

33

28.58

... More
Laying old CC interlocking paver blocks - Laying old cement cocrete interlocking paver blocks of any design/ shape laid in required line, level, curvature, colour and pattern over and including 50 mm thick compacted bed of coarse sand, filling the joints with fine sand etc. all complete as per the directions of the Engineer-in-Charge. [Note: Old CC paver blocks shall be supplied by the department free of cost].

25

416

353.02

... More
Chamfered edge CC paver blocks: - Providing and laying factory made chamfered edge interlocking Cement Concrete paver blocks in foot path, park & lawns driveway or light & traffic parking etc. of required strength, thickness & size/ shape, made by table vibratory method using PU mould, laid in required colour & pattern over 50mm thick compacted bed of course sand, compacting and proper embedding/laying of inter locking paver blocks into the sand bedding layer through vibratory compaction by using plate vibrator, filling the joints with sand and cutting of paver blocks as per required size and pattern, finishing and sweeping extra sand, all complete as per manufacturer's specifications & directions of the Engineer-in-Charge :

-

-

-

... More
M-35 Grade (60mm thick) - 60mm thick Cement Concrete paver block of M-35 grade with approved colour, design & pattern.

25

1136

963.42

... More
PTMT Urinal Cock: - Providing and fixing PTMT urinal cock of approved quality and colour :

-

-

-

... More
15mm NB - 15 mm nominal bore, 80 mm long, 42 mm high and 30mm wide with BSP female threads weighing not less than 48 gms.

3

210

178.64

... More
Dismantle steel work (built-up section) including dismembering - Dismantling steel work in built up sections in angles, tees, flats and channels including all gusset plates, bolts, nuts, cutting rivets, welding etc. including dismembering and stacking within 50 metres lead. [Notes: (1) Dismantling shall be allowed during day shift only & prior permission for the same shall be obtained. (2) Providing of necessary covers/ barricades around the work area shall be done prior to dismantling operations. (3) Cutting of steel shall be done using hack saw or chiesel or any other method as approved by the Engineer-in-Charge.]

25

5

4.52

... More
Profiled sheeting (0.45mm BMT, 550 MPa): - Designing, providing, fabricating and fixing profiled sheeting 730-1020 mm cover width, 28-30 mm crests @ 186-333 mm centre to centre, manufactured out of 0.45 mm BMT (Base Metal Thickness) Hi-Tensile Steel (Minimum yield strength of 550 MPa) coated with hot dip metalic galvalume/ zincalume coating AZ-150 or equivalent as per AS:1397 and super polyster XRW quality paint coat as per AS/ NZS2728 (Category-3) of approved colour for roofing, cladding, gutters, rainwater pipes, spouts etc. The total mass of the coating on both sides shall be 150 gms/sqm (Zinc 45%/ Aluminium 55%). The total paint coat thickness shall be 35 microns, comprising of 20 microns exterior coat of super polyster XRW on top surface and 5 micron super polyester on back surface over 5 micron primer coats on both surfaces including side and end laps. The sheets shall have wide pans with 2-3 stiffening ribs for effective water shedding and special male/ female ends with full return legs on side laps for purlins support and anti-capilary flute in side lap. The sheets shall be fixed using polymer coated hot dip galvanised hex head self drilling fasteners as per AS:3566 (Class-3) on each crest of sheets for connection with purlins and polymer coated hot dipped stitching fasteners at 300 mm c/c on all sides and end laps, etc. Approved sealing tapes shall be used on side laps and end laps of sheets and closer to be provided at the last end of sheet. The measurement shall be based on per unit of finished/ laid area. Item to include curved sheets also wherever required. The Contractor shall give minimum 10 year guarantee for the sheets against deterioration, disintegration, loss of lustre, variation in colour, etc. and leakages across laps, fasteners etc. The Contractor is to submit design and shop drawing for approval on the sheet profile, design and details before installation :

-

-

-

... More
Roof, cladding & accessories - Roof, side cladding, gable end cladding, gutters, rainwater pipes/ spouts etc. [Note: The area of sheet coverings shall be measured on the flat surface i.e. without allowance for laps and ribs].

25

1784

1512.09

... More
Rainwater Pipes (uPVC)-110mm Dia - Providing and fixing on wall face Unplasticised Rigid PVC (uPVC) rainwater pipes (110 mm diameter, single socketed) conforming to IS:13592 Type-A, including jointing with seal ring conforming to IS:5382, leaving 10 mm gap for thermal expansion.

15

391

332.17

... More
CPVC Piping (Internal Work-Exposed): - Internal Work - Exposed on wall: Providing and fixing Chlorinated Polyvinyl Chloride (CPVC) pipes, having thermal stability for hot & cold water supply, including all CPVC plain & brass threaded fittings, including fixing the pipe with clamps at 1.00 m spacing. This includes jointing of pipes & fittings with one step CPVC solvent cement and testing of joints complete as per directions of the Engineer-in-Charge :

-

-

-

... More
20 mm nominal outer dia pipes - 20 mm nominal outer dia pipes

10

394

334.24

... More
25 mm nominal outer dia pipes - 25 mm nominal outer dia pipes

10

474

402.03

... More
50 mm nominal outer dia pipes - 50 mm nominal outer dia pipes

10

1160

983.84

... More
Water thinnable cement primer - Water thinnable cement primer

10

77

65.33

... More
Water proofing cement paint: - Finishing walls with water proofing cement paint of required shade :

-

-

-

... More
New work (Two or more coats) - New work (Two or more coats applied @ 3.84 Kg/10 sqm)

10

117

99.36

... More
Textured exterior paint: - Finishing walls with textured exterior paint of required shade :

-

-

-

... More
New work (Two or more coats) - New work (Two or more coats applied @ 3.28 ltr/10 sqm) over and including priming coat of exterior primer applied @ 2.20kg/10 sqm

10

298

252.63

... More
Water proofing cement paint: - Finishing walls with water proofing cement paint of required shade :

-

-

-

... More
Old work (one or more coats incl primer) - Old work (one or more coats applied @ 2.20 kg/10 sqm) over priming coat of primer applied @ 0.80 litrs/10 sqm complete including cost of Priming coat.

25

112

94.95

... More
Old work (one or more coats) - Old work (one or more coats applied @ 2.20 kg/10 sqm) complete.

25

76

64.63

... More
Textured exterior paint: - Finishing walls with textured exterior paint of required shade :

-

-

-

... More
Old work (Two or more coats) - Old work (Two or more coats on existing cement paint surface applied @ 3.28 ltr/10 sqm.

25

216

183.76

... More
Old work (One or more coats) - Old work (One or more coats) applied @ 1.82 ltr/10 sqm.

25

135

114.66

... More
Synthetic enamel paint: - Painting with synthetic enamel paint of approved brand and manufacture to give an even shade :

-

-

-

... More
Two or more coats on new work - Two or more coats on new work

15

156

132.36

... More
Red oxide zinc chromate primer - With ready mixed red oxide zinc chromate primer of approved brand and manufacture on steel galvanised iron/ steel works.

15

65

55.21

... More
Red oxide zinc chromate primer (2nd coat) - With ready mixed red oxide zinc chromate primer of approved brand and manufacture on steel work (second coat).

15

34

29.61

... More
Synthetic enamel paint: - Painting with synthetic enamel paint of approved brand and manufacture of required colour to give an even shade :

-

-

-

... More
Old work (one or more coats) - One or more coats on old work

25

102

87.06

... More
White cement based putty on wall - Providing and applying white cement based putty of average thickness 1 mm, of approved brand and manufacturer, over the plastered wall surface to prepare the surface even and smooth complete.

25

147

125.39

... More
Acrylic emulsion paint on wall: - Wall painting with acrylic emulsion paint of approved brand and manufacture to give an even shade :

-

-

-

... More
Two or more coats on new work - Two or more coats on new work

15

165

140.09

... More
Lettering with Black Japan paint - Lettering with black Japan paint of approved brand and manufacture. [Note: Unit "EA" shall mean "PER LETTER PER CM HEIGHT"].

500

6

5.12

... More
Contractors Profit on Monthly charges for providing, operating and maintaining Quick Response Team (QRT)

24

21526

18243.2

... More
Contractors Profit on Mechanical/Electrical/T&I Technician (QRT) extra hourly charges beyond duty hours/ odd hours as approved by Site Engineer / EIC (1 EA = 1 HR)

100

38

32.33

... More
Contractors Profit on Helper (QRT) extra hourly charges beyond duty hours/ odd hours as approved by Site Engineer/ EIC. (1 EA = 1 HR)

50

32

27.53

... More
Contractors Profit on QRT vehicle driver extra hourly charges beyond duty hours/ odd hours as approved by Site Engineer/ EIC. (1 EA = 1 HR)

50

32

27.53

... More
Contractors Profit on Monthly charges for providing, operating and maintaining PIDWS Alarm Verification Team

24

12841

10882.34

... More
Contractors Profit on Unarmed Guard (PIDWA AVT) extra hourly charges beyond duty hours/ odd hours as approved by Site Engineer / EIC (1 EA = 1 HR)

50

37

31.76

... More
Contractors Profit on PIDWS AVT vehicle driver extra hourly charges beyond duty hours/ odd hours as approved by Site Engineer/ EIC. (1 EA = 1 HR)

50

32

27.53

... More
Contractor Profit on manning of SV/RCP

168

4114

3486.59

... More
QRT Vehicle hiring cost - Monthly charges for Providing, Operating and Maintaining 01 no. of Mahindra & Mahindra - Bolero Camper: BOL CAMPER4WD POWER STEERING BS6 with 5 seater or equivalent vehicle with approval from Engineer-In-Charge in working condition and not older than year of manufacturing 2023 for a period of 2 years excluding cost of fuel but inclusive of all taxes (except GST), insurance, cost of obtaining fitness certificate, lubricant, spares, contractor profit etc. for smooth running of one (01) vehicle for two year contract period as per instruction of Engineer-In-Charge. QRT vehicle hiring charges are considered for 24*7 days. QRT vehicle will also be used in night for PIDWS alarm verification. Note:- (1) Hiring charge to be quoted is exclusive of driver wage payment & cost of fuel. Separate provision exists for payment of such items. (2) Rate quoted by the bidder is for One vehicle/month on 24*7 hr basis inclusive of Contractor Profit. (Variable)

24

26359

22338.52

... More
Monthly running/fuel charges for QRT/PIDWS alarm verification vehicle Mahindra & Mahindra - Bolero Camper: BOL CAMPER4WD POWER STEERING BS6 with 5 seater or equivalent vehicle with approval from Engineer-In-Charge in working condition and not older than year of manufacturing 2023. Running charges for KM run for applicable work as outlined in tender documents. The rate shall remain constant through out the contract. Apart from using the vehicle for mobilizing of QRT members to site, this vehicle shall also be used for taking delivery of IOCL's materials such as leak clamps, sleeves, weld+ends, valves, pigs etc. from the designated stockpile location, transportation of materials to ROW/ work site, RCP/SV stations, station locations etc.No charges shall be paid for transporting owner supplied leak clamps, sleeve, coating materials(R-95/Belzona/Cold Applied tape etc), fire extinguishers etc. to Base Location of Contractor. Unit is Rs per km. Km shall be calculated on the basis of two way distance. This item includes cost of toll, parking charges, contractor's profit and all other associated cost for completion of work. Vehicle will also be used for verfication of PIDWS alarms in night

168351.66

10

8.99

... More
Providing skilled santiary plumber for plumbing work at RCP/SV including all tools, tackles and manpower as per the requirement of repairing job as instructed by EIC/ Site Engineer. (1 EA=1 DAY)

5

1192

1010.38

... More
Deployment of dedicated security guard/watch man at site for safety and security of pipeline during exigencies. The security guards shall be deputed at site on 24*7 basis till the completion of the work and closure of site. The security guard shall remain available at site to protect pipeline from any untoward activities. The unit of measurement 'EA' means shift of 8 hours by one security guard.

5

996

844.1

... More
Intentionally kept blank

-

-

-

... More
Transportation of pipe/EEE:-Taking delivery and transportation of Owner-supplied coated/bare pipe (upto length of 12m of OD 12"/18"/30")/Emergency Evaculation Equipment to the leak/pilferage/burst site in in BKPL Bihar/Jharkhand from designated stockpile locations,loading and unloading, inspection of the coated/bare pipes visually and with holiday detector for defects, arranging all necessary intermediate storage area required thereof till the pipe(s) are installed in permanent position.Carrying out repair of pipe & coating defects for defects occurring after "taking over" of pipes from Owner, replacement in the case of non-repairable defects and repairing damages to pipe coating including defects/ damages occurring during transportation & handling.Payment will be made per trip of trailor upto 100 KM of pipe/RoW

1

56027

47480.55

... More
Additional Utility vehicle/Pickup Van: Pick up van/Utility vehicle 2-wheel drive with Fuel, operator for Transportation (of owner's material) within range of 100 Km of pipeline length/ROW including loading, unloading of equipment on/from vehicle(manually), taking delivery of IOCL's materials such as leak clamps, sleeves, weld+ends, valves, pigs etc. from the designated stockpile location, transportation of materials to ROW/ work site, RCP/SV stations, IOCL locations etc. This item includes cost of toll, parking charges and all other associated cost for completion of work. Unit of measurement "Ea" means per trip (to & fro) of the vehicle within range of 100 km

4

4878

4134.3

... More
General Note: (Below mentioned SOR items shall be read in conjunction with this note.) The work as mentioned in all of the below given item description is to be done as per tender specifications and/or as directed by Engineer in Charge/Site Engineer complete in all respect by maintaining quality and safety of Contractor’s personnel/labours/equipment/ Owner’s pipeline and other facilities in a most professional and planned manner. The SOR is inclusive of cost of materials, power source, tools, tackles, measuring instruments, labours, highly skilled/skilled/semi-skilled/unskilled manpower, machineries, accessories, consumables, transportation cost of mobilizing and demobilizing of all resources (equipment and manpower) to site/RCP/SV/HOV/IOCL locations , loading & unloading of equipment, Site accommodation, setting of plan, access road, water supply, electricity and general site arrangements, Site Supervision, and all associated cost of supply and services for performing and completing the work as per the direction of Site Engineer/ Engineer-In-Charge. All of these arrangements have to be done by Contractor. No separate charges shall be payable for these arrangements as SOR is inclusive of all cost of supply & services for completion of work mentioned in item description. Payment towards these SOR shall be made only if payments are not covered in any of the SOR items elsewhere in this contract.

-

-

-

... More
Repair of Kilometer Posts, direction markers, warning posts, Vent pipe by supplying & welding of top portion inclusive of two coats of synthetic enamel paint of approved quality. For Kilometer post & Turning point the numbering and arrow is to be etched by gas cutting torch as directed by Site Engineer / Engineer in Charge.The SOR is inclusive of all cost of supply and services as mentioned in general note for completion of work.

12

2066

1751.33

... More
Uprooting, shifting & installation(as per tender specification) of existing ROW facilities such as Boundary pillars, KM Post, TP/IP, Warning Post, Notice boards, to a suitable location within ROW.The SOR is inclusive of all cost of supply and services as mentioned in general note for completion of work.

12

1192

1010.38

... More
Supplying fitting and fixing 600 mm ( ±30 mm) diametre R.B.T (Reinforced Barbed Tape) Concertina fencing on wall top using concertina coils stretched to approx.6 meters length at site clipped with two nos. of horizontal R.B.T strands which will be tensioned and fixed with the vertical M.S angle iron posts by means of security fasteners (such as 'C' clips, R.B.T clips etc.)(The rate is exclusive of the cost of posts)(Length of boundary wall be considered for measurement)The SOR is inclusive of all cost of supply and services as mentioned in general note for completion of work.

15

595

505.02

... More
Supplying, fitting, fixing, Chain link fencing of approved quality with R.C.C posts wooden posts or iron posts by means of galvanised "C" clips to grid of horizontal strands of galvanised high tensile spring steel wire of 12 S.W.G which have to be tensioned and fixed to the vertical posts by means of galvanised special clips, bolts and nuts etc. including painting and all materials, labour charges etc.(I) 50 mm. x 50 mm. x 8 g. (The rate is exclusive of the cost of posts)The SOR is inclusive of all cost of supply and services as mentioned in general note for completion of work.

15

604

512.45

... More
Pest and Rodent Control at RCP/SV locations: The Contractor may hire external agency for this work. However, the contractor or the external agency hired for this work must possess valid license to stock & use restricted insecticide(s) for commercial pest control operation(s) as per rule 10(3-A) of Insecticide rule 1971. License issuing authority shall be ministry/ Department of agriculture of any state Govt. Or central govt. Of India. Copy of the said license shall be submitted to IOCL office before execution of the work. The contractor must ensure that incident of snake/rodent/pests & insects entry inside RCP/SV permises do not occur after pest and rodent control work.The SOR is inclusive of all cost of supply and services as mentioned in general note for completion of work.

-

-

-

... More
Supplying and providing rodent Control chemical, snake control chemical for baiting at all RCP/SV. Rodent control is to be done by brands like Roban cakes or equivalent approved brand having Bromadiolone .25% as chemical composition with minimum consumption of 600 gm of cake per RCP/SV per event. The work shall be done at interval as directed by Engineer in Charge/Site Engineer.The SOR is inclusive of all cost of supply and services as mentioned in general note for completion of work. Unit is Rs per RCP/SV per event.

8

908

769.82

... More
Supplying and providing snake control chemical for baiting at all RCP/SV. Snake control is to be done by using carbolic acid and phorate granule powder of approved brands with minimum consumption of 1200 gm of carbolic acid per quarter per RCP/SV and 2 KG of phorate powder per RCP per event.The work shall be done at interval as directed by Engineer in Charge/Site Engineer.The SOR is inclusive of all cost of supply and services as mentioned in general note for completion of work.Unit is Rs per RCP/SV per event.

8

1987

1683.97

... More
Supplying and providing chemical for controlling crawling/ flying pests and insects including mosquitos, ants, spider, lizards, cockroaches at all RCP/SV in trenches, crevices, walls etc at all places by spraying inside and outside the RCP/SV building. This is to be done by using water based chemical solution by brands like spotkill or equivalent brand having alphacyphermethrin 10% as composition with minimum consumption of 200 ml of the chemical per RCP per event. The work shall be done at interval as directed by Engineer in Charge/Site Engineer.The SOR is inclusive of all cost of supply and services as mentioned in general note for completion of work.Unit is Rs per RCP/SV per event.

8

1930

1635.86

... More
Washing and cleaning complete toilet block (toilet/wash basin/bathroom/floor/floor traps/water taps etc.) and maintaining the same in good hygienic condition by supplying, providing and maintaining items as mentioned below inside toilet block of each RCP/SV throughout the year as per consumption rate per annum. The work shall be done once in a Fortnight per RCP/SV or at interval as directed by Engineer in Charge/Site Engineer. Unit is Rs per Toilet block per day. The SOR is inclusive of all cost of supply & services for completion of the work. Note: The below mentioned items are to be used for washing and cleaning of toilet block only and not for other housekeeping of RCP/SV.The SOR is inclusive of all cost of supply (Toilet cleaner, Toilet Cleaning brush, Phenyl Floor Cleaner, Toilet air freshner, napthaline balls,Liquid Handwash (Dettol/lifebuoy), Detergent Powder, Broom )and services as mentioned in general note for completion of work.

104

658

558.12

... More
Providing Register in SV/ RCP for record as per specifications and direction of Site Engineer / EIC.

48

210

178.02

... More
Providing 20 litres RO Drinking water jar as per direction of EIC/ Site Engineer

48

125

106.49

... More
Providing RO Drinking water in SV/ RCP as per direction of EIC / Site Engineer

48

34

28.87

... More
Providing Dustbin in SV/ RCP ,as per specifications and direction of Site Engineer / EIC.

4

1627

1378.93

... More
Providing First Aid Box in SV/RCP as per specifications and direction of Site Engineer / EIC.( Add-on Safety - Medical Emergency First Aid Kit for Industries (with Metal Box) - CLASS – B (As Per Factory Act 1948))

2

1640

1390

... More
Providing protable ladder in SV/ RCP ,as per specifications and direction of Site Engineer / EIC.

2

9083

7698.16

... More
Supplying sapling( grafting) at awareness program location in mainline as advised by EIC/Site Engineer. Unit is Rs per sapling.The SOR is inclusive of all cost of supply and services as mentioned in general note for completion of work.

-

-

-

... More
mango/black jamun or any other equivalent plant

150

133

113.55

... More
lemon/guava/java apple or any other equivalent plant

150

113

96.23

... More
neem/mahogani/Akashmoni/ flowering plants or any other equivalent plant

150

17

14.43

... More
Arranging and serving official lunch with refreshment for guests (IOCL officials, police officials, gram panchayat members, administrative officials-DM,BDO,SDO etc.) Unit is lunch packet per guest.The SOR is inclusive of all cost of supply and services as mentioned in general note for completion of work.

120

465

394.53

... More
Arranging and serving tea, snacks, sweet packets for villagers attending the programme. Unit is Rs per personThe SOR is inclusive of all cost of supply and services as mentioned in general note for completion of work.

600

88

75.06

... More
Providing and setting up good quality and safe Pandal/Tent including all materials, labours, tools & trackles, transportaion etc. completed in all respect as per advice by EIC/Site Engineer. The SOR is inclusive of all cost of supply and services as mentioned in general note for completion of work. FT2 rate is for 24 Hrs deployment .

1000

22

19.25

... More
Hiring charges of good quality chair and arranging its in proper manner including all materials, labours, tools & trackles, transportaion etc completed in all respect as per advice by EIC/Site EngineerThe SOR is inclusive of all cost of supply and services as mentioned in general note for completion of work .(1 EA=1 DAY equivalent to 24 Hrs.)

400

15

13.47

... More
Hiring charges of good quality chair with cover and arranging its in proper manner including all materials, labours, tools & trackles, transportaion etc completed in all respect as per advice by EIC/Site Engineer.The SOR is inclusive of all cost of supply and services as mentioned in general note for completion of work.(1 EA=1 DAY equivalent to 24 Hrs.)

80

45

38.49

... More
Hiring charges of good quality table with cover and arranging its in proper manner including all materials, labours, tools & trackles, transportaion etc completed in all respect as per advice by EIC/Site EngineerThe SOR is inclusive of all cost of supply and services as mentioned in general note for completion of work.(1 EA=1 DAY equivalent to 24 Hrs.)

20

51

43.3

... More
Hiring charges of sound system with operator including microphone, box, 2 nos. mic etc and arranging its in proper manner including all materials, labours, tools & trackles, transportaion etc completed in all respect as per advice by EIC/Site EngineerThe SOR is inclusive of all cost of supply and services as mentioned in general note for completion of work. .(1 EA=1 DAY equivalent to 24 Hrs.)

4

4314

3656.63

... More
Painting / Lettering Works on steel or other metal surface at height up to 10 m, with best quality Primer and Paint/sticker, including smoothening surface by sand papering etc. Complete with All Materials, Labor, Tools, Equipment

-

-

-

... More
Supply of retro radium sticker with designing & printing

10

203

172.25

... More
Supply of good quality PVC Gumming sticker (Round) with designing & printing

50

113

96.23

... More
Supply of good quality PVC Gumming sticker (Square shape) with designing & printing

50

98

83.72

... More
Supply of ACP board

50

249

211.7

... More
Supply & printing of multi colour leaflet (A4 size)

1500

13

11.55

... More
Providing New year calender

2500

34

28.87

... More
Supply, Printing & Fixing of multi-coloured Flex banner

50

18

15.88

... More
Supply, Printing & Fixing of Eco vinyle print hi Glosy

15

79

67.36

... More
Supply, Printing & Fixing of Soft sheet with vinyle pesting

15

98

83.72

... More
Supply, Printing & Fixing of Radium sticker cutting work

15

203

172.25

... More
Manual excavation (restricted area without the use of JCB) in all type of soil including hard murrum for exposing existing pipeline , bottom clearance including keeping top layer of soil seperately, shoring, shuttering, stacking of soil, followed by backfilling of the trench . The contractor shall properly compact the backfilled earth & restore the RoW to original condition as per the direction of EIC/site engineer.

25

585

496.38

... More
Supply of 12 Kl water as and when required basis including costof hiring of 12 Kl capacity tanker lorry, fuel, labour etc.

3

15486

13124.14

... More
Providing Nitrogen filled cylinder each of 7m3 capacity at 140-300 bar, as and when required basis including hose assembly (hose length 10 m minimum) fitted with flange 2 inch 600#/1 inch 600# on one end nd regulator with valve on another end However, cylinder shall be the property of the Contractor.

10

1367

1159.21

... More
Hire Charges for Labour for emergency works: Note: Payment for Labour charges under this item will be made only for work carried out other than work mentioned in other SOR items of the tender and as per direction of Engineer-in-Charge. Unit per labour per day is shift of 08 hours

50

708

600.3

... More
Grass cutting / cleaning housekeeping of at Repeater cum Cathodic protection station (RCP) or Cathodic Protection location where building and or brick masonry boundary is available including transportation, labour charges etc. Note: RCP/CP shall include overall area covered inside the boundary of RCP premises.

16

3449

2923.29



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.