Water Resources Department Tender

BidAssist is a very user-friendly website which helps in finding the specific Assam e-tender that one is looking for. For getting any information or detail about any e-tender the Assam government must have posted, BidAssist is designed in such a manner so as to provide information on all government tenders in one place without any inconvenience.

Water Resources Department - WRD Tender

Works
Civil And Construction
Water Storage And Supply
Eprocure
Opening Date30 Jan 2025
Closing Date26 Feb 2025
Tender AmountRefer Documents 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
II. FOR TEMPORARY PROTECTION OF SLOPE

-

-

-

... More
Carriage of 300 gsm Geo sheet of including loading & unloading, stacking cost of P.O.L. etc. complete and including hire charge of truck with driver and handyman, etc. completed as directed. (Distance to be calculated from Divisional Store) Distance from Divisional Store to Work Site = 5KM

13171.2

-

-

... More
Labour charge for laying Geo fabric sheet as filter bellow pitching including carrying, lapping, wrapping & stitching as directed by the Engineer-in-Charge.

12544

-

-

... More
Carriage of Geo Bags of size 1.03 × 0.70 m / 1.0 x 0.7m including loading & unloading, stacking, etc. complete and including hire charge of truck with driver and handyman cost of POL etc. completed as directed. (Distance to be calculated from Divisional Store) Distance from Divisional Store to Work Site = 5KM

21029

-

-

... More
Filling and laying of Geo bags of size 1.03 m × 0.70 m including excavation of sand/silt of size more than 80 micron from flood plain or adjacent chars within a distance of 90 m of the work site, filling geo bags with sand/silt having minimum weighing 126.00 Kg and minimum volume 0.084 Cum after filling, double locking chain stitching the mouth of the filled bags with polypropylene thread by power driven double needle double stitched machine, stacking the same in batches of 100, carrying the same to the dumping site including all handling charges and local carriage within a distance of 150 m and laying properly as directed. (Geo Bag and Polypropylene thread will be supplied by the department free of cost) Without Boat

21029

-

-

... More
Earth work in excavation by hydraulic excavator, to proper grade and slopes as required including utilizing the spoils for filling works in the vicinity including removing roots & vegetation, dressing to design section etc. complete as directed. Ordinary Soil, For depth up to 3.00 m

230.4

-

-

... More
SECTION 2: FOR ABOVE WATER WORKS WITH PERMANENT RIVER BANK PROTECTION WORKS

-

-

-

... More
Earth work in excavation of drainage channel to the proper grade and slopes as required including depositing the excavated debris/soil to a safe distance of minimum 50 m distance as directed. Normal Soil

9152.18

-

-

... More
Earthwork in bank trimming to the designed section /slope by mechanical means including removing the trimmed soils to a minimum distance of 30 m, complete as directed.

25329.54

-

-

... More
Construction and supply of Wire -netting box of size 1.50 m × 1.50 m × 0.45 m made with mechanically woven, double twisted, hexagonal shaped wire mesh with wire made of low carbon, high ductile MS wire with heavy class of galvanization with an additional layer of PVC coating with mesh type of 10 × 12 as per EN 10223 & ASTM A975, mesh wire of 2.70 mm (I.D) /3.70 mm (OD) tensile strength of 450-500/mm2, edge wire selvedge around it at least 2.5 times, lacing wire (Zinc PVC coated) of 2.20 mm (I.D)/3.20 mm (OD), VC coating thickness of 0.50 mm nominal, 0.38 mm minimum, Mesh opening size 150 mm × 150 mm and with average weight per unit being 12 Kg with additional 3% of the weight of box for lacing wire supplied separately, supporting the facing of the box with zinc coated steel wire of required length as directed, complying with ASTM and European norms

3414

-

-

... More
Earth work in excavation by hydraulic excavator, to proper grade and slopes as required including utilizing the spoils for filling works in the vicinity including removing roots & vegetation, dressing to design section etc. complete as directed. Ordinary Soil, For depth up to 3.00 m

1027.58

-

-

... More
Carriage of 300 gsm Geo sheet of including loading & unloading, stacking cost of P.O.L. etc. complete and including hire charge of truck with driver and handyman, etc. completed as directed. (Distance to be calculated from Divisional Store) Distance from Divisional Store to Work Site = 5KM

24546.46

-

-

... More
Labour charge for laying Geo fabric sheet as filter bellow pitching including carrying, lapping, wrapping & stitching as directed by the Engineer-in-Charge.

23377.58

-

-

... More
Carriage of Geo Bags of size 1.03 × 0.70 m / 1.0 x 0.7m including loading & unloading, stacking, etc. complete and including hire charge of truck with driver and handyman cost of POL etc. completed as directed. (Distance to be calculated from Divisional Store) Distance from Divisional Store to Work Site = 5KM

148377

-

-

... More
Filling and laying of Geo bags of size 1.03 m × 0.70 m including excavation of sand/silt of size more than 80 micron from flood plain or adjacent chars within a distance of 90 m of the work site, filling geo bags with sand/silt having minimum weighing 126.00 Kg and minimum volume 0.084 Cum after filling, double locking chain stitching the mouth of the filled bags with polypropylene thread by power driven double needle double stitched machine, stacking the same in batches of 100, carrying the same to the dumping site including all handling charges and local carriage within a distance of 150 m and laying properly as directed. (Geo Bag and Polypropylene thread will be supplied by the department free of cost) Without Boat

107409

-

-

... More
Filling and laying in PVC coated WN Box of size 1.5m x 1.5m x 0.45m with sand/silt filled Geo bags of size 1.03 m × 0.70 m including excavation of sand/silt from flood plain or adjacent chars within a distance of 90 m of the work site, filling geo bags with sand/silt having minimum weighing 126.00 Kg and minimum volume 0.084 Cum after filling, double locking chain stitching the mouth of the filled bags with polypropylene thread by power driven double needle machine, stacking the same in batches of 100, carrying the same to the dumping site including all handling charges and local carriage within a distance of 150 m and laying properly in PVC coated WN Box complete as directed. (Geo Bag, PVC coated wire netting box and Polypropylene thread will be supplied by the department free of cost) Without Boat

40968

-

-

... More
EMP IMPLEMENTATION COST I) Mitigation Measures

-

-

-

... More
Provision for tree cutting and compensatory plantation (1:10) measures, monitoring and maintenance

50

-

-

... More
Obtaining and submission of copies (to PMU) all consents, permits, clearances, no objection clearances or NOCs, tree cutting permissions, and other relevant permits from various authorities before the start of construction

1

-

-

... More
Disposal of existing old geo-bags and other materials used as temporary anti-erosion and flood protection measures, and disposal of all solid wastes during construction to designated locations and/or use of local municipal services

1

-

-

... More
Provision of all requisite facilities (i.e. drinking water supply, sanitation, domestic solid waste collection and disposal, fuel supply etc.) at construction camps. Ensuring rehabilitation of borrow areas and other impacted lands in line with WRD guidelines, and decommissioning of construction camp before handling over the project.

1

-

-

... More
Traffic management at work sites (i.e. pavement markings, channelizing devices, arrow panels and warning lights) along with construction and/or strengthening of landing ghats for barges

1

-

-

... More
Water sprinkling for dust suppression, barricading, temporary noise barriers, and provision of personal protective equipment (such as boots, life-saving-jackets, etc.)

1

-

-

... More
Implementation of biodiversity action plan and other biodiversity conservation and mitigation measures

1

-

-

... More
Construct temporary alternative ghats and landing facilities. Restore disturbed sites post-construction.

1

-

-

... More
EMP IMPLEMENTATION COST II) Monitoring Measures

-

-

-

... More
Air quality monitoring

7

-

-

... More
Noise levels monitoring

7

-

-

... More
Surface water monitoring

7

-

-

... More
Groundwater monitoring

7

-

-

... More
Soil monitoring

2

-

-

... More
EMP IMPLEMENTATION COST III) Capacity Building

-

-

-

... More
Training on EMP Implementation, COVID-19 protocols and other health and safety topics

1

-

-

... More
Preparation of plans and protocols (i.e. traffic management plan, waste or spoil management plan, chance find protocol, and other relevant activities)

1

-

-

... More
Biodiversity Assessment

1

-

-

... More
Engagement of one Environment Expert and one OHS Expert for each High Priority Project areas

2

-

-



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements

Past Bidders
This list is curated from the bidders of the similar tenders in the past

Unlock the Tender details for free
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.