Public Works Roads Department Tender

BidAssist is a very user-friendly website which helps in finding the specific Assam e-tender that one is looking for. For getting any information or detail about any e-tender the Assam government must have posted, BidAssist is designed in such a manner so as to provide information on all government tenders in one place without any inconvenience.

Public Works Roads Department - PWRD Tender

Works
Civil And Construction
Bridge Construction
Eprocure
Opening Date6 Dec 2023
Closing Date5 Jan 2024
Tender Amount₹ 10,94,05,000 
Notes
Download

Costs

Summary

Construction Of Bridges In Lakhimpur District I. Br. No. 2/1 On Tikirai To Tikirai Chapori Road Ii. Br. No. 2/1 On Johing Tarben Line Road Iii. Br. No. 1/1 On Kharkra Nadi Near Junubasti Health Sub-centre

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Excavation for Structures, Excavation for Structures (Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material, I. Ordinary Soil, B Mechanical Means with dewatering i) Depth upto 3 m ii) Br. No. 2/1 on Johing Tarben Line Road

139.4

-

-

... More
Excavation for Structures, Excavation for Structures (Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material, I. Ordinary Soil, B Mechanical Means with dewatering i) Depth upto 3 m iii) Br.No. 1/1 on Kharkra Nadi Near Junubasti Health Sub-Centre

204.98

-

-

... More
Providing and constructing temporary island for construction of well foundation complete as per technical specification. (a) For 6m dia. Well (ii) Depth of water above 2.0 m upto 3.0 m i) Br. No. 2/1 on Tikirai to Tikirai Chapori Road

1

-

-

... More
Providing and constructing one span service road to reach island location from one pier location to another pier location i) Br. No. 2/1 on Tikirai to Tikirai Chapori Road

32.4

-

-

... More
Providing and laying cutting edge of mild steel weighing 40 kg per metre for well foundation complete as per drawing and technical specification. i) Br. No. 2/1 on Tikirai to Tikirai Chapori Road

4.35

-

-

... More
Providing and laying cutting edge of mild steel weighing 40 kg per metre for well foundation complete as per drawing and technical specification. ii) Br. No. 2/1 on Johing Tarben Line Road

3.04

-

-

... More
Plain/Reinforced cement concrete, in well foundation complete as per drawing and technical specification including steel shuttering formwork. (N) Without plasticiser, A. Well Curb, (iv) RCC M35 Grade, Case II -With Batching Plant, Transit Mixer and Concrete Pump i) Br. No. 2/1 on Tikirai to Tikirai Chapori Road

97.22

-

-

... More
Plain/Reinforced cement concrete, in well foundation complete as per drawing and technical specification including steel shuttering formwork. (N) Without plasticiser, A. Well Curb, (iv) RCC M35 Grade, Case II -With Batching Plant, Transit Mixer and Concrete Pump ii) Br. No. 2/1 on Johing Tarben Line Road

74.02

-

-

... More
Plain/Reinforced cement concrete, in well foundation complete as per drawing and technical specification including steel shuttering formwork. (N) Without plasticiser, B. Well Steining, (viii) RCC M35 Grade, Case II -With Batching Plant, Transit Mixer and Concrete Pump i) Br. No. 2/1 on Tikirai to Tikirai Chapori Road

1148.21

-

-

... More
Plain/Reinforced cement concrete, in well foundation complete as per drawing and technical specification including steel shuttering formwork. (N) Without plasticiser, B. Well Steining, (viii) RCC M35 Grade, Case II -With Batching Plant, Transit Mixer and Concrete Pump ii) Br. No. 2/1 on Johing Tarben Line Road

678.12

-

-

... More
Plain/Reinforced cement concrete, in well foundation complete as per drawing and technical specification including steel shuttering formwork. (N) Without plasticiser, C.Bottom Plug, (ii) PCC M25 Grade, Case II -With Batching Plant, Transit Mixer and Concrete Pump i) Br. No. 2/1 on Tikirai to Tikirai Chapori Road

264.27

-

-

... More
Plain/Reinforced cement concrete, in well foundation complete as per drawing and technical specification including steel shuttering formwork. (N) Without plasticiser, C.Bottom Plug, (ii) PCC M25 Grade, Case II -With Batching Plant, Transit Mixer and Concrete Pump ii) Br. No. 2/1 on Johing Tarben Line Road

200.58

-

-

... More
Plain/Reinforced cement concrete, in well foundation complete as per drawing and technical specification including steel shuttering formwork. (N) Without plasticiser, D.Intermediate Plug, (ii) PCC M20 Grade, Case II -With Batching Plant, Transit Mixer and Concrete Pump i) Br. No. 2/1 on Tikirai to Tikirai Chapori Road

10.21

-

-

... More
Plain/Reinforced cement concrete, in well foundation complete as per drawing and technical specification including steel shuttering formwork. (N) Without plasticiser, E.Top Plug, (ii) PCC M20 Grade, Case I -Using Concrete Mixer i) Br. No. 2/1 on Tikirai to Tikirai Chapori Road

16.63

-

-

... More
Plain/Reinforced cement concrete, in well foundation complete as per drawing and technical specification including steel shuttering formwork. (N) Without plasticiser, E.Top Plug, (ii) PCC M20 Grade, Case I -Using Concrete Mixer ii) Br. No. 2/1 on Johing Tarben Line Road

16.63

-

-

... More
Plain/Reinforced cement concrete, in well foundation complete as per drawing and technical specification including steel shuttering formwork. (N) Without plasticiser, F.Well Cap, (iv) RCC M35 Grade, Case II -With Batching Plant, Transit Mixer and Concrete Pump. i) Br. No. 2/1 on Tikirai to Tikirai Chapori Road

179.1

-

-

... More
Plain/Reinforced cement concrete, in well foundation complete as per drawing and technical specification including steel shuttering formwork. (N) Without plasticiser, F.Well Cap, (iv) RCC M35 Grade, Case II -With Batching Plant, Transit Mixer and Concrete Pump. ii) Br. No. 2/1 on Johing Tarben Line Road

131.38

-

-

... More
Sinking of 7 m external diameter well ( other than pneumatic method of sinking ) through all types of strata namely sandy soil, clayey soil and rock as shown against each case, complete as per drawing and technical specifications. Depth of sinking is rekonewed from bed level. (A) Sandy Soil (i) Depth below bed level upto 3.0 M. i) Br. No. 2/1 on Tikirai to Tikirai Chapori Road

6

-

-

... More
Sinking of 7 m external diameter well ( other than pneumatic method of sinking ) through all types of strata namely sandy soil, clayey soil and rock as shown against each case, complete as per drawing and technical specifications. Depth of sinking is rekonewed from bed level. (A) Sandy Soil (i) Depth below bed level upto 3.0 M. ii) Br. No. 2/1 on Johing Tarben Line Road

6

-

-

... More
Sinking of 7 m external diameter well ( other than pneumatic method of sinking ) through all types of strata namely sandy soil, clayey soil and rock as shown against each case, complete as per drawing and technical specifications. Depth of sinking is rekonewed from bed level. (A) Sandy Soil (ii) Beyond 3m upto 10m depth i) Br. No. 2/1 on Tikirai to Tikirai Chapori Road

14

-

-

... More
Sinking of 7 m external diameter well ( other than pneumatic method of sinking ) through all types of strata namely sandy soil, clayey soil and rock as shown against each case, complete as per drawing and technical specifications. Depth of sinking is rekonewed from bed level. (A) Sandy Soil (ii) Beyond 3m upto 10m depth ii) Br. No. 2/1 on Johing Tarben Line Road

14

-

-

... More
Sinking of 7 m external diameter well ( other than pneumatic method of sinking ) through all types of strata namely sandy soil, clayey soil and rock as shown against each case, complete as per drawing and technical specifications. Depth of sinking is rekonewed from bed level. (A) Sandy Soil (iii) Beyond 10m upto 20m. i) Br. No. 2/1 on Tikirai to Tikirai Chapori Road

20

-

-

... More
Sinking of 7 m external diameter well ( other than pneumatic method of sinking ) through all types of strata namely sandy soil, clayey soil and rock as shown against each case, complete as per drawing and technical specifications. Depth of sinking is rekonewed from bed level. (A) Sandy Soil (iii) Beyond 10m upto 20m. ii) Br. No. 2/1 on Johing Tarben Line Road

16

-

-

... More
Sinking of 7 m external diameter well ( other than pneumatic method of sinking ) through all types of strata namely sandy soil, clayey soil and rock as shown against each case, complete as per drawing and technical specifications. Depth of sinking is rekonewed from bed level. (A) Sandy Soil (iv) Beyond 20m upto 30m (a) For Sinking i) Br. No. 2/1 on Tikirai to Tikirai Chapori Road

2

-

-

... More
Sinking of 6 m external diameter well ( other than pneumatic method of sinking ) through all types of strata namely sandy soil, clayey soil and rock as shown against each case, complete as per drawing and technical specifications. Depth of sinking is rekonewed from bed level. (A) Sandy Soil (i) Depth below bed level upto 3.0 M i) Br. No. 2/1 on Tikirai to Tikirai Chapori Road

3

-

-

... More
Sinking of 6 m external diameter well ( other than pneumatic method of sinking ) through all types of strata namely sandy soil, clayey soil and rock as shown against each case, complete as per drawing and technical specifications. Depth of sinking is rekonewed from bed level. (A) Sandy Soil (ii) Beyond 3m upto 10m depth. i) Br. No. 2/1 on Tikirai to Tikirai Chapori Road

7

-

-

... More
Sinking of 6 m external diameter well ( other than pneumatic method of sinking ) through all types of strata namely sandy soil, clayey soil and rock as shown against each case, complete as per drawing and technical specifications. Depth of sinking is rekonewed from bed level. (A) Sandy Soil (iii) Beyond 10m upto 20m i) Br. No. 2/1 on Tikirai to Tikirai Chapori Road

10

-

-

... More
Sinking of 6 m external diameter well ( other than pneumatic method of sinking ) through all types of strata namely sandy soil, clayey soil and rock as shown against each case, complete as per drawing and technical specifications. Depth of sinking is rekonewed from bed level. (A) Sandy Soil (iv) Beyond 20m upto 30 m, (a) For Sinking i) Br. No. 2/1 on Tikirai to Tikirai Chapori Road

2

-

-

... More
Sand filling in wells complete as per drawing and technical specifications i) Br. No. 2/1 on Tikirai to Tikirai Chapori Road

740.14

-

-

... More
Sand filling in wells complete as per drawing and technical specifications ii) Br. No. 2/1 on Johing Tarben Line Road

488.82

-

-

... More
Bored cast-in-situ M 35 grade RCC pile excluding reinforcement complete as per drawing and Technical Specifications and removal of excavated earth with all lead and lift up to 1000 m. Pile diameter = 1000 mm iii) Br.No. 1/1 on Kharkra Nadi Near Junubasti Health Sub-Centre

216

-

-

... More
Pile load test on single vertical pile in accordance with I.S. 2911 (Part IV)as per technical specifications. a) Initial load test (Safe load = 160 t) iii) Br.No. 1/1 on Kharkra Nadi Near Junubasti Health Sub-Centre

240

-

-

... More
Pile load test on single vertical pile in accordance with I.S. 2911 (Part IV)as per technical specifications. b) Routine Load Test of 2 Nos. test for piles upto 50 Nos. iii) Br.No. 1/1 on Kharkra Nadi Near Junubasti Health Sub-Centre

400

-

-

... More
Pile integrity test of piles by using pile driving analyser or equivalent as approved by the E-IN-C and detail specification . Test to be carried out by an approved reputed agency including all incidental works. iii) Br.No. 1/1 on Kharkra Nadi Near Junubasti Health Sub-Centre

6

-

-

... More
Cement concrete for reinforcement concrete in pile cap complete as per drawing and technical specifications. D. RCC grade M - 35 i) Using concrete mixer iii) Br.No. 1/1 on Kharkra Nadi Near Junubasti Health Sub-Centre

109.01

-

-

... More
Levelling course for Pile cap Providing and lying of PCC M - 15 levelling course 100 mm thick below the pile cap. as per drawing and technical specifications. iii) Br.No. 1/1 on Kharkra Nadi Near Junubasti Health Sub-Centre

7.79

-

-

... More
Supplying, fitting and placing uncoated TMT Bar reinforcement in foundation complete as per drawing and Technical Specifications. (a) TMT-IS 1786 ( Fe-500 D) Primary Producer (TATA/ SAIL/ Esser Steel/ Jindal panther steel/ Shyam steel or equivalent) i) Br. No. 2/1 on Tikirai to Tikirai Chapori Road

56.79

-

-

... More
Reinforcement in Foundation: Supplying, fitting and placing TMT IS:1786 Fe500 D bar reinforcement in foundation complete as per drawing and technical specifications (A) TMT-IS 1786 ( Fe-500 D) Primary Producer (TATA/ SAIL/ Esser Steel/ Jindal panther steel/ Shyam steel or equivalent) ii) Br. No. 2/1 on Johing Tarben Line Road

38.41

-

-

... More
Reinforcement in Foundation: Supplying, fitting and placing TMT IS:1786 Fe500 D bar reinforcement in foundation complete as per drawing and technical specifications (A) TMT-IS 1786 ( Fe-500 D) Primary Producer (TATA/ SAIL/ Esser Steel/ Jindal panther steel/ Shyam steel or equivalent) iii) Br.No. 1/1 on Kharkra Nadi Near Junubasti Health Sub-Centre

34.23

-

-

... More
Plain/ Reinforced Cement Concrete in substructure complete as per Drawing and Technical Specifications. (N) Without plasticiser H) a) RCC Grade M 35 a) Height up to 5.0 m Case-I : Using Concrete Mixer i) Br. No. 2/1 on Tikirai to Tikirai Chapori Road

313.77

-

-

... More
Plain/ Reinforced Cement Concrete in substructure complete as per Drawing and Technical Specifications. (N) Without plasticiser H) a) RCC Grade M 35 a) Height up to 5.0 m Case-I : Using Concrete Mixer ii) Br. No. 2/1 on Johing Tarben Line Road

96.12

-

-

... More
Plain/ Reinforced Cement Concrete in substructure complete as per Drawing and Technical Specifications. (N) Without plasticiser H) a) RCC Grade M 35 a) Height up to 5.0 m Case-I : Using Concrete Mixer iii) Br.No. 1/1 on Kharkra Nadi Near Junubasti Health Sub-Centre

85.21

-

-

... More
Supplying, fitting and placing TMT IS:1786 (Fe 500) bar reinforcement in sub-structure complete as per drawing and technical specifications (a) TMT-IS 1786 ( Fe-500 D) Primary Producer (TATA/ SAIL/ Esser Steel/ Jindal panther steel/ Shyam steel or equivalent) i) Br. No. 2/1 on Tikirai to Tikirai Chapori Road

40.56

-

-

... More
Supplying, fitting and placing TMT IS:1786 (Fe 500) bar reinforcement in sub-structure complete as per drawing and technical specifications (a) TMT-IS 1786 ( Fe-500 D) Primary Producer (TATA/ SAIL/ Esser Steel/ Jindal panther steel/ Shyam steel or equivalent) ii) Br. No. 2/1 on Johing Tarben Line Road

12.69

-

-

... More
Supplying, fitting and placing TMT IS:1786 (Fe 500) bar reinforcement in sub-structure complete as per drawing and technical specifications (a) TMT-IS 1786 ( Fe-500 D) Primary Producer (TATA/ SAIL/ Esser Steel/ Jindal panther steel/ Shyam steel or equivalent) iii) Br.No. 1/1 on Kharkra Nadi Near Junubasti Health Sub-Centre

9.34

-

-

... More
Providing weep holes in Brick masonry/Plain/Reinforced concrete abutment, wing wall/return wall with 100 mm dia AC pipe, extending through the full width of the structure with slope of 1V :20H towards drawing foce. Complete as per drawing and Technical specification. i) Br. No. 2/1 on Tikirai to Tikirai Chapori Road

138

-

-

... More
Providing weep holes in Brick masonry/Plain/Reinforced concrete abutment, wing wall/return wall with 100 mm dia AC pipe, extending through the full width of the structure with slope of 1V :20H towards drawing foce. Complete as per drawing and Technical specification. ii) Br. No. 2/1 on Johing Tarben Line Road

34

-

-

... More
Providing weep holes in Brick masonry/Plain/Reinforced concrete abutment, wing wall/return wall with 100 mm dia AC pipe, extending through the full width of the structure with slope of 1V :20H towards drawing foce. Complete as per drawing and Technical specification. iii) Br.No. 1/1 on Kharkra Nadi Near Junubasti Health Sub-Centre

34

-

-

... More
Back filling behind abutment, wing wall and return wall complete as per drawing and Technical specification (A) Granular Material i) Br. No. 2/1 on Tikirai to Tikirai Chapori Road

207.58

-

-

... More
Back filling behind abutment, wing wall and return wall complete as per drawing and Technical specification (A) Granular Material ii) Br. No. 2/1 on Johing Tarben Line Road

113.33

-

-

... More
Back filling behind abutment, wing wall and return wall complete as per drawing and Technical specification (A) Granular Material iii) Br.No. 1/1 on Kharkra Nadi Near Junubasti Health Sub-Centre

67.14

-

-

... More
Providing and laying of Filter media with granular materials/stone crushed aggregates satisfying the requirements laid down in clause 2504.2.2. of MoRTH specifications to a thickness of not less than 600 mm with smaller size towards the soil and bigger size toeards the wall and provided over the entire surfaces behind the abutement, wing wall and return wall to the full height compacted to firm condition complete as per drawing and technical specification. i) Br. No. 2/1 on Tikirai to Tikirai Chapori Road

85.9

-

-

... More
Providing and laying of Filter media with granular materials/stone crushed aggregates satisfying the requirements laid down in clause 2504.2.2. of MoRTH specifications to a thickness of not less than 600 mm with smaller size towards the soil and bigger size toeards the wall and provided over the entire surfaces behind the abutement, wing wall and return wall to the full height compacted to firm condition complete as per drawing and technical specification. ii) Br. No. 2/1 on Johing Tarben Line Road

36.95

-

-

... More
Providing and laying of Filter media with granular materials/stone crushed aggregates satisfying the requirements laid down in clause 2504.2.2. of MoRTH specifications to a thickness of not less than 600 mm with smaller size towards the soil and bigger size toeards the wall and provided over the entire surfaces behind the abutement, wing wall and return wall to the full height compacted to firm condition complete as per drawing and technical specification. iii) Br.No. 1/1 on Kharkra Nadi Near Junubasti Health Sub-Centre

38.37

-

-

... More
Supplying, fitting and fixing in position true to line and level POT-PTFE bearing consisting of a metal piston supported by a disc or unreinforced elastomer confined within a metal cylinder, sealing rings, dust seals, PTFE surface sliding against stainlesssteel matting surfaces, complete assembly to be of cast steel/fabricated structural steel, meatal and elastomer elements to be as per IRC:83 part-I &II respectively and parts conforming to BS:5400, complete as per drawing and approved technical specification. i) Br. No. 2/1 on Tikirai to Tikirai Chapori Road

3200

-

-

... More
Supplying, fitting and fixing in position true to line and level POT-PTFE bearing consisting of a metal piston supported by a disc or unreinforced elastomer confined within a metal cylinder, sealing rings, dust seals, PTFE surface sliding against stainlesssteel matting surfaces, complete assembly to be of cast steel/fabricated structural steel, meatal and elastomer elements to be as per IRC:83 part-I &II respectively and parts conforming to BS:5400, complete as per drawing and approved technical specification. ii) Br. No. 2/1 on Johing Tarben Line Road

1600

-

-

... More
Supplying, fitting and fixing in position true to line and level POT-PTFE bearing consisting of a metal piston supported by a disc or unreinforced elastomer confined within a metal cylinder, sealing rings, dust seals, PTFE surface sliding against stainlesssteel matting surfaces, complete assembly to be of cast steel/fabricated structural steel, meatal and elastomer elements to be as per IRC:83 part-I &II respectively and parts conforming to BS:5400, complete as per drawing and approved technical specification. iii) Br.No. 1/1 on Kharkra Nadi Near Junubasti Health Sub-Centre

1110

-

-

... More
Furnishing and placing reinforcement / prestressed cement concrete in super structure as per drawing and technical specifications. (N) Without Plasticiser D. RCC/ PSC grade M - 35 Case I : Using concrete mixer For T beam and slab2) Height 5.0m to 10.0 m i) Br. No. 2/1 on Tikirai to Tikirai Chapori Road

153.83

-

-

... More
Furnishing and placing reinforcement / prestressed cement concrete in super structure as per drawing and technical specifications. (N) Without Plasticiser D. RCC/ PSC grade M - 35 Case I : Using concrete mixer For T beam and slab2) Height 5.0m to 10.0 m ii) Br. No. 2/1 on Johing Tarben Line Road

76.92

-

-

... More
Furnishing and placing reinforcement / prestressed cement concrete in super structure as per drawing and technical specifications. (N) Without Plasticiser D. RCC/ PSC grade M - 35 Case I : Using concrete mixer For T beam and slab 1) Height up to 5.0 m iii) Br.No. 1/1 on Kharkra Nadi Near Junubasti Health Sub-Centre

94.29

-

-

... More
Furnishing and placing reinforcement / prestressed cement concrete in super structure as per drawing and technical specifications. E. RCC Grade M-40, For T beam and slab 2) Height 5.0m to 10.0 m i) Br. No. 2/1 on Tikirai to Tikirai Chapori Road

35.45

-

-

... More
Furnishing and placing reinforcement / prestressed cement concrete in super structure as per drawing and technical specifications. E. RCC Grade M-40, For T beam and slab 2) Height 5.0m to 10.0 m ii) Br. No. 2/1 on Johing Tarben Line Road

18.55

-

-

... More
Furnishing and placing reinforcement / prestressed cement concrete in super structure as per drawing and technical specifications. E. RCC Grade M-40, For T beam and slab 2) Height 5.0m to 10.0 m iii) Br.No. 1/1 on Kharkra Nadi Near Junubasti Health Sub-Centre

11.48

-

-

... More
Furnishing and placing reinforcement / prestressed cement concrete in super structure as per drawing and technical specifications. E. RCC Grade M-40, For I-beam & slab including launching of precast girders by launching truss upto 40 m span 2) Height 5.0m to 10.0 m i) Br. No. 2/1 on Tikirai to Tikirai Chapori Road

225.04

-

-

... More
Furnishing and placing reinforcement / prestressed cement concrete in super structure as per drawing and technical specifications. E. RCC Grade M-40, For I-beam & slab including launching of precast girders by launching truss upto 40 m span 2) Height 5.0m to 10.0 m ii) Br. No. 2/1 on Johing Tarben Line Road

112.52

-

-

... More
Reinforcement in Super Structure: Supplying, fitting and placing TMT conforming to IS:1786 Fe 500 D reinforcement in super-structure including splicing complete as per drawing and technical specifications a) TMT-IS 1786 ( Fe-500 D) Primary Producer (TATA/ SAIL/ Esser Steel/ Jindal panther steel/ Shyam steel or equivalent) i) Br. No. 2/1 on Tikirai to Tikirai Chapori Road

61.39

-

-

... More
Reinforcement in Super Structure: Supplying, fitting and placing TMT conforming to IS:1786 Fe 500 D reinforcement in super-structure including splicing complete as per drawing and technical specifications a) TMT-IS 1786 ( Fe-500 D) Primary Producer (TATA/ SAIL/ Esser Steel/ Jindal panther steel/ Shyam steel or equivalent) ii) Br. No. 2/1 on Johing Tarben Line Road

30.87

-

-

... More
Reinforcement in Super Structure: Supplying, fitting and placing TMT conforming to IS:1786 Fe 500 D reinforcement in super-structure including splicing complete as per drawing and technical specifications a) TMT-IS 1786 ( Fe-500 D) Primary Producer (TATA/ SAIL/ Esser Steel/ Jindal panther steel/ Shyam steel or equivalent) iii) Br.No. 1/1 on Kharkra Nadi Near Junubasti Health Sub-Centre

21.96

-

-

... More
Reinforcement in Super Structure: Supplying, fitting and placing TMT conforming to IS:1786 Fe 500 D reinforcement in super-structure including splicing complete as per drawing and technical specifications a) TMT-IS 1786 ( Fe-500 D) Primary Producer (TATA/ SAIL/ Esser Steel/ Jindal panther steel/ Shyam steel or equivalent) i) Br. No. 2/1 on Tikirai to Tikirai Chapori Road

11.74

-

-

... More
High tensile steel wires / strands including all accessories for stressing , stressing operations and grouting complete as per drawing and technical specifications. ii) Br. No. 2/1 on Johing Tarben Line Road

5.87

-

-

... More
Providing and laying Cement concrete wearing coat M-30 grade including reinforcement complete as per drawing and Technical Specifications i) Br. No. 2/1 on Tikirai to Tikirai Chapori Road

40.36

-

-

... More
Providing and laying Cement concrete wearing coat M-30 grade including reinforcement complete as per drawing and Technical Specifications ii) Br. No. 2/1 on Johing Tarben Line Road

22.14

-

-

... More
Providing and laying Cement concrete wearing coat M-30 grade including reinforcement complete as per drawing and Technical Specifications iii) Br.No. 1/1 on Kharkra Nadi Near Junubasti Health Sub-Centre

16.29

-

-

... More
Drainage Spouts complete as per drawing and Technical specification i) Br. No. 2/1 on Tikirai to Tikirai Chapori Road

24

-

-

... More
Drainage Spouts complete as per drawing and Technical specification ii) Br. No. 2/1 on Johing Tarben Line Road

12

-

-

... More
Drainage Spouts complete as per drawing and Technical specification iii) Br.No. 1/1 on Kharkra Nadi Near Junubasti Health Sub-Centre

8

-

-

... More
PCC M15 Grade leveling course below approach slab complete as per drawing and Technical specification i) Br. No. 2/1 on Tikirai to Tikirai Chapori Road

8.05

-

-

... More
PCC M15 Grade leveling course below approach slab complete as per drawing and Technical specification ii) Br. No. 2/1 on Johing Tarben Line Road

8.05

-

-

... More
PCC M15 Grade leveling course below approach slab complete as per drawing and Technical specification iii) Br.No. 1/1 on Kharkra Nadi Near Junubasti Health Sub-Centre

8.05

-

-

... More
Reinforced cement concrete approach slab including reinforcement and formwork complete as per drawing and Technical specification a) TMT-IS 1786 ( Fe-500 D) Primary Producer (TATA/ SAIL/ Esser Steel/ Jindal panther steel/ Shyam steel or equivalent) i) Br. No. 2/1 on Tikirai to Tikirai Chapori Road

15.65

-

-

... More
Reinforced cement concrete approach slab including reinforcement and formwork complete as per drawing and Technical specification a) TMT-IS 1786 ( Fe-500 D) Primary Producer (TATA/ SAIL/ Esser Steel/ Jindal panther steel/ Shyam steel or equivalent) ii) Br. No. 2/1 on Johing Tarben Line Road

15.65

-

-

... More
Reinforced cement concrete approach slab including reinforcement and formwork complete as per drawing and Technical specification a) TMT-IS 1786 ( Fe-500 D) Primary Producer (TATA/ SAIL/ Esser Steel/ Jindal panther steel/ Shyam steel or equivalent) iii) Br.No. 1/1 on Kharkra Nadi Near Junubasti Health Sub-Centre

15.65

-

-

... More
Providing Strip Seal Expansion Joint to cater movement of +70mm as per drawing. i) Br. No. 2/1 on Tikirai to Tikirai Chapori Road

25.35

-

-

... More
Providing Strip Seal Expansion Joint to cater movement of +70mm as per drawing. ii) Br. No. 2/1 on Johing Tarben Line Road

16.9

-

-

... More
Providing Strip Seal Expansion Joint to cater movement of +70mm as per drawing. iii) Br.No. 1/1 on Kharkra Nadi Near Junubasti Health Sub-Centre

16.9

-

-

... More
Span Load Test - Load testing of one or more spans of bridges as selected by the Engineer as per approved load test procedure following relevant IS/IRC/Railway codes with contractor's labour, deflection measuring instruments, loading materials, recording and analyzing the load testing results including all leads and lifts etc. complete as required. The rates are all inclusive and will be paid after load test is finished and girder is cleared of the kentledges/loading materials etc. The load shall be 1.25 times the stipulated design load based on Design load & not span ( Extra for every increase of 100.00 mt or part there for in the span load capacity up to 800.00 mt. i) Br. No. 2/1 on Tikirai to Tikirai Chapori Road

1

-

-

... More
Span Load Test - Load testing of one or more spans of bridges as selected by the Engineer as per approved load test procedure following relevant IS/IRC/Railway codes with contractor's labour, deflection measuring instruments, loading materials, recording and analyzing the load testing results including all leads and lifts etc. complete as required. The rates are all inclusive and will be paid after load test is finished and girder is cleared of the kentledges/loading materials etc. The load shall be 1.25 times the stipulated design load based on Design load & not span ( Extra for every increase of 100.00 mt or part there for in the span load capacity up to 800.00 mt. ii) Br. No. 2/1 on Johing Tarben Line Road

1

-

-

... More
Span Load Test - Load testing of one or more spans of bridges as selected by the Engineer as per approved load test procedure following relevant IS/IRC/Railway codes with contractor's labour, deflection measuring instruments, loading materials, recording and analyzing the load testing results including all leads and lifts etc. complete as required. The rates are all inclusive and will be paid after load test is finished and girder is cleared of the kentledges/loading materials etc. The load shall be 1.25 times the stipulated design load based on Design load & not span ( Extra for every increase of 100.00 mt or part there for in the span load capacity up to 800.00 mt. iii) Br.No. 1/1 on Kharkra Nadi Near Junubasti Health Sub-Centre

1

-

-

... More
Non-Destructive testing with Ultrasonic Pulse Velocity Meter with data storage facility for detection of cracks, voids and other imperfections in Reinforced concrete structures and furnishing the findings thereof in proper comprehensible format, complete as directed by the department i) Br. No. 2/1 on Tikirai to Tikirai Chapori Road

18

-

-

... More
Non-Destructive testing with Ultrasonic Pulse Velocity Meter with data storage facility for detection of cracks, voids and other imperfections in Reinforced concrete structures and furnishing the findings thereof in proper comprehensible format, complete as directed by the department ii) Br. No. 2/1 on Johing Tarben Line Road

12

-

-

... More
Non-Destructive testing with Ultrasonic Pulse Velocity Meter with data storage facility for detection of cracks, voids and other imperfections in Reinforced concrete structures and furnishing the findings thereof in proper comprehensible format, complete as directed by the department iii) Br.No. 1/1 on Kharkra Nadi Near Junubasti Health Sub-Centre

12

-

-

... More
Non-destructive testing with rebound hammer for detection of damage zones in Reinforced concrete structures and furnishing the findings thereof in proper comprehensible format i) Br. No. 2/1 on Tikirai to Tikirai Chapori Road

40

-

-

... More
Non-destructive testing with rebound hammer for detection of damage zones in Reinforced concrete structures and furnishing the findings thereof in proper comprehensible format ii) Br. No. 2/1 on Johing Tarben Line Road

20

-

-

... More
Non-destructive testing with rebound hammer for detection of damage zones in Reinforced concrete structures and furnishing the findings thereof in proper comprehensible format iii) Br.No. 1/1 on Kharkra Nadi Near Junubasti Health Sub-Centre

20

-

-

... More
Providing and laying filter material underneath pitching in slopes complete as per drawing and technical specifications Clause 1302 i) Br. No. 2/1 on Tikirai to Tikirai Chapori Road

169.11

-

-

... More
Providing and laying filter material underneath pitching in slopes complete as per drawing and technical specifications Clause 1302 ii) Br. No. 2/1 on Johing Tarben Line Road

45.8

-

-

... More
Providing and laying filter material underneath pitching in slopes complete as per drawing and technical specifications Clause 1302 iii) Br.No. 1/1 on Kharkra Nadi Near Junubasti Health Sub-Centre

84.56

-

-

... More
Providing and laying pitching on slopes laid over prepared filter media as per drawing and technical specifications Clause 1302 (i) Stone/Boulder i) Br. No. 2/1 on Tikirai to Tikirai Chapori Road

507.33

-

-

... More
Providing and laying pitching on slopes laid over prepared filter media as per drawing and technical specifications Clause 1302 (i) Stone/Boulder ii) Br. No. 2/1 on Johing Tarben Line Road

91.61

-

-

... More
Providing and laying pitching on slopes laid over prepared filter media as per drawing and technical specifications Clause 1302 (i) Stone/Boulder iii) Br.No. 1/1 on Kharkra Nadi Near Junubasti Health Sub-Centre

169.11

-

-

... More
Providing and laying of boulder apron laid in wire crates with 4 mm dia GI wire conforming to IS:280 and IS:4826 in 100 mm x 100 mm mesh (woven diagonally) including 10 per cent extra for laps and joints laid with stone boulders weighing not less than 25 kg each as per drawing and technical specifications Clause 1301 i) Br. No. 2/1 on Tikirai to Tikirai Chapori Road

760.08

-

-

... More
Providing and laying of boulder apron laid in wire crates with 4 mm dia GI wire conforming to IS:280 and IS:4826 in 100 mm x 100 mm mesh (woven diagonally) including 10 per cent extra for laps and joints laid with stone boulders weighing not less than 25 kg each as per drawing and technical specifications Clause 1301 ii) Br. No. 2/1 on Johing Tarben Line Road

233.63

-

-

... More
Providing and laying of boulder apron laid in wire crates with 4 mm dia GI wire conforming to IS:280 and IS:4826 in 100 mm x 100 mm mesh (woven diagonally) including 10 per cent extra for laps and joints laid with stone boulders weighing not less than 25 kg each as per drawing and technical specifications Clause 1301 iii) Br.No. 1/1 on Kharkra Nadi Near Junubasti Health Sub-Centre

318.77

-

-

... More
Earthwork in excavation for foundation of structures as per drawings and technical specifications , including setting out, construction of shoring and bracing, including dewatering and using machinery, removal of stumps and other deleterious matter, dressing of sides and bottom and back filling with approved material . I) In Ordinary Soil. B. Mechanical means. i) Depth up to 3.00 m (with dewatering) i) Br. No. 2/1 on Tikirai to Tikirai Chapori Road

267.29

-

-

... More
Earthwork in excavation for foundation of structures as per drawings and technical specifications , including setting out, construction of shoring and bracing, including dewatering and using machinery, removal of stumps and other deleterious matter, dressing of sides and bottom and back filling with approved material . I) In Ordinary Soil. B. Mechanical means. i) Depth up to 3.00 m (with dewatering) ii) Br. No. 2/1 on Johing Tarben Line Road

152.74

-

-

... More
Earthwork in excavation for foundation of structures as per drawings and technical specifications , including setting out, construction of shoring and bracing, including dewatering and using machinery, removal of stumps and other deleterious matter, dressing of sides and bottom and back filling with approved material . I) In Ordinary Soil. B. Mechanical means. i) Depth up to 3.00 m (with dewatering) iii) Br.No. 1/1 on Kharkra Nadi Near Junubasti Health Sub-Centre

152.74

-

-

... More
Plain/Reinforced cement concrete, in open foundation complete as per drawing and technical specification including steel shuttering formwork. I. Without plasticiser. A. PCC Grade M15. i) Br. No. 2/1 on Tikirai to Tikirai Chapori Road

18.65

-

-

... More
Plain/Reinforced cement concrete, in open foundation complete as per drawing and technical specification including steel shuttering formwork. I. Without plasticiser. A. PCC Grade M15. ii) Br. No. 2/1 on Johing Tarben Line Road

10.66

-

-

... More
Plain/Reinforced cement concrete, in open foundation complete as per drawing and technical specification including steel shuttering formwork. I. Without plasticiser. A. PCC Grade M15. iii) Br.No. 1/1 on Kharkra Nadi Near Junubasti Health Sub-Centre

10.66

-

-

... More
Plain/Reinforced cement concrete, in open foundation complete as per drawing and technical specification including steel shuttering formwork. I. Without plasticiser. G RCC Grade M30 (i) Using Concrete Mixer i) Br. No. 2/1 on Tikirai to Tikirai Chapori Road

103.99

-

-

... More
Plain/Reinforced cement concrete, in open foundation complete as per drawing and technical specification including steel shuttering formwork. I. Without plasticiser. G RCC Grade M30 (i) Using Concrete Mixer ii) Br. No. 2/1 on Johing Tarben Line Road

36.51

-

-

... More
Plain/Reinforced cement concrete, in open foundation complete as per drawing and technical specification including steel shuttering formwork. I. Without plasticiser. G RCC Grade M30 (i) Using Concrete Mixer iii) Br.No. 1/1 on Kharkra Nadi Near Junubasti Health Sub-Centre

30.31

-

-

... More
Supplying, fitting and placing uncoated TMT Bar reinforcement in foundation complete as per drawing and Technical Specifications. (a) TMT-IS 1786 ( Fe-500 D) Primary Producer (TATA/ SAIL/ Esser Steel/ Jindal panther steel/ Shyam steel or equivalent) i) Br. No. 2/1 on Tikirai to Tikirai Chapori Road

6.29

-

-

... More
Supplying, fitting and placing uncoated TMT Bar reinforcement in foundation complete as per drawing and Technical Specifications. (a) TMT-IS 1786 ( Fe-500 D) Primary Producer (TATA/ SAIL/ Esser Steel/ Jindal panther steel/ Shyam steel or equivalent) ii) Br. No. 2/1 on Johing Tarben Line Road

2.22

-

-

... More
Supplying, fitting and placing uncoated TMT Bar reinforcement in foundation complete as per drawing and Technical Specifications. (a) TMT-IS 1786 ( Fe-500 D) Primary Producer (TATA/ SAIL/ Esser Steel/ Jindal panther steel/ Shyam steel or equivalent) iii) Br.No. 1/1 on Kharkra Nadi Near Junubasti Health Sub-Centre

2.19

-

-

... More
Plain/ Reinforced Cement Concrete in substructure complete as per Drawing and Technical Specifications. H) a) RCC Grade M 35 I) Height up to 5.0 m Case-I : Using Concrete Mixer i) Br. No. 2/1 on Tikirai to Tikirai Chapori Road

94.99

-

-

... More
Plain/ Reinforced Cement Concrete in substructure complete as per Drawing and Technical Specifications. H) a) RCC Grade M 35 I) Height up to 5.0 m Case-I : Using Concrete Mixer ii) Br. No. 2/1 on Johing Tarben Line Road

36.26

-

-

... More
Plain/ Reinforced Cement Concrete in substructure complete as per Drawing and Technical Specifications. H) a) RCC Grade M 35 I) Height up to 5.0 m Case-I : Using Concrete Mixer iii) Br.No. 1/1 on Kharkra Nadi Near Junubasti Health Sub-Centre

36.26

-

-

... More
Supplying, fitting and placing TMT bars reinforcement in substructure complete as per drawing and Technical Specifications b) (i) TMT-IS 1786 ( Fe-500 D) Primary Producer (TATA/ SAIL/ Esser Steel/ Jindal panther steel/ Shyam steel or equivalent) i) Br. No. 2/1 on Tikirai to Tikirai Chapori Road

15.66

-

-

... More
Supplying, fitting and placing TMT bars reinforcement in substructure complete as per drawing and Technical Specifications b) (i) TMT-IS 1786 ( Fe-500 D) Primary Producer (TATA/ SAIL/ Esser Steel/ Jindal panther steel/ Shyam steel or equivalent) ii) Br. No. 2/1 on Johing Tarben Line Road

5.25

-

-

... More
Supplying, fitting and placing TMT bars reinforcement in substructure complete as per drawing and Technical Specifications b) (i) TMT-IS 1786 ( Fe-500 D) Primary Producer (TATA/ SAIL/ Esser Steel/ Jindal panther steel/ Shyam steel or equivalent) iii) Br.No. 1/1 on Kharkra Nadi Near Junubasti Health Sub-Centre

4.78

-

-

... More
Providing weep holes in Brick masonry/Plain/Reinforced concrete abutment, wing wall/return wall with 100 mm dia AC pipe, extending through the full width of the structure with slope of 1V :20H towards drawing foce. Complete as per drawing and Technical specification. i) Br. No. 2/1 on Tikirai to Tikirai Chapori Road

96

-

-

... More
Providing weep holes in Brick masonry/Plain/Reinforced concrete abutment, wing wall/return wall with 100 mm dia AC pipe, extending through the full width of the structure with slope of 1V :20H towards drawing foce. Complete as per drawing and Technical specification. ii) Br. No. 2/1 on Johing Tarben Line Road

48

-

-

... More
Providing weep holes in Brick masonry/Plain/Reinforced concrete abutment, wing wall/return wall with 100 mm dia AC pipe, extending through the full width of the structure with slope of 1V :20H towards drawing foce. Complete as per drawing and Technical specification. iii) Br.No. 1/1 on Kharkra Nadi Near Junubasti Health Sub-Centre

72

-

-

... More
Providing and laying of Filter media with granular materials/stone crushed aggregates satisfying the requirements to a thickness of not less than 600 mm with smaller size towards the soil and bigger size towards the wall and provided over the entire surfaces behind the abutement, wing wall and return wall to the full height compacted to firm condition complete as per drawing and technical specification. i) Br. No. 2/1 on Tikirai to Tikirai Chapori Road

68.46

-

-

... More
Providing and laying of Filter media with granular materials/stone crushed aggregates satisfying the requirements to a thickness of not less than 600 mm with smaller size towards the soil and bigger size towards the wall and provided over the entire surfaces behind the abutement, wing wall and return wall to the full height compacted to firm condition complete as per drawing and technical specification. ii) Br. No. 2/1 on Johing Tarben Line Road

39.9

-

-

... More
Providing and laying of Filter media with granular materials/stone crushed aggregates satisfying the requirements to a thickness of not less than 600 mm with smaller size towards the soil and bigger size towards the wall and provided over the entire surfaces behind the abutement, wing wall and return wall to the full height compacted to firm condition complete as per drawing and technical specification. iii) Br.No. 1/1 on Kharkra Nadi Near Junubasti Health Sub-Centre

39.9

-

-

... More
Construction of embankment with approved material obtained from borrow pits with a lift upto 1.5 m, transporting to site, spreading, grading to required slope and compacting to meet requirement of Tables 300.1 and 300.2 with a lead upto 1000 m as per Technical Specification Clause 301.5 (a) from private land i) Br. No. 2/1 on Tikirai to Tikirai Chapori Road

18199.48

-

-

... More
Construction of embankment with approved material obtained from borrow pits with a lift upto 1.5 m, transporting to site, spreading, grading to required slope and compacting to meet requirement of Tables 300.1 and 300.2 with a lead upto 1000 m as per Technical Specification Clause 301.5 (a) from private land ii) Br. No. 2/1 on Johing Tarben Line Road

4501.42

-

-

... More
Construction of embankment with approved material obtained from borrow pits with a lift upto 1.5 m, transporting to site, spreading, grading to required slope and compacting to meet requirement of Tables 300.1 and 300.2 with a lead upto 1000 m as per Technical Specification Clause 301.5 (a) from private land iii) Br.No. 1/1 on Kharkra Nadi Near Junubasti Health Sub-Centre

7392.38

-

-

... More
Construction of subgrade and earthen shoulders with approved material obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of Table 300.2 with lead upto 1000 m as per Technical Specification Clause 303.1. (a) from private land i) Br. No. 2/1 on Tikirai to Tikirai Chapori Road

2047.28

-

-

... More
Construction of subgrade and earthen shoulders with approved material obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of Table 300.2 with lead upto 1000 m as per Technical Specification Clause 303.1. (a) from private land ii) Br. No. 2/1 on Johing Tarben Line Road

1287.12

-

-

... More
Construction of subgrade and earthen shoulders with approved material obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of Table 300.2 with lead upto 1000 m as per Technical Specification Clause 303.1. (a) from private land iii) Br.No. 1/1 on Kharkra Nadi Near Junubasti Health Sub-Centre

1711.46

-

-

... More
Construction of granular sub-base by providing well graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with smooth wheel roller to achieve the desired density, complete as per Technical Specification Clause 401.A)By Mix in Place Method (ii) for grading- II Material i) Br. No. 2/1 on Tikirai to Tikirai Chapori Road

295.42

-

-

... More
Construction of granular sub-base by providing well graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with smooth wheel roller to achieve the desired density, complete as per Technical Specification Clause 401.A)By Mix in Place Method (ii) for grading- II Material ii) Br. No. 2/1 on Johing Tarben Line Road

198.23

-

-

... More
Construction of granular sub-base by providing well graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with smooth wheel roller to achieve the desired density, complete as per Technical Specification Clause 401.A)By Mix in Place Method (ii) for grading- II Material iii) Br.No. 1/1 on Kharkra Nadi Near Junubasti Health Sub-Centre

265.05

-

-

... More
WBM Grading 2 (A) Using stone screening Type-B 11.2 mm for Gr.II (II) Providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with smooth wheel roller 80-100 kN in stages to proper grade and camber, applying and brooming, stone screening/binding materials to fill-up the interstices of coarse aggregate, watering and compacting to the required density grading 2 as per Technical Specification Clause 405.(b) Manual means i) Br. No. 2/1 on Tikirai to Tikirai Chapori Road

137.81

-

-

... More
WBM Grading 2 (A) Using stone screening Type-B 11.2 mm for Gr.II (II) Providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with smooth wheel roller 80-100 kN in stages to proper grade and camber, applying and brooming, stone screening/binding materials to fill-up the interstices of coarse aggregate, watering and compacting to the required density grading 2 as per Technical Specification Clause 405.(b) Manual means ii) Br. No. 2/1 on Johing Tarben Line Road

92.81

-

-

... More
WBM Grading 2 (A) Using stone screening Type-B 11.2 mm for Gr.II (II) Providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with smooth wheel roller 80-100 kN in stages to proper grade and camber, applying and brooming, stone screening/binding materials to fill-up the interstices of coarse aggregate, watering and compacting to the required density grading 2 as per Technical Specification Clause 405.(b) Manual means iii) Br.No. 1/1 on Kharkra Nadi Near Junubasti Health Sub-Centre

123.75

-

-

... More
WBM Grading 3, Using stone screening Type-B 11.2 mm for Gr.III (III) Providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with smooth wheel roller 80-100 kN in stages to proper grade and camber, applying and brooming, stone screening to fill-up the interstices of coarse aggregate, watering and compacting to the required density Grading 3 as per Technical Specification Clause 405. (b) By Manual Means i) Br. No. 2/1 on Tikirai to Tikirai Chapori Road

137.81

-

-

... More
WBM Grading 3, Using stone screening Type-B 11.2 mm for Gr.III (III) Providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with smooth wheel roller 80-100 kN in stages to proper grade and camber, applying and brooming, stone screening to fill-up the interstices of coarse aggregate, watering and compacting to the required density Grading 3 as per Technical Specification Clause 405. (b) By Manual Means ii) Br. No. 2/1 on Johing Tarben Line Road

92.81

-

-

... More
WBM Grading 3, Using stone screening Type-B 11.2 mm for Gr.III (III) Providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with smooth wheel roller 80-100 kN in stages to proper grade and camber, applying and brooming, stone screening to fill-up the interstices of coarse aggregate, watering and compacting to the required density Grading 3 as per Technical Specification Clause 405. (b) By Manual Means iii) Br.No. 1/1 on Kharkra Nadi Near Junubasti Health Sub-Centre

123.75

-

-

... More
Providing and laying interlocking concrete block pavement with M40 grade grade of concrete blocks having thickness 80mm as per technical specification clause 1504 complete including carriage.(i) Including Edge block/ Edge restraints i) Br. No. 2/1 on Tikirai to Tikirai Chapori Road

1831.53

-

-

... More
Providing and laying interlocking concrete block pavement with M40 grade grade of concrete blocks having thickness 80mm as per technical specification clause 1504 complete including carriage.(i) Including Edge block/ Edge restraints ii) Br. No. 2/1 on Johing Tarben Line Road

1233.71

-

-

... More
Providing and laying interlocking concrete block pavement with M40 grade grade of concrete blocks having thickness 80mm as per technical specification clause 1504 complete including carriage.(i) Including Edge block/ Edge restraints iii) Br.No. 1/1 on Kharkra Nadi Near Junubasti Health Sub-Centre

1648.36

-

-

... More
Furnishing and laying of the live sods of perennial turf forming grass on embankment slope, verges or other locations shown on the drawing or as directed by the Engineer including preparation of ground, fetching of sods and watering as per Technical Specification Clause 309 i) Br. No. 2/1 on Tikirai to Tikirai Chapori Road

2683.28

-

-

... More
Furnishing and laying of the live sods of perennial turf forming grass on embankment slope, verges or other locations shown on the drawing or as directed by the Engineer including preparation of ground, fetching of sods and watering as per Technical Specification Clause 309 ii) Br. No. 2/1 on Johing Tarben Line Road

2683.28

-

-

... More
Furnishing and laying of the live sods of perennial turf forming grass on embankment slope, verges or other locations shown on the drawing or as directed by the Engineer including preparation of ground, fetching of sods and watering as per Technical Specification Clause 309 iii) Br.No. 1/1 on Kharkra Nadi Near Junubasti Health Sub-Centre

2683.28

-

-

... More
Providing and fixing of retro-reflectorised cautionary, mandatory and informatory sign as per IRC:67 made of encapsulated lens type reflective sheeting vide Clause 1701.2.3 fixed over aluminium sheeting, 1.5 mm thick supported on a mild steel angle iron post 75 mm x 75 mm x 6 mm firmly fixed to the ground by means of properly designed foundation with M15 grade cement concrete 450 mm x 450 mm x 600 mm, 600 mm below ground level as per drawings and Technical Specification Clause 801. (i) 600mm equilateral triangle i) Br. No. 2/1 on Tikirai to Tikirai Chapori Road

4

-

-

... More
Providing and fixing of retro-reflectorised cautionary, mandatory and informatory sign as per IRC:67 made of encapsulated lens type reflective sheeting vide Clause 1701.2.3 fixed over aluminium sheeting, 1.5 mm thick supported on a mild steel angle iron post 75 mm x 75 mm x 6 mm firmly fixed to the ground by means of properly designed foundation with M15 grade cement concrete 450 mm x 450 mm x 600 mm, 600 mm below ground level as per drawings and Technical Specification Clause 801. (i) 600mm equilateral triangle ii) Br. No. 2/1 on Johing Tarben Line Road

4

-

-

... More
Providing and fixing of retro-reflectorised cautionary, mandatory and informatory sign as per IRC:67 made of encapsulated lens type reflective sheeting vide Clause 1701.2.3 fixed over aluminium sheeting, 1.5 mm thick supported on a mild steel angle iron post 75 mm x 75 mm x 6 mm firmly fixed to the ground by means of properly designed foundation with M15 grade cement concrete 450 mm x 450 mm x 600 mm, 600 mm below ground level as per drawings and Technical Specification Clause 801. (i) 600mm equilateral triangle iii) Br.No. 1/1 on Kharkra Nadi Near Junubasti Health Sub-Centre

4

-

-

... More
Providing and fixing of retro-reflectorised cautionary, mandatory and informatory sign as per IRC:67 made of encapsulated lens type reflective sheeting vide Clause 1701.2.3 fixed over aluminium sheeting, 1.5 mm thick supported on a mild steel angle iron post 75 mm x 75 mm x 6 mm firmly fixed to the ground by means of properly designed foundation with M15 grade cement concrete 450 mm x 450 mm x 600 mm, 600 mm below ground level as per drawings and Technical Specification Clause 801. (ii) 800mm x 600mm rectangular i) Br. No. 2/1 on Tikirai to Tikirai Chapori Road

8

-

-

... More
Providing and fixing of retro-reflectorised cautionary, mandatory and informatory sign as per IRC:67 made of encapsulated lens type reflective sheeting vide Clause 1701.2.3 fixed over aluminium sheeting, 1.5 mm thick supported on a mild steel angle iron post 75 mm x 75 mm x 6 mm firmly fixed to the ground by means of properly designed foundation with M15 grade cement concrete 450 mm x 450 mm x 600 mm, 600 mm below ground level as per drawings and Technical Specification Clause 801. (ii) 800mm x 600mm rectangular ii) Br. No. 2/1 on Johing Tarben Line Road

8

-

-

... More
Providing and fixing of retro-reflectorised cautionary, mandatory and informatory sign as per IRC:67 made of encapsulated lens type reflective sheeting vide Clause 1701.2.3 fixed over aluminium sheeting, 1.5 mm thick supported on a mild steel angle iron post 75 mm x 75 mm x 6 mm firmly fixed to the ground by means of properly designed foundation with M15 grade cement concrete 450 mm x 450 mm x 600 mm, 600 mm below ground level as per drawings and Technical Specification Clause 801. (ii) 800mm x 600mm rectangular iii) Br.No. 1/1 on Kharkra Nadi Near Junubasti Health Sub-Centre

8

-

-

... More
Providing and fixing of retro-reflectorised cautionary, mandatory and informatory sign as per IRC:67 made of encapsulated lens type reflective sheeting vide Clause 1701.2.3 fixed over aluminium sheeting, 1.5 mm thick supported on a mild steel angle iron post 75 mm x 75 mm x 6 mm firmly fixed to the ground by means of properly designed foundation with M15 grade cement concrete 450 mm x 450 mm x 600 mm, 600 mm below ground level as per drawings and Technical Specification Clause 801. (iii) 600mm circular i) Br. No. 2/1 on Tikirai to Tikirai Chapori Road

4

-

-

... More
Providing and fixing of retro-reflectorised cautionary, mandatory and informatory sign as per IRC:67 made of encapsulated lens type reflective sheeting vide Clause 1701.2.3 fixed over aluminium sheeting, 1.5 mm thick supported on a mild steel angle iron post 75 mm x 75 mm x 6 mm firmly fixed to the ground by means of properly designed foundation with M15 grade cement concrete 450 mm x 450 mm x 600 mm, 600 mm below ground level as per drawings and Technical Specification Clause 801. (iii) 600mm circular ii) Br. No. 2/1 on Johing Tarben Line Road

4

-

-

... More
Providing and fixing of retro-reflectorised cautionary, mandatory and informatory sign as per IRC:67 made of encapsulated lens type reflective sheeting vide Clause 1701.2.3 fixed over aluminium sheeting, 1.5 mm thick supported on a mild steel angle iron post 75 mm x 75 mm x 6 mm firmly fixed to the ground by means of properly designed foundation with M15 grade cement concrete 450 mm x 450 mm x 600 mm, 600 mm below ground level as per drawings and Technical Specification Clause 801. (iii) 600mm circular iii) Br.No. 1/1 on Kharkra Nadi Near Junubasti Health Sub-Centre

4

-

-

... More
Type - A, "W" : Metal Beam Crash Barrier (Providing and erecting a "W" metal beam crash barrier comprising of 3 mm thick corrugated sheet metal beam rail, 70 cm above road/ground level, fixed on ISMC series channel vertical post, 150 x 75 x 5 mm spaced 2m center to center, 1.8 m high, 1.1m below ground/road level, all steel parts and fitments to be galvanized by hot dip process, all fitting to conform to IS:1367 and IS:1364, metal beam rail to be fixedon the vertical post with a spacer of channel section 150mmX75mmX5mm, 330mm long complete as per clause 810.) i) Br. No. 2/1 on Tikirai to Tikirai Chapori Road

80

-

-

... More
Type - A, "W" : Metal Beam Crash Barrier (Providing and erecting a "W" metal beam crash barrier comprising of 3 mm thick corrugated sheet metal beam rail, 70 cm above road/ground level, fixed on ISMC series channel vertical post, 150 x 75 x 5 mm spaced 2m center to center, 1.8 m high, 1.1m below ground/road level, all steel parts and fitments to be galvanized by hot dip process, all fitting to conform to IS:1367 and IS:1364, metal beam rail to be fixedon the vertical post with a spacer of channel section 150mmX75mmX5mm, 330mm long complete as per clause 810.) ii) Br. No. 2/1 on Johing Tarben Line Road

80

-

-

... More
Type - A, "W" : Metal Beam Crash Barrier (Providing and erecting a "W" metal beam crash barrier comprising of 3 mm thick corrugated sheet metal beam rail, 70 cm above road/ground level, fixed on ISMC series channel vertical post, 150 x 75 x 5 mm spaced 2m center to center, 1.8 m high, 1.1m below ground/road level, all steel parts and fitments to be galvanized by hot dip process, all fitting to conform to IS:1367 and IS:1364, metal beam rail to be fixedon the vertical post with a spacer of channel section 150mmX75mmX5mm, 330mm long complete as per clause 810.) iii) Br.No. 1/1 on Kharkra Nadi Near Junubasti Health Sub-Centre

80

-

-

... More
Construction of cold weather Bamboo bridge overall width of 3.70m and clear road way 3m with jungle wood post 20cm to 25cm dia 5nos. In each rows and rows being 2.1m. apart except for the navigable span which should be 3m. Post to be driven at least 180cm. or more below ground level including providing 20cm to 25cm center to center and placed over 20 cm dia, jungle wood dham, 15cm dia. jungle wood bracing collar fixed by bolts and nuts, straps etc. mature bholuka Bamboo cross groth all closely packed and tied 75cm wide track way made from 38mm thick 1st class local plank fixed on 75mmx100mm first class local wood battens 120cm apart and 3 lines of jati bamboo horizantal railing fixed in bholuka bamboo post placed at 210cm apart and white washed including all necessary nuts and bolts, coir ropes, struts, nails etc. complete with a layer of brushwood to exposed portion out-side trackway with earth topping complete as per direction of the department i) Br. No. 2/1 on Tikirai to Tikirai Chapori Road

30

-

-

... More
Construction of cold weather Bamboo bridge overall width of 3.70m and clear road way 3m with jungle wood post 20cm to 25cm dia 5nos. In each rows and rows being 2.1m. apart except for the navigable span which should be 3m. Post to be driven at least 180cm. or more below ground level including providing 20cm to 25cm center to center and placed over 20 cm dia, jungle wood dham, 15cm dia. jungle wood bracing collar fixed by bolts and nuts, straps etc. mature bholuka Bamboo cross groth all closely packed and tied 75cm wide track way made from 38mm thick 1st class local plank fixed on 75mmx100mm first class local wood battens 120cm apart and 3 lines of jati bamboo horizantal railing fixed in bholuka bamboo post placed at 210cm apart and white washed including all necessary nuts and bolts, coir ropes, struts, nails etc. complete with a layer of brushwood to exposed portion out-side trackway with earth topping complete as per direction of the department ii) Br. No. 2/1 on Johing Tarben Line Road

30

-

-

... More
Construction of embankment with approved material obtained from borrow pits with a lift upto 1.5 m, transporting to site, spreading, grading to required slope and compacting to meet requirement of Tables 300.1 and 300.2 with a lead upto 1000 m as per Technical Specification. i) Br. No. 2/1 on Tikirai to Tikirai Chapori Road

100

-

-

... More
Construction of embankment with approved material obtained from borrow pits with a lift upto 1.5 m, transporting to site, spreading, grading to required slope and compacting to meet requirement of Tables 300.1 and 300.2 with a lead upto 1000 m as per Technical Specification. ii) Br. No. 2/1 on Johing Tarben Line Road

100

-

-

... More
Planting of Trees and their Maintenance for one Year (Planting of trees by the road side (Avenue trees) in 0.60 m dia holes, 1 m deep dug in the ground, mixing the soil with decayed farm yard/sludge mannure, planting the saplings, backfilling the trenches, watering , fixing the tree guatrd and maintaining the plants for three year. i) Br. No. 2/1 on Tikirai to Tikirai Chapori Road

25

-

-

... More
Planting of Trees and their Maintenance for one Year (Planting of trees by the road side (Avenue trees) in 0.60 m dia holes, 1 m deep dug in the ground, mixing the soil with decayed farm yard/sludge mannure, planting the saplings, backfilling the trenches, watering , fixing the tree guatrd and maintaining the plants for three year. ii) Br. No. 2/1 on Johing Tarben Line Road

25

-

-

... More
Planting of Trees and their Maintenance for one Year (Planting of trees by the road side (Avenue trees) in 0.60 m dia holes, 1 m deep dug in the ground, mixing the soil with decayed farm yard/sludge mannure, planting the saplings, backfilling the trenches, watering , fixing the tree guatrd and maintaining the plants for three year. iii) Br.No. 1/1 on Kharkra Nadi Near Junubasti Health Sub-Centre

25

-

-

... More
Implementation of Enviromental and Social Management Plan Air quality monitoring at 3 locations for 2 seasons for 2 consecutive years (Construction Stage) i) Br. No. 2/1 on Tikirai to Tikirai Chapori Road

12

-

-

... More
Implementation of Enviromental and Social Management Plan Air quality monitoring at 3 locations for 2 seasons for 2 consecutive years (Construction Stage) ii) Br. No. 16/2 on Lahdoigarh Road

12

-

-

... More
Implementation of Enviromental and Social Management Plan Air quality monitoring at 3 locations for 2 seasons for 2 consecutive years (Construction Stage) iii) Br.No. 1/1 on Kharkra Nadi Near Junubasti Health Sub-Centre

12

-

-

... More
Implementation of Enviromental and Social Management Plan Air quality monitoring at 3 locations for 2 seasons for 1 Year (Operation Stage) i) Br. No. 2/1 on Tikirai to Tikirai Chapori Road

6

-

-

... More
Implementation of Enviromental and Social Management Plan Air quality monitoring at 3 locations for 2 seasons for 1 Year (Operation Stage) ii) Br. No. 2/1 on Johing Tarben Line Road

6

-

-

... More
Implementation of Enviromental and Social Management Plan Air quality monitoring at 3 locations for 2 seasons for 1 Year (Operation Stage) iii) Br.No. 1/1 on Kharkra Nadi Near Junubasti Health Sub-Centre

6

-

-

... More
Implementation of Enviromental and Social Management Plan Water quality monitoring at 3 locations for 2 seasons for 2 consecutive years (Construction Stage) i) Br. No. 2/1 on Tikirai to Tikirai Chapori Road

12

-

-

... More
Implementation of Enviromental and Social Management Plan Water quality monitoring at 3 locations for 2 seasons for 2 consecutive years (Construction Stage) ii) Br. No. 2/1 on Johing Tarben Line Road

12

-

-

... More
Implementation of Enviromental and Social Management Plan Water quality monitoring at 3 locations for 2 seasons for 2 consecutive years (Construction Stage) iii) Br.No. 1/1 on Kharkra Nadi Near Junubasti Health Sub-Centre

12

-

-

... More
Implementation of Enviromental and Social Management Plan Water quality monitoring at 3 locations for 2 seasons for 1 Year (Operation Stage) i) Br. No. 2/1 on Tikirai to Tikirai Chapori Road

6

-

-

... More
Implementation of Enviromental and Social Management Plan Water quality monitoring at 3 locations for 2 seasons for 1 Year (Operation Stage) ii) Br. No. 2/1 on Johing Tarben Line Road

6

-

-

... More
Implementation of Enviromental and Social Management Plan Water quality monitoring at 3 locations for 2 seasons for 1 Year (Operation Stage) iii) Br.No. 1/1 on Kharkra Nadi Near Junubasti Health Sub-Centre

6

-

-

... More
Implementation of Enviromental and Social Management Plan Noise quality monitoring at 3 locations for 2 seasons for 2 consecutive years (Construction Stage) i) Br. No. 2/1 on Tikirai to Tikirai Chapori Road

12

-

-

... More
Implementation of Enviromental and Social Management Plan Noise quality monitoring at 3 locations for 2 seasons for 2 consecutive years (Construction Stage) ii) Br. No. 2/1 on Johing Tarben Line Road

12

-

-

... More
Implementation of Enviromental and Social Management Plan Noise quality monitoring at 3 locations for 2 seasons for 2 consecutive years (Construction Stage) iii) Br.No. 1/1 on Kharkra Nadi Near Junubasti Health Sub-Centre

12

-

-

... More
Implementation of Enviromental and Social Management Plan Noise quality monitoring at 3 locations for 2 seasons for 1 Year (Operation Stage) i) Br. No. 2/1 on Tikirai to Tikirai Chapori Road

6

-

-

... More
Implementation of Enviromental and Social Management Plan Noise quality monitoring at 3 locations for 2 seasons for 1 Year (Operation Stage) ii) Br. No. 2/1 on Johing Tarben Line Road

6

-

-

... More
Implementation of Enviromental and Social Management Plan Noise quality monitoring at 3 locations for 2 seasons for 1 Year (Operation Stage) iii) Br.No. 1/1 on Kharkra Nadi Near Junubasti Health Sub-Centre

6

-

-

... More
Implementation of Enviromental and Social Management Plan Soil quality monitoring at 3 locations for 2 seasons for 2 consecutive years (Construction Stage) i) Br. No. 2/1 on Tikirai to Tikirai Chapori Road

12

-

-

... More
Implementation of Enviromental and Social Management Plan Soil quality monitoring at 3 locations for 2 seasons for 2 consecutive years (Construction Stage) ii) Br. No. 2/1 on Johing Tarben Line Road

12

-

-

... More
Implementation of Enviromental and Social Management Plan Soil quality monitoring at 3 locations for 2 seasons for 2 consecutive years (Construction Stage) iii) Br.No. 1/1 on Kharkra Nadi Near Junubasti Health Sub-Centre

12

-

-

... More
Implementation of Enviromental and Social Management Plan Soli quality monitoring at 3 locations for 2 seasons for 1 Year (Operation Stage) i) Br. No. 2/1 on Tikirai to Tikirai Chapori Road

6

-

-

... More
Implementation of Enviromental and Social Management Plan Soli quality monitoring at 3 locations for 2 seasons for 1 Year (Operation Stage) ii) Br. No. 2/1 on Johing Tarben Line Road

6

-

-

... More
Implementation of Enviromental and Social Management Plan Soli quality monitoring at 3 locations for 2 seasons for 1 Year (Operation Stage) iii) Br.No. 1/1 on Kharkra Nadi Near Junubasti Health Sub-Centre

6

-

-

... More
A Provisional sum (fixed amount) for items of Utility Shifting of Rs. 80,000.00 (not to be changed by the Bidder in BOQ) i) Br. No. 2/1 on Tikirai to Tikirai Chapori Road

1

-

-

... More
A Provisional sum (fixed amount) for items of tree felling/plantation of Rs. 3,44,719.00 (not to be changed by the Bidder in BOQ) ii) Br. No. 2/1 on Johing Tarben Line Road

1

-

-

... More
A Provisional sum (fixed amount) for items of Utility Shifting & tree felling/plantation of Rs. 2,74,813.00 (not to be changed by the Bidder in BOQ) iii) Br.No. 1/1 on Kharkra Nadi Near Junubasti Health Sub-Centre

1

-

-



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.