Urban Development Department Tender
... More
BidAssist is a very user-friendly website which helps in finding the specific Assam e-tender that one is looking for. For getting any information or detail about any e-tender the Assam government must have posted, BidAssist is designed in such a manner so as to provide information on all government tenders in one place without any inconvenience.
Urban Development Department - UDD Tender
Civil And Construction
Consultancy Services
Civil And Architectural Services
Eprocure
Opening Date10 Feb 2025
Closing Date27 Feb 2025
Tender Amount₹ 5,73,79,570
AI Insights
Technical
Technical
Financial
Bid Capacity
... View More
Available Bid Capacity = 2AN - B Where:
A = Maximum value of civil engineering works executed in its name in any one financial year during the last five financial years (updated to current Price level) N = Number of years prescribed for completion of the work for which Bids are invited [months / 12].
B = Updated value (at current Price level), of all existing Commitments i.e., ongoing works, works likely to be awarded to be executed during the Period of completion of the work for which Bids are invited.
Technical Capacity
... View More
The bidder is required to have prior work experience in execution of Sewage Treatment Plants (STP)/ Effluent Treatment Plant (ETP) / Common Effluent Treatment plant (CETP) with Design, Supply, Procurement and Construction within the last 07 (Seven) financial years. The bidder should have experience of satisfactorily completing a Sewage Treatment Plant (STP) project of at least 1.0 MLD or more capacity with proven technology during the last 07 years, with at least one year of successful Operation and Maintenance. The bidder should also have experience in STP/ETP/CETP of at least 1.0 MLD in operation and maintenance, with the STP/ETP/CETP having been in successful operation for at least one year. The bidder should have completed similar works within the last 7 years. In terms of specific values and percentages, no specific percentage of similar works completed is mentioned. However, details of similar works completed in the name of the Bidder as Prime Contractor during the last five financial years showing year wise break up of value of work executed are required, supported with work done certificates. The bidder is also required to provide details of value of Civil Engineering works executed in each year during the last five financial years. Additionally, the bidder's rates should not be more than 15% higher or lower than the reasonable rates considered by the employer. If the bid price is considered unbalanced, the bidder may be required to deposit an additional performance security deposit for the amount of the unbalanced contract value.
Costs
EMD
₹ 11,47,591Document Cost
₹ 11,500Tender Fee
Refer Documents
Summary
Design, Supply, Construction, Installation, Testing And Commissioning Of Sewage Treatment Plant At Haflong Town
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2025_UDD_42628_1Tender No
SBM(U) 277/2025/02 Dt. 27-01- 2025Tender Authority
Urban Development Department ViewPurchaser Address
-Website
http://https://udd.assam.gov.in/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
Design, Supply, Construction, installation, Testing and Commissioning of Sewage Treatment Plant at Haflong Town
BOQ Items
... More
Design & Construction of Inlet Chamber
1
-
-
... More
Design & Construction of Bar Screen Chamber
1
-
-
... More
Design & Construction of Grit Chamber
2
-
-
... More
Design & Construction of Parshall Flume
1
-
-
... More
Design & Construction of Aeration Tank
2
-
-
... More
Design & Construction of Secondary Settling Tank
2
-
-
... More
Design & Construction of Tube Settler
1
-
-
... More
Design & Construction of Sludge Drying Bed
1
-
-
... More
Design & Construction of Disinfection Tank
1
-
-
... More
Design & Construction of Sludge centrifuge Decanter
1
-
-
... More
Electrification Works for STP Capacity 2.5 MLD:
-
-
-
... More
Design, Supply, installation, testing & commissining of all electrical works related to STP including Main Panel Board , campus lighting, Internal and external electrification as per requirement of the project as per design and scope of works refer to the bid document
1
-
-
... More
Electromechanical Works for STP of Capacity 2.5 MLD
-
-
-
... More
Design ,Supply, Installation, testing and commissioning of all Electro Mechanical Items for Construction of 2.50 MLD capacity Sewerage Treatment Plant suitable for Extended Aeration technology
1
-
-
... More
Power Connection for STP of Capacity 2.5 MLD
-
-
-
... More
Design & Providing electrical power connection to Sewage Treatment Plant site including drawal of electrical power line from the nearby APDCL Grid, setting up of required capacity Sub-Station, providing electrical control panel & metering unit etc. and including obtaining necessary approval & load sanction from APDCL and payment of supervision & other charges to APDCL, if any, all complete, as specified & directed
1
-
-
... More
Design and construction of Diesel Generator Room and Store Room as per requirement of the Sewerage treatment plant
1
-
-
... More
Design & Instalation of Deep Tube Well as per design and scope of works refer to the bid document
1
-
-
... More
Design & Construction of Boundary Wall of 1.8 m. high (above GL) brick Security Wall with RCC framed structure at treatment plant site with MS gate having locking arrangement, wall finished with weather coat cement paint & gate finished with non glossy synthetic enamel paint over a coat of red lead primer), all complete, as directed and specified.
1
-
-
... More
Design and Construction of Interception and Diversion(I&D)
-
-
-
... More
A. Collection chamber with Screen
1
-
-
... More
B.Supply, Installation, testing and commissioning of Raw Sewerage Pumps
1
-
-
... More
C.Supply , laying, testing & commissioning of Raw Sewerage Rising Main line for Sewerage Treatment plant
1
-
-
... More
D. Road Restoration for interception and Diversion, laying of Raw Sewer line with all respect as per specification of concerned authority and as per the direction of Engineer-in-Charge.
1
-
-
... More
Design & Construction of Community Soak Pit in 8 Nos of Ward as per requirement of the project
1
-
-
... More
Operation and maintenance (O&M ) for 5 years
-
-
-
... More
Operation, maintenance, excluding APDCL charges for Power Consumption, but including required Manpower, chemicals and material, repairing of all components as required, repair to pipeline leakages, road restoration for the repairing works, painting of civil or non-civil structures (if any), retrofitting works of the civil structure wherever necessary and management of Sewerage Treatment plants ( proposed)pumps and motors, pumping stations including mechanical, electrical panels, necessary accessories. It also includes activities for maintenance of campus development, laboratory, etc. and all works related to plant operation as per scope of work, specification , performance indicator and other relevant works for 5(Five) years. Sewage Treatment Plant must comply each and every point of CPCB SOP https://cpcb.nic.in/NGTMC/sop_ocems_stp.pdf and to comply all SOP points during commissioning and Operation & Maintenance of OCEMS system and any other works as directed by Engineer in charge/ employer (APDCL Energy Charges will be borne by the ULB)
1
-
-
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements
Past BiddersThis list is curated from the bidders of the similar tenders in the past
- Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
- Awarded Ratexx%
- Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
- Awarded Ratexx%
- Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
- Awarded Ratexx%